1. March 15, 2016 Page 1 of 6
CURRICULUM VITAE
ENGR. MAJID HUSSAIN
House No. 424, Block No. 20, F.B Area, Karachi, Pakistan
Cell No: +92-300-3942150
Home Phone No: +92-21-36364016
Email: emh424@gmail.com
Skype:emh424
OBJECTIVES:
I want to utilize my knowledge of Civil Engineering for personal growth as well as for achieving goals of the
organization. I want to work on projects for the development of better future of the humanity.
DATE OF BIRTH : 09-10-1965
NATIONALITY: Pakistani (Passport Number: FF6895592 Validity: 11 OCT 2018)
EDUCATION
Degree Institute Date
ME Env. Engineering NED University of Engineering and Technology, Karachi 2001
BE Civil Engineering NED University of Engineering and Technology, Karachi 1989
OTHER SKILLS (Training, Computer proficiency) :
MS Word;
MS Excel;
MS Power Point;
MS Project
Attended training course on PRIMAVERA;
AutoCAD;
ISO 14001Lead Auditor Course
LANGUAGE & DEGREE OF PROFICIENCY
Language Read Spoken Written
English Excellent Good Good
Urdu Excellent Excellent Excellent
Punjabi Fair Excellent Fair
MEMBERSHIP IN PROFESSIONAL ORGANIZATIONS:
Member – Pakistan Engineering Council (Civil/11973);
Member – Institution of Engineers Pakistan (M–16617/Civil);
Member – Institution of Doctors, Engineers and Scientists, Netherlands (1474)
COUNTRIES OF WORK EXPERIENCE: Pakistan
EMPLOYMENT RECORD : Experience of Twenty Six Years
2. CURRICULUM VITAE MAJID HUSSAIN
March 15, 2016 Page 2 of 6
FROM : Feb 2016 - Present
EMPLOYER : K.M. Sharif & Co.
POSITION HELD : PROJECT ENGINEER
DESCRIPTION OF WORK :
Construction Management
FROM : Nov 2014 – to Present
EMPLOYER : PIMSAT Institute of Higher Education, Karachi
POSITION HELD : Assistant Head of Civil Engineering Department
Responsibilities included:
Management of Civil Engineering Department
Project Management
Teaching of Civil Engineering subjects
FROM : Jan 2003 – to Oct 2014
EMPLOYER : NEC Consultants (Private) Limited, Karachi, Pakistan
POSITION HELD : Senior Civil Engineer
DESCRIPTION OF WORK :
Feasibility Phase, Design Phase, Procurement Phase, Construction Phase, Commissioning
Phase and Operation Phase of Combined Effluent Treatment Plant (capacity: 43000 Cu.M/day),
Korangi Industrial Area, Karachi, Pakistan
Grit Chamber
Equalization Tanks
Lifting Pumping Station
Sludge Pumping Station
Final Effluent Pumping Station
Primary Sedimentation Tanks
UASB Reactors
Aeration Tanks
Gas Holders
Control Panel Room
Sludge Drying Beds
Secondary Sedimentation Tanks
Office Building
Vehicle Yard
Boundary Wall
Wastewater Conveyance System (12 KM Length) of Combined Effluent Treatment Plant,
Korangi Industrial Area, Karachi, Pakistan
Dilution Line (3.5 KM) for Combined Effluent Treatment Plant, Korangi Industrial Area, Karachi
Wastewater Pumping Station for Combined Effluent Treatment Plant, Korangi Industrial Area,
Karachi, Pakistan
Prepared Contractual Procedures of Management of Combined Effluent Treatment Plant, PTA
(S.Z) Environmental Society, Korangi Industrial Area, Karachi, Pakistan
Combined Effluent Treatment Plant, National Industrial Park, Korangi Creek, Karachi, Pakistan
Combined Effluent Treatment Plant, Sunder Industrial Estate, Lahore, Pakistan
Combined Effluent Treatment Plant, Pakistan Textile City, Karachi, Pakistan
Combined Effluent Treatment Plant, Faisalabad Industrial City, Pakistan
Performance Audit of Combined Effluent Treatment Plants of Karachi Water & Sewerage
Board (150 MDG)
Combined Effluent Treatment Plants under the project of Greater Karachi Sewerage Plan (500
MGD)
Industrial Wastewater Treatment Plant of M/s Muhammad Shafi Tanneries, Sind Industrial
Trading Estate, Karachi, Pakistan
Industrial Wastewater Treatment Plant of M/s Din Leather, Sind Industrial Trading Estate,
Karachi, Pakistan
Industrial Wastewater Treatment Plant of M/s Feroze Textile, Sind Industrial Trading Estate,
Karachi, Pakistan
Industrial Wastewater Treatment Plant of M/s Al-Karam Textile, Landhi Industrial Area,
Karachi, Pakistan
Wastewater Treatment Plant of M/s Philip Morris Industries-Kotri Industrial Area, Pakistan
Wastewater Treatment Plant of M/s Philip Morris Industries-Sahiwal, Pakistan
Water Treatment Plant of Jacobabad City, Pakistan
3. CURRICULUM VITAE MAJID HUSSAIN
March 15, 2016 Page 3 of 6
Wastewater Flow Monitoring at:
M/s Mehran Sugar Mills for Wastewater Treatment Plant
M/s Tando Allahyar Sugar Mills for Wastewater Treatment Plant
M/s Mirpurkhas Sugar Mills for Wastewater Treatment Plant
M/s Army Sugar Mills, Badin for Wastewater Treatment Plant
M/s Mirza Sugar Mills, Badin for Wastewater Treatment Plant
M/s Colgate Pamolive at Kotri Industrial Area
M/s National Food, Sindh Industrial Trading Estate
Environmental Audits at 85 Industrial Units, Korangi Industrial Area, Karachi, Pakistan
Development and Implementation of Environmental Management System (ISO 14001) at 65
Industrial Units, Korangi Industrial Area, Karachi, Pakistan
Environmental Management System for Combined Effluent Treatment Plant – Korangi
Industrial Area, Karachi, Pakistan
Prepared Newsletters of Combined Effluent Treatment Plant, Korangi Industrial Area, Karachi,
Pakistan
Environmental Management System for Combined Effluent Treatment Plant of Textile City, Bin
Qasim Industrial Area, Karachi, Pakistan
Implementation of Solid Waste Management Plan at Korangi Tanneries, Korangi Industrial Area,
Karachi, Pakistan
Studied Textile Audit Reports and prepared database
Prepared Solid Waste Management Plan of Textile City, Karachi, Pakistan
Prepared Risk Management Plan of Textile City, Karachi, Pakistan
Surveyed Landfills and dumping sites of Karachi
Surveyed following Industrial Estates of Karachi to see practices of solid waste management:
Korangi Industrial Area
Landhi Industrial Area
F.B Industrial Area
North Karachi Industrial Area
Sindh Industrial Trading Estate
Solid Waste Generation & Disposal Survey of Jacobabad City under USAID Project
Solid Waste Sampling in the wastewater of Malir River, Lyari River, Kalri Nallah and Pitcher
Nallah of Karachi
Study of Water Quality of Indus River and conducted sampling at Hyderabad Bypass Bridge,
Thatta - Sajawal Bridge and Dadu - Moro Bridge
Prepared Laboratory HSE Manual for M/s Pak Oasis Industries
Prepared Solid Waste Management Plan for Jacobabad City
DESCRIPTION OF DUTIES:
Coordination Meetings with Client, Consultants, Contractors, Government Departments and
Industries
Coordination for Bidding Process
Preparation of Bidding Documents
Preparation of Drawings
Preparation of Condition of Contract
Preparation of BOQ
Preparation of Specifications
Preparation of Engineering Estimate
Prequalification of Contractors
Invitation of Tender
Pre-Bid Meeting with Contractors
Opening of Tenders
Evaluation of Tenders
Selection of Contractor
Award of Work to Selected Contractor
Contract Management
Project Estimation;
Preparation of BOQ;
Preparation of Tenders;
Tender Evaluation;
Contract Management;
Preparation of Bar Bending Schedules;
Coordination Meetings with Client, Contractors and industries;
Checking the quality and quantity of construction work
Checking, evaluation and scrutinizing all Interim Payment Certificates
Checking all the shop drawings
4. CURRICULUM VITAE MAJID HUSSAIN
March 15, 2016 Page 4 of 6
Maintaining a filing system of all correspondence
Keeping current set of record drawings and specifications
Keeping valid all bonds/policies/guarantees construction period
Maintaining monthly log, giving brief description of construction progress, meetings held,
decisions taken, minutes of meetings and other important events related to construction
works.
Checking the quality and quantity of personnel assigned
Preparation of monthly progress reports
Checking the layout
Re-adjusting the layouts and/or designs
Check that the work is being carried out in accordance with final approved shop drawings,
specifications and Contract documents.
See that selection and use of building materials is in accordance with the approved
specifications. Testing of structural and other materials
See that the work has been completed in accordance with the requirements of the contract
and to the satisfaction of the Client.
Checking and approval of ‘As Built Drawings’.
Checking & giving report after the defect liability period.
Closing of Contract.
Suggest substitute materials
Review change orders
Maintain a record of work progress as per items of the Bill of Quantities
Proper implementation of time schedule for construction agreed upon as per
contract.
Checking of Health, Safety & Environmental arrangements at works
FROM : April 1995 - Dec 2002
EMPLOYER : National Management Consultants (Pvt.) Ltd., Karachi, Pakistan
POSITION HELD : Project Engineer
DESCRIPTION OF WORK
Worked on Combined Effluent Treatment Plant for Korangi Tanneries, Korangi Industrial Area,
Karachi, Pakistan which included: Office Building; Environmental Laboratory; Equalization Tanks;
Pumping Stations; Primary Sedimentation Tanks; Secondary Sedimentation Tanks; Up-flow
Anaerobic Sludge Reactors; Aeration Tanks; Control Panel Room; Sludge Drying Beds
Construction Management of National Institute of Leather Technology – Korangi Industrial Area,
Karachi, Pakistan which included: College Building; Laboratories; Tannery; Hostel Building; Canteen;
Sports Hall
DESCRIPTION OF DUTIES
Coordination Meetings with Client, Contractors and industries;
Checking the quality and quantity of construction work
Checking, evaluation and scrutinizing all Interim Payment Certificates
Checking all the shop drawings
Maintaining a filing system of all correspondence
Keeping current set of record drawings and specifications
Keeping valid all bonds/policies/guarantees construction period
Maintaining monthly log, giving brief description of construction progress, meetings held, decisions
taken, minutes of meetings and other important events related to construction works.
Checking the quality and quantity of personnel assigned
Preparation of monthly progress reports
Checking the layout
Re-adjusting the layouts and/or designs
Check that the work is being carried out in accordance with final approved shop drawings,
specifications and Contract documents.
See that selection and use of building materials is in accordance with the approved specifications.
Testing of structural and other materials
5. CURRICULUM VITAE MAJID HUSSAIN
March 15, 2016 Page 5 of 6
See that the work has been completed in accordance with the requirements of the contract and to
the satisfaction of the Client.
Checking and approval of ‘As Built Drawings’.
Checking & giving report after the defect liability period.
Closing of Contract.
Suggest substitute materials
Review change orders
Maintain a record of work progress as per items of the Bill of Quantities
Proper implementation of time schedule for construction agreed upon as per contract.
Checking of Health, Safety & Environmental arrangements at works
FROM : Jan 1992 - April 1995
EMPLOYER : Naqvi & Siddique Associates
POSITION HELD : Site Engineer/Resident Engineer
DESCRIPTION OF WORK: Construction Management of hospital building (covered area 540,000 sft)
and Hostel buildings for Bolan Medical Complex Quetta, Pakistan
DESCRIPTION OF DUTIES
Coordination Meetings with Client, Contractors and industries;
Checking the quality and quantity of construction work
Checking, evaluation and scrutinizing all Interim Payment Certificates
Checking all the shop drawings
Maintaining a filing system of all correspondence
Keeping current set of record drawings and specifications
Keeping valid all bonds/policies/guarantees construction period
Maintaining monthly log, giving brief description of construction progress, meetings held, decisions
taken, minutes of meetings and other important events related to construction works.
Checking the quality and quantity of personnel assigned
Preparation of monthly progress reports
Checking the layout
Re-adjusting the layouts and/or designs
Check that the work is being carried out in accordance with final approved shop drawings,
specifications and Contract documents.
See that selection and use of building materials is in accordance with the approved specifications.
Testing of structural and other materials
See that the work has been completed in accordance with the requirements of the contract and to
the satisfaction of the Client.
Checking and approval of ‘As Built Drawings’.
Checking & giving report after the defect liability period.
Closing of Contract.
Suggest substitute materials
Review change orders
Maintain a record of work progress as per items of the Bill of Quantities
Proper implementation of time schedule for construction agreed upon as per contract.
Checking of Health, Safety & Environmental arrangements at works
FROM : Feb 1991 – Dec 1991
EMPLOYER : Aquater (Pakistan) (Pvt.) Ltd.
POSITION HELD : Field Assistant
DESCRIPTION OF WORK: Construction supervision of Cooling Tower and Priling Tower for Extension
of Fertilizer Plant – District Rahim Yar Khan, Pakistan
DESCRIPTION OF DUTIES:
Construction Management;
QA/QC of Construction Activities;
Coordination with Contractors;
Bills Verification;
6. CURRICULUM VITAE MAJID HUSSAIN
March 15, 2016 Page 6 of 6
Health, Safety & Environmental Management
FROM : Oct 1989 – Jan 1991
EMPLOYER : SAITA (Pakistan) Private Ltd. Karachi, Pakistan
POSITION HELD : Site Engineer
DESCRIPTION OF WORK
Construction of Thermal Power Station (1100 MW) – Muzaffargarh, Pakistan which included: cooling
towers; Turbo generator foundation; Switch gear station; Water intake channel
DESCRIPTION OF DUTIES
Construction Management;
Coordination with Client;
Health, Safety & Environmental management