Table of Content
 What is sampling
 Need of sampling
 Cement- As a building Material
 Sampling of cement
 Process Inspection
 Lot Inspection
 Precautions to be taken while sampling
 Tests of cement
What is sampling?
 Sampling is the removal of a portion from a given lot of material which is then a representative
of the whole lot and of a convenient size for further testing.
 It is done either by hand or by an equipment.
 Hand sampling is usually expensive, slow, and inaccurate, (so that it is generally applied only
where the material is not suitable for equipment sampling or where machinery is either not
available or too expensive to install.)
 Many different sampling devices are available, including shovels, pipe samplers, and automatic
machine samplers.
Need of sampling
 Materials used in construction should be of good quality and to check whether a material is
standard or not, sampling and testing is important.
 Sampling can save time and money. A sample study is usually less expensive than a census
study and produces results at a relatively faster speed.
 Sampling remains the only choice when a test involves the destruction of the item under study.
Cement- As a Building Material
 Cement is a mixture of calcareous, siliceous, argillaceous & other substances.
 It is made by mixing substances containing CaCO3, with substances containing SiO2, Alumina
& Iron oxide, after heating this mixture, the resultant clinker is grinded to be a fine powder,
which is a Cement.
 It has both adhesive & Cohesive Properties.
 It is one of most used building material.
Sampling of cement
 Process Inspection
 For an in-process quality check for the intermediate and finished product during the
production process.
 Lot Inspection
 Lot Inspection will be generated at the time of production order release.
Process Inspection
 By Purchaser- To ensure its conformity to the specification requirements
 By Manufacturer- To ensure uniformity & reduce quality fluctuations to minimum.
 Methods of Drawing samples
Clinker-
a) Every hour from each kiln, immediately after coming out from cooling chamber.
b) After mixing all these hourly samples, a composite sample shall be made for a day.
c) From this composite sample, a small quantity is taken out for the chemical analysis.
d) Remaining clinker is pulverized after mixing it with gypsum & tested for the other
characteristics.
Process Inspection
Cement Grinding-
a) From grinding mill, Hourly for testing setting time and every alternate hour for fineness test.
b) Remaining portions from hourly sample shall be mixed to be a composite sample of the week &
tested for the other characteristics, such as heat of hydration of cement.
Cement Packing-
a) From Packing machine, daily for testing fineness, setting time, soundness, compressive strength
and degree of whiteness.
b) Remaining portions form daily sample shall be mixed to be a composite sample of the week &
tested for the other characteristics, such as heat of hydration of cement.
Lot Inspection
 When Process Inspection cannot be made available or when the purchaser so desires, the
procedure of Lot Inspection shall be followed for judging conformity of the lot of
hydraulic cement.
 Recommended- cement should be sampled when it is in motion.
1. Sampling From Conveyors
2. Sampling from bulk storage
3. Sampling from ship’s hold
4. Sampling from wagons
5. Sampling from bags
Lot Inspection
 Sampling from conveyors
1. A lot shall be divided into sub lots at the time of discharging over
a conveyor belt.
2. Then a gross sample is drawn from each of the sub lots & shall be
kept separately.
3. The collecting frequency should be one increment for every 10
tons of discharged cement.
4. Mostly a scoop is used for the sampling from moving belts, which
can sweep across the cross section of the material & along the
belt.
5. After taking the increments out of sub lots, they shall be placed
directly on a moisture proof, air tight containers to avoid moisture
absorption & Aeration of sample.
No’s of sub lots into which a lot is to
be divided
Wt. of Lot (Tons) No’s of sub-lots
<100 2
101-200 3
201-300 4
301-500 5
501-1000 6
1001-2000 7
Lot Inspection
 Sampling from Bulk Storage i.e. silos
1. A lot shall be divided into sub lots depending upon the weight of the Lot
2. Then a gross sample is drawn from each of the sub lots when the cement is being charged into bulk
storage or at the time of discharging from the bulk storage.
3. Increment shall be taken from each opening.
4. The collecting frequency should be one increment for every 10 tons of discharged cement.
Lot Inspection
 Sampling from Ship’s Hold
1. A lot shall be divided into sub lots depending upon the weight of the Lot
2. For collecting samples from ship’s hold, i.e. for depths greater than 2 m, sampling pipe activated
by air jet is used.
3. Then a gross sample is drawn from each of the sub lots.
4. The collecting frequency should be one increment for every 10 tons of cement.
5. The increment shall be weight at least 2 kg.
Lot Inspection
 Sampling from Wagons
1. A lot shall be divided into sub lots depending upon the weight of the Lot
2. For collecting samples from wagons, i.e. for depths smaller than 2 m, Slotted-tube sampler is
used.
3. Then a gross sample is drawn from at least six evenly distributed points in each selected wagon.
4. The increment shall be weight at least 2 kg.
5. After taking the increments out of wagons, they shall be placed directly on a moisture proof, air
tight containers to avoid moisture absorption & Aeration of sample.
Lot Inspection
 Sampling from Bags
1. A lot shall be divided into sub lots depending upon the weight of the Lot.
2. at least 2 percent of the bags (minimum of five) shall be sampled.
3. Selection of bags should be random.
4. Tube sampler shall be inserted diagonally into the valve of the bag and the thumb placed over the
air hole and then shall be withdrawn.
5. Equal no’s of increments should be taken out from each bags.
6. The increment shall be weight at least 2 kg.
Sampling Equipments
Tube Sampler For Bags Slotted Tube sampler for bulk storage
Sampling of Cement
 Precautions to be taken while sampling
1. The sampling instrument shall be clean and dry when used.
2. Precautions shall be taken to protect the sample, the material being sampled, the sampling equipment
and the containers for samples from adventitious contamination.
3. The sample containers shall be of such a size that they are almost completely filled by the sample.
4. The sample containers shall he sealed air-tight after filling and marked with full particulars of the
material and the date of sampling.
5. Samples shall be stored in such a manner that the temperature of the material does not vary unduly from
the normal temperature.
6. The place of sampling shall be clean and dry and free from draught.
Test on Cement
The following tests are conducted on cement in the laboratory are as follows:
1. Consistency Test
2. Setting Time Test
3. Fineness Test
4. Strength Test
5. Soundness Test
6. Heat of Hydration Test
7. Tensile Strength Test
8. Chemical Composition Test
Test on Cement
The following tests are conducted on cement in the field are as follows:
1. Colour Test of Cement
2. Presence of Lumps
3. Cement Adulteration Test
4. Float Test
5. Date of Manufacturing
Consistency Test of cement
 Aim: To determine consistency of standard Cement paste.
 Apparatus:
Consistency Test of cement
Material Used:
Cement material shall be stored in
sealed, airtight containers to avoid
changes in its characteristics due to
absorption or deposition from the
atmosphere.
Consistency Test of cement
 Procedure:
• Keep the vicat apparatus on a level base while using vicat apparatus with dashpot, keep the bearing
movable rod to its highest position and pin it. Unscrew the top of the dashpot. Half fill the dashpot
with any suitable oil of viscosity and screw the top. Work the plunger a number of times.
• Attach the plunger for determining standard consistency to the movable rod. Work the plunger a
number of times.
• Take 400 gm of cement in a pan and a weighed quantity of water in a beaker.
• Prepare a paste with the water added to cement. Start a stopwatch at the time of adding water to
cement.
• Keep the vicat mould on a non-porous plate and fill the cement paste in it.
Consistency Test of cement
 Procedure:
Consistency Test of cement
 Procedure:
Consistency Test of cement
 Procedure:
• After completely filling the mould, shake it slightly to expel the air. Smooth off the surface of the
paste making it level with the top of the moulder. The cement pastes thus prepared is the test block.
• Place the test block resting on the non-porous plate under the movable rod, bearing the needle.
• Lower the plunger gently to touch the surface of the cement paste and quickly release.
• Remove the pin holding the movable bearing rod to the surface of the cement paste and quickly
release by pushing down the plunger to sink in to the paste. This operation shall be done
immediately after filling the mould.
• Prepare trial test specimens with varying percentages of water until plunger penetrates to a point 5
to 7mm from the bottom of the vicat mould, which is read on the scale. Express the water required
as percentage by weight of the dry cement.
Consistency Test of cement
 Procedure:
Consistency Test of cement
 Observation Table:
SR. NO. DESCRIPTION READING
1. Weight of cement taken (g) (W1)
2. Quantity of water added to cement (W2)
3
Standard Consistency of Cement for 5-7 mm
penetration (W2/W1*100)
Consistency Test of cement
 Significance and importance of the test:
1. It determines the amount of water needed to make a paste. It is necessary to determine consistency
because the amount of water affects the setting time of the cement.
2. Consistency plays a vital role in the determination of compressive strength of concrete or
workability test for concrete.
3. Less water than this quantity would not complete chemical reaction thus resulting in the reduction
of strength and more water would increase water-cement ratio and so would reduce its strength.
Consistency Test of cement
 Why is Consistency Test Done?
We know that the cement we used on our site is mostly affected by
1. Weather Conditions
2. Excessive combination of Silica. One of the cement ingredients which determines the initial and final
setting time of cement paste.
3. The fineness of cement.
4. Manufacturing Defects
By Standardising the consistency of cement, we know that how much of water is required to produce an
effective cement which will eventually produce good quality of concrete.
 Aim :- Determination of the initial and final setting time of cement.
 Reference: - IS 4031 (Part-5):1988
 Apparatus :- Vicat apparatus, Vicat mould, needle, gauging trowel, measuring jar, weighing balance,
stop watch, rubber glove, non porous glass plate.
 Material:- Ordinary Portland cement; Water.
Setting Time of Cement
Setting Time of Cement
Setting Time of Cement
 Theory :-
• The time to which cement can be moulded in any desired shape without losing it’s strength is called
Initial setting time of cement
or
• The time at which cement starts hardens and completely loses its plasticity is called Initial setting time of
cement
or
• The time available for mixing the cement and placing it in position is an Initial setting time of cement.
or
• Initial set is a stage where the cement paste stiffens to such an extent that the Vicat needle is not
permitted to move down through the paste within 5 ± 0.5 mm measured from the bottom of the mould.
The time elapsed between the moments that the water is added to the cement to the initial set is regarded
as initial setting time.
Setting Time of Cement
• The time at which cement completely loses its plasticity and became hard is a final setting time of
cement.
or
• The time taken by cement to gain its entire strength is a Final setting time of cement.
• For an ordinary Portland cement, the initial setting time should not be less than 30 minutes while the
final setting time should not be more than 600 minutes.
 Procedure :-
1) Preparation of Test Block
• Prepare a neat cement paste by gauging the cement with 0.85 times the water required to give a paste of
standard consistency. Potable or distilled water shall be used in preparing the paste. The paste shall be
gauged in the manner and under the conditions prescribed in IS : 4031 (Part 5)- 1988. Start a stop-watch
at the instant when water is added to the cement. Fill the Vicat mould with a cement paste gauged as
above, the mould resting on a nonporous plate. Fill the mould completely and smooth off the surface of
the paste making it level with the top of the mould. The cement block thus prepared in the mould is the
test block.
• Immediately after moulding, place the test block in the moist closet or moist room and allow it to
remain there except when determinations of time of setting are being made.
Setting Time of Cement
2) Determination of Initial Setting Time
• Place the test block confined in the mould and resting on the non-porous plate, under the rod bearing the
needle (with cross section 1 mm2 ).
• lower the needle gently until it comes in contact with the surface of the test block and quickly release,
allowing it to penetrate into the test block.
• In the beginning, the needle will completely pierce the test block. Repeat this procedure until the
needle, when brought in contact with the test block and released as described above, fails to pierce the
block beyond 5.0 ± 0.5 mm measured from the bottom of the mould.
• The period elapsing between the time when water is added to the cement and the time at which the
needle fails to pierce the test block to a point 5.0 ± 0.5 mm measured from the bottom of the mould shall
be the initial setting time.
Initial & Final Setting Time of Cement
Initial & Final Setting Time of Cement
3) Determination of Final Setting Time-
• Replace the needle of the Vicat apparatus by the needle with an annular attachment .
• The cement shall be considered as finally set when, upon applying the needle gently to the surface of
the test block, the needle makes an impression thereon, while the attachment fails to do so.
• The period elapsing between the time when water is added to the cement and the time at which,
attachment fails to make an impression on the surface of test block shall be the final setting time.
Initial & Final Setting Time of Cement
Initial & Final Setting Time of Cement
 Observations:-
• Weight of given sample of cement is ___________ g.
• The normal consistency of a given sample of cement is ___________ %
• Volume of water taken(0.85 times the water required to give a paste of standard consistency) for preparation of test
block ____________ ml
Initial & Final Setting Time of Cement
Initial & Final Setting Time of Cement
 Precaution for Initial and Final setting time of cement test
• The needle should be cleaned after every use.
• The mould should be slightly moved so that the penetration would not be at the same place.
• The experiment should be carried out at a place where there is no external vibration or disturbance.
• The mould should not have any type of movement from initial setting time to final setting time.
• The temperature of the room in which the experiment is conducted should be maintained around 27º-29º C
and hydration should be maintained in between 60-70%.
The End..!

More Related Content

What's hot

What's hot (20)

How to determine Soundness of cement?
How to determine Soundness of cement?How to determine Soundness of cement?
How to determine Soundness of cement?
 
Pull out test for concrete
Pull out test for concretePull out test for concrete
Pull out test for concrete
 
Ready mix concrete (2)
Ready mix concrete (2)Ready mix concrete (2)
Ready mix concrete (2)
 
Aggregates of Concrete
Aggregates of ConcreteAggregates of Concrete
Aggregates of Concrete
 
Cement testing
Cement testingCement testing
Cement testing
 
Batching and mixing
Batching and mixingBatching and mixing
Batching and mixing
 
How to control kiln shell corrosion
How to control kiln shell corrosionHow to control kiln shell corrosion
How to control kiln shell corrosion
 
Cement
CementCement
Cement
 
Bs 1881-part-116-83
Bs 1881-part-116-83Bs 1881-part-116-83
Bs 1881-part-116-83
 
2. testing of cement ppt
2. testing of cement ppt2. testing of cement ppt
2. testing of cement ppt
 
CEMENT Lecture Note.pptx
CEMENT Lecture Note.pptxCEMENT Lecture Note.pptx
CEMENT Lecture Note.pptx
 
Manufacturing and Quality Control of Cement.
Manufacturing and Quality Control of Cement.Manufacturing and Quality Control of Cement.
Manufacturing and Quality Control of Cement.
 
Cement
CementCement
Cement
 
Introduction on flexural testing machine
Introduction on flexural testing machineIntroduction on flexural testing machine
Introduction on flexural testing machine
 
ICP / MS Technique
ICP / MS TechniqueICP / MS Technique
ICP / MS Technique
 
Cement
CementCement
Cement
 
Heat of Hydration in Mass Concrete
Heat of Hydration in Mass ConcreteHeat of Hydration in Mass Concrete
Heat of Hydration in Mass Concrete
 
Cement course
Cement courseCement course
Cement course
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
FOAM CONCRETE STUDY AND TESTING
FOAM CONCRETE STUDY AND TESTINGFOAM CONCRETE STUDY AND TESTING
FOAM CONCRETE STUDY AND TESTING
 

Similar to Sampling of cement & its tests

Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...Mayur Rahangdale
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Vijay Patidar
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Vijay Patidar
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01Engr. Umair Razzaq
 
Transportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfTransportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfRESHMAFEGADE
 
Practical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptxPractical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptxLaxmiNarayanGurung
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersPhurba Tamang
 
Cement and admixtures
Cement and admixturesCement and admixtures
Cement and admixturesTarun kumar
 
F &amp; f lab manual prepared by prashant mulge appa iet gulbarga
F &amp; f lab manual prepared by prashant mulge appa iet gulbargaF &amp; f lab manual prepared by prashant mulge appa iet gulbarga
F &amp; f lab manual prepared by prashant mulge appa iet gulbargaPrashant Mulge 8095548003
 
Fresh Concrete - Presentation.pptx
Fresh Concrete - Presentation.pptxFresh Concrete - Presentation.pptx
Fresh Concrete - Presentation.pptxBhanumathiBadana
 
Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...chourasiya12345
 
34p making concrete test in field
34p  making concrete test in field34p  making concrete test in field
34p making concrete test in fieldOmar Adelouane
 
Concrete lab manual - Polytechnics
Concrete lab manual - PolytechnicsConcrete lab manual - Polytechnics
Concrete lab manual - PolytechnicsSHAMJITH KM
 
Properties of Concrete (cement)
Properties of Concrete (cement)Properties of Concrete (cement)
Properties of Concrete (cement)Salman H. Sindhoo
 

Similar to Sampling of cement & its tests (20)

Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
 
Transportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfTransportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdf
 
Practical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptxPractical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptx
 
Cement tests
Cement testsCement tests
Cement tests
 
Yawer
YawerYawer
Yawer
 
Yawer
YawerYawer
Yawer
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil Engineers
 
Cement and admixtures
Cement and admixturesCement and admixtures
Cement and admixtures
 
Cement Test.pdf
Cement Test.pdfCement Test.pdf
Cement Test.pdf
 
Types of road material and its tests
Types of road material and its testsTypes of road material and its tests
Types of road material and its tests
 
F &amp; f lab manual prepared by prashant mulge appa iet gulbarga
F &amp; f lab manual prepared by prashant mulge appa iet gulbargaF &amp; f lab manual prepared by prashant mulge appa iet gulbarga
F &amp; f lab manual prepared by prashant mulge appa iet gulbarga
 
Fresh Concrete - Presentation.pptx
Fresh Concrete - Presentation.pptxFresh Concrete - Presentation.pptx
Fresh Concrete - Presentation.pptx
 
Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...
 
34p making concrete test in field
34p  making concrete test in field34p  making concrete test in field
34p making concrete test in field
 
Concrete lab manual - Polytechnics
Concrete lab manual - PolytechnicsConcrete lab manual - Polytechnics
Concrete lab manual - Polytechnics
 
Properties of Concrete (cement)
Properties of Concrete (cement)Properties of Concrete (cement)
Properties of Concrete (cement)
 
L 37 final
L 37 finalL 37 final
L 37 final
 

More from Kundan Sanap

Cash flow report using ms project
Cash flow report  using ms projectCash flow report  using ms project
Cash flow report using ms projectKundan Sanap
 
Project monitoring activity
Project monitoring activityProject monitoring activity
Project monitoring activityKundan Sanap
 
Role of artificial intellligence in construction engg &amp; management
Role of artificial intellligence in construction engg &amp; managementRole of artificial intellligence in construction engg &amp; management
Role of artificial intellligence in construction engg &amp; managementKundan Sanap
 
Roles of gps in high rise buildings construction
Roles of gps in high rise buildings constructionRoles of gps in high rise buildings construction
Roles of gps in high rise buildings constructionKundan Sanap
 
Gantt chart of Minor bridge
Gantt chart of Minor bridge Gantt chart of Minor bridge
Gantt chart of Minor bridge Kundan Sanap
 
Report on Planning & scheduling of a Minor bridge
Report on Planning & scheduling of a Minor bridgeReport on Planning & scheduling of a Minor bridge
Report on Planning & scheduling of a Minor bridgeKundan Sanap
 
Organizational structure of SAIL
Organizational structure of SAILOrganizational structure of SAIL
Organizational structure of SAILKundan Sanap
 
Forecasting method
Forecasting methodForecasting method
Forecasting methodKundan Sanap
 
Project management information system (PMIS)
Project management information system (PMIS)Project management information system (PMIS)
Project management information system (PMIS)Kundan Sanap
 
Environmental impact assessment case study
Environmental impact assessment case studyEnvironmental impact assessment case study
Environmental impact assessment case studyKundan Sanap
 
Case study on flexible pavement failures
Case study on flexible pavement failuresCase study on flexible pavement failures
Case study on flexible pavement failuresKundan Sanap
 
Cantilever bridge construction
Cantilever bridge constructionCantilever bridge construction
Cantilever bridge constructionKundan Sanap
 

More from Kundan Sanap (12)

Cash flow report using ms project
Cash flow report  using ms projectCash flow report  using ms project
Cash flow report using ms project
 
Project monitoring activity
Project monitoring activityProject monitoring activity
Project monitoring activity
 
Role of artificial intellligence in construction engg &amp; management
Role of artificial intellligence in construction engg &amp; managementRole of artificial intellligence in construction engg &amp; management
Role of artificial intellligence in construction engg &amp; management
 
Roles of gps in high rise buildings construction
Roles of gps in high rise buildings constructionRoles of gps in high rise buildings construction
Roles of gps in high rise buildings construction
 
Gantt chart of Minor bridge
Gantt chart of Minor bridge Gantt chart of Minor bridge
Gantt chart of Minor bridge
 
Report on Planning & scheduling of a Minor bridge
Report on Planning & scheduling of a Minor bridgeReport on Planning & scheduling of a Minor bridge
Report on Planning & scheduling of a Minor bridge
 
Organizational structure of SAIL
Organizational structure of SAILOrganizational structure of SAIL
Organizational structure of SAIL
 
Forecasting method
Forecasting methodForecasting method
Forecasting method
 
Project management information system (PMIS)
Project management information system (PMIS)Project management information system (PMIS)
Project management information system (PMIS)
 
Environmental impact assessment case study
Environmental impact assessment case studyEnvironmental impact assessment case study
Environmental impact assessment case study
 
Case study on flexible pavement failures
Case study on flexible pavement failuresCase study on flexible pavement failures
Case study on flexible pavement failures
 
Cantilever bridge construction
Cantilever bridge constructionCantilever bridge construction
Cantilever bridge construction
 

Recently uploaded

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 

Sampling of cement & its tests

  • 1. Sampling of cement & Its Tests PREPARED BY: KUNDAN S. SANAP- 202030016 OMKAR H. KHARADE- 202030002 MAYUR U. RAHANGDALE- 202030018. VEERMATA JIJABAI TECHNOLOGICAL INSTITUTE, MATUNGA
  • 2. Table of Content  What is sampling  Need of sampling  Cement- As a building Material  Sampling of cement  Process Inspection  Lot Inspection  Precautions to be taken while sampling  Tests of cement
  • 3. What is sampling?  Sampling is the removal of a portion from a given lot of material which is then a representative of the whole lot and of a convenient size for further testing.  It is done either by hand or by an equipment.  Hand sampling is usually expensive, slow, and inaccurate, (so that it is generally applied only where the material is not suitable for equipment sampling or where machinery is either not available or too expensive to install.)  Many different sampling devices are available, including shovels, pipe samplers, and automatic machine samplers.
  • 4. Need of sampling  Materials used in construction should be of good quality and to check whether a material is standard or not, sampling and testing is important.  Sampling can save time and money. A sample study is usually less expensive than a census study and produces results at a relatively faster speed.  Sampling remains the only choice when a test involves the destruction of the item under study.
  • 5. Cement- As a Building Material  Cement is a mixture of calcareous, siliceous, argillaceous & other substances.  It is made by mixing substances containing CaCO3, with substances containing SiO2, Alumina & Iron oxide, after heating this mixture, the resultant clinker is grinded to be a fine powder, which is a Cement.  It has both adhesive & Cohesive Properties.  It is one of most used building material.
  • 6. Sampling of cement  Process Inspection  For an in-process quality check for the intermediate and finished product during the production process.  Lot Inspection  Lot Inspection will be generated at the time of production order release.
  • 7. Process Inspection  By Purchaser- To ensure its conformity to the specification requirements  By Manufacturer- To ensure uniformity & reduce quality fluctuations to minimum.  Methods of Drawing samples Clinker- a) Every hour from each kiln, immediately after coming out from cooling chamber. b) After mixing all these hourly samples, a composite sample shall be made for a day. c) From this composite sample, a small quantity is taken out for the chemical analysis. d) Remaining clinker is pulverized after mixing it with gypsum & tested for the other characteristics.
  • 8. Process Inspection Cement Grinding- a) From grinding mill, Hourly for testing setting time and every alternate hour for fineness test. b) Remaining portions from hourly sample shall be mixed to be a composite sample of the week & tested for the other characteristics, such as heat of hydration of cement. Cement Packing- a) From Packing machine, daily for testing fineness, setting time, soundness, compressive strength and degree of whiteness. b) Remaining portions form daily sample shall be mixed to be a composite sample of the week & tested for the other characteristics, such as heat of hydration of cement.
  • 9. Lot Inspection  When Process Inspection cannot be made available or when the purchaser so desires, the procedure of Lot Inspection shall be followed for judging conformity of the lot of hydraulic cement.  Recommended- cement should be sampled when it is in motion. 1. Sampling From Conveyors 2. Sampling from bulk storage 3. Sampling from ship’s hold 4. Sampling from wagons 5. Sampling from bags
  • 10. Lot Inspection  Sampling from conveyors 1. A lot shall be divided into sub lots at the time of discharging over a conveyor belt. 2. Then a gross sample is drawn from each of the sub lots & shall be kept separately. 3. The collecting frequency should be one increment for every 10 tons of discharged cement. 4. Mostly a scoop is used for the sampling from moving belts, which can sweep across the cross section of the material & along the belt. 5. After taking the increments out of sub lots, they shall be placed directly on a moisture proof, air tight containers to avoid moisture absorption & Aeration of sample. No’s of sub lots into which a lot is to be divided Wt. of Lot (Tons) No’s of sub-lots <100 2 101-200 3 201-300 4 301-500 5 501-1000 6 1001-2000 7
  • 11. Lot Inspection  Sampling from Bulk Storage i.e. silos 1. A lot shall be divided into sub lots depending upon the weight of the Lot 2. Then a gross sample is drawn from each of the sub lots when the cement is being charged into bulk storage or at the time of discharging from the bulk storage. 3. Increment shall be taken from each opening. 4. The collecting frequency should be one increment for every 10 tons of discharged cement.
  • 12. Lot Inspection  Sampling from Ship’s Hold 1. A lot shall be divided into sub lots depending upon the weight of the Lot 2. For collecting samples from ship’s hold, i.e. for depths greater than 2 m, sampling pipe activated by air jet is used. 3. Then a gross sample is drawn from each of the sub lots. 4. The collecting frequency should be one increment for every 10 tons of cement. 5. The increment shall be weight at least 2 kg.
  • 13. Lot Inspection  Sampling from Wagons 1. A lot shall be divided into sub lots depending upon the weight of the Lot 2. For collecting samples from wagons, i.e. for depths smaller than 2 m, Slotted-tube sampler is used. 3. Then a gross sample is drawn from at least six evenly distributed points in each selected wagon. 4. The increment shall be weight at least 2 kg. 5. After taking the increments out of wagons, they shall be placed directly on a moisture proof, air tight containers to avoid moisture absorption & Aeration of sample.
  • 14. Lot Inspection  Sampling from Bags 1. A lot shall be divided into sub lots depending upon the weight of the Lot. 2. at least 2 percent of the bags (minimum of five) shall be sampled. 3. Selection of bags should be random. 4. Tube sampler shall be inserted diagonally into the valve of the bag and the thumb placed over the air hole and then shall be withdrawn. 5. Equal no’s of increments should be taken out from each bags. 6. The increment shall be weight at least 2 kg.
  • 15. Sampling Equipments Tube Sampler For Bags Slotted Tube sampler for bulk storage
  • 16. Sampling of Cement  Precautions to be taken while sampling 1. The sampling instrument shall be clean and dry when used. 2. Precautions shall be taken to protect the sample, the material being sampled, the sampling equipment and the containers for samples from adventitious contamination. 3. The sample containers shall be of such a size that they are almost completely filled by the sample. 4. The sample containers shall he sealed air-tight after filling and marked with full particulars of the material and the date of sampling. 5. Samples shall be stored in such a manner that the temperature of the material does not vary unduly from the normal temperature. 6. The place of sampling shall be clean and dry and free from draught.
  • 17. Test on Cement The following tests are conducted on cement in the laboratory are as follows: 1. Consistency Test 2. Setting Time Test 3. Fineness Test 4. Strength Test 5. Soundness Test 6. Heat of Hydration Test 7. Tensile Strength Test 8. Chemical Composition Test
  • 18. Test on Cement The following tests are conducted on cement in the field are as follows: 1. Colour Test of Cement 2. Presence of Lumps 3. Cement Adulteration Test 4. Float Test 5. Date of Manufacturing
  • 19. Consistency Test of cement  Aim: To determine consistency of standard Cement paste.  Apparatus:
  • 20. Consistency Test of cement Material Used: Cement material shall be stored in sealed, airtight containers to avoid changes in its characteristics due to absorption or deposition from the atmosphere.
  • 21. Consistency Test of cement  Procedure: • Keep the vicat apparatus on a level base while using vicat apparatus with dashpot, keep the bearing movable rod to its highest position and pin it. Unscrew the top of the dashpot. Half fill the dashpot with any suitable oil of viscosity and screw the top. Work the plunger a number of times. • Attach the plunger for determining standard consistency to the movable rod. Work the plunger a number of times. • Take 400 gm of cement in a pan and a weighed quantity of water in a beaker. • Prepare a paste with the water added to cement. Start a stopwatch at the time of adding water to cement. • Keep the vicat mould on a non-porous plate and fill the cement paste in it.
  • 22. Consistency Test of cement  Procedure:
  • 23. Consistency Test of cement  Procedure:
  • 24. Consistency Test of cement  Procedure: • After completely filling the mould, shake it slightly to expel the air. Smooth off the surface of the paste making it level with the top of the moulder. The cement pastes thus prepared is the test block. • Place the test block resting on the non-porous plate under the movable rod, bearing the needle. • Lower the plunger gently to touch the surface of the cement paste and quickly release. • Remove the pin holding the movable bearing rod to the surface of the cement paste and quickly release by pushing down the plunger to sink in to the paste. This operation shall be done immediately after filling the mould. • Prepare trial test specimens with varying percentages of water until plunger penetrates to a point 5 to 7mm from the bottom of the vicat mould, which is read on the scale. Express the water required as percentage by weight of the dry cement.
  • 25. Consistency Test of cement  Procedure:
  • 26. Consistency Test of cement  Observation Table: SR. NO. DESCRIPTION READING 1. Weight of cement taken (g) (W1) 2. Quantity of water added to cement (W2) 3 Standard Consistency of Cement for 5-7 mm penetration (W2/W1*100)
  • 27. Consistency Test of cement  Significance and importance of the test: 1. It determines the amount of water needed to make a paste. It is necessary to determine consistency because the amount of water affects the setting time of the cement. 2. Consistency plays a vital role in the determination of compressive strength of concrete or workability test for concrete. 3. Less water than this quantity would not complete chemical reaction thus resulting in the reduction of strength and more water would increase water-cement ratio and so would reduce its strength.
  • 28. Consistency Test of cement  Why is Consistency Test Done? We know that the cement we used on our site is mostly affected by 1. Weather Conditions 2. Excessive combination of Silica. One of the cement ingredients which determines the initial and final setting time of cement paste. 3. The fineness of cement. 4. Manufacturing Defects By Standardising the consistency of cement, we know that how much of water is required to produce an effective cement which will eventually produce good quality of concrete.
  • 29.  Aim :- Determination of the initial and final setting time of cement.  Reference: - IS 4031 (Part-5):1988  Apparatus :- Vicat apparatus, Vicat mould, needle, gauging trowel, measuring jar, weighing balance, stop watch, rubber glove, non porous glass plate.  Material:- Ordinary Portland cement; Water. Setting Time of Cement
  • 30. Setting Time of Cement
  • 31. Setting Time of Cement  Theory :- • The time to which cement can be moulded in any desired shape without losing it’s strength is called Initial setting time of cement or • The time at which cement starts hardens and completely loses its plasticity is called Initial setting time of cement or • The time available for mixing the cement and placing it in position is an Initial setting time of cement. or • Initial set is a stage where the cement paste stiffens to such an extent that the Vicat needle is not permitted to move down through the paste within 5 ± 0.5 mm measured from the bottom of the mould. The time elapsed between the moments that the water is added to the cement to the initial set is regarded as initial setting time.
  • 32. Setting Time of Cement • The time at which cement completely loses its plasticity and became hard is a final setting time of cement. or • The time taken by cement to gain its entire strength is a Final setting time of cement. • For an ordinary Portland cement, the initial setting time should not be less than 30 minutes while the final setting time should not be more than 600 minutes.
  • 33.  Procedure :- 1) Preparation of Test Block • Prepare a neat cement paste by gauging the cement with 0.85 times the water required to give a paste of standard consistency. Potable or distilled water shall be used in preparing the paste. The paste shall be gauged in the manner and under the conditions prescribed in IS : 4031 (Part 5)- 1988. Start a stop-watch at the instant when water is added to the cement. Fill the Vicat mould with a cement paste gauged as above, the mould resting on a nonporous plate. Fill the mould completely and smooth off the surface of the paste making it level with the top of the mould. The cement block thus prepared in the mould is the test block. • Immediately after moulding, place the test block in the moist closet or moist room and allow it to remain there except when determinations of time of setting are being made. Setting Time of Cement
  • 34. 2) Determination of Initial Setting Time • Place the test block confined in the mould and resting on the non-porous plate, under the rod bearing the needle (with cross section 1 mm2 ). • lower the needle gently until it comes in contact with the surface of the test block and quickly release, allowing it to penetrate into the test block. • In the beginning, the needle will completely pierce the test block. Repeat this procedure until the needle, when brought in contact with the test block and released as described above, fails to pierce the block beyond 5.0 ± 0.5 mm measured from the bottom of the mould. • The period elapsing between the time when water is added to the cement and the time at which the needle fails to pierce the test block to a point 5.0 ± 0.5 mm measured from the bottom of the mould shall be the initial setting time. Initial & Final Setting Time of Cement
  • 35. Initial & Final Setting Time of Cement
  • 36. 3) Determination of Final Setting Time- • Replace the needle of the Vicat apparatus by the needle with an annular attachment . • The cement shall be considered as finally set when, upon applying the needle gently to the surface of the test block, the needle makes an impression thereon, while the attachment fails to do so. • The period elapsing between the time when water is added to the cement and the time at which, attachment fails to make an impression on the surface of test block shall be the final setting time. Initial & Final Setting Time of Cement
  • 37. Initial & Final Setting Time of Cement
  • 38.  Observations:- • Weight of given sample of cement is ___________ g. • The normal consistency of a given sample of cement is ___________ % • Volume of water taken(0.85 times the water required to give a paste of standard consistency) for preparation of test block ____________ ml Initial & Final Setting Time of Cement
  • 39. Initial & Final Setting Time of Cement  Precaution for Initial and Final setting time of cement test • The needle should be cleaned after every use. • The mould should be slightly moved so that the penetration would not be at the same place. • The experiment should be carried out at a place where there is no external vibration or disturbance. • The mould should not have any type of movement from initial setting time to final setting time. • The temperature of the room in which the experiment is conducted should be maintained around 27º-29º C and hydration should be maintained in between 60-70%.