SlideShare a Scribd company logo
1 of 18
Download to read offline
Curriculum Vitae
Mahmoud Ali Ali Youssef:Name
NACE II Coating, Painting and Insulation Specialist:Job Title
Email:Engineer_ma7moud@yahoo.com
Summary
More than 9 years’ experience continuous employment in the
oil & gas fields at:-
-From March 2016 up to now working with OGC Oman AL
DAQM 36"Pipe line
- From July 2015 till March 2016working with Petro-jet as
external, internal pipeline coating engineer at pipe line coating
factory.
- From January 2014 till May 2015 working with Egyptian
polyethylene as coating painting, insulation engineer.
- From January 2013 till December 2013 working with Gulf of
Suez petroleum- Gupco as coating and painting engineer in Ras
Shokir off shore work.
-From June 2009 till December 2012 working with Orascom
construction industry as painting, coating and insulation
engineer in Sorfert fertilizer plant Algeria.
-From October 2007 till May 2008 working with Jotun paint
company as coating advisor.
Education/Qualifications/Affiliations
-B.Sc. – chemistry department – ALEXANDRIA University 2007
- NACE level II CIP.
- NACE level I CIP. ID #64942
- NACE PCS I.
- SSPC PCI Level II NO 35165
- OSHA Safety training program.
Algeria. Duration: Aug, 2010 (6 days).
- JOTUN training course (40hr) for surface preparation and
paint application.
Professional Experience
Date March 2016 up to now
Employer Oman Gas Company
Project AL DAQM 36"pipe line internal and external
Role Coating engineer
Description - Review all external and internal coating
documented.
- Supervision and follow out all stage during PE
coating and internal Liquid epoxy coating.
2- Carry out all inspection tests during stage of PE
coating.
3- Checked of all material and keep it in good storage
according to technical data sheet.
4- Measuring of all ambient condition according to
specs.
5- Overall monitoring of all blasting activities
6- Ensuring that all daily testing after blasting and
before FBE application carried out and
reviewing reports.
7- Monitoring of pipe surface temp before FBE
applied
8- Checked of all PE and adhesive temp
9- Make visual inspection of pipe after cooling stage
10- Measure of total coating thickness of 3PL system
11-Monitoring of holiday test and peel test and
impact test
12-Monitoring of all plant lab tests like (indentation
resistance & ultimate elongation of PE &
degree of cure FBE by DSC and MEK test &
CATHODIC disbanding test).
13-carry out of all internal coating inspection like
degree of cleaning after blasting ,chloride test
,surface profile test , dust test , measure WFT ,
measure DFT , porosity test , curing test , bend
test , hardness test , adhesion test .
Date From January 2014 till May 2015
Employer Egyptian Ethylene and derivatives
Project Egyptian polyethylene
Role Painting Coating ,insulation engineer
Description 1- Carry out inspection and testing verification
activities for painting, insulation and fireproofing.
2-Verifying that all surface preparation, painting (by
visual inspection, witness testing, and
surveillance and intervention points) is in accordance
with agreed ITP.
3-Maintaining a daily report/log of all inspection,
surveillance and intervention activities
undertaken. Ensuring that all documentation, plans,
reports, records and certification requirements
related to discipline inspection requirements are
collected, reviewed/approved,
updated, distributed and filed in an appropriate
mannerDate From January 2013 till December 2013
Employer Gulf of Suez petroleum
Project Ras Shokir off shore project
Role Painting and Coating engineer
Description 1- Carry out all offshore painting and coating
inspection.
2- Provide assurance of the quality of the paint
application.
3- Execute Painting / coating inspection work as
per company / project inspection Test plan.
4- Surface acceptance and substrate testing for
painting.
5- Review all areas in scope of work with paint
contractor prior to prep and paint application.
6- Typed reports on defects to consultant
and/or owner.
Date From June 2009 till December 2012
Employer Orascom construction industry
Project Sorfert fertilizer plant Algeria
Role Painting and Coating engineer
Description  Carry out all inspection tests before and during
stage of coating.
 Checked of all material and keep it in good
storage according to technical data sheet.
 Measuring of all ambient condition according
to specs.
 Overall monitoring of all blasting activities.
 Ensuring that all daily testing after blasting and
before application carried out and reviewing
reports.
 Monitoring of pipe, tanks, steel structure and
vessels surface temp before painting
applications.
 Measure of total coating thickness of systems.
 Responsible for stage wise painting / coating
inspection of internal and external coating for
gas line.
 Undertake QC painting / coating activities in
the work place for daily basis.
 Monitor weather condition for surface
preparation and painting / coating application.
Date From October 2007 till May 2008
Employer Jotun paint company
Project Various project
Role coating advisor
Description  Reading specifications, checking compatibility
of data sheet for products with spec’s
requirements, PQT for all paint materials in
accordance to the project spec.,
documentations, Inspection of Abrasive
blasting and Painting activities including
inspection of all required tests (such as:
surface cleanliness, profile, ambient
conditions, abrasive contamination, holiday
detection, visual inspection, Pull of test,
curing).
 Monitor all steps of thinning, mixing of paint.
 Observe induction time for the paint material
after mixing and before application
 Visual inspection and make all test for each
coat
 Observe and record daily report for the client
for final inspection
Date From July up to march2016
Employer Petro-jet Subsea
Project Subsea project
Role Painting & coating inspector
Description  Review all external and internal coating
documented.
 Supervision and follow out all stage during PE
coating and internal Liquid epoxy coating.
 Carry out all inspection tests during stage of
PE coating.
 Checked of all material and keep it in good
storage according to technical data sheet.
 Measuring of all ambient condition according
to specs.
 Overall monitoring of all blasting activities
 Ensuring that all daily testing after blasting
and before FBE application carried out and
 Reviewing reports.
 Monitoring of pipe surface temp before FBE
applied
 Checked of all PE and adhesive temp
 Make visual inspection of pipe after cooling
stage
 Measure of total coating thickness of 3PL
system
 Monitoring of holiday test and peel test and
impact test
 Monitoring of all plant lab tests like
(indentation resistance & ultimate elongation
of PE& degree of cure FBE by DSC and MEK
test & CATHODIC disbanding test.)
 carry out of all internal coating inspection like
degree of cleaning after blasting ,chloride test
 ,surface profile test , dust test , measure WFT
, measure DFT , porosity test , curing test ,
bend test , hardness test , adhesion test .
Revision History
Rev. Issue Date Description of changes
0.0 1 April 2016
Curriculum vitae 1
Curriculum vitae 1
Curriculum vitae 1
Curriculum vitae 1
Curriculum vitae 1
Curriculum vitae 1
Curriculum vitae 1
Curriculum vitae 1
Curriculum vitae 1
Curriculum vitae 1

More Related Content

What's hot

Rohit Patil CV 3A
Rohit Patil CV 3ARohit Patil CV 3A
Rohit Patil CV 3A
Rohit Patil
 
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
sarmad Azeem
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
RAMPRASADBALLAV1
 
resume of felixvillezon.doc.
resume of felixvillezon.doc.resume of felixvillezon.doc.
resume of felixvillezon.doc.
FELIX VILLEZON
 
Rajesh kannan -BGAS level 2 CV
Rajesh kannan -BGAS level 2 CVRajesh kannan -BGAS level 2 CV
Rajesh kannan -BGAS level 2 CV
Rajesh kannan
 
CV Roberto Lopez - photo
CV Roberto Lopez - photoCV Roberto Lopez - photo
CV Roberto Lopez - photo
Roberto Lopez
 
AKSHAY BOGS CV
AKSHAY BOGS CVAKSHAY BOGS CV
AKSHAY BOGS CV
AKSHAY M
 
Abdullah khan_original
Abdullah khan_originalAbdullah khan_original
Abdullah khan_original
Abudullah khan
 

What's hot (16)

CV santosh Kumar 1st Mar 2016 doc
CV santosh Kumar 1st Mar 2016 docCV santosh Kumar 1st Mar 2016 doc
CV santosh Kumar 1st Mar 2016 doc
 
Rohit Patil CV 3A
Rohit Patil CV 3ARohit Patil CV 3A
Rohit Patil CV 3A
 
Antony_Joy_CV.DOC
Antony_Joy_CV.DOCAntony_Joy_CV.DOC
Antony_Joy_CV.DOC
 
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
resume of felixvillezon.doc.
resume of felixvillezon.doc.resume of felixvillezon.doc.
resume of felixvillezon.doc.
 
Rajesh kannan -BGAS level 2 CV
Rajesh kannan -BGAS level 2 CVRajesh kannan -BGAS level 2 CV
Rajesh kannan -BGAS level 2 CV
 
CV-CE-0516
CV-CE-0516CV-CE-0516
CV-CE-0516
 
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorSaleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
 
5 test material beton di bali
5 test material beton di bali5 test material beton di bali
5 test material beton di bali
 
CV Roberto Lopez - photo
CV Roberto Lopez - photoCV Roberto Lopez - photo
CV Roberto Lopez - photo
 
C.V.
C.V.C.V.
C.V.
 
CURRICULUM VITE
CURRICULUM VITECURRICULUM VITE
CURRICULUM VITE
 
senthilkumar CV
senthilkumar CVsenthilkumar CV
senthilkumar CV
 
AKSHAY BOGS CV
AKSHAY BOGS CVAKSHAY BOGS CV
AKSHAY BOGS CV
 
Abdullah khan_original
Abdullah khan_originalAbdullah khan_original
Abdullah khan_original
 

Similar to Curriculum vitae 1

Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2
Sundar Rajan
 
Mostafa Akl Coating Inspector-1-3-1-1 (1)
Mostafa Akl Coating Inspector-1-3-1-1 (1)Mostafa Akl Coating Inspector-1-3-1-1 (1)
Mostafa Akl Coating Inspector-1-3-1-1 (1)
Mostafa Akl
 
INDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QCINDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QC
Inder Singh
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014
Stuart Cooper
 
Multidispline Inspector - DEEPAK Rai
Multidispline Inspector - DEEPAK RaiMultidispline Inspector - DEEPAK Rai
Multidispline Inspector - DEEPAK Rai
Deepak Rai
 
‫attiah hijazy C.V
‫attiah hijazy C.V‫attiah hijazy C.V
‫attiah hijazy C.V
attiah hijazy
 
Multidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAIMultidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAI
Deepak Rai
 

Similar to Curriculum vitae 1 (20)

Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2
 
Resume
ResumeResume
Resume
 
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISOR
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISORCOATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISOR
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISOR
 
Govindaswamy-cv
Govindaswamy-cvGovindaswamy-cv
Govindaswamy-cv
 
Painting system
Painting systemPainting system
Painting system
 
Mostafa Akl Coating Inspector-1-3-1-1 (1)
Mostafa Akl Coating Inspector-1-3-1-1 (1)Mostafa Akl Coating Inspector-1-3-1-1 (1)
Mostafa Akl Coating Inspector-1-3-1-1 (1)
 
INDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QCINDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QC
 
Cv mohd syahril awth
Cv mohd syahril awthCv mohd syahril awth
Cv mohd syahril awth
 
SABRI CV
SABRI CVSABRI CV
SABRI CV
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014
 
Multidispline Inspector - DEEPAK Rai
Multidispline Inspector - DEEPAK RaiMultidispline Inspector - DEEPAK Rai
Multidispline Inspector - DEEPAK Rai
 
‫attiah hijazy C.V
‫attiah hijazy C.V‫attiah hijazy C.V
‫attiah hijazy C.V
 
Multidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAIMultidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAI
 
AMRO C.V
AMRO C.VAMRO C.V
AMRO C.V
 
jovy's RESUME
jovy's RESUMEjovy's RESUME
jovy's RESUME
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
David_Wanless_CV
David_Wanless_CVDavid_Wanless_CV
David_Wanless_CV
 

Recently uploaded

Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
MaherOthman7
 

Recently uploaded (20)

Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 

Curriculum vitae 1

  • 1. Curriculum Vitae Mahmoud Ali Ali Youssef:Name NACE II Coating, Painting and Insulation Specialist:Job Title Email:Engineer_ma7moud@yahoo.com Summary More than 9 years’ experience continuous employment in the oil & gas fields at:- -From March 2016 up to now working with OGC Oman AL DAQM 36"Pipe line - From July 2015 till March 2016working with Petro-jet as external, internal pipeline coating engineer at pipe line coating factory. - From January 2014 till May 2015 working with Egyptian polyethylene as coating painting, insulation engineer. - From January 2013 till December 2013 working with Gulf of Suez petroleum- Gupco as coating and painting engineer in Ras Shokir off shore work. -From June 2009 till December 2012 working with Orascom construction industry as painting, coating and insulation engineer in Sorfert fertilizer plant Algeria. -From October 2007 till May 2008 working with Jotun paint company as coating advisor.
  • 2. Education/Qualifications/Affiliations -B.Sc. – chemistry department – ALEXANDRIA University 2007 - NACE level II CIP. - NACE level I CIP. ID #64942 - NACE PCS I. - SSPC PCI Level II NO 35165 - OSHA Safety training program. Algeria. Duration: Aug, 2010 (6 days). - JOTUN training course (40hr) for surface preparation and paint application. Professional Experience Date March 2016 up to now Employer Oman Gas Company Project AL DAQM 36"pipe line internal and external Role Coating engineer Description - Review all external and internal coating documented. - Supervision and follow out all stage during PE coating and internal Liquid epoxy coating. 2- Carry out all inspection tests during stage of PE coating. 3- Checked of all material and keep it in good storage according to technical data sheet. 4- Measuring of all ambient condition according to specs. 5- Overall monitoring of all blasting activities
  • 3. 6- Ensuring that all daily testing after blasting and before FBE application carried out and reviewing reports. 7- Monitoring of pipe surface temp before FBE applied 8- Checked of all PE and adhesive temp 9- Make visual inspection of pipe after cooling stage 10- Measure of total coating thickness of 3PL system 11-Monitoring of holiday test and peel test and impact test 12-Monitoring of all plant lab tests like (indentation resistance & ultimate elongation of PE & degree of cure FBE by DSC and MEK test & CATHODIC disbanding test). 13-carry out of all internal coating inspection like degree of cleaning after blasting ,chloride test ,surface profile test , dust test , measure WFT , measure DFT , porosity test , curing test , bend test , hardness test , adhesion test . Date From January 2014 till May 2015 Employer Egyptian Ethylene and derivatives Project Egyptian polyethylene Role Painting Coating ,insulation engineer Description 1- Carry out inspection and testing verification activities for painting, insulation and fireproofing. 2-Verifying that all surface preparation, painting (by visual inspection, witness testing, and surveillance and intervention points) is in accordance with agreed ITP.
  • 4. 3-Maintaining a daily report/log of all inspection, surveillance and intervention activities undertaken. Ensuring that all documentation, plans, reports, records and certification requirements related to discipline inspection requirements are collected, reviewed/approved, updated, distributed and filed in an appropriate mannerDate From January 2013 till December 2013 Employer Gulf of Suez petroleum Project Ras Shokir off shore project Role Painting and Coating engineer Description 1- Carry out all offshore painting and coating inspection. 2- Provide assurance of the quality of the paint application. 3- Execute Painting / coating inspection work as per company / project inspection Test plan. 4- Surface acceptance and substrate testing for painting. 5- Review all areas in scope of work with paint contractor prior to prep and paint application. 6- Typed reports on defects to consultant and/or owner.
  • 5. Date From June 2009 till December 2012 Employer Orascom construction industry Project Sorfert fertilizer plant Algeria Role Painting and Coating engineer Description  Carry out all inspection tests before and during stage of coating.  Checked of all material and keep it in good storage according to technical data sheet.  Measuring of all ambient condition according to specs.  Overall monitoring of all blasting activities.  Ensuring that all daily testing after blasting and before application carried out and reviewing reports.  Monitoring of pipe, tanks, steel structure and vessels surface temp before painting applications.  Measure of total coating thickness of systems.  Responsible for stage wise painting / coating inspection of internal and external coating for gas line.  Undertake QC painting / coating activities in the work place for daily basis.  Monitor weather condition for surface preparation and painting / coating application.
  • 6. Date From October 2007 till May 2008 Employer Jotun paint company Project Various project Role coating advisor Description  Reading specifications, checking compatibility of data sheet for products with spec’s requirements, PQT for all paint materials in accordance to the project spec., documentations, Inspection of Abrasive blasting and Painting activities including inspection of all required tests (such as: surface cleanliness, profile, ambient conditions, abrasive contamination, holiday detection, visual inspection, Pull of test, curing).  Monitor all steps of thinning, mixing of paint.  Observe induction time for the paint material after mixing and before application  Visual inspection and make all test for each coat  Observe and record daily report for the client for final inspection
  • 7. Date From July up to march2016 Employer Petro-jet Subsea Project Subsea project Role Painting & coating inspector Description  Review all external and internal coating documented.  Supervision and follow out all stage during PE coating and internal Liquid epoxy coating.  Carry out all inspection tests during stage of PE coating.  Checked of all material and keep it in good storage according to technical data sheet.  Measuring of all ambient condition according to specs.  Overall monitoring of all blasting activities  Ensuring that all daily testing after blasting and before FBE application carried out and  Reviewing reports.  Monitoring of pipe surface temp before FBE applied  Checked of all PE and adhesive temp  Make visual inspection of pipe after cooling stage  Measure of total coating thickness of 3PL system  Monitoring of holiday test and peel test and impact test  Monitoring of all plant lab tests like (indentation resistance & ultimate elongation of PE& degree of cure FBE by DSC and MEK test & CATHODIC disbanding test.)  carry out of all internal coating inspection like
  • 8. degree of cleaning after blasting ,chloride test  ,surface profile test , dust test , measure WFT , measure DFT , porosity test , curing test , bend test , hardness test , adhesion test . Revision History Rev. Issue Date Description of changes 0.0 1 April 2016