ISLAND DETECTION & SMOOTH
SWITCH CONTROL
Contents
Page
目录页
— 2 —
• Types of islands in power systems with DR
• Issues with unintentional islands
• Methods of protecting against unintentional
islands
• Standard testing for unintentional islanding
• Simulations and Results
• Probability of unintentional islanding
• The future of anti-islanding protection
• References
Terms
• Area EPS – Area Electric Power System
• Local EPS – Local Electric Power System
• PCC – Point of Common Coupling
• DR – Distributed Resource (e.g. distributed generation
(DG), distributed energy resource (DER))
• DER – Distributed Energy Resource
• Anti-islanding (non-islanding protection) – The use of
relays or controls to prevent the continued existence of an
unintentional island
Island Definition
Island: A condition in which a
portion of an Area EPS (Electric
Power System) is energized solely
by one or more Local EPSs
through the associated
PCCs(Point of Common
Coupling) while that portion of
the Area EPS is electrically
separated from the rest of the
Area EPS.[1]
• Intentional (Planned)
• Unintentional (unplanned) DR
115kV
13.2kV
Adjacent
Feeder
Island forms
when breaker
opens
Types of Islands
• Intentional Islands (Microgrids)
(1) have DR(Distributed Resources) and load
(2) have the ability to disconnect from and parallel with the area EPS(Electric Power
System)
(3) include the local EPS and may include portions of the area EPS, and
(4) are intentionally planned.
Distribution Feeder
from Substation
Open for a
Utility
Microgrid
DS
DG Load Load
DG Load
Microgrid
Switch
Distributed
Generation
Distributed
Generation
Distributed
Storage
Open for a
Facility Microgrid
Possible
Control Systems
Microgrid
Switch
Types of Islands
• Unintentional Islanding
For an unintentional island in which the DR energizes a
portion of the Area EPS through the PCC, the DR
interconnection system shall detect the island and cease to
energize the Area EPS within two seconds of the formation
of an island.
Issues with Unintentional Islanding
1)Personnel Safety – Unintentional islands can cause hazards
for utility workers if they assume downed lines are not
energized during restoration
Types of Islands
2)Overvoltages – Transient overvoltages due to rapid loss of load are
possible. If an adequate ground source is not present in the island, a
ground fault can result in voltages that exceed 173% on the unfaulted
phases.
3)Reconnection out of phase - This can result in large transient torques
applied to motors connected to the islanded area EPS and their
mechanical systems (e.g., shafts, blowers, and pumps), which could
result in damage or failure.
4)Power Quality – Unplanned island area EPS may not have suitable power
quality for loads
5)Protection – Unintentional islands may not provide sufficient fault current
to operate fuses or overcurrent relay protection devices inside island
References [4]-[9]
Unintentional Islands Detection & Protection
• Reverse/Minimum Import/Export Relays
• Passive Detection Methods
• Active Detection Methods
e.g. instability induced voltage or frequency drift and/or system
impedance measurement coupled with relay functions
• Communication-Based Anti-Islanding
Direct transfer trip (DTT)
Power line carrier (PLC)
Impedance Insertion
• Methods Under Development
Phasor-based anti-islanding
Reverse/Minimum Import/Export Relays
• Protective Relay
Function (Reverse
Power = 32)
• Used in cases where
the DR is not
exporting to the grid
• Local loads are
typically larger than
DR
DR
115kV
13.2kV
Adjacent
Feeder
81
O/U
59 27 32
Unintentional Islanding Test
• IEEE 1547.1 details testing
requirements for unintentional
islanding [40]
• Uses a matched RLC load and
measures trip times when island
condition occurs
• The RLC load is set to a Quality
factor (Qf) = 1.0
• Qf of 1.0 is equivalent to a load
displacement power factor of 0.707.
• Distribution circuits typically operate
at a value greater than 0.75 p.f.
• Conducted at 100%, 66%, and 33%
rated power
Unintentional Islanding Test for Synchronous Generators
o Load is matched in real and reactive
power [40]
o Tested at:
• Minimum Load at unity 1.0 p.f.
• Maximum real load at unity 1.0
p.f.
• Maximum real load at rated p.f.
lagging
• Maximum real load at rated p.f.
leading
Simulations & Results
o Figure shows a diagram of the parallel connection between a
photovoltaic power generation system and a utility grid. During normal
operations, the real power and reactive power required by the loads are
supplied by the photovoltaic power generation system and utility grid.
When the utility grid is disconnected and islanding phenomena is
observed, the power at the point of common coupling is unbalanced.
Simulations & Results
o Four islanding tests have been carried out in order to evaluate the
performance of the proposed islanding detection method under diverse
operation conditions, namely;
voltage swell, voltage dip, distorted grid voltage, and voltage flicker.
o Figure in next slide shows that three cycles of voltage swelling occurred
in the system before the utility grid end outage at Second 4. The
islanding detection method determined that the swell in voltage was
caused by signal interference rather than an islanding operation.
Therefore, the system did not disconnect the loads until 0.5 cycle after
the islanding operation had occurred.
Simulations & Results
Simulations & Results
As shown below figure, the system voltage operation was normal before the
three cycles of voltage swelling. At Second 4, the utility grid was disconnected
to induce an islanding operation. The results show that the islanding operation
detection method can recognize when a voltage swell is caused by power
quality interference. Therefore, the system only disconnected the load from the
photovoltaic power generation system within a 0.5 cycle (i.e., precisely 0.003
s) after disconnection of the utility grid (i.e., the islanding operation).
Guidelines for Assessment of DG Unintentional Islanding Risk
o Cases in Which Unintentional Islanding can be Ruled Out
• Aggregated AC rating of all DG within the potential island is less
than some fraction of the minimum real power load within the
potential island
• Not possible to balance reactive power supply and demand within
the potential island.
• DTT/PLCP is used
o Cases in Which Additional Study May Be Considered
• Potential island contains large capacitors, and is tuned such that the
power factor within a potential island is very close to 1.0
• Very large numbers of inverters
• Inverters from several different manufacturers
• Include both inverters and rotating generators
The Future of Anti-islanding Protection
o Passive islanding often has a NDZ, but it is hard for power systems to
maintain a generation/load balance for extended periods of time
(beyond 10s)[50]
o Active anti-islanding techniques are fast and work best on “stiff” grids.
Most techniques work when a significant change in system
characteristics occur because of island formation.
o New integration requirements are opening up voltage and frequency trip
points to enable grid stability at high DR penetrations
o Multiples of active anti-islanding techniques may or may not work
against each other.
o Future power systems may not be as stiff with reduced use of
synchronous generators.
References
[1] 1547™-2003 IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems
[2] Kroposki, B., Lasseter, R., Ise, T., Morozumi, S. Papathanassiou, S., and Hatziargyriou, N., “Making microgrids work”, IEEE Power and
Energy Magazine, Vol. 6, Issue 3, pp. 40-53, 2008
[3] IEEE 1547.4™-2011 IEEE Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems
[4] IEEE 1547.2™-2008 IEEE Application Guide for IEEE Std 1547™, IEEE Standard for Interconnecting Distributed Resources with Electric
Power Systems
[5] Walling, R., Miller, N. “Distributed Generation Islanding – Implications on Power System Dynamic Performance”, IEEE Power Engineering
Society Summer Meeting, pp.92-96, 2002
[6] Barker, P., de Mello, R., “Determining the Impact of Distributed Generation on Power Systems: Part 1 – Radial Distribution System”, Power
engineering Society Summer Meeting, pp. 1645-1655, 2000
[7] Stevens, J., Bonn, R., Ginn, J., Gonzalez, S., Kern, G., “Development and Testing of an Approach to Anti-islanding in Utility-Interconnected
Photovoltaic Systems” Sandia Report SAND-2000-1939, August 2000
[8] IEEE 929-2000 IEEE Recommended Practice for Utility Interface of Photovoltaic (PV) Systems
[9] Gish, W. B., Greuel, S., and Feero, W. E., “Ferroresonance and loading relationships for DSG installations,” IEEE Transactions on Power
Delivery, Vol. PWRD-2, no. 3, pp. 953–959, July 1987
[10] Kobayashi, H. Takigawa, K, Hashimoto, E., Kitamura, A., Matsuda, H., “Method for Preventing Islanding Phenomenon in Utility Grid with a
Number of Small Scale PV Systems”, IEEE Photovoltaic Specialists Conference, pp. 695-700, 1991 IEEE
o Thank You!

More Related Content

Similar to tanveerppt-170427091913.pdf

Presentation best practice earthing and protection
Presentation   best practice earthing and protectionPresentation   best practice earthing and protection
Presentation best practice earthing and protectionMahesh Chandra Manav
 
Islanding Detection and Controlled Islanding in Emerging Power Systems Key Is...
Islanding Detection and Controlled Islanding in Emerging Power Systems Key Is...Islanding Detection and Controlled Islanding in Emerging Power Systems Key Is...
Islanding Detection and Controlled Islanding in Emerging Power Systems Key Is...IRJET Journal
 
Renewable Energy Technology : 5-day course at IIT Bombay - May 2012
Renewable Energy Technology : 5-day course at IIT Bombay - May 2012Renewable Energy Technology : 5-day course at IIT Bombay - May 2012
Renewable Energy Technology : 5-day course at IIT Bombay - May 2012Kishore Malani, M.Tech
 
protection of feeders in distribution substation
protection of feeders in distribution substationprotection of feeders in distribution substation
protection of feeders in distribution substationPanneerselvam Rathinam
 
Power system stability issues and Defence Mechanism in Indian Grid
Power system stability issues and Defence Mechanism in Indian GridPower system stability issues and Defence Mechanism in Indian Grid
Power system stability issues and Defence Mechanism in Indian GridChandan Kumar
 
SWES_Unit-V.ppt
SWES_Unit-V.pptSWES_Unit-V.ppt
SWES_Unit-V.pptGopiPasala
 
8575R 50% Complete
8575R 50% Complete8575R 50% Complete
8575R 50% Completehiidrasidi
 
A wave-to-wire model of ocean wave energy conversion system using MATLAB/Simu...
A wave-to-wire model of ocean wave energy conversion system using MATLAB/Simu...A wave-to-wire model of ocean wave energy conversion system using MATLAB/Simu...
A wave-to-wire model of ocean wave energy conversion system using MATLAB/Simu...Jakir Hossain
 
01-120917022737-phpapp02.pdf
01-120917022737-phpapp02.pdf01-120917022737-phpapp02.pdf
01-120917022737-phpapp02.pdfThien Phan Bản
 
A Passive Islanding Detection Method for Neutral point clamped Multilevel Inv...
A Passive Islanding Detection Method for Neutral point clamped Multilevel Inv...A Passive Islanding Detection Method for Neutral point clamped Multilevel Inv...
A Passive Islanding Detection Method for Neutral point clamped Multilevel Inv...IJECEIAES
 
Performance of quadrilateral relay on EHV transmission line protection during...
Performance of quadrilateral relay on EHV transmission line protection during...Performance of quadrilateral relay on EHV transmission line protection during...
Performance of quadrilateral relay on EHV transmission line protection during...IDES Editor
 
ESA SAS paper 2011ESASP_690E__62S
ESA SAS paper 2011ESASP_690E__62SESA SAS paper 2011ESASP_690E__62S
ESA SAS paper 2011ESASP_690E__62SNoah Schmitz
 
Wireless power transmission via solar power satellite
Wireless power transmission via solar power satelliteWireless power transmission via solar power satellite
Wireless power transmission via solar power satelliteFaizy Ali
 
SALIENT FEATURES OF GRID-CONNECTED PHOTOVOLTAIC SYSTEM AND ITS IMPACT ON POWE...
SALIENT FEATURES OF GRID-CONNECTED PHOTOVOLTAIC SYSTEM AND ITS IMPACT ON POWE...SALIENT FEATURES OF GRID-CONNECTED PHOTOVOLTAIC SYSTEM AND ITS IMPACT ON POWE...
SALIENT FEATURES OF GRID-CONNECTED PHOTOVOLTAIC SYSTEM AND ITS IMPACT ON POWE...Editor IJMTER
 
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...IRJET Journal
 
Wireless power transmission via Space Based Solar Power
Wireless power transmission via Space Based Solar PowerWireless power transmission via Space Based Solar Power
Wireless power transmission via Space Based Solar Powernikhil gaurav
 

Similar to tanveerppt-170427091913.pdf (20)

Presentation best practice earthing and protection
Presentation   best practice earthing and protectionPresentation   best practice earthing and protection
Presentation best practice earthing and protection
 
Islanding Detection and Controlled Islanding in Emerging Power Systems Key Is...
Islanding Detection and Controlled Islanding in Emerging Power Systems Key Is...Islanding Detection and Controlled Islanding in Emerging Power Systems Key Is...
Islanding Detection and Controlled Islanding in Emerging Power Systems Key Is...
 
Renewable Energy Technology : 5-day course at IIT Bombay - May 2012
Renewable Energy Technology : 5-day course at IIT Bombay - May 2012Renewable Energy Technology : 5-day course at IIT Bombay - May 2012
Renewable Energy Technology : 5-day course at IIT Bombay - May 2012
 
protection of feeders in distribution substation
protection of feeders in distribution substationprotection of feeders in distribution substation
protection of feeders in distribution substation
 
Power system stability issues and Defence Mechanism in Indian Grid
Power system stability issues and Defence Mechanism in Indian GridPower system stability issues and Defence Mechanism in Indian Grid
Power system stability issues and Defence Mechanism in Indian Grid
 
SWES_Unit-V.ppt
SWES_Unit-V.pptSWES_Unit-V.ppt
SWES_Unit-V.ppt
 
Islanding
IslandingIslanding
Islanding
 
8575R 50% Complete
8575R 50% Complete8575R 50% Complete
8575R 50% Complete
 
G42022933
G42022933G42022933
G42022933
 
A wave-to-wire model of ocean wave energy conversion system using MATLAB/Simu...
A wave-to-wire model of ocean wave energy conversion system using MATLAB/Simu...A wave-to-wire model of ocean wave energy conversion system using MATLAB/Simu...
A wave-to-wire model of ocean wave energy conversion system using MATLAB/Simu...
 
Unit-5.pptx
Unit-5.pptxUnit-5.pptx
Unit-5.pptx
 
01-120917022737-phpapp02.pdf
01-120917022737-phpapp02.pdf01-120917022737-phpapp02.pdf
01-120917022737-phpapp02.pdf
 
A Passive Islanding Detection Method for Neutral point clamped Multilevel Inv...
A Passive Islanding Detection Method for Neutral point clamped Multilevel Inv...A Passive Islanding Detection Method for Neutral point clamped Multilevel Inv...
A Passive Islanding Detection Method for Neutral point clamped Multilevel Inv...
 
Performance of quadrilateral relay on EHV transmission line protection during...
Performance of quadrilateral relay on EHV transmission line protection during...Performance of quadrilateral relay on EHV transmission line protection during...
Performance of quadrilateral relay on EHV transmission line protection during...
 
ESA SAS paper 2011ESASP_690E__62S
ESA SAS paper 2011ESASP_690E__62SESA SAS paper 2011ESASP_690E__62S
ESA SAS paper 2011ESASP_690E__62S
 
Wireless power transmission via solar power satellite
Wireless power transmission via solar power satelliteWireless power transmission via solar power satellite
Wireless power transmission via solar power satellite
 
Class 16 load shedding
Class 16 load sheddingClass 16 load shedding
Class 16 load shedding
 
SALIENT FEATURES OF GRID-CONNECTED PHOTOVOLTAIC SYSTEM AND ITS IMPACT ON POWE...
SALIENT FEATURES OF GRID-CONNECTED PHOTOVOLTAIC SYSTEM AND ITS IMPACT ON POWE...SALIENT FEATURES OF GRID-CONNECTED PHOTOVOLTAIC SYSTEM AND ITS IMPACT ON POWE...
SALIENT FEATURES OF GRID-CONNECTED PHOTOVOLTAIC SYSTEM AND ITS IMPACT ON POWE...
 
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
 
Wireless power transmission via Space Based Solar Power
Wireless power transmission via Space Based Solar PowerWireless power transmission via Space Based Solar Power
Wireless power transmission via Space Based Solar Power
 

More from gulie

Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...
Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...
Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...gulie
 
PPT material.pptx
PPT material.pptxPPT material.pptx
PPT material.pptxgulie
 
Gneration1.ppt
Gneration1.pptGneration1.ppt
Gneration1.pptgulie
 
PrabhuPresent.ppt
PrabhuPresent.pptPrabhuPresent.ppt
PrabhuPresent.pptgulie
 
Adaptation of Chinese Culture .pptx
Adaptation of Chinese Culture .pptxAdaptation of Chinese Culture .pptx
Adaptation of Chinese Culture .pptxgulie
 
Capacitor Cabinet-RAM 2.1-3600-0.3Y.pdf
Capacitor Cabinet-RAM 2.1-3600-0.3Y.pdfCapacitor Cabinet-RAM 2.1-3600-0.3Y.pdf
Capacitor Cabinet-RAM 2.1-3600-0.3Y.pdfgulie
 
1337683699.3104Lecture 07 - Synchronous machines.ppt
1337683699.3104Lecture 07 - Synchronous machines.ppt1337683699.3104Lecture 07 - Synchronous machines.ppt
1337683699.3104Lecture 07 - Synchronous machines.pptgulie
 
1337683622.6252Lecture 05 - DC motors.ppt
1337683622.6252Lecture 05 - DC motors.ppt1337683622.6252Lecture 05 - DC motors.ppt
1337683622.6252Lecture 05 - DC motors.pptgulie
 
2730.ppt
2730.ppt2730.ppt
2730.pptgulie
 
Basic Power Electronics Concepts_Ozipineci_ORNL.pdf
Basic Power Electronics Concepts_Ozipineci_ORNL.pdfBasic Power Electronics Concepts_Ozipineci_ORNL.pdf
Basic Power Electronics Concepts_Ozipineci_ORNL.pdfgulie
 
Electrical Engineering Objective Type Questions.pdf
Electrical Engineering Objective Type Questions.pdfElectrical Engineering Objective Type Questions.pdf
Electrical Engineering Objective Type Questions.pdfgulie
 
Job Hunting Techniques for UAE.pptx
Job Hunting Techniques for UAE.pptxJob Hunting Techniques for UAE.pptx
Job Hunting Techniques for UAE.pptxgulie
 
lachhab2013.pdf
lachhab2013.pdflachhab2013.pdf
lachhab2013.pdfgulie
 
sikder2018.pdf
sikder2018.pdfsikder2018.pdf
sikder2018.pdfgulie
 
SVM-plus-Phase-Shift Modulation Strategy for Single-Stage.pdf
SVM-plus-Phase-Shift Modulation Strategy for Single-Stage.pdfSVM-plus-Phase-Shift Modulation Strategy for Single-Stage.pdf
SVM-plus-Phase-Shift Modulation Strategy for Single-Stage.pdfgulie
 
Multiphase Converters.pdf
Multiphase Converters.pdfMultiphase Converters.pdf
Multiphase Converters.pdfgulie
 
Grid Converters for Photovoltaic and Wind Power Systems - 2010 - Teodorescu -...
Grid Converters for Photovoltaic and Wind Power Systems - 2010 - Teodorescu -...Grid Converters for Photovoltaic and Wind Power Systems - 2010 - Teodorescu -...
Grid Converters for Photovoltaic and Wind Power Systems - 2010 - Teodorescu -...gulie
 
09_chapter4SPACEVECTORPULSEWIDTHMODULATION.pdf
09_chapter4SPACEVECTORPULSEWIDTHMODULATION.pdf09_chapter4SPACEVECTORPULSEWIDTHMODULATION.pdf
09_chapter4SPACEVECTORPULSEWIDTHMODULATION.pdfgulie
 
Atp book
Atp bookAtp book
Atp bookgulie
 
Electrical power systems design and analysis mohamed e. el-hawary
Electrical power systems   design and analysis mohamed e. el-hawaryElectrical power systems   design and analysis mohamed e. el-hawary
Electrical power systems design and analysis mohamed e. el-hawarygulie
 

More from gulie (20)

Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...
Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...
Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...
 
PPT material.pptx
PPT material.pptxPPT material.pptx
PPT material.pptx
 
Gneration1.ppt
Gneration1.pptGneration1.ppt
Gneration1.ppt
 
PrabhuPresent.ppt
PrabhuPresent.pptPrabhuPresent.ppt
PrabhuPresent.ppt
 
Adaptation of Chinese Culture .pptx
Adaptation of Chinese Culture .pptxAdaptation of Chinese Culture .pptx
Adaptation of Chinese Culture .pptx
 
Capacitor Cabinet-RAM 2.1-3600-0.3Y.pdf
Capacitor Cabinet-RAM 2.1-3600-0.3Y.pdfCapacitor Cabinet-RAM 2.1-3600-0.3Y.pdf
Capacitor Cabinet-RAM 2.1-3600-0.3Y.pdf
 
1337683699.3104Lecture 07 - Synchronous machines.ppt
1337683699.3104Lecture 07 - Synchronous machines.ppt1337683699.3104Lecture 07 - Synchronous machines.ppt
1337683699.3104Lecture 07 - Synchronous machines.ppt
 
1337683622.6252Lecture 05 - DC motors.ppt
1337683622.6252Lecture 05 - DC motors.ppt1337683622.6252Lecture 05 - DC motors.ppt
1337683622.6252Lecture 05 - DC motors.ppt
 
2730.ppt
2730.ppt2730.ppt
2730.ppt
 
Basic Power Electronics Concepts_Ozipineci_ORNL.pdf
Basic Power Electronics Concepts_Ozipineci_ORNL.pdfBasic Power Electronics Concepts_Ozipineci_ORNL.pdf
Basic Power Electronics Concepts_Ozipineci_ORNL.pdf
 
Electrical Engineering Objective Type Questions.pdf
Electrical Engineering Objective Type Questions.pdfElectrical Engineering Objective Type Questions.pdf
Electrical Engineering Objective Type Questions.pdf
 
Job Hunting Techniques for UAE.pptx
Job Hunting Techniques for UAE.pptxJob Hunting Techniques for UAE.pptx
Job Hunting Techniques for UAE.pptx
 
lachhab2013.pdf
lachhab2013.pdflachhab2013.pdf
lachhab2013.pdf
 
sikder2018.pdf
sikder2018.pdfsikder2018.pdf
sikder2018.pdf
 
SVM-plus-Phase-Shift Modulation Strategy for Single-Stage.pdf
SVM-plus-Phase-Shift Modulation Strategy for Single-Stage.pdfSVM-plus-Phase-Shift Modulation Strategy for Single-Stage.pdf
SVM-plus-Phase-Shift Modulation Strategy for Single-Stage.pdf
 
Multiphase Converters.pdf
Multiphase Converters.pdfMultiphase Converters.pdf
Multiphase Converters.pdf
 
Grid Converters for Photovoltaic and Wind Power Systems - 2010 - Teodorescu -...
Grid Converters for Photovoltaic and Wind Power Systems - 2010 - Teodorescu -...Grid Converters for Photovoltaic and Wind Power Systems - 2010 - Teodorescu -...
Grid Converters for Photovoltaic and Wind Power Systems - 2010 - Teodorescu -...
 
09_chapter4SPACEVECTORPULSEWIDTHMODULATION.pdf
09_chapter4SPACEVECTORPULSEWIDTHMODULATION.pdf09_chapter4SPACEVECTORPULSEWIDTHMODULATION.pdf
09_chapter4SPACEVECTORPULSEWIDTHMODULATION.pdf
 
Atp book
Atp bookAtp book
Atp book
 
Electrical power systems design and analysis mohamed e. el-hawary
Electrical power systems   design and analysis mohamed e. el-hawaryElectrical power systems   design and analysis mohamed e. el-hawary
Electrical power systems design and analysis mohamed e. el-hawary
 

Recently uploaded

Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 

Recently uploaded (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

tanveerppt-170427091913.pdf

  • 1. 1 RIAZ MUHAMMAD TANVEER STUDENT ID: L1600305 2017年4月25日 ISLAND DETECTION & SMOOTH SWITCH CONTROL
  • 2. Contents Page 目录页 — 2 — • Types of islands in power systems with DR • Issues with unintentional islands • Methods of protecting against unintentional islands • Standard testing for unintentional islanding • Simulations and Results • Probability of unintentional islanding • The future of anti-islanding protection • References
  • 3. Terms • Area EPS – Area Electric Power System • Local EPS – Local Electric Power System • PCC – Point of Common Coupling • DR – Distributed Resource (e.g. distributed generation (DG), distributed energy resource (DER)) • DER – Distributed Energy Resource • Anti-islanding (non-islanding protection) – The use of relays or controls to prevent the continued existence of an unintentional island
  • 4. Island Definition Island: A condition in which a portion of an Area EPS (Electric Power System) is energized solely by one or more Local EPSs through the associated PCCs(Point of Common Coupling) while that portion of the Area EPS is electrically separated from the rest of the Area EPS.[1] • Intentional (Planned) • Unintentional (unplanned) DR 115kV 13.2kV Adjacent Feeder Island forms when breaker opens
  • 5. Types of Islands • Intentional Islands (Microgrids) (1) have DR(Distributed Resources) and load (2) have the ability to disconnect from and parallel with the area EPS(Electric Power System) (3) include the local EPS and may include portions of the area EPS, and (4) are intentionally planned. Distribution Feeder from Substation Open for a Utility Microgrid DS DG Load Load DG Load Microgrid Switch Distributed Generation Distributed Generation Distributed Storage Open for a Facility Microgrid Possible Control Systems Microgrid Switch
  • 6. Types of Islands • Unintentional Islanding For an unintentional island in which the DR energizes a portion of the Area EPS through the PCC, the DR interconnection system shall detect the island and cease to energize the Area EPS within two seconds of the formation of an island. Issues with Unintentional Islanding 1)Personnel Safety – Unintentional islands can cause hazards for utility workers if they assume downed lines are not energized during restoration
  • 7. Types of Islands 2)Overvoltages – Transient overvoltages due to rapid loss of load are possible. If an adequate ground source is not present in the island, a ground fault can result in voltages that exceed 173% on the unfaulted phases. 3)Reconnection out of phase - This can result in large transient torques applied to motors connected to the islanded area EPS and their mechanical systems (e.g., shafts, blowers, and pumps), which could result in damage or failure. 4)Power Quality – Unplanned island area EPS may not have suitable power quality for loads 5)Protection – Unintentional islands may not provide sufficient fault current to operate fuses or overcurrent relay protection devices inside island References [4]-[9]
  • 8. Unintentional Islands Detection & Protection • Reverse/Minimum Import/Export Relays • Passive Detection Methods • Active Detection Methods e.g. instability induced voltage or frequency drift and/or system impedance measurement coupled with relay functions • Communication-Based Anti-Islanding Direct transfer trip (DTT) Power line carrier (PLC) Impedance Insertion • Methods Under Development Phasor-based anti-islanding
  • 9. Reverse/Minimum Import/Export Relays • Protective Relay Function (Reverse Power = 32) • Used in cases where the DR is not exporting to the grid • Local loads are typically larger than DR DR 115kV 13.2kV Adjacent Feeder 81 O/U 59 27 32
  • 10. Unintentional Islanding Test • IEEE 1547.1 details testing requirements for unintentional islanding [40] • Uses a matched RLC load and measures trip times when island condition occurs • The RLC load is set to a Quality factor (Qf) = 1.0 • Qf of 1.0 is equivalent to a load displacement power factor of 0.707. • Distribution circuits typically operate at a value greater than 0.75 p.f. • Conducted at 100%, 66%, and 33% rated power
  • 11. Unintentional Islanding Test for Synchronous Generators o Load is matched in real and reactive power [40] o Tested at: • Minimum Load at unity 1.0 p.f. • Maximum real load at unity 1.0 p.f. • Maximum real load at rated p.f. lagging • Maximum real load at rated p.f. leading
  • 12. Simulations & Results o Figure shows a diagram of the parallel connection between a photovoltaic power generation system and a utility grid. During normal operations, the real power and reactive power required by the loads are supplied by the photovoltaic power generation system and utility grid. When the utility grid is disconnected and islanding phenomena is observed, the power at the point of common coupling is unbalanced.
  • 13. Simulations & Results o Four islanding tests have been carried out in order to evaluate the performance of the proposed islanding detection method under diverse operation conditions, namely; voltage swell, voltage dip, distorted grid voltage, and voltage flicker. o Figure in next slide shows that three cycles of voltage swelling occurred in the system before the utility grid end outage at Second 4. The islanding detection method determined that the swell in voltage was caused by signal interference rather than an islanding operation. Therefore, the system did not disconnect the loads until 0.5 cycle after the islanding operation had occurred.
  • 15. Simulations & Results As shown below figure, the system voltage operation was normal before the three cycles of voltage swelling. At Second 4, the utility grid was disconnected to induce an islanding operation. The results show that the islanding operation detection method can recognize when a voltage swell is caused by power quality interference. Therefore, the system only disconnected the load from the photovoltaic power generation system within a 0.5 cycle (i.e., precisely 0.003 s) after disconnection of the utility grid (i.e., the islanding operation).
  • 16. Guidelines for Assessment of DG Unintentional Islanding Risk o Cases in Which Unintentional Islanding can be Ruled Out • Aggregated AC rating of all DG within the potential island is less than some fraction of the minimum real power load within the potential island • Not possible to balance reactive power supply and demand within the potential island. • DTT/PLCP is used o Cases in Which Additional Study May Be Considered • Potential island contains large capacitors, and is tuned such that the power factor within a potential island is very close to 1.0 • Very large numbers of inverters • Inverters from several different manufacturers • Include both inverters and rotating generators
  • 17. The Future of Anti-islanding Protection o Passive islanding often has a NDZ, but it is hard for power systems to maintain a generation/load balance for extended periods of time (beyond 10s)[50] o Active anti-islanding techniques are fast and work best on “stiff” grids. Most techniques work when a significant change in system characteristics occur because of island formation. o New integration requirements are opening up voltage and frequency trip points to enable grid stability at high DR penetrations o Multiples of active anti-islanding techniques may or may not work against each other. o Future power systems may not be as stiff with reduced use of synchronous generators.
  • 18. References [1] 1547™-2003 IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems [2] Kroposki, B., Lasseter, R., Ise, T., Morozumi, S. Papathanassiou, S., and Hatziargyriou, N., “Making microgrids work”, IEEE Power and Energy Magazine, Vol. 6, Issue 3, pp. 40-53, 2008 [3] IEEE 1547.4™-2011 IEEE Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems [4] IEEE 1547.2™-2008 IEEE Application Guide for IEEE Std 1547™, IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems [5] Walling, R., Miller, N. “Distributed Generation Islanding – Implications on Power System Dynamic Performance”, IEEE Power Engineering Society Summer Meeting, pp.92-96, 2002 [6] Barker, P., de Mello, R., “Determining the Impact of Distributed Generation on Power Systems: Part 1 – Radial Distribution System”, Power engineering Society Summer Meeting, pp. 1645-1655, 2000 [7] Stevens, J., Bonn, R., Ginn, J., Gonzalez, S., Kern, G., “Development and Testing of an Approach to Anti-islanding in Utility-Interconnected Photovoltaic Systems” Sandia Report SAND-2000-1939, August 2000 [8] IEEE 929-2000 IEEE Recommended Practice for Utility Interface of Photovoltaic (PV) Systems [9] Gish, W. B., Greuel, S., and Feero, W. E., “Ferroresonance and loading relationships for DSG installations,” IEEE Transactions on Power Delivery, Vol. PWRD-2, no. 3, pp. 953–959, July 1987 [10] Kobayashi, H. Takigawa, K, Hashimoto, E., Kitamura, A., Matsuda, H., “Method for Preventing Islanding Phenomenon in Utility Grid with a Number of Small Scale PV Systems”, IEEE Photovoltaic Specialists Conference, pp. 695-700, 1991 IEEE