SlideShare a Scribd company logo
1 of 6
Download to read offline
1
Ivan Fletcher
Tel: 00447908924006 or 00447519919720
E-Mail: ivan.fletcher@ymail.com
EXPERIENCE
Experienced in the Fabrication & Installation of Structural Steels, Heavy Plate & Pipe Work,
with over 20 years, successfully overseeing and completing projects from conception to
completion. 28 years total within the Engineering sector. Knowledge of workshop & site
management procedures, CDM Regulations, Estimating, Crane Plot Plan Studies, Material,
plant & equipment hire & procurement, Site Management, Safety Regulations and Quality
Standards.
PERSONAL DETAILS
POSTAL MAILING ADDRESS “Mardale” Vicar Street, Telford, Shropshire. TF2 6BH
EMAIL ivan.fletcher@ymail.com
TELEPHONE 00447908924006
ADDITIONAL SKILLS/ATTRIBUTES
 Punctual, reliable, self-motivating, work in a team or independently when required.
 Ability to plan & review for erection of structures
 Working knowledge of Crane studies, plot plans to establish correct crane location &
requirement.
 Working with structural engineers calculations:-
 Analyze engineering proposals, requirements, and related technical data pertaining to
design. Determines feasibility of designing new structures or modifying existing
structures considering costs, available space, time limitations, and other technical
factors.
 Provided technical information concerning erection techniques, materials, properties,
and advantages and limitations that affect long-range engineering planning.
 Compiled and analyzes operational and research data to establish performance
Standards for newly designed or modified structures.
 Able to adapt computer program solutions to improve efficiency and effectiveness,
organizing records, and compiling reports.
 Experience of using Computer Aided Design Systems and related software.
 Able to adhere to engineering principles and techniques.
 Knowledge of considering time constraints like safety, cost and environmental issues.
 Ability to evaluate theoretical designs.
SOFTWARE PACKAGES
 AutoDesk AutoPlant 3D
 AutoCad 2012, 2D, ISO & 3D
 AutoDesk Navisworks
 M.S Projects Manager
 Adobe Photoshop CC
 M.S Word
 M.S Excel
 M.S Access
 Adobe PDF
 M.S PowerPoint
 M.S Publisher
 Pinnacle Studio
 I am currently learning to use AutoCAD Inventor 2013 & Solidworks 2013 to help broadening my
knowledge & to widen my skills.
2
EMPLOYMENT
(Last Position working through an agency)
Hilton Industrial Service Limited
Structural & Pipework Design Draftsman (Contract) March 2013 to
August 2015
Design draftsman using 3D Modelling for Shop Fabrication, Site Installation of Access
ways, ladders, supporting steelwork, Pipe work, for Power Stations, Incineration Plants &
Council Departments throughout the Midlands area, Lincoln & Bilbao Spain.
Currently Design drafting using 3D Modelling of Structural & Pipework for a Multi-Million
Pound Project based at Southampton Docks for Southern Water Authority.
Their clients MWH Main Contractor, Principal Contractor 4D, Pipework co-ordination
Installers Xylem. Design Drafting of all structural Staircases, Platform Walkways,
Supporting Steelwork, Crane Gantries & 100 Ǿ to 500 Ǿ Stainless Steel Pipe work:- again
all in 3D.
Greenbank Tetrotech, Derby (January – March 2013) 3 Month Contract
12 week Contract, working as a 3D Design Draftsman on Low Knox Boiler Ducting 650-
1200 Ǿ 6mm walls, Consisting of square to rounds, transitions, lobster backs,
compensating plates to mains, stiffening rings, flanges, together with supporting steelwork
from external process unit to Coal Fired boiler wall quadrant wall tubes. Together with
platform design, monorail lifting beam design drawings. The company is heavy into Power
Station Conveyors, Pipework lined systems through Britain.
WSP-CEL Consultancy, December 2012 –January 2013 2 Month Contract
Mechanical, Structural & Pipe work Draughtsman
Contracted as a Draftsman drawing of P & I.D.’s for Pharmaceutical Plant re-build, working
from process engineer’s sketches, Plant & Equipment Layout Concept drawings.
Moulson Process Plant Consultants (Shropshire) Contract
January 2012 – November 2012
Employed as a Pipe Work Design Draftsman, Using P & I.D. to produce Conceptual Design
drawings of project work for chemical process plants, Heptane Recovery Plants, Methanol
Recovery Plant, industrial scale Bio Diesel Plant. Drawing from conception to completion in
3D to ascertain layout of plant equipment, pipe work & steelwork of individual items,
transferring all too 2D fabrication & site installation drawings, or 2D to 3D
3
SES Service Engineering Limited (Chemical, Power Gen, Corus Steelworks U.K, oil &
gas industries)
July 2004 - November 2011
(Projects Engineer/Contracts Manager) Pipework & Structural.
The role was to secure enquires for Structural or Pipe work, Tendering & submitting direct
to client.
Upon receipt & acceptance of orders, Contract review order for accuracy to tender. Prepare
Programme of works using Microsoft Project. Procure all Materials, plant hire, and crane
hire, consumable purchase, set up of site establishment, Crane Plot Plans, safety & risk
assessments, and Method statements. Detailing & producing shop Fabrication & installation
drawings. Project Manage from start to completion.
Revising & formulating additional works, negotiating direct to the client.
Full involvement with client engineers & designers with continues progress meetings for
every contract.
I was responsible for all the contract orders I had received, from conception to completion,
reporting directly to the Engineering Director (The Owner)
As the company did not originally have any drawing facilities or capabilities, at first I used
my own software, but as the order book grew the company purchased equipment &
employed additional staff to work under my supervision to assist where & when required.
During this period I had estimated & secured contracts ranging from 25k up to & including
1.25 million, to a total company value over the period in excess of 3.5 million
(Where load or stress calculation either structural or pipe work were required, these would
be performed by a Design House External Contractor, with myself directly in permanent
contact, assisting with conceptual designs)
ARMASTOKE LTD. Pharmaceutical, Gas, Oil & Power Generation Industries Leeds
June 2001 – July 2004
Senior Estimator Pipe Pork, Structural Steel & Plate work.
Became Site Manager for a short period towards the end of this employment, I left the
company as it was going into receivership.
Estimating contracts from 20K up to & including 2.5 Million at Power Generation Plants
around the U.K. Also chemical plants i.e. AstraZenica, Syngenta, Avecia, Various Courtalds
Plants.
A.R. Industries, Cardiff, South Wales
Jan – April 2000
(CAD Design Engineer)
Updating original drawings, item Data base, drawing iso concept drawings,
Proto type projects, refrigeration, compressed air & hydraulics, fabrication drawings &
testing of new assemblies.
R.C.P. Engineering Ltd, Croesyceiliog, South Wales
May – Oct 2000
(Projects Manager) 6 Month Contract, Structural Steel & Fabrication Projects.
Secure various contracts, which involved the fabrication design & installation drawings,
material procurement & site engineering contract control. £400k secured work during this
period.
4
ABB Power Construction Ltd, Derby (Power Station Plants, Chemical, Power Gen, oil
& gas industries) June 1999 – March 2000
(Site Engineer) Nov - March
Medway Gas Fired power station,
Modification and installation of a Dead start unit, consisting of 6 Diesel Engines and
Generators, water cooling system, fuel lines, compressed air lines, inlet and outlet engine
breathing system, fan cooling pipe work , Installation of Fin Fan Heat Exchangers, 750 Ǿ
Exhaust ducting including all supporting steelwork, access ways & staircases.
Responsible for all site managerial and engineering decisions, liaising with Cummins the
client technical & design team, weekly progress meetings, co-ordination and monitoring &
direction all personnel associated with this contract.
ABB Power Construction Ltd, (Assistant Sub-Contracts Engineer) June - Nov
Uskmouth Power Station.
Multi Million pound Refurbishment & re-commissioning of 3 x 120mw Boilers.
Responsibility for the liaison, co-ordination and monitoring between all departments for
Sub-contractors on site work. Monitoring & maintaining safety audits of all Sub-Contract
companies. Obtaining quotations, to enable issue of site instruction.
Production built drawings of conveyor mechanical components & boiler skin case
orientation.
Sub-contractors included Scaffolding, Insulation, Painting, Cleaning, Machining (on and off
site), Fabrication (on and off site), Steelwork installers, Brickwork/Refractory, boiler valve
overhaul and machining. Inspection, monitoring for quality control, of sub-contractors for
acceptance criteria.
Thyssen Engineering Installation Dept.
(1995 -1999)
(Deputy Installation Manager)
Deputising for the installation manager, duties included, responsible for securing tenders,
estimating costs, labour requirements, material and plant requirements of tendered work,
sourcing manpower. Maintaining & monitoring orders to final completion of secured
contracts.
Structural steelwork, Buildings, Access gantries, Platforms and Stairways.
Gas Main 2mtr Ǿ. with two directional lobsters’ backs, including all V supporting steelwork.
Conditioning Tower 5 metre Ǿ x 33 metre high including steelwork
Tubular membrane panel wall system for British steel gas cooling hood
High-pressure waste heat steam pipe work system Leeds Hospital
Compressed air and hydraulic pipe work installations
Heavy plate De-watering and catchments container, control building,
ABS feed and return pipe work, valves and quenching system, including Supports.
Gas stack, shell plate water tank, with segmented roof
Aluminium tubular heli-pad safety perimeter catch net scheme at Leeds LGI Hospital.
Steel fan house containment building filter room
Re-design, fabrication on site erection of test tank for 300 tonne of water.
Approx. 2.5 Million profitable orders gained
5
Lake Construction Ltd.
1992-1995
Contracts Manager
Responsible for securing enquires, estimating and all management upon receipt of an
order number of contracts secured. Drawing working involved throughout. West Burton
Power Station Overhaul Shutdown, British Steel Tubular Membrane hood cooling system
for Basic Oxygen System, 400 x 2 tubes from circular ring main headers to square outlet
transition section for extracting gas from the crucibles.
Approx. 1.1 Million profitable orders gained during the time spent with them.
R.A.J. Thompson Engineers & Contractors Ltd
1983-1992
(Site Manager) Final Position 2 Years
Eggborough Power station- Repair and maintenance contract consisting of skin casing
replacement, structural steelwork, air slides, air agitators, air pipe work, buffer hopper
modifications of the precipitators during annual outage.
British Sugar York- Pipe work and valve department: Responsible for the installation of
stainless steel pipe work systems, mild steel ducting and the replacement of shell plates on
the drier system.
British steel Scunthorpe- Repair & renewal of membrane panels within the gas cooling
hood system.
Aldermaston A.W.E. - Installation of structural steel & walkways, modification of holding
tanks and sub-contractors applying specialised rubberised protective coating systems.
(Senior Site Engineer) Power Station Repair & Maintenance 5 Years
Ironbridge, Eggborough, West Burton, Cottom, Thorpe Marsh, Wakefield, Power Stations,
Responsible for the contract engineering all aspects monitoring and overseeing of
personnel.
(Plater/Fabricator/Pipefitter & Welder) 2 Years
General, fabricating and pipe fitting throughout Britain, on Power Stations
Incineration Plants, Chemical Plants and Oil Refineries.
Installations ranging from Main Boiler Drum replacement, Steam Headers, Top, Bottom &
Mid Dead Spaces, Economisers, Ducting System, Fluffing Air slides, Dipper Trough,
Casings, Buck Stays, Sling Rods, inclusive to this the associated Pipework & the Structural
aspects from top to bottom. There are not many parts of a Boiler Furnace that I have not
actively been involved, whether it was originally from the hands on experience, to Site
Supervisor, Site Engineer, and Assistant Sub manager to Site Manager Position.
Modification and installation of a Dead start unit, consisting of 6 Diesel Engines and
Generators, water cooling system, fuel lines, compressed air lines, inlet and outlet engine
breathing system, fan cooling pipe work , Installation of Fin Fan Heat Exchangers, 750 Ǿ
Exhaust ducting including all supporting steelwork, access ways & staircases.
Responsible for all site managerial and engineering decisions, liaising with Cummins the
client technical & design team, weekly progress meetings, co-ordination and monitoring &
direction all personnel associated with this contract.
Multi Million pound Refurbishment & re-commissioning of 3 x 120mw Boilers.
Responsibility for the liaison, co-ordination and monitoring between all departments for
Sub-contractors on site work. Monitoring & maintaining safety audits of all Sub-Contract
companies. Obtaining quotations, to enable issue of site instruction.
Production built drawings of conveyor mechanical components & boiler skin case
orientation.
Sub-contractors included Scaffolding, Insulation, Painting, Cleaning, Machining (on and off
site), Fabrication (on and off site), Steelwork installers, Brickwork/Refractory, boiler valve
overhaul and machining. Inspection, monitoring for quality control, of sub-contractors for
acceptance criteria.
6

More Related Content

What's hot (20)

Cv mm
Cv mmCv mm
Cv mm
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Resume
ResumeResume
Resume
 
Construction supervisor
Construction supervisorConstruction supervisor
Construction supervisor
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping Supervisor
 
Nithin-CV
Nithin-CVNithin-CV
Nithin-CV
 
joy S resume
joy S resumejoy S resume
joy S resume
 
Vinoop nk resume all
Vinoop nk  resume all Vinoop nk  resume all
Vinoop nk resume all
 
Ali
AliAli
Ali
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Johns resume
Johns resumeJohns resume
Johns resume
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
WilliamHarkabusResume
WilliamHarkabusResumeWilliamHarkabusResume
WilliamHarkabusResume
 
Triple d engineering brochure
Triple d engineering   brochureTriple d engineering   brochure
Triple d engineering brochure
 

Similar to I.a.fletcher c.v. may 2016

Similar to I.a.fletcher c.v. may 2016 (20)

Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
 
Structural Designer-Vijayanand
Structural Designer-VijayanandStructural Designer-Vijayanand
Structural Designer-Vijayanand
 
STEPHEN HESKETH
STEPHEN HESKETHSTEPHEN HESKETH
STEPHEN HESKETH
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
Projects CV January 2016
Projects CV January 2016Projects CV January 2016
Projects CV January 2016
 
Sr. Estimation engineer
Sr. Estimation engineerSr. Estimation engineer
Sr. Estimation engineer
 
CoreCV
CoreCVCoreCV
CoreCV
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
 
Resume_-_Sourav_Sengupta
Resume_-_Sourav_SenguptaResume_-_Sourav_Sengupta
Resume_-_Sourav_Sengupta
 
Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Gennaro Palmieri
Gennaro PalmieriGennaro Palmieri
Gennaro Palmieri
 
Hafiz's CV
Hafiz's CVHafiz's CV
Hafiz's CV
 
HAFIZ'S Cv
HAFIZ'S Cv HAFIZ'S Cv
HAFIZ'S Cv
 
GARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGARYCV_2015_Dec_complete
GARYCV_2015_Dec_complete
 
Kevin Ward
Kevin WardKevin Ward
Kevin Ward
 
Brief Profile Sanjeev Kadam - 2016
Brief Profile Sanjeev Kadam -    2016Brief Profile Sanjeev Kadam -    2016
Brief Profile Sanjeev Kadam - 2016
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

I.a.fletcher c.v. may 2016

  • 1. 1 Ivan Fletcher Tel: 00447908924006 or 00447519919720 E-Mail: ivan.fletcher@ymail.com EXPERIENCE Experienced in the Fabrication & Installation of Structural Steels, Heavy Plate & Pipe Work, with over 20 years, successfully overseeing and completing projects from conception to completion. 28 years total within the Engineering sector. Knowledge of workshop & site management procedures, CDM Regulations, Estimating, Crane Plot Plan Studies, Material, plant & equipment hire & procurement, Site Management, Safety Regulations and Quality Standards. PERSONAL DETAILS POSTAL MAILING ADDRESS “Mardale” Vicar Street, Telford, Shropshire. TF2 6BH EMAIL ivan.fletcher@ymail.com TELEPHONE 00447908924006 ADDITIONAL SKILLS/ATTRIBUTES  Punctual, reliable, self-motivating, work in a team or independently when required.  Ability to plan & review for erection of structures  Working knowledge of Crane studies, plot plans to establish correct crane location & requirement.  Working with structural engineers calculations:-  Analyze engineering proposals, requirements, and related technical data pertaining to design. Determines feasibility of designing new structures or modifying existing structures considering costs, available space, time limitations, and other technical factors.  Provided technical information concerning erection techniques, materials, properties, and advantages and limitations that affect long-range engineering planning.  Compiled and analyzes operational and research data to establish performance Standards for newly designed or modified structures.  Able to adapt computer program solutions to improve efficiency and effectiveness, organizing records, and compiling reports.  Experience of using Computer Aided Design Systems and related software.  Able to adhere to engineering principles and techniques.  Knowledge of considering time constraints like safety, cost and environmental issues.  Ability to evaluate theoretical designs. SOFTWARE PACKAGES  AutoDesk AutoPlant 3D  AutoCad 2012, 2D, ISO & 3D  AutoDesk Navisworks  M.S Projects Manager  Adobe Photoshop CC  M.S Word  M.S Excel  M.S Access  Adobe PDF  M.S PowerPoint  M.S Publisher  Pinnacle Studio  I am currently learning to use AutoCAD Inventor 2013 & Solidworks 2013 to help broadening my knowledge & to widen my skills.
  • 2. 2 EMPLOYMENT (Last Position working through an agency) Hilton Industrial Service Limited Structural & Pipework Design Draftsman (Contract) March 2013 to August 2015 Design draftsman using 3D Modelling for Shop Fabrication, Site Installation of Access ways, ladders, supporting steelwork, Pipe work, for Power Stations, Incineration Plants & Council Departments throughout the Midlands area, Lincoln & Bilbao Spain. Currently Design drafting using 3D Modelling of Structural & Pipework for a Multi-Million Pound Project based at Southampton Docks for Southern Water Authority. Their clients MWH Main Contractor, Principal Contractor 4D, Pipework co-ordination Installers Xylem. Design Drafting of all structural Staircases, Platform Walkways, Supporting Steelwork, Crane Gantries & 100 Ǿ to 500 Ǿ Stainless Steel Pipe work:- again all in 3D. Greenbank Tetrotech, Derby (January – March 2013) 3 Month Contract 12 week Contract, working as a 3D Design Draftsman on Low Knox Boiler Ducting 650- 1200 Ǿ 6mm walls, Consisting of square to rounds, transitions, lobster backs, compensating plates to mains, stiffening rings, flanges, together with supporting steelwork from external process unit to Coal Fired boiler wall quadrant wall tubes. Together with platform design, monorail lifting beam design drawings. The company is heavy into Power Station Conveyors, Pipework lined systems through Britain. WSP-CEL Consultancy, December 2012 –January 2013 2 Month Contract Mechanical, Structural & Pipe work Draughtsman Contracted as a Draftsman drawing of P & I.D.’s for Pharmaceutical Plant re-build, working from process engineer’s sketches, Plant & Equipment Layout Concept drawings. Moulson Process Plant Consultants (Shropshire) Contract January 2012 – November 2012 Employed as a Pipe Work Design Draftsman, Using P & I.D. to produce Conceptual Design drawings of project work for chemical process plants, Heptane Recovery Plants, Methanol Recovery Plant, industrial scale Bio Diesel Plant. Drawing from conception to completion in 3D to ascertain layout of plant equipment, pipe work & steelwork of individual items, transferring all too 2D fabrication & site installation drawings, or 2D to 3D
  • 3. 3 SES Service Engineering Limited (Chemical, Power Gen, Corus Steelworks U.K, oil & gas industries) July 2004 - November 2011 (Projects Engineer/Contracts Manager) Pipework & Structural. The role was to secure enquires for Structural or Pipe work, Tendering & submitting direct to client. Upon receipt & acceptance of orders, Contract review order for accuracy to tender. Prepare Programme of works using Microsoft Project. Procure all Materials, plant hire, and crane hire, consumable purchase, set up of site establishment, Crane Plot Plans, safety & risk assessments, and Method statements. Detailing & producing shop Fabrication & installation drawings. Project Manage from start to completion. Revising & formulating additional works, negotiating direct to the client. Full involvement with client engineers & designers with continues progress meetings for every contract. I was responsible for all the contract orders I had received, from conception to completion, reporting directly to the Engineering Director (The Owner) As the company did not originally have any drawing facilities or capabilities, at first I used my own software, but as the order book grew the company purchased equipment & employed additional staff to work under my supervision to assist where & when required. During this period I had estimated & secured contracts ranging from 25k up to & including 1.25 million, to a total company value over the period in excess of 3.5 million (Where load or stress calculation either structural or pipe work were required, these would be performed by a Design House External Contractor, with myself directly in permanent contact, assisting with conceptual designs) ARMASTOKE LTD. Pharmaceutical, Gas, Oil & Power Generation Industries Leeds June 2001 – July 2004 Senior Estimator Pipe Pork, Structural Steel & Plate work. Became Site Manager for a short period towards the end of this employment, I left the company as it was going into receivership. Estimating contracts from 20K up to & including 2.5 Million at Power Generation Plants around the U.K. Also chemical plants i.e. AstraZenica, Syngenta, Avecia, Various Courtalds Plants. A.R. Industries, Cardiff, South Wales Jan – April 2000 (CAD Design Engineer) Updating original drawings, item Data base, drawing iso concept drawings, Proto type projects, refrigeration, compressed air & hydraulics, fabrication drawings & testing of new assemblies. R.C.P. Engineering Ltd, Croesyceiliog, South Wales May – Oct 2000 (Projects Manager) 6 Month Contract, Structural Steel & Fabrication Projects. Secure various contracts, which involved the fabrication design & installation drawings, material procurement & site engineering contract control. £400k secured work during this period.
  • 4. 4 ABB Power Construction Ltd, Derby (Power Station Plants, Chemical, Power Gen, oil & gas industries) June 1999 – March 2000 (Site Engineer) Nov - March Medway Gas Fired power station, Modification and installation of a Dead start unit, consisting of 6 Diesel Engines and Generators, water cooling system, fuel lines, compressed air lines, inlet and outlet engine breathing system, fan cooling pipe work , Installation of Fin Fan Heat Exchangers, 750 Ǿ Exhaust ducting including all supporting steelwork, access ways & staircases. Responsible for all site managerial and engineering decisions, liaising with Cummins the client technical & design team, weekly progress meetings, co-ordination and monitoring & direction all personnel associated with this contract. ABB Power Construction Ltd, (Assistant Sub-Contracts Engineer) June - Nov Uskmouth Power Station. Multi Million pound Refurbishment & re-commissioning of 3 x 120mw Boilers. Responsibility for the liaison, co-ordination and monitoring between all departments for Sub-contractors on site work. Monitoring & maintaining safety audits of all Sub-Contract companies. Obtaining quotations, to enable issue of site instruction. Production built drawings of conveyor mechanical components & boiler skin case orientation. Sub-contractors included Scaffolding, Insulation, Painting, Cleaning, Machining (on and off site), Fabrication (on and off site), Steelwork installers, Brickwork/Refractory, boiler valve overhaul and machining. Inspection, monitoring for quality control, of sub-contractors for acceptance criteria. Thyssen Engineering Installation Dept. (1995 -1999) (Deputy Installation Manager) Deputising for the installation manager, duties included, responsible for securing tenders, estimating costs, labour requirements, material and plant requirements of tendered work, sourcing manpower. Maintaining & monitoring orders to final completion of secured contracts. Structural steelwork, Buildings, Access gantries, Platforms and Stairways. Gas Main 2mtr Ǿ. with two directional lobsters’ backs, including all V supporting steelwork. Conditioning Tower 5 metre Ǿ x 33 metre high including steelwork Tubular membrane panel wall system for British steel gas cooling hood High-pressure waste heat steam pipe work system Leeds Hospital Compressed air and hydraulic pipe work installations Heavy plate De-watering and catchments container, control building, ABS feed and return pipe work, valves and quenching system, including Supports. Gas stack, shell plate water tank, with segmented roof Aluminium tubular heli-pad safety perimeter catch net scheme at Leeds LGI Hospital. Steel fan house containment building filter room Re-design, fabrication on site erection of test tank for 300 tonne of water. Approx. 2.5 Million profitable orders gained
  • 5. 5 Lake Construction Ltd. 1992-1995 Contracts Manager Responsible for securing enquires, estimating and all management upon receipt of an order number of contracts secured. Drawing working involved throughout. West Burton Power Station Overhaul Shutdown, British Steel Tubular Membrane hood cooling system for Basic Oxygen System, 400 x 2 tubes from circular ring main headers to square outlet transition section for extracting gas from the crucibles. Approx. 1.1 Million profitable orders gained during the time spent with them. R.A.J. Thompson Engineers & Contractors Ltd 1983-1992 (Site Manager) Final Position 2 Years Eggborough Power station- Repair and maintenance contract consisting of skin casing replacement, structural steelwork, air slides, air agitators, air pipe work, buffer hopper modifications of the precipitators during annual outage. British Sugar York- Pipe work and valve department: Responsible for the installation of stainless steel pipe work systems, mild steel ducting and the replacement of shell plates on the drier system. British steel Scunthorpe- Repair & renewal of membrane panels within the gas cooling hood system. Aldermaston A.W.E. - Installation of structural steel & walkways, modification of holding tanks and sub-contractors applying specialised rubberised protective coating systems. (Senior Site Engineer) Power Station Repair & Maintenance 5 Years Ironbridge, Eggborough, West Burton, Cottom, Thorpe Marsh, Wakefield, Power Stations, Responsible for the contract engineering all aspects monitoring and overseeing of personnel. (Plater/Fabricator/Pipefitter & Welder) 2 Years General, fabricating and pipe fitting throughout Britain, on Power Stations Incineration Plants, Chemical Plants and Oil Refineries. Installations ranging from Main Boiler Drum replacement, Steam Headers, Top, Bottom & Mid Dead Spaces, Economisers, Ducting System, Fluffing Air slides, Dipper Trough, Casings, Buck Stays, Sling Rods, inclusive to this the associated Pipework & the Structural aspects from top to bottom. There are not many parts of a Boiler Furnace that I have not actively been involved, whether it was originally from the hands on experience, to Site Supervisor, Site Engineer, and Assistant Sub manager to Site Manager Position. Modification and installation of a Dead start unit, consisting of 6 Diesel Engines and Generators, water cooling system, fuel lines, compressed air lines, inlet and outlet engine breathing system, fan cooling pipe work , Installation of Fin Fan Heat Exchangers, 750 Ǿ Exhaust ducting including all supporting steelwork, access ways & staircases. Responsible for all site managerial and engineering decisions, liaising with Cummins the client technical & design team, weekly progress meetings, co-ordination and monitoring & direction all personnel associated with this contract. Multi Million pound Refurbishment & re-commissioning of 3 x 120mw Boilers. Responsibility for the liaison, co-ordination and monitoring between all departments for Sub-contractors on site work. Monitoring & maintaining safety audits of all Sub-Contract companies. Obtaining quotations, to enable issue of site instruction. Production built drawings of conveyor mechanical components & boiler skin case orientation. Sub-contractors included Scaffolding, Insulation, Painting, Cleaning, Machining (on and off site), Fabrication (on and off site), Steelwork installers, Brickwork/Refractory, boiler valve overhaul and machining. Inspection, monitoring for quality control, of sub-contractors for acceptance criteria.
  • 6. 6