Floor Tile Laying Methodology for Dry Area (Thick bed system)
A. SURFACE PREPARATION
1. Surface should be well brushed and clean - form loose laitance, paint, oil, grease etc.
B. SETTING OUT & LEVEL
2. SURVEYER to provide the Reference level (RL) on the wall/Column (Generally: 1000 mm
form FFL) with reference Gate Level (+/- 0.0 M) taken from Local Municipality bench
mark.
3. SCREED TOP LEVEL inside the dry area floor tiles to be 1020 mm form RL, which should
be marked prior to start of screed. (See pic below) Thus, providing an allowance of
10mm for tile and 10mm for Cement Glue to accommodate.
C. MOTOR BED
4. Portland cement and Black Sand with the ratio of 1:3 to be mixed as semi dry
consistency. Where, screed should form a ball after press hold quantity with hand. (See
Pic below).
+ 1020 FROM FFL
5. The mixed mortar screed to be laid directly over the Structural Slab leveled with
Horizontal Bar (3 meter Aluminum RHS) to achieve flat uniform surface. (See pic above)
D. SELECTION OF THE CORRECT TILE
6. In order to achieve correct approved color, type and size the reference number should
verified with the approval. The same caliber to be used at a particular floor or Villa in
order to achieve adulations in floor due to shape &/ bend irregularities and finally (most
important) it is strongly recommended to use tile of same Batch no. for Particular
Space/flat/house to avoid Shade/Tone difference.
E. FIXING OF TILE - Conventional method (Thick bed system)
7. The floor tile to be started at the set dimension (SP) which is approved by the
Consultant / Client in the Tile layout shop drawing. (Also the site conditioned to be
considered and minor adjustment to be made to avoid cut piece)
8. Fixing the Approved tile (porcelain / Ceramic tile) of right type and Color with even tone
on the fresh cement mortar bed with Tile Glue (Polymer modified Tile Adhesive – As
bonding agent) with cement paste of 1:2 ratio Tile Glue with Ordinary Portland Cement
respectively.(Note: Cement paste should have paste consistency (like peanut butter)
formed by Mechanical mixer. As per pic below)
9. Only 1.0 square meter of tile lay at one time only.
10. TILE CUT PIECE – The right method to achieve tile cut piece without broken enamel
10.1 Trained labor to perform the tile cutting to achieve the uniform press load applied
while performing mechanical cut. (See pic below)
10.2 The perfect tile edge with clean enamel cut at the surface will be only
achieved by the sharp tile cutting wheel. This assembly should be changed every,
20 days when using the machine on daily basis. (See pic below)
11. Tile should be dry & fixed by pressing into the place with slight twist motion, ensuring
the tile back achieves full contact with the Cement Glue adhesive
12. The laid tile to be then tapped with rubber hammer to achieve set level.
13. 3mm spacer to be used to keep the same line on floor and skirting.
14. Excess Cement Glue adhesive should be removed from the face of the tile by using
damp sponge.
15. Joints to be racked out in readiness for grouting.
16. Allow setting time of 3 days for this “Conventional thick bed system’’ of tile laying.
F. GROUTING
17. Approved grout to be used after 24 hours of tile fix.
18. Joint depth to be 3-4mm.
19. Grout should be applied with squeegee, brush or sponge.
20. Surplus grout should be removed by damp sponge.
21. Tile should be polished by dry cloth when grout has completed.
G. PROTECTION
22. Adequately protect and keep clean all the completed areas.
23. Protective sheet to be laid over the finished floor for light traffic.

More Related Content

What's hot

72747160 estimation
72747160 estimation72747160 estimation
72747160 estimation
imaduddin91
 
CL Final Assignment Report Part B
CL Final Assignment Report Part BCL Final Assignment Report Part B
CL Final Assignment Report Part B
Pang Shuen
 
5) int walls finishes bq
5) int walls finishes bq5) int walls finishes bq
5) int walls finishes bq
Jeanne Hoo
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
Awanish Shukla
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
Natalie Reid
 
Are you a Realtor?
Are you a Realtor?Are you a Realtor?
Are you a Realtor?
protouch
 

What's hot (19)

72747160 estimation
72747160 estimation72747160 estimation
72747160 estimation
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
CL Final Assignment Report Part B
CL Final Assignment Report Part BCL Final Assignment Report Part B
CL Final Assignment Report Part B
 
5) int walls finishes bq
5) int walls finishes bq5) int walls finishes bq
5) int walls finishes bq
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
 
Bq floor
Bq floorBq floor
Bq floor
 
First Class Office Building Sale - 9811022205 l Sector 32, Gurgaon
First Class Office Building Sale - 9811022205 l Sector 32, GurgaonFirst Class Office Building Sale - 9811022205 l Sector 32, Gurgaon
First Class Office Building Sale - 9811022205 l Sector 32, Gurgaon
 
Terrazo tiles in risers of steps
Terrazo tiles in risers of stepsTerrazo tiles in risers of steps
Terrazo tiles in risers of steps
 
Item
ItemItem
Item
 
Perfect binding
Perfect bindingPerfect binding
Perfect binding
 
How to stamp concrete patios, pool deck, driveways etc.
How to stamp concrete patios, pool deck, driveways etc.How to stamp concrete patios, pool deck, driveways etc.
How to stamp concrete patios, pool deck, driveways etc.
 
Summer Internship Presentation of Building
Summer Internship Presentation of Building Summer Internship Presentation of Building
Summer Internship Presentation of Building
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Installing wallpaper
Installing wallpaperInstalling wallpaper
Installing wallpaper
 
Geom5-4
Geom5-4Geom5-4
Geom5-4
 
Allan block Installation guide
Allan block Installation guideAllan block Installation guide
Allan block Installation guide
 
Are you a Realtor?
Are you a Realtor?Are you a Realtor?
Are you a Realtor?
 
Brochure May 15
Brochure May 15Brochure May 15
Brochure May 15
 

Similar to Ceramic / Porcelain Floor tile laying - Methodology

Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
KHUSHBU SHAH
 
Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)
Waqas Aslam
 
floorfinishesandcovering-140424000010-phpapp01.pdf
floorfinishesandcovering-140424000010-phpapp01.pdffloorfinishesandcovering-140424000010-phpapp01.pdf
floorfinishesandcovering-140424000010-phpapp01.pdf
DivyaBalani7
 

Similar to Ceramic / Porcelain Floor tile laying - Methodology (20)

Kajaria tiles installtion
Kajaria tiles installtionKajaria tiles installtion
Kajaria tiles installtion
 
Flooring.ppt
Flooring.pptFlooring.ppt
Flooring.ppt
 
Building specfication ppt- avneet.pptx
Building specfication ppt- avneet.pptxBuilding specfication ppt- avneet.pptx
Building specfication ppt- avneet.pptx
 
plaster.pptx
plaster.pptxplaster.pptx
plaster.pptx
 
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
 
B.3. Arch 561 LEC-10 detail spec example.pdf
B.3. Arch 561  LEC-10 detail spec example.pdfB.3. Arch 561  LEC-10 detail spec example.pdf
B.3. Arch 561 LEC-10 detail spec example.pdf
 
cereamic
cereamiccereamic
cereamic
 
Finishing of cement
Finishing of cementFinishing of cement
Finishing of cement
 
Waterproffing.pptx
Waterproffing.pptxWaterproffing.pptx
Waterproffing.pptx
 
Types of plaster
Types of plasterTypes of plaster
Types of plaster
 
Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)
 
Building Materials & Construction Module - 5
Building Materials & Construction Module - 5Building Materials & Construction Module - 5
Building Materials & Construction Module - 5
 
Plastering mortar insulation and bonding material
Plastering mortar insulation and bonding materialPlastering mortar insulation and bonding material
Plastering mortar insulation and bonding material
 
Types of Flooring
Types of Flooring Types of Flooring
Types of Flooring
 
Chapter 8 floorings
Chapter 8 flooringsChapter 8 floorings
Chapter 8 floorings
 
FLOORING
FLOORINGFLOORING
FLOORING
 
Terrazzo flooring and PCC flooring
Terrazzo flooring and PCC flooringTerrazzo flooring and PCC flooring
Terrazzo flooring and PCC flooring
 
FLOOR FINISHES AND COVERINGS
FLOOR FINISHES AND COVERINGSFLOOR FINISHES AND COVERINGS
FLOOR FINISHES AND COVERINGS
 
floorfinishesandcovering-140424000010-phpapp01.pdf
floorfinishesandcovering-140424000010-phpapp01.pdffloorfinishesandcovering-140424000010-phpapp01.pdf
floorfinishesandcovering-140424000010-phpapp01.pdf
 
Plastering ppt
Plastering pptPlastering ppt
Plastering ppt
 

Recently uploaded

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Ceramic / Porcelain Floor tile laying - Methodology

  • 1. Floor Tile Laying Methodology for Dry Area (Thick bed system) A. SURFACE PREPARATION 1. Surface should be well brushed and clean - form loose laitance, paint, oil, grease etc. B. SETTING OUT & LEVEL 2. SURVEYER to provide the Reference level (RL) on the wall/Column (Generally: 1000 mm form FFL) with reference Gate Level (+/- 0.0 M) taken from Local Municipality bench mark. 3. SCREED TOP LEVEL inside the dry area floor tiles to be 1020 mm form RL, which should be marked prior to start of screed. (See pic below) Thus, providing an allowance of 10mm for tile and 10mm for Cement Glue to accommodate. C. MOTOR BED 4. Portland cement and Black Sand with the ratio of 1:3 to be mixed as semi dry consistency. Where, screed should form a ball after press hold quantity with hand. (See Pic below). + 1020 FROM FFL
  • 2. 5. The mixed mortar screed to be laid directly over the Structural Slab leveled with Horizontal Bar (3 meter Aluminum RHS) to achieve flat uniform surface. (See pic above) D. SELECTION OF THE CORRECT TILE 6. In order to achieve correct approved color, type and size the reference number should verified with the approval. The same caliber to be used at a particular floor or Villa in order to achieve adulations in floor due to shape &/ bend irregularities and finally (most important) it is strongly recommended to use tile of same Batch no. for Particular Space/flat/house to avoid Shade/Tone difference. E. FIXING OF TILE - Conventional method (Thick bed system) 7. The floor tile to be started at the set dimension (SP) which is approved by the Consultant / Client in the Tile layout shop drawing. (Also the site conditioned to be considered and minor adjustment to be made to avoid cut piece) 8. Fixing the Approved tile (porcelain / Ceramic tile) of right type and Color with even tone on the fresh cement mortar bed with Tile Glue (Polymer modified Tile Adhesive – As bonding agent) with cement paste of 1:2 ratio Tile Glue with Ordinary Portland Cement respectively.(Note: Cement paste should have paste consistency (like peanut butter) formed by Mechanical mixer. As per pic below)
  • 3. 9. Only 1.0 square meter of tile lay at one time only. 10. TILE CUT PIECE – The right method to achieve tile cut piece without broken enamel 10.1 Trained labor to perform the tile cutting to achieve the uniform press load applied while performing mechanical cut. (See pic below) 10.2 The perfect tile edge with clean enamel cut at the surface will be only achieved by the sharp tile cutting wheel. This assembly should be changed every, 20 days when using the machine on daily basis. (See pic below)
  • 4. 11. Tile should be dry & fixed by pressing into the place with slight twist motion, ensuring the tile back achieves full contact with the Cement Glue adhesive 12. The laid tile to be then tapped with rubber hammer to achieve set level. 13. 3mm spacer to be used to keep the same line on floor and skirting. 14. Excess Cement Glue adhesive should be removed from the face of the tile by using damp sponge. 15. Joints to be racked out in readiness for grouting. 16. Allow setting time of 3 days for this “Conventional thick bed system’’ of tile laying. F. GROUTING 17. Approved grout to be used after 24 hours of tile fix. 18. Joint depth to be 3-4mm. 19. Grout should be applied with squeegee, brush or sponge. 20. Surplus grout should be removed by damp sponge. 21. Tile should be polished by dry cloth when grout has completed. G. PROTECTION 22. Adequately protect and keep clean all the completed areas. 23. Protective sheet to be laid over the finished floor for light traffic.