Types of Testing For 3-Phase Motors
If a three-phase motor is exhibiting problems, such as failure to start, overheating and
inconsistent supply, there are several diagnostic tools and methods at your disposal.
These tools and methods are discussed below. Before testing, however, be sure to take
appropriate safety precautions. These include:
Wearing protective safety gear: This safety gear may include grounding straps, gloves,
and any other relevant protective gear for the environment.
Having all tools readily available: Some common diagnostic tools include ubiquitous
multimeters, clamp-on ammeters, temperature sensors and oscilloscopes. Having these
tools available will help you avoid leaving the motor unattended.
Disconnecting the motor from power: When you are ready, move the transformer’s
motor disconnect switch to take it off of power. Be careful to make sure that the power is
actually turned off — on some motors, the disconnect switch is the same as the on/off
switch, so switching the disconnect switch to the on position will power the motor.
Also, be sure to disconnect all equipment and wiring that is not going to be included in
the testing process.
Discharge before and after testing: Before beginning testing and after each electrical
test, be sure to discharge the motor, as it has an inherent amount of capacitance. This
can be accomplished by shunting conductors to ground and each other before
reconnecting.
Check the nameplate: The nameplate or motor specifications provide valuable
information about the motor, such as the intended amperage of the motor. This
information can be used to assess the health of the motor compared to its intended
design.
1. General Inspections
The most basic inspection is a visual inspection. Once the motor is removed from
power and you are prepared to begin inspection, remove the cover of the motor.
Once this is removed, you can start to check the motor for visual indications of
damage. Some things to look for during this process include:
General Damage: General damage tends to be easy to spot. This may appear in the
form of burn marks or indentations. Check all over the motor for any indications of
heat or environmental damage.
Shaft Condition: Manually rotate the motor shaft to assess its condition. This should
be easy unless the motor is especially large. The shaft should rotate smoothly, with
no catches or loose parts. Newer motors may have some difficulty turning due to
tight tolerances, disuse or ambient moisture, which will need to be addressed with
oiling and further inspection. However, older motors may have more serious
obstructions that need repair or replacing.
Connection Quality: Look at all the connections within the motor for indications of
wear or damage, and assess any wires outside of the motor for potential breaks. Any
broken wires should be handled and replaced with care. Once the motor has
undergone a general inspection, double-check your inspection tools and start
troubleshooting the electrical properties of the motor.
2. Continuity Tests
Continuity testing tests the resistance between two points. If there is low
resistance, the two points are electrically connected. If there is higher resistance,
the circuit is open. The earth continuity test determines whether the motor is
connected to ground.
To complete the earth continuity test, set the multimeter to continuity mode.
Once this is done, place one point on the frame of the motor and the other point
on a known connection to the earth, preferably an area close to the motor
installation. A good motor should result in a reading that is less than 0.5 ohms. If
the value is greater than 0.5 ohms, however, this indicates that the motor’s
insulation is failing and has the potential to cause an electric shock. Determining
the causes of this failure may require further testing.
3. Power Supply Test
The next test that should be completed is the power supply test. This checks that the
incoming power supply is as expected and meets the design specifications of the
motor. The power supply test can be done by checking the voltage being applied to
the motor with a multimeter. Compare this with the specifications as noted on the
nameplate. If the applied voltage is significantly lower or higher than specified, this
may be one source of your problems.
In addition to this test, check that the terminal for the power supply is in good
condition. Damage and poor connections may also be at fault for any variances or
performance issues.
4. AC Motor Winding Continuity Test
Next, examine the inside of the motor and the wires involved in the three-
phase current. Set and calibrate your multimeter for voltage and find the six
wires of the three-phase motor.
When looking at the box, you should see six wires, three on each side. There
should be terminals on each side of the box that these wires are connected to.
One side will have terminals labeled L1, L2 and L3 or Line 1, Line 2 and Line
3. The other side will have terminals labeled T1, T2 and T3 or Load 1, Load 2
and Load 3. L terminals indicate line wires with incoming current, while T
terminals indicate outgoing wires. The exception is European motors, which
will have the designations U, V and W. These wires should be tested to
determine the health of the motor’s power supply.
This can be tested using the following methods:
No Power Incoming Test: To test the incoming voltage, place the multimeter
probes on different permutations of the L terminals while the box is powered
down. Take a reading for the L1 to L2 connection, the L1 to L3 connection
and the L2 to L3 connection. These readings should be the same if the motor
is working properly. For a 230/400V system, the expected voltage should
be 400V between each of the three-phase supply lines.
Line to Neutral Test: If there is an available neutral terminal, place one
multimeter probe on that and the other on each of the line terminals. The
voltage reading should be half of whatever voltage reading was received
during the previous test.
No Power Outgoing Test: This test is similar to the test above, but tests
the outgoing voltage. While the box is still off, take a reading between the
T1 and T2 leads, the T1 and T3 leads and T2 and T3 leads. In this case, the
voltage reading should be zero for each test.
Power Outgoing Test: Carefully power up the box and repeat the same
tests as above, testing each permutation of the T leads. There should be
little to no variation between each lead combination.
If the readings differ from the expected results and the power supply test
showed no issues, this may indicate problems with the health of the three-
phase AC motor. Most often, this indicates that the motor is burned out.
5. Insulation Resistance Test
The insulation resistance test is the next test that must be done to determine
the overall health of the motor. This is done by comparing the resistance
between each pair of motor phases and between each motor phase and the
frame. This can be done with an insulation tester or Megger. The tests must be
completed as follows:
Phase Resistance: Take the insulation tester and set it to 500V. Take each end
and place it on different permutations of L1, L2 and L3 and record each
reading.
Phase to Earth Resistance: Take the insulation tester, using the same setting,
and check each lead from phase to the frame of the motor. The minimum
value of insulation resistance should be 1 Mega ohm. If the value is less than
0.2 Megaohms, replace the motor.
Any errors during this round of testing could indicate problems with
insulation, which is a problem when it comes to the safety and functionality of
the motor.
.6. Running Amps Test
This final test determines how much energy is drawn to drive the motor. More
powerful motors will draw more current, measured in amps. Before testing, it is
important to check the amperage draw your motor requires — this will usually be on
the nameplate.
When you are ready, use the following steps, which guide you through how to
measure three-phase current:
Prepare for Test: Set your multimeter to measure amperes and set it to the correct
ampere range for your motor per the specifications listed on the nameplate. You
should also be sure to wear rubber gloves during the test to protect yourself from
electric shock.
Turn On the Motor: Turn on the motor and locate the terminals. The positive
terminal will be labeled with a plus sign and have a red wire connected to it. The
negative terminal will be labeled with a minus sign and have a connected black wire.
Place the Sensors: Place the negative sensor of the multimeter to the negative
terminal of the motor, then place the positive sensor to the positive terminal. Be sure
to keep your hands clear of moving parts at all times to avoid injury.
When the sensors are connected, take the ampere reading and turn off the motor. The
ampere reading should be within range if it is operating correctly. The ampere
reading will not exceed the manufacturer’s specification but should be at or slightly
below the given amperage draw. If the ampere reading is well below specification or
out of range, this may indicate problems with the motor.

More Related Content

What's hot

Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sightDHAVALKUMAR JULASANA
 
Transformer asset management
Transformer asset managementTransformer asset management
Transformer asset managementMuthar Hussain
 
Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.Geetesh Verma
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta testDonald Stephen
 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...Jobin Abraham
 
Power transformer maintenance
Power transformer maintenancePower transformer maintenance
Power transformer maintenanceLucian Lazar
 
Transformer testing
Transformer testingTransformer testing
Transformer testingajayknows
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, IndiaRajuMondal18
 
Instrument transformer CT & PT
Instrument transformer CT & PTInstrument transformer CT & PT
Instrument transformer CT & PTChandan Singh
 
Testing of Transformer (AREVA)
Testing of Transformer (AREVA)Testing of Transformer (AREVA)
Testing of Transformer (AREVA)AHMED MOHAMED HEGAB
 
Tan delta test for power transformers
Tan delta test for power transformersTan delta test for power transformers
Tan delta test for power transformersjibinjoy1988
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protectionRakesh Joshi
 
Impulse test for power transformers
Impulse test for power transformersImpulse test for power transformers
Impulse test for power transformersjibinjoy1988
 
Percentage Impedance of Transformer
Percentage Impedance of TransformerPercentage Impedance of Transformer
Percentage Impedance of TransformerAshish Ganguli
 
Chapter 5 mukesh gurjar
Chapter 5 mukesh gurjarChapter 5 mukesh gurjar
Chapter 5 mukesh gurjarMukesh gurjar
 
Transformer tests
Transformer testsTransformer tests
Transformer testspandiyarajanc
 
Impulse testing of transformer
Impulse testing of transformerImpulse testing of transformer
Impulse testing of transformerPreet_patel
 
Transformer 2
Transformer 2Transformer 2
Transformer 2Viswa Nathan
 

What's hot (20)

Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sight
 
Transformer asset management
Transformer asset managementTransformer asset management
Transformer asset management
 
Transformer
TransformerTransformer
Transformer
 
Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta test
 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
 
Power transformer maintenance
Power transformer maintenancePower transformer maintenance
Power transformer maintenance
 
Transformer testing
Transformer testingTransformer testing
Transformer testing
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
 
Instrument transformer CT & PT
Instrument transformer CT & PTInstrument transformer CT & PT
Instrument transformer CT & PT
 
Testing of Transformer (AREVA)
Testing of Transformer (AREVA)Testing of Transformer (AREVA)
Testing of Transformer (AREVA)
 
Tan delta test for power transformers
Tan delta test for power transformersTan delta test for power transformers
Tan delta test for power transformers
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
Impulse test for power transformers
Impulse test for power transformersImpulse test for power transformers
Impulse test for power transformers
 
Percentage Impedance of Transformer
Percentage Impedance of TransformerPercentage Impedance of Transformer
Percentage Impedance of Transformer
 
Chapter 5 mukesh gurjar
Chapter 5 mukesh gurjarChapter 5 mukesh gurjar
Chapter 5 mukesh gurjar
 
Transformer Site test
Transformer Site testTransformer Site test
Transformer Site test
 
Transformer tests
Transformer testsTransformer tests
Transformer tests
 
Impulse testing of transformer
Impulse testing of transformerImpulse testing of transformer
Impulse testing of transformer
 
Transformer 2
Transformer 2Transformer 2
Transformer 2
 

Similar to Motor testing procedure by javid iqbal sodagar

Motor testing by javid iqbal sodagar
Motor testing by javid iqbal sodagarMotor testing by javid iqbal sodagar
Motor testing by javid iqbal sodagarjavid iqbal sodagar
 
Chapter 57
Chapter 57Chapter 57
Chapter 57mcfalltj
 
Measurement of insulation resistance javid iqbal sodagar converted
Measurement of insulation resistance javid iqbal sodagar convertedMeasurement of insulation resistance javid iqbal sodagar converted
Measurement of insulation resistance javid iqbal sodagar convertedjavid iqbal sodagar
 
Halderman ch053 lecture
Halderman ch053 lectureHalderman ch053 lecture
Halderman ch053 lecturemcfalltj
 
Control of ac motors
Control of ac motorsControl of ac motors
Control of ac motorsDamion Lawrence
 
induction motor protection system seminar report
induction motor protection system seminar reportinduction motor protection system seminar report
induction motor protection system seminar reportdipali karangale
 
Solenoid Performance Codes
Solenoid Performance CodesSolenoid Performance Codes
Solenoid Performance Codestransmission_guy
 
Halderman ch055 lecture
Halderman ch055 lectureHalderman ch055 lecture
Halderman ch055 lecturemcfalltj
 
Chapter 34
Chapter 34Chapter 34
Chapter 34mcfalltj
 
Armature & field coil inspection
Armature & field coil inspectionArmature & field coil inspection
Armature & field coil inspectioncoolabhi1236
 
Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13-
 
Nyscma Electrical Safety 11 6 08 Ralph Viola
Nyscma Electrical Safety 11 6 08 Ralph ViolaNyscma Electrical Safety 11 6 08 Ralph Viola
Nyscma Electrical Safety 11 6 08 Ralph ViolaMartin Demarest
 
Parasitic draw testing
Parasitic draw testingParasitic draw testing
Parasitic draw testingCraig Kielb
 
Wire Harness Test Simple
Wire Harness Test SimpleWire Harness Test Simple
Wire Harness Test SimpleRon Spohrer
 
industrial training at vishakhapatnam steel plant
industrial training at vishakhapatnam steel plantindustrial training at vishakhapatnam steel plant
industrial training at vishakhapatnam steel plantPurnachand Battula
 
Mitsubishi s500 e-vfd-detailed
Mitsubishi s500 e-vfd-detailedMitsubishi s500 e-vfd-detailed
Mitsubishi s500 e-vfd-detailedawatori
 

Similar to Motor testing procedure by javid iqbal sodagar (20)

Motor testing by javid iqbal sodagar
Motor testing by javid iqbal sodagarMotor testing by javid iqbal sodagar
Motor testing by javid iqbal sodagar
 
Chapter 57
Chapter 57Chapter 57
Chapter 57
 
Measurement of insulation resistance javid iqbal sodagar converted
Measurement of insulation resistance javid iqbal sodagar convertedMeasurement of insulation resistance javid iqbal sodagar converted
Measurement of insulation resistance javid iqbal sodagar converted
 
Halderman ch053 lecture
Halderman ch053 lectureHalderman ch053 lecture
Halderman ch053 lecture
 
Sun vat 40 ops-1979
Sun vat 40 ops-1979Sun vat 40 ops-1979
Sun vat 40 ops-1979
 
Control of ac motors
Control of ac motorsControl of ac motors
Control of ac motors
 
induction motor protection system seminar report
induction motor protection system seminar reportinduction motor protection system seminar report
induction motor protection system seminar report
 
Solenoid Performance Codes
Solenoid Performance CodesSolenoid Performance Codes
Solenoid Performance Codes
 
Halderman ch055 lecture
Halderman ch055 lectureHalderman ch055 lecture
Halderman ch055 lecture
 
Chapter 34
Chapter 34Chapter 34
Chapter 34
 
Armature & field coil inspection
Armature & field coil inspectionArmature & field coil inspection
Armature & field coil inspection
 
Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13
 
Starter Motor diagnostic
Starter Motor diagnosticStarter Motor diagnostic
Starter Motor diagnostic
 
Nyscma Electrical Safety 11 6 08 Ralph Viola
Nyscma Electrical Safety 11 6 08 Ralph ViolaNyscma Electrical Safety 11 6 08 Ralph Viola
Nyscma Electrical Safety 11 6 08 Ralph Viola
 
Parasitic draw testing
Parasitic draw testingParasitic draw testing
Parasitic draw testing
 
Wire Harness Test Simple
Wire Harness Test SimpleWire Harness Test Simple
Wire Harness Test Simple
 
industrial training at vishakhapatnam steel plant
industrial training at vishakhapatnam steel plantindustrial training at vishakhapatnam steel plant
industrial training at vishakhapatnam steel plant
 
Mitsubishi s500 e-vfd-detailed
Mitsubishi s500 e-vfd-detailedMitsubishi s500 e-vfd-detailed
Mitsubishi s500 e-vfd-detailed
 
Mech EE6365 EE lab_manual
Mech EE6365 EE lab_manualMech EE6365 EE lab_manual
Mech EE6365 EE lab_manual
 
Troubleshooting.pptx
Troubleshooting.pptxTroubleshooting.pptx
Troubleshooting.pptx
 

More from javid iqbal sodagar

Make money online with fiverr discover the untold fiverr secret gig that hel...
Make money online with fiverr  discover the untold fiverr secret gig that hel...Make money online with fiverr  discover the untold fiverr secret gig that hel...
Make money online with fiverr discover the untold fiverr secret gig that hel...javid iqbal sodagar
 
Fiverr for beginners how to make money online with fiverr .javid iqbal sodagar
Fiverr for beginners  how to make money online with fiverr .javid iqbal sodagarFiverr for beginners  how to make money online with fiverr .javid iqbal sodagar
Fiverr for beginners how to make money online with fiverr .javid iqbal sodagarjavid iqbal sodagar
 
101 fiverr gigs 101 ways you can make money online.javid iqbal sodagar
101 fiverr gigs  101 ways you can make money online.javid iqbal sodagar101 fiverr gigs  101 ways you can make money online.javid iqbal sodagar
101 fiverr gigs 101 ways you can make money online.javid iqbal sodagarjavid iqbal sodagar
 
33 fiverr gigs that sell like crazy .javid iqbal sodagar
33 fiverr gigs that sell like crazy .javid iqbal sodagar33 fiverr gigs that sell like crazy .javid iqbal sodagar
33 fiverr gigs that sell like crazy .javid iqbal sodagarjavid iqbal sodagar
 
Safe switchgear specifications javid iqbal sodagar
Safe switchgear specifications javid iqbal sodagarSafe switchgear specifications javid iqbal sodagar
Safe switchgear specifications javid iqbal sodagarjavid iqbal sodagar
 
Recommendations for storage&instalation of cables javid iqbal sodagar
Recommendations for storage&instalation of cables  javid iqbal sodagarRecommendations for storage&instalation of cables  javid iqbal sodagar
Recommendations for storage&instalation of cables javid iqbal sodagarjavid iqbal sodagar
 
Protection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarProtection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarjavid iqbal sodagar
 
How to size overload protection javid iqbal sodagar
How to size overload protection javid iqbal sodagarHow to size overload protection javid iqbal sodagar
How to size overload protection javid iqbal sodagarjavid iqbal sodagar
 
Guide to proper bearing lubrication procedures javid iqbal sodagar
Guide to proper bearing lubrication procedures javid iqbal sodagarGuide to proper bearing lubrication procedures javid iqbal sodagar
Guide to proper bearing lubrication procedures javid iqbal sodagarjavid iqbal sodagar
 
How manufacturers can save electricity with electric motors javid iqbal sodagar
How manufacturers can save electricity with electric motors javid iqbal sodagarHow manufacturers can save electricity with electric motors javid iqbal sodagar
How manufacturers can save electricity with electric motors javid iqbal sodagarjavid iqbal sodagar
 
Transformer operation and maintenance cycle javid iqbal sodagar
Transformer operation and maintenance cycle javid iqbal sodagarTransformer operation and maintenance cycle javid iqbal sodagar
Transformer operation and maintenance cycle javid iqbal sodagarjavid iqbal sodagar
 
Four ways of ensuring proper selectivity in mvhv electrical network protectio...
Four ways of ensuring proper selectivity in mvhv electrical network protectio...Four ways of ensuring proper selectivity in mvhv electrical network protectio...
Four ways of ensuring proper selectivity in mvhv electrical network protectio...javid iqbal sodagar
 
Protection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarProtection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarjavid iqbal sodagar
 
Major faults in an alternator and their protection.
Major faults in an alternator and their protection.Major faults in an alternator and their protection.
Major faults in an alternator and their protection.javid iqbal sodagar
 
Guide to proper bearing lubrication procedures javid iqbal sodagar
Guide to proper bearing lubrication procedures javid iqbal sodagarGuide to proper bearing lubrication procedures javid iqbal sodagar
Guide to proper bearing lubrication procedures javid iqbal sodagarjavid iqbal sodagar
 
Three mistakes of bearing lubrication javid iqbal sodagar
Three mistakes of bearing lubrication javid iqbal sodagarThree mistakes of bearing lubrication javid iqbal sodagar
Three mistakes of bearing lubrication javid iqbal sodagarjavid iqbal sodagar
 
Discovering the secrets of proper bearing lubrication javid iqbal sodagar
Discovering the secrets of proper bearing lubrication javid iqbal sodagarDiscovering the secrets of proper bearing lubrication javid iqbal sodagar
Discovering the secrets of proper bearing lubrication javid iqbal sodagarjavid iqbal sodagar
 
Fly ash bricks javid iqbal sodagar
Fly ash bricks javid iqbal sodagarFly ash bricks javid iqbal sodagar
Fly ash bricks javid iqbal sodagarjavid iqbal sodagar
 
Fly ash process javid iqbal sodagar converted
Fly ash process javid iqbal sodagar convertedFly ash process javid iqbal sodagar converted
Fly ash process javid iqbal sodagar convertedjavid iqbal sodagar
 
How manufacturers can save electricity with electric motors javid iqbal sodagar
How manufacturers can save electricity with electric motors javid iqbal sodagarHow manufacturers can save electricity with electric motors javid iqbal sodagar
How manufacturers can save electricity with electric motors javid iqbal sodagarjavid iqbal sodagar
 

More from javid iqbal sodagar (20)

Make money online with fiverr discover the untold fiverr secret gig that hel...
Make money online with fiverr  discover the untold fiverr secret gig that hel...Make money online with fiverr  discover the untold fiverr secret gig that hel...
Make money online with fiverr discover the untold fiverr secret gig that hel...
 
Fiverr for beginners how to make money online with fiverr .javid iqbal sodagar
Fiverr for beginners  how to make money online with fiverr .javid iqbal sodagarFiverr for beginners  how to make money online with fiverr .javid iqbal sodagar
Fiverr for beginners how to make money online with fiverr .javid iqbal sodagar
 
101 fiverr gigs 101 ways you can make money online.javid iqbal sodagar
101 fiverr gigs  101 ways you can make money online.javid iqbal sodagar101 fiverr gigs  101 ways you can make money online.javid iqbal sodagar
101 fiverr gigs 101 ways you can make money online.javid iqbal sodagar
 
33 fiverr gigs that sell like crazy .javid iqbal sodagar
33 fiverr gigs that sell like crazy .javid iqbal sodagar33 fiverr gigs that sell like crazy .javid iqbal sodagar
33 fiverr gigs that sell like crazy .javid iqbal sodagar
 
Safe switchgear specifications javid iqbal sodagar
Safe switchgear specifications javid iqbal sodagarSafe switchgear specifications javid iqbal sodagar
Safe switchgear specifications javid iqbal sodagar
 
Recommendations for storage&instalation of cables javid iqbal sodagar
Recommendations for storage&instalation of cables  javid iqbal sodagarRecommendations for storage&instalation of cables  javid iqbal sodagar
Recommendations for storage&instalation of cables javid iqbal sodagar
 
Protection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarProtection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagar
 
How to size overload protection javid iqbal sodagar
How to size overload protection javid iqbal sodagarHow to size overload protection javid iqbal sodagar
How to size overload protection javid iqbal sodagar
 
Guide to proper bearing lubrication procedures javid iqbal sodagar
Guide to proper bearing lubrication procedures javid iqbal sodagarGuide to proper bearing lubrication procedures javid iqbal sodagar
Guide to proper bearing lubrication procedures javid iqbal sodagar
 
How manufacturers can save electricity with electric motors javid iqbal sodagar
How manufacturers can save electricity with electric motors javid iqbal sodagarHow manufacturers can save electricity with electric motors javid iqbal sodagar
How manufacturers can save electricity with electric motors javid iqbal sodagar
 
Transformer operation and maintenance cycle javid iqbal sodagar
Transformer operation and maintenance cycle javid iqbal sodagarTransformer operation and maintenance cycle javid iqbal sodagar
Transformer operation and maintenance cycle javid iqbal sodagar
 
Four ways of ensuring proper selectivity in mvhv electrical network protectio...
Four ways of ensuring proper selectivity in mvhv electrical network protectio...Four ways of ensuring proper selectivity in mvhv electrical network protectio...
Four ways of ensuring proper selectivity in mvhv electrical network protectio...
 
Protection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarProtection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagar
 
Major faults in an alternator and their protection.
Major faults in an alternator and their protection.Major faults in an alternator and their protection.
Major faults in an alternator and their protection.
 
Guide to proper bearing lubrication procedures javid iqbal sodagar
Guide to proper bearing lubrication procedures javid iqbal sodagarGuide to proper bearing lubrication procedures javid iqbal sodagar
Guide to proper bearing lubrication procedures javid iqbal sodagar
 
Three mistakes of bearing lubrication javid iqbal sodagar
Three mistakes of bearing lubrication javid iqbal sodagarThree mistakes of bearing lubrication javid iqbal sodagar
Three mistakes of bearing lubrication javid iqbal sodagar
 
Discovering the secrets of proper bearing lubrication javid iqbal sodagar
Discovering the secrets of proper bearing lubrication javid iqbal sodagarDiscovering the secrets of proper bearing lubrication javid iqbal sodagar
Discovering the secrets of proper bearing lubrication javid iqbal sodagar
 
Fly ash bricks javid iqbal sodagar
Fly ash bricks javid iqbal sodagarFly ash bricks javid iqbal sodagar
Fly ash bricks javid iqbal sodagar
 
Fly ash process javid iqbal sodagar converted
Fly ash process javid iqbal sodagar convertedFly ash process javid iqbal sodagar converted
Fly ash process javid iqbal sodagar converted
 
How manufacturers can save electricity with electric motors javid iqbal sodagar
How manufacturers can save electricity with electric motors javid iqbal sodagarHow manufacturers can save electricity with electric motors javid iqbal sodagar
How manufacturers can save electricity with electric motors javid iqbal sodagar
 

Recently uploaded

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 

Recently uploaded (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

Motor testing procedure by javid iqbal sodagar

  • 1. JAVID IQBAL SODAGAR DGM ELECTRICAL Three-Phase Motor Testing Procedure
  • 2. Types of Testing For 3-Phase Motors If a three-phase motor is exhibiting problems, such as failure to start, overheating and inconsistent supply, there are several diagnostic tools and methods at your disposal. These tools and methods are discussed below. Before testing, however, be sure to take appropriate safety precautions. These include: Wearing protective safety gear: This safety gear may include grounding straps, gloves, and any other relevant protective gear for the environment. Having all tools readily available: Some common diagnostic tools include ubiquitous multimeters, clamp-on ammeters, temperature sensors and oscilloscopes. Having these tools available will help you avoid leaving the motor unattended. Disconnecting the motor from power: When you are ready, move the transformer’s motor disconnect switch to take it off of power. Be careful to make sure that the power is actually turned off — on some motors, the disconnect switch is the same as the on/off switch, so switching the disconnect switch to the on position will power the motor. Also, be sure to disconnect all equipment and wiring that is not going to be included in the testing process. Discharge before and after testing: Before beginning testing and after each electrical test, be sure to discharge the motor, as it has an inherent amount of capacitance. This can be accomplished by shunting conductors to ground and each other before reconnecting. Check the nameplate: The nameplate or motor specifications provide valuable information about the motor, such as the intended amperage of the motor. This information can be used to assess the health of the motor compared to its intended design.
  • 3. 1. General Inspections The most basic inspection is a visual inspection. Once the motor is removed from power and you are prepared to begin inspection, remove the cover of the motor. Once this is removed, you can start to check the motor for visual indications of damage. Some things to look for during this process include: General Damage: General damage tends to be easy to spot. This may appear in the form of burn marks or indentations. Check all over the motor for any indications of heat or environmental damage. Shaft Condition: Manually rotate the motor shaft to assess its condition. This should be easy unless the motor is especially large. The shaft should rotate smoothly, with no catches or loose parts. Newer motors may have some difficulty turning due to tight tolerances, disuse or ambient moisture, which will need to be addressed with oiling and further inspection. However, older motors may have more serious obstructions that need repair or replacing. Connection Quality: Look at all the connections within the motor for indications of wear or damage, and assess any wires outside of the motor for potential breaks. Any broken wires should be handled and replaced with care. Once the motor has undergone a general inspection, double-check your inspection tools and start troubleshooting the electrical properties of the motor.
  • 4. 2. Continuity Tests Continuity testing tests the resistance between two points. If there is low resistance, the two points are electrically connected. If there is higher resistance, the circuit is open. The earth continuity test determines whether the motor is connected to ground. To complete the earth continuity test, set the multimeter to continuity mode. Once this is done, place one point on the frame of the motor and the other point on a known connection to the earth, preferably an area close to the motor installation. A good motor should result in a reading that is less than 0.5 ohms. If the value is greater than 0.5 ohms, however, this indicates that the motor’s insulation is failing and has the potential to cause an electric shock. Determining the causes of this failure may require further testing. 3. Power Supply Test The next test that should be completed is the power supply test. This checks that the incoming power supply is as expected and meets the design specifications of the motor. The power supply test can be done by checking the voltage being applied to the motor with a multimeter. Compare this with the specifications as noted on the nameplate. If the applied voltage is significantly lower or higher than specified, this may be one source of your problems. In addition to this test, check that the terminal for the power supply is in good condition. Damage and poor connections may also be at fault for any variances or performance issues.
  • 5. 4. AC Motor Winding Continuity Test Next, examine the inside of the motor and the wires involved in the three- phase current. Set and calibrate your multimeter for voltage and find the six wires of the three-phase motor. When looking at the box, you should see six wires, three on each side. There should be terminals on each side of the box that these wires are connected to. One side will have terminals labeled L1, L2 and L3 or Line 1, Line 2 and Line 3. The other side will have terminals labeled T1, T2 and T3 or Load 1, Load 2 and Load 3. L terminals indicate line wires with incoming current, while T terminals indicate outgoing wires. The exception is European motors, which will have the designations U, V and W. These wires should be tested to determine the health of the motor’s power supply. This can be tested using the following methods: No Power Incoming Test: To test the incoming voltage, place the multimeter probes on different permutations of the L terminals while the box is powered down. Take a reading for the L1 to L2 connection, the L1 to L3 connection and the L2 to L3 connection. These readings should be the same if the motor is working properly. For a 230/400V system, the expected voltage should be 400V between each of the three-phase supply lines.
  • 6. Line to Neutral Test: If there is an available neutral terminal, place one multimeter probe on that and the other on each of the line terminals. The voltage reading should be half of whatever voltage reading was received during the previous test. No Power Outgoing Test: This test is similar to the test above, but tests the outgoing voltage. While the box is still off, take a reading between the T1 and T2 leads, the T1 and T3 leads and T2 and T3 leads. In this case, the voltage reading should be zero for each test. Power Outgoing Test: Carefully power up the box and repeat the same tests as above, testing each permutation of the T leads. There should be little to no variation between each lead combination. If the readings differ from the expected results and the power supply test showed no issues, this may indicate problems with the health of the three- phase AC motor. Most often, this indicates that the motor is burned out.
  • 7. 5. Insulation Resistance Test The insulation resistance test is the next test that must be done to determine the overall health of the motor. This is done by comparing the resistance between each pair of motor phases and between each motor phase and the frame. This can be done with an insulation tester or Megger. The tests must be completed as follows: Phase Resistance: Take the insulation tester and set it to 500V. Take each end and place it on different permutations of L1, L2 and L3 and record each reading. Phase to Earth Resistance: Take the insulation tester, using the same setting, and check each lead from phase to the frame of the motor. The minimum value of insulation resistance should be 1 Mega ohm. If the value is less than 0.2 Megaohms, replace the motor. Any errors during this round of testing could indicate problems with insulation, which is a problem when it comes to the safety and functionality of the motor.
  • 8. .6. Running Amps Test This final test determines how much energy is drawn to drive the motor. More powerful motors will draw more current, measured in amps. Before testing, it is important to check the amperage draw your motor requires — this will usually be on the nameplate. When you are ready, use the following steps, which guide you through how to measure three-phase current: Prepare for Test: Set your multimeter to measure amperes and set it to the correct ampere range for your motor per the specifications listed on the nameplate. You should also be sure to wear rubber gloves during the test to protect yourself from electric shock. Turn On the Motor: Turn on the motor and locate the terminals. The positive terminal will be labeled with a plus sign and have a red wire connected to it. The negative terminal will be labeled with a minus sign and have a connected black wire. Place the Sensors: Place the negative sensor of the multimeter to the negative terminal of the motor, then place the positive sensor to the positive terminal. Be sure to keep your hands clear of moving parts at all times to avoid injury. When the sensors are connected, take the ampere reading and turn off the motor. The ampere reading should be within range if it is operating correctly. The ampere reading will not exceed the manufacturer’s specification but should be at or slightly below the given amperage draw. If the ampere reading is well below specification or out of range, this may indicate problems with the motor.