M. N. DASTUR & COMPANY (P) LTD.
Consulting Engineers
KOLKATA
1Total Engineering - Concept to Completion
02 March 2015
“Engineer is no longer concerned with the
developments in specialised fields, but has to make
an inter-disciplinary approach to the solution.”
M.N. Dastur, Founder
2Total Engineering - Concept to Completion
 Established in 1955 by Dr. M. N. Dastur
 Knowledge driven Consulting Engineering
organisation with global presence
 Over 2000 multidisciplinary team of dedicated staff
 Successfully engineered over 1,000 industrial
projects in the fields of Steel, Power, Chemicals,
Cement, Mining etc
 ISO 9001-2008 certified; Information Security
Management System (ISO 17020:2005)
 Certification on Inspection (ISO 17020:2012) in
progress
About Us
3Total Engineering - Concept to Completion
Global Presence
Dastur Engineering International GmbH
Dϋsseldorf, Germany
Dastur International Inc.
New Jersey, USA
M. N. Dastur & Company (P) Ltd.
Kolkata, India
Dastur Engineering International GmbH
Abu Dhabi , UAE
Dastur Engineering International GmbH
Tokyo, Japan
Branch Offices in India: Bangalore, Bhubaneswar, Chennai, Hyderabad, Mumbai, New Delhi
4Total Engineering - Concept to Completion
Mining &
Mineral Processing
Environmental
Engineering
Iron Making
Steel Making &
Ferro Alloys
Rolling Mill
Coke Oven &
By products
Process
Metallurgy & Lab
Chemical
& Other Process
Non Ferrous
Calcining, Refr.
Furnaces & Cement
Mechanical &
Material Handling
Civil
Electrical
Structural
Instrumentation
Utilities
Water System
Layout,
Trans. & Logistic
Commercial &
Contract
Project Managers
Project Services
Inspection
BD Ferrous
BD Non-Ferrous
BD Mining &
Mineral Processing
Turnkey
Automation
QMS
Library Services
CORPORATE
Corporate Finance
Account,
MIS & Audit
HRA
Human Resources
Administration
Construction
Site-in-charges
Simulation
Software
Dastur Business &
Technology Consulting
Cost Engineering
KM & Business
Excellence
IT / ISMS
Legal & Commercial
Law & Taxation
Payroll &
Retirement
BD Eng. Services
Board of Directors
Advisory Committee
Dastur Engineering International
Dastur International Inc.
PROCESS ENGINEERING
CMD
JMD
BUSINESS DEVLPMNT
CONSTRUCTION
INTERNAL DEVLPMNT
PROJECT
Organisational Structure
5Total Engineering - Concept to Completion
Areas of Operation
 Geology, Mining & Mineral Processing
 Process Engineering
o Ferroalloys
o Iron making
o Coke making
o Steel making
o Non-ferrous Metals
o Rolling Mills
o Calcining, Refractories & Ceramics
 Materials Handling
 Structural Engineering
 Electrical, Instrumentation & Automation
 Environmental Engineering
 Civil & Geotech Engineering
 Infrastructure, Logistics & Layout
 Water Systems
 Utility Systems
 Cost Engineering
 Project Management
 Inspection & Quality
 Business & Technology Consulting
6Total Engineering - Concept to Completion
Completed Projects (Mining)
Service: Pre Feasibility Study
Project: Bunder Diamod Project
Client: Rio Tinto Exploration India Ltd
Year: 2000
Service: Feasibility Report
Project: Mine Planning of Roida II Iron Ore Mine
Client: ATHA GROUP
Year: 2000
Service: Techno-Economic Viability Report
Project: Itakpe iron ore mine
Client: Global Infrastructure (Nigeria) Ltd
Year: 2000
Service: Project Execution Report
Project: DSO Project
Client: Tata Steel Limited
Year: 2000
7Total Engineering - Concept to Completion
Ongoing Projects (Mining)
Service: Concept to Completion
Project: 1 MTPA Integrated Steel Plant
Client: BUA International Limited
Service: Concise DPR Report
Project: Alternate Bauxite supply for stream 5
Client: National Aluminium Company Limited
Service: EPCM Services
Project: Sukhinda Underground Chromite Mine
Client: TATA Steel
Service: Resource Assessment Report & Detailed Project Report
Project: Khatau Narbheram Roida-II iron ore mine
Client: Atha Group
Pipeline Projects (Mining)
8Total Engineering - Concept to Completion
Our Clients (Mining)
Development of
South Kaliapani Chromite Underground Mine
in Jajpur district of
The Odisha Mining Corporation Limited (OMC)
PROJECT ROUTE MAP
M. N. DASTUR & COMPANY (P) LTD.
Consulting Engineers
KOLKATA
9Total Engineering - Concept to Completion
02 March 2015
Tapas Das, Supdt. Engineer
10Total Engineering - Concept to Completion
11Total Engineering - Concept to Completion
 South Kaliapani Chromite mine of Odisha Mining Corporation Limited (OMC)
is located in Sukinda valley in the district of Jajpur, Odisha.
 As the depth of the present open cast mine and the constraints of space for
overburden disposal is increasing day by day, underground mining is the need
of the time to sustain the production of chrome ore in future.
 For this purpose OMC has been rendered the scope of the work for this
project as follows:
1) Pre feasibility study
2) Exploration & reserve estimation
3) Conceptual feasibility study
4) Detail feasibility study with geotechnical & hydro-geological works
5) EPCM services for the South Kaliapani Chromite underground project
South Kaliapani Underground Chromite mine
12Total Engineering - Concept to Completion
Conceptual Underground Metal Mine
Pump StationCrusher
Skip Filling Station
Sump
Ore Bin
Exploratory
Drilling
Level Development
Sub Level Development
Mined Out
and Backfilled
Stope
Producing
Stope
Ventilation
Shaft
Ramp
Shaft
Surface Structures
OB DumpTailing Pond
Skip
13Total Engineering - Concept to Completion
Pre Feasibility Study
(Concept & Comparison)
Exploration & Reserve estimation
(Viability)
Conceptual feasibility study
(Selection & Basic information)
Detail feasibility study
(Definitions and detailing)
Level of Study
Knowledge
Total Engineering – Concept to Completion
Engineering,
Procurement,
Construction
Management
Collection + Analysis +
Selection = Understanding Confirmation
Detailing and increased
confidence
14Total Engineering - Concept to Completion
Pre Feasibility Study
 Collection of all previous data/documents/drawings related to mine.
 Verification and adequacy check of the available data/documents/drawings.
 Review of exploration status, geological and geotechnical documents.
 Review of hydrological/hydro-geological study, if carried out previously.
 Review of any documents related to underground mining feasibilities, if
carried out previously.
 Review of probable mine methods, equipment requirements and capital
investments for every mine methods.
 Review of different types of mode of access (shaft/audit/decline) and their
suitable locations.
 Review of different types of transportation/haulage systems.
Deliverable: Pre Feasibility Study Report.
15Total Engineering - Concept to Completion
Exploration & Reserve Estimation
 Checking the adequacy of the geological exploration work and evaluation for
additional exploration work.
 Formulation of scheme & technical specification for additional exploration work.
 Tender assistance services to select and appoint drilling agencies by OMC.
 Geological logging and sampling at site during additional exploration work.
 Tender assistance services to select and appointment of laboratory by OMC for
the physico-mechanical and chemical analyses of samples collected during the
additional exploration work.
 Analytical evaluation of the available as well as additional exploration data.
 Preparation of 3D geological model using specialised geo-mining software and
estimation of geological reserves and grades by geo-statistical method.
Deliverable: Detailed Geological Report
16Total Engineering - Concept to Completion
3D Mine modeling with geo-mining software
17Total Engineering - Concept to Completion
Conceptual Feasibility Study
 Preliminary geological modeling and review of mineable resources/reserves.
 Geotechnical study
 Formulation of scheme and technical specification for geotechnical exploration work
 Formulation of test schedule for geotechnical test works
 Tender assistance services to select and appoint geotechnical agencies by OMC
 Detail geotechnical analysis based on the results supplied by the geotechnical agencies
 Geo-hydrological & hydrological study
 Detailing of chosen mining method and development of basic mine plan
 Preparation of basic information on
 Chosen mode of access (shaft/ audit / decline)
 Chosen transportation/haulage systems
 Chosen mining equipments
 Preferable drilling & blasting pattern
 Preferable production cycle
18Total Engineering - Concept to Completion
Conceptual Feasibility Study
 Preparation of basic information on
 Ventilation system
 Power distribution system
 Water management system
 Mine illumination system
 Mine communication system
 Mine rescue and fire fighting system
 Backfill & waste handling system
 Material handling system
 Surface infrastructures
 Preparation of basic project schedule
 Determination of basic project financial indexes like CAPEX, OPEX, NPV, IRR etc
Deliverable: Conceptual Feasibility Study Report
19Total Engineering - Concept to Completion
Simba Rotary Drilling Machine
Mining Equipments
EIMCO Rocker Shovel LoaderEIMCO Load Haul Dumper
Handheld Jackhammer Drill
with air leg
Rock Breaker
20Total Engineering - Concept to Completion
Detailed Feasibility Study
 Concise geological report with extractable resource /reserve and cut off grade.
 Soil testing
 Formulation of scheme, technical specification & test schedule for soil testing
 Tender assistance services to select and appoint testing agencies by OMC
 Numerical modeling & study.
 Preparation of 3D mine model using specialised geo-mining software.
 Preparation of Mining Plan / Scheme in line with statutory guidelines.
 Detail study on
 Mode of access (shaft/ audit / decline)
 Transportation/haulage systems
 Mining equipments
 Drilling & blasting pattern
 Production cycle (long term & short term)
 Ventilation system
21Total Engineering - Concept to Completion
Detailed Feasibility Study
 Detail study on
 Power distribution system
 Water management system
 Mine illumination system
 Mine communication service
 Mine rescue services and fire fighting plan
 Backfill & waste handling system
 Material handling system
 Surface structures
 Mine safety system
 Mine closure scheme
 Procurement Management System
 Education, Training and Development
 Human Resource Development
 Standard Operation Procedures
22Total Engineering - Concept to Completion
Detailed Feasibility Study
 Preparation of scheme for Mineral Beneficiation
 Preparation of Level 1 Master Network project schedule
 Environmental audit to prepare EIA and EMP
 Financial Study
 Capital and operating budget estimation with ±25% accuracy
 Review of major decisive factor like NPV, IRR etc
 Cash flow forecast
 Cost management system
Deliverable: 1. Mining Plan / Scheme
2. Environmental Audit Report
3. Feasibility Study Report – Technical
4. Feasibility Study Report – Financial
23Total Engineering - Concept to Completion
Time
Developing a mine – Procedure, Milestones & Approvals
Pre
Feasibility
Study
Exploration & Reserve estimation
Conceptual
Feasibility Study
Detailed feasibility study EPCM
Operation
Mining Lease
Approval
Forest Clearance
Approval
EIA & EMP
Approval
Mining Plan &
Mining Closure Approval
Start of
operation
Start of
production
PAP R&R and Land Accusation1 2
3 4 5 6
Geotechnical
test works
Geo-hydrological &
hydrological test
work
Numerical Study
Soil Testing
Beneficiation
test work
1> Pre Feasibility Study Report 2> Detailed Geological Report 3> Conceptual Feasibility Study Report 4> Mining Plan / Scheme 5> Environmental Audit Report 6> Feasibility Study Report
Exploration Drilling
24Total Engineering - Concept to Completion
 Preparation Work Breakdown Structure (WBS) & Linear responsibility Matrix
 Engineering Management - Design & detail Engineering of
 Shaft / decline
 Transportation/haulage systems
 Underground infrastructures
 Ventilation system
 Power distribution system
 Water management system
 Mine illumination system
 Mine communication service
 Backfill & waste handling system
 Material handling system
 Surface structures
 Up gradation of mining scheme and plan depending upon the input from
engineering management.
 Project Management
 Project Scheduling
 Quality Control
 Progress Supervision
 Communications
EPCM Services
25Total Engineering - Concept to Completion
 Procurement Management
 Preparation of tender documents
 Conduct tendering process
 Preparation of techno-commercial comparison among venders
 Preparation of draft contract document
 Supervise logistic, commissioning & quality.
 Construction Management
 Preparation of SOP & SWP
 Site supervision
 Enforcement of statuary regulations and HSE policy
 Documentation of guidelines and procedures for
 Safety Management Plan
 Workman Training Manuals
 Management Information System
 Human Resources Management Plan
 HSE Management Plan
EPCM Services
26Total Engineering - Concept to Completion
Project Execution Plan
Project Charter
Detailed
Scope of Work
Work Breakdown
Structure
Project Schedule
Management Plan
RACI MATRIX
(Linear Responsibility Matrix)
Integration
Management Plan
Change Control
Procedure
Communication
Management Plan
Cost Management
Plan
Quality Management
Plan
Procurement
Management Plan
Risk Management
PlanHuman Resource
Management Plan
Safety Management
Plan
Document Management
Procedure
Project
Organisational Chart
Engineering
Management
Procurement
Management
Construction
Management
Guideline and manual
preparation
CoreControlExecution
Receive Order
27Total Engineering - Concept to Completion
Mr. Avijit Podder (Key Geologist)
Mr. Tapas Das (Key Mining Engineer)
Mr. Tridib Choudhury (Key Mechanical Engineer)
 M.Sc. (Geology) from University of Calcutta, India.
 4 years of field experience in various exploration and mining companies.
 5 years of experience within DASTUR in geo-technical logging, sampling,
evaluation, assessment and estimation of mineral resources and reserve,
3D ore body modeling and raw material linkage for various steel plants.
 Ph.D. (Mining) from West Virginia University, USA.
 2 years of project management experience as Project Manager in a brown
field coal mine project (CAPEX €15M) in Czech Republic.
 2 years of underground metal mine experience as Technical Manager.
 B.E. (Mechanical) from Jalpaiguri Govt. Engineering College, India.
 21 years of experience in shaft development and mining machinery
maintenance in underground metal mines.
 12 years of experience in design and commissioning of mineral processing
plants in India and abroad.
DASTUR Mining Team for this project
28Total Engineering - Concept to Completion
29Total Engineering - Concept to Completion
Consulting Engineers & Project Managers to the Mining Industry
The RSV Group of Linked Enterprises is a group of well-
reputed South African-based Project Management and
Design (PM&D) consultancies, specialising in the
minerals and mining sectors.
It brings together the vast experience and resources
from its Linked Enterprise partners across the globe,
giving clients the benefit of international best practices
and dynamic solutions.
ISO 9001:2008 Accreditation for the Provision of Multi-
disciplinary Project Management Services in the Mining,
Metal and Industrial Projects sectors.
30Total Engineering - Concept to Completion
31Total Engineering - Concept to Completion
ANNEXURE
M. N. DASTUR & COMPANY (P) LTD.
Consulting Engineers
KOLKATA
02 March 2015
32Total Engineering - Concept to Completion
Sub Level Caving
33Total Engineering - Concept to Completion
Sub Level Cut & Fill
34Total Engineering - Concept to Completion
Mode of access (Shaft/decline)

More Related Content

What's hot (20)

Shaft sinking 1
Shaft sinking 1Shaft sinking 1
Shaft sinking 1
 
Volume calculation
Volume calculationVolume calculation
Volume calculation
 
Shaft sinking operation
Shaft sinking operationShaft sinking operation
Shaft sinking operation
 
Longwall technology in india, SCCL
Longwall technology in india, SCCLLongwall technology in india, SCCL
Longwall technology in india, SCCL
 
Bore hole
Bore holeBore hole
Bore hole
 
Room and Pillar Mining Method
Room and Pillar Mining MethodRoom and Pillar Mining Method
Room and Pillar Mining Method
 
Pillar design in coal mines
Pillar design in coal minesPillar design in coal mines
Pillar design in coal mines
 
Mining methods
Mining methodsMining methods
Mining methods
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder ppt
 
Mining terminology
Mining terminologyMining terminology
Mining terminology
 
Basics of drilling 1
Basics of drilling 1Basics of drilling 1
Basics of drilling 1
 
Shaft sinking.
Shaft sinking.Shaft sinking.
Shaft sinking.
 
Roof supports in coal mines
Roof supports in coal minesRoof supports in coal mines
Roof supports in coal mines
 
Shaft sinking
Shaft sinking Shaft sinking
Shaft sinking
 
Sublevel stoping..Underground mining methods
Sublevel stoping..Underground mining methodsSublevel stoping..Underground mining methods
Sublevel stoping..Underground mining methods
 
TYPES OF VENTILATION SYSTEMS IN MINES - CENTRAL BOUNDARY U W Z
TYPES OF VENTILATION SYSTEMS IN MINES - CENTRAL BOUNDARY U W ZTYPES OF VENTILATION SYSTEMS IN MINES - CENTRAL BOUNDARY U W Z
TYPES OF VENTILATION SYSTEMS IN MINES - CENTRAL BOUNDARY U W Z
 
Design of openings
Design of openingsDesign of openings
Design of openings
 
Design of openpit mining
Design of openpit miningDesign of openpit mining
Design of openpit mining
 
Sustanable mining
Sustanable miningSustanable mining
Sustanable mining
 
Rock Mass Classification
Rock Mass ClassificationRock Mass Classification
Rock Mass Classification
 

Similar to Project Route Map - OMC South Kaliapani Chromite UG Mine

FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)Narasimha Sharma
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015Mohd Murtaza
 
IDT's Presentation.pptx
IDT's Presentation.pptxIDT's Presentation.pptx
IDT's Presentation.pptxONGCWCS
 
Peter Etim-CV.
Peter Etim-CV. Peter Etim-CV.
Peter Etim-CV. Peter Etim
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspectorMuhammad Amjad
 
CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)Sukanta Dalai
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process EngineerJuber Loharia
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineerRobin Dargavel BEng (Hons)
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv pipingMohamedZidan85
 
Resume - Jayesh Vanza
Resume - Jayesh Vanza Resume - Jayesh Vanza
Resume - Jayesh Vanza jayesh127
 
Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochureMANOJ PATNE
 
Prime Consulting Group Profile
Prime Consulting Group ProfilePrime Consulting Group Profile
Prime Consulting Group ProfileMANOJ PATNE
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali
 
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey ServicesPramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey ServicesIndiaMART InterMESH Limited
 

Similar to Project Route Map - OMC South Kaliapani Chromite UG Mine (20)

FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
 
IDT's Presentation.pptx
IDT's Presentation.pptxIDT's Presentation.pptx
IDT's Presentation.pptx
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Peter Etim-CV.
Peter Etim-CV. Peter Etim-CV.
Peter Etim-CV.
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
Resume - Jayesh Vanza
Resume - Jayesh Vanza Resume - Jayesh Vanza
Resume - Jayesh Vanza
 
Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochure
 
ISQ_ESS_Presentation29_01_ppt.ppt
ISQ_ESS_Presentation29_01_ppt.pptISQ_ESS_Presentation29_01_ppt.ppt
ISQ_ESS_Presentation29_01_ppt.ppt
 
Prime Consulting Group Profile
Prime Consulting Group ProfilePrime Consulting Group Profile
Prime Consulting Group Profile
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
CV-Padmanabh
CV-PadmanabhCV-Padmanabh
CV-Padmanabh
 
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey ServicesPramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
 

More from Tapas Das

Basic safety in JMS 2020
Basic safety in JMS 2020Basic safety in JMS 2020
Basic safety in JMS 2020Tapas Das
 
Surda mine Data & Tendering 2017 analysis
Surda mine Data & Tendering 2017 analysisSurda mine Data & Tendering 2017 analysis
Surda mine Data & Tendering 2017 analysisTapas Das
 
IRL PPT 2011 & AR 2014
IRL PPT 2011 & AR 2014IRL PPT 2011 & AR 2014
IRL PPT 2011 & AR 2014Tapas Das
 
MDO Concept - An answer to Indian captive coal mining
MDO Concept - An answer to Indian captive coal miningMDO Concept - An answer to Indian captive coal mining
MDO Concept - An answer to Indian captive coal miningTapas Das
 
Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mi...
Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mi...Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mi...
Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mi...Tapas Das
 
EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectTapas Das
 
Room & Pillar Project Status Update - OCT 2012
Room & Pillar Project Status Update - OCT 2012Room & Pillar Project Status Update - OCT 2012
Room & Pillar Project Status Update - OCT 2012Tapas Das
 

More from Tapas Das (7)

Basic safety in JMS 2020
Basic safety in JMS 2020Basic safety in JMS 2020
Basic safety in JMS 2020
 
Surda mine Data & Tendering 2017 analysis
Surda mine Data & Tendering 2017 analysisSurda mine Data & Tendering 2017 analysis
Surda mine Data & Tendering 2017 analysis
 
IRL PPT 2011 & AR 2014
IRL PPT 2011 & AR 2014IRL PPT 2011 & AR 2014
IRL PPT 2011 & AR 2014
 
MDO Concept - An answer to Indian captive coal mining
MDO Concept - An answer to Indian captive coal miningMDO Concept - An answer to Indian captive coal mining
MDO Concept - An answer to Indian captive coal mining
 
Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mi...
Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mi...Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mi...
Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mi...
 
EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West Project
 
Room & Pillar Project Status Update - OCT 2012
Room & Pillar Project Status Update - OCT 2012Room & Pillar Project Status Update - OCT 2012
Room & Pillar Project Status Update - OCT 2012
 

Recently uploaded

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 

Recently uploaded (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 

Project Route Map - OMC South Kaliapani Chromite UG Mine

  • 1. M. N. DASTUR & COMPANY (P) LTD. Consulting Engineers KOLKATA 1Total Engineering - Concept to Completion 02 March 2015 “Engineer is no longer concerned with the developments in specialised fields, but has to make an inter-disciplinary approach to the solution.” M.N. Dastur, Founder
  • 2. 2Total Engineering - Concept to Completion  Established in 1955 by Dr. M. N. Dastur  Knowledge driven Consulting Engineering organisation with global presence  Over 2000 multidisciplinary team of dedicated staff  Successfully engineered over 1,000 industrial projects in the fields of Steel, Power, Chemicals, Cement, Mining etc  ISO 9001-2008 certified; Information Security Management System (ISO 17020:2005)  Certification on Inspection (ISO 17020:2012) in progress About Us
  • 3. 3Total Engineering - Concept to Completion Global Presence Dastur Engineering International GmbH Dϋsseldorf, Germany Dastur International Inc. New Jersey, USA M. N. Dastur & Company (P) Ltd. Kolkata, India Dastur Engineering International GmbH Abu Dhabi , UAE Dastur Engineering International GmbH Tokyo, Japan Branch Offices in India: Bangalore, Bhubaneswar, Chennai, Hyderabad, Mumbai, New Delhi
  • 4. 4Total Engineering - Concept to Completion Mining & Mineral Processing Environmental Engineering Iron Making Steel Making & Ferro Alloys Rolling Mill Coke Oven & By products Process Metallurgy & Lab Chemical & Other Process Non Ferrous Calcining, Refr. Furnaces & Cement Mechanical & Material Handling Civil Electrical Structural Instrumentation Utilities Water System Layout, Trans. & Logistic Commercial & Contract Project Managers Project Services Inspection BD Ferrous BD Non-Ferrous BD Mining & Mineral Processing Turnkey Automation QMS Library Services CORPORATE Corporate Finance Account, MIS & Audit HRA Human Resources Administration Construction Site-in-charges Simulation Software Dastur Business & Technology Consulting Cost Engineering KM & Business Excellence IT / ISMS Legal & Commercial Law & Taxation Payroll & Retirement BD Eng. Services Board of Directors Advisory Committee Dastur Engineering International Dastur International Inc. PROCESS ENGINEERING CMD JMD BUSINESS DEVLPMNT CONSTRUCTION INTERNAL DEVLPMNT PROJECT Organisational Structure
  • 5. 5Total Engineering - Concept to Completion Areas of Operation  Geology, Mining & Mineral Processing  Process Engineering o Ferroalloys o Iron making o Coke making o Steel making o Non-ferrous Metals o Rolling Mills o Calcining, Refractories & Ceramics  Materials Handling  Structural Engineering  Electrical, Instrumentation & Automation  Environmental Engineering  Civil & Geotech Engineering  Infrastructure, Logistics & Layout  Water Systems  Utility Systems  Cost Engineering  Project Management  Inspection & Quality  Business & Technology Consulting
  • 6. 6Total Engineering - Concept to Completion Completed Projects (Mining) Service: Pre Feasibility Study Project: Bunder Diamod Project Client: Rio Tinto Exploration India Ltd Year: 2000 Service: Feasibility Report Project: Mine Planning of Roida II Iron Ore Mine Client: ATHA GROUP Year: 2000 Service: Techno-Economic Viability Report Project: Itakpe iron ore mine Client: Global Infrastructure (Nigeria) Ltd Year: 2000 Service: Project Execution Report Project: DSO Project Client: Tata Steel Limited Year: 2000
  • 7. 7Total Engineering - Concept to Completion Ongoing Projects (Mining) Service: Concept to Completion Project: 1 MTPA Integrated Steel Plant Client: BUA International Limited Service: Concise DPR Report Project: Alternate Bauxite supply for stream 5 Client: National Aluminium Company Limited Service: EPCM Services Project: Sukhinda Underground Chromite Mine Client: TATA Steel Service: Resource Assessment Report & Detailed Project Report Project: Khatau Narbheram Roida-II iron ore mine Client: Atha Group Pipeline Projects (Mining)
  • 8. 8Total Engineering - Concept to Completion Our Clients (Mining)
  • 9. Development of South Kaliapani Chromite Underground Mine in Jajpur district of The Odisha Mining Corporation Limited (OMC) PROJECT ROUTE MAP M. N. DASTUR & COMPANY (P) LTD. Consulting Engineers KOLKATA 9Total Engineering - Concept to Completion 02 March 2015 Tapas Das, Supdt. Engineer
  • 10. 10Total Engineering - Concept to Completion
  • 11. 11Total Engineering - Concept to Completion  South Kaliapani Chromite mine of Odisha Mining Corporation Limited (OMC) is located in Sukinda valley in the district of Jajpur, Odisha.  As the depth of the present open cast mine and the constraints of space for overburden disposal is increasing day by day, underground mining is the need of the time to sustain the production of chrome ore in future.  For this purpose OMC has been rendered the scope of the work for this project as follows: 1) Pre feasibility study 2) Exploration & reserve estimation 3) Conceptual feasibility study 4) Detail feasibility study with geotechnical & hydro-geological works 5) EPCM services for the South Kaliapani Chromite underground project South Kaliapani Underground Chromite mine
  • 12. 12Total Engineering - Concept to Completion Conceptual Underground Metal Mine Pump StationCrusher Skip Filling Station Sump Ore Bin Exploratory Drilling Level Development Sub Level Development Mined Out and Backfilled Stope Producing Stope Ventilation Shaft Ramp Shaft Surface Structures OB DumpTailing Pond Skip
  • 13. 13Total Engineering - Concept to Completion Pre Feasibility Study (Concept & Comparison) Exploration & Reserve estimation (Viability) Conceptual feasibility study (Selection & Basic information) Detail feasibility study (Definitions and detailing) Level of Study Knowledge Total Engineering – Concept to Completion Engineering, Procurement, Construction Management Collection + Analysis + Selection = Understanding Confirmation Detailing and increased confidence
  • 14. 14Total Engineering - Concept to Completion Pre Feasibility Study  Collection of all previous data/documents/drawings related to mine.  Verification and adequacy check of the available data/documents/drawings.  Review of exploration status, geological and geotechnical documents.  Review of hydrological/hydro-geological study, if carried out previously.  Review of any documents related to underground mining feasibilities, if carried out previously.  Review of probable mine methods, equipment requirements and capital investments for every mine methods.  Review of different types of mode of access (shaft/audit/decline) and their suitable locations.  Review of different types of transportation/haulage systems. Deliverable: Pre Feasibility Study Report.
  • 15. 15Total Engineering - Concept to Completion Exploration & Reserve Estimation  Checking the adequacy of the geological exploration work and evaluation for additional exploration work.  Formulation of scheme & technical specification for additional exploration work.  Tender assistance services to select and appoint drilling agencies by OMC.  Geological logging and sampling at site during additional exploration work.  Tender assistance services to select and appointment of laboratory by OMC for the physico-mechanical and chemical analyses of samples collected during the additional exploration work.  Analytical evaluation of the available as well as additional exploration data.  Preparation of 3D geological model using specialised geo-mining software and estimation of geological reserves and grades by geo-statistical method. Deliverable: Detailed Geological Report
  • 16. 16Total Engineering - Concept to Completion 3D Mine modeling with geo-mining software
  • 17. 17Total Engineering - Concept to Completion Conceptual Feasibility Study  Preliminary geological modeling and review of mineable resources/reserves.  Geotechnical study  Formulation of scheme and technical specification for geotechnical exploration work  Formulation of test schedule for geotechnical test works  Tender assistance services to select and appoint geotechnical agencies by OMC  Detail geotechnical analysis based on the results supplied by the geotechnical agencies  Geo-hydrological & hydrological study  Detailing of chosen mining method and development of basic mine plan  Preparation of basic information on  Chosen mode of access (shaft/ audit / decline)  Chosen transportation/haulage systems  Chosen mining equipments  Preferable drilling & blasting pattern  Preferable production cycle
  • 18. 18Total Engineering - Concept to Completion Conceptual Feasibility Study  Preparation of basic information on  Ventilation system  Power distribution system  Water management system  Mine illumination system  Mine communication system  Mine rescue and fire fighting system  Backfill & waste handling system  Material handling system  Surface infrastructures  Preparation of basic project schedule  Determination of basic project financial indexes like CAPEX, OPEX, NPV, IRR etc Deliverable: Conceptual Feasibility Study Report
  • 19. 19Total Engineering - Concept to Completion Simba Rotary Drilling Machine Mining Equipments EIMCO Rocker Shovel LoaderEIMCO Load Haul Dumper Handheld Jackhammer Drill with air leg Rock Breaker
  • 20. 20Total Engineering - Concept to Completion Detailed Feasibility Study  Concise geological report with extractable resource /reserve and cut off grade.  Soil testing  Formulation of scheme, technical specification & test schedule for soil testing  Tender assistance services to select and appoint testing agencies by OMC  Numerical modeling & study.  Preparation of 3D mine model using specialised geo-mining software.  Preparation of Mining Plan / Scheme in line with statutory guidelines.  Detail study on  Mode of access (shaft/ audit / decline)  Transportation/haulage systems  Mining equipments  Drilling & blasting pattern  Production cycle (long term & short term)  Ventilation system
  • 21. 21Total Engineering - Concept to Completion Detailed Feasibility Study  Detail study on  Power distribution system  Water management system  Mine illumination system  Mine communication service  Mine rescue services and fire fighting plan  Backfill & waste handling system  Material handling system  Surface structures  Mine safety system  Mine closure scheme  Procurement Management System  Education, Training and Development  Human Resource Development  Standard Operation Procedures
  • 22. 22Total Engineering - Concept to Completion Detailed Feasibility Study  Preparation of scheme for Mineral Beneficiation  Preparation of Level 1 Master Network project schedule  Environmental audit to prepare EIA and EMP  Financial Study  Capital and operating budget estimation with ±25% accuracy  Review of major decisive factor like NPV, IRR etc  Cash flow forecast  Cost management system Deliverable: 1. Mining Plan / Scheme 2. Environmental Audit Report 3. Feasibility Study Report – Technical 4. Feasibility Study Report – Financial
  • 23. 23Total Engineering - Concept to Completion Time Developing a mine – Procedure, Milestones & Approvals Pre Feasibility Study Exploration & Reserve estimation Conceptual Feasibility Study Detailed feasibility study EPCM Operation Mining Lease Approval Forest Clearance Approval EIA & EMP Approval Mining Plan & Mining Closure Approval Start of operation Start of production PAP R&R and Land Accusation1 2 3 4 5 6 Geotechnical test works Geo-hydrological & hydrological test work Numerical Study Soil Testing Beneficiation test work 1> Pre Feasibility Study Report 2> Detailed Geological Report 3> Conceptual Feasibility Study Report 4> Mining Plan / Scheme 5> Environmental Audit Report 6> Feasibility Study Report Exploration Drilling
  • 24. 24Total Engineering - Concept to Completion  Preparation Work Breakdown Structure (WBS) & Linear responsibility Matrix  Engineering Management - Design & detail Engineering of  Shaft / decline  Transportation/haulage systems  Underground infrastructures  Ventilation system  Power distribution system  Water management system  Mine illumination system  Mine communication service  Backfill & waste handling system  Material handling system  Surface structures  Up gradation of mining scheme and plan depending upon the input from engineering management.  Project Management  Project Scheduling  Quality Control  Progress Supervision  Communications EPCM Services
  • 25. 25Total Engineering - Concept to Completion  Procurement Management  Preparation of tender documents  Conduct tendering process  Preparation of techno-commercial comparison among venders  Preparation of draft contract document  Supervise logistic, commissioning & quality.  Construction Management  Preparation of SOP & SWP  Site supervision  Enforcement of statuary regulations and HSE policy  Documentation of guidelines and procedures for  Safety Management Plan  Workman Training Manuals  Management Information System  Human Resources Management Plan  HSE Management Plan EPCM Services
  • 26. 26Total Engineering - Concept to Completion Project Execution Plan Project Charter Detailed Scope of Work Work Breakdown Structure Project Schedule Management Plan RACI MATRIX (Linear Responsibility Matrix) Integration Management Plan Change Control Procedure Communication Management Plan Cost Management Plan Quality Management Plan Procurement Management Plan Risk Management PlanHuman Resource Management Plan Safety Management Plan Document Management Procedure Project Organisational Chart Engineering Management Procurement Management Construction Management Guideline and manual preparation CoreControlExecution Receive Order
  • 27. 27Total Engineering - Concept to Completion Mr. Avijit Podder (Key Geologist) Mr. Tapas Das (Key Mining Engineer) Mr. Tridib Choudhury (Key Mechanical Engineer)  M.Sc. (Geology) from University of Calcutta, India.  4 years of field experience in various exploration and mining companies.  5 years of experience within DASTUR in geo-technical logging, sampling, evaluation, assessment and estimation of mineral resources and reserve, 3D ore body modeling and raw material linkage for various steel plants.  Ph.D. (Mining) from West Virginia University, USA.  2 years of project management experience as Project Manager in a brown field coal mine project (CAPEX €15M) in Czech Republic.  2 years of underground metal mine experience as Technical Manager.  B.E. (Mechanical) from Jalpaiguri Govt. Engineering College, India.  21 years of experience in shaft development and mining machinery maintenance in underground metal mines.  12 years of experience in design and commissioning of mineral processing plants in India and abroad. DASTUR Mining Team for this project
  • 28. 28Total Engineering - Concept to Completion
  • 29. 29Total Engineering - Concept to Completion Consulting Engineers & Project Managers to the Mining Industry The RSV Group of Linked Enterprises is a group of well- reputed South African-based Project Management and Design (PM&D) consultancies, specialising in the minerals and mining sectors. It brings together the vast experience and resources from its Linked Enterprise partners across the globe, giving clients the benefit of international best practices and dynamic solutions. ISO 9001:2008 Accreditation for the Provision of Multi- disciplinary Project Management Services in the Mining, Metal and Industrial Projects sectors.
  • 30. 30Total Engineering - Concept to Completion
  • 31. 31Total Engineering - Concept to Completion ANNEXURE M. N. DASTUR & COMPANY (P) LTD. Consulting Engineers KOLKATA 02 March 2015
  • 32. 32Total Engineering - Concept to Completion Sub Level Caving
  • 33. 33Total Engineering - Concept to Completion Sub Level Cut & Fill
  • 34. 34Total Engineering - Concept to Completion Mode of access (Shaft/decline)