SlideShare a Scribd company logo
1 of 8
GROUP MEMBERS
• R.M.S.T.Ranaweera
• H.R.M.P.G.Rathnayaka
• R.D.Sudasinghe
• T.M.S.B.Thennakoon
• K.M.N.C.Thilakarathna
• N.G.I.N.Chathuranga
• K.K.Dhananjanee
• R.A.T.M.Ranasinghe
• K.P.K.P.Samaranayaka
• Y.M.R.D.Senevirathna
• The Petronas Twin Towers, located in Kuala Lumpur, Malaysia, are among the most iconic
skyscrapers in the world.. Planning on the Petronas Towers started on 1 January 1992 and included
rigorous tests and simulations of wind and structural loads on the design. They were completed in
1998, and at the time were the tallest buildings in the world, measuring 1,483 feet (452 meters) in
height. Today, they remain the tallest twin towers in the world and a must-see attraction for visitors
to Kuala Lumpur.
• The towers were designed by the Argentine-American architect Cesar Pelli, who drew inspiration
from Islamic art and architecture. The towers' façade features intricate geometric patterns and
Islamic motifs, while the towers themselves are arranged in the shape of an eight-pointed star, a
symbol common in Islamic art.
• The total cost for constructing Malaysia's twin skyscrapers was over $1.6 billion US.
• The towers are home to a variety of tenants, including offices, retail spaces, and the headquarters
of the oil and gas company, Petronas. The towers' 88 floors are serviced by a total of 78 elevators,
which are among the fastest in the world, capable of reaching speeds of up to 1,010 meters per
minute.
• One of the main attractions of the Petronas Twin Towers is the Skybridge, a 170-meter-long (558-
foot-long) walkway that connects the two towers on the 41st and 42nd floors. Visitors can take an
elevator to the Skybridge and enjoy panoramic views of Kuala Lumpur's skyline and surrounding
areas.
• Another popular attraction is the Observation Deck on the 86th floor of the towers, which offers
breathtaking views of the city and beyond. Visitors can purchase tickets to access the Observation
Deck and spend time taking in the stunning views of Kuala Lumpur and its surroundings.
• The Petronas Twin Towers are not just an engineering marvel, but also a symbol of Malaysia's
economic and cultural progress. They have become a source of pride for Malaysians and a popular
destination for tourists from around the world. Their unique design and impressive height have
made them a recognizable landmark of the city of Kuala Lumpur and an important part of
Malaysia's cultural heritage.
Petronas Twin Towers
Construction Project
Plan
1. Project Objectives:
- Construct two iconic towers that will serve as a symbol of Malaysia's
economic growth and modernity.
- Create a world-class office space that meets international standards.
- Ensure the completion of the project within the defined timeframe and
budget.
- Implement sustainable design and green initiatives for energy efficiency
and environmental conservation.
2. Project Deliverables:
- Completed PETRONAS Twin Towers with all architectural features and
structural elements.
- Fully functional office spaces, including amenities and facilities.
- Adherence to sustainable design principles and green building
certifications.
3. Project Stages:
a) Pre-Construction Phase:
- Conduct feasibility studies and site analysis.
- Develop architectural and engineering design plans.
- Obtain necessary permits and approvals from relevant authorities.
b) Construction Phase:
- Clear the construction site and prepare for foundation work.
- Construct the foundation system, including piling and basements.
- Build the steel and concrete composite structures for both towers.
- Install architectural features, such as glass facades, sky bridge, and
landscaping.
- Complete interior fit-out and infrastructure, including HVAC,
electrical systems, and elevators.
- Conduct thorough quality assurance and safety checks throughout
the construction process.
c) Post-Construction Phase:
- Perform final inspections and obtain necessary certifications.
- Conduct tenant installations and fit-outs.
- Establish maintenance and operational procedures.
- Develop a comprehensive handover plan for PETRONAS and
related stakeholders.
- Prepare for the official opening and inauguration of the
PETRONAS Twin Towers.
4. Resources:
- Human resources: Architects, engineers, project managers,
construction workers, administrative staff, and support personnel.a
- Material resources: Construction materials, equipment, tools,
machinery, and technology.
- Financial resources: Budget allocation for the entire project,
including contingencies and reserves.
5. Timeline:
- Pre-Construction Phase: 6 months
- Construction Phase: 4 years
- Post-Construction Phase: 2 months
6. Milestones and Deliverable Dates:
- Feasibility study and design plans approved: Month 6
- Foundation work completed: Month 12
- Structural construction completed: Month 36
- Sky bridge installation: Month 40
- Interior fit-out and infrastructure completed: Month 44
- Final inspections and certifications obtained: Month 56
- Tenant installations completed: Month 57
- Official opening and inauguration: Month 58
7. Monitoring and Control:
- Regular progress reviews and status updates.
- Monitoring of key performance indicators, including
budget, timeline, and quality.
- Prompt resolution of issues and risks through effective
project management techniques.
- Adherence to safety standards and regulatory
requirements.
8. Communication and Stakeholder Engagement:
- Regular communication with stakeholders, including
PETRONAS, government authorities, contractors, and
tenants.
- Timely reporting on project progress, milestones, and any
changes or deviations from the plan.
- Addressing stakeholder concerns and ensuring
transparency throughout the project.

More Related Content

Similar to PETRONAS TWIN TOWER.pptx

Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis
 
Role of -engineers-on-engg-day
Role of -engineers-on-engg-dayRole of -engineers-on-engg-day
Role of -engineers-on-engg-daySanjeev Deshmukh
 
Engineering Fundamental 6 August 2020.pptx
Engineering Fundamental 6 August 2020.pptxEngineering Fundamental 6 August 2020.pptx
Engineering Fundamental 6 August 2020.pptxJagdishannaya
 
Project Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang JayaProject Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang JayaJoe Onn Lim
 
proposal of building project
proposal of building projectproposal of building project
proposal of building projectSandes Sigdel
 
The petronas twin towers
The petronas twin towersThe petronas twin towers
The petronas twin towersaman shukla
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay SandsBimenpreet Kaur
 
List of various Projects PPT . To know about the company
List of various Projects PPT . To know about the companyList of various Projects PPT . To know about the company
List of various Projects PPT . To know about the companyrebekahsantineer1
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Shafik
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGsiavashn
 
World's tallest buildings
World's tallest buildingsWorld's tallest buildings
World's tallest buildingsMarilen Ebrada
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 

Similar to PETRONAS TWIN TOWER.pptx (20)

Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1
 
klcc
klccklcc
klcc
 
Role of -engineers-on-engg-day
Role of -engineers-on-engg-dayRole of -engineers-on-engg-day
Role of -engineers-on-engg-day
 
Engineering Fundamental 6 August 2020.pptx
Engineering Fundamental 6 August 2020.pptxEngineering Fundamental 6 August 2020.pptx
Engineering Fundamental 6 August 2020.pptx
 
Project Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang JayaProject Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang Jaya
 
E SQUARE GROUP A1-6.pptx
E SQUARE GROUP A1-6.pptxE SQUARE GROUP A1-6.pptx
E SQUARE GROUP A1-6.pptx
 
proposal of building project
proposal of building projectproposal of building project
proposal of building project
 
The petronas twin towers
The petronas twin towersThe petronas twin towers
The petronas twin towers
 
AKANLAR 2015
AKANLAR 2015AKANLAR 2015
AKANLAR 2015
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay Sands
 
amir cv
amir cvamir cv
amir cv
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
List of various Projects PPT . To know about the company
List of various Projects PPT . To know about the companyList of various Projects PPT . To know about the company
List of various Projects PPT . To know about the company
 
andy_sexton CV 2017
andy_sexton CV 2017andy_sexton CV 2017
andy_sexton CV 2017
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
 
Tunneling
TunnelingTunneling
Tunneling
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
 
Taha Abu Allan CV
Taha Abu Allan CVTaha Abu Allan CV
Taha Abu Allan CV
 
World's tallest buildings
World's tallest buildingsWorld's tallest buildings
World's tallest buildings
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 

Recently uploaded

Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 

Recently uploaded (20)

Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 

PETRONAS TWIN TOWER.pptx

  • 1. GROUP MEMBERS • R.M.S.T.Ranaweera • H.R.M.P.G.Rathnayaka • R.D.Sudasinghe • T.M.S.B.Thennakoon • K.M.N.C.Thilakarathna • N.G.I.N.Chathuranga • K.K.Dhananjanee • R.A.T.M.Ranasinghe • K.P.K.P.Samaranayaka • Y.M.R.D.Senevirathna
  • 2. • The Petronas Twin Towers, located in Kuala Lumpur, Malaysia, are among the most iconic skyscrapers in the world.. Planning on the Petronas Towers started on 1 January 1992 and included rigorous tests and simulations of wind and structural loads on the design. They were completed in 1998, and at the time were the tallest buildings in the world, measuring 1,483 feet (452 meters) in height. Today, they remain the tallest twin towers in the world and a must-see attraction for visitors to Kuala Lumpur. • The towers were designed by the Argentine-American architect Cesar Pelli, who drew inspiration from Islamic art and architecture. The towers' façade features intricate geometric patterns and Islamic motifs, while the towers themselves are arranged in the shape of an eight-pointed star, a symbol common in Islamic art. • The total cost for constructing Malaysia's twin skyscrapers was over $1.6 billion US. • The towers are home to a variety of tenants, including offices, retail spaces, and the headquarters of the oil and gas company, Petronas. The towers' 88 floors are serviced by a total of 78 elevators, which are among the fastest in the world, capable of reaching speeds of up to 1,010 meters per minute.
  • 3. • One of the main attractions of the Petronas Twin Towers is the Skybridge, a 170-meter-long (558- foot-long) walkway that connects the two towers on the 41st and 42nd floors. Visitors can take an elevator to the Skybridge and enjoy panoramic views of Kuala Lumpur's skyline and surrounding areas. • Another popular attraction is the Observation Deck on the 86th floor of the towers, which offers breathtaking views of the city and beyond. Visitors can purchase tickets to access the Observation Deck and spend time taking in the stunning views of Kuala Lumpur and its surroundings. • The Petronas Twin Towers are not just an engineering marvel, but also a symbol of Malaysia's economic and cultural progress. They have become a source of pride for Malaysians and a popular destination for tourists from around the world. Their unique design and impressive height have made them a recognizable landmark of the city of Kuala Lumpur and an important part of Malaysia's cultural heritage.
  • 4. Petronas Twin Towers Construction Project Plan 1. Project Objectives: - Construct two iconic towers that will serve as a symbol of Malaysia's economic growth and modernity. - Create a world-class office space that meets international standards. - Ensure the completion of the project within the defined timeframe and budget. - Implement sustainable design and green initiatives for energy efficiency and environmental conservation. 2. Project Deliverables: - Completed PETRONAS Twin Towers with all architectural features and structural elements. - Fully functional office spaces, including amenities and facilities. - Adherence to sustainable design principles and green building certifications.
  • 5. 3. Project Stages: a) Pre-Construction Phase: - Conduct feasibility studies and site analysis. - Develop architectural and engineering design plans. - Obtain necessary permits and approvals from relevant authorities. b) Construction Phase: - Clear the construction site and prepare for foundation work. - Construct the foundation system, including piling and basements. - Build the steel and concrete composite structures for both towers. - Install architectural features, such as glass facades, sky bridge, and landscaping. - Complete interior fit-out and infrastructure, including HVAC, electrical systems, and elevators. - Conduct thorough quality assurance and safety checks throughout the construction process.
  • 6. c) Post-Construction Phase: - Perform final inspections and obtain necessary certifications. - Conduct tenant installations and fit-outs. - Establish maintenance and operational procedures. - Develop a comprehensive handover plan for PETRONAS and related stakeholders. - Prepare for the official opening and inauguration of the PETRONAS Twin Towers. 4. Resources: - Human resources: Architects, engineers, project managers, construction workers, administrative staff, and support personnel.a - Material resources: Construction materials, equipment, tools, machinery, and technology. - Financial resources: Budget allocation for the entire project, including contingencies and reserves.
  • 7. 5. Timeline: - Pre-Construction Phase: 6 months - Construction Phase: 4 years - Post-Construction Phase: 2 months 6. Milestones and Deliverable Dates: - Feasibility study and design plans approved: Month 6 - Foundation work completed: Month 12 - Structural construction completed: Month 36 - Sky bridge installation: Month 40 - Interior fit-out and infrastructure completed: Month 44 - Final inspections and certifications obtained: Month 56 - Tenant installations completed: Month 57 - Official opening and inauguration: Month 58
  • 8. 7. Monitoring and Control: - Regular progress reviews and status updates. - Monitoring of key performance indicators, including budget, timeline, and quality. - Prompt resolution of issues and risks through effective project management techniques. - Adherence to safety standards and regulatory requirements. 8. Communication and Stakeholder Engagement: - Regular communication with stakeholders, including PETRONAS, government authorities, contractors, and tenants. - Timely reporting on project progress, milestones, and any changes or deviations from the plan. - Addressing stakeholder concerns and ensuring transparency throughout the project.