ERWIN E. MENDOZA
EMPLOYMENT HISTORY: DUTIES AND RESPONSIBILITIES:
April, 2010 to Present
ISG Middle East
Sama Tower, Sheikh Zayed
Road
Dubai, United Arab Emirates
Senior HSE Advisor
Website: www.isgplc.com
Projects Completed:
Flat 501
Garden Plaza Tower
Al Nahda, Sharjah, UAE
Mobile +971-50-5090377
Email address erwinmendoza@yahoo.com
Represent the Dept. on all issues pertaining to HSE.
Develop and implement the policies and procedures for Health Safety & Environmental
in relation to international and local legislation.
Produce Site Specific PCMP & Fire Risk Assessment and review it every 3 months.
Conduct Project Site Audits & Inspection which Pertains to HSE.
Manage Health, Safety & Environment Site Set-Up requirements.
Conduct Site Specific Site Induction.
Review and Approved RAMS. (Risk Assessment & Method Statement)
Facilitated Weekly Trade Contractor HSE Meeting.
Coordinate & closure for any Clients Infringement Notices.
Submit Daily / Weekly & Monthly HSE Report.
Inspection of Fire Fighting Equipment.
Facilitate Fire Drill & Emergency Evacuation every 6 mos.
Project Profile:
Playtown, City Walk,
Dubai
The project
An important high profile contract awarded by Meraas Leisure & Entertainment to fit out a
children’s entertainment facility at City Walk. The new venue is on three levels covering
50,000 sq ft. This is part of an exciting change of direction for ISG in UAE, as we are identify
ing a strong pipeline of work in the Leisure & Entertainment sector. The Playtown works are
due to begin early June for a six month period.
Client: Meraas
Value: AED 50m
Project Profile:
1. Healthpoint, Replacement of AHU’s (Phase 1), Abu Dhabi
Value AED3.2M |
ISG successfully completed the Phase 1 works at Healthpoint, which consisted of the
replacement of 3 AHU’s and associated return air units.
2. Healthpoint, Replacement of AHU’s (Phase 2), Abu Dhabi
Value AED13M |
As a result of a successful handover of phase 1, ISG are currently working at Healthpoint,
Abu Dhabi on Phase 2. Phase 2 works includes replacement of 24 AHU’s at this VIP
hospital. The challenge of this project was working in a live hospital environment which
meant zero disruption to business whilst works took place.
3. Healthpoint, VIP/Physio Rooms
Value: AED3m (approx) |
Modifications and upgrade of existing areas within the live hospital of ground floor and level 2
area. Works consisting of modifications to MEP services and decor.
Project Profile:
Kempinski Hotel, Mall of the Emirates
Dubai, UAE
The project
We completely refurbished all of the external facades whilst also adding a new façade
lighting scheme. An external terrace complete with olive trees and a water feature was
also added that by day serves as a dining terrace and by night doubles as a trend
setting bar.
Upgraded reception area, a wood paneled remodeled bar complete with a mosaic
ceiling and private dining facility, all day dining restaurant, kitchens and 393 bedrooms,
including more than 20 suites with balconies on the upper floors, were extensively
2. _________________________________________________________________________________________________
CV, Erwin E. Mendoza Page 2 of 10
upgraded. This involved major strip out works in a rolling sequence of floors to maintain
the clients programmed. In addition, major structural works were undertaken to sheer
walls where new meeting rooms were created.
All of the above was undertaken within a logistically challenging, extremely restricted
site with a brief from the client that we should be invisible.
Client: Majid Al Futtaim
Value: AED 130m
Project Profile:
1 Cleveland Clinic, Levels 13-14, Abu Dhabi
Value AED14M | 30,000 sq ft
The works took the CAT A space and reconfigured the services to suit the new
arrangements. New offices, meeting rooms and break out spaces were formed and the space
is fully occupied with staff servicing the Hospital on Sowwah Island.
2 Cleveland Clinic, Levels 12-18, Abu Dhabi
Value AED31M | 100,000 sq ft
Following the successful completion of floor 13-14, ISG were awarded Phase 2 which
consisted of the fit out of floors 12-18 to the same high standard as previous.
3 Cleveland Clinic, VIP Kitchen Alterations
Value AED7M | 25,000 sq ft
ISG carried out the refurbishment of the existing VIP kitchens and service areas at Cleveland
Clinic Hospital, Abu Dhabi. The primary aim of the project was to conduct the works whilst
allowing the CCAD food service team to operate efficiently, delivering timely meals to the
Royal & VIP patients as well as continuing to conform with the ADFCA regulations.
4 Cleveland Clinic, Staff Kitchen Alterations
Value AED7M | 25,000 sq ft
The existing staff kitchens on Level 6 were stripped out and rebuilt. New clean food
delivery and food waste routes were formed, including new food delivery cold rooms,
food preparation cold rooms and food waste cold room.
5 Cleveland Clinic, Loading Bay refurbishment
Value AED1M | 15,000 sq ft
ISG completed a full refurbishment of the Cleveland Clinic loading bay area including the
installation of a new ceiling and waste management system.
Project Profile:
Lloyds, DIFC
The Project consisted of two entire floors, totaling 19,000sqft within DIFC Building 2,
Dubai. The two floors, consist of a mixture of open plan, cellular offices, filing storage,
print / plotter rooms, pantries, meeting rooms along with additional space for Managing
Agents.
Finishes were higher end consisting of glazed and gypsum partitions, a mixture of
gypsum, metal tile and barisol ceilings along with high specification floor finishes,
including marble, timber, carpet and vinyl.
Project Profile:
Goldman Sachs
Dubai, UAE
The project
The project involved construction works required to fit out the proposed offices space as per
required expectations of the Goldman Sachs standards. The works required constituted CAT
A fit out, including modification to the existing MEP equipment. Perkins + Will (ID Consultant)
together with Hoare Leas (MEP Consultant) developed the design from tender design stage
to detailed design issued for construction. The IT installation for this project was a complex
and challenging process. ISG installed 10 Racks into the server room. The install was N + 1
(duty and standby) and was configured as active/active resilience/redundancy where the
CCU’s alternate between running to maintain longevity. In the event of power failure one unit
will run via a standby generator and UPS configuration and dual power supplies. The CCU’s
were 51.3KW total cooling and 50.9 KW sensible cooling.
Client: Goldman Sachs
Value: AED 20m
3. _________________________________________________________________________________________________
CV, Erwin E. Mendoza Page 3 of 10
Project Profile:
Exxon Mobil
Dubai, UAE
The project
ISG has an international framework agreement with the client and is responsible for the
overall control of the sub-contractors including MEP, data infrastructure and all IT, AV and
CCTV systems.
Packages also included partitioning systems, furniture, carpets, lighting and artwork.
Challenges
In addition to our own robust systems, ISG also had to comply with Exxon Mobil’s stringent
health and safety requirements and are proud to have delivered the project with zero
accidents or incidents by adopting a culture that places us firmly ahead of our competitors.
Client: Exxon Mobil
Value: AED 30m
Project Profile:
Pfizer
Dubai, UAE
The project
Engaged early from a concept design stage, ISG had to ascertain Pfizer’s needs and
specialized requirements particularly with regards to strengthened Security and
telecommunications. Artillery Architects were then commissioned to bring the design on from
concept to construction design.
Pfizer brought EC Harris into the framework as their Project Managers, and we have worked
united with them in delivering this time and budget constrained project, while developing a
strong relationship throughout the process.
Client: Pfizer
Value: AED 16m
Project Profile:
Philips
Dubai, UAE
The project
This project was built over 4 floors from shell and core over a period of 13 weeks
Working closely alongside Arcadis as project managers the works comprised of full MEP
instillation, state of the art conference rooms, executive offices, show rooms and product
display lounge
This project was a show piece for Philips products including intelligent lighting, light controlled
Blinds and Dynalite products and is Philips Middle East head Quarters
Client: Philips
Value: AED 11.1m
Project Profile:
Tourism & Culture Authority
Abu Dhabi, UAE
The project
ISG were appointed by the Abu Dhabi Tourism & Culture Authority for fit out of the full 14
floors. Each floor was an average of 1030sqm and consisted of a mixture of open plan,
glazed Offices, Directors Office, CEO office, auditorium, training rooms ,phone room, server /
IDF room, nursery, war room, prayer room, filing storage, print / plotter rooms, pantries,
board rooms, meeting rooms, smoking room, breakout area and a staff lounge Area.
Finishes are high end with bespoke Bolon vinyl tiles, Botanic Tilia in all board rooms and
meeting rooms, VIP lounge and senior offices with floating timber ceilings and operable walls
with fabric panels feature in meeting rooms.
Double glazed partitions are specified throughout for both Cellular offices and meeting
rooms, this includes double glazed doors which achieve Prayer room finished with carpet
showing Qibla directions, ablutions, pantries & toilets with Metallic finish mosaic floor and
walls, Breakout areas finishes are high end Bolon – Artisan Motley rolls, Omani Beige marble
wall Claddings enhancing the beauty of the offices RW 44Db rating.
Client: Tourism & Culture Authority
Value: AED 55m
4. _________________________________________________________________________________________________
CV, Erwin E. Mendoza Page 4 of 10
August 01, 2007 to March 30, 2010 DUTIES AND RESPONSIBILITIES:
Zabeel & SML Construction JV
FZCO
Villa 19 The Greens
Dubai, United Arab Emirates
Senior HSE Engineer
Website: www.zsml.ae
Project Profile:
China National Petroleum Corporation
Emaar Business Park, Dubai
The project
The Project consists of the entire nine floors, totaling 22,000sqm within Building 1,
Emaar Business Park, Dubai. The nine floors, each have an average of 2,450sqm,
consist of a mixture of open plan, cellular offices, filing storage, print / plotter rooms,
pantries, meeting rooms and a staff lounge.
Our portfolio of projects includes the construction and upgrade of data centres,
laboratories, clean rooms and processing facilities as well as the renewal of critical
infrastructure such as boilers and chillers and the introduction of sustainable initiatives
including solar devices and other energy-efficient solutions.
Our highly skilled teams specialise in all aspects of technical fit out including; data
centres, laboratories, medical theatres, dealers floors, communications rooms, television
broadcasting facilities and recording studios.
Client: China National Petroleum Corporation
Value: AED 36.73m
Project Profile:
Ritz Carlton Spa The Ritz Carlton
Abu Dhabi Grand Canal
The project
The project consists of Male and Female facilities inclusive of Customer Changing and
Treatment Rooms, Hammam, Sauna, Steam Lounge, Rest Rooms and Beauty Saloon.
The Shell and Core has been constructed inclusive of all external walls and finishes, external
doors, external windows, GRC work, rendering, roof, waterproofing, roof plant plinths, internal
walls and structural staircases, lift shaft, builders work holes for MEP services.
Client: Abu Dhabi National Hotel
Value: US 3m
Project Profile:
Yahsat Satellite Office
Abu Dhabi
The project
ISG has an international framework agreement with the client. As a main contractor ISG is
responsible for the overall control of the sub-contractors including MEP, data infrastructure
and all IT, AV and CCTV systems.
Packages also included partitioning systems, furniture, carpets, lighting and artwork.
Client: Yahsat
Value: AED 25m
Conduct Daily Inspection with Sub-Contractor Safety Officer.
Facilitate Weekly Safety Meeting with all Sub-Contractors HSE Representatives.
Document Control for all HSE Documents requirement from EHS- PCFC and
preparation of Weekly and Monthly HSE Report.
Monitor and update all 3
rd
Party Certificates Documents.
Assist HSE Manager in development and implementation of policies and procedures
for Health Safety & Environmental in relation with local laws and legislations.
Ensure that the site is compliance with EHS-PCFC regulations.
Joint Weekly Audit wit EHS PCFC HSE Representative and Nakheel Environmental
Officer.
Review and Approved RAMS.
Ensure all Fire Fighting Equipment are properly maintained and updated.
Facilitate Fire Drill & Emergency Evacuation every 6 mos.
Coordinate & closure for any Clients Infringement Notices.
Conduct specific site induction.
Issued PTW to all Trade Contractors.
Inspection of all Plant Equipment in compliance with EHS-PCFC Regulation.
Fabrication and Placement of Mandatory, Precautionary Signage’s and informative
signage’s and updated as site requirement change.
5. _________________________________________________________________________________________________
CV, Erwin E. Mendoza Page 5 of 10
Project Completed
March 20, 2007 to July 31, 2007 DUTIES AND RESPONSIBILITIES:
United Technology & Trading
Company
Banyas Deira
Dubai, United Arab Emirates
Safety Engineer
Website: www.poolsuae.com
Project Completed:
Project Profile:
Jumeirah Zabeel Saray Plot C4 & C5 Palm Jumeirah Island
Dubai, United Arab Emirates
The Client Zabeel Investments has commissioned the construction of the executive resort
and spa located on plots C4 and C5 of the Crescent on the Palm Jumeirah, Dubai. The
resort will be operated by Rixos Hotels, will be constructed by ZSML and the project will be
managed by EC Harris.The works comprise the construction of a luxury five-star 415 room
hotel and 38 five-bed villas over a 95 000 sqm plot including 50 000 sqm of landscaping and
associated amenities. The hotel is to be seven levels high, plus basement, ground and
mezzanine level. The site is located on reclaimed land and will be fronted by the sea on two
sides
Client: Zabeel Properties Value: AED 2Billion
Project Profile:
Nakheel Sales Office Palm Deira Island
Dubai, United Arab Emirates
The Client Zabeel Investments has commissioned the construction of the executive Nakheel
Sales Office located at the Front of Palm Deira Island, Dubai. The Sales Office were built
mainly commercial sales purposes, constructed by ZSML and the project will be managed by
EC Harris. The works comprise the construction of an 18 000 sqm plot and a 50 000 sqm
landscaping, car parking and associated amenities.
Client: Zabeel Properties Value: AED 1Billion
Attend Main Contractor HSE Coordination Meeting.
Initiate internal HSE Training as per site requirements.
Review and Approved RAMS prior for submission to Main Contractor.
Coordinate new workers to be inducted by Main Contractor HSE Department prior for
issuance of Access pass.
Ensure all water features are well cordoned and maintained cleanliness and proper
material stacking.
Ensure all chemicals are secured in a steel box in a control temperature and
MSDS/COSHH are in place.
Ensure all operatives are in compliance of mandatory PPE on site.
Ensure all Electrical tools are inspected regularly with quarterly color coded.
Submit Monthly HSE Report to Main Contractor.
Project Profile:
Dubai Mall Internal Water Features
Dubai, United Arab Emirates
Challenge 1: To clad two huge water features inside the mall. Basalt stone fixing was very
important in this case. Water is an element that cannot be controlled – and so if the cladding
and the degree of cladding was not done right, then the water would most likely be thrown off
the wall, and onto the onlookers.
Challenge 2: The upper trough that holds the water to be fed to the water feature has to be
aligned correctly with the least difference in levels. Had this not been aligned correctly, the
water fall that you see today would not have been falling off evenly throughout the length of
the water feature.
Challenge 3: There are two external water features that have a choreographed sequencing of
the nozzles with the lights. Programming was critical in this aspect so as to match the nozzles
effect with that of the color changing light.
Client: Emaar Properties Value: AED 50m
6. _________________________________________________________________________________________________
CV, Erwin E. Mendoza Page 6 of 10
August 16, 2005 to March 05, 2007 DUTIES AND RESPONSIBILITIES:
Royal Cargo Combined Logistic
Manila, Philippines
OSH Practitioner / Pollution
Control Officer
Website: www.royalcargo.com
Project Completed:
April 1998 to August 15, 2005 DUTIES AND RESPONSIBILITIES:
F.F. CRUZ & CO., INC.
800 Edsa Quezon City
Manila, Philippines
Safety Officer
Website: www.ffcruz.com.ph
Ensures that personal protective tools and equipment are regularly checked and
maintained
Prepare and conduct safety orientation classes for newly hired employees
Prepares and set programs for the implementation of safety procedures by way of
trainings/seminar.
Attend to all related coordination meetings with the customers such as DSM (Daily
Safety Meeting), CSQ (Contractors Safety and Quality) etc.
Ensure the accesses of the employees are granted on the jobsite i.e ERAAF, EDOOR
Ensure all lifting Equipments are 3
rd
party certified and inspected before use.
Ensure RAMS and Lifting Plan is approved before execution.
Conduct TBT together with Project Lead and operatives before start of work.
Ensure all operatives are in compliance with basic mandatory PPE.
Project Profile:
Intel Philippines
Cavite, Philippines
RCCLI is contracted to do all rigging works of all Intel Equipment coming and coming out. All
Equipments will be rigged thorough rigging platforms using a mobile crane. Equipment will
moved using hydraulic jack, 3 point roller or an Air Pad equipment if required. Outgoing
Equipment will rig-out from the building and it will be properly crate as per international crating
procedure ready to be shipped out.
Client: Intel Philippines Value: As Per Activity Quote
Project Profile:
Process Equipment Modules for Goro Nickel Project
Bauan Batangas, Philippines
The Goro Nickel Project was a process equipment module fabrication and assembly intended
for a nickel mining refinery plant, owned by Inco Australia Management Pty. Ltd. The
subcontract amounted to $24 million, which was started on June 2005 and was completed on
March 2008. The modules were fabricated in EEI Fabrication Shop in Bauan, Batangas and
were shipped to New Caledonia.
Scope of Work:
• Weighing of module to determine the center gravity prior for positioning of 2 multi
axle trailer.
• Transportation of modules from EEI fabrication yard to sea dock loading area.
• Lifting of modules from multi axle trailer to Big Lift Cargo ship.
Client: EEI Corporation Value: Php 50m
Helps maintaining an effective accident/incident prevention program at the workplace
Provides assistance to clients/government inspector in conducting safety and health
inspection.
Prepares guidelines/rules pertaining to safety in and out of working premises, as well
as guidelines/safety procedures for the common cause of all individuals.
Monitor and update all 3
rd
Party Certificates Documents.
Review and Approved RAMS.
Ensure all Fire Fighting Equipment are properly maintained and updated.
Update Traffic Management System as site changes.
Coordinate & closure for any Clients Infringement Notices.
Conduct specific site induction.
Issued PTW to all Trade Contractors.
Inspection of all Plant Equipment in compliance with local laws and legislations.
Fabrication and Placement of Traffic, Mandatory, Precautionary Signage’s and
informative signage’s and updated as site requirement change.
7. _________________________________________________________________________________________________
CV, Erwin E. Mendoza Page 7 of 10
Project Completed:
Project Profile:
Metro Manila Skyway Project Stage 1
Magallanes-Bicutan, Philippines
The first stage of the Skyway System consists of the construction of the 9.5-kilometer
elevated road from Bicutan, Parañaque City to the Makati Central Business District as well as
the rehabilitation of the 13.5-kilometer section of the South Luzon Expressway from Alabang
to Magallanes.
When Skyway Stage 1 first opened to traffic in 1999, an average of 160,000 vehicles per day
used the Skyway System—around 25,000 on the elevated and 135,000 on the at-grade—with
these numbers increasing in subsequent years. Millions of commuters now use the Skyway
System every day, and they have all benefited from the concrete benefits of the completed
project.
Before the Skyway System, a trip from Alabang to Magallanes took about two hours on the
average. With the Skyway Stage 1 in operation, it now takes only 30 minutes or less to travel
on the Alabang-Magallanes at-grade section and less than 15 minutes on the elevated
section. Motorists have also been enjoying the excellent road condition, expert traffic
management, less pollution and no flooding on the Skyway System.
Skyway Stage 1 has already afforded thousands of motorists enormous savings since its soft
opening in December 1998, slashing travel time from the snail-paced southern arteries to the
Makati Central Business District by as much as 50%.
.
Client: CITTRA Value: Php 1.5 Billion
Project Profile:
Fort Bonifacio – Kalayaan Edsa Buendia Fly Over Project
Makati, Philippines
The flyover is 645 meters in length, its two lanes separated by concrete meridian one meter in
width. Road works and other related structures were likewise built to make the flyover
operational.
Client: Bonifacio Properties Value: Php 800m
Project Profile:
Amorsolo Canal Cover Project 1D2-D
Makati, Philippines
For the road over the Amorsolo Canal we used precast concrete planks for deck slab and
sidewalks. These concrete planks were supported by continuous beams cast at grade and sit
on the canal banks and resting on concrete micro-pile foundation. This project included
upgrading the box culvert on road intersection, drainage, dredging works, and construction of
road curb, road markings and other road appurtenants.
Client: CITTRA Value: Php 500m
Project Profile:
Metro Manila Flood Control Project
Psig, Philippines
FFCCI conducted the civil works for this one-billion-peso project of the Department of Public
Works and Highways, including the construction of the following: discharge sluice, surge tank,
bypass, pump house, intake canal, pump pit, trash hopper foundation and oil storage tank
foundation. We also undertook the rehabilitation and dredging of two waterways connected
with the San Andres Pumping Station: The Estero de Pandacan and Estero Tripa de Gallina –
using concrete sheet piles as revetment for the 3.5 kilometer stretch.
Client: DPWH Value: Php 1 Billion
8. _________________________________________________________________________________________________
CV, Erwin E. Mendoza Page 8 of 10
EDUCATIONAL ATTAINMENT:
• Graduate, Bachelor of Science in Civil Engineering
Technological Institute of the Philippines, Manila
(5 Years Course)
• Graduate, Associate in Maritime Transportation
PMI-Colleges, Manila
(4 Years Course)
ACCREDITATION/MEMBERSHIP:
• NEBOSH (International General Certificate) SHEilds (ME) Ltd, Dubai.
• IOSH Managing Safely by British Safety Council
Cert No. 10793
• Registered Safety Advisor (SARS)
By: Nakheel-EHS Dubai World Project
Reg. No. 0352-1
• OSHA-Construction Safety & Health (30 Hours)
By: U.S. Department of Labor
Reg. No. 600119907
• Accredited Safety Practitioner
By: Department of Labor and Employment-BWC
BWC No. 1001203 CA No. 1033-050118-1281
• Accredited Pollution Control Officer
By: Department of Environment and Natural Resources
PCO#336H342
• Holding Valid UAE-Dubai Driving Licensed.
DL No. 1222391
HSE TRAININGS ATTENDED:
TRAININGS / SEMINARS VENUES DATE
Number
of
Hours
Safety of Life at Sea (SOLAS) Personal
Survival Techniques; First Aid at Sea; Fire
Fighting/Fire Prevention & Survival
Craft/Boat Handling
Mariners (Polytechnic Training Center) January 28, 1994 8 Hours
F.F. CRUZ & CO., INC. – “Oxy-Acetylene
and Electrical Arc Welding”
Amorsolo Canal Cover Project –
Amorsolo St., Makati City, Philippines
December 28, 1999 2 Hrs.
F.F. CRUZ & CO., INC. – “Mobile / Crawler
Crane, Slings and Clips Safety”
Amorsolo Canal Cover Project –
Amorsolo St., Makati City, Philippines
December 28, 1999 3 Hrs.
F.F. CRUZ & CO., INC. – “Causes of
Accident and Temporary Structure”
Amorsolo Canal Cover Project –
Amorsolo St., Makati City, Philippines
January 5, 2000 8 Hrs.
Occupational Safety & Health (OSH) in
Construction
CMDF, 6/F, Prudential Bank Bldg.,
Pasong Tamo St., Makati City
Philippines
May 7-11, 2001 40 Hrs.
Construction Safety and Health Course for
Safety Officer
PCA Escobar Training Centre, 3/F,
Padilla Bldg.
Emerald Ave., Ortigas Center, Pasig
City. Philippines
June 1,8,15,22 and 29,
2002
40 Hrs.
The Association of Carriers & Equipment
Lessors, Inc. –
Safe Rigging Practices for Safety Officers,
Riggers & Crane Operators.
ACEL Seminar Room, 1601 Jolibee
Plaza Condominium, Emerald Avenue,
Ortigas, Pasig City. Philippines
July 20, 2002 8 Hrs.
F.F. CRUZ & CO., INC. – Basic Supervisory
Skills Programs
Heavy Equipment Division, FFCCI
Pasig City Philippines
October 12 and 19, 2002 16 Hrs.
9. _________________________________________________________________________________________________
CV, Erwin E. Mendoza Page 9 of 10
The Association of Carriers & Equipment
Lessors, Inc. –
Advance Rigging and Safe Crane
Operation.
TESDA Women’s Center, Taguig, Metro
Manila, Philippines
November 12, 2002 8 Hrs
Construction Safety Training for Site Safety
Officers
PCA Escobar Training Centre, 3/F,
Padilla Bldg. Emerald Ave., Ortigas
Center, Pasig City. Philippines
October 6-11, 2003 40 Hrs.
The Philippine National Red Cross –
Dissemination on International Humanitarian
Law (IHL) and the Red Cross Movement.
PNRC-Rizal Chapter
Pasig City, Philippines
April 17, 2004 8 Hrs.
The Philippine National Red Cross – First
Aid Training
Pasig Catholic College
Pasig City, Philippines
April 19-22, 2004 32 Hrs.
The Philippine National Red Cross – Basic
Life Support, CPR Training Healthcare
Providers
Pasig Catholic College
Pasig City, Philippines
April 23-24, 2004 16 Hrs.
Accident Prevention (Home Safety) Pasig Catholic College
Pasig City, Philippines
May 14, 2004 8 Hrs
U.S. Department of Labor- OSHA 30 Hrs.
Construction Safety & Health
Intel Technology Philippines-General
Trias Cavite City, Philippines
June, 2006 30 Hrs.
Pollution Control Association of the
Philippines Inc.- Pollution Control Officer
Training Course
PCAPI-Unit 245-247, Cityland Pioneer
St., Mandaluyong City 1550,
Philippines.
September 18-22, 2006 40 Hrs.
Rigging, Lifting and Slinging Banks man Eurolink Safety, Dubai UAE September 26, 2007 8 Hrs.
CPR & Basic First Aid American Safety & Health Institute,
Ministry of Health (UAE) & Department
of Health & Medical Services (Dubai)
October 16, 2007 8 Hrs.
Fire Fighting Training Mirdif Security & Safety Consultant,
Dubai UAE
November 1, 2007 8 Hrs.
Scaffolding Training Eurolink Safety, Dubai UAE February 23 & 27, 2008 16 Hrs.
Nakheel-EHS Safety Advisor Registration
Training
Nakheel Asset Management Dubai UAE March 25 & 26, 2008 16 Hrs.
NEBOSH (International General Certificate)
IGC-1; IGC-2; IGC-3
SHEilds (ME) Ltd, Dubai. October 8 & 9, 2009 Exam
Passed
IOSH (Managing Safely) Cert, No. 10793 British Safety Council Dubai 17 April 2015
Passed
Working Safety at Height Cert. 117494 Eurolink Safety 18 February 2016 8 Hours
IPAF-MEWPS for Managers Cert.
OP/1189334
IPAF - Al Laith Scaffolding LLC 1 February 2016 8 Hours
Total Number of Hours 371 Hrs.
10. _________________________________________________________________________________________________
CV, Erwin E. Mendoza Page 10 of 10
References:
1. Gary Harsant
HSQE Manager
ISG Middle East LLC.
E-mail: gary.harsant@isgmideast.com
Mobile Number: +971 501731025
2. Andy Woods
Project Manager
Philips
E-mail: andy.woods@ophilips.com
Mobile Number: +971 551003884
3. Herbert Brucal
Regional EHS Manager
Middle East & Africa, Johnson Controls
E-mail: hbrucal@gmail.com
Mobile Number: +971 558787351
4. Paul Gyles
Chief Financial Officer
Meraas Holding
E-mail: paul.gyles@meraas.ae
Mobile Number: +971 50 4507677
Dialect Spoken:
1. English
2. Hindi
3. Turkish
4. Arabic
5. Tagalog