SlideShare a Scribd company logo
1 of 20
Download to read offline
in Greece
Hotels & Resorts
2/20
Our company’s experience in working on the
most notable luxury resort developments in
Greece has been a long-standing asset. LDK
has worked with most of the notable Hotel Op-
erator chains and has cumulative knowledge of
their specifications, including expertise in im-
plementing these standardized specifications
to he conditions of the project. We are familiar
with their work methods and the compromis-
es and negotiations that occur between Hotel
Operators and Owners regarding quality and
cost issues. We have accumulated hands-on
experience and know-how in different work-
ing environments, different mentalities and
behaviors, multilingual environments, FIDIC
contracts, international codes and standards
(e.g. NFPA, ASHRAE, BS, EN, CIBSE, IEEE, DIN,
etc.). In the next pages you can browse through
indicative Projects that we have carried out.
3/20
AMANZO’E
Phase A 38 autonomous villas with private
pool / A central building with common use
facilities (Restaurant, Offices, Library, Bar,
Multiple use hall, Stores, Central Kitchen,
Underground parking area), SPA / 1 exterior
pool with restaurant and bar. The complex
along with the surrounding area covers an
area of 100,000 m².
Phase B 30 luxurious villas (from 450 m² to
6.000 m²) / Beach club, locker building, build-
ing with Kitchen, private dining rooms with
an outdoor pool, and a central outdoor pool
/ Reception building with offices and Elec-
trical and Mechanical facilities with power
substation. The complex along with the sur-
rounding area covers an area of 250,000 m².
Services provided by Consultant
MEP Design and Supervision
of Buildings and Infrastructure
Status of Project
Phase A Design & Construction completed
Phase B Design & Construction on going
4/20
COSTA NAVARINO
Integrated Tourist Development
Zone of Messinia (POTA Messinia),
of an area of 1,300,000 m² in the area
of Romanos, Messinia, Greece. The
resort complex consists of The Ro-
manos deluxe hotel (Starwood Lux-
ury Collection) (289 rooms and 32
suites) and The Westin (Starwood
Westin) (445 rooms & suites), a
Conference Centre with a capaci-
ty of 1,200 people, and a Thalasso-
therapy Centre of 4,450 m², along
with a Golf Club of 3,000 m², an 18-
hole golf course and a Golf Acade-
my, and all infrastructure facilities.
Services provided by Consultant
MEP Design of Buildings
and Infrastructure
Status of Project
Design completed
Construction completed
5/20
ATHENS HILTON
Renovation and extension of the 5
star Deluxe Athens Hilton. The hotel
comprises 527 rooms and suites, 4
restaurants and bars, 14 conference
halls and a Health Club of 1,500 m².
The entire design team (architects,
structural engineers, mechanical and
electrical engineers) were located on
site for the duration of the design
and construction phases, sharing of-
fice space with the construction team
allowing prompt response to arising
problems and close coordination.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
6/20
GRANDE BRETAGNE STARWOOD
Renovation of the Grande Bretagne 5-star deluxe ho-
tel of Starwood Luxury Collection in Athens. The hotel
comprises 321 rooms, 59 suites, roof garden, 3 restau-
rants and bars, mixed use halls and a SPA of 800 m².
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
7/20
ASTIR PALACE
Astir Palace Resort Vouliagmeni is a 5 Star Hotel Complex, operated
and managed by Starwood. It is located in Vouliagmeni, Attica, Greece.
The Project involved the full refurbishment of all the MEP installations
Arion Resort and SPA, of the Starwoord’s Luxury Collection (123 rooms)
and the Westin Athens (formerly Nafsika) Hotel of Starwood’s Westin
Hotels & Resorts (165 rooms) along with a Conference Centre and Halls.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
8/20
HYATT REGENCY
HYATT Regency Thessaloniki 5 star Hotel is the first
of HYATT Group in Greece. The hotel complex con-
sists of 118 rooms, 34 suites and a Conference Centre
with a capacity of 1,050 people. The hotels consists
of a SPA and indoor and outdoor swimming pools.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
9/20
GRAND RESORT LAGONISSI
Phase A Renovation and extension of the 5-star
deluxe hotel complex Grand Resort Lagonissi
in Attica, Greece. The complex spreads over an
area of 24 hectars.
Phase B Conference Centre with a capacity of
3,500people,newhealthspabuildingof4,500 m²
and renovation of the main hotel building.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
10/20
GRECOTEL AMIRANDES
Renovation and extension of the
5-star deluxe hotel complex Grecotel
Amirandes, in Gouves, Iraklio, Crete,
Greece. The complex consists of 236
rooms and bungalows with a total ca-
pacity of 638 beds, an Elixir SPA of
520 m², a Conference Centre of 710 m²
of 400 people capacity, 18 villas with
private swimming pools, a presidential
and a royal suite, and 4 restaurants.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
11/20
REGENCY CASINO MONT PARNES
Phase A Two funicular rail stations and an underground park-
ing area with a capacity of 1,000 vehicles.
Phase B 5-star deluxe hotel of 170 beds on Mount Parnitha, At-
tica, Greece, along with a SPA of 1,000 m², a Casino and Casino
VIP halls of 6,000 m², an Exhibition hall and Conference halls.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Phase A Design completed - Construction completed
Phase B Design completed
12/20
ASTERIA HOTEL COMPLEX
Upgrade and Expansion of Asteria Hotel Complex
in Glyfada, Athens, and creation of a water theme
park. The total area is larger than 35,000 m².
Services provided by Consultant
MEP Design
Status of Project
Design development completed
13/20
ELOUNDA BEACH & ELOUNDA BAY
Partial renovations and extensions of the 5-star deluxe hotel complex-
es Elounda Beach and Elounda Bay Palace in Aghios Nikolaos, Crete,
Greece. The two complexes cover an area of 200,000 m² and host 258
rooms, 19 bungalows suites, 105 bungalows, 6 guest houses and 9 su-
per-modern Conference Centres with a total capacity of 1,520 people.
Services provided by Consultant
MEP Design and Supervision of Buildings and Infrastructure
Status of Project
Design & Construction completed
14/20
RADISSON BLU PARK
Radisson Blu Park Hotel, 5-star
hotel, comprises 135 rooms and
suites, roof garden pool, confer-
ence halls and underground park-
ing area. The hotel undergone a full
refurbishment of the rooms and
the public spaces in two phases.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design & Construction completed
15/20
SITIA BAY RESORT
5-star Hotel Complex, of 357 beds capacity, in the Municipality
of Sitia, in the island of Crete. The Resort consists of a SPA of
100 people capacity, a Conference Centre (200 people capaci-
ty), a central lodge with the reception and communal ameni-
ties, 31 2-floor bungalows, 2 outdoors and 1 indoors swimming
pools. The Resort with its surrounding area are 107,000 m².
Services provided by Consultant
MEP Design of Buildings and Infrastructure
Status of Project
Design completed
16/20
HALCYON HILLS
Luxury 5-star eco-friendly SPA Resort “Halcyon Hills”
close to Klima beach in the island of Samos, Greece,
of 693 beds capacity with facilities that include tennis
courts, dive centre, gym and a 930 m² SPA. The plot has
an area of around 9 hectares and the scope of work is
a development of nearly 17,000 m² built area (depending
on the exact size of the plot) and the surrounding area of
gardens, streets, including infrastructure networks.
Services provided by Consultant
MEP Design of Buildings and Infrastructure
Status of Project
Design Development completed
17/20
ALDEMAR OLYMPIAN VILLAGE
Renovation and extension of Aldemar Olympian Village 5-star Re-
sort complex in Skafidia, Western Peloponnese, Greece.
PhaseAResortcomplexofmainhotelandbungalowswith431rooms
and 82 suites, along with 49 apartments in bungalow complex.
Phase B Extension of the resort complex – Conference Centre with
a capacity of 1,200 people, 5-star Hotel of 200 beds capacity and
Thalassotherapy Centre & SPA of 4,000 m².
Services provided by Consultant
MEP Design and Supervision of Buildings and Infrastructure
Status of Project
Design & Construction completed
18/20
HOLIDAY INN
Holiday Inn 5-star hotel in Pallini, Attica, com-
prises 191 rooms, 3 suites, indoors pool, con-
ference halls and underground parking area.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design & Construction completed
19/20
CANDIA PARK VILLAGE
5 star, 800 beds capacity Candia Park Vil-
lage is modelled on a traditional Cretan
Village with 222 two-storey homes with
a balcony or veranda. Arranged in neigh-
bourhoods within the gardens with nar-
row streets, its layout is characterized by
simplicity and functionality. The square
with the clock and the Greek Kafenion add
to the charm of this picturesque village.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design & Construction completed
20/20
MIRAMARE PARK SUITES & VILLAS
Renovation and extension of Miramare Park Suites & Villas,
5 star, 360 beds capacity. The reception area is regarded as
the starting and finishing point of all activities, resembling
a train station. The “Wonderland Express”, a faithful repli-
ca of a British Midland steam engine from the beginning of
last century, crosses the complex from one side to the oth-
er on an actual 2-km railway line. A 1,600 m² lake covered
with wooden platforms creates an imposing atmosphere.
The bungalows cover an area of 60 m² each with hall, kitch-
en and dining room near and the main bedroom.
Services provided by Consultant
MEP Design and Supervision
of Buildings and Infrastructure
Status of Project
Design & Construction completed

More Related Content

What's hot

intercontinental hotel
intercontinental hotel intercontinental hotel
intercontinental hotel Fatma Mohamed
 
Gardenia_Presentation
Gardenia_PresentationGardenia_Presentation
Gardenia_PresentationSaira Bano
 
DESIGNERS Consultants\' CV of Hotels & Resorts
DESIGNERS Consultants\'  CV of Hotels & ResortsDESIGNERS Consultants\'  CV of Hotels & Resorts
DESIGNERS Consultants\' CV of Hotels & Resortssherine_2011
 
Reva Residences Dubai by Damac Properties at Business Bay Dubai Canal
Reva Residences Dubai by Damac Properties at Business Bay Dubai CanalReva Residences Dubai by Damac Properties at Business Bay Dubai Canal
Reva Residences Dubai by Damac Properties at Business Bay Dubai CanalIGotMyDeal
 
TBB_Press Release_Mercure&IbisHotel_ENG(May2015)
TBB_Press Release_Mercure&IbisHotel_ENG(May2015)TBB_Press Release_Mercure&IbisHotel_ENG(May2015)
TBB_Press Release_Mercure&IbisHotel_ENG(May2015)Stella Nurina
 
Rustomjee Elements in Upper Juhu, Mumbai - Brochure, Price, Floor Plan
Rustomjee Elements in Upper Juhu, Mumbai - Brochure, Price, Floor PlanRustomjee Elements in Upper Juhu, Mumbai - Brochure, Price, Floor Plan
Rustomjee Elements in Upper Juhu, Mumbai - Brochure, Price, Floor PlanIGotMyDeal
 
Grand riviera suites by anna kalugdan
Grand riviera suites by anna kalugdanGrand riviera suites by anna kalugdan
Grand riviera suites by anna kalugdancondochix
 
PROJECT OVERVIEW ENTEC
PROJECT OVERVIEW  ENTECPROJECT OVERVIEW  ENTEC
PROJECT OVERVIEW ENTECJulio Bautista
 
Ready to move in Apartments- Pantheon Boulevard
Ready to move in Apartments- Pantheon BoulevardReady to move in Apartments- Pantheon Boulevard
Ready to move in Apartments- Pantheon Boulevardraj devad
 
Supertech Crown Tower Brochure - Zricks.com
Supertech Crown Tower Brochure - Zricks.comSupertech Crown Tower Brochure - Zricks.com
Supertech Crown Tower Brochure - Zricks.comZricks.com
 
Sotogrande at Cap Cana, Dominican Republic
Sotogrande at Cap Cana, Dominican RepublicSotogrande at Cap Cana, Dominican Republic
Sotogrande at Cap Cana, Dominican Republicgbonnelly
 
sfa design Portfolio
sfa design Portfoliosfa design Portfolio
sfa design PortfolioSue Firestone
 
Grand Cenia CONDOMINIUM IN CEBU CITY
Grand Cenia CONDOMINIUM IN CEBU CITYGrand Cenia CONDOMINIUM IN CEBU CITY
Grand Cenia CONDOMINIUM IN CEBU CITYguest4cfe3b
 

What's hot (19)

intercontinental hotel
intercontinental hotel intercontinental hotel
intercontinental hotel
 
Properties for-sale-in-dubai-offplan
Properties for-sale-in-dubai-offplanProperties for-sale-in-dubai-offplan
Properties for-sale-in-dubai-offplan
 
Gardenia_Presentation
Gardenia_PresentationGardenia_Presentation
Gardenia_Presentation
 
DESIGNERS Consultants\' CV of Hotels & Resorts
DESIGNERS Consultants\'  CV of Hotels & ResortsDESIGNERS Consultants\'  CV of Hotels & Resorts
DESIGNERS Consultants\' CV of Hotels & Resorts
 
Damac Aykon City dubai
Damac Aykon City dubaiDamac Aykon City dubai
Damac Aykon City dubai
 
Reva Residences Dubai by Damac Properties at Business Bay Dubai Canal
Reva Residences Dubai by Damac Properties at Business Bay Dubai CanalReva Residences Dubai by Damac Properties at Business Bay Dubai Canal
Reva Residences Dubai by Damac Properties at Business Bay Dubai Canal
 
TBB_Press Release_Mercure&IbisHotel_ENG(May2015)
TBB_Press Release_Mercure&IbisHotel_ENG(May2015)TBB_Press Release_Mercure&IbisHotel_ENG(May2015)
TBB_Press Release_Mercure&IbisHotel_ENG(May2015)
 
Rustomjee Elements in Upper Juhu, Mumbai - Brochure, Price, Floor Plan
Rustomjee Elements in Upper Juhu, Mumbai - Brochure, Price, Floor PlanRustomjee Elements in Upper Juhu, Mumbai - Brochure, Price, Floor Plan
Rustomjee Elements in Upper Juhu, Mumbai - Brochure, Price, Floor Plan
 
Grand riviera suites by anna kalugdan
Grand riviera suites by anna kalugdanGrand riviera suites by anna kalugdan
Grand riviera suites by anna kalugdan
 
PROJECT OVERVIEW ENTEC
PROJECT OVERVIEW  ENTECPROJECT OVERVIEW  ENTEC
PROJECT OVERVIEW ENTEC
 
Ready to move in Apartments- Pantheon Boulevard
Ready to move in Apartments- Pantheon BoulevardReady to move in Apartments- Pantheon Boulevard
Ready to move in Apartments- Pantheon Boulevard
 
DDG residential
DDG residentialDDG residential
DDG residential
 
Supertech Crown Tower Brochure - Zricks.com
Supertech Crown Tower Brochure - Zricks.comSupertech Crown Tower Brochure - Zricks.com
Supertech Crown Tower Brochure - Zricks.com
 
Sotogrande at Cap Cana, Dominican Republic
Sotogrande at Cap Cana, Dominican RepublicSotogrande at Cap Cana, Dominican Republic
Sotogrande at Cap Cana, Dominican Republic
 
sfa design Portfolio
sfa design Portfoliosfa design Portfolio
sfa design Portfolio
 
Neoworld noida
Neoworld noidaNeoworld noida
Neoworld noida
 
Grand Cenia CONDOMINIUM IN CEBU CITY
Grand Cenia CONDOMINIUM IN CEBU CITYGrand Cenia CONDOMINIUM IN CEBU CITY
Grand Cenia CONDOMINIUM IN CEBU CITY
 
New hotel in china
New hotel in chinaNew hotel in china
New hotel in china
 
ONE 16
ONE 16ONE 16
ONE 16
 

Viewers also liked

Construction of a hotel, Cadaqués, Spain
Construction of a hotel, Cadaqués, SpainConstruction of a hotel, Cadaqués, Spain
Construction of a hotel, Cadaqués, SpainDIAS CONSULT INVESTMENT
 
Hotel Development - From Concept To Construction
Hotel Development - From Concept To ConstructionHotel Development - From Concept To Construction
Hotel Development - From Concept To Constructionmarkus_aklin
 
Hotel Design
Hotel DesignHotel Design
Hotel Designlbridge89
 
Data collection of five star hotel
Data collection of five star hotelData collection of five star hotel
Data collection of five star hotelAr. Sahid Akhtar
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Bookrajensen00
 
Case Study -Hotel design
Case Study -Hotel designCase Study -Hotel design
Case Study -Hotel designhebasayeed
 
Case study - Hotel Silicrest
Case study - Hotel SilicrestCase study - Hotel Silicrest
Case study - Hotel Silicrestnainadesh
 
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiDesign, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
Project Construction of 5 star hotel
Project Construction of 5 star hotelProject Construction of 5 star hotel
Project Construction of 5 star hotelMuhammad Farhan Javed
 

Viewers also liked (10)

Construction of a hotel, Cadaqués, Spain
Construction of a hotel, Cadaqués, SpainConstruction of a hotel, Cadaqués, Spain
Construction of a hotel, Cadaqués, Spain
 
Hotel Development - From Concept To Construction
Hotel Development - From Concept To ConstructionHotel Development - From Concept To Construction
Hotel Development - From Concept To Construction
 
Hotel Design
Hotel DesignHotel Design
Hotel Design
 
Data collection of five star hotel
Data collection of five star hotelData collection of five star hotel
Data collection of five star hotel
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Book
 
Case Study -Hotel design
Case Study -Hotel designCase Study -Hotel design
Case Study -Hotel design
 
Case study - Hotel Silicrest
Case study - Hotel SilicrestCase study - Hotel Silicrest
Case study - Hotel Silicrest
 
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiDesign, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Project Construction of 5 star hotel
Project Construction of 5 star hotelProject Construction of 5 star hotel
Project Construction of 5 star hotel
 

Similar to Hotels & Resorts in Greece

Evora Resort Serangan Lombok
Evora Resort Serangan LombokEvora Resort Serangan Lombok
Evora Resort Serangan LombokBrad Shennan
 
Tortuga Hotel Suites E Brochure
Tortuga Hotel Suites E BrochureTortuga Hotel Suites E Brochure
Tortuga Hotel Suites E BrochurePaul Violet
 
Citadines Millenium Ortigas Serviced Apart Hotel by Ascott Ltd
Citadines Millenium Ortigas Serviced Apart Hotel by Ascott LtdCitadines Millenium Ortigas Serviced Apart Hotel by Ascott Ltd
Citadines Millenium Ortigas Serviced Apart Hotel by Ascott LtdMark Anthony Timajo
 
Tourism investment italy
Tourism investment italyTourism investment italy
Tourism investment italyGUA Global
 
Woods Bagot_Lifestyle_Hotel and Resort_1
Woods Bagot_Lifestyle_Hotel and Resort_1Woods Bagot_Lifestyle_Hotel and Resort_1
Woods Bagot_Lifestyle_Hotel and Resort_1Davide Bertacca
 
Top anticipated luxury hotels for 2014
Top anticipated luxury hotels for 2014Top anticipated luxury hotels for 2014
Top anticipated luxury hotels for 2014Invenia
 
Executive summary for eden heights
Executive summary for eden heightsExecutive summary for eden heights
Executive summary for eden heightsFine and Country
 
Mobile blu marine 5th floor 504
Mobile  blu marine  5th  floor 504Mobile  blu marine  5th  floor 504
Mobile blu marine 5th floor 504Christiana Ioannou
 
Planet Group Profile
Planet Group ProfilePlanet Group Profile
Planet Group ProfileWael Baidas
 
Domesttu Company ProfileA company profile
Domesttu Company ProfileA company  profileDomesttu Company ProfileA company  profile
Domesttu Company ProfileA company profilezuluagencyeg
 

Similar to Hotels & Resorts in Greece (20)

Evora Resort Serangan Lombok
Evora Resort Serangan LombokEvora Resort Serangan Lombok
Evora Resort Serangan Lombok
 
Tortuga Hotel Suites E Brochure
Tortuga Hotel Suites E BrochureTortuga Hotel Suites E Brochure
Tortuga Hotel Suites E Brochure
 
Citadines Millenium Ortigas Serviced Apart Hotel by Ascott Ltd
Citadines Millenium Ortigas Serviced Apart Hotel by Ascott LtdCitadines Millenium Ortigas Serviced Apart Hotel by Ascott Ltd
Citadines Millenium Ortigas Serviced Apart Hotel by Ascott Ltd
 
Tourism investment italy
Tourism investment italyTourism investment italy
Tourism investment italy
 
Woods Bagot_Lifestyle_Hotel and Resort_1
Woods Bagot_Lifestyle_Hotel and Resort_1Woods Bagot_Lifestyle_Hotel and Resort_1
Woods Bagot_Lifestyle_Hotel and Resort_1
 
Top anticipated luxury hotels for 2014
Top anticipated luxury hotels for 2014Top anticipated luxury hotels for 2014
Top anticipated luxury hotels for 2014
 
Eugenia Tzelardonis - Project Portfolio
Eugenia Tzelardonis - Project PortfolioEugenia Tzelardonis - Project Portfolio
Eugenia Tzelardonis - Project Portfolio
 
PORTFOLIO
PORTFOLIOPORTFOLIO
PORTFOLIO
 
Executive summary for eden heights
Executive summary for eden heightsExecutive summary for eden heights
Executive summary for eden heights
 
Mobile blu marine 5th floor 504
Mobile  blu marine  5th  floor 504Mobile  blu marine  5th  floor 504
Mobile blu marine 5th floor 504
 
SR Condo and Waterpark
SR Condo and Waterpark SR Condo and Waterpark
SR Condo and Waterpark
 
Planet Group Profile
Planet Group ProfilePlanet Group Profile
Planet Group Profile
 
Blu marine 5th floor 504
Blu marine  5th  floor 504Blu marine  5th  floor 504
Blu marine 5th floor 504
 
Blu marine 5th floor 504
Blu marine  5th  floor 504Blu marine  5th  floor 504
Blu marine 5th floor 504
 
JLPL Falcon View Mohali
JLPL Falcon View MohaliJLPL Falcon View Mohali
JLPL Falcon View Mohali
 
Domesttu Company ProfileA company profile
Domesttu Company ProfileA company  profileDomesttu Company ProfileA company  profile
Domesttu Company ProfileA company profile
 
Blu marine 5th floor 505
Blu marine  5th  floor 505Blu marine  5th  floor 505
Blu marine 5th floor 505
 
La siesta views
La siesta viewsLa siesta views
La siesta views
 
Erwin Mendoza CV
Erwin Mendoza CVErwin Mendoza CV
Erwin Mendoza CV
 
Alila Hua Hin
Alila  Hua  HinAlila  Hua  Hin
Alila Hua Hin
 

More from LDK

Socioeconomic Develpoment- Interview
Socioeconomic Develpoment- InterviewSocioeconomic Develpoment- Interview
Socioeconomic Develpoment- InterviewLDK
 
Consulting Services in Public & Private Partnerhips
Consulting Services in Public & Private PartnerhipsConsulting Services in Public & Private Partnerhips
Consulting Services in Public & Private PartnerhipsLDK
 
What do we learn from an Environmental Engineer?
What do we learn from an Environmental Engineer?What do we learn from an Environmental Engineer?
What do we learn from an Environmental Engineer?LDK
 
Technologies - Policy
Technologies - Policy Technologies - Policy
Technologies - Policy LDK
 
Working at LDK Consultants
Working at LDK ConsultantsWorking at LDK Consultants
Working at LDK ConsultantsLDK
 
Sector: Publicity
Sector: PublicitySector: Publicity
Sector: PublicityLDK
 
Socioeconomic Development
Socioeconomic DevelopmentSocioeconomic Development
Socioeconomic DevelopmentLDK
 

More from LDK (7)

Socioeconomic Develpoment- Interview
Socioeconomic Develpoment- InterviewSocioeconomic Develpoment- Interview
Socioeconomic Develpoment- Interview
 
Consulting Services in Public & Private Partnerhips
Consulting Services in Public & Private PartnerhipsConsulting Services in Public & Private Partnerhips
Consulting Services in Public & Private Partnerhips
 
What do we learn from an Environmental Engineer?
What do we learn from an Environmental Engineer?What do we learn from an Environmental Engineer?
What do we learn from an Environmental Engineer?
 
Technologies - Policy
Technologies - Policy Technologies - Policy
Technologies - Policy
 
Working at LDK Consultants
Working at LDK ConsultantsWorking at LDK Consultants
Working at LDK Consultants
 
Sector: Publicity
Sector: PublicitySector: Publicity
Sector: Publicity
 
Socioeconomic Development
Socioeconomic DevelopmentSocioeconomic Development
Socioeconomic Development
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 

Hotels & Resorts in Greece

  • 2. 2/20 Our company’s experience in working on the most notable luxury resort developments in Greece has been a long-standing asset. LDK has worked with most of the notable Hotel Op- erator chains and has cumulative knowledge of their specifications, including expertise in im- plementing these standardized specifications to he conditions of the project. We are familiar with their work methods and the compromis- es and negotiations that occur between Hotel Operators and Owners regarding quality and cost issues. We have accumulated hands-on experience and know-how in different work- ing environments, different mentalities and behaviors, multilingual environments, FIDIC contracts, international codes and standards (e.g. NFPA, ASHRAE, BS, EN, CIBSE, IEEE, DIN, etc.). In the next pages you can browse through indicative Projects that we have carried out.
  • 3. 3/20 AMANZO’E Phase A 38 autonomous villas with private pool / A central building with common use facilities (Restaurant, Offices, Library, Bar, Multiple use hall, Stores, Central Kitchen, Underground parking area), SPA / 1 exterior pool with restaurant and bar. The complex along with the surrounding area covers an area of 100,000 m². Phase B 30 luxurious villas (from 450 m² to 6.000 m²) / Beach club, locker building, build- ing with Kitchen, private dining rooms with an outdoor pool, and a central outdoor pool / Reception building with offices and Elec- trical and Mechanical facilities with power substation. The complex along with the sur- rounding area covers an area of 250,000 m². Services provided by Consultant MEP Design and Supervision of Buildings and Infrastructure Status of Project Phase A Design & Construction completed Phase B Design & Construction on going
  • 4. 4/20 COSTA NAVARINO Integrated Tourist Development Zone of Messinia (POTA Messinia), of an area of 1,300,000 m² in the area of Romanos, Messinia, Greece. The resort complex consists of The Ro- manos deluxe hotel (Starwood Lux- ury Collection) (289 rooms and 32 suites) and The Westin (Starwood Westin) (445 rooms & suites), a Conference Centre with a capaci- ty of 1,200 people, and a Thalasso- therapy Centre of 4,450 m², along with a Golf Club of 3,000 m², an 18- hole golf course and a Golf Acade- my, and all infrastructure facilities. Services provided by Consultant MEP Design of Buildings and Infrastructure Status of Project Design completed Construction completed
  • 5. 5/20 ATHENS HILTON Renovation and extension of the 5 star Deluxe Athens Hilton. The hotel comprises 527 rooms and suites, 4 restaurants and bars, 14 conference halls and a Health Club of 1,500 m². The entire design team (architects, structural engineers, mechanical and electrical engineers) were located on site for the duration of the design and construction phases, sharing of- fice space with the construction team allowing prompt response to arising problems and close coordination. Services provided by Consultant MEP Design and Supervision Status of Project Design completed Construction completed
  • 6. 6/20 GRANDE BRETAGNE STARWOOD Renovation of the Grande Bretagne 5-star deluxe ho- tel of Starwood Luxury Collection in Athens. The hotel comprises 321 rooms, 59 suites, roof garden, 3 restau- rants and bars, mixed use halls and a SPA of 800 m². Services provided by Consultant MEP Design and Supervision Status of Project Design completed Construction completed
  • 7. 7/20 ASTIR PALACE Astir Palace Resort Vouliagmeni is a 5 Star Hotel Complex, operated and managed by Starwood. It is located in Vouliagmeni, Attica, Greece. The Project involved the full refurbishment of all the MEP installations Arion Resort and SPA, of the Starwoord’s Luxury Collection (123 rooms) and the Westin Athens (formerly Nafsika) Hotel of Starwood’s Westin Hotels & Resorts (165 rooms) along with a Conference Centre and Halls. Services provided by Consultant MEP Design and Supervision Status of Project Design completed Construction completed
  • 8. 8/20 HYATT REGENCY HYATT Regency Thessaloniki 5 star Hotel is the first of HYATT Group in Greece. The hotel complex con- sists of 118 rooms, 34 suites and a Conference Centre with a capacity of 1,050 people. The hotels consists of a SPA and indoor and outdoor swimming pools. Services provided by Consultant MEP Design and Supervision Status of Project Design completed Construction completed
  • 9. 9/20 GRAND RESORT LAGONISSI Phase A Renovation and extension of the 5-star deluxe hotel complex Grand Resort Lagonissi in Attica, Greece. The complex spreads over an area of 24 hectars. Phase B Conference Centre with a capacity of 3,500people,newhealthspabuildingof4,500 m² and renovation of the main hotel building. Services provided by Consultant MEP Design and Supervision Status of Project Design completed Construction completed
  • 10. 10/20 GRECOTEL AMIRANDES Renovation and extension of the 5-star deluxe hotel complex Grecotel Amirandes, in Gouves, Iraklio, Crete, Greece. The complex consists of 236 rooms and bungalows with a total ca- pacity of 638 beds, an Elixir SPA of 520 m², a Conference Centre of 710 m² of 400 people capacity, 18 villas with private swimming pools, a presidential and a royal suite, and 4 restaurants. Services provided by Consultant MEP Design and Supervision Status of Project Design completed Construction completed
  • 11. 11/20 REGENCY CASINO MONT PARNES Phase A Two funicular rail stations and an underground park- ing area with a capacity of 1,000 vehicles. Phase B 5-star deluxe hotel of 170 beds on Mount Parnitha, At- tica, Greece, along with a SPA of 1,000 m², a Casino and Casino VIP halls of 6,000 m², an Exhibition hall and Conference halls. Services provided by Consultant MEP Design and Supervision Status of Project Phase A Design completed - Construction completed Phase B Design completed
  • 12. 12/20 ASTERIA HOTEL COMPLEX Upgrade and Expansion of Asteria Hotel Complex in Glyfada, Athens, and creation of a water theme park. The total area is larger than 35,000 m². Services provided by Consultant MEP Design Status of Project Design development completed
  • 13. 13/20 ELOUNDA BEACH & ELOUNDA BAY Partial renovations and extensions of the 5-star deluxe hotel complex- es Elounda Beach and Elounda Bay Palace in Aghios Nikolaos, Crete, Greece. The two complexes cover an area of 200,000 m² and host 258 rooms, 19 bungalows suites, 105 bungalows, 6 guest houses and 9 su- per-modern Conference Centres with a total capacity of 1,520 people. Services provided by Consultant MEP Design and Supervision of Buildings and Infrastructure Status of Project Design & Construction completed
  • 14. 14/20 RADISSON BLU PARK Radisson Blu Park Hotel, 5-star hotel, comprises 135 rooms and suites, roof garden pool, confer- ence halls and underground park- ing area. The hotel undergone a full refurbishment of the rooms and the public spaces in two phases. Services provided by Consultant MEP Design and Supervision Status of Project Design & Construction completed
  • 15. 15/20 SITIA BAY RESORT 5-star Hotel Complex, of 357 beds capacity, in the Municipality of Sitia, in the island of Crete. The Resort consists of a SPA of 100 people capacity, a Conference Centre (200 people capaci- ty), a central lodge with the reception and communal ameni- ties, 31 2-floor bungalows, 2 outdoors and 1 indoors swimming pools. The Resort with its surrounding area are 107,000 m². Services provided by Consultant MEP Design of Buildings and Infrastructure Status of Project Design completed
  • 16. 16/20 HALCYON HILLS Luxury 5-star eco-friendly SPA Resort “Halcyon Hills” close to Klima beach in the island of Samos, Greece, of 693 beds capacity with facilities that include tennis courts, dive centre, gym and a 930 m² SPA. The plot has an area of around 9 hectares and the scope of work is a development of nearly 17,000 m² built area (depending on the exact size of the plot) and the surrounding area of gardens, streets, including infrastructure networks. Services provided by Consultant MEP Design of Buildings and Infrastructure Status of Project Design Development completed
  • 17. 17/20 ALDEMAR OLYMPIAN VILLAGE Renovation and extension of Aldemar Olympian Village 5-star Re- sort complex in Skafidia, Western Peloponnese, Greece. PhaseAResortcomplexofmainhotelandbungalowswith431rooms and 82 suites, along with 49 apartments in bungalow complex. Phase B Extension of the resort complex – Conference Centre with a capacity of 1,200 people, 5-star Hotel of 200 beds capacity and Thalassotherapy Centre & SPA of 4,000 m². Services provided by Consultant MEP Design and Supervision of Buildings and Infrastructure Status of Project Design & Construction completed
  • 18. 18/20 HOLIDAY INN Holiday Inn 5-star hotel in Pallini, Attica, com- prises 191 rooms, 3 suites, indoors pool, con- ference halls and underground parking area. Services provided by Consultant MEP Design and Supervision Status of Project Design & Construction completed
  • 19. 19/20 CANDIA PARK VILLAGE 5 star, 800 beds capacity Candia Park Vil- lage is modelled on a traditional Cretan Village with 222 two-storey homes with a balcony or veranda. Arranged in neigh- bourhoods within the gardens with nar- row streets, its layout is characterized by simplicity and functionality. The square with the clock and the Greek Kafenion add to the charm of this picturesque village. Services provided by Consultant MEP Design and Supervision Status of Project Design & Construction completed
  • 20. 20/20 MIRAMARE PARK SUITES & VILLAS Renovation and extension of Miramare Park Suites & Villas, 5 star, 360 beds capacity. The reception area is regarded as the starting and finishing point of all activities, resembling a train station. The “Wonderland Express”, a faithful repli- ca of a British Midland steam engine from the beginning of last century, crosses the complex from one side to the oth- er on an actual 2-km railway line. A 1,600 m² lake covered with wooden platforms creates an imposing atmosphere. The bungalows cover an area of 60 m² each with hall, kitch- en and dining room near and the main bedroom. Services provided by Consultant MEP Design and Supervision of Buildings and Infrastructure Status of Project Design & Construction completed