ITEM BILLNO.2:SINGLE STOREY BUNGALOW
Class C
QTY UNIT RATE
(RM)
AMOUNT
(RM)
A
B
C
D
INTERNAL CEILING FINISHES
“UAC Superflex”asbestos-free cement
sheet to clg & fxg to 50mm x 50mm sawn
pressure treated Grd B tbr joist
1200mm x 610mm x 3.2mm Ceiling Lining
Wrot Pressure treated Group “C timber as
described in:-
40mm x 12mm beading to ceiling board
Painting
Prepare and apply one coat of “ICI” primer
and two coats “ICI” emulsion paints or
other equal & approved paints to soffit of
free-asbestos cement sheet ceiling
Soffit of asbestos-free cement sheet ceiling
Knot.prime,stop and apply one “ICI”
primer,two undercoat and one coats of
“ICI”gloss Nippon paint or approved
equivalent on woodwork:-
Surfaces of beading, not exceeding 150mm
girth
237
246
237
246
M2
M
M2
M
ITEM BILLNO.2:SINGLE STOREY BUNGALOW
Class C
QTY UNIT RATE
(RM)
AMOUNT
(RM)
A EXTERNAL CEILING FINISHES
1200mm x 610mm x 3.2mm Ceiling Lining
“UAC Superflex”asbestos-free cement
sheet to clg & fxg to 50mm x 50mm sawn
pressure treated Grd B tbr joist
Wrot Pressure treated Group “C timber as
described in:-
40mm x 12mm beading to ceiling board
56 M2
B
C
D
Painting
Prepare and apply one coat of “ICI” primer
and two coats “ICI” emulsion paints or
other equal & approved paints to soffit of
free-asbestos cement sheet ceiling
Soffit of asbestos-free cement sheet ceiling
Knot.prime,stop and apply one “ICI”
primer,two undercoat and one coats of
“ICI”gloss Nippon paint or approved
equivalent on woodwork:-
Surfaces of beading, not exceeding 150mm
girth
69
56
68
M
M2
M
ITEM BILLNO.2:SINGLE STOREY BUNGALOW
Class C
QTY UNIT RATE
(RM)
AMOUNT
(RM)
A
B
C
EXTERNAL FLOOR FINISHES
Cement and sand (1:6)paving; trowelled
hard and smooth:-
To floor;50mm thick
Cement and sand (1:3) beds and
backings; screeded finish; to receive
homogeneous tiles:-
To Floor; 40mm thick
To Drop; 19mm thick; 50mm high
300mm x 300mm x 8mm thk “Guocera” or
approved equivalent Homogeneous tiles
as described bedded , jtd & ptd in c&s (1:6)
78
93
35
M2
M2
M
D
E
mortar to floor level or laid to floor n.e
150mm from horiz screeded bed
To Floor.
To Drop; 50mm High
93
35
M2
M
ITEM BILLNO.2:SINGLE STOREY BUNGALOW
Class C
QTY UNIT RATE
(RM)
AMOUNT
(RM)
A
B
C
D
E
F
G
H
INTERNAL FLOOR FINISHES
Cement and sand (1:6)paving; trowelled
hard and smooth:-
To floor;50mm thick
To Drop ; 19mm thick ; 50mm high
Cement and sand (1:3) beds and
backings; screeded finish; to receive
ceramic tiles:-
To Floor; 38mm thick
To Drop; 19mm thick; 50mm high
To Drop; 19mm thick; 100mm high
To skirting ; 19mm thick ;100mm high
Cement and sand (1:3) beds and
backings; screeded finish; to receive
homogeneous tiles:-
To Floor; 38mm thick
To Drop; 19mm thick; 50mm high
To Drop; 19mm thick; 100mm high
To skirting ; 19mm thick ;100mm high
3
2
190
3
2
45
162
3
10
M2
M
M2
M
M
M
M2
M
M
I
J
K
L
M
N
O
P
Q
200mm x 200mm x 8mm thick “Guocera”
or approved equivalent ceramic tiles as
descd bedded , jtd & ptd in c & s (1:6) mort
To Floor.
To Drop; 50mm High
To Drop; 100mm High
To skirting ; 19mm thick ;100mm high
200mm x 200mm x 12mm thick “Anti-Slip”
or approved equivalent ceramic tiles as
descd bedded , jtd & ptd in c & s (1:6) mort
To Floor.
To Drop; 100mm High
300mm x 300mm x 8mm thick “Guocera”
or approved equivalent homogeneous as
descd bedded , jtd & ptd in c & s (1:6) mort
To Floor
To Drop; 50mm High
To Drop; 100mm High
To skirting ; 19mm thick ;100mm high
300mm x 300mm x 8mm thick “Guocera”
or approved equivalent homogeneous as
78
45
3
2
45
22
1
145
2
M
M2
M
M
M
M2
M
M2
M
R
S
T
U
descd bedded , jtd & ptd in c & s (1:6) mort
To Floor
To Drop; 50mm High
9
79
17
2
M
M
M2
M
ITEM BILLNO.2:SINGLE STOREY BUNGALOW
Class C
QTY UNIT RATE
(RM)
AMOUNT
(RM)
A
B
C
INTERNAL WALL FINISHES
Cement and sand (1:6) as described
internal plastering finished with a steel
trowel:-
19mm Thick to walls and
Cement and sand (1:3) beds and
backings ; screeded finish to receive
ceramic tiles:-
19mm Thick to walls
200mm x 250mm x 8mm thick “White
Horse” or approved equivalent ceramic
tiles of approved pattern and color and
pointed in neat white cement as described
19mm Thick to walls
Painting
Prepare & apply to plastered surfaces ;
502
133
133
M2
M
M2
D
one coat of ‘Nippon’ primer and two coats
of ‘Nippon’ Emulsion paint
Soffit of asbestos-free cement sheet ceiling
502 M2
ITEM BILLNO.2:SINGLE STOREY BUNGALOW
Class C
QTY UNIT RATE
(RM)
AMOUNT
(RM)
A
B
EXTERNAL WALL FINISHES
Cement and sand (1:6) as described
external plastering finishes with a steel
trowel
19mm Thick to walls and columns
Painting
Prepare and apply one coat of “ICI” primer
and two coats of “ICI” weathershield paint
or approved equivalent to:-
Plastered walls and columns
294
294
M2
M2
ITEM BILLNO.2:SINGLE STOREY BUNGALOW
Class C
QTY UNIT RATE
(RM)
AMOUNT
(RM)
A
EXTERNAL WALLS ELEMENT
Clay brickwork in cement mortar(1:6) in
stretcher bond w. & incl. Brick reinft.at
every 4th course
One brick wall (115mm thick) reinforced with
and including brick reinforcement as
described at every fourth course
Approved bituminous felt damp proof
197 M2
B
course to B.S. 743 well lapped 100mm at
jts bedded in c & S (1:6) mort.(measured
net-no allowance made for laps)
To one brick wall 115mm wide
76 M
ITEM BILLNO.2:SINGLE STOREY BUNGALOW
Class C
QTY UNIT RATE
(RM)
AMOUNT
(RM)
A
B
INTERNAL WALL ELEMENT
Clay brickwork in cement mortar (1:6) in
stretcher bond as described:-
Half brick wall (115mm thick) reinforced with
and including brick reinforcement as
described at every 4th course
Approved bituminous felt damp proof
course to B.S. 743 well lapped 100mm at
joints bedded in ct & s (1:6)
mortar.(Measurement nett-no allowance
made for laps)
To half brick wall 115mm wide
202
58
M2
M
Item
Item

More Related Content

What's hot

12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimateimaduddin91
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residentialgrahamelanders
 
coba_flooring Brochure
coba_flooring Brochurecoba_flooring Brochure
coba_flooring BrochureMatthew Davies
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaAaron Kaira
 
10.1.1.452.2904 (1)
10.1.1.452.2904 (1)10.1.1.452.2904 (1)
10.1.1.452.2904 (1)MapVitco
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochurekristenjames
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallPraveen Sudarsan
 
Ceramic / Porcelain Floor tile laying - Methodology
Ceramic / Porcelain Floor tile laying - MethodologyCeramic / Porcelain Floor tile laying - Methodology
Ceramic / Porcelain Floor tile laying - MethodologyTHIYAGARAJAN GANESAN
 
Flinders park apc_pisabrochure
Flinders park apc_pisabrochureFlinders park apc_pisabrochure
Flinders park apc_pisabrochurekristenjames
 

What's hot (19)

12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Bo q for shelter
Bo q  for shelterBo q  for shelter
Bo q for shelter
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
Brochure May 15
Brochure May 15Brochure May 15
Brochure May 15
 
Car park bq
Car park bqCar park bq
Car park bq
 
Pisa brochure
Pisa brochurePisa brochure
Pisa brochure
 
coba_flooring Brochure
coba_flooring Brochurecoba_flooring Brochure
coba_flooring Brochure
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron Kaira
 
10.1.1.452.2904 (1)
10.1.1.452.2904 (1)10.1.1.452.2904 (1)
10.1.1.452.2904 (1)
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochure
 
Versaloc
VersalocVersaloc
Versaloc
 
Build a carport
Build a carportBuild a carport
Build a carport
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
Ceramic / Porcelain Floor tile laying - Methodology
Ceramic / Porcelain Floor tile laying - MethodologyCeramic / Porcelain Floor tile laying - Methodology
Ceramic / Porcelain Floor tile laying - Methodology
 
Flinders park apc_pisabrochure
Flinders park apc_pisabrochureFlinders park apc_pisabrochure
Flinders park apc_pisabrochure
 

Viewers also liked (14)

Leasure offer
Leasure offerLeasure offer
Leasure offer
 
Ave maria vocação
Ave maria  vocaçãoAve maria  vocação
Ave maria vocação
 
Two page summary of 2016 formatting rules
Two page summary of 2016 formatting rulesTwo page summary of 2016 formatting rules
Two page summary of 2016 formatting rules
 
Tv serials
Tv serialsTv serials
Tv serials
 
mackenzie fedorinchik
mackenzie fedorinchikmackenzie fedorinchik
mackenzie fedorinchik
 
Obgyn Bed 2016
Obgyn Bed 2016Obgyn Bed 2016
Obgyn Bed 2016
 
TRABAJO INTRACLASE 2
TRABAJO INTRACLASE 2TRABAJO INTRACLASE 2
TRABAJO INTRACLASE 2
 
Revised 2016 New Rules Engineering Powerpoint for Electronic Submission and E...
Revised 2016 New Rules Engineering Powerpoint for Electronic Submission and E...Revised 2016 New Rules Engineering Powerpoint for Electronic Submission and E...
Revised 2016 New Rules Engineering Powerpoint for Electronic Submission and E...
 
StaffArabia
StaffArabiaStaffArabia
StaffArabia
 
Các từ theo sau chắc chắn là v ing
Các từ theo sau chắc chắn là v ingCác từ theo sau chắc chắn là v ing
Các từ theo sau chắc chắn là v ing
 
Energy efficientventilationsystembs
Energy efficientventilationsystembsEnergy efficientventilationsystembs
Energy efficientventilationsystembs
 
Building service-1-prsentation-slide
Building service-1-prsentation-slideBuilding service-1-prsentation-slide
Building service-1-prsentation-slide
 
Question 1 radio trailer
Question 1 radio trailerQuestion 1 radio trailer
Question 1 radio trailer
 
Identity and Access Management from Microsoft and Razor Technology
Identity and Access Management from Microsoft and Razor TechnologyIdentity and Access Management from Microsoft and Razor Technology
Identity and Access Management from Microsoft and Razor Technology
 

Similar to Item

Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updatedArthur Wilson
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof coveringEst
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Stephen Nzima
 
Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)Waqas Aslam
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochurekristenjames
 
Day ch e ngineering companies presentation
Day ch e ngineering companies presentationDay ch e ngineering companies presentation
Day ch e ngineering companies presentationMaxpromotion
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimationimaduddin91
 
Building Materials & Construction Module - 5
Building Materials & Construction Module - 5Building Materials & Construction Module - 5
Building Materials & Construction Module - 5Abhilash B L
 
Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Trevain Bechan
 
Catalog - pvc panel
Catalog - pvc panelCatalog - pvc panel
Catalog - pvc panelJustin Guo
 
7 building construction part 2 flooring,roofs,staircase and maintance - edit
7 building construction part 2   flooring,roofs,staircase and maintance - edit7 building construction part 2   flooring,roofs,staircase and maintance - edit
7 building construction part 2 flooring,roofs,staircase and maintance - editmuhammadumairallahdi
 
Adenta renovation finishes schedule
Adenta renovation finishes scheduleAdenta renovation finishes schedule
Adenta renovation finishes scheduleNana Barima
 

Similar to Item (20)

Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updated
 
Office building new
Office building newOffice building new
Office building new
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
 
3D
3D3D
3D
 
Boq sample
Boq sampleBoq sample
Boq sample
 
Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)
 
CETCON wall care
CETCON wall careCETCON wall care
CETCON wall care
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochure
 
Day ch e ngineering companies presentation
Day ch e ngineering companies presentationDay ch e ngineering companies presentation
Day ch e ngineering companies presentation
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimation
 
rahta.pdf
rahta.pdfrahta.pdf
rahta.pdf
 
Flooring
FlooringFlooring
Flooring
 
Building Materials & Construction Module - 5
Building Materials & Construction Module - 5Building Materials & Construction Module - 5
Building Materials & Construction Module - 5
 
21KUIKspec
21KUIKspec21KUIKspec
21KUIKspec
 
Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02
 
Gypsum Board
Gypsum BoardGypsum Board
Gypsum Board
 
Catalog - pvc panel
Catalog - pvc panelCatalog - pvc panel
Catalog - pvc panel
 
7 building construction part 2 flooring,roofs,staircase and maintance - edit
7 building construction part 2   flooring,roofs,staircase and maintance - edit7 building construction part 2   flooring,roofs,staircase and maintance - edit
7 building construction part 2 flooring,roofs,staircase and maintance - edit
 
Adenta renovation finishes schedule
Adenta renovation finishes scheduleAdenta renovation finishes schedule
Adenta renovation finishes schedule
 

More from lohwenjun

current project (1).pdf
current project (1).pdfcurrent project (1).pdf
current project (1).pdflohwenjun
 
project completed.pdf
project completed.pdfproject completed.pdf
project completed.pdflohwenjun
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignmentlohwenjun
 
Be presentation slides
Be presentation slidesBe presentation slides
Be presentation slideslohwenjun
 
Individual journal pdf
Individual journal pdfIndividual journal pdf
Individual journal pdflohwenjun
 
Fm assignment final report
Fm assignment final reportFm assignment final report
Fm assignment final reportlohwenjun
 
Compiled report
Compiled reportCompiled report
Compiled reportlohwenjun
 
Pp1 assignment group 8
Pp1 assignment group 8Pp1 assignment group 8
Pp1 assignment group 8lohwenjun
 
F inal presentation slides
F inal presentation slidesF inal presentation slides
F inal presentation slideslohwenjun
 
Estimating presentation slides
Estimating presentation slidesEstimating presentation slides
Estimating presentation slideslohwenjun
 
Management science-group report
Management science-group reportManagement science-group report
Management science-group reportlohwenjun
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group reportlohwenjun
 
Ctblockworksystem. report
Ctblockworksystem. reportCtblockworksystem. report
Ctblockworksystem. reportlohwenjun
 
Ct3 presentation slides
Ct3 presentation slides Ct3 presentation slides
Ct3 presentation slides lohwenjun
 
Bs powerpoint slides
Bs powerpoint slidesBs powerpoint slides
Bs powerpoint slideslohwenjun
 
Bs final report
Bs final reportBs final report
Bs final reportlohwenjun
 
Supply chain individual assignment final
Supply chain individual assignment finalSupply chain individual assignment final
Supply chain individual assignment finallohwenjun
 
Maths survey (print this) (final) 1
Maths survey (print this) (final)  1Maths survey (print this) (final)  1
Maths survey (print this) (final) 1lohwenjun
 
Mathematics assignment finalll
Mathematics assignment finalllMathematics assignment finalll
Mathematics assignment finallllohwenjun
 
Economics report 1
Economics report 1Economics report 1
Economics report 1lohwenjun
 

More from lohwenjun (20)

current project (1).pdf
current project (1).pdfcurrent project (1).pdf
current project (1).pdf
 
project completed.pdf
project completed.pdfproject completed.pdf
project completed.pdf
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignment
 
Be presentation slides
Be presentation slidesBe presentation slides
Be presentation slides
 
Individual journal pdf
Individual journal pdfIndividual journal pdf
Individual journal pdf
 
Fm assignment final report
Fm assignment final reportFm assignment final report
Fm assignment final report
 
Compiled report
Compiled reportCompiled report
Compiled report
 
Pp1 assignment group 8
Pp1 assignment group 8Pp1 assignment group 8
Pp1 assignment group 8
 
F inal presentation slides
F inal presentation slidesF inal presentation slides
F inal presentation slides
 
Estimating presentation slides
Estimating presentation slidesEstimating presentation slides
Estimating presentation slides
 
Management science-group report
Management science-group reportManagement science-group report
Management science-group report
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group report
 
Ctblockworksystem. report
Ctblockworksystem. reportCtblockworksystem. report
Ctblockworksystem. report
 
Ct3 presentation slides
Ct3 presentation slides Ct3 presentation slides
Ct3 presentation slides
 
Bs powerpoint slides
Bs powerpoint slidesBs powerpoint slides
Bs powerpoint slides
 
Bs final report
Bs final reportBs final report
Bs final report
 
Supply chain individual assignment final
Supply chain individual assignment finalSupply chain individual assignment final
Supply chain individual assignment final
 
Maths survey (print this) (final) 1
Maths survey (print this) (final)  1Maths survey (print this) (final)  1
Maths survey (print this) (final) 1
 
Mathematics assignment finalll
Mathematics assignment finalllMathematics assignment finalll
Mathematics assignment finalll
 
Economics report 1
Economics report 1Economics report 1
Economics report 1
 

Recently uploaded

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 

Recently uploaded (20)

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 

Item

  • 1. ITEM BILLNO.2:SINGLE STOREY BUNGALOW Class C QTY UNIT RATE (RM) AMOUNT (RM) A B C D INTERNAL CEILING FINISHES “UAC Superflex”asbestos-free cement sheet to clg & fxg to 50mm x 50mm sawn pressure treated Grd B tbr joist 1200mm x 610mm x 3.2mm Ceiling Lining Wrot Pressure treated Group “C timber as described in:- 40mm x 12mm beading to ceiling board Painting Prepare and apply one coat of “ICI” primer and two coats “ICI” emulsion paints or other equal & approved paints to soffit of free-asbestos cement sheet ceiling Soffit of asbestos-free cement sheet ceiling Knot.prime,stop and apply one “ICI” primer,two undercoat and one coats of “ICI”gloss Nippon paint or approved equivalent on woodwork:- Surfaces of beading, not exceeding 150mm girth 237 246 237 246 M2 M M2 M
  • 2. ITEM BILLNO.2:SINGLE STOREY BUNGALOW Class C QTY UNIT RATE (RM) AMOUNT (RM) A EXTERNAL CEILING FINISHES 1200mm x 610mm x 3.2mm Ceiling Lining “UAC Superflex”asbestos-free cement sheet to clg & fxg to 50mm x 50mm sawn pressure treated Grd B tbr joist Wrot Pressure treated Group “C timber as described in:- 40mm x 12mm beading to ceiling board 56 M2
  • 3. B C D Painting Prepare and apply one coat of “ICI” primer and two coats “ICI” emulsion paints or other equal & approved paints to soffit of free-asbestos cement sheet ceiling Soffit of asbestos-free cement sheet ceiling Knot.prime,stop and apply one “ICI” primer,two undercoat and one coats of “ICI”gloss Nippon paint or approved equivalent on woodwork:- Surfaces of beading, not exceeding 150mm girth 69 56 68 M M2 M
  • 4. ITEM BILLNO.2:SINGLE STOREY BUNGALOW Class C QTY UNIT RATE (RM) AMOUNT (RM) A B C EXTERNAL FLOOR FINISHES Cement and sand (1:6)paving; trowelled hard and smooth:- To floor;50mm thick Cement and sand (1:3) beds and backings; screeded finish; to receive homogeneous tiles:- To Floor; 40mm thick To Drop; 19mm thick; 50mm high 300mm x 300mm x 8mm thk “Guocera” or approved equivalent Homogeneous tiles as described bedded , jtd & ptd in c&s (1:6) 78 93 35 M2 M2 M
  • 5. D E mortar to floor level or laid to floor n.e 150mm from horiz screeded bed To Floor. To Drop; 50mm High 93 35 M2 M
  • 6. ITEM BILLNO.2:SINGLE STOREY BUNGALOW Class C QTY UNIT RATE (RM) AMOUNT (RM) A B C D E F G H INTERNAL FLOOR FINISHES Cement and sand (1:6)paving; trowelled hard and smooth:- To floor;50mm thick To Drop ; 19mm thick ; 50mm high Cement and sand (1:3) beds and backings; screeded finish; to receive ceramic tiles:- To Floor; 38mm thick To Drop; 19mm thick; 50mm high To Drop; 19mm thick; 100mm high To skirting ; 19mm thick ;100mm high Cement and sand (1:3) beds and backings; screeded finish; to receive homogeneous tiles:- To Floor; 38mm thick To Drop; 19mm thick; 50mm high To Drop; 19mm thick; 100mm high To skirting ; 19mm thick ;100mm high 3 2 190 3 2 45 162 3 10 M2 M M2 M M M M2 M M
  • 7. I J K L M N O P Q 200mm x 200mm x 8mm thick “Guocera” or approved equivalent ceramic tiles as descd bedded , jtd & ptd in c & s (1:6) mort To Floor. To Drop; 50mm High To Drop; 100mm High To skirting ; 19mm thick ;100mm high 200mm x 200mm x 12mm thick “Anti-Slip” or approved equivalent ceramic tiles as descd bedded , jtd & ptd in c & s (1:6) mort To Floor. To Drop; 100mm High 300mm x 300mm x 8mm thick “Guocera” or approved equivalent homogeneous as descd bedded , jtd & ptd in c & s (1:6) mort To Floor To Drop; 50mm High To Drop; 100mm High To skirting ; 19mm thick ;100mm high 300mm x 300mm x 8mm thick “Guocera” or approved equivalent homogeneous as 78 45 3 2 45 22 1 145 2 M M2 M M M M2 M M2 M
  • 8. R S T U descd bedded , jtd & ptd in c & s (1:6) mort To Floor To Drop; 50mm High 9 79 17 2 M M M2 M
  • 9. ITEM BILLNO.2:SINGLE STOREY BUNGALOW Class C QTY UNIT RATE (RM) AMOUNT (RM) A B C INTERNAL WALL FINISHES Cement and sand (1:6) as described internal plastering finished with a steel trowel:- 19mm Thick to walls and Cement and sand (1:3) beds and backings ; screeded finish to receive ceramic tiles:- 19mm Thick to walls 200mm x 250mm x 8mm thick “White Horse” or approved equivalent ceramic tiles of approved pattern and color and pointed in neat white cement as described 19mm Thick to walls Painting Prepare & apply to plastered surfaces ; 502 133 133 M2 M M2
  • 10. D one coat of ‘Nippon’ primer and two coats of ‘Nippon’ Emulsion paint Soffit of asbestos-free cement sheet ceiling 502 M2 ITEM BILLNO.2:SINGLE STOREY BUNGALOW Class C QTY UNIT RATE (RM) AMOUNT (RM)
  • 11. A B EXTERNAL WALL FINISHES Cement and sand (1:6) as described external plastering finishes with a steel trowel 19mm Thick to walls and columns Painting Prepare and apply one coat of “ICI” primer and two coats of “ICI” weathershield paint or approved equivalent to:- Plastered walls and columns 294 294 M2 M2
  • 12. ITEM BILLNO.2:SINGLE STOREY BUNGALOW Class C QTY UNIT RATE (RM) AMOUNT (RM) A EXTERNAL WALLS ELEMENT Clay brickwork in cement mortar(1:6) in stretcher bond w. & incl. Brick reinft.at every 4th course One brick wall (115mm thick) reinforced with and including brick reinforcement as described at every fourth course Approved bituminous felt damp proof 197 M2
  • 13. B course to B.S. 743 well lapped 100mm at jts bedded in c & S (1:6) mort.(measured net-no allowance made for laps) To one brick wall 115mm wide 76 M
  • 14. ITEM BILLNO.2:SINGLE STOREY BUNGALOW Class C QTY UNIT RATE (RM) AMOUNT (RM) A B INTERNAL WALL ELEMENT Clay brickwork in cement mortar (1:6) in stretcher bond as described:- Half brick wall (115mm thick) reinforced with and including brick reinforcement as described at every 4th course Approved bituminous felt damp proof course to B.S. 743 well lapped 100mm at joints bedded in ct & s (1:6) mortar.(Measurement nett-no allowance made for laps) To half brick wall 115mm wide 202 58 M2 M