BUILDING STRUCTURES [ARC 2522] PROJECT 1
LEE YIANG SIANG (DEAN) 
WONG SOON FOOK 
LING TECK ONG 
PRO WEI KEAT 
CHUNG KA SENG
WONG KIEN HOU 0312104

LECTURER MR. ADIB
0302966
0302953
0303127
0303646
0316922
FETTUCCINE TRUSS BRIDGE

TAYLOR’S UNIVERSITY
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN

PRECEDENT STUDY: WADDELL “A” TRUSS BRIDGE, PARKVILLE, MISSOURI.
CONTENT
1.  Introduction
1.1 General purpose of study
1.2 Report preview
1.3 Restriction
1.4 Working schedule
2.  Methodology
2.1 Precedent study
2.2 Making of fettuccine truss 
bridge 
2.3 Structural analysis
3.  Precedent Studies
4.  Equipment & Material 
Study
4.1 Adhesive types
4.2 Material strength study
4.2.1 Fettuccine types
and strength
test
4.2.2 Gluing method
4.2.3 Orientation
5.  Model Making
5.1 Method of construction
5.2 Joint
6.  Design Process
6.1 1st Bridge
6.2 2nd Bridge
6.3 3rd Bridge
6.4 Final Bridge
7.  Testing
7.1 Material and protocol test
7.2 Final model test
7.2.1 Observation
7.2.2 Efficiency 
8.  Design Modification
8.1 Failure reasoning
8.2 Solution
8.3 Result
9. Conclusion
10. References
11.  Appendix
11.1 Detail of Missouri Bridge
11.2 Truss analysis exercise
1. INTRODUCTION
1.1 GENERAL PURPOSE OF STUDY
This project purposely aims to develop the understanding of tension and compressive
strength of construction materials and thus be able to evaluate, explore and improve
attributes of construction materials. Besides, this study also purpose to develop
understanding of force distribution in a truss by exploring and apply understanding of
load distribution in a truss. In this project, the ability of designing a truss bridge with high
level of aesthetic value but minimal construction material is to be learnt. Moreover,
through the process of designing fettuccine truss bridge, exploration will be taken on
different arrangement of members in a truss structure thus able to evaluate and identify
tension and compression members in a truss structure. 
1.2 REPORT PREVIEW
In a group of 6, a precedent study of a truss bridge are required to carry out. Next, a
fettuccine truss bridge of 600mm clear span and with maximum of 150g based on the
gathered info from the precedent study. In this report, the precedent study, Waddell “A”
truss bridge located in Parkville, Missouri is studied and analysis on strength of the
material used load transfer system and truss system of this precedent study is stated in
this report. Before building the fettuccine bridge, a method of researching the strength
of the material in different brands and experiment on creating joints is taken. Besides, a
set of testing result of our truss bridge model is carried out and the designated bridge is
showed. Calculation regarding the given questions in exercise 1 is also included in the
last few page.
1.3 RESTRICTION
Fettuccine is the only material that can be used to build the model bridge and we are
required to construct it with 600mm clear span and maximum weight of 150g.
1.4 WORKING SCHEDULE
Date
 Tasks
2 April 2014
 Buy material and prepare equipment
3 April 2014
 Fettuccine strength test
8 April 2014
 Case study and fettuccine strength test
9 April 2014
 Construct 1st bridge
13 April 2014
 Testing 1st bridge
16 April 2014
 Construct 2nd bridge
17 April 2014
 Testing 2nd bridge
20 April 2014
 Construct 3rd bridge
21 April 2014
 Testing 3rd bridge
24 April 2014
 Construct final bridge
25 April 2014
 Final bridge testing 
Table 1.4.1: Working schedule
2. METHODOLOGY
2.1 PRECEDENT STUDY
To study on the precedent study, Waddell “A” truss bridge, research is taken from the
source of internet and books. Looking at the detail of the precedent study, a real truss
bridge connections, arrangement of members and orientation of each member is to be
studied and put into the truss model structure design. Thus, the truss model’s structure
will be depended on the information obtained from the precedent studies.
2.2 MAKING OF FETTUCCINE TRUSS BRIDGE
PHASE 1: MATERIAL STRENGTH TESTING

Main material of doing the model bridge is fettuccine and the secondary, adhesive to
stick the fettuccine together as a whole structure. It is important to test different brands
of fettuccine to see their strength of taking load before skipping to the next
phase ,model making. Data showing the fettuccine strength results in different
circumstances is recorded in the subtopic of material under the topic, Analysis.


PHASE 2: CHOOSING ADHESIVE

Adhesive that is used to bond the fettuccine together might affect the strength of whole
structure .There are various choices of glue with different characteristics that could have
change the physical strength of fettuccine. As so it is crucial to choose the right
adhesive.
PHASE 3: MODEL MAKING

Based on the obtained information, we tried to apply some improvement on the truss
bridge model. To build a perfect model, it is first to produce an Autocad drawing of the
design model to be printed out into 1:1 scale and build it based on the cad drawing.
Jointing of the model bridge will be further discussed under the topic of truss analysis.


PHASE 4: MODEL TESTING

Finished model is tested by applying load with string attached to the middle of the
intermediate member of the model with the restriction of 60 cm clear span. Model are
tested and improved into the final designated model.


2.3 STRUCTURAL ANALYSIS
Structure model Is analyze to show the understanding of the truss and its load transfer
system. Failure models are analyzed to discover the problem and the analysis is the
reference to the next model bridge. In structural analysis, calculation and load transfer
diagrams are show.
3. PRECEDENT STUDY
2.1 PRECEDENT STUDY
To study on the precedent study, Waddell “A” truss bridge, research is taken from the
source of internet and books. Looking at the detail of the precedent study, a real truss
bridge connections, arrangement of members and orientation of each member is to be
studied and put into the truss model structure design. Thus, the truss model’s structure
will be depended on the information obtained from the precedent studies.


Missouri Bridge
Waddell A Truss
History Background
Built 1898 for the Quincy, Omaha and Kansas City Railway. Abandoned in 1939, but
converted into a highway bridge on MO 4 in 1953. Dismantled in 1980 to make room for
Smithville Reservoir, but relocated to English Landing Park in Parkville in 1987.

Through truss bridge originally spanning Linn Branch Creek in Clinton County near
Trimble, but relocated to English Landing Park in Parkville spanning Rush Creek open to
pedestrians only.
Bottom Chord
Cross Brace
Diagonal
Hip Vertical
Top Brace
End Post
Middle Chord
Design Strategies
The waddell‘A’truss bridge is identified by the Historic American Engineering Record.
Designed and patented by the famous American Engineer John Alexander Low Waddell,
the ‘A’truss is a significant type of late 19th century, short-span railroad bridge that used
pin-connections to join its major structural members. Because of its great height the
‘A’truss of this type of Bridge are great rigidity in all directions, ease and cheapness of
erection and economy of metal when it is compared with structures of other types having
equal strength and rigidity.
Compression
Tension
 Force Distribution
Truss Connection
Diagram 4.2.7: Identification of members in Waddell “A” truss bridge.
View From through Bridge
Southwestern Portal
Bridge Dateplate
Overview Looking North
Comparison between Previous and Present site
Built 1898 for the Quincy, Omaha and Kansas City Railway. Abandoned in 1939, but
converted into a highway bridge on MO 4 in 1953. Dismantled in 1980 to make room for
Smithville Reservoir, but relocated to English Landing Park in Parkville in 1987.
Present Site Parkville 1987 - present
Barrel Shot With Dateplate In
Right Foreground
Steel Approach Beams View
From Underneath Bridge
Approach View
Previous Site Kansas 1898 - 1939
Missouri Bridge Engineering Elevation Drawing by John Alexander Waddell
General View Of 'A' Truss From Side 
Showing Abutments
Detail View Of Lateral Cross Bracing
Detail of Top chord Connection by John Alexander Waddell
General View From Side Showing Guard Rail In
Foreground
Detail View Of Support Column Looking Down
Axis Of Truss
Detail of Truss Connection and Members by John Alexander Waddell
Detail View Of Bridge Underside Showing
Original Floor Beams And Bottom Chord Lateral
Bracing
Detail View Of Circa 1952 Steel Approach Beams
Taken From Underneath Bridge
4. EQUIPMENT AND MATERIAL STUDY
4.1 ADHESIVE TYPES
Three different glue kinds are tested to get the best result on connection.
3 second ok glue

-  Highest effieciency.
-  Fastest solidify time
between connection
-  Easy to use
-  Clean joint
Epoxy glue

-  High effieciency.
-  Rigid joint
Uhu glue

-  Easy to use
Hot glue

-  Easy to use.


-  Expand and bending
might occurs
-  Cracked joint after store
for a few days.


-  Long solidify time
-  Messy


-  Messy if not control
well
-  Joints slightly flexible
when dry
-  Longer solidify time
than 3 seconds glue
-  Longer solidify time.
-  Easily create bulky finishing
-  Weight increase significantly
-  Joints flexible when dry
Table 4.1.1: Comparison of advantages and disadvantages of different types adhesives
Type	
  of	
  
Glue
Glue	
  
applied	
  
(on	
  
fe0uccine)
Clear	
  
Span	
  
(mm)
Length	
  
(mm)
Layer	
  of	
  
S;cks
No.	
  of	
  
50$	
  
coins
No.	
  of	
  
20$	
  
coins
Weight	
  
Sustained	
  (g)	
  
UHU Whole 20 24 2 16 38 364.70
3	
  Sec	
  
Glue
Whole 20 24 2 16 24 285.12
From the table above, Uhu glue is obviously better than 3 seconds glue even
though Uhu needs more time to solidify the connection. This is because Uhu does
not solidify the connection thoroughly and causes to preserve the elasticity of the
fettuccine thus can sustained more stress form the load.
Type	
  of	
  
Glue
Glue	
  
applied	
  
(Point)
Clear	
  
Span	
  
(mm)
Length	
  
(mm)
Layer	
  of	
  
S;cks
No.	
  of	
  
50$	
  
coins
No.	
  of	
  
20$	
  
coins
Weight	
  
Sustained	
  (g)	
  
UHU Whole 20 24 2 16 38 112.79
3	
  Sec	
  
Glue
Whole 20 24 2 16 24 285.12
The results of the second test seems totally different from the first test, which on
the first test: Uhu is better than 3 second glue , whereas on the second test where
the fettuccines are to let dry for more than one day: 3 seconds glue has the better
quality. Besides, in terms of workmanships, 3 second glue leave no tracks which
made it the best choice among all the glue types.
Table 4.1.2: strength of fettuccine after applied with UHU and 3 seconds glue and tested within a day.
Table 4.1.3: The second test on glued fettuccine let to dry for more than one day.
In addition, we discovered that the stick that using Uhu glue to connect are
separated when second test is carrying out. This proves that Uhu glue does not
bond the fettuccine well as it separate into two after it was left dry for two days.
Days
to left
dry
Type	
  
of	
  
Glue
Glue	
  
applied	
  
(Point)
Clear	
  
Span	
  
(mm)
Length	
  
(mm)
Layer	
  of	
  
S;cks
Weight	
  
Sustained	
  
(g)	
  
1 3	
  Sec	
  
Glue
Whole 20 24 2 285.12
3 3	
  Sec	
  
Glue
Whole 20 24 2 101.37
The table shows that the strength of fettuccine falls sharply after three days left to
dry. This is because the 3 second glue make the fettuccine oxidized and brittle. As
a conclusion, the truss bridge has to be done freshly one day or two before the
model test as to prevent the oxidization happened on the bridge.
Table 4.1.3: Third test shows comparison of the fettuccine’s strength after let dry 
for different amount of days.
4.2 MATERIAL STRENGTH STUDY
4.2.1 FETTUCCINE TYPES AND STRENGTH TEST
Several tests on material strength is carried out to identify which brands or which
type of material does the best to be the members of the bridge.
Since fettuccine is the only material that can be used to construct the bridge, its
attribute is required to be studied and tested before making the model. The way of
putting or joining fettuccine could affect the whole structure bridge.

To build a strong bridge, it is crucial to know which fettuccine’s brand can be used
and has the strongest strength to withstand load. Below are three different brands
of fettuccine and each brand is tested with load hanging on one stick of fettuccine.


Image
 Name
 Weight
sustained
Shape/ Section
of fettuccine
Barilla	
   187g
	
  
San Remo
 156g
	
  
Kimball
	
  
112g
	
  
From the diagram above, it is obviously stated that the strongest fettuccine is
Barilla, followed by San Remo and Kimball. Barilla brand’s fettuccine has the utmost
strength mostly because of the expanded shape of the fettuccine. Yet, the unique
shape of the fettuccine has bring the disadvantage on making bond with another
fettuccine and its strength may fall when stack with two or more straps.
Table 4.2.1: Fettuccine types with description.
The capacity of the bonding is too small which may cause the the fettuccine to fall apart
when light force is applied. 
Barilla fettuccine (2 stacks)
Light
Force
The fettuccine is flatter thus the capacity of the bonding is big enough which make the
fettuccine hard to break apart when light force is applied.


As a conclusion, we eliminates Barilla as the bridge material and choose San Remo
because of its higher physical strength and bigger capacity to stack on to create stronger
bond. In addition, the flatter shape of San Remo fettuccine will easy our work on building
the truss bridge.
San Remo fettuccine (2 stacks)
Light
Force
Diagram 4.2.4: Result of two layer San Remo fettuccine after light force is applied.
Diagram 4.2.3: Result of two layer Barilla fettuccine after light force is applied.
4.2.2 GLUING METHOD 
Several gluing method are tested to determine which method does the best by not
destruct or affect the strength of fettuccine.
3	
  Sec	
  
Glue
2	
  Points 20 24 2 16 10 149.28
3	
  Points 20 24 2 16 18 250.90
Whole 20 24 2 16 24 285.12
Diagram 4.2.5: 3 seconds glue is applied at the end point of a fettuccine stick.
Diagram 4.2.6: 3 seconds glue is applied at the end point and the middle point of 
a fettuccine stick.
Diagram 4.2.7: 3 seconds glue is applied wholly on a fettuccine stick.
Table 4.2.2: 3 different gluing method to show comparison.
Table above shows that the gluing method of 3 seconds glue apply wholly on
fettuccine works the best, followed by 3 interval points and then 2 interval points. In
addition, 2 points and 3 points method which does not glue the whole fettuccine
had left some unglue space to be flexible. In this case after the glued fettuccine is
let to dried for one day, observation shows expanding and bending occurs.
Type	
  of	
  Glue Layer	
  of	
  
S;cks
Glue	
  Applied Weight	
  
Sustained	
  
(Horizontal)
(g)
Weight	
  
Sustained	
  
(Ver;cal)
(g)	
  
3	
  Sec	
  Glue 2 Whole 285.12 355.45
3 Whole 395.13 450.28
4 Whole 453.72 533.34
5 Whole 589.33 522.56
4.2.3 ORIENTATION
Testing on the orientation of fettuccine (horizontally or vertically) helps to
determine which placing position would have more strength to be put into our
model design.
Horizontal orientation Vertical orientation
Diagram 4.2.8: Horizontal and vertical orientation of fettuccine.
Table 4.2.3: Comparison of horizontal and vertical orientation with the increasing 
amount of layer.
Outcome of the test shows when fettuccine members are to stack to 4 layers, it is
best to use vertical orientation, whereas horizontal orientation is suitable for 5
layers of fettuccine.
5. MODEL MAKING
5.1 METHOD OF CONSTRUCTION
1)
Cut 3 pieces of 24cm
length fettuccine to form
the base.
2)
Use a 5cm piece to glue the main base together.
Place a 15cm piece in the middle and connect
the triangle with two other 40cm pieces.
Put straight
trusses after
every 9cm
interval on
t h e m a i n
base.
3)
4)
Then, connect pieces from the middle towards each vertical truss,
5)
 Thicken the truss
afterwards. The
bottom base with 5
pieces, upper two
parts with 4 pieces
and the trusses by
2. Replicate another
one after finishing.
6)
 Start	
   connec;ng	
   the	
   two	
   parts	
   at	
  
the	
  bo0om	
  end.	
  
7)
The leftmost picture shows how it looks like after joining them. The middle piece is
reinforced as it will be the piece holding the weight.
The top parts are joined with two singular fettuccine pieces.
8)
The completed final
model.
9)
5.2 JOINT
Step	
  1:	
  
Randomly	
  
choose	
  two	
  
Fe0uccine	
  
Step	
  2:	
  
Glue	
  them	
  
together	
  
Step	
  3:	
  
Repeat	
  the	
  
procedure	
  
Final	
  Product	
  
OVERLAID	
  JOINT	
  
BRIDLE	
  JOINT	
  
Step	
  1:	
  
Label	
  the	
  
area	
  that	
  
need	
  to	
  be	
  
cut	
  
Step	
  2:	
  
Glue	
  them	
  
together	
  
Step	
  3:	
  
Measure	
  
and	
  label	
  
the	
  cut	
  
area	
  
Step	
  4:	
  
S;ck	
  them	
  
together	
  to	
  
fill	
  the	
  gap	
  
Step	
  5:	
  
Cover	
  it	
  by	
  
a	
  new	
  
Fe0uccine	
  
Step	
  6:	
  
Repeat	
  the	
  
procedure	
  
Final	
  
	
  Product	
  
Overlaid joint is used in the first
bridge design. We are then
discovered that bridle joint is
better as it makes the surface
clear and having more aesthetic
value. Yet, bridle joint required
careful trimming and the
trimming need to be planned
cautiously too.
6. DESIGN PROCESS
6.1 1st BRIDGE
First bridge referring the design from precedent study — Waddell 'A' Truss Bridge. From the
observation of Waddell “A” truss bridge, The truss members are a few as its span length is
shorter and the material using metal which meant to be stronger. In this project, fettuccine, the
only material is quite weak to be a construction material. As so, more truss members and bracing
are added into the bridge as supports.
Design 2
Design 2
BOTTOM	
  LAYER	
  
	
  TOP	
  VIEW	
  
	
  SIDES	
  LAYER	
   CROSS	
  SECTION	
  
740	
  
50	
  
300	
  
Diagram 6.1.1: Tension and compression member (1st bridge)
Length : 74cm
Max Height : 30cm
Max Width : 5cm 
Mass : 182 g 

Max Load : 5KG
Efficiency : 137.36
	
  
6.2 2nd BRIDGE
The second bridge also
resemble the design from
precedent study —Waddell
'A' Truss Bridge, relying
support from the triangle
shape beam. As the load is
meant to hang at the
bottom, there are 5 hanging
members on each side
connected to the beam to
support the whole the
structure. The hanging
members are designed in
tension to favour the
characteristic of fettucine. 
Besides that, the bottom layer on each side connected with 20 fettucine with lenght of 7cm.
There are 4 members on each side connected to the point that load applied to strenghthen
the whole structure. The arrangement of bracing members and number of layers of fettucine
are tested from this design.
 
 
Length : 72cm
Max Height : 30cm
Max Width : 7cm 
Mass : 170 g 

Max Load : 5KG
Efficiency : 147.06
	
  
Model testing
of 2nd bridge
 
 
2nd bridge fall
at max load of
5kg.
 
 
BOTTOM	
  LAYER	
  
	
  TOP	
  VIEW	
  
	
  SIDES	
  LAYER	
   CROSS	
  SECTION	
  
Diagram 6.2.1: Tension and compression member (2nd bridge)
300	
  
6.3 3rd BRIDGE
After considering the failure
of previous designs, we
intended to reduce some
braces in the structure, the
horizontal members was
removed to reduce the
weight of the structure and
it didn’t really support the
whole structure as well.
Besides that, we also adding
two more hanging members
on each side of the structure
that connected to the
triangle beam to strengthen
the bridge. Gathering
information from precedent
study and some other
existing bridge, we reduce
the height of the bridge
from 380mm to 330mm to
increase the overall stability
of the structure, . At the
thesss
same time, it also reduce the weight of the structure which in turn contributing to higher
efficiency.
Length : 74cm
Max Height : 20cm
Max Width : 7cm 
Mass : 169 g 

Max Load : 8KG
Efficiency : 378.7
	
  
MODEL	
  TESTING	
  OF	
  3RD	
  BRIDGE	
  
3RD	
  BRIDGE	
  FAILURE	
  
The	
  whole	
  structure	
  
remain	
  the	
  same	
  
accept	
  the	
  horizontal	
  
interconnec;ng	
  	
  
member	
  at	
  the	
  center	
  
break	
  when	
  the	
  load	
  is	
  
8kg.	
  
3RD	
  BRIDGE	
  FAILURE	
  
740	
  
70	
  
BOTTOM	
  LAYER	
  
	
  TOP	
  VIEW	
  
	
  SIDES	
  LAYER	
  
200	
  
CROSS	
  SECTION	
  
Diagram 6.3.1: Tension and compression member (3rd bridge)
Final Bridge Design


Length 
: 72cm
Height 
: 15cm
Width 
: 7cm
Mass 
: 0.142kg
After considering the failure of
previous designs, the horizontal
interconnecting member at the
center have been strengthened
by 7 layered of fettuccine.
The picture above shows
the 4th design which is
the final bridge. The
bridge height changed
from 20cm to 15cm to
reduce the overall
weight and thus increase
6.3 FINAL BRIDGE
in efficiency. Moreover, by understanding that fettuccini has a weak compression
strength, the bottom horizontal member which intersects the center were added more
layer of fettuccini to strengthen the bridge structure. The previous bridge were weight
169gram which already overweight. Therefore we also reduce the layers of the vertical
members, from each 5 layers to ratio of 4:3:2:1 which the 4 is the nearest to the center
load and 1 is at the end. Furthermore, every surface at joints were worn flat to maximize
area of bonding. Lastly, the layers between layers of fettuccini were properly glued to
increase the tightness and make it more durable.
TOP VIEW (FINAL DESIGN)
BOTTOM LAYER
SIDES LAYER
720	
  
150	
  
70	
  
5 LAYERED
3 LAYERED
4 LAYERED
2 LAYERED
1 LAYERED
CROSS SECTION
TENSION	
  
COMPRESSION	
  
LOAD	
  
Model testing Final model falls
Diagram 6.4.1: Tension and compression member (3rd bridge)
7. TESTING
7.1 MATERIAL AND PROTOCOL TEST
Material and protocol design model are tested using the equipment that we had in our
dedicated working area. The equipment included a pail, “S” hook, 50 cents, 20 cents,
two tables, water, 6 liters bottle, measuring ruler and a long plastic bag. 
Load for fettuccine strength test are using 50 cents and 20 cents coins which per 50 cents
weighted 9g and per 20 cents weighted 6g. The reason is we have enough coin supply
and it is easy for us to clean the place once the load is fallen. 
Diagram 7.1.1: Equipment
First, different layers of
fettuccine which are to
test are labeled for
ease of recording.
Second, fettuccine is placed in
between of two tables with a
clear span of 20cm and two
full water bottles are served as
weight placed at the end of
the table holding and stable
the fettuccine.
Third, an ‘S’ hook with the pail
carried is hanged on the
middle part of fettuccine and
is ready to carry coin. Coin is
putting in one by one slowly
until the fettuccine breaks. 
Once the fettuccine finally
break, collected coins are
recounted to assure the
amount and to be recorded.
In protocol test, we demand a more accurate result, so we use water as load instead of
coins. As under normal condition and specific gravity of water, 1 litre is equal to 1 kg. The
method of weighing is almost the same as the different is only replacing the pail into
bigger one and the coin into water.
First thing to do before
testing is to weight the
bridge.
Water is then poured into
the pail. Weight of the
pail is added into the
record along with the
water weight.
Failure: the bridge is not
fully tested for not
knowing the breaking
point. This is because the
pail is too small that even
when the water is full, the
bridge is still not break.

Solution: the small pail is
replaced by a bigger pail.
7.2 FINAL MODEL TEST
Final model is tested in a classroom on 25th April 2014.

During the model testing, the horizontal interconnecting member in the center was
placed with a ‘S’ hook and empty bag was hung into it. Then we slowly put the loads
starting with 2kg into the bag with interval of 10 seconds time until it reached 6kg. At this
point, we changed the 2kg load to 1kg load until the bridge reached its breaking point
at 8kg.

7.2.1 OBSERVATION:

Weight: 142g
Maximum Load: 8kg
Efficiency, E= (Maximum Load) 
Weight of Bridge

= 64
0.142 

= 450.7
When more load is added into the bag, the bridge becomes heavier and we
observe that there is a slight bending to the right together with a crack sound but
later when we add another load to it at the point of 7kgs, we were surprised that it
bend back to original position. The bridge collapse when it reached its maximum
point at 8kg. 
7.2.2 EFFICIENCY:
Diagram 7.2.1: Final model test
2	
  
8. DESIGN MODIFICATION
8.1 FAILURE REASONING
Reason 01: Uneven sizes of the two main triangular truss
Throughout the process of analyzing the failure of the trus
s bridge, we found out that the two triangular trusses we
made were not even, one is slightly higher and another is
lower making them unbalance when combined together. 
The fettuccini bridge were tilt a little to a side and when
the load added to it, causes uneven distribution of force
acting on the bridge. By failing to have even distribution
force acting on all members, the part that is slightly lower
to ground will withstand more force and will break
eventually.

Reason 02: Lesser fettuccini layers used in the slanted part.
The breaking failure of the fettuccini bridge include the
lesser fettuccini layers in the slanted part to support the
bridge. Because of the intention to minimize the load of
the bridge, we have minus out the layers used in the
slanted part from 4 layers to 3 layers making it less
durable. The more fettuccini layers stick together as a
member of truss bridge, the stronger the bridge but it will
also cause a heavier mass.

Reason 03: No support from the sides of the bridge at the edge of table
At the two sides of the bridge, there were no truss
members to support the lower part of the bridge to make
it still. There might be chances that it slide and cause the
structure to tilt off because of compression force. When
the exertion forces were added, the members will start to
bend. By adding extra members to strengthen the sides,
the force will be distributed more and thus increase the
overall efficiency of bridge.
Solution 01: Adding supporting members at both ends of the truss bridge
By adding two diagonal bracing at the both sides of the bridge and triangular structure at
the bottom of the bridge, the bridge will be strengthen and make it more balance to
withstand more loads. Adding extra members is a good way to distribute the compression
force. 
But because of adding the extra members, the bridge will be overweight. Therefore we
analyzed that the bridge only have weakness in supporting compression force therefore,
horizontal members of the structure which support the tension force can be reduced in terms
of layers of fettuccini to reduce weight.

Solution 02: Always check that the truss members in the lower part are all flat and lies 
in a straight line
We have to carefully calculate correctly making sure that the trusses bridge were even and
the two triangular truss were symmetrical. This will make the bridge more stable and able to
withstand more external forces. The highlighted part in the figure above should lies in a
straight line so that the force will distribute evenly and deflection will not occur in one even
part. 

8.2 SOLUTION
Diagram 8.2.1: Final bridge with supporting members added
Diagram 7.2.2: Final bridge with flat straight base
8.3 RESULT
After analyzing the solutions, we
modified our bridge again and tested
once again by applying the solutions.
As expected, it was a success design as
it able to withstand a load of 12kg,
resulting efficiency as below:
Weight of bridge: 138gram
Load withstand: 12kg
Efficiency= (12)
0.138kg

=1043.48
2	
  

More Related Content

What's hot

Fettucine Truss Bridge report
Fettucine Truss Bridge reportFettucine Truss Bridge report
Fettucine Truss Bridge reportKen Wong
 
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGEBUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGEPatricia Kong
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportJoyeeLee0131
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 reportAdelinetingg
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge ReportYvonne Chin
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Josia Tannos, EIT
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeMohammed Abdelkawy
 
Design and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at AllahabadDesign and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at AllahabadAbhijit Kumar
 
Truss bridge final presentation
Truss bridge final presentationTruss bridge final presentation
Truss bridge final presentationkaiumbhai
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...
Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...
Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...Hossam Shafiq II
 
Design of portal frame structures
Design of portal frame structuresDesign of portal frame structures
Design of portal frame structuresSiddiq Mohammed
 
Building Structure Project 1 Report
Building Structure Project 1 ReportBuilding Structure Project 1 Report
Building Structure Project 1 Reportkimberleyee95
 
Modelling of Cable stayed bridge by AIT
Modelling of Cable stayed bridge by AITModelling of Cable stayed bridge by AIT
Modelling of Cable stayed bridge by AITRahul Saraswat
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report ForestedTiger
 
Precast pretensioned concrete girders
Precast pretensioned concrete girdersPrecast pretensioned concrete girders
Precast pretensioned concrete girdersMD.Yeasin Mostafiz
 
NOH3 Launching Girder Assembly and Erection VSL
NOH3  Launching Girder Assembly and Erection VSLNOH3  Launching Girder Assembly and Erection VSL
NOH3 Launching Girder Assembly and Erection VSLIan Kelly
 

What's hot (20)

Fettucine Truss Bridge report
Fettucine Truss Bridge reportFettucine Truss Bridge report
Fettucine Truss Bridge report
 
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGEBUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis Report
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 report
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge Report
 
Bridge report
Bridge reportBridge report
Bridge report
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
 
Design and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at AllahabadDesign and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at Allahabad
 
Truss bridge final presentation
Truss bridge final presentationTruss bridge final presentation
Truss bridge final presentation
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Suspension Bridges
Suspension BridgesSuspension Bridges
Suspension Bridges
 
Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...
Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...
Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...
 
Design of portal frame structures
Design of portal frame structuresDesign of portal frame structures
Design of portal frame structures
 
Building Structure Project 1 Report
Building Structure Project 1 ReportBuilding Structure Project 1 Report
Building Structure Project 1 Report
 
Modelling of Cable stayed bridge by AIT
Modelling of Cable stayed bridge by AITModelling of Cable stayed bridge by AIT
Modelling of Cable stayed bridge by AIT
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report
 
Precast pretensioned concrete girders
Precast pretensioned concrete girdersPrecast pretensioned concrete girders
Precast pretensioned concrete girders
 
NOH3 Launching Girder Assembly and Erection VSL
NOH3  Launching Girder Assembly and Erection VSLNOH3  Launching Girder Assembly and Erection VSL
NOH3 Launching Girder Assembly and Erection VSL
 
Etabs (atkins)
Etabs (atkins)Etabs (atkins)
Etabs (atkins)
 

Viewers also liked

Building structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalmBuilding structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalmJ.j. Hayashi
 
Auston and Tim
Auston and TimAuston and Tim
Auston and Timroehsco
 
School4you Spaghetti Challenge
School4you Spaghetti ChallengeSchool4you Spaghetti Challenge
School4you Spaghetti ChallengeProlympia Virserum
 
Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)Soh Shing
 
Spaghetti bridge project description 1314
Spaghetti bridge project description 1314Spaghetti bridge project description 1314
Spaghetti bridge project description 1314donpata
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]Soh Shing
 
Building structures report
Building structures report Building structures report
Building structures report Soh Shing
 
How to do your own spaghetti bridge
How to do your own spaghetti bridgeHow to do your own spaghetti bridge
How to do your own spaghetti bridgeAna Carvalho
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report Soh Shing
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge constructionsymphonyjo
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringHalcrow
 
project report on truss bridge
project report on truss bridgeproject report on truss bridge
project report on truss bridgerajdutt1111
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge ConstructionRobin Nirwal
 

Viewers also liked (16)

Building structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalmBuilding structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalm
 
T.G.
T.G.T.G.
T.G.
 
Auston and Tim
Auston and TimAuston and Tim
Auston and Tim
 
School4you Spaghetti Challenge
School4you Spaghetti ChallengeSchool4you Spaghetti Challenge
School4you Spaghetti Challenge
 
Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)
 
Spaghetti bridge project description 1314
Spaghetti bridge project description 1314Spaghetti bridge project description 1314
Spaghetti bridge project description 1314
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]
 
Building structures report
Building structures report Building structures report
Building structures report
 
How to do your own spaghetti bridge
How to do your own spaghetti bridgeHow to do your own spaghetti bridge
How to do your own spaghetti bridge
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge construction
 
types of bridges
types of bridgestypes of bridges
types of bridges
 
Types of bridges.pptx 1
Types of bridges.pptx 1Types of bridges.pptx 1
Types of bridges.pptx 1
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
project report on truss bridge
project report on truss bridgeproject report on truss bridge
project report on truss bridge
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge Construction
 

Similar to Build Fettuccine Truss Bridge

Building structure report
Building structure reportBuilding structure report
Building structure reportChenyi Teo
 
Bstructure report
Bstructure reportBstructure report
Bstructure reportMegan Chung
 
Project 1 fettucine truss bridge
Project 1 fettucine truss bridgeProject 1 fettucine truss bridge
Project 1 fettucine truss bridgeAh Jun
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxoJason Juen
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxoJason Juen
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxoAnthony Chew
 
BUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEBUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEChuah Say Yin
 
Building Structures - Fettucine Bridge
Building Structures - Fettucine BridgeBuilding Structures - Fettucine Bridge
Building Structures - Fettucine Bridgenadiacbass
 
B structures report
B structures reportB structures report
B structures reportaleensies
 
Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis ReportEsther Lau
 
Analysis and Design of PSC post te girder
Analysis and Design of PSC post te girderAnalysis and Design of PSC post te girder
Analysis and Design of PSC post te girderJesikaLalwani
 
Analysis and Design of Post tensioned girder
Analysis and Design of Post tensioned girderAnalysis and Design of Post tensioned girder
Analysis and Design of Post tensioned girderJesikaLalwani
 
building Structure
building Structurebuilding Structure
building Structureamee16
 
DSS UNIT 1 Introduction.pdf
DSS UNIT 1 Introduction.pdfDSS UNIT 1 Introduction.pdf
DSS UNIT 1 Introduction.pdfSwaraj636170
 
bridge report
bridge reportbridge report
bridge reportabc def
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeColby Hooi
 

Similar to Build Fettuccine Truss Bridge (20)

Building structure report
Building structure reportBuilding structure report
Building structure report
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 
FETTICCINE BRIDGE
FETTICCINE BRIDGEFETTICCINE BRIDGE
FETTICCINE BRIDGE
 
Fettucine
FettucineFettucine
Fettucine
 
Project 1 fettucine truss bridge
Project 1 fettucine truss bridgeProject 1 fettucine truss bridge
Project 1 fettucine truss bridge
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
BUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEBUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGE
 
Building Structures - Fettucine Bridge
Building Structures - Fettucine BridgeBuilding Structures - Fettucine Bridge
Building Structures - Fettucine Bridge
 
B structures report
B structures reportB structures report
B structures report
 
Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis Report
 
Analysis and Design of PSC post te girder
Analysis and Design of PSC post te girderAnalysis and Design of PSC post te girder
Analysis and Design of PSC post te girder
 
Analysis and Design of Post tensioned girder
Analysis and Design of Post tensioned girderAnalysis and Design of Post tensioned girder
Analysis and Design of Post tensioned girder
 
building Structure
building Structurebuilding Structure
building Structure
 
Finalest final report
Finalest final reportFinalest final report
Finalest final report
 
DSS UNIT 1 Introduction.pdf
DSS UNIT 1 Introduction.pdfDSS UNIT 1 Introduction.pdf
DSS UNIT 1 Introduction.pdf
 
bridge report
bridge reportbridge report
bridge report
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine Bridge
 

More from lee yiang siang

A study of how sustainable building materials benefit belum rainforest resort
A study of how sustainable building materials benefit belum rainforest resortA study of how sustainable building materials benefit belum rainforest resort
A study of how sustainable building materials benefit belum rainforest resortlee yiang siang
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure reportlee yiang siang
 
B.structures report-project2 done
B.structures report-project2 doneB.structures report-project2 done
B.structures report-project2 donelee yiang siang
 

More from lee yiang siang (6)

A study of how sustainable building materials benefit belum rainforest resort
A study of how sustainable building materials benefit belum rainforest resortA study of how sustainable building materials benefit belum rainforest resort
A study of how sustainable building materials benefit belum rainforest resort
 
Subang parade b.service
Subang parade b.serviceSubang parade b.service
Subang parade b.service
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure report
 
Fettucine recipe
Fettucine recipeFettucine recipe
Fettucine recipe
 
B.structures report-project2 done
B.structures report-project2 doneB.structures report-project2 done
B.structures report-project2 done
 
Subang parade b.service
Subang parade b.serviceSubang parade b.service
Subang parade b.service
 

Build Fettuccine Truss Bridge

  • 1. BUILDING STRUCTURES [ARC 2522] PROJECT 1 LEE YIANG SIANG (DEAN) WONG SOON FOOK LING TECK ONG PRO WEI KEAT CHUNG KA SENG WONG KIEN HOU 0312104 LECTURER MR. ADIB 0302966 0302953 0303127 0303646 0316922 FETTUCCINE TRUSS BRIDGE TAYLOR’S UNIVERSITY SCHOOL OF ARCHITECTURE, BUILDING & DESIGN PRECEDENT STUDY: WADDELL “A” TRUSS BRIDGE, PARKVILLE, MISSOURI.
  • 2. CONTENT 1.  Introduction 1.1 General purpose of study 1.2 Report preview 1.3 Restriction 1.4 Working schedule 2.  Methodology 2.1 Precedent study 2.2 Making of fettuccine truss bridge 2.3 Structural analysis 3.  Precedent Studies 4.  Equipment & Material Study 4.1 Adhesive types 4.2 Material strength study 4.2.1 Fettuccine types and strength test 4.2.2 Gluing method 4.2.3 Orientation 5.  Model Making 5.1 Method of construction 5.2 Joint 6.  Design Process 6.1 1st Bridge 6.2 2nd Bridge 6.3 3rd Bridge 6.4 Final Bridge 7.  Testing 7.1 Material and protocol test 7.2 Final model test 7.2.1 Observation 7.2.2 Efficiency 8.  Design Modification 8.1 Failure reasoning 8.2 Solution 8.3 Result 9. Conclusion 10. References 11.  Appendix 11.1 Detail of Missouri Bridge 11.2 Truss analysis exercise
  • 3. 1. INTRODUCTION 1.1 GENERAL PURPOSE OF STUDY This project purposely aims to develop the understanding of tension and compressive strength of construction materials and thus be able to evaluate, explore and improve attributes of construction materials. Besides, this study also purpose to develop understanding of force distribution in a truss by exploring and apply understanding of load distribution in a truss. In this project, the ability of designing a truss bridge with high level of aesthetic value but minimal construction material is to be learnt. Moreover, through the process of designing fettuccine truss bridge, exploration will be taken on different arrangement of members in a truss structure thus able to evaluate and identify tension and compression members in a truss structure. 1.2 REPORT PREVIEW In a group of 6, a precedent study of a truss bridge are required to carry out. Next, a fettuccine truss bridge of 600mm clear span and with maximum of 150g based on the gathered info from the precedent study. In this report, the precedent study, Waddell “A” truss bridge located in Parkville, Missouri is studied and analysis on strength of the material used load transfer system and truss system of this precedent study is stated in this report. Before building the fettuccine bridge, a method of researching the strength of the material in different brands and experiment on creating joints is taken. Besides, a set of testing result of our truss bridge model is carried out and the designated bridge is showed. Calculation regarding the given questions in exercise 1 is also included in the last few page.
  • 4. 1.3 RESTRICTION Fettuccine is the only material that can be used to build the model bridge and we are required to construct it with 600mm clear span and maximum weight of 150g. 1.4 WORKING SCHEDULE Date Tasks 2 April 2014 Buy material and prepare equipment 3 April 2014 Fettuccine strength test 8 April 2014 Case study and fettuccine strength test 9 April 2014 Construct 1st bridge 13 April 2014 Testing 1st bridge 16 April 2014 Construct 2nd bridge 17 April 2014 Testing 2nd bridge 20 April 2014 Construct 3rd bridge 21 April 2014 Testing 3rd bridge 24 April 2014 Construct final bridge 25 April 2014 Final bridge testing Table 1.4.1: Working schedule
  • 5. 2. METHODOLOGY 2.1 PRECEDENT STUDY To study on the precedent study, Waddell “A” truss bridge, research is taken from the source of internet and books. Looking at the detail of the precedent study, a real truss bridge connections, arrangement of members and orientation of each member is to be studied and put into the truss model structure design. Thus, the truss model’s structure will be depended on the information obtained from the precedent studies. 2.2 MAKING OF FETTUCCINE TRUSS BRIDGE PHASE 1: MATERIAL STRENGTH TESTING Main material of doing the model bridge is fettuccine and the secondary, adhesive to stick the fettuccine together as a whole structure. It is important to test different brands of fettuccine to see their strength of taking load before skipping to the next phase ,model making. Data showing the fettuccine strength results in different circumstances is recorded in the subtopic of material under the topic, Analysis. PHASE 2: CHOOSING ADHESIVE Adhesive that is used to bond the fettuccine together might affect the strength of whole structure .There are various choices of glue with different characteristics that could have change the physical strength of fettuccine. As so it is crucial to choose the right adhesive.
  • 6. PHASE 3: MODEL MAKING Based on the obtained information, we tried to apply some improvement on the truss bridge model. To build a perfect model, it is first to produce an Autocad drawing of the design model to be printed out into 1:1 scale and build it based on the cad drawing. Jointing of the model bridge will be further discussed under the topic of truss analysis. PHASE 4: MODEL TESTING Finished model is tested by applying load with string attached to the middle of the intermediate member of the model with the restriction of 60 cm clear span. Model are tested and improved into the final designated model. 2.3 STRUCTURAL ANALYSIS Structure model Is analyze to show the understanding of the truss and its load transfer system. Failure models are analyzed to discover the problem and the analysis is the reference to the next model bridge. In structural analysis, calculation and load transfer diagrams are show.
  • 7. 3. PRECEDENT STUDY 2.1 PRECEDENT STUDY To study on the precedent study, Waddell “A” truss bridge, research is taken from the source of internet and books. Looking at the detail of the precedent study, a real truss bridge connections, arrangement of members and orientation of each member is to be studied and put into the truss model structure design. Thus, the truss model’s structure will be depended on the information obtained from the precedent studies. Missouri Bridge Waddell A Truss History Background Built 1898 for the Quincy, Omaha and Kansas City Railway. Abandoned in 1939, but converted into a highway bridge on MO 4 in 1953. Dismantled in 1980 to make room for Smithville Reservoir, but relocated to English Landing Park in Parkville in 1987. Through truss bridge originally spanning Linn Branch Creek in Clinton County near Trimble, but relocated to English Landing Park in Parkville spanning Rush Creek open to pedestrians only.
  • 8. Bottom Chord Cross Brace Diagonal Hip Vertical Top Brace End Post Middle Chord Design Strategies The waddell‘A’truss bridge is identified by the Historic American Engineering Record. Designed and patented by the famous American Engineer John Alexander Low Waddell, the ‘A’truss is a significant type of late 19th century, short-span railroad bridge that used pin-connections to join its major structural members. Because of its great height the ‘A’truss of this type of Bridge are great rigidity in all directions, ease and cheapness of erection and economy of metal when it is compared with structures of other types having equal strength and rigidity. Compression Tension Force Distribution Truss Connection Diagram 4.2.7: Identification of members in Waddell “A” truss bridge.
  • 9. View From through Bridge Southwestern Portal Bridge Dateplate Overview Looking North Comparison between Previous and Present site Built 1898 for the Quincy, Omaha and Kansas City Railway. Abandoned in 1939, but converted into a highway bridge on MO 4 in 1953. Dismantled in 1980 to make room for Smithville Reservoir, but relocated to English Landing Park in Parkville in 1987. Present Site Parkville 1987 - present Barrel Shot With Dateplate In Right Foreground Steel Approach Beams View From Underneath Bridge Approach View Previous Site Kansas 1898 - 1939
  • 10. Missouri Bridge Engineering Elevation Drawing by John Alexander Waddell General View Of 'A' Truss From Side Showing Abutments Detail View Of Lateral Cross Bracing
  • 11. Detail of Top chord Connection by John Alexander Waddell General View From Side Showing Guard Rail In Foreground Detail View Of Support Column Looking Down Axis Of Truss
  • 12. Detail of Truss Connection and Members by John Alexander Waddell Detail View Of Bridge Underside Showing Original Floor Beams And Bottom Chord Lateral Bracing Detail View Of Circa 1952 Steel Approach Beams Taken From Underneath Bridge
  • 13. 4. EQUIPMENT AND MATERIAL STUDY 4.1 ADHESIVE TYPES Three different glue kinds are tested to get the best result on connection. 3 second ok glue -  Highest effieciency. -  Fastest solidify time between connection -  Easy to use -  Clean joint Epoxy glue -  High effieciency. -  Rigid joint Uhu glue -  Easy to use Hot glue -  Easy to use. -  Expand and bending might occurs -  Cracked joint after store for a few days. -  Long solidify time -  Messy -  Messy if not control well -  Joints slightly flexible when dry -  Longer solidify time than 3 seconds glue -  Longer solidify time. -  Easily create bulky finishing -  Weight increase significantly -  Joints flexible when dry Table 4.1.1: Comparison of advantages and disadvantages of different types adhesives
  • 14. Type  of   Glue Glue   applied   (on   fe0uccine) Clear   Span   (mm) Length   (mm) Layer  of   S;cks No.  of   50$   coins No.  of   20$   coins Weight   Sustained  (g)   UHU Whole 20 24 2 16 38 364.70 3  Sec   Glue Whole 20 24 2 16 24 285.12 From the table above, Uhu glue is obviously better than 3 seconds glue even though Uhu needs more time to solidify the connection. This is because Uhu does not solidify the connection thoroughly and causes to preserve the elasticity of the fettuccine thus can sustained more stress form the load. Type  of   Glue Glue   applied   (Point) Clear   Span   (mm) Length   (mm) Layer  of   S;cks No.  of   50$   coins No.  of   20$   coins Weight   Sustained  (g)   UHU Whole 20 24 2 16 38 112.79 3  Sec   Glue Whole 20 24 2 16 24 285.12 The results of the second test seems totally different from the first test, which on the first test: Uhu is better than 3 second glue , whereas on the second test where the fettuccines are to let dry for more than one day: 3 seconds glue has the better quality. Besides, in terms of workmanships, 3 second glue leave no tracks which made it the best choice among all the glue types. Table 4.1.2: strength of fettuccine after applied with UHU and 3 seconds glue and tested within a day. Table 4.1.3: The second test on glued fettuccine let to dry for more than one day. In addition, we discovered that the stick that using Uhu glue to connect are separated when second test is carrying out. This proves that Uhu glue does not bond the fettuccine well as it separate into two after it was left dry for two days.
  • 15. Days to left dry Type   of   Glue Glue   applied   (Point) Clear   Span   (mm) Length   (mm) Layer  of   S;cks Weight   Sustained   (g)   1 3  Sec   Glue Whole 20 24 2 285.12 3 3  Sec   Glue Whole 20 24 2 101.37 The table shows that the strength of fettuccine falls sharply after three days left to dry. This is because the 3 second glue make the fettuccine oxidized and brittle. As a conclusion, the truss bridge has to be done freshly one day or two before the model test as to prevent the oxidization happened on the bridge. Table 4.1.3: Third test shows comparison of the fettuccine’s strength after let dry for different amount of days.
  • 16. 4.2 MATERIAL STRENGTH STUDY 4.2.1 FETTUCCINE TYPES AND STRENGTH TEST Several tests on material strength is carried out to identify which brands or which type of material does the best to be the members of the bridge. Since fettuccine is the only material that can be used to construct the bridge, its attribute is required to be studied and tested before making the model. The way of putting or joining fettuccine could affect the whole structure bridge. To build a strong bridge, it is crucial to know which fettuccine’s brand can be used and has the strongest strength to withstand load. Below are three different brands of fettuccine and each brand is tested with load hanging on one stick of fettuccine. Image Name Weight sustained Shape/ Section of fettuccine Barilla   187g   San Remo 156g   Kimball   112g   From the diagram above, it is obviously stated that the strongest fettuccine is Barilla, followed by San Remo and Kimball. Barilla brand’s fettuccine has the utmost strength mostly because of the expanded shape of the fettuccine. Yet, the unique shape of the fettuccine has bring the disadvantage on making bond with another fettuccine and its strength may fall when stack with two or more straps. Table 4.2.1: Fettuccine types with description.
  • 17. The capacity of the bonding is too small which may cause the the fettuccine to fall apart when light force is applied. Barilla fettuccine (2 stacks) Light Force The fettuccine is flatter thus the capacity of the bonding is big enough which make the fettuccine hard to break apart when light force is applied. As a conclusion, we eliminates Barilla as the bridge material and choose San Remo because of its higher physical strength and bigger capacity to stack on to create stronger bond. In addition, the flatter shape of San Remo fettuccine will easy our work on building the truss bridge. San Remo fettuccine (2 stacks) Light Force Diagram 4.2.4: Result of two layer San Remo fettuccine after light force is applied. Diagram 4.2.3: Result of two layer Barilla fettuccine after light force is applied.
  • 18. 4.2.2 GLUING METHOD Several gluing method are tested to determine which method does the best by not destruct or affect the strength of fettuccine. 3  Sec   Glue 2  Points 20 24 2 16 10 149.28 3  Points 20 24 2 16 18 250.90 Whole 20 24 2 16 24 285.12 Diagram 4.2.5: 3 seconds glue is applied at the end point of a fettuccine stick. Diagram 4.2.6: 3 seconds glue is applied at the end point and the middle point of a fettuccine stick. Diagram 4.2.7: 3 seconds glue is applied wholly on a fettuccine stick. Table 4.2.2: 3 different gluing method to show comparison. Table above shows that the gluing method of 3 seconds glue apply wholly on fettuccine works the best, followed by 3 interval points and then 2 interval points. In addition, 2 points and 3 points method which does not glue the whole fettuccine had left some unglue space to be flexible. In this case after the glued fettuccine is let to dried for one day, observation shows expanding and bending occurs.
  • 19. Type  of  Glue Layer  of   S;cks Glue  Applied Weight   Sustained   (Horizontal) (g) Weight   Sustained   (Ver;cal) (g)   3  Sec  Glue 2 Whole 285.12 355.45 3 Whole 395.13 450.28 4 Whole 453.72 533.34 5 Whole 589.33 522.56 4.2.3 ORIENTATION Testing on the orientation of fettuccine (horizontally or vertically) helps to determine which placing position would have more strength to be put into our model design. Horizontal orientation Vertical orientation Diagram 4.2.8: Horizontal and vertical orientation of fettuccine. Table 4.2.3: Comparison of horizontal and vertical orientation with the increasing amount of layer. Outcome of the test shows when fettuccine members are to stack to 4 layers, it is best to use vertical orientation, whereas horizontal orientation is suitable for 5 layers of fettuccine.
  • 20. 5. MODEL MAKING 5.1 METHOD OF CONSTRUCTION 1) Cut 3 pieces of 24cm length fettuccine to form the base. 2) Use a 5cm piece to glue the main base together. Place a 15cm piece in the middle and connect the triangle with two other 40cm pieces. Put straight trusses after every 9cm interval on t h e m a i n base. 3)
  • 21. 4) Then, connect pieces from the middle towards each vertical truss, 5) Thicken the truss afterwards. The bottom base with 5 pieces, upper two parts with 4 pieces and the trusses by 2. Replicate another one after finishing. 6) Start   connec;ng   the   two   parts   at   the  bo0om  end.  
  • 22. 7) The leftmost picture shows how it looks like after joining them. The middle piece is reinforced as it will be the piece holding the weight. The top parts are joined with two singular fettuccine pieces. 8) The completed final model. 9)
  • 23. 5.2 JOINT Step  1:   Randomly   choose  two   Fe0uccine   Step  2:   Glue  them   together   Step  3:   Repeat  the   procedure   Final  Product   OVERLAID  JOINT   BRIDLE  JOINT   Step  1:   Label  the   area  that   need  to  be   cut   Step  2:   Glue  them   together  
  • 24. Step  3:   Measure   and  label   the  cut   area   Step  4:   S;ck  them   together  to   fill  the  gap   Step  5:   Cover  it  by   a  new   Fe0uccine   Step  6:   Repeat  the   procedure   Final    Product   Overlaid joint is used in the first bridge design. We are then discovered that bridle joint is better as it makes the surface clear and having more aesthetic value. Yet, bridle joint required careful trimming and the trimming need to be planned cautiously too.
  • 25. 6. DESIGN PROCESS 6.1 1st BRIDGE First bridge referring the design from precedent study — Waddell 'A' Truss Bridge. From the observation of Waddell “A” truss bridge, The truss members are a few as its span length is shorter and the material using metal which meant to be stronger. In this project, fettuccine, the only material is quite weak to be a construction material. As so, more truss members and bracing are added into the bridge as supports. Design 2 Design 2 BOTTOM  LAYER    TOP  VIEW    SIDES  LAYER   CROSS  SECTION   740   50   300   Diagram 6.1.1: Tension and compression member (1st bridge) Length : 74cm Max Height : 30cm Max Width : 5cm Mass : 182 g Max Load : 5KG Efficiency : 137.36  
  • 26. 6.2 2nd BRIDGE The second bridge also resemble the design from precedent study —Waddell 'A' Truss Bridge, relying support from the triangle shape beam. As the load is meant to hang at the bottom, there are 5 hanging members on each side connected to the beam to support the whole the structure. The hanging members are designed in tension to favour the characteristic of fettucine. Besides that, the bottom layer on each side connected with 20 fettucine with lenght of 7cm. There are 4 members on each side connected to the point that load applied to strenghthen the whole structure. The arrangement of bracing members and number of layers of fettucine are tested from this design.     Length : 72cm Max Height : 30cm Max Width : 7cm Mass : 170 g Max Load : 5KG Efficiency : 147.06   Model testing of 2nd bridge     2nd bridge fall at max load of 5kg.    
  • 27. BOTTOM  LAYER    TOP  VIEW    SIDES  LAYER   CROSS  SECTION   Diagram 6.2.1: Tension and compression member (2nd bridge) 300  
  • 28. 6.3 3rd BRIDGE After considering the failure of previous designs, we intended to reduce some braces in the structure, the horizontal members was removed to reduce the weight of the structure and it didn’t really support the whole structure as well. Besides that, we also adding two more hanging members on each side of the structure that connected to the triangle beam to strengthen the bridge. Gathering information from precedent study and some other existing bridge, we reduce the height of the bridge from 380mm to 330mm to increase the overall stability of the structure, . At the thesss same time, it also reduce the weight of the structure which in turn contributing to higher efficiency. Length : 74cm Max Height : 20cm Max Width : 7cm Mass : 169 g Max Load : 8KG Efficiency : 378.7   MODEL  TESTING  OF  3RD  BRIDGE  
  • 29. 3RD  BRIDGE  FAILURE   The  whole  structure   remain  the  same   accept  the  horizontal   interconnec;ng     member  at  the  center   break  when  the  load  is   8kg.   3RD  BRIDGE  FAILURE   740   70   BOTTOM  LAYER    TOP  VIEW    SIDES  LAYER   200   CROSS  SECTION   Diagram 6.3.1: Tension and compression member (3rd bridge)
  • 30. Final Bridge Design Length : 72cm Height : 15cm Width : 7cm Mass : 0.142kg After considering the failure of previous designs, the horizontal interconnecting member at the center have been strengthened by 7 layered of fettuccine. The picture above shows the 4th design which is the final bridge. The bridge height changed from 20cm to 15cm to reduce the overall weight and thus increase 6.3 FINAL BRIDGE in efficiency. Moreover, by understanding that fettuccini has a weak compression strength, the bottom horizontal member which intersects the center were added more layer of fettuccini to strengthen the bridge structure. The previous bridge were weight 169gram which already overweight. Therefore we also reduce the layers of the vertical members, from each 5 layers to ratio of 4:3:2:1 which the 4 is the nearest to the center load and 1 is at the end. Furthermore, every surface at joints were worn flat to maximize area of bonding. Lastly, the layers between layers of fettuccini were properly glued to increase the tightness and make it more durable.
  • 31. TOP VIEW (FINAL DESIGN) BOTTOM LAYER SIDES LAYER 720   150   70   5 LAYERED 3 LAYERED 4 LAYERED 2 LAYERED 1 LAYERED CROSS SECTION TENSION   COMPRESSION   LOAD   Model testing Final model falls Diagram 6.4.1: Tension and compression member (3rd bridge)
  • 32. 7. TESTING 7.1 MATERIAL AND PROTOCOL TEST Material and protocol design model are tested using the equipment that we had in our dedicated working area. The equipment included a pail, “S” hook, 50 cents, 20 cents, two tables, water, 6 liters bottle, measuring ruler and a long plastic bag. Load for fettuccine strength test are using 50 cents and 20 cents coins which per 50 cents weighted 9g and per 20 cents weighted 6g. The reason is we have enough coin supply and it is easy for us to clean the place once the load is fallen. Diagram 7.1.1: Equipment First, different layers of fettuccine which are to test are labeled for ease of recording.
  • 33. Second, fettuccine is placed in between of two tables with a clear span of 20cm and two full water bottles are served as weight placed at the end of the table holding and stable the fettuccine. Third, an ‘S’ hook with the pail carried is hanged on the middle part of fettuccine and is ready to carry coin. Coin is putting in one by one slowly until the fettuccine breaks. Once the fettuccine finally break, collected coins are recounted to assure the amount and to be recorded.
  • 34. In protocol test, we demand a more accurate result, so we use water as load instead of coins. As under normal condition and specific gravity of water, 1 litre is equal to 1 kg. The method of weighing is almost the same as the different is only replacing the pail into bigger one and the coin into water. First thing to do before testing is to weight the bridge. Water is then poured into the pail. Weight of the pail is added into the record along with the water weight. Failure: the bridge is not fully tested for not knowing the breaking point. This is because the pail is too small that even when the water is full, the bridge is still not break. Solution: the small pail is replaced by a bigger pail.
  • 35. 7.2 FINAL MODEL TEST Final model is tested in a classroom on 25th April 2014. During the model testing, the horizontal interconnecting member in the center was placed with a ‘S’ hook and empty bag was hung into it. Then we slowly put the loads starting with 2kg into the bag with interval of 10 seconds time until it reached 6kg. At this point, we changed the 2kg load to 1kg load until the bridge reached its breaking point at 8kg. 7.2.1 OBSERVATION: Weight: 142g Maximum Load: 8kg Efficiency, E= (Maximum Load) Weight of Bridge = 64 0.142 = 450.7 When more load is added into the bag, the bridge becomes heavier and we observe that there is a slight bending to the right together with a crack sound but later when we add another load to it at the point of 7kgs, we were surprised that it bend back to original position. The bridge collapse when it reached its maximum point at 8kg. 7.2.2 EFFICIENCY: Diagram 7.2.1: Final model test 2  
  • 36. 8. DESIGN MODIFICATION 8.1 FAILURE REASONING Reason 01: Uneven sizes of the two main triangular truss Throughout the process of analyzing the failure of the trus s bridge, we found out that the two triangular trusses we made were not even, one is slightly higher and another is lower making them unbalance when combined together. The fettuccini bridge were tilt a little to a side and when the load added to it, causes uneven distribution of force acting on the bridge. By failing to have even distribution force acting on all members, the part that is slightly lower to ground will withstand more force and will break eventually. Reason 02: Lesser fettuccini layers used in the slanted part. The breaking failure of the fettuccini bridge include the lesser fettuccini layers in the slanted part to support the bridge. Because of the intention to minimize the load of the bridge, we have minus out the layers used in the slanted part from 4 layers to 3 layers making it less durable. The more fettuccini layers stick together as a member of truss bridge, the stronger the bridge but it will also cause a heavier mass. Reason 03: No support from the sides of the bridge at the edge of table At the two sides of the bridge, there were no truss members to support the lower part of the bridge to make it still. There might be chances that it slide and cause the structure to tilt off because of compression force. When the exertion forces were added, the members will start to bend. By adding extra members to strengthen the sides, the force will be distributed more and thus increase the overall efficiency of bridge.
  • 37. Solution 01: Adding supporting members at both ends of the truss bridge By adding two diagonal bracing at the both sides of the bridge and triangular structure at the bottom of the bridge, the bridge will be strengthen and make it more balance to withstand more loads. Adding extra members is a good way to distribute the compression force. But because of adding the extra members, the bridge will be overweight. Therefore we analyzed that the bridge only have weakness in supporting compression force therefore, horizontal members of the structure which support the tension force can be reduced in terms of layers of fettuccini to reduce weight. Solution 02: Always check that the truss members in the lower part are all flat and lies in a straight line We have to carefully calculate correctly making sure that the trusses bridge were even and the two triangular truss were symmetrical. This will make the bridge more stable and able to withstand more external forces. The highlighted part in the figure above should lies in a straight line so that the force will distribute evenly and deflection will not occur in one even part. 8.2 SOLUTION Diagram 8.2.1: Final bridge with supporting members added Diagram 7.2.2: Final bridge with flat straight base
  • 38. 8.3 RESULT After analyzing the solutions, we modified our bridge again and tested once again by applying the solutions. As expected, it was a success design as it able to withstand a load of 12kg, resulting efficiency as below: Weight of bridge: 138gram Load withstand: 12kg Efficiency= (12) 0.138kg =1043.48 2