Mahmoud Ali Ali Youssef has over 9 years of experience as a coating, painting and insulation specialist in the oil and gas industry. He has worked on pipeline coating projects in Oman and Egypt, as well as offshore projects in Egypt. He also has experience working with a paint company as an advisor and inspector. His responsibilities have included reviewing coating documents, supervising coating application, inspecting and testing coatings, and ensuring coatings meet specifications. He holds certifications from NACE and SSPC and safety training from OSHA.
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorsalimmalic
I developed a clear understanding of the different aspects of the works of Painting / Coating, Insulation and Fire proofing as well as an awareness of likely future developments in this field. This gave me practical experience of producing creative ideas within a strict deadline and demonstrated my ability to prioritize tasks. Now I am working in CAPE EAST WLL QATAR as a PAINTING/INSULATION INSPECTOR
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISORArtem Velychko
I am certified Coating/Insulation Supervisor with over 15 years' experience working on a range of Projects as Owner/Client representative. With the ability to work in different disciplines and cultures, either independently, or as part of a team, I am conscientious and have extensive knowledge of Health Safety & Environmental practices.
Results-orientated with a flexible attitude, I am able to use my skills in a variety of situations and to take into consideration the different protocols, working methods of teams that I have encountered and adapt to their contrasting routines. Possessing excellent organisation and delegation techniques, I have very well- developed communication and interpersonal skills and can adapt to different site problems quickly. I have a particular talent for client/user liaison, identification of problems and developing workable solutions for them.
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorsalimmalic
I developed a clear understanding of the different aspects of the works of Painting / Coating, Insulation and Fire proofing as well as an awareness of likely future developments in this field. This gave me practical experience of producing creative ideas within a strict deadline and demonstrated my ability to prioritize tasks. Now I am working in CAPE EAST WLL QATAR as a PAINTING/INSULATION INSPECTOR
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISORArtem Velychko
I am certified Coating/Insulation Supervisor with over 15 years' experience working on a range of Projects as Owner/Client representative. With the ability to work in different disciplines and cultures, either independently, or as part of a team, I am conscientious and have extensive knowledge of Health Safety & Environmental practices.
Results-orientated with a flexible attitude, I am able to use my skills in a variety of situations and to take into consideration the different protocols, working methods of teams that I have encountered and adapt to their contrasting routines. Possessing excellent organisation and delegation techniques, I have very well- developed communication and interpersonal skills and can adapt to different site problems quickly. I have a particular talent for client/user liaison, identification of problems and developing workable solutions for them.
A highly motivated and imaginative of Independent inspector with over than 7 Years experiences in fabrication/ vendor inspection of Oil & Gas equipment at Various of Country for Vessel ( Filter, Separator, Coalescor etc), coulomb, heat exchanger, tank, air cooler, metering skid & piping package, structure and valve
Seeking for On-Call/long term contract job of inspection in Mechanical, welding or quality control inspection as current position is Freelance Inspector and had good knowledge, Experiences in Vendor and Welding Inspection.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
1. Curriculum Vitae
Mahmoud Ali Ali Youssef:Name
NACE II Coating, Painting and Insulation Specialist:Job Title
Email:Engineer_ma7moud@yahoo.com
Summary
More than 9 years’ experience continuous employment in the
oil & gas fields at:-
-From March 2016 up to now working with OGC Oman AL
DAQM 36"Pipe line
- From July 2015 till March 2016working with Petro-jet as
external, internal pipeline coating engineer at pipe line coating
factory.
- From January 2014 till May 2015 working with Egyptian
polyethylene as coating painting, insulation engineer.
- From January 2013 till December 2013 working with Gulf of
Suez petroleum- Gupco as coating and painting engineer in Ras
Shokir off shore work.
-From June 2009 till December 2012 working with Orascom
construction industry as painting, coating and insulation
engineer in Sorfert fertilizer plant Algeria.
-From October 2007 till May 2008 working with Jotun paint
company as coating advisor.
2. Education/Qualifications/Affiliations
-B.Sc. – chemistry department – ALEXANDRIA University 2007
- NACE level II CIP.
- NACE level I CIP. ID #64942
- NACE PCS I.
- SSPC PCI Level II NO 35165
- OSHA Safety training program.
Algeria. Duration: Aug, 2010 (6 days).
- JOTUN training course (40hr) for surface preparation and
paint application.
Professional Experience
Date March 2016 up to now
Employer Oman Gas Company
Project AL DAQM 36"pipe line internal and external
Role Coating engineer
Description - Review all external and internal coating
documented.
- Supervision and follow out all stage during PE
coating and internal Liquid epoxy coating.
2- Carry out all inspection tests during stage of PE
coating.
3- Checked of all material and keep it in good storage
according to technical data sheet.
4- Measuring of all ambient condition according to
specs.
5- Overall monitoring of all blasting activities
3. 6- Ensuring that all daily testing after blasting and
before FBE application carried out and
reviewing reports.
7- Monitoring of pipe surface temp before FBE
applied
8- Checked of all PE and adhesive temp
9- Make visual inspection of pipe after cooling stage
10- Measure of total coating thickness of 3PL system
11-Monitoring of holiday test and peel test and
impact test
12-Monitoring of all plant lab tests like (indentation
resistance & ultimate elongation of PE &
degree of cure FBE by DSC and MEK test &
CATHODIC disbanding test).
13-carry out of all internal coating inspection like
degree of cleaning after blasting ,chloride test
,surface profile test , dust test , measure WFT ,
measure DFT , porosity test , curing test , bend
test , hardness test , adhesion test .
Date From January 2014 till May 2015
Employer Egyptian Ethylene and derivatives
Project Egyptian polyethylene
Role Painting Coating ,insulation engineer
Description 1- Carry out inspection and testing verification
activities for painting, insulation and fireproofing.
2-Verifying that all surface preparation, painting (by
visual inspection, witness testing, and
surveillance and intervention points) is in accordance
with agreed ITP.
4. 3-Maintaining a daily report/log of all inspection,
surveillance and intervention activities
undertaken. Ensuring that all documentation, plans,
reports, records and certification requirements
related to discipline inspection requirements are
collected, reviewed/approved,
updated, distributed and filed in an appropriate
mannerDate From January 2013 till December 2013
Employer Gulf of Suez petroleum
Project Ras Shokir off shore project
Role Painting and Coating engineer
Description 1- Carry out all offshore painting and coating
inspection.
2- Provide assurance of the quality of the paint
application.
3- Execute Painting / coating inspection work as
per company / project inspection Test plan.
4- Surface acceptance and substrate testing for
painting.
5- Review all areas in scope of work with paint
contractor prior to prep and paint application.
6- Typed reports on defects to consultant
and/or owner.
5. Date From June 2009 till December 2012
Employer Orascom construction industry
Project Sorfert fertilizer plant Algeria
Role Painting and Coating engineer
Description Carry out all inspection tests before and during
stage of coating.
Checked of all material and keep it in good
storage according to technical data sheet.
Measuring of all ambient condition according
to specs.
Overall monitoring of all blasting activities.
Ensuring that all daily testing after blasting and
before application carried out and reviewing
reports.
Monitoring of pipe, tanks, steel structure and
vessels surface temp before painting
applications.
Measure of total coating thickness of systems.
Responsible for stage wise painting / coating
inspection of internal and external coating for
gas line.
Undertake QC painting / coating activities in
the work place for daily basis.
Monitor weather condition for surface
preparation and painting / coating application.
6. Date From October 2007 till May 2008
Employer Jotun paint company
Project Various project
Role coating advisor
Description Reading specifications, checking compatibility
of data sheet for products with spec’s
requirements, PQT for all paint materials in
accordance to the project spec.,
documentations, Inspection of Abrasive
blasting and Painting activities including
inspection of all required tests (such as:
surface cleanliness, profile, ambient
conditions, abrasive contamination, holiday
detection, visual inspection, Pull of test,
curing).
Monitor all steps of thinning, mixing of paint.
Observe induction time for the paint material
after mixing and before application
Visual inspection and make all test for each
coat
Observe and record daily report for the client
for final inspection
7. Date From July up to march2016
Employer Petro-jet Subsea
Project Subsea project
Role Painting & coating inspector
Description Review all external and internal coating
documented.
Supervision and follow out all stage during PE
coating and internal Liquid epoxy coating.
Carry out all inspection tests during stage of
PE coating.
Checked of all material and keep it in good
storage according to technical data sheet.
Measuring of all ambient condition according
to specs.
Overall monitoring of all blasting activities
Ensuring that all daily testing after blasting
and before FBE application carried out and
Reviewing reports.
Monitoring of pipe surface temp before FBE
applied
Checked of all PE and adhesive temp
Make visual inspection of pipe after cooling
stage
Measure of total coating thickness of 3PL
system
Monitoring of holiday test and peel test and
impact test
Monitoring of all plant lab tests like
(indentation resistance & ultimate elongation
of PE& degree of cure FBE by DSC and MEK
test & CATHODIC disbanding test.)
carry out of all internal coating inspection like
8. degree of cleaning after blasting ,chloride test
,surface profile test , dust test , measure WFT
, measure DFT , porosity test , curing test ,
bend test , hardness test , adhesion test .
Revision History
Rev. Issue Date Description of changes
0.0 1 April 2016