Lean production system design for fishing
net manufacturing using lean principles and
simulation optimization
Ilyas Hussain
P2MFG15006
Introduction
 The common challenges that companies face are market com-
petition, increased pressure on inventory, increased service
levels, and reduced work in process (WIP). Lean
manufacturing is one of the approaches that can help
companies respond appropriately to these challenges.
 The focus of the approach is on cost reduction, by eliminating
activities that do not add value by linking and balancing work
stages, so that products from one stage are consumed directly
by the next stage, until the end of the production line is
reached.
 Fishing net manufacturing is a high make-to-order (MTO)
environment, because net size and type change according to
the ocean environment, fish kinds and ship size.
 MTO manufacturing need not be a pull production system as
there are many (or some) simultaneous orders in the
manufacturing process and orders may be different in size and
specifications.
 Higher WIP and longer cycle times always result in a lower
service level and produce lower customer satisfaction in MTO
environments.
 Through the production procedure the production units
become bigger and bigger and the processing time in most
steps are quite long.
 This provides the motivation for this research, to design a lean
manufacturing system for this industry.
 The objective of the present study is to model a non-typical
production system – a fishing-net manufacturing system – and
to propose a lean production system design which is optimized
by simulation optimization.
Current State Map of Fishing Net
 There are various fishing nets each net has a unique
application which is based on the ocean environment, fish type
and ship size.
 Therefore, the same customer could order nets of different
types or different sizes. Each order requires different raw
material types, twine sizes, mesh sizes, mesh depths and mesh
lengths.
 Net cage is one kind of fishing net which is the main product
of the case study company.
 The general diameter varies from 10 m to 30 m, depth varies
from 4 m to 10 m, while mesh varies from 2 mm to 30 mm.
 There are six workstations for net cage manufacturing. They
are (1) Twisting, (2) Braiding, (3) Net knitting,(4) Dyeing, (5)
Heating and (6) Suturing. All manufactured net cages follow
the sequence of workstation above, from 1 to 6.
 There two options for the width of a net: 1 or 2 m. According
to the specification of the knitting machines in the case
company the standard size can be 10 m × 1 m or 10 m × 2 m.
 Every knitting machines can knit one single 10 m × 2 m net or
two 10 m × 1 m nets simultaneously.
 Dyeing workstation, a number of nets in standard size can be
dyed together, but the total weight of the nets cannot exceed
the capacity of the dyeing machine.
 One single 10 m × 2 m net or two 10 m × 1 m nets can be
heated simultaneously in heating machine.
 Finally, the nets with standard size are sutured to form net
cages according to the request of the customers.
 According to the current state map, reducing the waiting time
in front of the each workstation is an opportunity to reduce the
lead time and, consequently, to increase the service level.
 Two performance indicators, average WIP level and average
service level, are taken into consideration in this case study.
 WIP level is defined as the total volume of semi-finished
goods in the production system. Service level is defined as the
percentage of orders that are completed before their
corresponding due date.
 As the company did not collect data on service level and WIP,
this research developed a simulation model to evaluate it.
Commercial software, Arena is adopted as the simulator for
the present study.
 To evaluate the performance of each scenario, a run length of
750 days with 3–12 replications was adopted for the
simulation model.
 The estimated service level and WIP are 68% and 63,971 kg
respectively.
Lean Principles
 There are five phase for implementation of VSM. The phases
are (1) selection of product family; (2) current state mapping;
(3) future state mapping; (4) definition of working plan; and
(5) achievement of working plan.
 The lean techniques to be used are defined in the third phase
which contains seven guidelines to define the future state map.
 Guideline 1: Produce to your TAKT time.
• “Takt time” is used to synchronize the pace of production with
the pace of sales.
• Takt time = available working time per day /customer demand
rate per day
 Guideline 2: Develop continuous flow where possible.
• Continuous flow refers to producing one piece at a time to
reduce the inventory of WIP and production CT. However
continuous flow requires a great deal of creativity to achieve
and sometimes it requires plant layout redistribution. In this
research, this guideline is not applicable and is not taken into
consideration in the case study.
 Guideline 3: Use a supermarket to control production where
continuous flow does not extend upstream.
• A “supermarket” is nothing more than a buffer or storage area
located at the end of the production process for products that
are ready to be shipped.
• Supermarkets use a kanban system to fix the inventory level. If
the number of kanbans in a supermarket is too high, it causes
higher inventory cost.
• If the number of kanban in the supermarket is too low the
downstream production process will be subject to delays.
 Guideline 4: Try to send customer scheduling to only one
production process.
• The process time is set by one of the production processes.
That process is called the “pacemaker process”. The
pacemaker process synchronizes the pace of the entire
manufacturing process and there are no supermarkets
downstream of the pacemaker process.
• Therefore, selecting different workstations as the pacemaker
process will have an important influence on the performance
of the entire manufacturing system.
 Guideline 5: level the production mix.
• Leveling the product mix means dividing the volume of all the
product types based on their kanban size, and then producing
them evenly over a time period.
• The more level the product mix is, the greater is the ability to
respond to different customer requirements with a short lead
time.
• For example, if there are three product types and the
production sequence can be A-A-A-B-B-B-C-C-C or A-B-C-
A-B-C-A-B-C.
• The latter is more level and allows the process to proceed
smoothly with smaller supermarkets.
 Guideline 6: Level the production volume.
• Leveling the production volume is related to Guideline
number1. It means that production should be based on a fixed
pace, the takt time.
 Guideline 7: Develop the ability to make “every part
everyday” in fabrication processes upstream of the pacemaker
process.
Future State Map Optimization
 From lean principles we identified five key controllable factors
as: (1) production unit size, (2) the pacemaker process, (3) the
number of batches for an order split, (4) the production
sequence, and (5) supermarket size, to optimize the proposed
fishing-net manufacturing system.
 According to the guidelines for designing the future state map,
the production unit should be as small as possible to level the
product mix.
 The production unit of each workstation depends on the
standard net size and the processing times of the standard net
size could be different in every workstation.
 As regard the pacemaker process, this research selects Knitting
workstation, Dyeing workstation and Suturing workstation as
the candidates.
 Knitting workstation usually has the highest machine
utilization. Dyeing workstation is batch processing. Its
capacity is batch-size dependent. Suturing workstation is the
most labor intensive workstation.
 the potential bottleneck could shift among the three
workstations which are thus considered as the candidate
pacemaker locations.
 The number of batches to be allowed will decide the
transportation volume between workstations.
 More batches allow for a more level product mix, but will
cause more changeovers. The changeover times between
different products are different.
 An appropriate production sequence can reduce the total
changeover time.
 This research selects earliest due date (EDD), first in fist out
(FIFO) and shortest process time (SPT) as alternative criteria
for designing the future state map.
 Four factors (production unit, pacemaker process, number of
batches and production sequence) are taken into consideration
in the experimental approach to designing the future state map.
 For each scenario, Opt Quest is used to find the best super-
market size and the corresponding performances are viewed as
the performance of each scenario.
 The Taguchi method aims to find an optimal combination of
parameters that have the smallest variance in performance. The
signal-to-noise ratio (S/N ratio, ) is an effective way to find
significant parameters by evaluating minimum variance.
 A higher S/N ratio means better performance for combinatorial
parameters .
Effect of s/n ratio of service level
Effect of s/n ratio of WIP level
 A2B1C1D2 is the best design for the future state map to
maximize the service level.
 A1B1C2D2is the best design for the future state map to
minimize the WIP.
 The optimizing results produced by Opt Quest show that the
design of A2B1C2D2 increases service level from 68% to 90%
and reduces WIP from 63,971 kg to 42,269.31 kg.
 The non-value adding time reduces from 44% (19.78 days)to
35.46% (13.78 days).
 Note that the optimal design of production unit (factor A) is
level 2 (10 × 2 m) which is bigger than level 1 (10 × 1 m).
Although the guideline number 7 encourages the production
unit to be smaller the better.
 The size of a final net cage range from 120 to 900 m2.The
smaller production unit would cause more processing time for
suturing process and would deteriorate the suturing
workstation performance.
Conclusion
 Lean manufacturing has been applied successfully in many
manufacturing industries. It focuses on cost reduction by
eliminating non-value adding activity. In general, waiting is
the most common non-value adding activity.
 Based on the guidelines for implementing lean manufacturing,
some important production factors are selected for designing
the future state VSM.
 Using experimental design and a simulation optimization tool,
these important factors are optimized. According to analysis
based on the simulation, the future state map not only
increases service level but also reduces the WIP.
 In the case study, the selected factors can be changed to any
level without extra investment. That means the case company
can implement the future state map to achieve lean
manufacturing without any financial pressure. This could be
the first step to achieving lean manufacturing.
Thank you

More Related Content

What's hot

Application of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionApplication of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionRazib Mahmud
 
Vsm and wip with arena simulation
Vsm and wip with  arena simulationVsm and wip with  arena simulation
Vsm and wip with arena simulationuniceder1111
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysisvideoaakash15
 
A Comparison Of Group Technology & Process Layout (3)
A   Comparison  Of  Group  Technology &  Process  Layout (3)A   Comparison  Of  Group  Technology &  Process  Layout (3)
A Comparison Of Group Technology & Process Layout (3)guest42598d4
 
Production-line balancing & capacity planning decision
Production-line balancing & capacity planning decisionProduction-line balancing & capacity planning decision
Production-line balancing & capacity planning decisionRohit Raina
 
Just in time - Operation Management
Just in time - Operation ManagementJust in time - Operation Management
Just in time - Operation ManagementDurgesh S
 
Cu mba operation managment module 4 calicut university
Cu mba operation managment module 4 calicut universityCu mba operation managment module 4 calicut university
Cu mba operation managment module 4 calicut universityChathamkulamInstitut
 
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...IJERA Editor
 
Production process
Production processProduction process
Production processBoss Hsiang
 
Capacity planning ppt
Capacity planning pptCapacity planning ppt
Capacity planning pptGagan bhati
 
Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industriespaperpublications3
 
Types of production processes
Types of production processesTypes of production processes
Types of production processesAnupam Kumar
 
Cellular manufacturing and group technology
Cellular manufacturing and group technologyCellular manufacturing and group technology
Cellular manufacturing and group technologyHitendrasinh Zala
 
Cellular Manufacturing
Cellular Manufacturing Cellular Manufacturing
Cellular Manufacturing sgrsoni45
 

What's hot (19)

Application of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionApplication of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments production
 
Vsm and wip with arena simulation
Vsm and wip with  arena simulationVsm and wip with  arena simulation
Vsm and wip with arena simulation
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysis
 
O0123190100
O0123190100O0123190100
O0123190100
 
A Comparison Of Group Technology & Process Layout (3)
A   Comparison  Of  Group  Technology &  Process  Layout (3)A   Comparison  Of  Group  Technology &  Process  Layout (3)
A Comparison Of Group Technology & Process Layout (3)
 
Production-line balancing & capacity planning decision
Production-line balancing & capacity planning decisionProduction-line balancing & capacity planning decision
Production-line balancing & capacity planning decision
 
Just in time - Operation Management
Just in time - Operation ManagementJust in time - Operation Management
Just in time - Operation Management
 
Cu mba operation managment module 4 calicut university
Cu mba operation managment module 4 calicut universityCu mba operation managment module 4 calicut university
Cu mba operation managment module 4 calicut university
 
Types of Manufacturing system
Types of Manufacturing systemTypes of Manufacturing system
Types of Manufacturing system
 
IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
 
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
 
Production process
Production processProduction process
Production process
 
Capacity planning ppt
Capacity planning pptCapacity planning ppt
Capacity planning ppt
 
Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industries
 
Process analysis
Process analysisProcess analysis
Process analysis
 
Types of production processes
Types of production processesTypes of production processes
Types of production processes
 
Just In Time & Kanban
Just In Time & KanbanJust In Time & Kanban
Just In Time & Kanban
 
Cellular manufacturing and group technology
Cellular manufacturing and group technologyCellular manufacturing and group technology
Cellular manufacturing and group technology
 
Cellular Manufacturing
Cellular Manufacturing Cellular Manufacturing
Cellular Manufacturing
 

Viewers also liked

Geeks Report Gk vacwork March 2016
Geeks Report Gk vacwork March 2016Geeks Report Gk vacwork March 2016
Geeks Report Gk vacwork March 2016Tanyani Daku
 
20160412木桐讀書會分享 灣生回家 by Jason
20160412木桐讀書會分享 灣生回家 by Jason20160412木桐讀書會分享 灣生回家 by Jason
20160412木桐讀書會分享 灣生回家 by JasonLibrarian Mouton
 
Retail Presentation_mobile_customer_connect_Oct2015
Retail Presentation_mobile_customer_connect_Oct2015Retail Presentation_mobile_customer_connect_Oct2015
Retail Presentation_mobile_customer_connect_Oct2015Natalia Haluszka
 
Vintage Couture
Vintage CoutureVintage Couture
Vintage Couturekels scott
 
Apostila de quimica organica
Apostila  de  quimica  organicaApostila  de  quimica  organica
Apostila de quimica organicaNeejacp
 
Gil antonio presentacion_competic 2
Gil antonio presentacion_competic 2Gil antonio presentacion_competic 2
Gil antonio presentacion_competic 213mama13
 
La educaciòn en la cuerda floja
La educaciòn en la cuerda flojaLa educaciòn en la cuerda floja
La educaciòn en la cuerda flojamishachu
 

Viewers also liked (10)

Geeks Report Gk vacwork March 2016
Geeks Report Gk vacwork March 2016Geeks Report Gk vacwork March 2016
Geeks Report Gk vacwork March 2016
 
20160412木桐讀書會分享 灣生回家 by Jason
20160412木桐讀書會分享 灣生回家 by Jason20160412木桐讀書會分享 灣生回家 by Jason
20160412木桐讀書會分享 灣生回家 by Jason
 
Retail Presentation_mobile_customer_connect_Oct2015
Retail Presentation_mobile_customer_connect_Oct2015Retail Presentation_mobile_customer_connect_Oct2015
Retail Presentation_mobile_customer_connect_Oct2015
 
Marketing de Contenidos
Marketing de ContenidosMarketing de Contenidos
Marketing de Contenidos
 
Vintage Couture
Vintage CoutureVintage Couture
Vintage Couture
 
Olanrewaju J. Jaiyeola
Olanrewaju J. JaiyeolaOlanrewaju J. Jaiyeola
Olanrewaju J. Jaiyeola
 
Apostila de quimica organica
Apostila  de  quimica  organicaApostila  de  quimica  organica
Apostila de quimica organica
 
Gil antonio presentacion_competic 2
Gil antonio presentacion_competic 2Gil antonio presentacion_competic 2
Gil antonio presentacion_competic 2
 
La educaciòn en la cuerda floja
La educaciòn en la cuerda flojaLa educaciòn en la cuerda floja
La educaciòn en la cuerda floja
 
My New Resume
My New ResumeMy New Resume
My New Resume
 

Similar to Lean in fishing net

What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processingramuaa128
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)ramuaa130
 
Production and operation management
Production and operation managementProduction and operation management
Production and operation managementHarsha Mathad
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...yearstart1
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...ramuaa124
 
The centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following dataThe centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following dataramuaa128
 
Which of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemWhich of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemramuaa130
 
Case study furniture industry
Case study   furniture industryCase study   furniture industry
Case study furniture industryGanesh TN
 
Which of the following is a focusing step of dr
Which of the following is a focusing step of drWhich of the following is a focusing step of dr
Which of the following is a focusing step of drramuaa129
 
Which of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecastingWhich of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecastingramuaa130
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...ramuaa130
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateyearstart1
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateramuaa124
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsramuaa127
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...ramuaa129
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)michaelkelinger2
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)beauti123157
 
In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...ramuaa127
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesyearstart1
 

Similar to Lean in fishing net (20)

What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processing
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Production and operation management
Production and operation managementProduction and operation management
Production and operation management
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...
 
The centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following dataThe centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following data
 
Which of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemWhich of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp system
 
Case study furniture industry
Case study   furniture industryCase study   furniture industry
Case study furniture industry
 
Which of the following is a focusing step of dr
Which of the following is a focusing step of drWhich of the following is a focusing step of dr
Which of the following is a focusing step of dr
 
Which of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecastingWhich of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecasting
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rate
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rate
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chains
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 
In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activities
 

More from Ilyas Hussain

Advanced Characterization Technique - SEM
Advanced Characterization Technique - SEMAdvanced Characterization Technique - SEM
Advanced Characterization Technique - SEMIlyas Hussain
 
Metallurgical structures
Metallurgical structuresMetallurgical structures
Metallurgical structuresIlyas Hussain
 
Aluminium alloy a201
Aluminium alloy   a201Aluminium alloy   a201
Aluminium alloy a201Ilyas Hussain
 
Assignment parts feeder
Assignment parts feederAssignment parts feeder
Assignment parts feederIlyas Hussain
 
Force measurement in grinding using dynamometer
Force measurement in grinding  using dynamometerForce measurement in grinding  using dynamometer
Force measurement in grinding using dynamometerIlyas Hussain
 
Thixocasting or semi solid metal casting
Thixocasting or semi solid metal castingThixocasting or semi solid metal casting
Thixocasting or semi solid metal castingIlyas Hussain
 
Atomic hyrogen arc welding
Atomic hyrogen arc weldingAtomic hyrogen arc welding
Atomic hyrogen arc weldingIlyas Hussain
 

More from Ilyas Hussain (11)

Advanced Characterization Technique - SEM
Advanced Characterization Technique - SEMAdvanced Characterization Technique - SEM
Advanced Characterization Technique - SEM
 
Parts feeder
Parts feederParts feeder
Parts feeder
 
forging
forgingforging
forging
 
Components of die
Components of dieComponents of die
Components of die
 
Metallurgical structures
Metallurgical structuresMetallurgical structures
Metallurgical structures
 
Aluminium alloy a201
Aluminium alloy   a201Aluminium alloy   a201
Aluminium alloy a201
 
Assignment parts feeder
Assignment parts feederAssignment parts feeder
Assignment parts feeder
 
Force measurement in grinding using dynamometer
Force measurement in grinding  using dynamometerForce measurement in grinding  using dynamometer
Force measurement in grinding using dynamometer
 
Comparators ppt
Comparators pptComparators ppt
Comparators ppt
 
Thixocasting or semi solid metal casting
Thixocasting or semi solid metal castingThixocasting or semi solid metal casting
Thixocasting or semi solid metal casting
 
Atomic hyrogen arc welding
Atomic hyrogen arc weldingAtomic hyrogen arc welding
Atomic hyrogen arc welding
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 

Recently uploaded (20)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 

Lean in fishing net

  • 1. Lean production system design for fishing net manufacturing using lean principles and simulation optimization Ilyas Hussain P2MFG15006
  • 2. Introduction  The common challenges that companies face are market com- petition, increased pressure on inventory, increased service levels, and reduced work in process (WIP). Lean manufacturing is one of the approaches that can help companies respond appropriately to these challenges.  The focus of the approach is on cost reduction, by eliminating activities that do not add value by linking and balancing work stages, so that products from one stage are consumed directly by the next stage, until the end of the production line is reached.
  • 3.  Fishing net manufacturing is a high make-to-order (MTO) environment, because net size and type change according to the ocean environment, fish kinds and ship size.  MTO manufacturing need not be a pull production system as there are many (or some) simultaneous orders in the manufacturing process and orders may be different in size and specifications.  Higher WIP and longer cycle times always result in a lower service level and produce lower customer satisfaction in MTO environments.
  • 4.  Through the production procedure the production units become bigger and bigger and the processing time in most steps are quite long.  This provides the motivation for this research, to design a lean manufacturing system for this industry.  The objective of the present study is to model a non-typical production system – a fishing-net manufacturing system – and to propose a lean production system design which is optimized by simulation optimization.
  • 5. Current State Map of Fishing Net  There are various fishing nets each net has a unique application which is based on the ocean environment, fish type and ship size.  Therefore, the same customer could order nets of different types or different sizes. Each order requires different raw material types, twine sizes, mesh sizes, mesh depths and mesh lengths.  Net cage is one kind of fishing net which is the main product of the case study company.  The general diameter varies from 10 m to 30 m, depth varies from 4 m to 10 m, while mesh varies from 2 mm to 30 mm.
  • 6.
  • 7.  There are six workstations for net cage manufacturing. They are (1) Twisting, (2) Braiding, (3) Net knitting,(4) Dyeing, (5) Heating and (6) Suturing. All manufactured net cages follow the sequence of workstation above, from 1 to 6.  There two options for the width of a net: 1 or 2 m. According to the specification of the knitting machines in the case company the standard size can be 10 m × 1 m or 10 m × 2 m.  Every knitting machines can knit one single 10 m × 2 m net or two 10 m × 1 m nets simultaneously.
  • 8.  Dyeing workstation, a number of nets in standard size can be dyed together, but the total weight of the nets cannot exceed the capacity of the dyeing machine.  One single 10 m × 2 m net or two 10 m × 1 m nets can be heated simultaneously in heating machine.  Finally, the nets with standard size are sutured to form net cages according to the request of the customers.
  • 9.
  • 10.  According to the current state map, reducing the waiting time in front of the each workstation is an opportunity to reduce the lead time and, consequently, to increase the service level.  Two performance indicators, average WIP level and average service level, are taken into consideration in this case study.  WIP level is defined as the total volume of semi-finished goods in the production system. Service level is defined as the percentage of orders that are completed before their corresponding due date.
  • 11.  As the company did not collect data on service level and WIP, this research developed a simulation model to evaluate it. Commercial software, Arena is adopted as the simulator for the present study.  To evaluate the performance of each scenario, a run length of 750 days with 3–12 replications was adopted for the simulation model.  The estimated service level and WIP are 68% and 63,971 kg respectively.
  • 12.
  • 13. Lean Principles  There are five phase for implementation of VSM. The phases are (1) selection of product family; (2) current state mapping; (3) future state mapping; (4) definition of working plan; and (5) achievement of working plan.  The lean techniques to be used are defined in the third phase which contains seven guidelines to define the future state map.
  • 14.  Guideline 1: Produce to your TAKT time. • “Takt time” is used to synchronize the pace of production with the pace of sales. • Takt time = available working time per day /customer demand rate per day  Guideline 2: Develop continuous flow where possible. • Continuous flow refers to producing one piece at a time to reduce the inventory of WIP and production CT. However continuous flow requires a great deal of creativity to achieve and sometimes it requires plant layout redistribution. In this research, this guideline is not applicable and is not taken into consideration in the case study.
  • 15.  Guideline 3: Use a supermarket to control production where continuous flow does not extend upstream. • A “supermarket” is nothing more than a buffer or storage area located at the end of the production process for products that are ready to be shipped. • Supermarkets use a kanban system to fix the inventory level. If the number of kanbans in a supermarket is too high, it causes higher inventory cost. • If the number of kanban in the supermarket is too low the downstream production process will be subject to delays.
  • 16.  Guideline 4: Try to send customer scheduling to only one production process. • The process time is set by one of the production processes. That process is called the “pacemaker process”. The pacemaker process synchronizes the pace of the entire manufacturing process and there are no supermarkets downstream of the pacemaker process. • Therefore, selecting different workstations as the pacemaker process will have an important influence on the performance of the entire manufacturing system.
  • 17.  Guideline 5: level the production mix. • Leveling the product mix means dividing the volume of all the product types based on their kanban size, and then producing them evenly over a time period. • The more level the product mix is, the greater is the ability to respond to different customer requirements with a short lead time. • For example, if there are three product types and the production sequence can be A-A-A-B-B-B-C-C-C or A-B-C- A-B-C-A-B-C. • The latter is more level and allows the process to proceed smoothly with smaller supermarkets.
  • 18.  Guideline 6: Level the production volume. • Leveling the production volume is related to Guideline number1. It means that production should be based on a fixed pace, the takt time.  Guideline 7: Develop the ability to make “every part everyday” in fabrication processes upstream of the pacemaker process.
  • 19. Future State Map Optimization  From lean principles we identified five key controllable factors as: (1) production unit size, (2) the pacemaker process, (3) the number of batches for an order split, (4) the production sequence, and (5) supermarket size, to optimize the proposed fishing-net manufacturing system.  According to the guidelines for designing the future state map, the production unit should be as small as possible to level the product mix.  The production unit of each workstation depends on the standard net size and the processing times of the standard net size could be different in every workstation.
  • 20.  As regard the pacemaker process, this research selects Knitting workstation, Dyeing workstation and Suturing workstation as the candidates.  Knitting workstation usually has the highest machine utilization. Dyeing workstation is batch processing. Its capacity is batch-size dependent. Suturing workstation is the most labor intensive workstation.  the potential bottleneck could shift among the three workstations which are thus considered as the candidate pacemaker locations.
  • 21.  The number of batches to be allowed will decide the transportation volume between workstations.  More batches allow for a more level product mix, but will cause more changeovers. The changeover times between different products are different.  An appropriate production sequence can reduce the total changeover time.  This research selects earliest due date (EDD), first in fist out (FIFO) and shortest process time (SPT) as alternative criteria for designing the future state map.
  • 22.
  • 23.  Four factors (production unit, pacemaker process, number of batches and production sequence) are taken into consideration in the experimental approach to designing the future state map.  For each scenario, Opt Quest is used to find the best super- market size and the corresponding performances are viewed as the performance of each scenario.  The Taguchi method aims to find an optimal combination of parameters that have the smallest variance in performance. The signal-to-noise ratio (S/N ratio, ) is an effective way to find significant parameters by evaluating minimum variance.  A higher S/N ratio means better performance for combinatorial parameters .
  • 24.
  • 25. Effect of s/n ratio of service level Effect of s/n ratio of WIP level
  • 26.  A2B1C1D2 is the best design for the future state map to maximize the service level.  A1B1C2D2is the best design for the future state map to minimize the WIP.  The optimizing results produced by Opt Quest show that the design of A2B1C2D2 increases service level from 68% to 90% and reduces WIP from 63,971 kg to 42,269.31 kg.  The non-value adding time reduces from 44% (19.78 days)to 35.46% (13.78 days).
  • 27.  Note that the optimal design of production unit (factor A) is level 2 (10 × 2 m) which is bigger than level 1 (10 × 1 m). Although the guideline number 7 encourages the production unit to be smaller the better.  The size of a final net cage range from 120 to 900 m2.The smaller production unit would cause more processing time for suturing process and would deteriorate the suturing workstation performance.
  • 28.
  • 29. Conclusion  Lean manufacturing has been applied successfully in many manufacturing industries. It focuses on cost reduction by eliminating non-value adding activity. In general, waiting is the most common non-value adding activity.  Based on the guidelines for implementing lean manufacturing, some important production factors are selected for designing the future state VSM.
  • 30.  Using experimental design and a simulation optimization tool, these important factors are optimized. According to analysis based on the simulation, the future state map not only increases service level but also reduces the WIP.  In the case study, the selected factors can be changed to any level without extra investment. That means the case company can implement the future state map to achieve lean manufacturing without any financial pressure. This could be the first step to achieving lean manufacturing.