Introduction
 Engineering, design and project management company based in
Constantia, Johannesburg (Established 2005)
 Full EPCM services to small maintenance projects
 Fully BEE compliant – Level 3 contributor (110%)
 Cost effective – low overhead structure
 Client focused and flexible
 Proven track record
 Strengths in crushing, milling, flotation, materials handling, pyromet
systems
Core Competencies
We provide our client with the following services:
 Conceptual and feasibility studies
 Project and construction management
 Process engineering and design ensuring the application of appropriate technologies
 Mechanical, Civil, Structural, Platework, Piping, Electrical and Instrumentation engineering design (Prokon)
 Detailed design / draughting services (Autocad)
 Structural steel and platework shopdetailing for fabrication (Tekla structures)
 Project planning, cost control and procurement management
 Expediting and quality control
 Pre and post-contract quantity surveying and enquiry assistance
 Hot and cold commissioning
 Plant process efficiency and optimisation studies
 Clerk of works services
Completed Projects
Client Project Description Project Basis Value Project Status
Impala Platinum Smelter expansion - No. 7 Pierce
Smith Converter and
Secondary Hood Installation
Full EPCM R 95 million Completed March 2009
Tharisa Minerals Early Revenue Plant - Greenfields
Chrome concentrator
Full EPCM R 60 million Completed April 2009
Lonmin Platinum Installation of Larox pressure filter
and ancilliaries at the Lonmin
Western Platinum Smelter
Full EPCM R 53 million In progress
Lonmin Platinum Slag Plant expansion - New Slag
Ball Mill, Filter cake receiving
station and other modifications
Full EPCM R 52 million Completed January 2007
Lonmin Platinum Optiamal usage of Smelter Filters. Feasibility Study R 55 million Completed July 2009
New Concept Projects Metorex Ruashi ROM Crushing
Stockpile & mill feed circuit.
Detailed design R 50 million Completed September 2008
Platinum Mile Resources Flotation concentrate & tailings
(Deswik) re-grind circuit
expansion.
Full EPCM R 40 million Completed February 2009
Impala Platinum Toll off loading, sampling and re-
pulping facility.
Full EPCM R 25 million Completed February 2006
Platinum Mile Resources Concentrate thickening and re-grind
(SMD) circuit.
Full EPCM R 12 million Completed August 2007
Impala Platinum R10 Hammer sampler installation. Full EPCM R 13 million Completed July 2008
Lonmin Platinum Engineering and Design Services
Agreement 2009 and 2010.
Design R 5 million Ongoing
Completed Projects
Client Project Description Project Basis Value Project Status
Holcim Rooikraal Secondary crushing
circuit upgrade.
Detailed design R 10 million Completed November 2008
Lonmin Platinum Upgrade of reagent plant. Lump sum turnkey R 1 million Completed September 2005
Platinum Mile
Resources
Cleaner tails re-grind feasibility
testwork and CBE
Feasibility Study N/A Completed January 2007
Debswana Diamond
Company
Class III feasibility study (CBE) for
400 tph re-crush reloading facility.
Feasibility Study N/A Completed September 2006
Impala Platinum Third party review of Hatch
furnance design.
Review N/A Completed February 2006.
Impala Platinum Pre-Feasibility study and testwork
for re-processing of tailings dams.
Pre-feasibility N/A Completed April 2006
Platinum Mile
Resources
Order of magnitude study for 250
000 tpm tailings re-treatment plant.
Pre-feasibility N/A Completed October 2006.
Impala Platinum Pre-Feasibility study for the
recovery of metallurgical grade
chromite from the Impala MF2 plant
tailings
Pre-feasibility N/A Completed November 2007
Assmang Pre-Feasibility study for the
recovery of metallurgical grade
chromite and PGE's from the
Assmang Dwarsrivier tailings
Pre-feasibility N/A Completed November 2007
Project photos
Project photos
Project photos
Project photos
Project photos
Project photos
Project photos
Project photos
Project photos
Project photos
Project photos
Quality Management System
 Based on templates of an ISO accredited system
 Targeted ISO accreditation – Mid 2011
 Encompasses all business aspects of our business
Quality Management System
 Corporate Procedures
 Quality Management Procedures
 Project Management Procedures
 Drawing Office Procedures
 Site Procedures
 Procurement Procedures
 Human Recourse Procedures
 IT Procedures
DTE Company Profile - May 2011

More Related Content

What's hot

Gaby. Aoude Mechanical Engineer
Gaby. Aoude Mechanical EngineerGaby. Aoude Mechanical Engineer
Gaby. Aoude Mechanical Engineer
gaby aoude
 
Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017
Dean Hamilton
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
Sher Chuhan
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland
 
Curriculum Vitea Neil Herbst
Curriculum Vitea Neil HerbstCurriculum Vitea Neil Herbst
Curriculum Vitea Neil Herbst
Neil Herbst
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
Subhash Dhiman
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16
Mark Koenig
 
Isb engineering specialist
Isb engineering specialistIsb engineering specialist
Isb engineering specialist
isbengineering
 

What's hot (20)

HAmmad Resume
HAmmad ResumeHAmmad Resume
HAmmad Resume
 
Gaby. Aoude Mechanical Engineer
Gaby. Aoude Mechanical EngineerGaby. Aoude Mechanical Engineer
Gaby. Aoude Mechanical Engineer
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
 
Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
Hossam salah-cv
Hossam salah-cvHossam salah-cv
Hossam salah-cv
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Engr. Asim Mahmood CV
Engr. Asim Mahmood CVEngr. Asim Mahmood CV
Engr. Asim Mahmood CV
 
CV for Linkedin
CV for LinkedinCV for Linkedin
CV for Linkedin
 
MY CV feb 2016
MY CV feb 2016MY CV feb 2016
MY CV feb 2016
 
Curriculum Vitea Neil Herbst
Curriculum Vitea Neil HerbstCurriculum Vitea Neil Herbst
Curriculum Vitea Neil Herbst
 
DML CV 17
DML CV 17DML CV 17
DML CV 17
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16
 
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
 
Isb engineering specialist
Isb engineering specialistIsb engineering specialist
Isb engineering specialist
 
Ismael_Lopez-Lara_Aug16
Ismael_Lopez-Lara_Aug16Ismael_Lopez-Lara_Aug16
Ismael_Lopez-Lara_Aug16
 

Similar to DTE Company Profile - May 2011

R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
R S Rajaram
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
Alaa Ammar
 
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDFSUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
Subin Singh
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
Koshalendra Pandey
 
kp 103777 kp
kp 103777 kpkp 103777 kp
kp 103777 kp
K PRAKASH
 
DominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_dates
Dominique Tharandt
 
Atta Demetre - General 16062015
Atta Demetre - General 16062015Atta Demetre - General 16062015
Atta Demetre - General 16062015
ATTA DEMETRE
 

Similar to DTE Company Profile - May 2011 (20)

R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
C. Bright Singh
C. Bright SinghC. Bright Singh
C. Bright Singh
 
CV of MK Patham-Inner-groove Copper tube project
CV of MK Patham-Inner-groove Copper tube projectCV of MK Patham-Inner-groove Copper tube project
CV of MK Patham-Inner-groove Copper tube project
 
CV- Sr. Procurement Engineer
CV- Sr. Procurement Engineer CV- Sr. Procurement Engineer
CV- Sr. Procurement Engineer
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
CV_Raja
CV_RajaCV_Raja
CV_Raja
 
Subin singh steel_structural_engineer
Subin singh steel_structural_engineerSubin singh steel_structural_engineer
Subin singh steel_structural_engineer
 
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDFSUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
 
Execution of Copper Rod Plant
Execution of  Copper Rod PlantExecution of  Copper Rod Plant
Execution of Copper Rod Plant
 
CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
resumenew_Atul Bhalla
resumenew_Atul Bhallaresumenew_Atul Bhalla
resumenew_Atul Bhalla
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
 
Project Route Map - OMC South Kaliapani Chromite UG Mine
Project Route Map - OMC South Kaliapani Chromite UG MineProject Route Map - OMC South Kaliapani Chromite UG Mine
Project Route Map - OMC South Kaliapani Chromite UG Mine
 
PEB Steel Profile.pdf
PEB Steel Profile.pdfPEB Steel Profile.pdf
PEB Steel Profile.pdf
 
kp 103777 kp
kp 103777 kpkp 103777 kp
kp 103777 kp
 
PROJECTS HANDLED
PROJECTS HANDLEDPROJECTS HANDLED
PROJECTS HANDLED
 
DominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_dates
 
Atta Demetre - General 16062015
Atta Demetre - General 16062015Atta Demetre - General 16062015
Atta Demetre - General 16062015
 

DTE Company Profile - May 2011

  • 1. Introduction to DTE Project Management (Pty) Ltd
  • 2. Introduction  Engineering, design and project management company based in Constantia, Johannesburg (Established 2005)  Full EPCM services to small maintenance projects  Fully BEE compliant – Level 3 contributor (110%)  Cost effective – low overhead structure  Client focused and flexible  Proven track record  Strengths in crushing, milling, flotation, materials handling, pyromet systems
  • 3. Core Competencies We provide our client with the following services:  Conceptual and feasibility studies  Project and construction management  Process engineering and design ensuring the application of appropriate technologies  Mechanical, Civil, Structural, Platework, Piping, Electrical and Instrumentation engineering design (Prokon)  Detailed design / draughting services (Autocad)  Structural steel and platework shopdetailing for fabrication (Tekla structures)  Project planning, cost control and procurement management  Expediting and quality control  Pre and post-contract quantity surveying and enquiry assistance  Hot and cold commissioning  Plant process efficiency and optimisation studies  Clerk of works services
  • 4. Completed Projects Client Project Description Project Basis Value Project Status Impala Platinum Smelter expansion - No. 7 Pierce Smith Converter and Secondary Hood Installation Full EPCM R 95 million Completed March 2009 Tharisa Minerals Early Revenue Plant - Greenfields Chrome concentrator Full EPCM R 60 million Completed April 2009 Lonmin Platinum Installation of Larox pressure filter and ancilliaries at the Lonmin Western Platinum Smelter Full EPCM R 53 million In progress Lonmin Platinum Slag Plant expansion - New Slag Ball Mill, Filter cake receiving station and other modifications Full EPCM R 52 million Completed January 2007 Lonmin Platinum Optiamal usage of Smelter Filters. Feasibility Study R 55 million Completed July 2009 New Concept Projects Metorex Ruashi ROM Crushing Stockpile & mill feed circuit. Detailed design R 50 million Completed September 2008 Platinum Mile Resources Flotation concentrate & tailings (Deswik) re-grind circuit expansion. Full EPCM R 40 million Completed February 2009 Impala Platinum Toll off loading, sampling and re- pulping facility. Full EPCM R 25 million Completed February 2006 Platinum Mile Resources Concentrate thickening and re-grind (SMD) circuit. Full EPCM R 12 million Completed August 2007 Impala Platinum R10 Hammer sampler installation. Full EPCM R 13 million Completed July 2008 Lonmin Platinum Engineering and Design Services Agreement 2009 and 2010. Design R 5 million Ongoing
  • 5. Completed Projects Client Project Description Project Basis Value Project Status Holcim Rooikraal Secondary crushing circuit upgrade. Detailed design R 10 million Completed November 2008 Lonmin Platinum Upgrade of reagent plant. Lump sum turnkey R 1 million Completed September 2005 Platinum Mile Resources Cleaner tails re-grind feasibility testwork and CBE Feasibility Study N/A Completed January 2007 Debswana Diamond Company Class III feasibility study (CBE) for 400 tph re-crush reloading facility. Feasibility Study N/A Completed September 2006 Impala Platinum Third party review of Hatch furnance design. Review N/A Completed February 2006. Impala Platinum Pre-Feasibility study and testwork for re-processing of tailings dams. Pre-feasibility N/A Completed April 2006 Platinum Mile Resources Order of magnitude study for 250 000 tpm tailings re-treatment plant. Pre-feasibility N/A Completed October 2006. Impala Platinum Pre-Feasibility study for the recovery of metallurgical grade chromite from the Impala MF2 plant tailings Pre-feasibility N/A Completed November 2007 Assmang Pre-Feasibility study for the recovery of metallurgical grade chromite and PGE's from the Assmang Dwarsrivier tailings Pre-feasibility N/A Completed November 2007
  • 17. Quality Management System  Based on templates of an ISO accredited system  Targeted ISO accreditation – Mid 2011  Encompasses all business aspects of our business
  • 18. Quality Management System  Corporate Procedures  Quality Management Procedures  Project Management Procedures  Drawing Office Procedures  Site Procedures  Procurement Procedures  Human Recourse Procedures  IT Procedures