SlideShare a Scribd company logo
1 of 4
Chennappan Bhoopalan
MBA & Quantity Surveying
(Singapore)
Blk195B, Punggol
Singapore763861
Mobile:+65-91647514
Email: bhoopalan2ncl@gmail.com
PROFESSIONALEXPERIENCE
Aug 2016 Quantity Surveyor (NCL Building Construction Pte, Ltd)
– Present Project: Changi East to Effect 3 Runway Operations At Singapore Changi Airport-Package 1
Main Contractor: Koh Brothers Building & Civil Engineering Contractor Pte Ltd.
Contract Sum: $ 7,592,119.11
Singapore
Aug 2015 Quantity Surveyor (NCL Building Construction Pte, Ltd)
– Aug 2016 General Industrial Factory MK13 at 12 Woodlands Link (Sembawang Planning Area.
Main Contractor: He Zhan Construction Pte, Ltd
Contract Sum: $ 1,071,557.95
Singapore
July 2013 Quantity Surveyor (NCL Building Construction Pte, Ltd)
-July 2016 Project: Water Town, Punggol.
Main Contractor: MA Builders Pte, Ltd
Contract Sum: $11,996,713.00
Singapore
Quantity Surveyor Achievement
Preparing Monthly progress claim and discuss withConsultant Project Manager.
 Certify Sub-contractors’ payment certificates for Archi and M&E works
 Liaise with consultant quantity surveyor and submitting cost break down of VO’s.
 Assist to contract manager to prepare letter of award /Letter of intent.
 Coordinate with site team and purchase order
 Preparing final accounts
 Quantity take off, Material enquiries and call quotations for tender
 Preparing tender documents for submission
 Attend monthly site progress meeting & VO meeting
PROFILE
A hard- working, self-motivated, and adaptable Electricals & mechanical & Maintenance & Quantity
Surveyor, with excellent organizational and team working skills and with 9 years’ experience. Capable of
working without supervision and willing to assume additional responsibility, is looking for a position in an
innovative, learning and challenging working environment that recognizes and fully utilizes my capabilities
and competencies
 Availableto starts immediately
 Current Salary:$ 3500
 Expected Salary: Negotiable
August 2012 – Jun
2013
Quantity Surveyor (NCL Construction)
Project: Fusinopolis 2a. Tower A & B.
Main Contractor: GS Engineering & Constriction Pte, Ltd
Contract Sum: $6,000,000.
Quantity Surveyor Achievements:
 Handling subcontractor Bills and payments
 Costing and processing variations
 Prepare final accounts and contract charges
 Prepared cost reports
 Measuring and recording site information
 Review all the drawings and specifications supplied by client
for quotation
• Prepare Weekly Accomplishment Report and Monthly Progress Report.
• Progress Claim
o Preparation of GENCON monthly progress claim for Civil Structural and
Architectural Works.
o Reconcile Accomplishment (Progress Claim) with Construction
Managers and Quantity Surveying Consultants.
o Assesment and Evaluation of Subcontractors’ progress claim.
• Material Procurement/ Subcontactor’s Account
o Post Tender Quantity Take Off (Rehash) and compare with the Bill of
Quantities.
o Source and compilequotation and prepare cost analysis
o Review and submit technical brochures with respect to the
specifications.
o Evaluate and compare suppliers’ cost proposals versus site budget.
o Endorse suppliers with approved technical brochures and lowest cost
proposal to the Head Office for negotiation and awarding.
o Monitoring of down payment and material delivery.
o Reconcile subcontractors’ Variation Order and endorse for revision of
Purchase Order.
o Monitor supplier/subcon progress until completion of works.
o Processing Variation Orders/ Change Orders Claims
o Preapare Quantity Take Off for revised and/or additional works.
o Reconcile quantities and cost of VO with the Owner’s Representative.
o Prepare documents for the approved/reconciled variation order.
• Prepare charges/deductions to subcontractors.
• Monitor Productivity Rate (Concreting, Rebar Works, Formworks,
Architectural Works, etc.)
July 2008-Dec 2009 Electrical & Mechanical Senior Supervisor (Hitachi Plant Technology Ltd)
Project: Palm Jumeirah Monorail
Main Contractor: Marubeni Corporation
Dubai(UAE)
 He Responsibilities Involved:
Experience in installation of power equipment’s like panelboards, Switchgear, Transformers and cable laying etc.
 Experience in Extra High Voltage A.C /D. C Transmission
 Panelboard reading observation and corrective actions.
 To perform the original drawings, prepare and submit the as-built drawings for the above project.
 ATP Signal:
a) Installation of ATP Box
b) Signal Cable Laying & Termination
c) Track switches Signal Cabling & Termination.
d) Fiber optical cable laying to OCMK Panel
e) F.O. PATCH CORD Cable for OCMK Panel
 Power Contact Lines:
a) Installation of insulator-shaped copper conductor, expansion joint, wire mesh.
b) FRP Plate, Jumper Cable, DC Cable pulling, Termination & Megger Test
c) Installation & Cable Termination of Bogie drop, Transverse & Shunting unit.
d) Installation of Scissor Lift, Fork Lift, Gantry Crane & Monorail Hoist.
 Analog Telephone:
a) Installation of Telephone, cable laying &Termination.
b) Installation of G.I conduit, Trucking, Cable Ladder, Cable Tray.
11 KV Substations
 Installation & Maintenance of 11kV Substation, 1MVA Standby Generator, Uninterruptible Power Supply (UPS), Emergency
Change over Switch (ECS).
 Cable Pulling (10 Sq.mm up to 300 Sq.mm)
 Experience in Extra High Voltage A.C /D. C Transmission
 CCTV.
a) Installation and cable laying for CCTV.
b) Installation and Cable laying for camera
c) F.O PATCH CORD Cable Laying
d) PATCHCORD CAT 6 UTP SNAG PROOP Cable Laying for CCTV Panel
Antennae
 Installation and cable pulling for Antennae.
 Equipment grounding termination, grounding copper plate cable termination and grounding concrete pit installation.
 Conduct Megger Test for high and low power cables
 Testing for Earth Resistance, continuity test and Earth equipment test for all electrical
Equipment’s.
Dec 2004-July2008: Maintenance Technician(E & M) (Innox Power Engineering (S) Pte, Ltd.)
Project: Sentosa Express Monorail Development Corporation, Singapore.
Main Contractor: Hitachi PlantTechnologyLtd
Singapore
Maintenance, Job Description SentosaExpress Monorail.
 Carry out maintenance of Sentosa Express (Monorail) Equipment and facilities being maintained are: 22KVSubstation,
1MVA Standby Generator.
 Uninterruptible Power Supply (UPS),Emergency Change over Switch (ECS) Track, Disconnecting Switch Panel(DSP),
Power Contact Lines, Communication equipment (Transponder),Wayside Electronic Marker, RTU-S, ATP &RB).
 Communication System (CentralRadio Equipment,PA system, SOS Telephone / Clock, Train Stop Button (ESB),Emergency
Train Stop (ETS), OCC Supervisory Control System (SCS).
Depot equipment:
 Maintenance Vehicle, Lifting Jack, Gantry Crane,Monorail Hoist, Scissor Lift, Tire Changer,Train Battery Charger and
Rescue Vehicle.
Depot control:
 Operator of Traverser, Maintenance Vehicle, Lifting Jack, Gantry Crane,Monorail Hoist, Scissor Lift, Tire Changer,
 Maintenance:
a) Track switch
b) Traverser
c) Car wash
d) Depot
e) Maintenance Vehicle
EDUCATION QUALAIFICATIONS
2015-2016 Specialist Diploma in Quantity surveyor (SDQS)
Global School of Technology’s & Management , Singapore
2010-2012 Master of Business Administration-Financial Management (MBA)
Annamalai University, Tamil Nadu, India.
1999-2002 Bachelor of Business Administration (BBA)
University of Madras, Tamil Nadu, India.
ADDITIONAL QUALIFICATIONS
Sep2013-Dec 2013 Auto CAD 2D & 3D modeling
G.Tec Computer Education Centre, Singapore.
Mar 2008-July 2008 Building Construction Supervisors Safety course
NTUC Learning Hub, Singapore.
COMPUTERSKILLS
Applications Auto CAD, QS pro constructor
Project Management MS Project
MS Office Word, Excel, Power Point, Access
Graphics Packages Photoshop, CorelDraw
PERSONALDETAILS
Age 35 Status Marriage
Nationality Indian Language English(fluent) and Tamil(native)
Availability Immediately Interests Sports, ReadingBook, &
News
REFEREERANCE
Mr. Mariano Glorionito Castillano(Greg)
Maintenance Engineer
SMRT Services
Tel: +6591731463
Email: marianoGC@smrt.com.sg
Mr. Somanath
Quantity Surveyor
NCL Building Construction Pte Ltd
Tel: +6591678075
Email: somanath2009@live.com

More Related Content

What's hot (20)

CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
Jason.Haraway, PE
Jason.Haraway, PEJason.Haraway, PE
Jason.Haraway, PE
 
CV 2016 .
CV 2016 .CV 2016 .
CV 2016 .
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1
 
DML CV 17
DML CV 17DML CV 17
DML CV 17
 
Purdel Faqeerzada Resume
Purdel Faqeerzada Resume Purdel Faqeerzada Resume
Purdel Faqeerzada Resume
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
7719 - CITY OF CHICAGO - ORD - Runway 10C-28C
7719 - CITY OF CHICAGO - ORD - Runway 10C-28C7719 - CITY OF CHICAGO - ORD - Runway 10C-28C
7719 - CITY OF CHICAGO - ORD - Runway 10C-28C
 
RAJPAL @cv
RAJPAL @cvRAJPAL @cv
RAJPAL @cv
 
updated CV Yacoub
updated CV Yacoubupdated CV Yacoub
updated CV Yacoub
 
Senior Level Assignment
Senior Level AssignmentSenior Level Assignment
Senior Level Assignment
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
cv mohamed mostafa 6
cv mohamed mostafa 6cv mohamed mostafa 6
cv mohamed mostafa 6
 
ARUN NARGUN
ARUN NARGUNARUN NARGUN
ARUN NARGUN
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
kenan Alnamous CV
kenan Alnamous CVkenan Alnamous CV
kenan Alnamous CV
 
Zupt Inertial Metrology - SUT / THS Subsea Metrology Seminar
Zupt Inertial Metrology - SUT / THS Subsea Metrology SeminarZupt Inertial Metrology - SUT / THS Subsea Metrology Seminar
Zupt Inertial Metrology - SUT / THS Subsea Metrology Seminar
 
KEVIN DAVID MORTON cv
KEVIN DAVID MORTON cvKEVIN DAVID MORTON cv
KEVIN DAVID MORTON cv
 
DTE Company Profile - May 2011
DTE Company Profile - May 2011DTE Company Profile - May 2011
DTE Company Profile - May 2011
 
RoyManncv5Link
RoyManncv5LinkRoyManncv5Link
RoyManncv5Link
 

Viewers also liked

7เทคนิคบริหารโครงการด้วยcpm pert
7เทคนิคบริหารโครงการด้วยcpm pert7เทคนิคบริหารโครงการด้วยcpm pert
7เทคนิคบริหารโครงการด้วยcpm pertpop Jaturong
 
The Best Measure Of Employee Experience
The Best Measure Of Employee ExperienceThe Best Measure Of Employee Experience
The Best Measure Of Employee ExperienceResilienceMentor.com
 
Management Leadership Development Programme
Management Leadership Development ProgrammeManagement Leadership Development Programme
Management Leadership Development Programmeguesta2a7e53
 
Optimal Design of Internal Induction Coils
Optimal Design of Internal Induction CoilsOptimal Design of Internal Induction Coils
Optimal Design of Internal Induction CoilsFluxtrol Inc.
 

Viewers also liked (6)

Docker
DockerDocker
Docker
 
7เทคนิคบริหารโครงการด้วยcpm pert
7เทคนิคบริหารโครงการด้วยcpm pert7เทคนิคบริหารโครงการด้วยcpm pert
7เทคนิคบริหารโครงการด้วยcpm pert
 
The Best Measure Of Employee Experience
The Best Measure Of Employee ExperienceThe Best Measure Of Employee Experience
The Best Measure Of Employee Experience
 
Management Leadership Development Programme
Management Leadership Development ProgrammeManagement Leadership Development Programme
Management Leadership Development Programme
 
Optimal Design of Internal Induction Coils
Optimal Design of Internal Induction CoilsOptimal Design of Internal Induction Coils
Optimal Design of Internal Induction Coils
 
CV Sapienza EN Jan 2016
CV Sapienza EN Jan 2016CV Sapienza EN Jan 2016
CV Sapienza EN Jan 2016
 

Similar to Resume

Similar to Resume (20)

CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
Sudarsang electrical designer
Sudarsang electrical designerSudarsang electrical designer
Sudarsang electrical designer
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 
Resume (10.08.16)
Resume (10.08.16)Resume (10.08.16)
Resume (10.08.16)
 
talhadiploma.doc
talhadiploma.doctalhadiploma.doc
talhadiploma.doc
 
CV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intCV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_int
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
Engr. Asim Mahmood CV
Engr. Asim Mahmood CVEngr. Asim Mahmood CV
Engr. Asim Mahmood CV
 
CV for Linkedin
CV for LinkedinCV for Linkedin
CV for Linkedin
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
Rajesh CV -
Rajesh CV - Rajesh CV -
Rajesh CV -
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
Naveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Curriculum vitae Project manager
Naveen Curriculum vitae Project manager
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 

Resume

  • 1. Chennappan Bhoopalan MBA & Quantity Surveying (Singapore) Blk195B, Punggol Singapore763861 Mobile:+65-91647514 Email: bhoopalan2ncl@gmail.com PROFESSIONALEXPERIENCE Aug 2016 Quantity Surveyor (NCL Building Construction Pte, Ltd) – Present Project: Changi East to Effect 3 Runway Operations At Singapore Changi Airport-Package 1 Main Contractor: Koh Brothers Building & Civil Engineering Contractor Pte Ltd. Contract Sum: $ 7,592,119.11 Singapore Aug 2015 Quantity Surveyor (NCL Building Construction Pte, Ltd) – Aug 2016 General Industrial Factory MK13 at 12 Woodlands Link (Sembawang Planning Area. Main Contractor: He Zhan Construction Pte, Ltd Contract Sum: $ 1,071,557.95 Singapore July 2013 Quantity Surveyor (NCL Building Construction Pte, Ltd) -July 2016 Project: Water Town, Punggol. Main Contractor: MA Builders Pte, Ltd Contract Sum: $11,996,713.00 Singapore Quantity Surveyor Achievement Preparing Monthly progress claim and discuss withConsultant Project Manager.  Certify Sub-contractors’ payment certificates for Archi and M&E works  Liaise with consultant quantity surveyor and submitting cost break down of VO’s.  Assist to contract manager to prepare letter of award /Letter of intent.  Coordinate with site team and purchase order  Preparing final accounts  Quantity take off, Material enquiries and call quotations for tender  Preparing tender documents for submission  Attend monthly site progress meeting & VO meeting PROFILE A hard- working, self-motivated, and adaptable Electricals & mechanical & Maintenance & Quantity Surveyor, with excellent organizational and team working skills and with 9 years’ experience. Capable of working without supervision and willing to assume additional responsibility, is looking for a position in an innovative, learning and challenging working environment that recognizes and fully utilizes my capabilities and competencies  Availableto starts immediately  Current Salary:$ 3500  Expected Salary: Negotiable
  • 2. August 2012 – Jun 2013 Quantity Surveyor (NCL Construction) Project: Fusinopolis 2a. Tower A & B. Main Contractor: GS Engineering & Constriction Pte, Ltd Contract Sum: $6,000,000. Quantity Surveyor Achievements:  Handling subcontractor Bills and payments  Costing and processing variations  Prepare final accounts and contract charges  Prepared cost reports  Measuring and recording site information  Review all the drawings and specifications supplied by client for quotation • Prepare Weekly Accomplishment Report and Monthly Progress Report. • Progress Claim o Preparation of GENCON monthly progress claim for Civil Structural and Architectural Works. o Reconcile Accomplishment (Progress Claim) with Construction Managers and Quantity Surveying Consultants. o Assesment and Evaluation of Subcontractors’ progress claim. • Material Procurement/ Subcontactor’s Account o Post Tender Quantity Take Off (Rehash) and compare with the Bill of Quantities. o Source and compilequotation and prepare cost analysis o Review and submit technical brochures with respect to the specifications. o Evaluate and compare suppliers’ cost proposals versus site budget. o Endorse suppliers with approved technical brochures and lowest cost proposal to the Head Office for negotiation and awarding. o Monitoring of down payment and material delivery. o Reconcile subcontractors’ Variation Order and endorse for revision of Purchase Order. o Monitor supplier/subcon progress until completion of works. o Processing Variation Orders/ Change Orders Claims o Preapare Quantity Take Off for revised and/or additional works. o Reconcile quantities and cost of VO with the Owner’s Representative. o Prepare documents for the approved/reconciled variation order. • Prepare charges/deductions to subcontractors. • Monitor Productivity Rate (Concreting, Rebar Works, Formworks, Architectural Works, etc.) July 2008-Dec 2009 Electrical & Mechanical Senior Supervisor (Hitachi Plant Technology Ltd) Project: Palm Jumeirah Monorail Main Contractor: Marubeni Corporation Dubai(UAE)  He Responsibilities Involved: Experience in installation of power equipment’s like panelboards, Switchgear, Transformers and cable laying etc.  Experience in Extra High Voltage A.C /D. C Transmission  Panelboard reading observation and corrective actions.  To perform the original drawings, prepare and submit the as-built drawings for the above project.  ATP Signal: a) Installation of ATP Box b) Signal Cable Laying & Termination c) Track switches Signal Cabling & Termination. d) Fiber optical cable laying to OCMK Panel e) F.O. PATCH CORD Cable for OCMK Panel  Power Contact Lines: a) Installation of insulator-shaped copper conductor, expansion joint, wire mesh. b) FRP Plate, Jumper Cable, DC Cable pulling, Termination & Megger Test c) Installation & Cable Termination of Bogie drop, Transverse & Shunting unit. d) Installation of Scissor Lift, Fork Lift, Gantry Crane & Monorail Hoist.  Analog Telephone: a) Installation of Telephone, cable laying &Termination. b) Installation of G.I conduit, Trucking, Cable Ladder, Cable Tray. 11 KV Substations  Installation & Maintenance of 11kV Substation, 1MVA Standby Generator, Uninterruptible Power Supply (UPS), Emergency Change over Switch (ECS).  Cable Pulling (10 Sq.mm up to 300 Sq.mm)  Experience in Extra High Voltage A.C /D. C Transmission
  • 3.  CCTV. a) Installation and cable laying for CCTV. b) Installation and Cable laying for camera c) F.O PATCH CORD Cable Laying d) PATCHCORD CAT 6 UTP SNAG PROOP Cable Laying for CCTV Panel Antennae  Installation and cable pulling for Antennae.  Equipment grounding termination, grounding copper plate cable termination and grounding concrete pit installation.  Conduct Megger Test for high and low power cables  Testing for Earth Resistance, continuity test and Earth equipment test for all electrical Equipment’s. Dec 2004-July2008: Maintenance Technician(E & M) (Innox Power Engineering (S) Pte, Ltd.) Project: Sentosa Express Monorail Development Corporation, Singapore. Main Contractor: Hitachi PlantTechnologyLtd Singapore Maintenance, Job Description SentosaExpress Monorail.  Carry out maintenance of Sentosa Express (Monorail) Equipment and facilities being maintained are: 22KVSubstation, 1MVA Standby Generator.  Uninterruptible Power Supply (UPS),Emergency Change over Switch (ECS) Track, Disconnecting Switch Panel(DSP), Power Contact Lines, Communication equipment (Transponder),Wayside Electronic Marker, RTU-S, ATP &RB).  Communication System (CentralRadio Equipment,PA system, SOS Telephone / Clock, Train Stop Button (ESB),Emergency Train Stop (ETS), OCC Supervisory Control System (SCS). Depot equipment:  Maintenance Vehicle, Lifting Jack, Gantry Crane,Monorail Hoist, Scissor Lift, Tire Changer,Train Battery Charger and Rescue Vehicle. Depot control:  Operator of Traverser, Maintenance Vehicle, Lifting Jack, Gantry Crane,Monorail Hoist, Scissor Lift, Tire Changer,  Maintenance: a) Track switch b) Traverser c) Car wash d) Depot e) Maintenance Vehicle
  • 4. EDUCATION QUALAIFICATIONS 2015-2016 Specialist Diploma in Quantity surveyor (SDQS) Global School of Technology’s & Management , Singapore 2010-2012 Master of Business Administration-Financial Management (MBA) Annamalai University, Tamil Nadu, India. 1999-2002 Bachelor of Business Administration (BBA) University of Madras, Tamil Nadu, India. ADDITIONAL QUALIFICATIONS Sep2013-Dec 2013 Auto CAD 2D & 3D modeling G.Tec Computer Education Centre, Singapore. Mar 2008-July 2008 Building Construction Supervisors Safety course NTUC Learning Hub, Singapore. COMPUTERSKILLS Applications Auto CAD, QS pro constructor Project Management MS Project MS Office Word, Excel, Power Point, Access Graphics Packages Photoshop, CorelDraw PERSONALDETAILS Age 35 Status Marriage Nationality Indian Language English(fluent) and Tamil(native) Availability Immediately Interests Sports, ReadingBook, & News REFEREERANCE Mr. Mariano Glorionito Castillano(Greg) Maintenance Engineer SMRT Services Tel: +6591731463 Email: marianoGC@smrt.com.sg Mr. Somanath Quantity Surveyor NCL Building Construction Pte Ltd Tel: +6591678075 Email: somanath2009@live.com