1. RESUME
PREMKUMAR. A Address: S/o P. Anbalagan
Email: premanbalagan@gmail.com 6/4, perumalsamy compound
Mobile: +919738775130 Theni Road, Usilampatti-625532,
Madurai Dist.
Career Objective
To continuously grow by contributing to the objectives of the organisation by working in a cohesive
work environment, and uphold the dignity of the position through acquired knowledge, sincerity and hard
work.
Academic Profile
Qualification Board /University Institution Year of
passing
Percentage
B.E
(Mechanical)
Anna University, Chennai Sethu Institute of
Technology, Madurai.
2012
6.72
(CGPA)
HSC State Board, Tamil Nadu. Z.K.M Higher Secondary
School, Bodinayakanur.
2008 70.58%
SSLC State Board, Tamil Nadu. Z.K.M Higher Secondary
School, Bodinayakanur.
2006 76%
Software Exposure
Modeling Software: Auto Cad 2008.
CATIA V5 R19.
M S Office Packages.
Subjects of Interest
• Manufacturing Technology.
• Production Engineering.
Working Experience
Organization: Leonardo Engineering pvt Ltd
Experience : February 2014 to till now.
Job Profile :
Inspection of the incoming material, stage inspection and final inspection in co-ordination
with Design department for maintaining the product Quality.
Role: Quality Control Engineer
Responsibilities:
Maintaining the inspection standards and inspection reports.
Coordinating with design and production to achieve the quality products.
Achieving quality objectives through time study to reduce the rework.
Presentation of line rejection & overall rejection.
Co-ordination with customers regarding new developments, improvements &
modification in the existing parts.
2. Project-6 :
Duration :
Project details :
“RIG FOR HYDRAULIC TESTING OF PIPES”, HAL, Koraput.
Jan 2015 to April 2015.
.
The rig provides Hydraulic testing facilty of aircraft pipe lines at 340 bar pressure. The
high pressure oil will be generated by the “Air to oil Booster Pump” driven by the air.
Project-5 :
Duration :
Project details :
“GENERAL PURPOSE PNEUMATIC TEST RIG”, HAL, Lucknow.
Nov 2014 to Feb 2014.
To provide clean dry and cold air for effective leak testing of IJT LRU’s before fitment
in the aircraft. The rig provides the loom with mating MIL connectors for the LRU’s
along with variable power suply.
Project-4 :
Duration :
Project details :
“250 LPM LUBE OIL SYSTEM”, Bharat Heavy Electricals Ltd.,
Hyderabad.
Sept 2014 to Dec 2014
.
To provide the cooled lube oil for the Bowl-Mill planetory gear boxes of the coal
pulverisers with 250 LPM flow rate with pressure, flow, temperature, level control.
Project-3 :
Duration :
Project details :
“FUEL PUMP TEST RIG”, Hindustan Aeronautics Limited (Engine
Divison), Bangalore.
Aug 2014 to Jan 2015
.
The rig provides the facility for testing the PTAE fuel pump of Light Compact
Helicoptor for its flow, pressure & voltage charecteristics at 29500 rpm.
Project-2 :
Duration :
Project details :
“SERVICE AIR TROLLEY”, Indian Air Force, Delhi.
Feb 2014 to March 2015
.
To provide dry and cold air for effective cooling of Electronic instruments, radar and
avionics bay of defense aircrafts during ground operation.
Project-1 :
Duration :
Project details :
“HYDRAULIC HIGH PRESSURE TESTING MACHINE - 1500 bar”,
Bharat Dynamics Limited, Bhanur.
Feb 2014 to July 2014
This hydraulic pressure testing system (200-1500 bar) is used for testing of components
at high pressure internally & externally using water as the testing fluid.
3. Organization: Hindustan Aeronautics Limited, Bangalore.
Experience : 1 year experience
Job Profile :
1. Proven track record encompassing process development, JIG loading, Rework scheme
& Assembly tool requirement.
2. Hands on experience in working in WINDCHILL
3. Hands on experience of application of IFS in the assembly line and process making.
Role: Trainee (Methods ALH Final Assembly, Helicopter Division, HAL)
Responsibility
1. Making the processes for assemblies of structure on ALH.
Preparing BOM for the assemblies from the Drawing and making process for
assemblies.
Co-ordinate with design to get dispositions for the quality related issues, and to
amend improvements in the assembly drawing.
Co-ordinate with QA to ensure the Quality of assembly,
2. Implementing Modification & Rework released by Design
Study of new modification released to find the work involved.
Advising to manufacture new parts for implementing the mod.
Estimating the Planning hour for implementing the MOD.
Suggesting the rework to be carried out for improvement after coordinating with
design and amending the drawing for regularizing the above.
Bjects of Interestbjects of Interes
Key skill
Completed DTE Type Writing in English Junior Grade.
Personal Profile
Date of Birth : 12-05-1991.
Languages Known : English, Tami, Telugu, kanada.
Declaration
I hereby declare that the information furnished above is true to the best of my knowledge.
Date:
Place: [A. Premkumar]