2. 2/20
Our company’s experience in working on the
most notable luxury resort developments in
Greece has been a long-standing asset. LDK
has worked with most of the notable Hotel Op-
erator chains and has cumulative knowledge of
their specifications, including expertise in im-
plementing these standardized specifications
to he conditions of the project. We are familiar
with their work methods and the compromis-
es and negotiations that occur between Hotel
Operators and Owners regarding quality and
cost issues. We have accumulated hands-on
experience and know-how in different work-
ing environments, different mentalities and
behaviors, multilingual environments, FIDIC
contracts, international codes and standards
(e.g. NFPA, ASHRAE, BS, EN, CIBSE, IEEE, DIN,
etc.). In the next pages you can browse through
indicative Projects that we have carried out.
3. 3/20
AMANZO’E
Phase A 38 autonomous villas with private
pool / A central building with common use
facilities (Restaurant, Offices, Library, Bar,
Multiple use hall, Stores, Central Kitchen,
Underground parking area), SPA / 1 exterior
pool with restaurant and bar. The complex
along with the surrounding area covers an
area of 100,000 m².
Phase B 30 luxurious villas (from 450 m² to
6.000 m²) / Beach club, locker building, build-
ing with Kitchen, private dining rooms with
an outdoor pool, and a central outdoor pool
/ Reception building with offices and Elec-
trical and Mechanical facilities with power
substation. The complex along with the sur-
rounding area covers an area of 250,000 m².
Services provided by Consultant
MEP Design and Supervision
of Buildings and Infrastructure
Status of Project
Phase A Design & Construction completed
Phase B Design & Construction on going
4. 4/20
COSTA NAVARINO
Integrated Tourist Development
Zone of Messinia (POTA Messinia),
of an area of 1,300,000 m² in the area
of Romanos, Messinia, Greece. The
resort complex consists of The Ro-
manos deluxe hotel (Starwood Lux-
ury Collection) (289 rooms and 32
suites) and The Westin (Starwood
Westin) (445 rooms & suites), a
Conference Centre with a capaci-
ty of 1,200 people, and a Thalasso-
therapy Centre of 4,450 m², along
with a Golf Club of 3,000 m², an 18-
hole golf course and a Golf Acade-
my, and all infrastructure facilities.
Services provided by Consultant
MEP Design of Buildings
and Infrastructure
Status of Project
Design completed
Construction completed
5. 5/20
ATHENS HILTON
Renovation and extension of the 5
star Deluxe Athens Hilton. The hotel
comprises 527 rooms and suites, 4
restaurants and bars, 14 conference
halls and a Health Club of 1,500 m².
The entire design team (architects,
structural engineers, mechanical and
electrical engineers) were located on
site for the duration of the design
and construction phases, sharing of-
fice space with the construction team
allowing prompt response to arising
problems and close coordination.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
6. 6/20
GRANDE BRETAGNE STARWOOD
Renovation of the Grande Bretagne 5-star deluxe ho-
tel of Starwood Luxury Collection in Athens. The hotel
comprises 321 rooms, 59 suites, roof garden, 3 restau-
rants and bars, mixed use halls and a SPA of 800 m².
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
7. 7/20
ASTIR PALACE
Astir Palace Resort Vouliagmeni is a 5 Star Hotel Complex, operated
and managed by Starwood. It is located in Vouliagmeni, Attica, Greece.
The Project involved the full refurbishment of all the MEP installations
Arion Resort and SPA, of the Starwoord’s Luxury Collection (123 rooms)
and the Westin Athens (formerly Nafsika) Hotel of Starwood’s Westin
Hotels & Resorts (165 rooms) along with a Conference Centre and Halls.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
8. 8/20
HYATT REGENCY
HYATT Regency Thessaloniki 5 star Hotel is the first
of HYATT Group in Greece. The hotel complex con-
sists of 118 rooms, 34 suites and a Conference Centre
with a capacity of 1,050 people. The hotels consists
of a SPA and indoor and outdoor swimming pools.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
9. 9/20
GRAND RESORT LAGONISSI
Phase A Renovation and extension of the 5-star
deluxe hotel complex Grand Resort Lagonissi
in Attica, Greece. The complex spreads over an
area of 24 hectars.
Phase B Conference Centre with a capacity of
3,500people,newhealthspabuildingof4,500 m²
and renovation of the main hotel building.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
10. 10/20
GRECOTEL AMIRANDES
Renovation and extension of the
5-star deluxe hotel complex Grecotel
Amirandes, in Gouves, Iraklio, Crete,
Greece. The complex consists of 236
rooms and bungalows with a total ca-
pacity of 638 beds, an Elixir SPA of
520 m², a Conference Centre of 710 m²
of 400 people capacity, 18 villas with
private swimming pools, a presidential
and a royal suite, and 4 restaurants.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design completed
Construction completed
11. 11/20
REGENCY CASINO MONT PARNES
Phase A Two funicular rail stations and an underground park-
ing area with a capacity of 1,000 vehicles.
Phase B 5-star deluxe hotel of 170 beds on Mount Parnitha, At-
tica, Greece, along with a SPA of 1,000 m², a Casino and Casino
VIP halls of 6,000 m², an Exhibition hall and Conference halls.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Phase A Design completed - Construction completed
Phase B Design completed
12. 12/20
ASTERIA HOTEL COMPLEX
Upgrade and Expansion of Asteria Hotel Complex
in Glyfada, Athens, and creation of a water theme
park. The total area is larger than 35,000 m².
Services provided by Consultant
MEP Design
Status of Project
Design development completed
13. 13/20
ELOUNDA BEACH & ELOUNDA BAY
Partial renovations and extensions of the 5-star deluxe hotel complex-
es Elounda Beach and Elounda Bay Palace in Aghios Nikolaos, Crete,
Greece. The two complexes cover an area of 200,000 m² and host 258
rooms, 19 bungalows suites, 105 bungalows, 6 guest houses and 9 su-
per-modern Conference Centres with a total capacity of 1,520 people.
Services provided by Consultant
MEP Design and Supervision of Buildings and Infrastructure
Status of Project
Design & Construction completed
14. 14/20
RADISSON BLU PARK
Radisson Blu Park Hotel, 5-star
hotel, comprises 135 rooms and
suites, roof garden pool, confer-
ence halls and underground park-
ing area. The hotel undergone a full
refurbishment of the rooms and
the public spaces in two phases.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design & Construction completed
15. 15/20
SITIA BAY RESORT
5-star Hotel Complex, of 357 beds capacity, in the Municipality
of Sitia, in the island of Crete. The Resort consists of a SPA of
100 people capacity, a Conference Centre (200 people capaci-
ty), a central lodge with the reception and communal ameni-
ties, 31 2-floor bungalows, 2 outdoors and 1 indoors swimming
pools. The Resort with its surrounding area are 107,000 m².
Services provided by Consultant
MEP Design of Buildings and Infrastructure
Status of Project
Design completed
16. 16/20
HALCYON HILLS
Luxury 5-star eco-friendly SPA Resort “Halcyon Hills”
close to Klima beach in the island of Samos, Greece,
of 693 beds capacity with facilities that include tennis
courts, dive centre, gym and a 930 m² SPA. The plot has
an area of around 9 hectares and the scope of work is
a development of nearly 17,000 m² built area (depending
on the exact size of the plot) and the surrounding area of
gardens, streets, including infrastructure networks.
Services provided by Consultant
MEP Design of Buildings and Infrastructure
Status of Project
Design Development completed
17. 17/20
ALDEMAR OLYMPIAN VILLAGE
Renovation and extension of Aldemar Olympian Village 5-star Re-
sort complex in Skafidia, Western Peloponnese, Greece.
PhaseAResortcomplexofmainhotelandbungalowswith431rooms
and 82 suites, along with 49 apartments in bungalow complex.
Phase B Extension of the resort complex – Conference Centre with
a capacity of 1,200 people, 5-star Hotel of 200 beds capacity and
Thalassotherapy Centre & SPA of 4,000 m².
Services provided by Consultant
MEP Design and Supervision of Buildings and Infrastructure
Status of Project
Design & Construction completed
18. 18/20
HOLIDAY INN
Holiday Inn 5-star hotel in Pallini, Attica, com-
prises 191 rooms, 3 suites, indoors pool, con-
ference halls and underground parking area.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design & Construction completed
19. 19/20
CANDIA PARK VILLAGE
5 star, 800 beds capacity Candia Park Vil-
lage is modelled on a traditional Cretan
Village with 222 two-storey homes with
a balcony or veranda. Arranged in neigh-
bourhoods within the gardens with nar-
row streets, its layout is characterized by
simplicity and functionality. The square
with the clock and the Greek Kafenion add
to the charm of this picturesque village.
Services provided by Consultant
MEP Design and Supervision
Status of Project
Design & Construction completed
20. 20/20
MIRAMARE PARK SUITES & VILLAS
Renovation and extension of Miramare Park Suites & Villas,
5 star, 360 beds capacity. The reception area is regarded as
the starting and finishing point of all activities, resembling
a train station. The “Wonderland Express”, a faithful repli-
ca of a British Midland steam engine from the beginning of
last century, crosses the complex from one side to the oth-
er on an actual 2-km railway line. A 1,600 m² lake covered
with wooden platforms creates an imposing atmosphere.
The bungalows cover an area of 60 m² each with hall, kitch-
en and dining room near and the main bedroom.
Services provided by Consultant
MEP Design and Supervision
of Buildings and Infrastructure
Status of Project
Design & Construction completed