Project Route Map - OMC South Kaliapani Chromite UG Mine
1. M. N. DASTUR & COMPANY (P) LTD.
Consulting Engineers
KOLKATA
1Total Engineering - Concept to Completion
02 March 2015
“Engineer is no longer concerned with the
developments in specialised fields, but has to make
an inter-disciplinary approach to the solution.”
M.N. Dastur, Founder
2. 2Total Engineering - Concept to Completion
Established in 1955 by Dr. M. N. Dastur
Knowledge driven Consulting Engineering
organisation with global presence
Over 2000 multidisciplinary team of dedicated staff
Successfully engineered over 1,000 industrial
projects in the fields of Steel, Power, Chemicals,
Cement, Mining etc
ISO 9001-2008 certified; Information Security
Management System (ISO 17020:2005)
Certification on Inspection (ISO 17020:2012) in
progress
About Us
3. 3Total Engineering - Concept to Completion
Global Presence
Dastur Engineering International GmbH
Dϋsseldorf, Germany
Dastur International Inc.
New Jersey, USA
M. N. Dastur & Company (P) Ltd.
Kolkata, India
Dastur Engineering International GmbH
Abu Dhabi , UAE
Dastur Engineering International GmbH
Tokyo, Japan
Branch Offices in India: Bangalore, Bhubaneswar, Chennai, Hyderabad, Mumbai, New Delhi
4. 4Total Engineering - Concept to Completion
Mining &
Mineral Processing
Environmental
Engineering
Iron Making
Steel Making &
Ferro Alloys
Rolling Mill
Coke Oven &
By products
Process
Metallurgy & Lab
Chemical
& Other Process
Non Ferrous
Calcining, Refr.
Furnaces & Cement
Mechanical &
Material Handling
Civil
Electrical
Structural
Instrumentation
Utilities
Water System
Layout,
Trans. & Logistic
Commercial &
Contract
Project Managers
Project Services
Inspection
BD Ferrous
BD Non-Ferrous
BD Mining &
Mineral Processing
Turnkey
Automation
QMS
Library Services
CORPORATE
Corporate Finance
Account,
MIS & Audit
HRA
Human Resources
Administration
Construction
Site-in-charges
Simulation
Software
Dastur Business &
Technology Consulting
Cost Engineering
KM & Business
Excellence
IT / ISMS
Legal & Commercial
Law & Taxation
Payroll &
Retirement
BD Eng. Services
Board of Directors
Advisory Committee
Dastur Engineering International
Dastur International Inc.
PROCESS ENGINEERING
CMD
JMD
BUSINESS DEVLPMNT
CONSTRUCTION
INTERNAL DEVLPMNT
PROJECT
Organisational Structure
5. 5Total Engineering - Concept to Completion
Areas of Operation
Geology, Mining & Mineral Processing
Process Engineering
o Ferroalloys
o Iron making
o Coke making
o Steel making
o Non-ferrous Metals
o Rolling Mills
o Calcining, Refractories & Ceramics
Materials Handling
Structural Engineering
Electrical, Instrumentation & Automation
Environmental Engineering
Civil & Geotech Engineering
Infrastructure, Logistics & Layout
Water Systems
Utility Systems
Cost Engineering
Project Management
Inspection & Quality
Business & Technology Consulting
6. 6Total Engineering - Concept to Completion
Completed Projects (Mining)
Service: Pre Feasibility Study
Project: Bunder Diamod Project
Client: Rio Tinto Exploration India Ltd
Year: 2000
Service: Feasibility Report
Project: Mine Planning of Roida II Iron Ore Mine
Client: ATHA GROUP
Year: 2000
Service: Techno-Economic Viability Report
Project: Itakpe iron ore mine
Client: Global Infrastructure (Nigeria) Ltd
Year: 2000
Service: Project Execution Report
Project: DSO Project
Client: Tata Steel Limited
Year: 2000
7. 7Total Engineering - Concept to Completion
Ongoing Projects (Mining)
Service: Concept to Completion
Project: 1 MTPA Integrated Steel Plant
Client: BUA International Limited
Service: Concise DPR Report
Project: Alternate Bauxite supply for stream 5
Client: National Aluminium Company Limited
Service: EPCM Services
Project: Sukhinda Underground Chromite Mine
Client: TATA Steel
Service: Resource Assessment Report & Detailed Project Report
Project: Khatau Narbheram Roida-II iron ore mine
Client: Atha Group
Pipeline Projects (Mining)
9. Development of
South Kaliapani Chromite Underground Mine
in Jajpur district of
The Odisha Mining Corporation Limited (OMC)
PROJECT ROUTE MAP
M. N. DASTUR & COMPANY (P) LTD.
Consulting Engineers
KOLKATA
9Total Engineering - Concept to Completion
02 March 2015
Tapas Das, Supdt. Engineer
11. 11Total Engineering - Concept to Completion
South Kaliapani Chromite mine of Odisha Mining Corporation Limited (OMC)
is located in Sukinda valley in the district of Jajpur, Odisha.
As the depth of the present open cast mine and the constraints of space for
overburden disposal is increasing day by day, underground mining is the need
of the time to sustain the production of chrome ore in future.
For this purpose OMC has been rendered the scope of the work for this
project as follows:
1) Pre feasibility study
2) Exploration & reserve estimation
3) Conceptual feasibility study
4) Detail feasibility study with geotechnical & hydro-geological works
5) EPCM services for the South Kaliapani Chromite underground project
South Kaliapani Underground Chromite mine
12. 12Total Engineering - Concept to Completion
Conceptual Underground Metal Mine
Pump StationCrusher
Skip Filling Station
Sump
Ore Bin
Exploratory
Drilling
Level Development
Sub Level Development
Mined Out
and Backfilled
Stope
Producing
Stope
Ventilation
Shaft
Ramp
Shaft
Surface Structures
OB DumpTailing Pond
Skip
13. 13Total Engineering - Concept to Completion
Pre Feasibility Study
(Concept & Comparison)
Exploration & Reserve estimation
(Viability)
Conceptual feasibility study
(Selection & Basic information)
Detail feasibility study
(Definitions and detailing)
Level of Study
Knowledge
Total Engineering – Concept to Completion
Engineering,
Procurement,
Construction
Management
Collection + Analysis +
Selection = Understanding Confirmation
Detailing and increased
confidence
14. 14Total Engineering - Concept to Completion
Pre Feasibility Study
Collection of all previous data/documents/drawings related to mine.
Verification and adequacy check of the available data/documents/drawings.
Review of exploration status, geological and geotechnical documents.
Review of hydrological/hydro-geological study, if carried out previously.
Review of any documents related to underground mining feasibilities, if
carried out previously.
Review of probable mine methods, equipment requirements and capital
investments for every mine methods.
Review of different types of mode of access (shaft/audit/decline) and their
suitable locations.
Review of different types of transportation/haulage systems.
Deliverable: Pre Feasibility Study Report.
15. 15Total Engineering - Concept to Completion
Exploration & Reserve Estimation
Checking the adequacy of the geological exploration work and evaluation for
additional exploration work.
Formulation of scheme & technical specification for additional exploration work.
Tender assistance services to select and appoint drilling agencies by OMC.
Geological logging and sampling at site during additional exploration work.
Tender assistance services to select and appointment of laboratory by OMC for
the physico-mechanical and chemical analyses of samples collected during the
additional exploration work.
Analytical evaluation of the available as well as additional exploration data.
Preparation of 3D geological model using specialised geo-mining software and
estimation of geological reserves and grades by geo-statistical method.
Deliverable: Detailed Geological Report
16. 16Total Engineering - Concept to Completion
3D Mine modeling with geo-mining software
17. 17Total Engineering - Concept to Completion
Conceptual Feasibility Study
Preliminary geological modeling and review of mineable resources/reserves.
Geotechnical study
Formulation of scheme and technical specification for geotechnical exploration work
Formulation of test schedule for geotechnical test works
Tender assistance services to select and appoint geotechnical agencies by OMC
Detail geotechnical analysis based on the results supplied by the geotechnical agencies
Geo-hydrological & hydrological study
Detailing of chosen mining method and development of basic mine plan
Preparation of basic information on
Chosen mode of access (shaft/ audit / decline)
Chosen transportation/haulage systems
Chosen mining equipments
Preferable drilling & blasting pattern
Preferable production cycle
18. 18Total Engineering - Concept to Completion
Conceptual Feasibility Study
Preparation of basic information on
Ventilation system
Power distribution system
Water management system
Mine illumination system
Mine communication system
Mine rescue and fire fighting system
Backfill & waste handling system
Material handling system
Surface infrastructures
Preparation of basic project schedule
Determination of basic project financial indexes like CAPEX, OPEX, NPV, IRR etc
Deliverable: Conceptual Feasibility Study Report
19. 19Total Engineering - Concept to Completion
Simba Rotary Drilling Machine
Mining Equipments
EIMCO Rocker Shovel LoaderEIMCO Load Haul Dumper
Handheld Jackhammer Drill
with air leg
Rock Breaker
20. 20Total Engineering - Concept to Completion
Detailed Feasibility Study
Concise geological report with extractable resource /reserve and cut off grade.
Soil testing
Formulation of scheme, technical specification & test schedule for soil testing
Tender assistance services to select and appoint testing agencies by OMC
Numerical modeling & study.
Preparation of 3D mine model using specialised geo-mining software.
Preparation of Mining Plan / Scheme in line with statutory guidelines.
Detail study on
Mode of access (shaft/ audit / decline)
Transportation/haulage systems
Mining equipments
Drilling & blasting pattern
Production cycle (long term & short term)
Ventilation system
21. 21Total Engineering - Concept to Completion
Detailed Feasibility Study
Detail study on
Power distribution system
Water management system
Mine illumination system
Mine communication service
Mine rescue services and fire fighting plan
Backfill & waste handling system
Material handling system
Surface structures
Mine safety system
Mine closure scheme
Procurement Management System
Education, Training and Development
Human Resource Development
Standard Operation Procedures
22. 22Total Engineering - Concept to Completion
Detailed Feasibility Study
Preparation of scheme for Mineral Beneficiation
Preparation of Level 1 Master Network project schedule
Environmental audit to prepare EIA and EMP
Financial Study
Capital and operating budget estimation with ±25% accuracy
Review of major decisive factor like NPV, IRR etc
Cash flow forecast
Cost management system
Deliverable: 1. Mining Plan / Scheme
2. Environmental Audit Report
3. Feasibility Study Report – Technical
4. Feasibility Study Report – Financial
23. 23Total Engineering - Concept to Completion
Time
Developing a mine – Procedure, Milestones & Approvals
Pre
Feasibility
Study
Exploration & Reserve estimation
Conceptual
Feasibility Study
Detailed feasibility study EPCM
Operation
Mining Lease
Approval
Forest Clearance
Approval
EIA & EMP
Approval
Mining Plan &
Mining Closure Approval
Start of
operation
Start of
production
PAP R&R and Land Accusation1 2
3 4 5 6
Geotechnical
test works
Geo-hydrological &
hydrological test
work
Numerical Study
Soil Testing
Beneficiation
test work
1> Pre Feasibility Study Report 2> Detailed Geological Report 3> Conceptual Feasibility Study Report 4> Mining Plan / Scheme 5> Environmental Audit Report 6> Feasibility Study Report
Exploration Drilling
24. 24Total Engineering - Concept to Completion
Preparation Work Breakdown Structure (WBS) & Linear responsibility Matrix
Engineering Management - Design & detail Engineering of
Shaft / decline
Transportation/haulage systems
Underground infrastructures
Ventilation system
Power distribution system
Water management system
Mine illumination system
Mine communication service
Backfill & waste handling system
Material handling system
Surface structures
Up gradation of mining scheme and plan depending upon the input from
engineering management.
Project Management
Project Scheduling
Quality Control
Progress Supervision
Communications
EPCM Services
25. 25Total Engineering - Concept to Completion
Procurement Management
Preparation of tender documents
Conduct tendering process
Preparation of techno-commercial comparison among venders
Preparation of draft contract document
Supervise logistic, commissioning & quality.
Construction Management
Preparation of SOP & SWP
Site supervision
Enforcement of statuary regulations and HSE policy
Documentation of guidelines and procedures for
Safety Management Plan
Workman Training Manuals
Management Information System
Human Resources Management Plan
HSE Management Plan
EPCM Services
26. 26Total Engineering - Concept to Completion
Project Execution Plan
Project Charter
Detailed
Scope of Work
Work Breakdown
Structure
Project Schedule
Management Plan
RACI MATRIX
(Linear Responsibility Matrix)
Integration
Management Plan
Change Control
Procedure
Communication
Management Plan
Cost Management
Plan
Quality Management
Plan
Procurement
Management Plan
Risk Management
PlanHuman Resource
Management Plan
Safety Management
Plan
Document Management
Procedure
Project
Organisational Chart
Engineering
Management
Procurement
Management
Construction
Management
Guideline and manual
preparation
CoreControlExecution
Receive Order
27. 27Total Engineering - Concept to Completion
Mr. Avijit Podder (Key Geologist)
Mr. Tapas Das (Key Mining Engineer)
Mr. Tridib Choudhury (Key Mechanical Engineer)
M.Sc. (Geology) from University of Calcutta, India.
4 years of field experience in various exploration and mining companies.
5 years of experience within DASTUR in geo-technical logging, sampling,
evaluation, assessment and estimation of mineral resources and reserve,
3D ore body modeling and raw material linkage for various steel plants.
Ph.D. (Mining) from West Virginia University, USA.
2 years of project management experience as Project Manager in a brown
field coal mine project (CAPEX €15M) in Czech Republic.
2 years of underground metal mine experience as Technical Manager.
B.E. (Mechanical) from Jalpaiguri Govt. Engineering College, India.
21 years of experience in shaft development and mining machinery
maintenance in underground metal mines.
12 years of experience in design and commissioning of mineral processing
plants in India and abroad.
DASTUR Mining Team for this project
29. 29Total Engineering - Concept to Completion
Consulting Engineers & Project Managers to the Mining Industry
The RSV Group of Linked Enterprises is a group of well-
reputed South African-based Project Management and
Design (PM&D) consultancies, specialising in the
minerals and mining sectors.
It brings together the vast experience and resources
from its Linked Enterprise partners across the globe,
giving clients the benefit of international best practices
and dynamic solutions.
ISO 9001:2008 Accreditation for the Provision of Multi-
disciplinary Project Management Services in the Mining,
Metal and Industrial Projects sectors.