Generally there are 'THREE' Factors are involved for the Fire Causes. They
are"
I) Accidental.
II) Natural.
III) Incendiary.
Comparing 'THREE', the most dangerous one is 'ACCIDENTAL'. Here
Electricity plays major role for the Fire Accident most of the Times.
There are 'THREE' Elements must be present, for a 'FIRE' to initiate. These
are Oxygen, Fuel and Heat. Electricity Plays major role to provide 'HEAT'
most of the Times.
SOURCES for the 'HEAT' in the 'ELECTRICAL SYSTEMS' :
Most of the Time, Fire happens in the Electrical Panels, Which we observed
from the Existing Cases. So it is better to mention that, Sources for the
'HEAT' in the Electrical Panels.
a) SHORT CIRCUIT.
b) OVER LOAD.
c) POOR QUALITY IN EARTHING DESIGN.
d) ABSENCE OF VENTILATION IN THE PANELS.
e) POOR QUALITY IN DESIGNING. [Ex. Under Sized Cables].
Anything else apart from the Above,...........................................Yes. That
Source should be Top in the above list.
What is that 'Important Factor'??... It is none other than 'UNDER SIZED
BUSBAR IN THE PANELS'...
This Article Gives Clear Picture of 'BUSBAR SIZING CALCULATION' and
What Care We should have to take 'Sizing of Busbar'. Here I will like to
describe Busbar Sizing of LT & HT Panel System. While This Methodology
doesn't have any relation with 'CALCULATION OF CONDUCTOR BUS
SIZING [ACSR]' for the Switch yard Projects. Both Calculations having
different Steps & Procedure to find Final Results.
The 'Electrical Design Engineer' Should have in-depth knowledge of 'Sizing
of BUSBAR for the Electrical Panels [Both HT & LT]. I have seen many times
in my past experience, Most of the Engineers doing Busbar Sizing
Calculation by 'Thumb Rule' Method, Even though Some of the Senior
Engineers in the Consultant offices & Leading Panel Fabricator will Practice
the Same 'THUMB RULE' method.
There are methods are exist in the world, To determine Proper sizing of
Busbar for the Electrical Systems. People not have that much Patience for
the Practicing Calculation. Now Software available to determine Proper Size
of Busbar for the panels. I would like to add more inputs in this article,
which I had experienced in my past years.
THUMB Rule for Busbar :
For Aluminium : 0.7 Amps / 1 Sq.mm of Bar.
For Copper : 1.2 Amps / 1 Sq.mm of Copper.
Here the above mentioned rules are not standard. Because some case people
will add Tolerance in the Positive End. i.e They used 0.75 Amps / 1 Sq.mm
of Bar & 1.4 Amps / 1 Sq.mm for Aluminium & Copper Respectively.
The Cost of the Aluminium bar in the Market based on the Quality. While
Practicing 'THUMB' Rule people should aware the Quality Standards of
Aluminium & Copper Bar. Sometimes we didn't aware the bar Quality which
is used by the fabricator in the Panel. Panel Fabricators should not take
responsible in case Panel gets fire due to the Busbar Under Sized. It will
directly hit EPC Contractor Market Value in the Industry.Also it leads to
Black Mark in their Industry. He should have to answer Client, Electrical
Inspectorate & Consultant. So People should take More Care for Busbar
Sizing for both LT & HT Panels.
I would like to share one of the Example I experienced in my past.
Consultant given Busbar Size for the Main MV Panel. [That Panel should
cater 10 MW of Power of the IT Building, Panel gets power from 3
Transformers & 6 Generators]. Panel should capable to Carry 6300A.
Busbar Size Should be Equal or More than of 6300A. Consultant
Recommended Busbar Size based on the 'THUMB Rule' We noticed, Busbar
Size is Low to Carry 6300A. Consultant Challenged Contractor that, His
recommended Size of Busbar will carry full load Current, then Contractor
approached 'CPRI Testing for their internal verification. Finally Busbar gets
melted when it carried full load Current [6300A] for the interval 1 Minute.
Here it is not the case for the carrying Short Circuit Current. If Busbar
doesn't able to carry the Full Load Current, then how it will carry Short
Circuit Current for the Second.???
After that we will fabricate the Panel with Proper Sizing of busbar which we
derived from the Proper Calculation. In some cases people only practicing
Calculation with only consider the 'K' Factors. There is formula exist apart
from the 'K' Factors.
The Design Engineer should consider the following points while doing
'BUSBAR SIZING CALCULATION':
 Adequate minimum required clearance between Phases and Phase to
Earth.
 Selection of Adequate Busbar Insulator Standoffs.
 Bolting Arrangements for Continuous Busbar Connections.
 Thermal Effects on Busbar and Insulator Standoffs under normal and
Fault conditions.
 Electrodynamic Forces applied to Busbars and Insulator Standoffs
under Fault Conditions.
 Avoidance of mechanical resonance under normal operating and Fault
Conditions.
TEMPERATURE RISE:
Maximum Permissible Temperature Rise for bolt - connected devices,
including busbars
Source Reference : IEC 62271 - 1
Co-Efficient Factors 'K' :
The Total 'K' Factor derived from Six 'K' factors, which is listed below :
K = K1 x K2 x K3 x K4 x K5 x K6
K1 is a Function of the Number of Bars per Phase and their space.
K2 is Corresponds to the Surface Finish of the Busbars.
K3 is a Function of the Mounting Arrangement.
K4 is a Function of the Installed Location.
K5 is a Function of any Artificial Ventilation.
K6 is a Function of the Type of Current.
Busbar Clearances as per IS : 4237 - 1967
Example :
Transformer Rating : 11 / 0.433 kv, 800 kVA Transformer. What is the
recommendable size of Copper Busbar in the LT Panel ??
If we consider 80 x 10 mm of Copper Bar, How many bars required to carry
full load current of Transformer Secondary End ?
Transformer Secondary Full load Current = 1066.72A,
Breaker Size Needed = 1250A. [Either ACB or MCCB]
According to Thumb Rule,
For Copper : 1.2 Amps / 1 Sq.mm of Copper.
for the Area 800 Sq.mm [80 x 10 mm], Current Carrying Capacity will be
960A.., Then additional one Run of Busbar needed to carry the Current of
1067A.
According to the Formula as per IEC 62271 - I
K = K1 x K2 x K3 x K4 x K5 x K6
K = 1 x 1 x 1 x 0.8 x 1 x 1 = 0.8
According to the Main Formula, Derived Value will be = 1547A
Rated Current = 0.8 x 1547 A = 1238 A
Conclusion:
To Carry the Current of 1067 A, One Run of 80 x 10 mm of Copper Bar
is enough.
Jay Ranvir
Chemtrols Solar Pvt. Ltd.
Amar Hill, Saki Vihar Road,
Powai, Mumbai - 400 072
Tel: (+91-22) 67151 331
Cell No.: +91 9594998390
E-Mail -: jay.ranvir@chemtrolssolar.com
Web: www.chemtrolssolar.com

More Related Content

What's hot

Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformerKapil Singh
 
Load Distribution
Load DistributionLoad Distribution
Load DistributionArpit Gupta
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design) SayanSarkar55
 
Underground Cables.pptx
Underground Cables.pptxUnderground Cables.pptx
Underground Cables.pptxkarthik prabhu
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protectionashwin fcc
 
Ppt of current transformer
Ppt of current transformerPpt of current transformer
Ppt of current transformerROOPAL PANCHOLI
 
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...Jobin Abraham
 
Design and construction of underground cable transmission line
Design and construction of underground cable transmission lineDesign and construction of underground cable transmission line
Design and construction of underground cable transmission lineFazlur Rahman
 
Circuit interruption
Circuit interruptionCircuit interruption
Circuit interruptionjawaharramaya
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in briefMuthar Hussain
 
Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology wessam alaslmi
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer ProtectionAng Sovann
 

What's hot (20)

Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
 
Load Distribution
Load DistributionLoad Distribution
Load Distribution
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
 
Underground Cables.pptx
Underground Cables.pptxUnderground Cables.pptx
Underground Cables.pptx
 
Underground cables (1)
Underground cables  (1)Underground cables  (1)
Underground cables (1)
 
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
BUS BAR  PROTECTION PPT BY:-R.K.PANDITBUS BAR  PROTECTION PPT BY:-R.K.PANDIT
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
Ppt of current transformer
Ppt of current transformerPpt of current transformer
Ppt of current transformer
 
Ac distribution
Ac distributionAc distribution
Ac distribution
 
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
 
Design and construction of underground cable transmission line
Design and construction of underground cable transmission lineDesign and construction of underground cable transmission line
Design and construction of underground cable transmission line
 
Circuit interruption
Circuit interruptionCircuit interruption
Circuit interruption
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in brief
 
Busbar design
Busbar designBusbar design
Busbar design
 
Circuit breakers
Circuit breakers Circuit breakers
Circuit breakers
 
Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology
 
IEEE substation design
IEEE substation designIEEE substation design
IEEE substation design
 
Load list calculation
Load list calculationLoad list calculation
Load list calculation
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 

Similar to Busbar sizing

Hts transformer
Hts transformerHts transformer
Hts transformerARGHA SAHA
 
X over r discussion
X over r discussionX over r discussion
X over r discussionHimmelstern
 
Presentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformerPresentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformerSMDDTech
 
Overhead Circuit Design
Overhead Circuit DesignOverhead Circuit Design
Overhead Circuit Designki hei chan
 
EE315a_design_project
EE315a_design_projectEE315a_design_project
EE315a_design_projectTamer Riad
 
INDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATIONINDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATIONArgha Dutta
 
Circuit Breaker: Part 2
Circuit Breaker: Part 2Circuit Breaker: Part 2
Circuit Breaker: Part 2Dr. Rohit Babu
 
Transformers in Power Distribution Networks
Transformers in Power Distribution NetworksTransformers in Power Distribution Networks
Transformers in Power Distribution NetworksLeonardo ENERGY
 
How to reduced transformer losses report
How to reduced transformer losses reportHow to reduced transformer losses report
How to reduced transformer losses reportkamal soni
 
Computer Simulation of a Heat Exchanger using Aspen
Computer Simulation of a Heat Exchanger using AspenComputer Simulation of a Heat Exchanger using Aspen
Computer Simulation of a Heat Exchanger using AspenAli Raza
 
Tibre table of contents
Tibre table of contentsTibre table of contents
Tibre table of contentsxquitah
 
Lecture 1_Reactive Elements-1 like inductorand capacitor .pdf
Lecture 1_Reactive Elements-1 like inductorand capacitor .pdfLecture 1_Reactive Elements-1 like inductorand capacitor .pdf
Lecture 1_Reactive Elements-1 like inductorand capacitor .pdfsuhailcg11
 

Similar to Busbar sizing (20)

Hts transformer
Hts transformerHts transformer
Hts transformer
 
X over r discussion
X over r discussionX over r discussion
X over r discussion
 
28-shaw_presentation.ashx
28-shaw_presentation.ashx28-shaw_presentation.ashx
28-shaw_presentation.ashx
 
Presentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformerPresentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformer
 
Low voltage circuit breakers
Low voltage circuit breakersLow voltage circuit breakers
Low voltage circuit breakers
 
Hpc new
Hpc newHpc new
Hpc new
 
Ee 2355 dem (1)
Ee 2355 dem (1)Ee 2355 dem (1)
Ee 2355 dem (1)
 
Overhead Circuit Design
Overhead Circuit DesignOverhead Circuit Design
Overhead Circuit Design
 
Ijetr011742
Ijetr011742Ijetr011742
Ijetr011742
 
Busbar Design
Busbar Design Busbar Design
Busbar Design
 
EE315a_design_project
EE315a_design_projectEE315a_design_project
EE315a_design_project
 
c4interc
c4intercc4interc
c4interc
 
INDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATIONINDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATION
 
Circuit Breaker: Part 2
Circuit Breaker: Part 2Circuit Breaker: Part 2
Circuit Breaker: Part 2
 
GUIDE TO OVERALL OVERHEAD LINE DESIGN
GUIDE TO OVERALL OVERHEAD LINE  DESIGNGUIDE TO OVERALL OVERHEAD LINE  DESIGN
GUIDE TO OVERALL OVERHEAD LINE DESIGN
 
Transformers in Power Distribution Networks
Transformers in Power Distribution NetworksTransformers in Power Distribution Networks
Transformers in Power Distribution Networks
 
How to reduced transformer losses report
How to reduced transformer losses reportHow to reduced transformer losses report
How to reduced transformer losses report
 
Computer Simulation of a Heat Exchanger using Aspen
Computer Simulation of a Heat Exchanger using AspenComputer Simulation of a Heat Exchanger using Aspen
Computer Simulation of a Heat Exchanger using Aspen
 
Tibre table of contents
Tibre table of contentsTibre table of contents
Tibre table of contents
 
Lecture 1_Reactive Elements-1 like inductorand capacitor .pdf
Lecture 1_Reactive Elements-1 like inductorand capacitor .pdfLecture 1_Reactive Elements-1 like inductorand capacitor .pdf
Lecture 1_Reactive Elements-1 like inductorand capacitor .pdf
 

More from Jay Ranvir

Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policyJay Ranvir
 
Open access mp
Open access mpOpen access mp
Open access mpJay Ranvir
 
Profile on the production retreaded tyre
Profile on the production retreaded tyreProfile on the production retreaded tyre
Profile on the production retreaded tyreJay Ranvir
 
Tyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessTyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessJay Ranvir
 
Open Access Charges Rajasthan
Open Access Charges RajasthanOpen Access Charges Rajasthan
Open Access Charges RajasthanJay Ranvir
 
Response to msedcl demands
Response to msedcl demandsResponse to msedcl demands
Response to msedcl demandsJay Ranvir
 
Practice directions rts net metering regulations 2015
Practice directions  rts  net metering regulations 2015Practice directions  rts  net metering regulations 2015
Practice directions rts net metering regulations 2015Jay Ranvir
 
Ppa agreement draft
Ppa agreement draftPpa agreement draft
Ppa agreement draftJay Ranvir
 
Notified f &s regulations 2018
Notified f &s  regulations 2018Notified f &s  regulations 2018
Notified f &s regulations 2018Jay Ranvir
 
Detailed comparison of capex vs opex
Detailed comparison of capex vs opexDetailed comparison of capex vs opex
Detailed comparison of capex vs opexJay Ranvir
 
Plastics to oil report
Plastics to oil reportPlastics to oil report
Plastics to oil reportJay Ranvir
 
Detail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantDetail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantJay Ranvir
 
Model ppa for renewable energy sources
Model ppa for renewable energy sourcesModel ppa for renewable energy sources
Model ppa for renewable energy sourcesJay Ranvir
 
Verification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationVerification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationJay Ranvir
 
Short term open access status for march 17
Short term open access status for march 17Short term open access status for march 17
Short term open access status for march 17Jay Ranvir
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)Jay Ranvir
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)Jay Ranvir
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyJay Ranvir
 
Ppa model presentation
Ppa model presentationPpa model presentation
Ppa model presentationJay Ranvir
 

More from Jay Ranvir (20)

Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policy
 
Open access mp
Open access mpOpen access mp
Open access mp
 
Profile on the production retreaded tyre
Profile on the production retreaded tyreProfile on the production retreaded tyre
Profile on the production retreaded tyre
 
Tyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessTyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading Process
 
Ch21
Ch21Ch21
Ch21
 
Open Access Charges Rajasthan
Open Access Charges RajasthanOpen Access Charges Rajasthan
Open Access Charges Rajasthan
 
Response to msedcl demands
Response to msedcl demandsResponse to msedcl demands
Response to msedcl demands
 
Practice directions rts net metering regulations 2015
Practice directions  rts  net metering regulations 2015Practice directions  rts  net metering regulations 2015
Practice directions rts net metering regulations 2015
 
Ppa agreement draft
Ppa agreement draftPpa agreement draft
Ppa agreement draft
 
Notified f &s regulations 2018
Notified f &s  regulations 2018Notified f &s  regulations 2018
Notified f &s regulations 2018
 
Detailed comparison of capex vs opex
Detailed comparison of capex vs opexDetailed comparison of capex vs opex
Detailed comparison of capex vs opex
 
Plastics to oil report
Plastics to oil reportPlastics to oil report
Plastics to oil report
 
Detail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantDetail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plant
 
Model ppa for renewable energy sources
Model ppa for renewable energy sourcesModel ppa for renewable energy sources
Model ppa for renewable energy sources
 
Verification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationVerification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligation
 
Short term open access status for march 17
Short term open access status for march 17Short term open access status for march 17
Short term open access status for march 17
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind Energy
 
Ppa model presentation
Ppa model presentationPpa model presentation
Ppa model presentation
 

Recently uploaded

Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Recently uploaded (20)

Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 

Busbar sizing

  • 1. Generally there are 'THREE' Factors are involved for the Fire Causes. They are" I) Accidental. II) Natural. III) Incendiary. Comparing 'THREE', the most dangerous one is 'ACCIDENTAL'. Here Electricity plays major role for the Fire Accident most of the Times. There are 'THREE' Elements must be present, for a 'FIRE' to initiate. These are Oxygen, Fuel and Heat. Electricity Plays major role to provide 'HEAT' most of the Times. SOURCES for the 'HEAT' in the 'ELECTRICAL SYSTEMS' : Most of the Time, Fire happens in the Electrical Panels, Which we observed from the Existing Cases. So it is better to mention that, Sources for the 'HEAT' in the Electrical Panels. a) SHORT CIRCUIT. b) OVER LOAD. c) POOR QUALITY IN EARTHING DESIGN. d) ABSENCE OF VENTILATION IN THE PANELS. e) POOR QUALITY IN DESIGNING. [Ex. Under Sized Cables]. Anything else apart from the Above,...........................................Yes. That Source should be Top in the above list. What is that 'Important Factor'??... It is none other than 'UNDER SIZED BUSBAR IN THE PANELS'... This Article Gives Clear Picture of 'BUSBAR SIZING CALCULATION' and What Care We should have to take 'Sizing of Busbar'. Here I will like to describe Busbar Sizing of LT & HT Panel System. While This Methodology doesn't have any relation with 'CALCULATION OF CONDUCTOR BUS SIZING [ACSR]' for the Switch yard Projects. Both Calculations having different Steps & Procedure to find Final Results. The 'Electrical Design Engineer' Should have in-depth knowledge of 'Sizing of BUSBAR for the Electrical Panels [Both HT & LT]. I have seen many times in my past experience, Most of the Engineers doing Busbar Sizing Calculation by 'Thumb Rule' Method, Even though Some of the Senior
  • 2. Engineers in the Consultant offices & Leading Panel Fabricator will Practice the Same 'THUMB RULE' method. There are methods are exist in the world, To determine Proper sizing of Busbar for the Electrical Systems. People not have that much Patience for the Practicing Calculation. Now Software available to determine Proper Size of Busbar for the panels. I would like to add more inputs in this article, which I had experienced in my past years. THUMB Rule for Busbar : For Aluminium : 0.7 Amps / 1 Sq.mm of Bar. For Copper : 1.2 Amps / 1 Sq.mm of Copper. Here the above mentioned rules are not standard. Because some case people will add Tolerance in the Positive End. i.e They used 0.75 Amps / 1 Sq.mm of Bar & 1.4 Amps / 1 Sq.mm for Aluminium & Copper Respectively. The Cost of the Aluminium bar in the Market based on the Quality. While Practicing 'THUMB' Rule people should aware the Quality Standards of Aluminium & Copper Bar. Sometimes we didn't aware the bar Quality which is used by the fabricator in the Panel. Panel Fabricators should not take responsible in case Panel gets fire due to the Busbar Under Sized. It will directly hit EPC Contractor Market Value in the Industry.Also it leads to Black Mark in their Industry. He should have to answer Client, Electrical Inspectorate & Consultant. So People should take More Care for Busbar Sizing for both LT & HT Panels. I would like to share one of the Example I experienced in my past. Consultant given Busbar Size for the Main MV Panel. [That Panel should cater 10 MW of Power of the IT Building, Panel gets power from 3 Transformers & 6 Generators]. Panel should capable to Carry 6300A. Busbar Size Should be Equal or More than of 6300A. Consultant Recommended Busbar Size based on the 'THUMB Rule' We noticed, Busbar Size is Low to Carry 6300A. Consultant Challenged Contractor that, His recommended Size of Busbar will carry full load Current, then Contractor approached 'CPRI Testing for their internal verification. Finally Busbar gets melted when it carried full load Current [6300A] for the interval 1 Minute. Here it is not the case for the carrying Short Circuit Current. If Busbar doesn't able to carry the Full Load Current, then how it will carry Short Circuit Current for the Second.??? After that we will fabricate the Panel with Proper Sizing of busbar which we derived from the Proper Calculation. In some cases people only practicing Calculation with only consider the 'K' Factors. There is formula exist apart from the 'K' Factors.
  • 3. The Design Engineer should consider the following points while doing 'BUSBAR SIZING CALCULATION':  Adequate minimum required clearance between Phases and Phase to Earth.  Selection of Adequate Busbar Insulator Standoffs.  Bolting Arrangements for Continuous Busbar Connections.  Thermal Effects on Busbar and Insulator Standoffs under normal and Fault conditions.  Electrodynamic Forces applied to Busbars and Insulator Standoffs under Fault Conditions.  Avoidance of mechanical resonance under normal operating and Fault Conditions. TEMPERATURE RISE: Maximum Permissible Temperature Rise for bolt - connected devices, including busbars Source Reference : IEC 62271 - 1 Co-Efficient Factors 'K' : The Total 'K' Factor derived from Six 'K' factors, which is listed below : K = K1 x K2 x K3 x K4 x K5 x K6 K1 is a Function of the Number of Bars per Phase and their space. K2 is Corresponds to the Surface Finish of the Busbars. K3 is a Function of the Mounting Arrangement. K4 is a Function of the Installed Location. K5 is a Function of any Artificial Ventilation. K6 is a Function of the Type of Current.
  • 4. Busbar Clearances as per IS : 4237 - 1967 Example : Transformer Rating : 11 / 0.433 kv, 800 kVA Transformer. What is the recommendable size of Copper Busbar in the LT Panel ?? If we consider 80 x 10 mm of Copper Bar, How many bars required to carry full load current of Transformer Secondary End ? Transformer Secondary Full load Current = 1066.72A, Breaker Size Needed = 1250A. [Either ACB or MCCB] According to Thumb Rule, For Copper : 1.2 Amps / 1 Sq.mm of Copper. for the Area 800 Sq.mm [80 x 10 mm], Current Carrying Capacity will be 960A.., Then additional one Run of Busbar needed to carry the Current of 1067A. According to the Formula as per IEC 62271 - I K = K1 x K2 x K3 x K4 x K5 x K6 K = 1 x 1 x 1 x 0.8 x 1 x 1 = 0.8 According to the Main Formula, Derived Value will be = 1547A Rated Current = 0.8 x 1547 A = 1238 A
  • 5. Conclusion: To Carry the Current of 1067 A, One Run of 80 x 10 mm of Copper Bar is enough. Jay Ranvir Chemtrols Solar Pvt. Ltd. Amar Hill, Saki Vihar Road, Powai, Mumbai - 400 072 Tel: (+91-22) 67151 331 Cell No.: +91 9594998390 E-Mail -: jay.ranvir@chemtrolssolar.com Web: www.chemtrolssolar.com