āļĢāļ°āļšāļšāđāļšāļšāļĨāļĩāļ™ (LEAN Systems)
āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļēāļ§āļĢāļĢāļ“, ACPE, CSCP, EPPM āđāļĨāļ°āļ„āļ“āļ°
āļšāļ˜.āļĄ., āļ§āļĻ.āļš.
LEAN Master, āļšāļĢāļīāļĐāļąāļ— āļ—āļēāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļēāļ āļˆāļēāļāļąāļ”
+6695-624-2449 L6SSCOR@GMAIL.COM
facebook.com/DoingLess
Design · Learn · Grow · Mature
Siripong S Jungthawan,
MBA, BEng, ACPE, CSCP, EPPM
Partner and Workgroup,
Global Entrepreneurship Network (Thailand)
PhD (Logistics and Supply Chain Management)
Program Manager, International College, KMITL
Design · Learn · Grow · Mature
LEAN Master and Co-founder,
Doing Less Getting More
LEAN Mentor,
LEAN Startup Machine
LEAN Startup Thailand
Mentor and Jury Moderator,
Creative Business CUP (CBC)
Founder, LEANxACADEMY.com
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļēāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
LEAN āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ
āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļēāđ„āļĢāļžāļļāđˆāļ‡
āļ—āļļāļāđāļœāļ‡āļŦāļ™āļąāļ‡āļŠāļ·āļ­āļŠāļąāđ‰āļ™āļ™āļē
āļ—āļąāđˆāļ§āļ›āļĢāļ°āđ€āļ—āļĻ
bit.ly/LEANBestSeller
āļŦāļĄāļ§āļ”āļšāļĢāļīāļŦāļēāļĢāļ˜āļļāļĢāļāļīāļˆ
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļēāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļēāļ
3
āļĨāļđāļāļ„āđ‰āļēāļ‚āļ­āļ‡āđ€āļĢāļē (Reference case)
4www.facebook.com/doingless
Hi-technologyFood and Medicine Service and consumer
Public and Government unit Educational institution
Amazon.com Inc. will acquire
Whole Foods Market Inc. for $13.7 billion
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš.,
ACPE, CSCP, EPPM 5
Source: www.bloomberg.com
The most trusted threat to legacy delivery providers?
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš.,
ACPE, CSCP, EPPM 6
amazon performance
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš.,
ACPE, CSCP, EPPM 7
Source: Amazon, Annual report 2016.
āļ§āļīāļ§āļąāļ’āļ™āļēāļāļēāļĢāļ‚āļ­āļ‡āļ­āļļāļ•āļŠāļēāļŦāļāļĢāļĢāļĄ 4.0
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
Smart X 4.0
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
IoT
9
āļˆāļēāļāļ­āļļāļ•āļŠāļēāļŦāļĢāļĢāļĄāļ”āļąāđ‰āļ‡āđ€āļ”āļīāļĄ āđ„āļ›āļŠāļđāđˆāļ­āļļāļ•āļŠāļēāļŦāļāļĢāļĢāļĄ 4.0
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
10
Zero Inventory (FG)
Huge Inventory (FG)
āđ€āļĢāļēāļˆāļ°āļĄāļĩāđ€āļžāļ·āđˆāļ­āļ™āļĢāđˆāļ§āļĄāļ‡āļēāļ™āđ€āļ›āđ‡āļ™āļŦāļļāđˆāļ™āļĒāļ™āļ•āđŒ
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
Source: from www.businessinsider.com, www.reuters.com
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
11
āļĄāļļāđˆāļ‡āļŠāļđāđˆ Super Cluster
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
Digital Transformation (1 min)
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļ§āļīāļ§āļąāļ’āļ™āļēāļāļēāļĢāļ‚āļ­āļ‡āđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™ (Evolution of Supply Chain)
14
āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™āļ—āļĩāđˆāļ‚āļĒāļēāļĒāļœāļĨ (Expanded Supply Chain Management) āļˆāļļāļ”āļāļēāđ€āļ™āļīāļ”āļˆāļ™āļ–āļķāļ‡āļĄāļ·āļ­āļĨāļđāļāļ„āđ‰āļēāļŠāļļāļ”āļ—āđ‰āļēāļĒ E2E
āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™ (Supply Chain Management) āļ•āļąāđ‰āļ‡āđāļ•āđˆāļ§āļąāļ•āļ–āļļāļ”āļīāļšāļ–āļķāļ‡āļĨāļđāļāļ„āđ‰āļē
āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļ§āļąāļŠāļ”āļļ (Material Management)
āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļāļēāļĢāđ„āļŦāļĨāļ§āļąāļŠāļ”āļļ
āļāļēāļĢāļˆāļąāļ”āļŦāļē
(Purchasing)
āļāļēāļĢāļ§āļēāļ‡āđāļœāļ™āļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ
(Production planning)
āđ‚āļĨāļˆāļīāļŠāļ•āļīāļāļŠāđŒ
(Logistics)
āļ›āļąāļˆāļˆāļąāļĒāļ™āļēāđ€āļ‚āđ‰āļē (Inputs)
āļŠāļīāđˆāļ‡āļ‚āļ­āļ‡ (Things)
āļ„āļ™ (People)
āļāļēāļĢāđāļ›āļĢāļŠāļ āļēāļž (Transformation)
āļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ (Manufacturing)
āļšāļĢāļīāļāļēāļĢ (Service)
āļ›āļąāļˆāļˆāļąāļĒāļ™āļēāļ­āļ­āļ (Outputs)
āļœāļĨāļīāļ•āļ āļąāļ“āļ‘āđŒ (Products)
āļšāļĢāļīāļāļēāļĢ (Services)
āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ‚āļ­āļ‡āļœāļđāđ‰āļˆāļąāļ”āļŦāļē
(Suppliers' supplier)
āļœāļđāđ‰āļˆāļąāļ”āļŦāļē (Suppliers)
āļ āļēāļĒāđƒāļ™ (Internal)
āļ āļēāļĒāļ™āļ­āļ (External)
āļĨāļđāļāļ„āđ‰āļē
(Customers)
āļĨāļđāļāļ„āđ‰āļēāļŠāļļāļ”āļ—āđ‰āļēāļĒ
(Customers’
customer)
- āļāļēāļĢāļžāļĒāļēāļāļĢāļ“āđŒ
- āļāļēāļĢāļˆāļąāļ”āļŦāļē
- āļāļēāļĢāļ§āļēāļ‡āđāļœāļ™āļ§āļąāļŠāļ”āļļ
- āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļŠāļīāļ™āļ„āđ‰āļēāļ„āļ‡āļ„āļĨāļąāļ‡
āļŊāļĨāļŊ
- āļŠāļīāļ™āļ„āđ‰āļēāļ„āļ‡āļ„āļĨāļąāļ‡āļĢāļ°āļŦāļ§āđˆāļēāļ‡
āļāļĢāļ°āļšāļ§āļ™āļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ
(WIP)
- āļ„āļĨāļąāļ‡āļŠāļīāļ™āļ„āđ‰āļē
- āļāļēāļĢāļ‚āļ™āļĒāđ‰āļēāļĒ
- āļāļēāļĢāļšāļĢāļĢāļˆāļļ
āļŊāļĨāļŊ
- āļŠāļīāļ™āļ„āđ‰āļēāļŠāļēāđ€āļĢāđ‡āļˆāļĢāļđāļ›
- āļ„āļēāļŠāļąāđˆāļ‡āļ‹āļ·āđ‰āļ­āļˆāļēāļāļĨāļđāļāļ„āđ‰āļē
- āļāļēāļĢāļ‚āļ™āļŠāđˆāļ‡
- āļšāļĢāļīāļāļēāļĢāļĨāļđāļāļ„āđ‰āļē
āļŊāļĨāļŊ
āđ‚āļĨāļˆāļīāļŠāļ•āļīāļāļŠāđŒāļ‚āļēāđ€āļ‚āđ‰āļē
(Inbound Logistics)
āļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ
(Production)
āđ‚āļĨāļˆāļīāļŠāļ•āļīāļāļŠāđŒāļ‚āļēāļ­āļ­āļ
(Outbound Logistics)
āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļ (Material flow)
āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļāļĢāļ°āđāļŠāđ€āļ‡āļīāļ™āļŠāļ” (Cash flow)
āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļāļĒāđ‰āļ­āļ™āļāļĨāļąāļš (Reverse material flow)
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āđāļšāļšāļˆāļēāļĨāļ­āļ‡āđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™ (3 āļŠāļĄāļēāļŠāļīāļ 4 āļāļēāļĢāđ„āļŦāļĨ 6 āļāļĢāļ°āļšāļ§āļ™āļāļēāļĢ)
15
āļœāļđāđ‰āļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ
(Manufacturer)
āļœāļđāđ‰āļāļĢāļ°āļˆāļēāļĒāļŠāļīāļ™āļ„āđ‰āļē
(Distributor)
āļĨāļđāļāļ„āđ‰āļē
(Customer)
āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļŠāļēāļĢāļŠāļ™āđ€āļ—āļĻ (Information flow)
āļœāļđāđ‰āļāļĢāļ°āļˆāļēāļĒāļŠāļīāļ™āļ„āđ‰āļē
āļĨāļđāļāļ„āđ‰āļē
āļĨāļđāļāļ„āđ‰āļē
āļĨāļđāļāļ„āđ‰āļē
āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļ (Material flow)
āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļāļĢāļ°āđāļŠāđ€āļ‡āļīāļ™āļŠāļ” (Cash flow)
āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļāļĒāđ‰āļ­āļ™āļāļĨāļąāļš (Reverse material flow)
āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 1
(Tier 1 Material
supplier)
āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 1
āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 1
āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 2
(Tier 2 Material
supplier)
āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 2
āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 2
āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 2
āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 2
āļ•āđ‰āļ™āļ™āđ‰āļē
(Upstream)
āļāļĨāļēāļ‡āļ™āđ‰āļē
(Midstream)
āļ›āļĨāļēāļĒāļ™āđ‰āļē
(Downstream)
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
āļ§āļēāļ‡āđāļœāļ™ (Plan: P)
āļˆāļąāļ”āļŦāļē (Source :S) āļœāļĨāļīāļ• (Make: M) āļŠāđˆāļ‡āļĄāļ­āļš (Deliver :D)
āļ—āļēāđƒāļŦāđ‰āđ€āļāļīāļ” (Enable: E)
āļĢāļąāļšāļ„āļ·āļ™ (Return :R)āļĢāļąāļšāļ„āļ·āļ™ (Return :R)āļĢāļąāļšāļ„āļ·āļ™ (Return :R)āļĢāļąāļšāļ„āļ·āļ™ (Return :R)
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļĢāļ°āļ”āļąāļšāđƒāļ™āļāļēāļĢāļšāļđāļĢāļ“āļēāļāļēāļĢāđƒāļ™āđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™
16
āļ—āļĩāđˆāļĄāļē: Stevens, G.C., Integrating the Supply Chain, International Journal of Physical Distribution and Material Management, Vol. 19, No. 8, 1989.
āļāļēāļĢāļ—āļēāļ‡āļēāļ™āđ€āļ›āđ‡āļ™āđāļœāļ™āļāđ†
āđ‚āļ›āļĢāđˆāļ‡āđƒāļŠ/āļĢāđˆāļ§āļĄāļĄāļ·āļ­
āđ€āļĢāļīāđˆāļĄāļšāļđāļĢāļ“āļēāļāļēāļĢāļŦāļ™āđ‰āļēāļ—āļĩāđˆ
āļšāļđāļĢāļ“āļēāļāļēāļĢāļ āļēāļĒāđƒāļ™āļ­āļ‡āļ„āđŒāļāļĢ
āļšāļđāļĢāļ“āļēāļāļēāļĢāļ āļēāļĒāļ™āļ­āļāļ­āļ‡āļ„āđŒāļāļĢ
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļāļēāļĢāļāļēāļŦāļ™āļ”āļāļĨāļĒāļļāļ—āļ˜āđŒāļŠāļīāļ™āļ„āđ‰āļēāļ„āļ‡āļ„āļĨāļąāļ‡āđƒāļŦāđ‰āđ€āļŦāļĄāļēāļ°āļŠāļĄāļāļąāļšāļ­āļļāļ›āļŠāļ‡āļ„āđŒ
17
āļ—āļĩāđˆāļĄāļē: Martin Christopher, 2011, Logistics and supply chain management : creating value-adding networks, Great Britain: Pearson Education, 4th ed.
MTO MTS
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
ETO
MTO
ATO
MTS
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
18
"Any customer can have a car painted any color that he wants so long
as it is black. Henry Ford (July 30, 1863 – April 7, 1947)”
From Henry Ford in collaboration with Samuel Crowther
in My Life and Work, 1922, Page 72
āļĨāļđāļāļ„āđ‰āļēāļˆāļ°āļŠāļąāđˆāļ‡āļĢāļ–āļĒāļ™āļ•āđŒāļŠāļĩāļ­āļ°āđ„āļĢāļāđ‡āđ„āļ”āđ‰ āđāļ•āđˆ Ford āļĄāļĩāđāļ•āđˆāļŠāļĩāļ”āļēāđ€āļ—āđˆāļēāļ™āļąāđ‰āļ™
Toyota āđ€āļ›āđ‡āļ™āļ­āļąāļ™āļ”āļąāļš 4 āļ‚āļ­āļ‡āđ‚āļĨāļ āđāļ•āđˆāļāļēāđ„āļĢāļĄāļēāļāļāļ§āđˆāļē 3 āļ­āļąāļ™āļ”āļąāļšāđāļĢāļāļĢāļ§āļĄāļāļąāļ™
â€Ē āđƒāļ™āļ›āļĩ 2005 Toyota āļāļēāđ„āļĢāļĄāļēāļāļāļ§āđˆāļē
America's Big Three āļ„āļ·āļ­ GM, Ford,
Chrysler
â€Ē GM 1.9%
â€Ē Ford 2.4%
â€Ē Chrysler 0.3%
â€Ē 4.6% < Toyota 6.7% āļ­āļĒāļđāđˆ 2.1%Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
19
4.6
āļˆāļēāļ Mass production āļŠāļđāđˆ Lean production
316.7 āļĨāđ‰āļēāļ™āļ„āļ™āļ›āļĢāļ°āļŠāļēāļāļĢ 127.4 āļĨāđ‰āļēāļ™āļ„āļ™
153.6 āļĨāđ‰āļēāļ™āļ„āļ™āđāļĢāļ‡āļ‡āļēāļ™ 65.9 āļĨāđ‰āļēāļ™āļ„āļ™
1.37%āļ­āļąāļ•āļĢāļēāļāļēāļĢāđ€āļāļīāļ” 0.80%
9.83 āļĨāđ‰āļēāļ™āļ•āļēāļĢāļēāļ‡āļāļīāđ‚āļĨāđ€āļĄāļ•āļĢ (āļ­āļąāļ™āļ”āļąāļš 3)āļžāļ·āđ‰āļ™āļ—āļĩāđˆ 3.78 āļĨāđ‰āļēāļ™āļ•āļēāļĢāļēāļ‡āļāļīāđ‚āļĨāđ€āļĄāļ•āļĢ (āļ­āļąāļ™āļ”āļąāļš 61)
āđāļœāđˆāļ™āļ”āļīāļ™
āļĨāļąāļāļĐāļ“āļ°āļ—āļēāļ‡
āļ āļđāļĄāļīāļĻāļēāļŠāļ•āļĢāđŒ
āļžāļ·āđ‰āļ™āļ—āļĩāđˆāļŠāđˆāļ§āļ™āđƒāļŦāļāđˆāđ€āļ›āđ‡āļ™āđ€āļāļēāļ°Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
Time line āļ‚āļ­āļ‡āđ€āļ„āļĢāļ·āļ­āđ‚āļ•āđ‚āļĒāļ•āđ‰āļē
2010
- Toyota āđāļĨāļ° Tesla Motors
āļĢāđˆāļ§āļĄāļāļąāļ™āļžāļąāļ’āļ™āļģāļĢāļ–āđ„āļŸāļŸāđ‰āļģ
- TMT āļœāļĨāļīāļ•āļĢāļ–āļĒāļ™āļ•āđŒāļ„āļĢāļš 5 āļĨāđ‰āļģāļ™āļ„āļąāļ™
1918
Toyoda Spinning
& Weaving Co., Ltd.
Toyota Way
1900 1920 1940 1960 1980 2000 2010 2020
1926
Toyoda Automatic
Loom Works, Ltd.
1924
Sakichi Toyoda
āļ›āļĢāļ°āļ”āļīāļĐāļāđŒāđ€āļ„āļĢāļ·āļ­āļ‡āļ—āļ­āļœāđ‰āļģ
āļ­āļąāļ•āđ‚āļ™āļĄāļąāļ•āļīāļĢāļļāđˆāļ™ Type-G
1929
Platt Brothers
& Co., Ltd.,
England
āļ‹āļ·āđ‰āļ­āļŠāļīāļ—āļ˜āļīāļšāļąāļ•āļĢ Type-G
1 āļĨāđ‰āļģāļ™āđ€āļĒāļ™
1933
āļ•āļąāđ‰āļ‡āļāđˆāļģāļĒāļĒāļģāļ™āļĒāļ™āļ•āđŒāđƒāļ™
Toyoda Automatic
Loom Works, Ltd.
1935
- āļˆāļ”āđ‚āļĨāđ‚āļāđ‰
- āļĢāļ–āļ•āđ‰āļ™āđāļšāļš a1
1890
Sakichi Toyoda
āļœāļĨāļīāļ•āđ€āļ„āļĢāļ·āđˆāļ­āļ‡āļ—āļ­āļœāđ‰āļģ
āļ”āđ‰āļ§āļĒāļĄāļ·āļ­āļ”āđ‰āļ§āļĒāļ­āļģāļĒāļļ
āđ€āļžāļĩāļĒāļ‡ 23 āļ›āļĩ
1937
Toyota Motor
Co., Ltd.
1941
Toyota Machine
Works Co., Ltd.
1957
- Toyota Motor
Sales Co., Ltd.
āđƒāļ™āļŠāļŦāļĢāļąāļ āđāļĨāļ°āđ„āļ—āļĒ
- āļŠāđˆāļ‡āļĢāļ– Crown āđ„āļ›
āļ‚āļģāļĒāđƒāļ™āļŠāļŦāļĢāļąāļ
1962
Toyota Motor
Thailand Co., Ltd.
(TMT)
1950
āļ›āļĨāļ”āļžāļ™āļąāļāļ‡āļģāļ™
Kiichiro Toyoda
āļĨāļģāļ­āļ­āļ
1951
āđ€āļĢāļīāđˆāļĄāļĢāļ°āļšāļš
Creative Idea
Suggestion System
1976
āļœāļĨāļīāļ•āļĢāļ–āļĒāļ™āļ•āđŒ
āļ„āļĢāļš 20 āļĨāđ‰āļģāļ™āļ„āļąāļ™
1984
āļĢāđˆāļ§āļĄāļ—āļļāļ™āļāļąāļš GM
āļ•āļąāđ‰āļ‡ New United
Motor Manufacturing,
Inc. (NUMMI)
1997
Toyota Hybrid
System
2002
Tianjin Toyota
Motor Co., Ltd. āđƒāļ™āļˆāļĩāļ™
1969
āļœāļĨāļīāļ•āļĢāļ–āļĒāļ™āļ•āđŒ
āļ„āļĢāļš 1 āļĨāđ‰āļģāļ™āļ„āļąāļ™
1989
āđ€āļ›āļĨāļĩāđˆāļĒāļ™āļŠāļ·āđˆāļ­āđāļĨāļ°āđ‚āļĨāđ‚āļāđ‰
1934
āļžāļąāļ’āļ™āļģāđ€āļ„āļĢāļ·āđˆāļ­āļ‡āļĒāļ™āļ•āđŒ Model a 2012
āļ„āļĢāļšāļĢāļ­āļš 75 āļ›āļĩ
1938
āđƒāļŠāđ‰āļĢāļ°āļšāļš JIT
(Just-in-time)
1948-1975
āļžāļąāļ’āļ™āļģToyota production
system (TPS) āđ‚āļ”āļĒ Taiichi Ohno,
Shigeo Shingo āđāļĨāļ° Eiji Toyoda
āļ—āļĩāđˆāļĄāļģ: āļ”āļąāļ”āđāļ›āļĨāļ‡āļˆāļģāļ Toyota Motor Corporation, 2014 (www.toyota-global.com)
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
Jidoka (č‡ŠåƒåŒ–) (Autonomation)
āđ€āļ„āļĢāļ·āđˆāļ­āļ‡āļˆāļąāļāļĢāļ•āļĢāļ§āļˆāļžāļš
āļ‚āļ­āļ‡āđ€āļŠāļĩāļĒ āđāļĨāļ°āđāļˆāđ‰āļ‡āđ„āļ”āđ‰
āđ€āļāļīāļ”āļŠāļ–āļēāļ™āļāļēāļĢāļ“āđŒ
āļœāļīāļ”āļ›āļāļ•āļī
āļŠāļēāļĒāļāļēāļĢāļœāļĨāļīāļ• āļŦāļĒāļļāļ”āļŦāļąāļ§āļŦāļ™āđ‰āļēāļ‡āļēāļ™āđ€āļ‚āđ‰āļēāļĄāļē
āđāļāđ‰āļ›āļąāļāļŦāļē
āļ›āļĢāļąāļšāļ§āļīāļ˜āļĩāđāļāđ‰āđ„āļ‚āļ›āļąāļāļŦāļēāđƒāļŦāđ‰
āđ€āļ›āđ‡āļ™āļĄāļēāļ•āļĢāļāļēāļ™
āļ‚āļ­āļ‡āđ€āļŠāļĩāļĒ
āđāļŠāļ‡ āļŠāļĩ āđ€āļŠāļĩāļĒāļ‡
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
TOYOTA concept car
www.facebook.com/DoingLESS
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļāļēāļĢāļ„āļ§āļšāļ„āļļāļĄāļ•āđ‰āļ™āļ—āļļāļ™āļ”āđ‰āļ§āļĒāđāļ™āļ§āļ„āļīāļ”āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāđāļšāļšāļĨāļĩāļ™
â€Ē āļ‚āļˆāļąāļ” Muda āđƒāļŦāđ‰āļŦāļĄāļ”āļŠāļīāđ‰āļ™āđ„āļ› āđāļĨāļ°āļŠāļĢāđ‰āļģāļ‡āļœāļĨāļāļģāđ„āļĢ
â€Ē āļœāļĨāļīāļ•āđ€āļ‰āļžāļģāļ°āļ‡āļģāļ™āļ—āļĩāđˆāļ‚āļģāļĒāđ„āļ”āđ‰
â€Ē āļ—āļģāļāļģāļĢāđ€āļ‰āļĨāļĩāđˆāļĒāļ›āļĢāļīāļĄāļģāļ“āļ‡āļģāļ™āđƒāļŦāđ‰āđƒāļāļĨāđ‰āđ€āļ„āļĩāļĒāļ‡āļāļąāļ™ (Heijenka) āļāđˆāļ­āļ™āļœāļĨāļīāļ•
â€Ē āļ—āļģāđƒāļŦāđ‰āđ€āļ›āđ‡āļ™ Autonomy āļ‰āļĨāļģāļ” āļ•āļąāļ”āļŠāļīāļ™āđƒāļˆāđ„āļ”āđ‰āđ€āļ­āļ‡
â€Ē āļœāļĨāļīāļ•āđ‚āļ”āļĒāđ„āļĄāđˆāļ•āđ‰āļ­āļ‡āļžāļķāđˆāļ‡āļžāļģāļāļģāļĢāļœāļĨāļīāļ•āļˆāļģāļ™āļ§āļ™āļĄāļģāļ
â€Ē āđƒāļŦāđ‰āļ„āļ§āļģāļĄāļŠāļģāļ„āļąāļāļ•āđˆāļ­āļŦāļ™āđ‰āļģāļ‡āļģāļ™āļˆāļĢāļīāļ‡ (Genba) āđāļĨāļ°āļŠāļīāđˆāļ‡āļ‚āļ­āļ‡āļˆāļĢāļīāļ‡ (Genbutsu)
â€Ē āđƒāļŠāđ‰āļ„āļ§āļģāļĄāļŠāļģāļĄāļģāļĢāļ–āļ‚āļ­āļ‡āļ„āļ™āđƒāļŦāđ‰āđ€āļ•āđ‡āļĄāļ—āļĩāđˆ
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
“āļžāļīāļˆāļēāļ“āļēāļŠāđˆāļ§āļ‡āđ€āļ§āļĨāļēāļ•āļąāđ‰āļ‡āđāļ•āđˆāļ—āļĩāđˆāļĨāļđāļāļ„āđ‰āļēāļŠāļąāđˆāļ‡āļ‹āļ·āđ‰āļ­ āļˆāļ™āļ–āļķāļ‡āđ€āļĄāļ·āđˆāļ­āļĢāļąāļšāđ€āļ‡āļīāļ™āļˆāļēāļāļĨāļđāļāļ„āđ‰āļē
āđāļĨāļ°āđ€āļĢāļēāļˆāļ°āļĨāļ”āļŠāđˆāļ§āļ‡āđ€āļ§āļĨāļēāļ™āļąāđ‰āļ™āđƒāļŦāđ‰āļŠāļąāđ‰āļ™āļĨāļ‡āđ„āļ”āđ‰āđ‚āļ”āļĒāļāļēāļĢāļāļēāļˆāļąāļ”āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļē”
Taiichi Ohno (1912-1990)
āļœāļđāđ‰āļ„āļīāļ”āļ„āđ‰āļ™āļĢāļ°āļšāļšāļāļēāļĢāļœāļĨāļīāļ•āđāļšāļšāđ‚āļ•āđ‚āļĒāļ•āđ‰āļē
āļ§āļīāļ§āļąāļ’āļ™āļēāļāļēāļĢāļ‚āļ­āļ‡āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāđāļšāļšāļĨāļĩāļ™
āļ—āļĩāđˆāļĄāļē: Auflage, 2013, Lean Management : Auf den Spuren des Erfolges der Managementphilosophie von Toyota und Co., MÞnchen: Hanser.
āđƒāļŠāđ‰āļĢāļ°āļšāļš āđāļĨāļ°āļ§āļīāļ˜āļĩāļ„āļīāļ”āđƒāļ™āļāļēāļĢāļˆāļąāļ”āļāļēāļĢ
āđƒāļ™āļ­āļļāļ•āļŠāļēāļŦāļāļĢāļĢāļĄāđƒāļ”āđ† āļāđ‡āđ„āļ”āđ‰
Mass production
Usw. LEAN X
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
Source: from Lean Enterprise Institute, Leadership Then and Now, 2014
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļŦāļĨāļąāļāļāļēāļĢāļ„āļīāļ”āđāļšāļšāļĨāļĩāļ™ 5 āļ›āļĢāļ°āļāļēāļĢ
āļ—āļĩāđˆāļĄāļģ: āļ”āļąāļ”āđāļ›āļĨāļ‡āļˆāļģāļ James P. Womack and Daniel T. Jones, Lean Thinking: Banish Waste and Create Wealth in Your Corporation, New York: Free Press, 2003.
āļ„āļļāļ“āļ„āđˆāļē
(Value)
āļŠāļēāļĒāļ˜āļēāļĢāļ„āļļāļ“āļ„āđˆāļē
(Value Stream)
āļāļēāļĢāđ„āļŦāļĨāļ—āļĩāļĨāļ°āļŠāļīāđ‰āļ™
(One piece
flow)
āļāļēāļĢāļ”āļķāļ‡
(Pull)
āļ„āļ§āļēāļĄāļĒāļ­āļ”āđ€āļĒāļĩāđˆāļĒāļĄ
(Excellence)
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
Inventory Defect
Waiting
Overproduction
Transportation
Motion
Flow
Excess processing
Non-utilized talent
āļ—āļĩāđˆāļĄāļģ: āļ”āļąāļ”āđāļ›āļĨāļ‡āļˆāļģāļ John Black, 2008, Lean Production: Implementing A World-Class System, New York: Industrial Press.
LEAN
8 Wastes
Batch VS One piece flow
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
PUSH VS PULL
â€Ē Push āļœāļĨāļąāļ āļœāļĨāļīāļ•āļ‚āļ­āļ‡āđ€āļŠāļĢāđ‡āļˆ (āļœāļĨāļąāļ) āļŠāđˆāļ‡āđ„āļ›āđƒāļŦāđ‰āļĨāļđāļāļ„āđ‰āļģ āļ™āļķāļāļ–āļķāļ‡ āļ‚āđ‰āļģāļ§āđāļāļ‡
â€Ē Pull āļ”āļķāļ‡ āļĨāļđāļāļ„āđ‰āļģāļĄāļģāļŠāļąāđˆāļ‡ (āļ”āļķāļ‡) āļ§āđˆāļģāļ­āļĒāļģāļāđ„āļ”āđ‰āļ­āļ°āđ„āļĢ āļ™āļķāļāļ–āļķāļ‡ āļ­āļģāļŦāļģāļĢāļ•āļģāļĄāļŠāļąāđˆāļ‡
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļšāđ‰āļēāļ™āđāļšāļšāļĨāļĩāļ™
āļĢāļ°āļšāļšāļ„āļ§āļšāļ„āļļāļĄāļ•āļąāļ§āđ€āļ­āļ‡āļ­āļąāļ•āđ‚āļ™āļĄāļąāļ•āļī
(Autonomation)
āļāļēāļĢāļ‹āđˆāļ­āļĄāļšāļēāļĢāļļāļ‡ TPM/OEE āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļŠāļēāļ˜āļēāļĢāļ“āļđāļ›āđ‚āļ āļ„
āļāļēāļĢāļšāļĢāļīāļŦāļēāļĢāļŦāļ™āđ‰āļēāļ‡āļēāļ™ āļāļēāļĢāļ­āļ­āļāđāļšāļšāļŠāļ–āļēāļ™āļĩāļ‡āļēāļ™
āļĢāļ°āļšāļšāļ›āđ‰āļ­āļ‡āļāļąāļ™āļ„āļ§āļēāļĄāļœāļīāļ”āļžāļĨāļēāļ”
(Mistake proofing/Pokayoke)
āļāļēāļĢāļ„āļ§āļšāļ„āļļāļĄāļ„āļļāļ“āļ āļēāļž
āļĢāļ°āļšāļšāļœāļĨāļīāļ•āđāļšāļšāļ—āļąāļ™āđ€āļ§āļĨāļēāļžāļ­āļ”āļĩ
(Just-in-time:JIT)
āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļ„āļĨāļąāļ‡āļŠāļīāļ™āļ„āđ‰āļē āļāļēāļĢāļ§āļēāļ‡āđāļœāļ™
āļāļēāļĢāļ§āļēāļ‡āļœāļąāļ‡āđ‚āļĢāļ‡āļ‡āļēāļ™āđāļšāļšāđ€āļ‹āļĨāļĨāđŒ āļāļēāļĢāļ›āļĢāļąāļšāđ€āļĢāļĩāļĒāļšāļāļēāļĢāļœāļĨāļīāļ•
āļĢāļ°āļšāļšāļ„āļąāļĄāļšāļąāļ‡ āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™āđāļĨāļ°
āđ‚āļĨāļˆāļīāļŠāļ•āļīāļāļŠāđŒ (SCML)
Multiple skill āļāļēāļĢāđ€āļ‡āļīāļ™āđāļĨāļ°āļšāļąāļāļŠāļĩ
āļĢāļ°āļšāļš SMED
(Single minute Exchange of Dies)
āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļŠāļēāļĒāļ˜āļēāļĢāļ„āļļāļ“āļ„āđˆāļē VSM
(Value stream management)
āļāļēāļĢāļ•āļĨāļēāļ” āļāļēāļĢāļœāļĨāļīāļ•āđāļšāļšāļ”āļķāļ‡
āļ‡āļēāļ™āļ—āļĩāđˆāđ€āļ›āđ‡āļ™āļĄāļēāļ•āļĢāļāļēāļ™
āļāļēāļĢāļ„āļ§āļšāļ„āļļāļĄāļ”āđ‰āļ§āļĒāļŠāļēāļĒāļ•āļē
(Visual control: VC)
āļ•āđ‰āļ™āļ—āļļāļ™āļ—āļĩāđˆāđāļ‚āđˆāļ‡āļ‚āļąāļ™āđ„āļ”āđ‰
āļāļģāļĢāļŠāđˆāļ‡āļĄāļ­āļšāļ—āļąāļ™āđ€āļ§āļĨāļģāļžāļ­āļ”āļĩ
āļŠāļīāļ™āļ„āđ‰āļģ/āļšāļĢāļīāļāļģāļĢāļ„āļļāļ“āļ āļģāļžāļŠāļđāļ‡
5S/5Gen
āļāļēāļĢāđāļāđ‰āļ›āļąāļāļŦāļēāļ­āļĒāđˆāļēāļ‡āļŠāļĢāđ‰āļēāļ‡āļŠāļĢāļĢāļ„āđŒ/QCC/āđ„āļ„āđ€āļ‹āđ‡āļ™/PDCA/āļāļēāļĢāļ„āļīāļ”āđāļšāļš A3
Small lot, mix model āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļŠāļĩāļĒ 8 āļ›āļĢāļ°āļāļēāļĢ
āļĢāļ°āļšāļšERP
āļ‹āļīāļāļ‹āđŒāļ‹āļīāļāļĄāđˆāļē TRIZ
āļāļēāļĢāļšāļĢāļīāļŦāļēāļĢāļ‡āļēāļ™āđāļšāļšāļĄāļĩāļŠāđˆāļ§āļ™āļĢāđˆāļ§āļĄ
(TQM)
āļŠāļ–āļīāļ•āļī
āļāļēāļĢāļšāļĢāļīāļŦāļēāļĢāļāļĢāļ“āļĩ
(Case management)
Why why analysis
āļĢāļģāļ‡āļ§āļąāļĨāļ•āđˆāļģāļ‡āđ† Shingo prize, PM award, TQA
āļāļēāļĢāļ•āļĢāļ§āļˆāļ„āļļāļ“āļ āļēāļžāļ—āļļāļāļ‚āļąāđ‰āļ™āļ•āļ­āļ™
āļ„āļ§āļģāļĄāļ›āļĨāļ­āļ”āļ āļąāļĒ
āļ‚āļ§āļąāļāļāļģāļĨāļąāļ‡āđƒāļˆ
āļ§āļąāļ’āļ™āļ˜āļĢāļĢāļĄāļ­āļ‡āļ„āđŒāļāļĢ/āļāļēāļĢāļ„āļīāļ”āđ€āļŠāļīāļ‡āļĢāļ°āļšāļš/āļāļēāļĢāļ„āļīāļ”āđāļšāļšāļĨāļĩāļ™/Mind set / Quality Management system (ISO 9001, 14001, HA JCI)
āļžāļąāļ’āļ™āļēāļšāļļāļ„āļĨāļēāļāļĢ
āļ—āļĩāđˆāļĄāļē: āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, 2557, āđ€āļ­āļāļ›āļĢāļ°āļāļ­āļšāļāļēāļĢāļšāļĢāļĢāļĒāļēāļĒāļŦāļĨāļąāļāļŠāļđāļ•āļĢāļāļēāļĢāļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ—āļĩāđˆāļ—āļļāļāļ„āļ™āļĄāļĩāļŠāđˆāļ§āļ™āļĢāđˆāļ§āļĄāđ€āļžāļ·āđˆāļ­āļžāļĢāđ‰āļ­āļĄāđ€āļ‚āđ‰āļēāļŠāļđāđˆāļāļēāļĢāđāļ‚āđˆāļ‡āļ‚āļąāļ™āđƒāļ™ AEC, āļāļĢāļļāļ‡āđ€āļ—āļžāļĄāļŦāļģāļ™āļ„āļĢ: āļāļĢāļ°āļ—āļĢāļ§āļ‡āļ­āļļāļ•āļŠāļģāļŦāļāļĢāļĢāļĄ.
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļē
8+1 WASTES
āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļēāļ—āļąāđ‰āļ‡ 8+1
āļĢāļ­āļ„āļ­āļĒ (Waiting)
āļŠāļ•āđŠāļ­āļāļšāļ§āļĄ
(Inventory)
āļœāļĨāļīāļ•āđ€āļāļīāļ™
(Overproduction)
āļ‚āļąāđ‰āļ™āļ•āļ­āļ™āđ€āļĒāļ­āļ°
(Excess processing)āđ€āļ”āļīāļ™ āđ€āļ­āļ·āđ‰āļ­āļĄ āļŦāļąāļ™
(Motion)
āļ‡āļēāļ™āļ‹āđˆāļ­āļĄ
(Defect, Rework)
āļĒāđ‰āļēāļĒāļšāđˆāļ­āļĒ
(Transport)
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļē
āļ„āļ§āļēāļĄāļ„āļīāļ”āļŠāļĢāđ‰āļēāļ‡āļŠāļĢāļĢāļ„āđŒāļ—āļĩāđˆāđ„āļĄāđˆāđ„āļ”āđ‰āļ™āļēāļĄāļēāđƒāļŠāđ‰āļ›āļĢāļ°āđ‚āļĒāļŠāļ™āđŒ
(Non-utilized talent, Ideas, creative)
āļˆāļēāļ‡āđˆāļēāļĒāđ† āļ§āđˆāļē DOWNTIMECopyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āđ€āļ™āļ·āđ‰āļ­āđāļ—āđ‰āļ‚āļ­āļ‡āļ‡āļēāļ™āļŦāļ™āđ‰āļēāļ‡āļēāļ™āļœāļĨāļīāļ•
â€Ē āļ‡āļēāļ™āļŠāļĢāđ‰āļēāļ‡āļ„āļļāļ“āļ„āđˆāļē (Value added: VA) āđ€āļŠāđˆāļ™ āļāļģāļĢāđāļ›āļĢāļĢāļđāļ› āļāļģāļĢāļœāļŠāļĄāļŠāļģāļĢ
â€Ē āļ‡āļēāļ™āļ—āļĩāđˆāļŦāļĨāļĩāļāđ€āļĨāļĩāđˆāļĒāļ‡āđ„āļĄāđˆāđ„āļ”āđ‰ (Necessary but non-value added: NNVA)
āđ€āļŠāđˆāļ™ āđ€āļ•āļĢāļĩāļĒāļĄāļ­āļļāļ›āļāļĢāļ“āđŒ āļāļģāļĢāļ•āļąāđ‰āļ‡āđ€āļ„āļĢāļ·āđˆāļ­āļ‡āļˆāļąāļāļĢ āļāļģāļĢāļ•āļĢāļ§āļˆāļŠāļ­āļš
â€Ē āļ‡āļēāļ™āļ—āļĩāđˆāļŠāļđāļāđ€āļ›āļĨāđˆāļē (Non-value added: NVA) āđ€āļŠāđˆāļ™ āļāļģāļĢāļĢāļ­āļ„āļ­āļĒ āļāļģāļĢ
āđ€āļ„āļĨāļ·āđˆāļ­āļ™āļĒāđ‰āļģāļĒ
āļ‡āļēāļ™āļŠāļĢāđ‰āļēāļ‡
āļ„āļļāļ“āļ„āđˆāļē
āļ‡āļēāļ™āļ—āļĩāđˆāđ€āļŦāļĨāļĩāļĒāļ
āđ€āļĨāļĩāđˆāļĒāļ‡āđ„āļĄāđˆāđ„āļ”āđ‰
āļ‡āļēāļ™āļ—āļĩāđˆāļŠāļđāļ
āđ€āļ›āļĨāđˆāļē
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āđ€āļ™āļ·āđ‰āļ­āđāļ—āđ‰āļ‚āļ­āļ‡āļ‡āļēāļ™āļŦāļ™āđ‰āļēāļ‡āļēāļ™
Total Time 100%
āļĢāļ­āļāļēāļĢāļ§āļēāļ‡āđāļœāļ™ āļāļēāļĢāļ§āļēāļ‡āđāļœāļ™
āļĢāļ­āļāļēāļĢāđ€āļ•āļĢāļĩāļĒāļĄ
āļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ•āļĢāļ§āļˆāļŠāļ­āļšāļ•āļĢāļ§āļˆāļŠāļ­āļš
āļĢāļ­āļ•āļĢāļ§āļˆāļŠāļ­āļš
āļšāļĢāļĢāļˆāļļāļ āļąāļ“āļ‘āđŒāļāļĢāļ°āļšāļ§āļ™āļāļēāļĢ
āļ‚āļ™āļĒāđ‰āļēāļĒ
āļĢāļ­āļāļĢāļ°āļšāļ§āļ™āļāļēāļĢ
āļāļĢāļ°āļšāļ§āļ™āļāļēāļĢ
āļ‹āđˆāļ­āļĄāļ‡āļēāļ™
facebook.com/L6SSCOR
āđ€āļ­āļŠ āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļēāļ§āļĢāļĢāļ“, ACPE, CSCP, EPPM
āļœāļđāđ‰āđāļ•āđˆāļ‡ LEAN āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļēāđ„āļĢāļžāļļāđˆāļ‡
āļŠāļĢāđ‰āļēāļ‡āļ„āļļāļ“āļ„āđˆāļē
VA
āđ„āļĄāđˆāļŠāļĢāđ‰āļēāļ‡āļ„āļļāļ“āļ„āđˆāļē āđāļ•āđˆāļ•āđ‰āļ­āļ‡āļ—āļē
NNVA
āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļē
āļĨāļĩāļ™ āļĄāļļāđˆāļ‡āļĨāļ”āļŠāđˆāļ§āļ™āļ™āļĩāđ‰
NVA (Wastes)
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
“āđƒāļ™āļ‡āļēāļ™āļ—āļĩāđˆāļ—āļēāļāļąāļ™āļ­āļĒāļđāđˆ 100 āļ‡āļēāļ™
āļˆāļ°āļĄāļĩāļ‡āļēāļ™āļ—āļĩāđˆāļĄāļĩāļ„āļļāļ“āļ„āđˆāļēāđ€āļžāļĩāļĒāļ‡ 10-20% āđ€āļ—āđˆāļēāļ™āļąāđ‰āļ™
āļŠāđˆāļ§āļ™āļ­āļĩāļ 80-90% āđ€āļ›āđ‡āļ™āļ‡āļēāļ™āļ—āļĩāđˆāđ„āļĄāđˆāļĄāļĩāļ„āļļāļ“āļ„āđˆāļē”
facebook.com/L6SSCOR
āđ€āļ­āļŠ āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļēāļ§āļĢāļĢāļ“, ACPE, CSCP, EPPM
āļœāļđāđ‰āđāļ•āđˆāļ‡ LEAN āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļēāđ„āļĢāļžāļļāđˆāļ‡
āļ›āļāļīāļ§āļąāļ•āļīāļ—āļēāļ‡āļ„āļ§āļēāļĄāļ„āļīāļ”
āļŦāļĨāļąāļāļāļēāļĢāđ€āļžāļīāđˆāļĄāļāļēāđ„āļĢāļˆāļēāļāļ•āđ‰āļ™āļ—āļļāļ™āļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ
â€Ē āļ­āļļāļ›āļŠāļ‡āļ„āđŒ > āļ­āļļāļ›āļ—āļģāļ™ āđ€āļžāļīāđˆāļĄāļĢāļģāļ„āļģāļ‚āļģāļĒ
āļāļēāļĢāļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢāđ€āļžāļ·āđˆāļ­āđ€āļžāļīāđˆāļĄāļāļēāđ„āļĢ
â€Ē āļ­āļļāļ›āļŠāļ‡āļ„āđŒ â‰Ī āļ­āļļāļ›āļ—āļģāļ™ āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ
āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ
āļĢāļēāļ„āļēāļ‚āļēāļĒ
āļĢāļēāļ„āļēāļ‚āļēāļĒ
āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ
āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ
āļĢāļēāļ„āļēāļ‚āļēāļĒāļ•āđ‰āļ™āļ—āļļāļ™ āļāļēāđ„āļĢ+ = āļĢāļēāļ„āļēāļ‚āļēāļĒāļ•āđ‰āļ™āļ—āļļāļ™ āļāļēāđ„āļĢ-=
āđ€āļžāļīāđˆāļĄāļĢāļēāļ„āļē
āļ‚āļēāļĒ
āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™
āļ—āļĩāđˆāļĄāļģ: āļĄāļąāļ‡āļāļĢ āđ‚āļĢāļˆāļ™āđŒāļ›āļĢāļ°āļ āļģāļāļĢ, āļĢāļ°āļšāļšāļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢāđāļšāļšāđ‚āļ•āđ‚āļĒāļ•āđ‰āļē āļ‰āļšāļąāļšāđ€āļ‚āđ‰āļēāđƒāļˆāļ‡āđˆāļēāļĒ, āļāļĢāļ‡āđ€āļ—āļžāļĄāļŦāļģāļ™āļ„āļĢ: āļŠāļĄāļģāļ„āļĄāļŠāđˆāļ‡āđ€āļŠāļĢāļīāļĄāđ€āļ—āļ„āđ‚āļ™āđ‚āļĨāļĒāļĩ (āđ„āļ—āļĒ-āļāļĩāđˆāļ›āļļāđˆāļ™), 2554.
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļ›āļāļīāļ§āļąāļ•āļīāļ—āļēāļ‡āļ„āļ§āļēāļĄāļ„āļīāļ”
āļāļēāļĢāļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢāđ€āļžāļ·āđˆāļ­āđ€āļžāļīāđˆāļĄāļāļēāđ„āļĢ
â€Ē āļ­āļļāļ›āļŠāļ‡āļ„āđŒ â‰Ī āļ­āļļāļ›āļ—āļģāļ™ āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™
āļāļēāļĢāļĨāļ”āļĢāļēāļ„āļēāļ‚āļēāļĒāđ€āļžāļ·āđˆāļ­āđ€āļžāļīāđˆāļĄāļ„āļ§āļēāļĄāļŠāļēāļĄāļēāļĢāļ–āđƒāļ™āļāļēāļĢāđāļ‚āđˆāļ‡āļ‚āļąāļ™
â€Ē āļ­āļļāļ›āļŠāļ‡āļ„āđŒ â‰Ī āļ­āļļāļ›āļ—āļģāļ™ āļĨāļ”āļĢāļģāļ„āļģāļ‚āļģāļĒ
āļ—āļĩāđˆāļĄāļģ: āļĄāļąāļ‡āļāļĢ āđ‚āļĢāļˆāļ™āđŒāļ›āļĢāļ°āļ āļģāļāļĢ, āļĢāļ°āļšāļšāļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢāđāļšāļšāđ‚āļ•āđ‚āļĒāļ•āđ‰āļē āļ‰āļšāļąāļšāđ€āļ‚āđ‰āļēāđƒāļˆāļ‡āđˆāļēāļĒ, āļāļĢāļ‡āđ€āļ—āļžāļĄāļŦāļģāļ™āļ„āļĢ: āļŠāļĄāļģāļ„āļĄāļŠāđˆāļ‡āđ€āļŠāļĢāļīāļĄāđ€āļ—āļ„āđ‚āļ™āđ‚āļĨāļĒāļĩ (āđ„āļ—āļĒ-āļāļĩāđˆāļ›āļļāđˆāļ™), 2554.
āļĢāļēāļ„āļēāļ‚āļēāļĒ
āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ
āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ
āļĢāļēāļ„āļēāļ‚āļēāļĒāļ•āđ‰āļ™āļ—āļļāļ™ āļāļēāđ„āļĢ-=
āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™
āļĢāļēāļ„āļēāļ‚āļēāļĒ
āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ
āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ
āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™ āđ€āļžāļīāđˆāļĄāļāļēāđ„āļĢ-=
āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™
āļĨāļ”āļĢāļēāļ„āļēāļ‚āļēāļĒ
āļĨāļ”āļĢāļēāļ„āļēāļ‚āļēāļĒ
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļŠāļđāļ•āļĢāļ‚āļ­āļ‡āļ„āļ§āļēāļĄāļĄāļąāđˆāļ™āļ„āļąāđˆāļ‡
āļ‚āļēāļĒ < āļ—āļļāļ™ āļ‚āļēāļ”āļ—āļļāļ™
āļ‚āļēāļĒ = āļ—āļļāļ™ āļ„āļļāđ‰āļĄāļ—āļļāļ™/āđ„āļ”āđ‰āļ›āļĢāļ°āđ‚āļĒāļŠāļ™āđŒāļ­āļĒāđˆāļēāļ‡āļ­āļ·āđˆāļ™ āđāļ•āđˆāđ„āļĄāđˆāđ„āļ”āđ‰āļ­āļĒāļđāđˆāđƒāļ™āļĢāļđāļ›āļ‚āļ­āļ‡āđ€āļ‡āļīāļ™
āļ‚āļēāļĒ > āļ—āļļāļ™ āļāļēāđ„āļĢ
āļāļēāđ„āļĢ = (āļĢāļēāļ„āļēāļ‚āļēāļĒ – āļ•āđ‰āļ™āļ—āļļāļ™ ) x āļˆāļēāļ™āļ§āļ™
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļŠāļđāļ•āļĢāļ‚āļ­āļ‡āļ„āļ§āļēāļĄāļĄāļąāđˆāļ™āļ„āļąāđˆāļ‡
āđ€āļžāļīāđˆāļĄāļĒāļ­āļ”āļ‚āļģāļĒ
āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™/āļ„āļ§āļģāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļģ
āļ§āļģāļ‡āļ•āļģāđāļŦāļ™āđˆāļ‡āļœāļĨāļīāļ•āđƒāļŦāļĄāđˆ/āđ€āļžāļīāđˆāļĄāļĢāļģāļ„āļģāļ‚āļģāļĒ
āļĒāļāļĢāļ°āļ”āļąāļšāļŠāļīāļ™āļ„āđ‰āļģāļ‚āļķāđ‰āļ™āđ„āļ›
āļĨāļ”āļĢāļ°āļ”āļąāļšāļŠāļīāļ™āļ„āđ‰āļģāļĨāļ‡āļĄāļģ
āļāļēāđ„āļĢ = (āļĢāļēāļ„āļēāļ‚āļēāļĒ – āļ•āđ‰āļ™āļ—āļļāļ™ ) x āļˆāļēāļ™āļ§āļ™
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
8 Wastes āļāļąāļšāļĄāļēāļ•āļĢāļāļēāļĢāđƒāļ™āļāļēāļĢāļ›āļĢāļąāļšāļ›āļĢāļļāļ‡
D Defect
O Overproduction
W Waiting
N Non-utilized talent
T Transport
I Inventory
M Motion
E Excess processing
āļĢāļ°āļšāļšāļ­āļąāļ•āđ‚āļ™āļĄāļąāļ•āļī (Jidoka č‡ŠåƒåŒ–) Poka-Yoke(ポã‚ŦãƒĻã‚ą) QC/QA
āđāļ™āļ§āļ„āļīāļ” Takt time āļĢāļ°āļšāļšāļ”āļķāļ‡ (Pull) āļœāļĨāļīāļ•āļ—āļĩāļĨāļ°āļŠāļīāđ‰āļ™
āļĢāļ°āļšāļšāļ­āļąāļ•āđ‚āļ™āļĄāļąāļ•āļī āļāļēāļĢāļ›āļĢāļąāļšāđ€āļĢāļĩāļĒāļšāļ‡āļēāļ™ (Heijunka åđģ暖化) U-cell
āļāļēāļĢāļšāļĢāļīāļŦāļēāļĢāļžāļ·āđ‰āļ™āļ—āļĩāđˆāļŦāļ™āđ‰āļēāļ‡āļēāļ™ āļāļēāļĢāđ€āļ”āļīāļ™āđƒāļ™āļŠāļēāļĒāļœāļĨāļīāļ• (Genba walk įūå ī)
āļāļēāļĢāļ§āļēāļ‡āļœāļąāļ‡āđ‚āļĢāļ‡āļ‡āļēāļ™ āļāļēāļĢāļāļēāļŦāļ™āļ”āđ€āļŠāđ‰āļ™āļ—āļēāļ‡ āļāļēāļĢāļˆāļąāļ”āļ‚āļ­āļ‡āđ€āļ›āđ‡āļ™āļŠāļļāļ”
āļāļēāļĢāļ›āļĢāļąāļšāđ€āļĢāļĩāļĒāļšāļ‡āļēāļ™ āļāļēāļŦāļ™āļ” SWIP āļĢāļ°āļšāļšāļ”āļķāļ‡ āļœāļĨāļīāļ•āļ—āļĩāļĨāļ°āļŠāļīāđ‰āļ™
āļāļēāļĢāļĻāļķāļāļĐāļēāļāļēāļĢāļ—āļēāļ‡āļēāļ™ āļāļēāļĢāļāļēāļŦāļ™āļ”āļĄāļēāļ•āļĢāļāļēāļ™ āļāļēāļĢāļˆāļąāļ”āļœāļąāļ‡āđ‚āļĢāļ‡āļ‡āļēāļ™
āļāļēāļĢāļāļēāļˆāļąāļ”āļ‡āļēāļ™āļ—āļĩāđˆāđ„āļĄāđˆāļˆāļēāđ€āļ›āđ‡āļ™āļ­āļ­āļ Jig&Fixture āļžāļąāļ’āļ™āļēāđ€āļ—āļ„āđ‚āļ™āđ‚āļĨāļĒāļĩ Retrofit
Value Engineer (VE), Variety Reduction Program (VRP)www.facebook.com/DoingLESS
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļāļĢāļ°āļšāļ§āļ™āļāļēāļĢāđƒāļ™āļāļēāļĢāļ›āļĢāļąāļšāļ›āļĢāļļāļ‡āđāļšāļšāļĨāļĩāļ™
Current
state VSM
A3
Kaizen
Future
state VSM
Standard
www.facebook.com/DoingLESS
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
P-D-C-A āđƒāļ™āđāļ•āđˆāļĨāļ°āļĢāļ°āļ”āļąāļš
Topdown
āļ—āļīāļĻāļ—āļēāļ‡āļ­āļ‡āļ„āđŒāļāļĢ (Direction)
āđ€āļ‚āđ‡āļĄāļĄāļļāđˆāļ‡ (True north)
āđ€āļ›āđ‰āļēāļŦāļĄāļēāļĒāđ€āļŠāļīāļ‡āļĒāļļāļ—āļ˜āļĻāļēāļŠāļ•āļĢāđŒ (Strategic targets)
āļāļēāļĢāļ•āļąāļ”āļŠāļīāļ™āļ”āđ‰āļ§āļĒāļāļēāļĢāļˆāļąāļ”āļĨāļēāļ”āļąāļš
(Prioritization trade-off decision)
āđ€āļ›āđ‰āļēāļŦāļĄāļēāļĒāđƒāļ™āļāļēāļĢāļ›āļāļīāļšāļąāļ•āļīāļāļēāļĢ (Operational targets)
āļāļēāļĢāđ‚āļ„āđ‰āļŠāđāļĨāļ°āļāļēāļĢāļŠāļ™āļąāļšāļŠāļ™āļļāļ™ (Coaching and supporting)
āļāļēāļĢāļˆāļąāļ”āļŠāļĄāļ”āļļāļĨāļĢāļ°āļŦāļ§āđˆāļēāļ‡āļ­āļļāļ›āļŠāļ‡āļ„āđŒāđāļĨāļ°āļ­āļļāļ›āļ—āļēāļ™
(Demand and capacity balancing)
Bottomup
āļœāļĨāļ›āđ‰āļ­āļ™āļāļĨāļąāļš (Feedback)
āđ€āļ›āđ‰āļēāļŦāļĄāļēāļĒāđ€āļ—āļĩāļĒāļšāļœāļĨ (Progress against targets)
āļšāļ—āđ€āļĢāļĩāļĒāļ™ (Lessons learned)
āđāļ™āļ§āļ„āļīāļ” (Ideas)
āļ„āļ§āļēāļĄāļāđ‰āļēāļ§āļŦāļ™āđ‰āļē (Progress)
āļ›āļąāļāļŦāļē (Problems)
āļ āļēāļĢāļ°āļ‡āļēāļ™ (Workload)
āđ€āļŠāļĩāļĒāļ‡āļ‚āļ­āļ‡āļĨāļđāļāļ„āđ‰āļē (VOC)
āļ āļēāļ§āļ°āļœāļđāđ‰āļ™āļēāļĢāļ°āļ”āļąāļšāļŠāļđāļ‡
(Senior Leadership)
āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļŠāļēāļĒāļ˜āļēāļĢāļ„āļļāļ“āļ„āđˆāļē
(Value stream management)
āļ›āļāļīāļšāļąāļ•āļīāļāļēāļĢāļŦāļ™āđ‰āļēāļ‡āļēāļ™
(Frontline/Shop floor)
P
D
C
A
P
D
C
A
www.facebook.com/DoingLESS
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļāļēāļĢāļ›āļĢāļąāļšāļ›āļĢāļļāļ‡āđāļšāļšāļĨāļĩāļ™āļ—āļēāđƒāļŦāđ‰āļ›āļĢāļ°āļŠāļīāļ—āļ˜āļīāļ āļēāļž
āļ‚āļ­āļ‡āļĢāļ°āļšāļšāđ‚āļ”āļĒāļĢāļ§āļĄāļ”āļĩāļ‚āļķāđ‰āļ™
Material flow (āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļ)
Why do we use VSM? (āļ—āļēāđ„āļĄāļ•āđ‰āļ­āļ‡āđƒāļŠāđ‰āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļŠāļēāļĒāļ˜āļēāļĢāļ„āļļāļ“āļ„āđˆāļē)
Source: adapted from Klaus Erlach, 2013, Value Stream Design: The Way Towards a Lean Factory, Heidelberg: Springer.
1
2
4
7
9Timeline
6
5
10
Value-added ratio
3
Information flow (āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļŠāļēāļĢāļŠāļ™āđ€āļ—āļĻ )
Reverse material flow (āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļāļĒāđ‰āļ­āļ™āļāļĨāļąāļš)
8
www.facebook.com/DoingLESS
8 wastes
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āđāļœāļ™āļœāļąāļ‡āļŠāļ–āļēāļ™āļ°āļ›āļąāļˆāļˆāļļāļšāļąāļ™
www.facebook.com/DoingLESS
Value-added: VA Non-value
added: NVA
VA Ratio
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļāļēāļĢāļ›āļĢāļąāļšāļ›āļĢāļļāļ‡āđāļœāļ™āļœāļąāļ‡āļŠāļ–āļēāļ™āļ°āļ›āļąāļˆāļˆāļļāļšāļąāļ™
www.facebook.com/DoingLESS
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļāļēāļĢāļ•āļąāļ”āļŠāļīāļ™āđƒāļˆāđƒāļ™āđ‚āļ„āļĢāļ‡āļāļēāļĢāļ›āļĢāļąāļšāļ›āļĢāļļāļ‡
www.facebook.com/DoingLESS
āļ—āļĩāđˆāļĄāļē: āļ”āļąāļ”āđāļ›āļĨāļ‡āļˆāļģāļ Steven Borris, 2012, Strategic Lean Mapping: Bleanding Improvement Processes fot the Perfect Solution, New York: McGraw-Hill.
āļœāļĨāļāļĢāļ°āļ—āļšāļ•āđˆāļē āļœāļĨāļāļĢāļ°āļ—āļšāļŠāļđāļ‡
āļĨāļ‡āļ—āļļāļ™āļŠāļđāļ‡
āļĨāļ‡āļ—āļļāļ™āļ•āđˆāļē
āļ—āļēāļ‡āđ€āļĨāļ·āļ­āļāļ—āļĩāđˆāļ”āļĩāļ—āļĩāđˆāļŠāļļāļ”
āļœāļĨāļāļĢāļ°āļ—āļšāļŠāļđāļ‡
āđāļĨāļ°āļĨāļ‡āļ—āļļāļ™āļ•āđˆāļē
āļ—āļēāļ‡āđ€āļĨāļ·āļ­āļāļ—āļĩāđˆāļ”āļĩāļĢāļ­āļ‡āļĄāļē
āļœāļĨāļāļĢāļ°āļ—āļšāļ•āđˆāļē
āđāļĨāļ°āļĨāļ‡āļ—āļļāļ™āļ•āđˆāļē
āļ—āļēāļ‡āđ€āļĨāļ·āļ­āļāļ—āļĩāđˆāļ”āļĩāļ­āļąāļ™āļ”āļąāļš 3
āļœāļĨāļāļĢāļ°āļ—āļšāļŠāļđāļ‡
āđāļĨāļ°āļĨāļ‡āļ—āļļāļ™āļŠāļđāļ‡
āļ—āļēāļ‡āđ€āļĨāļ·āļ­āļāļ—āļĩāđˆāđāļĒāđˆāļ—āļĩāđˆāļŠāļļāļ”
āļœāļĨāļāļĢāļ°āļ—āļšāļ•āđˆāļē
āđāļĨāļ°āļĨāļ‡āļ—āļļāļ™āļŠāļđāļ‡
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļ„āļ§āļēāļĄāļāđ‰āļēāļ§āļŦāļ™āđ‰āļēāļ‚āļ­āļ‡āļāļēāļĢāļ›āļĢāļąāļšāļ›āļĢāļļāļ‡āļ­āļĒāđˆāļēāļ‡āļ•āđˆāļ­āđ€āļ™āļ·āđˆāļ­āļ‡āđ€āļžāļ·āđˆāļ­āļĨāļ”āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļē
āļ—āļĩāđˆāļĄāļģ: āļ”āļąāļ”āđāļ›āļĨāļ‡āļˆāļģāļ Berliner C, Brimson JA (1988) Cost management for today’s advanced manufacturing. Harvard Business School Press, Boston.
www.facebook.com/DoingLESS
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļ‚āļąāđ‰āļ™āļ•āļ­āļ™āļāļēāļĢāļšāđˆāļ‡āļŠāļĩāđ‰āļĄāļēāļ•āļĢāļ§āļąāļ”āđāļšāļšāļĨāļĩāļ™
āļĄāļēāļ•āļĢāļ§āļąāļ” āđ€āļŠāđ‰āļ™āļāļēāļ™ āđ€āļ›āđ‰āļēāļŦāļĄāļēāļĒ
āļ›āļĢāļīāļĄāļģāļ“āļŠāļīāļ™āļ„āđ‰āļģāļ„āļ‡āļ„āļĨāļąāļ‡ WIP āļ‚āļ­āļ‡āļŠāļģāļĒāļ˜āļģāļĢāļ„āļļāļ“āļ„āđˆāļģāļĢāļ§āļĄ 30,000 āļ•āļąāļ™
āļĢāļ­āļšāđ€āļ§āļĨāļģāđƒāļ™āļāļģāļĢāļœāļĨāļīāļ•āļŠāļīāļ™āļ„āđ‰āļģ 1 āļ§āļąāļ™
āđ€āļ§āļĨāļģāļ™āļģāļ‚āļ­āļ‡āļŠāļģāļĒāļ˜āļģāļĢāļ„āļļāļ“āļ„āđˆāļģ 4 āļŠāļąāļ›āļ”āļģāļŦāđŒ
āļāļģāļĢāļŠāđˆāļ‡āļĄāļ­āļšāļŠāļīāļ™āļ„āđ‰āļģāļ•āļĢāļ‡āđ€āļ§āļĨāļģ 75%
āļ›āļĢāļīāļĄāļģāļ“āļ‚āđ‰āļ­āļšāļāļžāļĢāđˆāļ­āļ‡ 5%
āļŠāđˆāļ§āļ‡āđ€āļ§āļĨāļģāļ—āļĩāđˆāđ€āļ„āļĢāļ·āđˆāļ­āļ‡āļˆāļąāļāļĢāđƒāļŠāđ‰āđ„āļ”āđ‰ 90%
VA/āđ€āļ§āļĨāļģāļĢāļ§āļĄ 5.5%
www.facebook.com/DoingLESS
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļŠāļīāļ™āļ„āđ‰āļēāļ„āļ‡āļ„āļĨāļąāļ‡āđ€āļžāļ·āđˆāļ­āļĢāļ­āļ‡āļĢāļąāļšāļāļēāļĢāđ€āļ›āļĨāļĩāđˆāļĒāļ™āļ­āļąāļ•āļĢāļēāļāļēāļĢāļ›āļāļīāļšāļąāļ•āļīāļāļēāļĢ
āļ—āļĩāđˆāļĄāļģ: Steve Bell, Lean Enterprise Systems: Using IT for Continuous Improvement, New Jersey: John Wiley & Sons, 2006.
āļ„āļēāļŠāļąāđˆāļ‡āļ‹āļ·āđ‰āļ­āļĨāļđāļāļ„āđ‰āļē
www.facebook.com/DoingLESS
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
STARTUP
â€Ē āļĒāļīāđˆāļ‡āđƒāļŦāļāđˆ āļ”āđ‰āļ§āļĒāļ„āļ§āļēāļĄāđ„āļĄāđˆāļĄāļĩ
â€Ē āđ€āļ›āļĨāļĩāđˆāļĒāļ™āđ„āļ§
â€Ē āļāļīāļ™āļ•āļĨāļēāļ”āļ—āļąāđˆāļ§āđ‚āļĨāļ
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
53
The LEAN Startup
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
54
The LEAN Startup
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
55
āļŠāļīāļ™āļ„āđ‰āļēāļ—āļĩāđˆāļžāļ­āđƒāļŠāđ‰āļāļēāļĢāđ„āļ”āđ‰
(Minimum Viable Product: MVP)
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
M: +66(0)95-624-2449
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
56
Source: How much should your MVP cost? sparksolutions.co/2016/01/how-much-should-your-mvp-cost/
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
0 1
â€Ē Customer-Problem fit
āļĨāļđāļāļ„āđ‰āļģāļĄāļĩāļ›āļąāļāļŦāļģāļ™āļĩāđ‰āļˆāļĢāļīāļ‡
â€Ē Problem-Solution fit
āļ›āļąāļāļŦāļģāđāļāđ‰āđ„āļ”āđ‰āļ”āđ‰āļ§āļĒāļ§āļīāļ˜āļĩāļ™āļĩāđ‰āļˆāļĢāļīāļ‡
â€Ē Product-Market fit
āļœāļĨāļīāļ•āļ āļąāļ“āļ‘āđŒāđ€āļŦāļĄāļģāļ°āļāļąāļšāļ•āļĨāļģāļ”āļ™āļĩāđ‰āļˆāļĢāļīāļ‡
āļ•āļĨāļģāļ”āđƒāļŦāļāđˆāđāļ„āđˆāđ„āļŦāļ™
āđƒāļ„āļĢāļāļīāļ™āļŠāđˆāļ§āļ™āđāļšāđˆāļ‡āđ„āļ›āđāļĨāđ‰āļ§
āđ€āļĢāļģāļˆāļ°āđ€āļ‚āđ‰āļģāđ„āļ›āļŠāđˆāļ§āļ™āđƒāļ”
â€Ē Market-Business Model fit
āđāļšāļšāļˆāļģāļĨāļ­āļ‡āļ˜āļļāļĢāļāļīāļˆ (BMC) >> āđāļœāļ™āļ˜āļļāļĢāļāļīāļˆ
â€Ē SCALE !
āļĨāļļāļĒāļ•āļĨāļēāļ”āđ‚āļĨāļāļāļ Source: Alexander Osterwalder et. al., 2014, Value Proposition Design:
How to Create Products and Services Customers Want, Canada: Wiley.
Steps of Fits (CPSM>>BMC>>SCALE)
The Balance Forces
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
Step by step
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
GOOB
[Test]
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
Fail Fast, Succeed Faster
Lean Startup Machine
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
No BMC, need LEAN Canvas
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
Lean Canvas
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
5
Lean Canvas
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
Used around the world.
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
LEARN
BUILDMEASURE
LEARN
BUILDMEASURE
LEARN
BUILDMEASURE
LEARN
BUILDMEASURE
LEARN
BUILDMEASURE
LEARN
BUILDMEASURE
LEARN
BUILDMEASURE
LEARN
BUILDMEASURE
LEARN
BUILDMEASURE
Lean Canvas
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
āđ„āļ›āļ•āđˆāļ­ āļŦāļĢāļ·āļ­ āđ€āļ›āļĨāļĩāđˆāļĒāļ™āļ—āļēāļ‡
Preserve or pivot
Lean Scale
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
Lean Scale
www.facebook.com/DoingLESS
Zero to one
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
Growth Hacker is ???
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., CPIM(BSCM), EPPM 74
MarketerDeveloper
Data analyst
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
J.A.R.V.I.S.: Business Intelligence (BI)
Copyright ÂĐ 2015, all rights reserved.
Doing LESS Getting MORE (DLGM)
āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
www.facebook.com/DoingLESS
AARRR (āļ­āļē...) Pirate Metrics
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
INCOME
Dave McClure, Founder 500 Startups
AARRR (āļ­āļē...) Pirate Metrics
āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
HAPPY
+
+
+
+
+ +
R
R
Lean Enterprise
āļĢāļēāļĒāļĨāļ°āđ€āļ­āļĩāļĒāļ”āđ€āļžāļīāđˆāļĄāđ€āļ•āļīāļĄ (For more information)
āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļēāļ§āļĢāļĢāļ“, CSCP, EPPM
Siripong Jungthawan, CSCP, EPPM
M/L: +6695-624-2449 E: L6SSCOR@GMAIL.COM
FB: @L6SSCOR Group LEAN Talk
www.facebook.com/groups/LEANTalk/

More Related Content

What's hot

Lean startup and innovation 180901 KMITL modern entrepreneurship
Lean startup and innovation 180901 KMITL modern entrepreneurshipLean startup and innovation 180901 KMITL modern entrepreneurship
Lean startup and innovation 180901 KMITL modern entrepreneurship
Dr.Eng.Siripong Jungthawan, PhD, MBA, ACPE, CAP, CSCP, EPPM
 
Lean āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļģāđ„āļĢāļžāļļāđˆāļ‡ 180629
Lean āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļģāđ„āļĢāļžāļļāđˆāļ‡ 180629Lean āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļģāđ„āļĢāļžāļļāđˆāļ‡ 180629
Lean āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļģāđ„āļĢāļžāļļāđˆāļ‡ 180629
Dr.Eng.Siripong Jungthawan, PhD, MBA, ACPE, CAP, CSCP, EPPM
 
How to import and distribute beauty products in thailand 210625
How to import and distribute beauty products in thailand 210625How to import and distribute beauty products in thailand 210625
How to import and distribute beauty products in thailand 210625
Dr.Eng.Siripong Jungthawan, PhD, MBA, ACPE, CAP, CSCP, EPPM
 

What's hot (16)

Lean canvas 180609 noah print
Lean canvas 180609 noah printLean canvas 180609 noah print
Lean canvas 180609 noah print
 
Lean systems KMUTNB Rayong
Lean systems KMUTNB RayongLean systems KMUTNB Rayong
Lean systems KMUTNB Rayong
 
Lean covid 19 pr os-cons for SPU
Lean covid 19 pr os-cons for SPULean covid 19 pr os-cons for SPU
Lean covid 19 pr os-cons for SPU
 
GEW2020 Design business model for new business
GEW2020 Design business model for new businessGEW2020 Design business model for new business
GEW2020 Design business model for new business
 
Lean startup and innovation 180901 KMITL modern entrepreneurship
Lean startup and innovation 180901 KMITL modern entrepreneurshipLean startup and innovation 180901 KMITL modern entrepreneurship
Lean startup and innovation 180901 KMITL modern entrepreneurship
 
Lean canvas 180618 startup week 2018 print
Lean canvas 180618 startup week 2018 printLean canvas 180618 startup week 2018 print
Lean canvas 180618 startup week 2018 print
 
Intro to startup 181002 ku startup print
Intro to startup  181002 ku startup printIntro to startup  181002 ku startup print
Intro to startup 181002 ku startup print
 
RSU Logistics 4.0 āļāļēāļĢāļ›āļĢāļąāļšāļ•āļąāļ§āļ‚āļ­āļ‡āļœāļđāđ‰āļ›āļĢāļ°āļāļ­āļšāļāļēāļĢāđƒāļ™āļĒāļļāļ„ Digital
RSU Logistics 4.0 āļāļēāļĢāļ›āļĢāļąāļšāļ•āļąāļ§āļ‚āļ­āļ‡āļœāļđāđ‰āļ›āļĢāļ°āļāļ­āļšāļāļēāļĢāđƒāļ™āļĒāļļāļ„ DigitalRSU Logistics 4.0 āļāļēāļĢāļ›āļĢāļąāļšāļ•āļąāļ§āļ‚āļ­āļ‡āļœāļđāđ‰āļ›āļĢāļ°āļāļ­āļšāļāļēāļĢāđƒāļ™āļĒāļļāļ„ Digital
RSU Logistics 4.0 āļāļēāļĢāļ›āļĢāļąāļšāļ•āļąāļ§āļ‚āļ­āļ‡āļœāļđāđ‰āļ›āļĢāļ°āļāļ­āļšāļāļēāļĢāđƒāļ™āļĒāļļāļ„ Digital
 
Lean systems 180225 kmutt print
Lean systems 180225 kmutt printLean systems 180225 kmutt print
Lean systems 180225 kmutt print
 
Gew2020 youth entrepreneurship
Gew2020 youth entrepreneurshipGew2020 youth entrepreneurship
Gew2020 youth entrepreneurship
 
Lean āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļģāđ„āļĢāļžāļļāđˆāļ‡ 180629
Lean āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļģāđ„āļĢāļžāļļāđˆāļ‡ 180629Lean āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļģāđ„āļĢāļžāļļāđˆāļ‡ 180629
Lean āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļģāđ„āļĢāļžāļļāđˆāļ‡ 180629
 
Bmc and vpd 170411 bbu print
Bmc and vpd 170411 bbu printBmc and vpd 170411 bbu print
Bmc and vpd 170411 bbu print
 
Lean iot 201202
Lean iot 201202Lean iot 201202
Lean iot 201202
 
How to import and distribute beauty products in thailand 210625
How to import and distribute beauty products in thailand 210625How to import and distribute beauty products in thailand 210625
How to import and distribute beauty products in thailand 210625
 
Business model canvas 161220 smart biz
Business model canvas 161220 smart bizBusiness model canvas 161220 smart biz
Business model canvas 161220 smart biz
 
āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļ•āđ‰āļ™āļ—āļļāļ™āļĢāļ§āļĄāļŠāļģāļŦāļĢāļąāļšāļāļēāļĢāļ‚āļ™āļŠāđˆāļ‡ 220323 MICHELIN How to total cost of ownership
āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļ•āđ‰āļ™āļ—āļļāļ™āļĢāļ§āļĄāļŠāļģāļŦāļĢāļąāļšāļāļēāļĢāļ‚āļ™āļŠāđˆāļ‡ 220323 MICHELIN  How to total cost of ownershipāļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļ•āđ‰āļ™āļ—āļļāļ™āļĢāļ§āļĄāļŠāļģāļŦāļĢāļąāļšāļāļēāļĢāļ‚āļ™āļŠāđˆāļ‡ 220323 MICHELIN  How to total cost of ownership
āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļ•āđ‰āļ™āļ—āļļāļ™āļĢāļ§āļĄāļŠāļģāļŦāļĢāļąāļšāļāļēāļĢāļ‚āļ™āļŠāđˆāļ‡ 220323 MICHELIN How to total cost of ownership
 

Similar to Lean systems 180714 SPU

Lean Canvas H 231117.pdf
Lean Canvas H 231117.pdfLean Canvas H 231117.pdf
SPU Proof of Concept and Completive Analysis 221001 P.pdf
SPU Proof of Concept and Completive Analysis 221001 P.pdfSPU Proof of Concept and Completive Analysis 221001 P.pdf
SPU Proof of Concept and Completive Analysis 221001 P.pdf
Dr.Eng.Siripong Jungthawan, PhD, MBA, ACPE, CAP, CSCP, EPPM
 
Foresight for thorkorsor
Foresight for thorkorsorForesight for thorkorsor
Foresight for thorkorsor
Nares Damrongchai
 
āļšāļĢāļīāļĐāļąāļ—āđ€āļ„āļĢāļ·āļ­āļ‹āļĩāđ€āļĄāļ™āļ•āđŒāđ„āļ—āļĒ
āļšāļĢāļīāļĐāļąāļ—āđ€āļ„āļĢāļ·āļ­āļ‹āļĩāđ€āļĄāļ™āļ•āđŒāđ„āļ—āļĒāļšāļĢāļīāļĐāļąāļ—āđ€āļ„āļĢāļ·āļ­āļ‹āļĩāđ€āļĄāļ™āļ•āđŒāđ„āļ—āļĒ
āļšāļĢāļīāļĐāļąāļ—āđ€āļ„āļĢāļ·āļ­āļ‹āļĩāđ€āļĄāļ™āļ•āđŒāđ„āļ—āļĒ
ploypilin chaisimma
 

Similar to Lean systems 180714 SPU (12)

Lean Canvas H 231117.pdf
Lean Canvas H 231117.pdfLean Canvas H 231117.pdf
Lean Canvas H 231117.pdf
 
SPU Proof of Concept and Completive Analysis 221001 P.pdf
SPU Proof of Concept and Completive Analysis 221001 P.pdfSPU Proof of Concept and Completive Analysis 221001 P.pdf
SPU Proof of Concept and Completive Analysis 221001 P.pdf
 
Presentation for Green Supply Chain
Presentation for Green Supply ChainPresentation for Green Supply Chain
Presentation for Green Supply Chain
 
03 tele sales process
03 tele sales process03 tele sales process
03 tele sales process
 
Wealth Management Presentation
Wealth Management PresentationWealth Management Presentation
Wealth Management Presentation
 
Foresight for thorkorsor
Foresight for thorkorsorForesight for thorkorsor
Foresight for thorkorsor
 
āļšāļĢāļīāļĐāļąāļ—āđ€āļ„āļĢāļ·āļ­āļ‹āļĩāđ€āļĄāļ™āļ•āđŒāđ„āļ—āļĒ
āļšāļĢāļīāļĐāļąāļ—āđ€āļ„āļĢāļ·āļ­āļ‹āļĩāđ€āļĄāļ™āļ•āđŒāđ„āļ—āļĒāļšāļĢāļīāļĐāļąāļ—āđ€āļ„āļĢāļ·āļ­āļ‹āļĩāđ€āļĄāļ™āļ•āđŒāđ„āļ—āļĒ
āļšāļĢāļīāļĐāļąāļ—āđ€āļ„āļĢāļ·āļ­āļ‹āļĩāđ€āļĄāļ™āļ•āđŒāđ„āļ—āļĒ
 
āļžāļąāļ’āļ™āļēāļ•āļ™āđ€āļ­āļ‡āļŠāļđāđˆāļ›āļĢāļ°āđ€āļ—āļĻāđ„āļ—āļĒ 4.0
āļžāļąāļ’āļ™āļēāļ•āļ™āđ€āļ­āļ‡āļŠāļđāđˆāļ›āļĢāļ°āđ€āļ—āļĻāđ„āļ—āļĒ 4.0āļžāļąāļ’āļ™āļēāļ•āļ™āđ€āļ­āļ‡āļŠāļđāđˆāļ›āļĢāļ°āđ€āļ—āļĻāđ„āļ—āļĒ 4.0
āļžāļąāļ’āļ™āļēāļ•āļ™āđ€āļ­āļ‡āļŠāļđāđˆāļ›āļĢāļ°āđ€āļ—āļĻāđ„āļ—āļĒ 4.0
 
Hpon1
Hpon1Hpon1
Hpon1
 
Thailand4.0
Thailand4.0Thailand4.0
Thailand4.0
 
Thaialnd Service Robot Market 2023
Thaialnd Service Robot Market 2023Thaialnd Service Robot Market 2023
Thaialnd Service Robot Market 2023
 
JumpStart Business
JumpStart BusinessJumpStart Business
JumpStart Business
 

Lean systems 180714 SPU

  • 1. āļĢāļ°āļšāļšāđāļšāļšāļĨāļĩāļ™ (LEAN Systems) āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļēāļ§āļĢāļĢāļ“, ACPE, CSCP, EPPM āđāļĨāļ°āļ„āļ“āļ° āļšāļ˜.āļĄ., āļ§āļĻ.āļš. LEAN Master, āļšāļĢāļīāļĐāļąāļ— āļ—āļēāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļēāļ āļˆāļēāļāļąāļ” +6695-624-2449 L6SSCOR@GMAIL.COM facebook.com/DoingLess Design · Learn · Grow · Mature
  • 2. Siripong S Jungthawan, MBA, BEng, ACPE, CSCP, EPPM Partner and Workgroup, Global Entrepreneurship Network (Thailand) PhD (Logistics and Supply Chain Management) Program Manager, International College, KMITL Design · Learn · Grow · Mature LEAN Master and Co-founder, Doing Less Getting More LEAN Mentor, LEAN Startup Machine LEAN Startup Thailand Mentor and Jury Moderator, Creative Business CUP (CBC) Founder, LEANxACADEMY.com
  • 3. āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļēāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 LEAN āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļēāđ„āļĢāļžāļļāđˆāļ‡ āļ—āļļāļāđāļœāļ‡āļŦāļ™āļąāļ‡āļŠāļ·āļ­āļŠāļąāđ‰āļ™āļ™āļē āļ—āļąāđˆāļ§āļ›āļĢāļ°āđ€āļ—āļĻ bit.ly/LEANBestSeller āļŦāļĄāļ§āļ”āļšāļĢāļīāļŦāļēāļĢāļ˜āļļāļĢāļāļīāļˆ Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļēāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļēāļ 3
  • 5. Amazon.com Inc. will acquire Whole Foods Market Inc. for $13.7 billion Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM 5 Source: www.bloomberg.com
  • 6. The most trusted threat to legacy delivery providers? Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM 6
  • 7. amazon performance Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM 7 Source: Amazon, Annual report 2016.
  • 8. āļ§āļīāļ§āļąāļ’āļ™āļēāļāļēāļĢāļ‚āļ­āļ‡āļ­āļļāļ•āļŠāļēāļŦāļāļĢāļĢāļĄ 4.0 Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 9. Smart X 4.0 Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 IoT 9
  • 10. āļˆāļēāļāļ­āļļāļ•āļŠāļēāļŦāļĢāļĢāļĄāļ”āļąāđ‰āļ‡āđ€āļ”āļīāļĄ āđ„āļ›āļŠāļđāđˆāļ­āļļāļ•āļŠāļēāļŦāļāļĢāļĢāļĄ 4.0 Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 10 Zero Inventory (FG) Huge Inventory (FG)
  • 11. āđ€āļĢāļēāļˆāļ°āļĄāļĩāđ€āļžāļ·āđˆāļ­āļ™āļĢāđˆāļ§āļĄāļ‡āļēāļ™āđ€āļ›āđ‡āļ™āļŦāļļāđˆāļ™āļĒāļ™āļ•āđŒ āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 Source: from www.businessinsider.com, www.reuters.com Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ 11
  • 12. āļĄāļļāđˆāļ‡āļŠāļđāđˆ Super Cluster Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 13. Digital Transformation (1 min) Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 14. āļ§āļīāļ§āļąāļ’āļ™āļēāļāļēāļĢāļ‚āļ­āļ‡āđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™ (Evolution of Supply Chain) 14 āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™āļ—āļĩāđˆāļ‚āļĒāļēāļĒāļœāļĨ (Expanded Supply Chain Management) āļˆāļļāļ”āļāļēāđ€āļ™āļīāļ”āļˆāļ™āļ–āļķāļ‡āļĄāļ·āļ­āļĨāļđāļāļ„āđ‰āļēāļŠāļļāļ”āļ—āđ‰āļēāļĒ E2E āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™ (Supply Chain Management) āļ•āļąāđ‰āļ‡āđāļ•āđˆāļ§āļąāļ•āļ–āļļāļ”āļīāļšāļ–āļķāļ‡āļĨāļđāļāļ„āđ‰āļē āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļ§āļąāļŠāļ”āļļ (Material Management) āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļāļēāļĢāđ„āļŦāļĨāļ§āļąāļŠāļ”āļļ āļāļēāļĢāļˆāļąāļ”āļŦāļē (Purchasing) āļāļēāļĢāļ§āļēāļ‡āđāļœāļ™āļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ (Production planning) āđ‚āļĨāļˆāļīāļŠāļ•āļīāļāļŠāđŒ (Logistics) āļ›āļąāļˆāļˆāļąāļĒāļ™āļēāđ€āļ‚āđ‰āļē (Inputs) āļŠāļīāđˆāļ‡āļ‚āļ­āļ‡ (Things) āļ„āļ™ (People) āļāļēāļĢāđāļ›āļĢāļŠāļ āļēāļž (Transformation) āļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ (Manufacturing) āļšāļĢāļīāļāļēāļĢ (Service) āļ›āļąāļˆāļˆāļąāļĒāļ™āļēāļ­āļ­āļ (Outputs) āļœāļĨāļīāļ•āļ āļąāļ“āļ‘āđŒ (Products) āļšāļĢāļīāļāļēāļĢ (Services) āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ‚āļ­āļ‡āļœāļđāđ‰āļˆāļąāļ”āļŦāļē (Suppliers' supplier) āļœāļđāđ‰āļˆāļąāļ”āļŦāļē (Suppliers) āļ āļēāļĒāđƒāļ™ (Internal) āļ āļēāļĒāļ™āļ­āļ (External) āļĨāļđāļāļ„āđ‰āļē (Customers) āļĨāļđāļāļ„āđ‰āļēāļŠāļļāļ”āļ—āđ‰āļēāļĒ (Customers’ customer) - āļāļēāļĢāļžāļĒāļēāļāļĢāļ“āđŒ - āļāļēāļĢāļˆāļąāļ”āļŦāļē - āļāļēāļĢāļ§āļēāļ‡āđāļœāļ™āļ§āļąāļŠāļ”āļļ - āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļŠāļīāļ™āļ„āđ‰āļēāļ„āļ‡āļ„āļĨāļąāļ‡ āļŊāļĨāļŊ - āļŠāļīāļ™āļ„āđ‰āļēāļ„āļ‡āļ„āļĨāļąāļ‡āļĢāļ°āļŦāļ§āđˆāļēāļ‡ āļāļĢāļ°āļšāļ§āļ™āļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ (WIP) - āļ„āļĨāļąāļ‡āļŠāļīāļ™āļ„āđ‰āļē - āļāļēāļĢāļ‚āļ™āļĒāđ‰āļēāļĒ - āļāļēāļĢāļšāļĢāļĢāļˆāļļ āļŊāļĨāļŊ - āļŠāļīāļ™āļ„āđ‰āļēāļŠāļēāđ€āļĢāđ‡āļˆāļĢāļđāļ› - āļ„āļēāļŠāļąāđˆāļ‡āļ‹āļ·āđ‰āļ­āļˆāļēāļāļĨāļđāļāļ„āđ‰āļē - āļāļēāļĢāļ‚āļ™āļŠāđˆāļ‡ - āļšāļĢāļīāļāļēāļĢāļĨāļđāļāļ„āđ‰āļē āļŊāļĨāļŊ āđ‚āļĨāļˆāļīāļŠāļ•āļīāļāļŠāđŒāļ‚āļēāđ€āļ‚āđ‰āļē (Inbound Logistics) āļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ (Production) āđ‚āļĨāļˆāļīāļŠāļ•āļīāļāļŠāđŒāļ‚āļēāļ­āļ­āļ (Outbound Logistics) āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļ (Material flow) āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļāļĢāļ°āđāļŠāđ€āļ‡āļīāļ™āļŠāļ” (Cash flow) āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļāļĒāđ‰āļ­āļ™āļāļĨāļąāļš (Reverse material flow) āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 15. āđāļšāļšāļˆāļēāļĨāļ­āļ‡āđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™ (3 āļŠāļĄāļēāļŠāļīāļ 4 āļāļēāļĢāđ„āļŦāļĨ 6 āļāļĢāļ°āļšāļ§āļ™āļāļēāļĢ) 15 āļœāļđāđ‰āļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ (Manufacturer) āļœāļđāđ‰āļāļĢāļ°āļˆāļēāļĒāļŠāļīāļ™āļ„āđ‰āļē (Distributor) āļĨāļđāļāļ„āđ‰āļē (Customer) āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļŠāļēāļĢāļŠāļ™āđ€āļ—āļĻ (Information flow) āļœāļđāđ‰āļāļĢāļ°āļˆāļēāļĒāļŠāļīāļ™āļ„āđ‰āļē āļĨāļđāļāļ„āđ‰āļē āļĨāļđāļāļ„āđ‰āļē āļĨāļđāļāļ„āđ‰āļē āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļ (Material flow) āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļāļĢāļ°āđāļŠāđ€āļ‡āļīāļ™āļŠāļ” (Cash flow) āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļāļĒāđ‰āļ­āļ™āļāļĨāļąāļš (Reverse material flow) āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 1 (Tier 1 Material supplier) āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 1 āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 1 āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 2 (Tier 2 Material supplier) āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 2 āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 2 āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 2 āļœāļđāđ‰āļˆāļąāļ”āļŦāļēāļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ‚āļąāđ‰āļ™āļ—āļĩāđˆ 2 āļ•āđ‰āļ™āļ™āđ‰āļē (Upstream) āļāļĨāļēāļ‡āļ™āđ‰āļē (Midstream) āļ›āļĨāļēāļĒāļ™āđ‰āļē (Downstream) āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 āļ§āļēāļ‡āđāļœāļ™ (Plan: P) āļˆāļąāļ”āļŦāļē (Source :S) āļœāļĨāļīāļ• (Make: M) āļŠāđˆāļ‡āļĄāļ­āļš (Deliver :D) āļ—āļēāđƒāļŦāđ‰āđ€āļāļīāļ” (Enable: E) āļĢāļąāļšāļ„āļ·āļ™ (Return :R)āļĢāļąāļšāļ„āļ·āļ™ (Return :R)āļĢāļąāļšāļ„āļ·āļ™ (Return :R)āļĢāļąāļšāļ„āļ·āļ™ (Return :R) Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 16. āļĢāļ°āļ”āļąāļšāđƒāļ™āļāļēāļĢāļšāļđāļĢāļ“āļēāļāļēāļĢāđƒāļ™āđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™ 16 āļ—āļĩāđˆāļĄāļē: Stevens, G.C., Integrating the Supply Chain, International Journal of Physical Distribution and Material Management, Vol. 19, No. 8, 1989. āļāļēāļĢāļ—āļēāļ‡āļēāļ™āđ€āļ›āđ‡āļ™āđāļœāļ™āļāđ† āđ‚āļ›āļĢāđˆāļ‡āđƒāļŠ/āļĢāđˆāļ§āļĄāļĄāļ·āļ­ āđ€āļĢāļīāđˆāļĄāļšāļđāļĢāļ“āļēāļāļēāļĢāļŦāļ™āđ‰āļēāļ—āļĩāđˆ āļšāļđāļĢāļ“āļēāļāļēāļĢāļ āļēāļĒāđƒāļ™āļ­āļ‡āļ„āđŒāļāļĢ āļšāļđāļĢāļ“āļēāļāļēāļĢāļ āļēāļĒāļ™āļ­āļāļ­āļ‡āļ„āđŒāļāļĢ āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 17. āļāļēāļĢāļāļēāļŦāļ™āļ”āļāļĨāļĒāļļāļ—āļ˜āđŒāļŠāļīāļ™āļ„āđ‰āļēāļ„āļ‡āļ„āļĨāļąāļ‡āđƒāļŦāđ‰āđ€āļŦāļĄāļēāļ°āļŠāļĄāļāļąāļšāļ­āļļāļ›āļŠāļ‡āļ„āđŒ 17 āļ—āļĩāđˆāļĄāļē: Martin Christopher, 2011, Logistics and supply chain management : creating value-adding networks, Great Britain: Pearson Education, 4th ed. MTO MTS āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 ETO MTO ATO MTS Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 18. Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 18 "Any customer can have a car painted any color that he wants so long as it is black. Henry Ford (July 30, 1863 – April 7, 1947)” From Henry Ford in collaboration with Samuel Crowther in My Life and Work, 1922, Page 72 āļĨāļđāļāļ„āđ‰āļēāļˆāļ°āļŠāļąāđˆāļ‡āļĢāļ–āļĒāļ™āļ•āđŒāļŠāļĩāļ­āļ°āđ„āļĢāļāđ‡āđ„āļ”āđ‰ āđāļ•āđˆ Ford āļĄāļĩāđāļ•āđˆāļŠāļĩāļ”āļēāđ€āļ—āđˆāļēāļ™āļąāđ‰āļ™
  • 19. Toyota āđ€āļ›āđ‡āļ™āļ­āļąāļ™āļ”āļąāļš 4 āļ‚āļ­āļ‡āđ‚āļĨāļ āđāļ•āđˆāļāļēāđ„āļĢāļĄāļēāļāļāļ§āđˆāļē 3 āļ­āļąāļ™āļ”āļąāļšāđāļĢāļāļĢāļ§āļĄāļāļąāļ™ â€Ē āđƒāļ™āļ›āļĩ 2005 Toyota āļāļēāđ„āļĢāļĄāļēāļāļāļ§āđˆāļē America's Big Three āļ„āļ·āļ­ GM, Ford, Chrysler â€Ē GM 1.9% â€Ē Ford 2.4% â€Ē Chrysler 0.3% â€Ē 4.6% < Toyota 6.7% āļ­āļĒāļđāđˆ 2.1%Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ āļ§āļĻ.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 19 4.6
  • 20. āļˆāļēāļ Mass production āļŠāļđāđˆ Lean production 316.7 āļĨāđ‰āļēāļ™āļ„āļ™āļ›āļĢāļ°āļŠāļēāļāļĢ 127.4 āļĨāđ‰āļēāļ™āļ„āļ™ 153.6 āļĨāđ‰āļēāļ™āļ„āļ™āđāļĢāļ‡āļ‡āļēāļ™ 65.9 āļĨāđ‰āļēāļ™āļ„āļ™ 1.37%āļ­āļąāļ•āļĢāļēāļāļēāļĢāđ€āļāļīāļ” 0.80% 9.83 āļĨāđ‰āļēāļ™āļ•āļēāļĢāļēāļ‡āļāļīāđ‚āļĨāđ€āļĄāļ•āļĢ (āļ­āļąāļ™āļ”āļąāļš 3)āļžāļ·āđ‰āļ™āļ—āļĩāđˆ 3.78 āļĨāđ‰āļēāļ™āļ•āļēāļĢāļēāļ‡āļāļīāđ‚āļĨāđ€āļĄāļ•āļĢ (āļ­āļąāļ™āļ”āļąāļš 61) āđāļœāđˆāļ™āļ”āļīāļ™ āļĨāļąāļāļĐāļ“āļ°āļ—āļēāļ‡ āļ āļđāļĄāļīāļĻāļēāļŠāļ•āļĢāđŒ āļžāļ·āđ‰āļ™āļ—āļĩāđˆāļŠāđˆāļ§āļ™āđƒāļŦāļāđˆāđ€āļ›āđ‡āļ™āđ€āļāļēāļ°Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 21. Time line āļ‚āļ­āļ‡āđ€āļ„āļĢāļ·āļ­āđ‚āļ•āđ‚āļĒāļ•āđ‰āļē 2010 - Toyota āđāļĨāļ° Tesla Motors āļĢāđˆāļ§āļĄāļāļąāļ™āļžāļąāļ’āļ™āļģāļĢāļ–āđ„āļŸāļŸāđ‰āļģ - TMT āļœāļĨāļīāļ•āļĢāļ–āļĒāļ™āļ•āđŒāļ„āļĢāļš 5 āļĨāđ‰āļģāļ™āļ„āļąāļ™ 1918 Toyoda Spinning & Weaving Co., Ltd. Toyota Way 1900 1920 1940 1960 1980 2000 2010 2020 1926 Toyoda Automatic Loom Works, Ltd. 1924 Sakichi Toyoda āļ›āļĢāļ°āļ”āļīāļĐāļāđŒāđ€āļ„āļĢāļ·āļ­āļ‡āļ—āļ­āļœāđ‰āļģ āļ­āļąāļ•āđ‚āļ™āļĄāļąāļ•āļīāļĢāļļāđˆāļ™ Type-G 1929 Platt Brothers & Co., Ltd., England āļ‹āļ·āđ‰āļ­āļŠāļīāļ—āļ˜āļīāļšāļąāļ•āļĢ Type-G 1 āļĨāđ‰āļģāļ™āđ€āļĒāļ™ 1933 āļ•āļąāđ‰āļ‡āļāđˆāļģāļĒāļĒāļģāļ™āļĒāļ™āļ•āđŒāđƒāļ™ Toyoda Automatic Loom Works, Ltd. 1935 - āļˆāļ”āđ‚āļĨāđ‚āļāđ‰ - āļĢāļ–āļ•āđ‰āļ™āđāļšāļš a1 1890 Sakichi Toyoda āļœāļĨāļīāļ•āđ€āļ„āļĢāļ·āđˆāļ­āļ‡āļ—āļ­āļœāđ‰āļģ āļ”āđ‰āļ§āļĒāļĄāļ·āļ­āļ”āđ‰āļ§āļĒāļ­āļģāļĒāļļ āđ€āļžāļĩāļĒāļ‡ 23 āļ›āļĩ 1937 Toyota Motor Co., Ltd. 1941 Toyota Machine Works Co., Ltd. 1957 - Toyota Motor Sales Co., Ltd. āđƒāļ™āļŠāļŦāļĢāļąāļ āđāļĨāļ°āđ„āļ—āļĒ - āļŠāđˆāļ‡āļĢāļ– Crown āđ„āļ› āļ‚āļģāļĒāđƒāļ™āļŠāļŦāļĢāļąāļ 1962 Toyota Motor Thailand Co., Ltd. (TMT) 1950 āļ›āļĨāļ”āļžāļ™āļąāļāļ‡āļģāļ™ Kiichiro Toyoda āļĨāļģāļ­āļ­āļ 1951 āđ€āļĢāļīāđˆāļĄāļĢāļ°āļšāļš Creative Idea Suggestion System 1976 āļœāļĨāļīāļ•āļĢāļ–āļĒāļ™āļ•āđŒ āļ„āļĢāļš 20 āļĨāđ‰āļģāļ™āļ„āļąāļ™ 1984 āļĢāđˆāļ§āļĄāļ—āļļāļ™āļāļąāļš GM āļ•āļąāđ‰āļ‡ New United Motor Manufacturing, Inc. (NUMMI) 1997 Toyota Hybrid System 2002 Tianjin Toyota Motor Co., Ltd. āđƒāļ™āļˆāļĩāļ™ 1969 āļœāļĨāļīāļ•āļĢāļ–āļĒāļ™āļ•āđŒ āļ„āļĢāļš 1 āļĨāđ‰āļģāļ™āļ„āļąāļ™ 1989 āđ€āļ›āļĨāļĩāđˆāļĒāļ™āļŠāļ·āđˆāļ­āđāļĨāļ°āđ‚āļĨāđ‚āļāđ‰ 1934 āļžāļąāļ’āļ™āļģāđ€āļ„āļĢāļ·āđˆāļ­āļ‡āļĒāļ™āļ•āđŒ Model a 2012 āļ„āļĢāļšāļĢāļ­āļš 75 āļ›āļĩ 1938 āđƒāļŠāđ‰āļĢāļ°āļšāļš JIT (Just-in-time) 1948-1975 āļžāļąāļ’āļ™āļģToyota production system (TPS) āđ‚āļ”āļĒ Taiichi Ohno, Shigeo Shingo āđāļĨāļ° Eiji Toyoda āļ—āļĩāđˆāļĄāļģ: āļ”āļąāļ”āđāļ›āļĨāļ‡āļˆāļģāļ Toyota Motor Corporation, 2014 (www.toyota-global.com) Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 22. Jidoka (č‡ŠåƒåŒ–) (Autonomation) āđ€āļ„āļĢāļ·āđˆāļ­āļ‡āļˆāļąāļāļĢāļ•āļĢāļ§āļˆāļžāļš āļ‚āļ­āļ‡āđ€āļŠāļĩāļĒ āđāļĨāļ°āđāļˆāđ‰āļ‡āđ„āļ”āđ‰ āđ€āļāļīāļ”āļŠāļ–āļēāļ™āļāļēāļĢāļ“āđŒ āļœāļīāļ”āļ›āļāļ•āļī āļŠāļēāļĒāļāļēāļĢāļœāļĨāļīāļ• āļŦāļĒāļļāļ”āļŦāļąāļ§āļŦāļ™āđ‰āļēāļ‡āļēāļ™āđ€āļ‚āđ‰āļēāļĄāļē āđāļāđ‰āļ›āļąāļāļŦāļē āļ›āļĢāļąāļšāļ§āļīāļ˜āļĩāđāļāđ‰āđ„āļ‚āļ›āļąāļāļŦāļēāđƒāļŦāđ‰ āđ€āļ›āđ‡āļ™āļĄāļēāļ•āļĢāļāļēāļ™ āļ‚āļ­āļ‡āđ€āļŠāļĩāļĒ āđāļŠāļ‡ āļŠāļĩ āđ€āļŠāļĩāļĒāļ‡ Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 24. Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 25. āļāļēāļĢāļ„āļ§āļšāļ„āļļāļĄāļ•āđ‰āļ™āļ—āļļāļ™āļ”āđ‰āļ§āļĒāđāļ™āļ§āļ„āļīāļ”āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāđāļšāļšāļĨāļĩāļ™ â€Ē āļ‚āļˆāļąāļ” Muda āđƒāļŦāđ‰āļŦāļĄāļ”āļŠāļīāđ‰āļ™āđ„āļ› āđāļĨāļ°āļŠāļĢāđ‰āļģāļ‡āļœāļĨāļāļģāđ„āļĢ â€Ē āļœāļĨāļīāļ•āđ€āļ‰āļžāļģāļ°āļ‡āļģāļ™āļ—āļĩāđˆāļ‚āļģāļĒāđ„āļ”āđ‰ â€Ē āļ—āļģāļāļģāļĢāđ€āļ‰āļĨāļĩāđˆāļĒāļ›āļĢāļīāļĄāļģāļ“āļ‡āļģāļ™āđƒāļŦāđ‰āđƒāļāļĨāđ‰āđ€āļ„āļĩāļĒāļ‡āļāļąāļ™ (Heijenka) āļāđˆāļ­āļ™āļœāļĨāļīāļ• â€Ē āļ—āļģāđƒāļŦāđ‰āđ€āļ›āđ‡āļ™ Autonomy āļ‰āļĨāļģāļ” āļ•āļąāļ”āļŠāļīāļ™āđƒāļˆāđ„āļ”āđ‰āđ€āļ­āļ‡ â€Ē āļœāļĨāļīāļ•āđ‚āļ”āļĒāđ„āļĄāđˆāļ•āđ‰āļ­āļ‡āļžāļķāđˆāļ‡āļžāļģāļāļģāļĢāļœāļĨāļīāļ•āļˆāļģāļ™āļ§āļ™āļĄāļģāļ â€Ē āđƒāļŦāđ‰āļ„āļ§āļģāļĄāļŠāļģāļ„āļąāļāļ•āđˆāļ­āļŦāļ™āđ‰āļģāļ‡āļģāļ™āļˆāļĢāļīāļ‡ (Genba) āđāļĨāļ°āļŠāļīāđˆāļ‡āļ‚āļ­āļ‡āļˆāļĢāļīāļ‡ (Genbutsu) â€Ē āđƒāļŠāđ‰āļ„āļ§āļģāļĄāļŠāļģāļĄāļģāļĢāļ–āļ‚āļ­āļ‡āļ„āļ™āđƒāļŦāđ‰āđ€āļ•āđ‡āļĄāļ—āļĩāđˆ Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 26. “āļžāļīāļˆāļēāļ“āļēāļŠāđˆāļ§āļ‡āđ€āļ§āļĨāļēāļ•āļąāđ‰āļ‡āđāļ•āđˆāļ—āļĩāđˆāļĨāļđāļāļ„āđ‰āļēāļŠāļąāđˆāļ‡āļ‹āļ·āđ‰āļ­ āļˆāļ™āļ–āļķāļ‡āđ€āļĄāļ·āđˆāļ­āļĢāļąāļšāđ€āļ‡āļīāļ™āļˆāļēāļāļĨāļđāļāļ„āđ‰āļē āđāļĨāļ°āđ€āļĢāļēāļˆāļ°āļĨāļ”āļŠāđˆāļ§āļ‡āđ€āļ§āļĨāļēāļ™āļąāđ‰āļ™āđƒāļŦāđ‰āļŠāļąāđ‰āļ™āļĨāļ‡āđ„āļ”āđ‰āđ‚āļ”āļĒāļāļēāļĢāļāļēāļˆāļąāļ”āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļē” Taiichi Ohno (1912-1990) āļœāļđāđ‰āļ„āļīāļ”āļ„āđ‰āļ™āļĢāļ°āļšāļšāļāļēāļĢāļœāļĨāļīāļ•āđāļšāļšāđ‚āļ•āđ‚āļĒāļ•āđ‰āļē
  • 27. āļ§āļīāļ§āļąāļ’āļ™āļēāļāļēāļĢāļ‚āļ­āļ‡āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāđāļšāļšāļĨāļĩāļ™ āļ—āļĩāđˆāļĄāļē: Auflage, 2013, Lean Management : Auf den Spuren des Erfolges der Managementphilosophie von Toyota und Co., MÞnchen: Hanser. āđƒāļŠāđ‰āļĢāļ°āļšāļš āđāļĨāļ°āļ§āļīāļ˜āļĩāļ„āļīāļ”āđƒāļ™āļāļēāļĢāļˆāļąāļ”āļāļēāļĢ āđƒāļ™āļ­āļļāļ•āļŠāļēāļŦāļāļĢāļĢāļĄāđƒāļ”āđ† āļāđ‡āđ„āļ”āđ‰ Mass production Usw. LEAN X Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 28. Source: from Lean Enterprise Institute, Leadership Then and Now, 2014 Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 29. āļŦāļĨāļąāļāļāļēāļĢāļ„āļīāļ”āđāļšāļšāļĨāļĩāļ™ 5 āļ›āļĢāļ°āļāļēāļĢ āļ—āļĩāđˆāļĄāļģ: āļ”āļąāļ”āđāļ›āļĨāļ‡āļˆāļģāļ James P. Womack and Daniel T. Jones, Lean Thinking: Banish Waste and Create Wealth in Your Corporation, New York: Free Press, 2003. āļ„āļļāļ“āļ„āđˆāļē (Value) āļŠāļēāļĒāļ˜āļēāļĢāļ„āļļāļ“āļ„āđˆāļē (Value Stream) āļāļēāļĢāđ„āļŦāļĨāļ—āļĩāļĨāļ°āļŠāļīāđ‰āļ™ (One piece flow) āļāļēāļĢāļ”āļķāļ‡ (Pull) āļ„āļ§āļēāļĄāļĒāļ­āļ”āđ€āļĒāļĩāđˆāļĒāļĄ (Excellence) Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 30. Inventory Defect Waiting Overproduction Transportation Motion Flow Excess processing Non-utilized talent āļ—āļĩāđˆāļĄāļģ: āļ”āļąāļ”āđāļ›āļĨāļ‡āļˆāļģāļ John Black, 2008, Lean Production: Implementing A World-Class System, New York: Industrial Press. LEAN 8 Wastes Batch VS One piece flow Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 31. PUSH VS PULL â€Ē Push āļœāļĨāļąāļ āļœāļĨāļīāļ•āļ‚āļ­āļ‡āđ€āļŠāļĢāđ‡āļˆ (āļœāļĨāļąāļ) āļŠāđˆāļ‡āđ„āļ›āđƒāļŦāđ‰āļĨāļđāļāļ„āđ‰āļģ āļ™āļķāļāļ–āļķāļ‡ āļ‚āđ‰āļģāļ§āđāļāļ‡ â€Ē Pull āļ”āļķāļ‡ āļĨāļđāļāļ„āđ‰āļģāļĄāļģāļŠāļąāđˆāļ‡ (āļ”āļķāļ‡) āļ§āđˆāļģāļ­āļĒāļģāļāđ„āļ”āđ‰āļ­āļ°āđ„āļĢ āļ™āļķāļāļ–āļķāļ‡ āļ­āļģāļŦāļģāļĢāļ•āļģāļĄāļŠāļąāđˆāļ‡ Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 32. āļšāđ‰āļēāļ™āđāļšāļšāļĨāļĩāļ™ āļĢāļ°āļšāļšāļ„āļ§āļšāļ„āļļāļĄāļ•āļąāļ§āđ€āļ­āļ‡āļ­āļąāļ•āđ‚āļ™āļĄāļąāļ•āļī (Autonomation) āļāļēāļĢāļ‹āđˆāļ­āļĄāļšāļēāļĢāļļāļ‡ TPM/OEE āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļŠāļēāļ˜āļēāļĢāļ“āļđāļ›āđ‚āļ āļ„ āļāļēāļĢāļšāļĢāļīāļŦāļēāļĢāļŦāļ™āđ‰āļēāļ‡āļēāļ™ āļāļēāļĢāļ­āļ­āļāđāļšāļšāļŠāļ–āļēāļ™āļĩāļ‡āļēāļ™ āļĢāļ°āļšāļšāļ›āđ‰āļ­āļ‡āļāļąāļ™āļ„āļ§āļēāļĄāļœāļīāļ”āļžāļĨāļēāļ” (Mistake proofing/Pokayoke) āļāļēāļĢāļ„āļ§āļšāļ„āļļāļĄāļ„āļļāļ“āļ āļēāļž āļĢāļ°āļšāļšāļœāļĨāļīāļ•āđāļšāļšāļ—āļąāļ™āđ€āļ§āļĨāļēāļžāļ­āļ”āļĩ (Just-in-time:JIT) āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļ„āļĨāļąāļ‡āļŠāļīāļ™āļ„āđ‰āļē āļāļēāļĢāļ§āļēāļ‡āđāļœāļ™ āļāļēāļĢāļ§āļēāļ‡āļœāļąāļ‡āđ‚āļĢāļ‡āļ‡āļēāļ™āđāļšāļšāđ€āļ‹āļĨāļĨāđŒ āļāļēāļĢāļ›āļĢāļąāļšāđ€āļĢāļĩāļĒāļšāļāļēāļĢāļœāļĨāļīāļ• āļĢāļ°āļšāļšāļ„āļąāļĄāļšāļąāļ‡ āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāđ‚āļ‹āđˆāļ­āļļāļ›āļ—āļēāļ™āđāļĨāļ° āđ‚āļĨāļˆāļīāļŠāļ•āļīāļāļŠāđŒ (SCML) Multiple skill āļāļēāļĢāđ€āļ‡āļīāļ™āđāļĨāļ°āļšāļąāļāļŠāļĩ āļĢāļ°āļšāļš SMED (Single minute Exchange of Dies) āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļŠāļēāļĒāļ˜āļēāļĢāļ„āļļāļ“āļ„āđˆāļē VSM (Value stream management) āļāļēāļĢāļ•āļĨāļēāļ” āļāļēāļĢāļœāļĨāļīāļ•āđāļšāļšāļ”āļķāļ‡ āļ‡āļēāļ™āļ—āļĩāđˆāđ€āļ›āđ‡āļ™āļĄāļēāļ•āļĢāļāļēāļ™ āļāļēāļĢāļ„āļ§āļšāļ„āļļāļĄāļ”āđ‰āļ§āļĒāļŠāļēāļĒāļ•āļē (Visual control: VC) āļ•āđ‰āļ™āļ—āļļāļ™āļ—āļĩāđˆāđāļ‚āđˆāļ‡āļ‚āļąāļ™āđ„āļ”āđ‰ āļāļģāļĢāļŠāđˆāļ‡āļĄāļ­āļšāļ—āļąāļ™āđ€āļ§āļĨāļģāļžāļ­āļ”āļĩ āļŠāļīāļ™āļ„āđ‰āļģ/āļšāļĢāļīāļāļģāļĢāļ„āļļāļ“āļ āļģāļžāļŠāļđāļ‡ 5S/5Gen āļāļēāļĢāđāļāđ‰āļ›āļąāļāļŦāļēāļ­āļĒāđˆāļēāļ‡āļŠāļĢāđ‰āļēāļ‡āļŠāļĢāļĢāļ„āđŒ/QCC/āđ„āļ„āđ€āļ‹āđ‡āļ™/PDCA/āļāļēāļĢāļ„āļīāļ”āđāļšāļš A3 Small lot, mix model āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļŠāļĩāļĒ 8 āļ›āļĢāļ°āļāļēāļĢ āļĢāļ°āļšāļšERP āļ‹āļīāļāļ‹āđŒāļ‹āļīāļāļĄāđˆāļē TRIZ āļāļēāļĢāļšāļĢāļīāļŦāļēāļĢāļ‡āļēāļ™āđāļšāļšāļĄāļĩāļŠāđˆāļ§āļ™āļĢāđˆāļ§āļĄ (TQM) āļŠāļ–āļīāļ•āļī āļāļēāļĢāļšāļĢāļīāļŦāļēāļĢāļāļĢāļ“āļĩ (Case management) Why why analysis āļĢāļģāļ‡āļ§āļąāļĨāļ•āđˆāļģāļ‡āđ† Shingo prize, PM award, TQA āļāļēāļĢāļ•āļĢāļ§āļˆāļ„āļļāļ“āļ āļēāļžāļ—āļļāļāļ‚āļąāđ‰āļ™āļ•āļ­āļ™ āļ„āļ§āļģāļĄāļ›āļĨāļ­āļ”āļ āļąāļĒ āļ‚āļ§āļąāļāļāļģāļĨāļąāļ‡āđƒāļˆ āļ§āļąāļ’āļ™āļ˜āļĢāļĢāļĄāļ­āļ‡āļ„āđŒāļāļĢ/āļāļēāļĢāļ„āļīāļ”āđ€āļŠāļīāļ‡āļĢāļ°āļšāļš/āļāļēāļĢāļ„āļīāļ”āđāļšāļšāļĨāļĩāļ™/Mind set / Quality Management system (ISO 9001, 14001, HA JCI) āļžāļąāļ’āļ™āļēāļšāļļāļ„āļĨāļēāļāļĢ āļ—āļĩāđˆāļĄāļē: āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, 2557, āđ€āļ­āļāļ›āļĢāļ°āļāļ­āļšāļāļēāļĢāļšāļĢāļĢāļĒāļēāļĒāļŦāļĨāļąāļāļŠāļđāļ•āļĢāļāļēāļĢāļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ—āļĩāđˆāļ—āļļāļāļ„āļ™āļĄāļĩāļŠāđˆāļ§āļ™āļĢāđˆāļ§āļĄāđ€āļžāļ·āđˆāļ­āļžāļĢāđ‰āļ­āļĄāđ€āļ‚āđ‰āļēāļŠāļđāđˆāļāļēāļĢāđāļ‚āđˆāļ‡āļ‚āļąāļ™āđƒāļ™ AEC, āļāļĢāļļāļ‡āđ€āļ—āļžāļĄāļŦāļģāļ™āļ„āļĢ: āļāļĢāļ°āļ—āļĢāļ§āļ‡āļ­āļļāļ•āļŠāļģāļŦāļāļĢāļĢāļĄ. Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 33. āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļē 8+1 WASTES āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļēāļ—āļąāđ‰āļ‡ 8+1 āļĢāļ­āļ„āļ­āļĒ (Waiting) āļŠāļ•āđŠāļ­āļāļšāļ§āļĄ (Inventory) āļœāļĨāļīāļ•āđ€āļāļīāļ™ (Overproduction) āļ‚āļąāđ‰āļ™āļ•āļ­āļ™āđ€āļĒāļ­āļ° (Excess processing)āđ€āļ”āļīāļ™ āđ€āļ­āļ·āđ‰āļ­āļĄ āļŦāļąāļ™ (Motion) āļ‡āļēāļ™āļ‹āđˆāļ­āļĄ (Defect, Rework) āļĒāđ‰āļēāļĒāļšāđˆāļ­āļĒ (Transport) Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 34. āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļē āļ„āļ§āļēāļĄāļ„āļīāļ”āļŠāļĢāđ‰āļēāļ‡āļŠāļĢāļĢāļ„āđŒāļ—āļĩāđˆāđ„āļĄāđˆāđ„āļ”āđ‰āļ™āļēāļĄāļēāđƒāļŠāđ‰āļ›āļĢāļ°āđ‚āļĒāļŠāļ™āđŒ (Non-utilized talent, Ideas, creative) āļˆāļēāļ‡āđˆāļēāļĒāđ† āļ§āđˆāļē DOWNTIMECopyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 35. āđ€āļ™āļ·āđ‰āļ­āđāļ—āđ‰āļ‚āļ­āļ‡āļ‡āļēāļ™āļŦāļ™āđ‰āļēāļ‡āļēāļ™āļœāļĨāļīāļ• â€Ē āļ‡āļēāļ™āļŠāļĢāđ‰āļēāļ‡āļ„āļļāļ“āļ„āđˆāļē (Value added: VA) āđ€āļŠāđˆāļ™ āļāļģāļĢāđāļ›āļĢāļĢāļđāļ› āļāļģāļĢāļœāļŠāļĄāļŠāļģāļĢ â€Ē āļ‡āļēāļ™āļ—āļĩāđˆāļŦāļĨāļĩāļāđ€āļĨāļĩāđˆāļĒāļ‡āđ„āļĄāđˆāđ„āļ”āđ‰ (Necessary but non-value added: NNVA) āđ€āļŠāđˆāļ™ āđ€āļ•āļĢāļĩāļĒāļĄāļ­āļļāļ›āļāļĢāļ“āđŒ āļāļģāļĢāļ•āļąāđ‰āļ‡āđ€āļ„āļĢāļ·āđˆāļ­āļ‡āļˆāļąāļāļĢ āļāļģāļĢāļ•āļĢāļ§āļˆāļŠāļ­āļš â€Ē āļ‡āļēāļ™āļ—āļĩāđˆāļŠāļđāļāđ€āļ›āļĨāđˆāļē (Non-value added: NVA) āđ€āļŠāđˆāļ™ āļāļģāļĢāļĢāļ­āļ„āļ­āļĒ āļāļģāļĢ āđ€āļ„āļĨāļ·āđˆāļ­āļ™āļĒāđ‰āļģāļĒ āļ‡āļēāļ™āļŠāļĢāđ‰āļēāļ‡ āļ„āļļāļ“āļ„āđˆāļē āļ‡āļēāļ™āļ—āļĩāđˆāđ€āļŦāļĨāļĩāļĒāļ āđ€āļĨāļĩāđˆāļĒāļ‡āđ„āļĄāđˆāđ„āļ”āđ‰ āļ‡āļēāļ™āļ—āļĩāđˆāļŠāļđāļ āđ€āļ›āļĨāđˆāļē Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 36. āđ€āļ™āļ·āđ‰āļ­āđāļ—āđ‰āļ‚āļ­āļ‡āļ‡āļēāļ™āļŦāļ™āđ‰āļēāļ‡āļēāļ™ Total Time 100% āļĢāļ­āļāļēāļĢāļ§āļēāļ‡āđāļœāļ™ āļāļēāļĢāļ§āļēāļ‡āđāļœāļ™ āļĢāļ­āļāļēāļĢāđ€āļ•āļĢāļĩāļĒāļĄ āļ§āļąāļ•āļ–āļļāļ”āļīāļš āļ•āļĢāļ§āļˆāļŠāļ­āļšāļ•āļĢāļ§āļˆāļŠāļ­āļš āļĢāļ­āļ•āļĢāļ§āļˆāļŠāļ­āļš āļšāļĢāļĢāļˆāļļāļ āļąāļ“āļ‘āđŒāļāļĢāļ°āļšāļ§āļ™āļāļēāļĢ āļ‚āļ™āļĒāđ‰āļēāļĒ āļĢāļ­āļāļĢāļ°āļšāļ§āļ™āļāļēāļĢ āļāļĢāļ°āļšāļ§āļ™āļāļēāļĢ āļ‹āđˆāļ­āļĄāļ‡āļēāļ™ facebook.com/L6SSCOR āđ€āļ­āļŠ āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļēāļ§āļĢāļĢāļ“, ACPE, CSCP, EPPM āļœāļđāđ‰āđāļ•āđˆāļ‡ LEAN āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļēāđ„āļĢāļžāļļāđˆāļ‡ āļŠāļĢāđ‰āļēāļ‡āļ„āļļāļ“āļ„āđˆāļē VA āđ„āļĄāđˆāļŠāļĢāđ‰āļēāļ‡āļ„āļļāļ“āļ„āđˆāļē āđāļ•āđˆāļ•āđ‰āļ­āļ‡āļ—āļē NNVA āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļē āļĨāļĩāļ™ āļĄāļļāđˆāļ‡āļĨāļ”āļŠāđˆāļ§āļ™āļ™āļĩāđ‰ NVA (Wastes) Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 37. “āđƒāļ™āļ‡āļēāļ™āļ—āļĩāđˆāļ—āļēāļāļąāļ™āļ­āļĒāļđāđˆ 100 āļ‡āļēāļ™ āļˆāļ°āļĄāļĩāļ‡āļēāļ™āļ—āļĩāđˆāļĄāļĩāļ„āļļāļ“āļ„āđˆāļēāđ€āļžāļĩāļĒāļ‡ 10-20% āđ€āļ—āđˆāļēāļ™āļąāđ‰āļ™ āļŠāđˆāļ§āļ™āļ­āļĩāļ 80-90% āđ€āļ›āđ‡āļ™āļ‡āļēāļ™āļ—āļĩāđˆāđ„āļĄāđˆāļĄāļĩāļ„āļļāļ“āļ„āđˆāļē” facebook.com/L6SSCOR āđ€āļ­āļŠ āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļēāļ§āļĢāļĢāļ“, ACPE, CSCP, EPPM āļœāļđāđ‰āđāļ•āđˆāļ‡ LEAN āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ˜āļļāļĢāļāļīāļˆ āļ‡āļēāļ™āđ€āļŠāļĢāđ‡āļˆāđ„āļ§ āļāļēāđ„āļĢāļžāļļāđˆāļ‡
  • 38. āļ›āļāļīāļ§āļąāļ•āļīāļ—āļēāļ‡āļ„āļ§āļēāļĄāļ„āļīāļ” āļŦāļĨāļąāļāļāļēāļĢāđ€āļžāļīāđˆāļĄāļāļēāđ„āļĢāļˆāļēāļāļ•āđ‰āļ™āļ—āļļāļ™āļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢ â€Ē āļ­āļļāļ›āļŠāļ‡āļ„āđŒ > āļ­āļļāļ›āļ—āļģāļ™ āđ€āļžāļīāđˆāļĄāļĢāļģāļ„āļģāļ‚āļģāļĒ āļāļēāļĢāļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢāđ€āļžāļ·āđˆāļ­āđ€āļžāļīāđˆāļĄāļāļēāđ„āļĢ â€Ē āļ­āļļāļ›āļŠāļ‡āļ„āđŒ â‰Ī āļ­āļļāļ›āļ—āļģāļ™ āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ āļĢāļēāļ„āļēāļ‚āļēāļĒ āļĢāļēāļ„āļēāļ‚āļēāļĒ āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ āļĢāļēāļ„āļēāļ‚āļēāļĒāļ•āđ‰āļ™āļ—āļļāļ™ āļāļēāđ„āļĢ+ = āļĢāļēāļ„āļēāļ‚āļēāļĒāļ•āđ‰āļ™āļ—āļļāļ™ āļāļēāđ„āļĢ-= āđ€āļžāļīāđˆāļĄāļĢāļēāļ„āļē āļ‚āļēāļĒ āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™ āļ—āļĩāđˆāļĄāļģ: āļĄāļąāļ‡āļāļĢ āđ‚āļĢāļˆāļ™āđŒāļ›āļĢāļ°āļ āļģāļāļĢ, āļĢāļ°āļšāļšāļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢāđāļšāļšāđ‚āļ•āđ‚āļĒāļ•āđ‰āļē āļ‰āļšāļąāļšāđ€āļ‚āđ‰āļēāđƒāļˆāļ‡āđˆāļēāļĒ, āļāļĢāļ‡āđ€āļ—āļžāļĄāļŦāļģāļ™āļ„āļĢ: āļŠāļĄāļģāļ„āļĄāļŠāđˆāļ‡āđ€āļŠāļĢāļīāļĄāđ€āļ—āļ„āđ‚āļ™āđ‚āļĨāļĒāļĩ (āđ„āļ—āļĒ-āļāļĩāđˆāļ›āļļāđˆāļ™), 2554. Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 39. āļ›āļāļīāļ§āļąāļ•āļīāļ—āļēāļ‡āļ„āļ§āļēāļĄāļ„āļīāļ” āļāļēāļĢāļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™āļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢāđ€āļžāļ·āđˆāļ­āđ€āļžāļīāđˆāļĄāļāļēāđ„āļĢ â€Ē āļ­āļļāļ›āļŠāļ‡āļ„āđŒ â‰Ī āļ­āļļāļ›āļ—āļģāļ™ āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™ āļāļēāļĢāļĨāļ”āļĢāļēāļ„āļēāļ‚āļēāļĒāđ€āļžāļ·āđˆāļ­āđ€āļžāļīāđˆāļĄāļ„āļ§āļēāļĄāļŠāļēāļĄāļēāļĢāļ–āđƒāļ™āļāļēāļĢāđāļ‚āđˆāļ‡āļ‚āļąāļ™ â€Ē āļ­āļļāļ›āļŠāļ‡āļ„āđŒ â‰Ī āļ­āļļāļ›āļ—āļģāļ™ āļĨāļ”āļĢāļģāļ„āļģāļ‚āļģāļĒ āļ—āļĩāđˆāļĄāļģ: āļĄāļąāļ‡āļāļĢ āđ‚āļĢāļˆāļ™āđŒāļ›āļĢāļ°āļ āļģāļāļĢ, āļĢāļ°āļšāļšāļāļēāļĢāļœāļĨāļīāļ•/āļšāļĢāļīāļāļēāļĢāđāļšāļšāđ‚āļ•āđ‚āļĒāļ•āđ‰āļē āļ‰āļšāļąāļšāđ€āļ‚āđ‰āļēāđƒāļˆāļ‡āđˆāļēāļĒ, āļāļĢāļ‡āđ€āļ—āļžāļĄāļŦāļģāļ™āļ„āļĢ: āļŠāļĄāļģāļ„āļĄāļŠāđˆāļ‡āđ€āļŠāļĢāļīāļĄāđ€āļ—āļ„āđ‚āļ™āđ‚āļĨāļĒāļĩ (āđ„āļ—āļĒ-āļāļĩāđˆāļ›āļļāđˆāļ™), 2554. āļĢāļēāļ„āļēāļ‚āļēāļĒ āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ āļĢāļēāļ„āļēāļ‚āļēāļĒāļ•āđ‰āļ™āļ—āļļāļ™ āļāļēāđ„āļĢ-= āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™ āļĢāļēāļ„āļēāļ‚āļēāļĒ āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ āļ•āđ‰āļ™āļ—āļļāļ™āļāļģāđ„āļĢ āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™ āđ€āļžāļīāđˆāļĄāļāļēāđ„āļĢ-= āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™ āļĨāļ”āļĢāļēāļ„āļēāļ‚āļēāļĒ āļĨāļ”āļĢāļēāļ„āļēāļ‚āļēāļĒ Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 40. āļŠāļđāļ•āļĢāļ‚āļ­āļ‡āļ„āļ§āļēāļĄāļĄāļąāđˆāļ™āļ„āļąāđˆāļ‡ āļ‚āļēāļĒ < āļ—āļļāļ™ āļ‚āļēāļ”āļ—āļļāļ™ āļ‚āļēāļĒ = āļ—āļļāļ™ āļ„āļļāđ‰āļĄāļ—āļļāļ™/āđ„āļ”āđ‰āļ›āļĢāļ°āđ‚āļĒāļŠāļ™āđŒāļ­āļĒāđˆāļēāļ‡āļ­āļ·āđˆāļ™ āđāļ•āđˆāđ„āļĄāđˆāđ„āļ”āđ‰āļ­āļĒāļđāđˆāđƒāļ™āļĢāļđāļ›āļ‚āļ­āļ‡āđ€āļ‡āļīāļ™ āļ‚āļēāļĒ > āļ—āļļāļ™ āļāļēāđ„āļĢ āļāļēāđ„āļĢ = (āļĢāļēāļ„āļēāļ‚āļēāļĒ – āļ•āđ‰āļ™āļ—āļļāļ™ ) x āļˆāļēāļ™āļ§āļ™ Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 41. āļŠāļđāļ•āļĢāļ‚āļ­āļ‡āļ„āļ§āļēāļĄāļĄāļąāđˆāļ™āļ„āļąāđˆāļ‡ āđ€āļžāļīāđˆāļĄāļĒāļ­āļ”āļ‚āļģāļĒ āļĨāļ”āļ•āđ‰āļ™āļ—āļļāļ™/āļ„āļ§āļģāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļģ āļ§āļģāļ‡āļ•āļģāđāļŦāļ™āđˆāļ‡āļœāļĨāļīāļ•āđƒāļŦāļĄāđˆ/āđ€āļžāļīāđˆāļĄāļĢāļģāļ„āļģāļ‚āļģāļĒ āļĒāļāļĢāļ°āļ”āļąāļšāļŠāļīāļ™āļ„āđ‰āļģāļ‚āļķāđ‰āļ™āđ„āļ› āļĨāļ”āļĢāļ°āļ”āļąāļšāļŠāļīāļ™āļ„āđ‰āļģāļĨāļ‡āļĄāļģ āļāļēāđ„āļĢ = (āļĢāļēāļ„āļēāļ‚āļēāļĒ – āļ•āđ‰āļ™āļ—āļļāļ™ ) x āļˆāļēāļ™āļ§āļ™ Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 42. 8 Wastes āļāļąāļšāļĄāļēāļ•āļĢāļāļēāļĢāđƒāļ™āļāļēāļĢāļ›āļĢāļąāļšāļ›āļĢāļļāļ‡ D Defect O Overproduction W Waiting N Non-utilized talent T Transport I Inventory M Motion E Excess processing āļĢāļ°āļšāļšāļ­āļąāļ•āđ‚āļ™āļĄāļąāļ•āļī (Jidoka č‡ŠåƒåŒ–) Poka-Yoke(ポã‚ŦãƒĻã‚ą) QC/QA āđāļ™āļ§āļ„āļīāļ” Takt time āļĢāļ°āļšāļšāļ”āļķāļ‡ (Pull) āļœāļĨāļīāļ•āļ—āļĩāļĨāļ°āļŠāļīāđ‰āļ™ āļĢāļ°āļšāļšāļ­āļąāļ•āđ‚āļ™āļĄāļąāļ•āļī āļāļēāļĢāļ›āļĢāļąāļšāđ€āļĢāļĩāļĒāļšāļ‡āļēāļ™ (Heijunka åđģ暖化) U-cell āļāļēāļĢāļšāļĢāļīāļŦāļēāļĢāļžāļ·āđ‰āļ™āļ—āļĩāđˆāļŦāļ™āđ‰āļēāļ‡āļēāļ™ āļāļēāļĢāđ€āļ”āļīāļ™āđƒāļ™āļŠāļēāļĒāļœāļĨāļīāļ• (Genba walk įūå ī) āļāļēāļĢāļ§āļēāļ‡āļœāļąāļ‡āđ‚āļĢāļ‡āļ‡āļēāļ™ āļāļēāļĢāļāļēāļŦāļ™āļ”āđ€āļŠāđ‰āļ™āļ—āļēāļ‡ āļāļēāļĢāļˆāļąāļ”āļ‚āļ­āļ‡āđ€āļ›āđ‡āļ™āļŠāļļāļ” āļāļēāļĢāļ›āļĢāļąāļšāđ€āļĢāļĩāļĒāļšāļ‡āļēāļ™ āļāļēāļŦāļ™āļ” SWIP āļĢāļ°āļšāļšāļ”āļķāļ‡ āļœāļĨāļīāļ•āļ—āļĩāļĨāļ°āļŠāļīāđ‰āļ™ āļāļēāļĢāļĻāļķāļāļĐāļēāļāļēāļĢāļ—āļēāļ‡āļēāļ™ āļāļēāļĢāļāļēāļŦāļ™āļ”āļĄāļēāļ•āļĢāļāļēāļ™ āļāļēāļĢāļˆāļąāļ”āļœāļąāļ‡āđ‚āļĢāļ‡āļ‡āļēāļ™ āļāļēāļĢāļāļēāļˆāļąāļ”āļ‡āļēāļ™āļ—āļĩāđˆāđ„āļĄāđˆāļˆāļēāđ€āļ›āđ‡āļ™āļ­āļ­āļ Jig&Fixture āļžāļąāļ’āļ™āļēāđ€āļ—āļ„āđ‚āļ™āđ‚āļĨāļĒāļĩ Retrofit Value Engineer (VE), Variety Reduction Program (VRP)www.facebook.com/DoingLESS Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 44. P-D-C-A āđƒāļ™āđāļ•āđˆāļĨāļ°āļĢāļ°āļ”āļąāļš Topdown āļ—āļīāļĻāļ—āļēāļ‡āļ­āļ‡āļ„āđŒāļāļĢ (Direction) āđ€āļ‚āđ‡āļĄāļĄāļļāđˆāļ‡ (True north) āđ€āļ›āđ‰āļēāļŦāļĄāļēāļĒāđ€āļŠāļīāļ‡āļĒāļļāļ—āļ˜āļĻāļēāļŠāļ•āļĢāđŒ (Strategic targets) āļāļēāļĢāļ•āļąāļ”āļŠāļīāļ™āļ”āđ‰āļ§āļĒāļāļēāļĢāļˆāļąāļ”āļĨāļēāļ”āļąāļš (Prioritization trade-off decision) āđ€āļ›āđ‰āļēāļŦāļĄāļēāļĒāđƒāļ™āļāļēāļĢāļ›āļāļīāļšāļąāļ•āļīāļāļēāļĢ (Operational targets) āļāļēāļĢāđ‚āļ„āđ‰āļŠāđāļĨāļ°āļāļēāļĢāļŠāļ™āļąāļšāļŠāļ™āļļāļ™ (Coaching and supporting) āļāļēāļĢāļˆāļąāļ”āļŠāļĄāļ”āļļāļĨāļĢāļ°āļŦāļ§āđˆāļēāļ‡āļ­āļļāļ›āļŠāļ‡āļ„āđŒāđāļĨāļ°āļ­āļļāļ›āļ—āļēāļ™ (Demand and capacity balancing) Bottomup āļœāļĨāļ›āđ‰āļ­āļ™āļāļĨāļąāļš (Feedback) āđ€āļ›āđ‰āļēāļŦāļĄāļēāļĒāđ€āļ—āļĩāļĒāļšāļœāļĨ (Progress against targets) āļšāļ—āđ€āļĢāļĩāļĒāļ™ (Lessons learned) āđāļ™āļ§āļ„āļīāļ” (Ideas) āļ„āļ§āļēāļĄāļāđ‰āļēāļ§āļŦāļ™āđ‰āļē (Progress) āļ›āļąāļāļŦāļē (Problems) āļ āļēāļĢāļ°āļ‡āļēāļ™ (Workload) āđ€āļŠāļĩāļĒāļ‡āļ‚āļ­āļ‡āļĨāļđāļāļ„āđ‰āļē (VOC) āļ āļēāļ§āļ°āļœāļđāđ‰āļ™āļēāļĢāļ°āļ”āļąāļšāļŠāļđāļ‡ (Senior Leadership) āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļŠāļēāļĒāļ˜āļēāļĢāļ„āļļāļ“āļ„āđˆāļē (Value stream management) āļ›āļāļīāļšāļąāļ•āļīāļāļēāļĢāļŦāļ™āđ‰āļēāļ‡āļēāļ™ (Frontline/Shop floor) P D C A P D C A www.facebook.com/DoingLESS Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 46. Material flow (āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļ) Why do we use VSM? (āļ—āļēāđ„āļĄāļ•āđ‰āļ­āļ‡āđƒāļŠāđ‰āļāļēāļĢāļˆāļąāļ”āļāļēāļĢāļŠāļēāļĒāļ˜āļēāļĢāļ„āļļāļ“āļ„āđˆāļē) Source: adapted from Klaus Erlach, 2013, Value Stream Design: The Way Towards a Lean Factory, Heidelberg: Springer. 1 2 4 7 9Timeline 6 5 10 Value-added ratio 3 Information flow (āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļŠāļēāļĢāļŠāļ™āđ€āļ—āļĻ ) Reverse material flow (āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ§āļąāļŠāļ”āļļāļĒāđ‰āļ­āļ™āļāļĨāļąāļš) 8 www.facebook.com/DoingLESS 8 wastes Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 47. āđāļœāļ™āļœāļąāļ‡āļŠāļ–āļēāļ™āļ°āļ›āļąāļˆāļˆāļļāļšāļąāļ™ www.facebook.com/DoingLESS Value-added: VA Non-value added: NVA VA Ratio Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 49. āļāļēāļĢāļ•āļąāļ”āļŠāļīāļ™āđƒāļˆāđƒāļ™āđ‚āļ„āļĢāļ‡āļāļēāļĢāļ›āļĢāļąāļšāļ›āļĢāļļāļ‡ www.facebook.com/DoingLESS āļ—āļĩāđˆāļĄāļē: āļ”āļąāļ”āđāļ›āļĨāļ‡āļˆāļģāļ Steven Borris, 2012, Strategic Lean Mapping: Bleanding Improvement Processes fot the Perfect Solution, New York: McGraw-Hill. āļœāļĨāļāļĢāļ°āļ—āļšāļ•āđˆāļē āļœāļĨāļāļĢāļ°āļ—āļšāļŠāļđāļ‡ āļĨāļ‡āļ—āļļāļ™āļŠāļđāļ‡ āļĨāļ‡āļ—āļļāļ™āļ•āđˆāļē āļ—āļēāļ‡āđ€āļĨāļ·āļ­āļāļ—āļĩāđˆāļ”āļĩāļ—āļĩāđˆāļŠāļļāļ” āļœāļĨāļāļĢāļ°āļ—āļšāļŠāļđāļ‡ āđāļĨāļ°āļĨāļ‡āļ—āļļāļ™āļ•āđˆāļē āļ—āļēāļ‡āđ€āļĨāļ·āļ­āļāļ—āļĩāđˆāļ”āļĩāļĢāļ­āļ‡āļĄāļē āļœāļĨāļāļĢāļ°āļ—āļšāļ•āđˆāļē āđāļĨāļ°āļĨāļ‡āļ—āļļāļ™āļ•āđˆāļē āļ—āļēāļ‡āđ€āļĨāļ·āļ­āļāļ—āļĩāđˆāļ”āļĩāļ­āļąāļ™āļ”āļąāļš 3 āļœāļĨāļāļĢāļ°āļ—āļšāļŠāļđāļ‡ āđāļĨāļ°āļĨāļ‡āļ—āļļāļ™āļŠāļđāļ‡ āļ—āļēāļ‡āđ€āļĨāļ·āļ­āļāļ—āļĩāđˆāđāļĒāđˆāļ—āļĩāđˆāļŠāļļāļ” āļœāļĨāļāļĢāļ°āļ—āļšāļ•āđˆāļē āđāļĨāļ°āļĨāļ‡āļ—āļļāļ™āļŠāļđāļ‡ Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 50. āļ„āļ§āļēāļĄāļāđ‰āļēāļ§āļŦāļ™āđ‰āļēāļ‚āļ­āļ‡āļāļēāļĢāļ›āļĢāļąāļšāļ›āļĢāļļāļ‡āļ­āļĒāđˆāļēāļ‡āļ•āđˆāļ­āđ€āļ™āļ·āđˆāļ­āļ‡āđ€āļžāļ·āđˆāļ­āļĨāļ”āļ„āļ§āļēāļĄāļŠāļđāļāđ€āļ›āļĨāđˆāļē āļ—āļĩāđˆāļĄāļģ: āļ”āļąāļ”āđāļ›āļĨāļ‡āļˆāļģāļ Berliner C, Brimson JA (1988) Cost management for today’s advanced manufacturing. Harvard Business School Press, Boston. www.facebook.com/DoingLESS Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 51. āļ‚āļąāđ‰āļ™āļ•āļ­āļ™āļāļēāļĢāļšāđˆāļ‡āļŠāļĩāđ‰āļĄāļēāļ•āļĢāļ§āļąāļ”āđāļšāļšāļĨāļĩāļ™ āļĄāļēāļ•āļĢāļ§āļąāļ” āđ€āļŠāđ‰āļ™āļāļēāļ™ āđ€āļ›āđ‰āļēāļŦāļĄāļēāļĒ āļ›āļĢāļīāļĄāļģāļ“āļŠāļīāļ™āļ„āđ‰āļģāļ„āļ‡āļ„āļĨāļąāļ‡ WIP āļ‚āļ­āļ‡āļŠāļģāļĒāļ˜āļģāļĢāļ„āļļāļ“āļ„āđˆāļģāļĢāļ§āļĄ 30,000 āļ•āļąāļ™ āļĢāļ­āļšāđ€āļ§āļĨāļģāđƒāļ™āļāļģāļĢāļœāļĨāļīāļ•āļŠāļīāļ™āļ„āđ‰āļģ 1 āļ§āļąāļ™ āđ€āļ§āļĨāļģāļ™āļģāļ‚āļ­āļ‡āļŠāļģāļĒāļ˜āļģāļĢāļ„āļļāļ“āļ„āđˆāļģ 4 āļŠāļąāļ›āļ”āļģāļŦāđŒ āļāļģāļĢāļŠāđˆāļ‡āļĄāļ­āļšāļŠāļīāļ™āļ„āđ‰āļģāļ•āļĢāļ‡āđ€āļ§āļĨāļģ 75% āļ›āļĢāļīāļĄāļģāļ“āļ‚āđ‰āļ­āļšāļāļžāļĢāđˆāļ­āļ‡ 5% āļŠāđˆāļ§āļ‡āđ€āļ§āļĨāļģāļ—āļĩāđˆāđ€āļ„āļĢāļ·āđˆāļ­āļ‡āļˆāļąāļāļĢāđƒāļŠāđ‰āđ„āļ”āđ‰ 90% VA/āđ€āļ§āļĨāļģāļĢāļ§āļĄ 5.5% www.facebook.com/DoingLESS Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 52. āļŠāļīāļ™āļ„āđ‰āļēāļ„āļ‡āļ„āļĨāļąāļ‡āđ€āļžāļ·āđˆāļ­āļĢāļ­āļ‡āļĢāļąāļšāļāļēāļĢāđ€āļ›āļĨāļĩāđˆāļĒāļ™āļ­āļąāļ•āļĢāļēāļāļēāļĢāļ›āļāļīāļšāļąāļ•āļīāļāļēāļĢ āļ—āļĩāđˆāļĄāļģ: Steve Bell, Lean Enterprise Systems: Using IT for Continuous Improvement, New Jersey: John Wiley & Sons, 2006. āļ„āļēāļŠāļąāđˆāļ‡āļ‹āļ·āđ‰āļ­āļĨāļđāļāļ„āđ‰āļē www.facebook.com/DoingLESS Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 53. STARTUP â€Ē āļĒāļīāđˆāļ‡āđƒāļŦāļāđˆ āļ”āđ‰āļ§āļĒāļ„āļ§āļēāļĄāđ„āļĄāđˆāļĄāļĩ â€Ē āđ€āļ›āļĨāļĩāđˆāļĒāļ™āđ„āļ§ â€Ē āļāļīāļ™āļ•āļĨāļēāļ”āļ—āļąāđˆāļ§āđ‚āļĨāļ Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 53
  • 54. The LEAN Startup āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ 54
  • 55. The LEAN Startup āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ 55
  • 56. āļŠāļīāļ™āļ„āđ‰āļēāļ—āļĩāđˆāļžāļ­āđƒāļŠāđ‰āļāļēāļĢāđ„āļ”āđ‰ (Minimum Viable Product: MVP) āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM M: +66(0)95-624-2449 Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ 56 Source: How much should your MVP cost? sparksolutions.co/2016/01/how-much-should-your-mvp-cost/
  • 57. Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS 0 1
  • 58. â€Ē Customer-Problem fit āļĨāļđāļāļ„āđ‰āļģāļĄāļĩāļ›āļąāļāļŦāļģāļ™āļĩāđ‰āļˆāļĢāļīāļ‡ â€Ē Problem-Solution fit āļ›āļąāļāļŦāļģāđāļāđ‰āđ„āļ”āđ‰āļ”āđ‰āļ§āļĒāļ§āļīāļ˜āļĩāļ™āļĩāđ‰āļˆāļĢāļīāļ‡ â€Ē Product-Market fit āļœāļĨāļīāļ•āļ āļąāļ“āļ‘āđŒāđ€āļŦāļĄāļģāļ°āļāļąāļšāļ•āļĨāļģāļ”āļ™āļĩāđ‰āļˆāļĢāļīāļ‡ āļ•āļĨāļģāļ”āđƒāļŦāļāđˆāđāļ„āđˆāđ„āļŦāļ™ āđƒāļ„āļĢāļāļīāļ™āļŠāđˆāļ§āļ™āđāļšāđˆāļ‡āđ„āļ›āđāļĨāđ‰āļ§ āđ€āļĢāļģāļˆāļ°āđ€āļ‚āđ‰āļģāđ„āļ›āļŠāđˆāļ§āļ™āđƒāļ” â€Ē Market-Business Model fit āđāļšāļšāļˆāļģāļĨāļ­āļ‡āļ˜āļļāļĢāļāļīāļˆ (BMC) >> āđāļœāļ™āļ˜āļļāļĢāļāļīāļˆ â€Ē SCALE ! āļĨāļļāļĒāļ•āļĨāļēāļ”āđ‚āļĨāļāļāļ Source: Alexander Osterwalder et. al., 2014, Value Proposition Design: How to Create Products and Services Customers Want, Canada: Wiley. Steps of Fits (CPSM>>BMC>>SCALE)
  • 59. The Balance Forces āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM
  • 60. Step by step āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM GOOB [Test]
  • 61. āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM Fail Fast, Succeed Faster Lean Startup Machine
  • 62. Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 64. No BMC, need LEAN Canvas Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 67. Lean Canvas Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 68. Used around the world. Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 69. āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM LEARN BUILDMEASURE LEARN BUILDMEASURE LEARN BUILDMEASURE LEARN BUILDMEASURE LEARN BUILDMEASURE LEARN BUILDMEASURE LEARN BUILDMEASURE LEARN BUILDMEASURE LEARN BUILDMEASURE
  • 70. Lean Canvas āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM āđ„āļ›āļ•āđˆāļ­ āļŦāļĢāļ·āļ­ āđ€āļ›āļĨāļĩāđˆāļĒāļ™āļ—āļēāļ‡ Preserve or pivot
  • 72. Lean Scale www.facebook.com/DoingLESS Zero to one Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ
  • 73. Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 74. Growth Hacker is ??? āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., CPIM(BSCM), EPPM 74 MarketerDeveloper Data analyst
  • 75. Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 76. J.A.R.V.I.S.: Business Intelligence (BI) Copyright ÂĐ 2015, all rights reserved. Doing LESS Getting MORE (DLGM) āļšāļˆāļ. āļ—āļģāļ™āđ‰āļ­āļĒāđ„āļ”āđ‰āļĄāļģāļ www.facebook.com/DoingLESS
  • 77. AARRR (āļ­āļē...) Pirate Metrics āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM INCOME Dave McClure, Founder 500 Startups
  • 78. AARRR (āļ­āļē...) Pirate Metrics āļ­.āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļģāļ§āļĢāļĢāļ“, āļšāļ˜.āļĄ., āļ§āļĻ.āļš., ACPE, CSCP, EPPM HAPPY + + + + + + R R Lean Enterprise
  • 79. āļĢāļēāļĒāļĨāļ°āđ€āļ­āļĩāļĒāļ”āđ€āļžāļīāđˆāļĄāđ€āļ•āļīāļĄ (For more information) āļŠāļīāļĢāļīāļžāļ‡āļĻāđŒ āļˆāļķāļ‡āļ–āļēāļ§āļĢāļĢāļ“, CSCP, EPPM Siripong Jungthawan, CSCP, EPPM M/L: +6695-624-2449 E: L6SSCOR@GMAIL.COM FB: @L6SSCOR Group LEAN Talk www.facebook.com/groups/LEANTalk/