3. NOx Formation
Nitrogen Oxides are formed when
nitrogen from the fuel and / or
combustion air is combined with
oxygen during combutsion
NOx formation increases with:
Fuel Nitrogen Level
Amount of Air available for
combustion
The combustion temperature
8. Selective Catalytic Reduction (SCR)
Requires a catalyst and a reducing
agent
Technology has been around for many
years
Patented by Englehard Corp. in 1957
First large scale installed by IHI in 1978
Is widely used in coal fired utilities
Is also commonly used in some
automobile and truck exhaust systems
10. Why Chose SCR over SNCR ?
Pros
Higher level of NOx
reduction
Lower level of
ammonia slip
Utilizes ammonia
coming from raw
materials
Cons
Much higher
investment cost
Higher operating
costs
More down time
Larger footprint
required
Difficult to retrofit
12. The Raw Mill Area
Preheater
Exhaust
300 – 400 oC
80 – 120 g/m3
Raw Mill
Exhaust
90 – 100 oC
10 – 20 mg/Nm3
13. Solnhofen - Germany
Equipment: Lurgi – GEA
Bischoff
Arrangement: High Dust
Kiln System: Preheater
Installed 2001
Catalyst Supplier: KWH
Operating Temp 320 – 340 oC
Layers Designed: 6
Layers Used: 3
Dust Loading: 80 – 100 g/Nm3
NOx In Design: 1050 mg/Nm3
NOx Out Design: 200 mg/Nm3
Aqueous Ammonia
Ammonia Slip: <1 mg/Nm3
(test)
Taken out of service in 2006, as
SNCR could meet permit
requirements
14. So What About the Dust ?
The catalyst needs to be in contact with the
NOx and Reducing agent
This requires a large surface area
Large surface areas requires smaller
openings between catalyst layers
Small Openings get plugged with dust
Coal Utilities operate at 10 – 20 gms/Nm3
Solnhofen operated at 80 – 100 gms/Nm3
15. Coal Fired Power Plant SCR
C-Flyash
SiO2
CaO Al2O3
OPC
F-Flyash
No Popcorn,
But ……
High CaO =>
CaSO4
Its Sticky
23. Joppa – USA
Equipment: Elex Cemcat
Kiln System: Long Dry w/ ESP
To be installed: July 2013
24. Logansport – IN, USA
Slipstream Test
Kiln System: Long Wet
Arrangement: Clean Side
To be installed: July 2013
25. Rezatto - Italy
SCR Technology to be
installed as part of a
plant upgrade project
Arrangement: High
Dust
Installation to be
complete by 2015
Reduction in NOx and
ammonia emissions
targeted
26. 1996 – 1998
Slip Stream
Tests
Germany,
Austria,
Sweden, & Italy
2001 – 2006
Full Scale,
High Dust SCR
Solnhofen,
Germany
Jun-06 Full
Scale High
Dust SCR
Monselice,
Italy
Jan-07 Full
Scale High
Dust SCR
Sarche, Italy
Apr-10 Full
Scale High
Dust SCR
Mergelstetten,
Germany
Mar-11 Full
Scale Clean
SCR
Rohrdorf,
Germany
Apr-12 Full Scale
Semi-Clean SCR
Mannersdorf,
Austria
Jul-13 Full Scale
Semi-Clean SCR
Grand Chain, Il,
USA
Jul-13
Slip Stream
Clean SCR
Logansport, IN,
USA
2015 Full
Scale High
Dust SCR,
Rezatto, Italy
SCR Installation Timeline
27. Game Changers
Tighter NOx Emissions Limits
(Europe <200 mg/m3)
Low Temperature Catalyst Development
(+/- 100 oC)
Tighter Ammonia Limits
(Europe 5 – 10 mg/m3)
Plus ???