1. Resume
Anjani kumar
Mobile No.: 09752868773,
E-Mail: anjanikumar2287@gmail.com
Anjani.kushwaha@external.cnhind.com
Job Objective
To grow with an organization through pursuing Quality Assurance & Control activities where I can utilize my skills to
meet derived Quality targets through amendment of continuous improvement to enable myself to respond to various
challenge.
Profile Summary
· A competent professional with over 6 .6 years of experience in:
Technical skills
o CORE COMPETENCY: CMM[Co-ordinate Measuring Machine], Layout Inspection & Measuring Instruments
o ROOT CAUSES IDENTIFICATION & PROBLEM SOLVING: 5W+1H, Why-Why, Fishbone Diagram.
o CONTINUOUS IMPROVEMENT: WCM PPAP & Kaizen
o SOFTWARES: MS SUIT (EXCEL, Power point, Word & Outlook), cam2 measure[FARO]
Organizational Experience
Since July 2014 to Continue Working with CASE NEW HOLLAND
CONSTRUCTION EQUIPMENT INDIA LTD. www.cnhindustrial.com
CMM[Co-ordinate Measuring Machine] Development / Quality Assurance
DESIGNATION: - Quality Engineer
Role:
Quality Implementation
o Programming in FARO CMM [Co-ordinate Measuring Machine] for inspection.
o Responsible for sample and layout inspection, conducting the product and process audit and present the
reports.
o Monitoring and inspection of all in house making structures and incoming parts.
o New Product quality & development (Chassis. Loader Arm, Boom, Dipper, Brackets, Deflector Plates,
Clamps).
o Weld penetration, DPT for cracks, Oil contamination tester and Surface roughness tester.
o Verification of CAPA taken against line complaints through audit at supplier end.
o Follow up of supplier for quality related issue.
o Taking stringent quality measures including preparation / maintenance of necessary documents to ensure
CMM[Co-ordinate Measuring Machine] Quality Assurance Process/Fixture Calibration
Project Operations WCM & HERCA System Implementation Testing
Process Audits Fabrication Welding Coordination /Auditing Wastage Minimization
2. compliance with above standards & customer requirements
o Resolving all customer complaints; taking timely corrective & preventive actions and preventing the
recurrence
Project Involved
o PROJECT CODE - TBCR-10
o MODEL NAME - 851
o DURATION - 2015-2016
o Role - C.F.T. -[Cross Functional Team]
o Team Size - 20 Member
INVOLVEMENT - As Part of C.F.T. Giving quality & Functional status of parts in meeting, Inspection of
Development parts as per drawing / standard requirements,
o PROJECT CODE - TB-80
o MODEL NAME - 770
o DURATION - 2015-2016”
o Role - C.F.T. -[Cross Functional Team]
o Team Size - 20 Member
INVOLVEMENT - As Part of C.F.T. Giving quality & Functional status of parts in meeting, Inspection of
Development parts as per drawing / standard requirements,
o PROJECT CODE - 23
o MODEL NAME - 752
o DURATION - 2014-2015
o Role - C.F.T. -[Cross Functional Team]
o Team Size - 12 Member
INVOLVEMENT: - Giving quality status of parts in meeting, Inspection of Development parts as per drawing /
standard requirements, Prepared the Inspection plan as per Received Components. PIR’s closing thru seven step process,
Communicate with vendor’s for problem resolution.
o PROJECT CODE - 20
o MODEL NAME - 1107 DX
o DURATION - 2014-2015
o Role - C.F.T. -[Cross Functional Team]
o Team Size - 09 Member
INVOLVEMENT: - Giving quality status of parts in meeting, Inspection of Development parts as per drawing / standard
requirements, Prepared the Inspection plan as per Received Components. PIR’s closing thru seven step process,
Communicate with vendor’s for problem resolution.
Quality Assurance & Testing
o Developing quality control set up to ensure quality of product and process at all processing stages
o Reviewing the operational practices, identifying the areas of obstruction / quality failures for implementing
appropriate system and process change for qualitative & quantities improvement
o Implementing Kaizen practices for optimizing resource utilization and maximizing productivity
o Planning & setting of processing & inspection facilities
o Ensuring tests and procedures are properly understood, carried out and evaluated
o Conducting root cause analysis of internal operations & customer complaints & taking corrective measures
o Controlling in-process and final inspection activities. Reviewing the disposal of the non-conforming products
Team Management
3. o Leading, mentoring & monitoring the performance of team members to ensure efficiency in process
operations in order to maintain Quality policy and achieve Quality objectives of the company
o Creating and sustaining a dynamic environment that fosters development opportunities and motivates high
performance amongst team members
Testing Engineer PDD Parm Technologies Pvt. Ltd. To Business partner of VE Commercial
Vehicles Ltd. www.vecv.in
Role since July 2013 to July 2014
o Application Installation & up gradation
o Data analysis and report preparation
o Proto part availability review
o Root cause analysis to any field failures
o New Development of vehicle
o Tress and travel with vehicle
o Prototype part manufacturing (sheet metal work, fabrication work)
o Raw Material Planning & manpower handling for production
o Inspection of development items.
o Daily defect analysis, reported from Field, Customers and to take corrective and preventive actions for the
same.
paint shop Quality / Production Hi-Tech metal forming Pvt. Ltd. To Business Partner of VE
Commercial vehicle Since July 2010- jun. 2013
Hi-Tech. metal forming Pvt. Ltd. is TS 16949-2000 in Sanwer road Indore (M.P.)
Manufacturing of Sheet Metal Components, Like Fuel Tank Assly, and Muffler Assly. Vacuum Tank Assly. Tubular Part
Assembly and Different Fabricated Assly, and sub Assly and Supply finished product to Eicher Motor, Force motor,
Mahindra www.hitechmetalformings.com
Role
o Quality Implementation
o Quality Assurance & Testing
o Team Management
o Production planning
Training:-
o 7 Step of Problem Resolving
o WCM (Kaizen making) TWTTP/HERCA
o Geometrical Dimensioning and Tolerances
o 8 Stages of Incoming Material
o Welding parameter.
Professional Qualification:-
Diploma in Mechanical Engg. From SAMRAT ASHOK TECHNOLOGICAL INSTITUTE OF VIDISHA
(RGPV Bhopal)
Educational Summary:-
S. no. Name of Specification Board/institution year of passing Result
4. Examination
1 Diploma in Mech.
Engg.
Mechanical
Engineering
Samrat Ashok Technological
Institute in Vidisha (RGPV Bhopal)
2010 57.2%
2 Higher secondary Art
Govt. Venket no 02 Satna
MP BOARD, BHOPAL
2007 47.5 %
3 High School All Sub.
Govt. Venket no 02 Satna
MP BOARD, BHOPAL
2005 52.7%
Hobbies:-
Social Service Reading Books, Hang Out With Friend
Listening To Music, Bike Riding
Strengths:-
Task Completion, Strong Will Power
Smart & Hard Working, My Determination
Personal Information:-
Father Name : Mr. kedar nath
Date of Birth : 2nd
feb 1987
Sex : Male
Marital Status : Married
Religion : Hindu
Nationality : Indian
Language Known : Hindi, English
I solemnly hereby declares that the above given information is true to the best of my knowledge.
Place: Indore
Date: (ANJANI KUMAR)