TYPICAL COURTYARD WALL ELEVATION NTS
1500
RENDERED AND
PAINTED FINISH TIMBER INFILL PANEL
6.0 x 6.0m POS
1500
3000
1500
3000
4000
6000
FLOOR AREAS
LOWER FLOOR LIVING GFA:
GARAGE GFA:
RUMPUS GFA:
UPPER FLOOR LIVING GFA:
(EXCLUDING STAIRS)
TOTAL GFA:
ALFRESCO AREA:
BLOCK 1 SECTION 146 BONNER
BLOCK AREA 713m
GENERAL NOTES:
CARRY OUT ALL WORK IN COMPLIANCE WITH THE RELEVANT
CODES OF PRACTICE, IN THE BEST TRADESPERSON LIKE MANNER
TO THE APPROVAL OF THE PROJECT MANAGER AND ALL
AUTHORITIES HAVING JURISDICTION OVER THE WORKS INCLUDING,
BUT NOT LIMITED TO THE FOLLOWING:
- ACT GOVERNMENT
- CURRENT BUILDING CODE OF AUSTRALIA
- ACT ELECTRICITY AND WATER (ACTEW)
- ALL RELEVANT AUSTRALIAN STANDARDS
POSITION OF STORMWATER LINES ARE APPROXIMATE ONLY AND
MAY VARY TO SUIT SITE CONDITIONS. POSITION OF DOWNPIPES
AND STORMWATER LINES TO BE VERIFIED BY BUILDER PRIOR TO
COMMENCEMENT OF WORK ON SITE.
CONTOURS AND DRAINAGE:
POST DEVELOPMENT CONTOURS AND LEVELS SHOWN ON THE
PLAN ARE TAKEN FROM PLANS SUPPLIED AND NO RESPONSIBILITY
IS TAKEN FOR SUBSEQUENT CUT/FILL LEVELS.
SITE SETOUT:
ALL BOUNDARY CLEARANCES SHOWN ARE TO BE VERIFIED BY THE
BUILDER AT SETOUT AND PRIOR TO ANY CONSTRUCTION
COMMENCING. BLOCK DIMENSIONS AND LEVELS HAVE BEEN
TAKEN FROM INFORMATION PROVIDED AND NO RESPONSIBILITY IS
TAKEN FOR THE ACCURACY OF THIS INFORMATION. IT IS
RECOMMENDED THAT A LICENCED SURVEYOR BE ENGAGED TO
SETOUT THE BUILDING TO ENSURE THAT APPROVED SETBACKS
ARE NOT ENCROACHED UPON.
FOR CONSTRUCTION DETAILS OF TIMBER FRAMEWORK, FOOTINGS
AND SLABS REFER TO THE BCA AND RELEVANT CODES AND
STANDARDS. TRUSSES TO BE DESIGNED AND INSTALLED TO
MANUFACTURERS SPECIFICATIONS AND ENGINEERS
SPECIFICATIONS AND DETAILS. ALL FOOTINGS, SLABS, COLUMNS,
BEAMS, FLOOR STRUCTURE, BRACING AND ALL OTHER
STRUCTURAL ELEMENTS TO BE DESIGNED AND APPROVED BY A
QUALIFIED STRUCTURAL ENGINEER PRIOR TO CONSTRUCTION.
NO RESPONSIBILITY IS TAKEN FOR THE DESIGN OF ANY
STRUCTURAL ELEMENTS.
ALL WORK MUST BE COMPLIANT WITH THE LEASE AND
DEVELOPMENT CONDITIONS FOR BLOCK 1 SECTION 146 BONNER.
GROUND FLOOR FOOTPRINT
UPPER LEVEL FOOTPRINT
CONCRETE
ALL CONSTRUCTION MUST COMPLY WITH BUSHFIRE PROTECTION
BAL 12.5 IN ACCORDANCE WITH AS 3959
GARAGE FFL 672.670
LOWER LIVING FFL 672.720
RUMPUS FFL 670.870
UPPER LIVING FFL 672.720
ENTRY AREA
ALFRESCO AREA
UP
3150
7270
1000
WATER FEATURE
WATER FEATURE
1.5m HIGH COURTYARD WALL.
COURTYARD WALL TO BE RENDERED
AND PAINTED THERMACELL WITH
TIMBER INFILL PANELS.
15750
4610
7930
TRANSITION 1:8
DRIVEWAY 1:4
TRANSITION 1:8
GRATED DRAIN TO BASE OF
DRIVEWAY
4000L WATER TANK
PROVIDE CONCRETE SLAB FOR WATER TANK.
WATER TANK TO BE CONNECTED TO 50% OR
LESSER) AND THE TANK IS TO BE CONNECTED
TO AT LEAST THE TOILET, LAUNDRY COLD
WATER AND ALL EXTERNAL TAPS.
1.8m HIGH TIMBER BOUNDARY FENCE
1.8m
HIGH
TIMBER
BOUNDARY
FENCE
4360
8570
9850
6590 3400 2970 6760 6710 1790 4360 6500 3000
1500
8900
7270
6020
2750
9440
PROVIDE HEDGE SCREENING TO
COURTYARD WALL.
CLOTHES LINE
RETAINING WALL AS REQUIRED
RETAINING WALL AS REQUIRED
GRADE AS REQUIRED
RETAINING WALL AS REQUIRED
PROPOSED DRIVEWAY
PROPOSED NEW DRIVEWAY TO COMPLY
WITH ACT GOVERNMENT DESIGN STANDARD
URBAN INFRASTRUCTURE DRAWING DS5-01
AND DS5-03. FINISH TO COMPLY WITH
LEASE & DEVELOPMENT CONDITIONS.
VERGE PROTECTION:
NO PARKING OR STORAGE OF MATERIALS ON
THE VERGE.
PROVIDE TEMPORARY 1.8M HIGH CHAIN WIRE
FENCING TO PROTECT VERGE.
Description
Rev drawn Date
Drawing Title
Drawing Number Rev
Date
Project Director
Project Architect Coord.
Reviewed
Verified
Approved
North
Scale Drawn
SITE PLAN
1:150(A3) A001
.
AL&CH
AL&CH
P2
05.09.15
heyward lance architecture
31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com
All dimensions are in millimetres. All levels are in metres.
Do not scale off drawing. All structure to engineers specification.
All dimensions, levels and site conditions must be verified
by contractor prior to commencement of any work.
All work must be carried out in accordance with the current edition of
the Building Code of Australia and all relevant Australian Standards.
Notes
Copyright
ISSUE FOR INFORMATION
P1 AL&CH 23.12.13
h e y w a r d l a n c e
a r c h i t e c t u r e
C copyright heyward lance architecture
Reproduction of this design and/or document in whole or in part
without prior written consent is an infringement of copyright.
Project
FOR APPROVAL
NOT FOR CONSTRUCTION
BLOCK 1 SECTION 146 BONNER -
Client
JAMES AND ALISON FOLK
ISSUE FOR INFORMATION
P2 AL&CH 05.09.15
3000
GARAGE FFL 672.670
LOWER LIVING FFL 672.720
RUMPUS FFL 670.870
UPPER LIVING FFL 672.720
ENTRY AREA
ALFRESCO AREA
UP
WATER FEATURE
WATER FEATURE
TRANSITION 1:8
DRIVEWAY 1:4
TRANSITION 1:8
4000L WATER TANK
1.8m
HIGH
TIMBER
BOUNDARY
FENCE
GENERAL NOTES:
CARRY OUT ALL WORK IN COMPLIANCE WITH THE RELEVANT
CODES OF PRACTICE, IN THE BEST TRADESPERSON LIKE MANNER
TO THE APPROVAL OF THE PROJECT MANAGER AND ALL
AUTHORITIES HAVING JURISDICTION OVER THE WORKS INCLUDING,
BUT NOT LIMITED TO THE FOLLOWING:
- ACT GOVERNMENT
- CURRENT BUILDING CODE OF AUSTRALIA
- ACT ELECTRICITY AND WATER (ACTEW)
- ALL RELEVANT AUSTRALIAN STANDARDS
STOCKPILE SITE TOPSOIL FOR RE-USE IN THE NEW WORKS WHERE
POSSIBLE.
ALL TREES, SHRUBS AND VEGETATION IS TO BE RETAINED UNLESS
NOTED OTHERWISE. PROTECT ALL VEGETATION DURING SITE
CLEARING.
CONTOURS AND LEVELS ARE APPROXIMATE ONLY. THE
CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL LEVELS ON
SITE.
THE DRAWINGS DO NOT SHOW ANY UNDERGROUND SERVICES ON,
OR SURROUNDING THE SITE. THE CONTRACTOR IS RESPONSIBLE
FOR CONFIRMING THE LOCATION OF ALL UNDERGROUND
SERVICES ON THE SITE PRIOR TO COMMENCEMENT OF WORKS.
IT IS THE RESPONSIBILITY OF THE BUILDER TO ENSURE THAT ANY
DISTURBANCES TO THE VERGE GROUND COVER, TREES, PATHS,
KERBS, ROADWAYS OR SERVICES OCCURRING FROM EITHER
CONSTRUCTION OR STORAGE OF MACHINERY/MATERIALS DURING
CONSTRUCTION WORKS ARE RECTIFIED TO THE SATISFACTION OF
ALL RELEVANT AUTHORITIES.
NO CONSTRUCTION MATERIAL IS TO BE STORED ON VERGES OR
PUBLIC OPEN SPACES.
NO CONSTRUCTION MATERIAL IS TO BE STORED ON VERGES OR
UNDER THE DRIPLINE OF RETAINED TREES.
THE CONTRACTOR IS RESPONSIBLE FOR RECTIFYING ANY DAMAGE
TO THE EXISTING KERB CROSSING, FOOTPATHS AND SURROUNDS
DURING THE CONSTRUCTION PERIOD.
SOIL EROSION MEASURES MUST COMPLY WITH EPS GUIDELINES.
ONE WAY CONSTRUCTION ACCESS POINT
ONE WAY ACCESS POINT TO BE FINISHED WITH 150mm DEEP -
75mm DIAMETER (NOMINAL) RIVER GRAVEL LAID ON HIGH TENSILE
STRENGTH GEOTEXTILE FABRIC PLACED AT THE NATURAL
GROUND LEVEL.
ROAD SUMPS
ROADS SUMPS ARE TO BE PROTECTED WITH 75mm DIAMETER
(NOMINAL) RIVER GRAVEL WRAPPED IN HIGH TENSILE STRENGTH
GEOTEXTILE FABRIC. THE PROTECTION MEASURES ARE TO BE
LOCATED TO CREATE A TRIANGLE IN FRONT OF THE SUMP.
ALL WORK MUST BE COMPLIANT WITH LEASE CONDITIONS AND
DEVELOPMENT REQUIREMENTS FOR B1 S146 BONNER.
PROVIDE SILT FENCING TO
EXTENT OF HATCHED AREA
SITE ACCESS POINT
TO BE FINISHED WITH 150mm
DEEP - 75mm DIAMETER
(NOMINAL) RIVER GRAVEL
LAID ON HIGH TENSILE
STRENGTH GEOTEXTILE
FABRIC PLACED AT THE
NATURAL GROUND LEVEL.
Description
Rev drawn Date
Drawing Title
Drawing Number Rev
Date
Project Director
Project Architect Coord.
Reviewed
Verified
Approved
North
Scale Drawn
EROSION AND
SEDIMENT CONTROL PLAN
1:150(A3) A002
.
AL&CH
AL&CH
P2
05.09.15
heyward lance architecture
31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com
All dimensions are in millimetres. All levels are in metres.
Do not scale off drawing. All structure to engineers specification.
All dimensions, levels and site conditions must be verified
by contractor prior to commencement of any work.
All work must be carried out in accordance with the current edition of
the Building Code of Australia and all relevant Australian Standards.
Notes
Copyright
ISSUE FOR INFORMATION
P1 AL&CH 23.12.13
h e y w a r d l a n c e
a r c h i t e c t u r e
C copyright heyward lance architecture
Reproduction of this design and/or document in whole or in part
without prior written consent is an infringement of copyright.
Project
BLOCK 1 SECTION 146 BONNER -
Client
JAMES AND ALISON FOLK
ISSUE FOR INFORMATION
P2 AL&CH 05.09.15
820
FW
SHOWER
1000 x 1000mm
ROBE LINEN
WM DRYER
820
CS
UNDER STAIR LANDING
820
820
820
820
ROBE
ROBE
BREAKOUT ROOM
CARPET
MUSIC STUDIO
CARPET
BEDROOM 02
CARPET
BEDROOM 03
CARPET
BEDROOM 04
CARPET
GARAGE
CONCRETE
STEP
01
02
03
04
05
06
07
08
09
10
11
BATH
LAUNDRY
UP
RUMPUS ROOM
4000L WATER TANK
FW
FFL 672.670
FFL 672.720
ALL CONCRETE SLABS AND FOOTINGS SHALL BE DETERMINED BY SITE CLASSIFICATION AND
AS2870.1-1996
PROVIDE TERMITE PROTECTION IN ACCORDANCE WITH AS3660-2000 PARTS 1,2 AND 3
ALL TIMBER FRAMING AND CONSTRUCTION MUST COMPLY WITH THE CURRENT VERSION OF THE TIMBER
FRAMING CODE AS1684 AND THE BCA
ALL LOWER LEVEL EXTERNAL WALLS TO BE THERMACELL WALL SYSTEM UNLESS NOTED OTHERWISE ON
THE DRAWINGS. INSTALL TO MANUFACTURERS SPECIFICATIONS. UPPER LEVEL WALLS TO BE
LIGHTWEIGHT CLAD WITH SARKING AND INSULATION.UNLESS NOTED OTHERWISE ON THE DRAWINGS.
ALL INSULATION TO COMPLY WITH ENERGY RATING REPORT.
NOTES
PROVIDE SMOKE ALARMS IN ACCORDANCE WITH PART 3.7.2 OF THE BCA AND AS3786.WIRING TO AS3000
WINDOWS TO COMPLY WITH ENERGY RATING REQUIREMENTS AND TO COMPLY WITH ALL RELEVANT
WINDOW CODES AND STANDARDS.
ALL FIRE RATED SEPARATION MUST BE UNDERTAKEN IN ACCORDANCE WITH THE BUILDING CODE OF
AUSTRALIA AND ALL RELEVENT AUSTRALIAN STANDARDS. ALL FIRE RATING CONSTRUCTION MUST BE
CERTIFIED BY A QUALIFIED PROFESSIONAL.
THE LOCATION OF SMOKE DETECTORS ARE INDICATIVE ONLY AND
THE LOCATION AND INSTALLATION OF SMOKE DETECTORS MUST BE
POSITIONED AND INSTALLED BY A SUITABLY QUALIFIED
PROFFESSIONAL AND IN ACCORDANCE WITH ALL CURRENT CODES
AND STANDARDS.
S
LIGHTING NOTE:
ALL LIGHTING PROVISIONS MUST COMPLY WITH SECTION 3.12.5.55
OF THE CURRENT VERSION OF THE BUILDING CODE OF AUSTRALIA.
S
S
02
A201
01
A202
01
A201
02
A202
6000 6500
250 6370 250 6000 250 2090 90 4440 1640 4360 250 2960 90 2950 250
MUSIC STUDIO GARAGE LAUNDRY BREAKOUT ROOM BED
6620 6500 2090 4780 1640 4360 850
32490
12170
5920
6250
250
5420
250
6000
250
MUSIC
STUDIO
GARAGE
5920
590
4810
850
19990 6500
250 6370 250 3000 90 2000 90 3800 90 3800 250 1640
MUSIC STUDIO BEDROOM 02 BATH BEDROOM 03 BEDROOM 04 BED
7500 1810 750 1810 880 2410 2170 2410 250 1640
8900
BED
RUMPUS
ROOM
1500
10670
500
1000
250
5750
90
600
3730
250
BREAKOUT
ROOM
BEDROOM
04
820
4120
3380
2100
250
(CATHEDRAL CEILING OVER)
1000
90
1000
90
2710
90
1000 1000
90
2710
1000
90
1410 500
2590 1410 90 1000
VERANDAH
PANEL
LIFT
GARAGE
DOOR
1218
REFER ELEVATION
1218
REFER ELEVATION
1824
REFER ELEVATION
1824
REFER ELEVATION
AA1821
REFER
ELEVATION
2100mm
HIGH
BIFOLD
GLASS
DOORS
ASD2430FSF
1812
AF0620 REFER ELEVATION
FFL 670.870
01
A301
820
CS
820 CS
820 CS
820 CS
FEATURE WALL TO CENTRE OF
STAIRS
OPEN STAIRS TO CLIENT
SELECTION
6870
6500
6620
820
820
820
820
WET
BAR
820
820CS
1812
1812OBS
1812
SKYLIGHT OVER
SKYLIGHT OVER
SKYLIGHT OVER
SKYLIGHT OVER
SKYLIGHT OVER
BED BED
BED
COVERED LINK TO
RUMPUS ROOM AREA
250
2500
90
3220
90
1500
90
910
250
WC
1200 2400 1200 850
BED
6000
4360
(CATHEDRAL CEILING OVER) (CATHEDRAL CEILING OVER)
(CATHEDRAL CEILING OVER)
250
2960
90
1000
90
1860
250
SHOWER BATH
4360 850 1200 2400 1200 850
BATH
WC
S
2950
3000
2950
STAIRS
DOWN
Description
Rev drawn Date
Drawing Title
Drawing Number Rev
Date
Project Director
Project Architect Coord.
Reviewed
Verified
Approved
North
Scale Drawn
LOWER FLOOR PLAN
1:100(A3) A101
.
AL&CH
AL&CH
P3
05.09.15
heyward lance architecture
31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com
All dimensions are in millimetres. All levels are in metres.
Do not scale off drawing. All structure to engineers specification.
All dimensions, levels and site conditions must be verified
by contractor prior to commencement of any work.
All work must be carried out in accordance with the current edition of
the Building Code of Australia and all relevant Australian Standards.
Notes
Copyright
ISSUE FOR INFORMATION
P1 AL&CH 20.12.13
h e y w a r d l a n c e
a r c h i t e c t u r e
C copyright heyward lance architecture
Reproduction of this design and/or document in whole or in part
without prior written consent is an infringement of copyright.
Project
PRELIMINARY ONLY
NOT FOR CONSTRUCTION
BLOCK 1 SECTION 146 BONNER -
Client
JAMES AND ALISON FOLK
ISSUE FOR INFORMATION
P2 AL&CH 23.12.13
ISSUE FOR INFORMATION
P3 AL&CH 05.09.15
LIVING ROOM
TIMBER
01
02
03
04
05
06
07
08
09
10
11 DN
12
13
14
15
16
720
820
1200
FW
SHOWER
1840
x
1000mm
ENSUITE
ROBE
ROBE
NOOK
BATH
WIP KITCHEN
2100mm
HIGH
FEATURE
STONE
CLAD
WALL
WITH
INTEGRATED
FIREPLACE
MEALS
BALUSTRADE
MASTER BED
CARPET
ENTRY
1500H
x
2480mm
BIFOLD
WINDOWS
ENTRY PORCH
ALFRESCO AREA
WATER FEATURE
WATER FEATURE
CUPD
RAKED CEILING AT 5 DEGREE PITCH
S
S
02
A201
01
A202
01
A201
02
A202
ALL CONCRETE SLABS AND FOOTINGS SHALL BE DETERMINED BY SITE CLASSIFICATION AND
AS2870.1-1996
PROVIDE TERMITE PROTECTION IN ACCORDANCE WITH AS3660-2000 PARTS 1,2 AND 3
ALL TIMBER FRAMING AND CONSTRUCTION MUST COMPLY WITH THE CURRENT VERSION OF THE TIMBER
FRAMING CODE AS1684 AND THE BCA
ALL LOWER LEVEL EXTERNAL WALLS TO BE THERMACELL WALL SYSTEM UNLESS NOTED OTHERWISE ON
THE DRAWINGS. INSTALL TO MANUFACTURERS SPECIFICATIONS. UPPER LEVEL WALLS TO BE
LIGHTWEIGHT CLAD WITH SARKING AND INSULATION.UNLESS NOTED OTHERWISE ON THE DRAWINGS.
ALL INSULATION TO COMPLY WITH ENERGY RATING REPORT.
NOTES
PROVIDE SMOKE ALARMS IN ACCORDANCE WITH PART 3.7.2 OF THE BCA AND AS3786.WIRING TO AS3000
WINDOWS TO COMPLY WITH ENERGY RATING REQUIREMENTS AND TO COMPLY WITH ALL RELEVANT
WINDOW CODES AND STANDARDS.
ALL FIRE RATED SEPARATION MUST BE UNDERTAKEN IN ACCORDANCE WITH THE BUILDING CODE OF
AUSTRALIA AND ALL RELEVENT AUSTRALIAN STANDARDS. ALL FIRE RATING CONSTRUCTION MUST BE
CERTIFIED BY A QUALIFIED PROFESSIONAL.
THE LOCATION OF SMOKE DETECTORS ARE INDICATIVE ONLY AND
THE LOCATION AND INSTALLATION OF SMOKE DETECTORS MUST BE
POSITIONED AND INSTALLED BY A SUITABLY QUALIFIED
PROFFESSIONAL AND IN ACCORDANCE WITH ALL CURRENT CODES
AND STANDARDS.
S
LIGHTING NOTE:
ALL LIGHTING PROVISIONS MUST COMPLY WITH SECTION 3.12.5.55
OF THE CURRENT VERSION OF THE BUILDING CODE OF AUSTRALIA.
21630
5270 600 13970 1790
600
100
3500 90 1780 90 1000 2690 90 4440 100 1790
MASTER BED WIP KITCHEN / MEALS
3390 1000 600 750 2410 12600
12170
1650
4600
1380
4400
150
100
4660
90
150
MASTER
BED
LIVING
/
ENTRY
1100
2650
850
125
1125
125
3170
125
1125
125
600 870 1000 600
LINE
OF
ENTRY
AWNING
ROOF
OVER
LINE OF BULKHEAD OVER
STRUCTURE OVER TO ENGINEERS DETAIL
90
1780
90
1600
90
1000
90
1000
90
1000
500
1000
21630
5270 1100 1910 2940 1910 6710 1790
6370
100
1200 400 4960
90
2090
90
4440
100
1790
ENTRY LIVING ROOM STAIRS KITCHEN / MEALS
FFL 675.420
3400 870 2100
380
2100 70 4440 100 1790
HANDRAIL AND BALUSTRADE
TO CLIENT SELECTION.
FEATURE HARDWOOD OR
EQUAL SCREENING TO ENTRY
10520
100
5850
4420
150
RENDERED PRIVACY SCREEN TO
SIDE OF BALCONY
100
600
4150
1000
100
600
1100
900
600
2
x
CS
TIMBER
TIMBER
TIMBER
900 2640 900
2680
2480
690
710
3610
100
600
600
830
1200
830
600
2460
REFER ELEVATION
2400mm HIGH ENTRY
DOORS AND SIDELIGHTS.
0631
LOUVRES
AT
HIGH
LEVEL
REFER
ELEVATION
AA2127
REFER
ELEVATION
AA0424
REFER ELEVATION
FLOOR SURFACE TO CLIENT
SELECTION. PROVIDE
WATERPROOFING AND
DRAINAGE TO ALL RELEVANT
STANDARDS.
FLOOR SURFACE TO CLIENT
SELECTION. PROVIDE
WATERPROOFING AND DRAINAGE
TO ALL RELEVANT STANDARDS.
2400mm
HIGH
BIFOLD
DOORS
REFER
ELEVATION
2400mm HIGH BIFOLD GLASS DOORS
REFER ELEVATION
01
A301
CONCEALED CAVITY
SLIDING DOOR
90
1530
940
300
FULL HEIGHT FEATURE WALL TO
CENTRE OF STAIRS
380
6000 4440
100
100
4320
5270
870
5420
100
Description
Rev drawn Date
Drawing Title
Drawing Number Rev
Date
Project Director
Project Architect Coord.
Reviewed
Verified
Approved
North
Scale Drawn
UPPER FLOOR PLAN
1:100(A3) A102
.
AL&CH
AL&CH
P3
05.09.15
heyward lance architecture
31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com
All dimensions are in millimetres. All levels are in metres.
Do not scale off drawing. All structure to engineers specification.
All dimensions, levels and site conditions must be verified
by contractor prior to commencement of any work.
All work must be carried out in accordance with the current edition of
the Building Code of Australia and all relevant Australian Standards.
Notes
Copyright
ISSUE FOR INFORMATION
P1 AL&CH 20.12.13
h e y w a r d l a n c e
a r c h i t e c t u r e
C copyright heyward lance architecture
Reproduction of this design and/or document in whole or in part
without prior written consent is an infringement of copyright.
Project
FOR APPROVAL
NOT FOR CONSTRUCTION
BLOCK 1 SECTION 146 BONNER -
Client
JAMES AND ALISON FOLK
ISSUE FOR INFORMATION
P2 AL&CH 23.12.13
ISSUE FOR INFORMATION
P3 AL&CH 05.09.15
COLORBOND ROOF.
COLORBOND ROOF.
COLORBOND ROOF.
COLORBOND ROOF.
COLORBOND ROOF.
EAVES
GUTTER
EAVES
GUTTER
DP
DP
DP
DP
COLORBOND ROOF OVER GARAGE.
PARAPET
PARAPET
METALDECK ROOF.
TIMBER EDGE BEAM
TIMBER EDGE BEAM
TIMBER
EDGE
BEAM
METALDECK ROOF CONCEALED BEHIND
FRAMING TO ENGINEERS DETAIL. PROVIDE
BOX GUTTER AND CLAD UNDERSIDE OF
AWNING WITH TIMBER CLADDING. PROVIDE
OVERFLOWS.
PERGOLA FRAMING OVER ALFRESCO AREA
TO STRUCTURAL ENGINEERS DETAIL.
DP
DP WITH SPREADER
DP
EAVES
GUTTER
EAVES GUTTER
WATER TANK
NOTES:
ALL EAVES GUTTERS TO BE COLORBOND QUAD GUTTERING.
INSTALL TO MANUFACTURERS RECOMMENDATION.
ALL ROOFING TO BE COLORBOND UNLESS NOTED OTHERWISE.
INSTALL TO MANUFACTURERS SPECIFICATIONS.
PROVIDE FASCIA, FLASHINGS AND PARAPET CAPPINGS AS REQUIRED.
DOWNPIPES AND SPREADERS TO BE COLORBOND TO MATCH GUTTERING.
PROVIDE PAINTED FC SHEET LINING TO ALL EAVES.
1200 1200
600
600 600
600
SOLAR
PANELS
COLORBOND ROOF.
SKYLIGHT
SOLAR
PANELS
SKYLIGHT
SKYLIGHT
SKYLIGHT
SKYLIGHT
Description
Rev drawn Date
Drawing Title
Drawing Number Rev
Date
Project Director
Project Architect Coord.
Reviewed
Verified
Approved
North
Scale Drawn
ROOF PLAN
1:100(A3) A103
.
AL&CH
AL&CH
P2
05.09.15
heyward lance architecture
31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com
All dimensions are in millimetres. All levels are in metres.
Do not scale off drawing. All structure to engineers specification.
All dimensions, levels and site conditions must be verified
by contractor prior to commencement of any work.
All work must be carried out in accordance with the current edition of
the Building Code of Australia and all relevant Australian Standards.
Notes
Copyright
ISSUE FOR INFORMATION
P1 AL&CH 20.12.13
h e y w a r d l a n c e
a r c h i t e c t u r e
C copyright heyward lance architecture
Reproduction of this design and/or document in whole or in part
without prior written consent is an infringement of copyright.
Project
FOR APPROVAL
NOT FOR CONSTRUCTION
BLOCK 1 SECTION 146 BONNER -
Client
JAMES AND ALISON FOLK
ISSUE FOR INFORMATION
P2 AL&CH 05.09.15
LINE
OF
BOUNDARY
2400
300
2700
COLORBOND ROOF AT 15
DEGREE PITCH.
TIMBER LOOK TILE CLADDING OR
EQUAL. PROVIDE SARKING AND
INSULATION.
LINE
OF
BOUNDARY
RENDERED FINISH ON
THERMACELL WALL SYSTEM.
FEATURE SANDSTONE VENEER
CLADDING ON THERMACELL
WALL SYSTEM.
HIGH LEVEL LOUVRED WINDOWS
ABOVE ENTRY DOOR
TIMBER LOOK TILE CLADDING OR
EQUAL. PROVIDE SARKING AND
INSULATION.
METALDECK ENTRY ROOF
CONCEALED BY TIMBER FRAMED
SURROUND. PROVIDE TIMBER
CLAD LINING TO UNDERSIDE
WITH RECESSED DOWNLIGHTS.
50
PANEL LIFT GARAGE DOOR IN
TIMBER FINISH
FFL 672.720 LIVING
FCL 675.120 LIVING
FFL 675.420 UPPER
FCL 678.120 UPPER
FFL 672.670 GARAGE
RETAINING WALLS AS REQUIRED
NGL AT GARAGE FACE
NGL AT RESIDENCE FACE
6700
NOM
PROVIDE HANDRAIL AND
BLAUSTRADE AS REQUIRED
FEATURE HARDWOOD OR
SIMILAR SCREENING TO ENTRY
AREA
LINE
OF
BOUNDARY
2400
300
2700
FFL 672.720 LIVING
FCL 675.120 LIVING
FFL 675.420 UPPER
FCL 678.120 UPPER
2400
300
FFL 670.870 RUMPUS
FCL 673.270 RUMPUS
FFL 673.57 STORAGE
FEATURE SANDSTONE VENEER
CLADDING ON THERMACELL
WALL SYSTEM.
METALDECK ENTRY ROOF
CONCEALED BY TIMBER FRAMED
SURROUND. PROVIDE TIMBER
CLAD LINING TO UNDERSIDE
WITH RECESSED DOWNLIGHTS.
RENDERED AND PAINTED FINISH
ON THERMACELL WALL SYSTEM.
COLORBOND ROOF
AT 5 DEGREE PITCH.
RENDERED AND PAINTED FINISH
AT HIGH LEVEL.
TIMBER PERGOLA FRAMING
OVER ALFRESCO AREA TO
ENGINEERS DETAIL.
GLASS BALUSTRADE PANELS TO
CLIENT SELECTION.
RENDERED AND PAINTED FINISH
ON THERMACELL WALL SYSTEM.
COLORBOND ROOF
AT 15 DEGREE PITCH.
COLORBOND ROOF
AT 30 DEGREE PITCH.
31 DEGREE BUILDING ENVELOPE LINE
AT BUILDING FACE
TIMBER LOOK TILE CLADDING OR
EQUAL. PROVIDE SARKING AND
INSULATION.
2400
8500
NOM
NGL
FEATURE SANDSTONE VENEER
CLADDING ON THERMACELL
WALL SYSTEM.
FEATURE HARDWOOD OR
SIMILAR SCREENING TO ENTRY
AREA
Description
Rev drawn Date
Drawing Title
Drawing Number Rev
Date
Project Director
Project Architect Coord.
Reviewed
Verified
Approved
North
Scale Drawn
ELEVATIONS
SHEET 01
1:100(A3) A201
.
AL&CH
AL&CH
P2
05.09.15
heyward lance architecture
31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com
All dimensions are in millimetres. All levels are in metres.
Do not scale off drawing. All structure to engineers specification.
All dimensions, levels and site conditions must be verified
by contractor prior to commencement of any work.
All work must be carried out in accordance with the current edition of
the Building Code of Australia and all relevant Australian Standards.
Notes
Copyright
ISSUE FOR INFORMATION
P1 AL&CH 20.12.13
h e y w a r d l a n c e
a r c h i t e c t u r e
C copyright heyward lance architecture
Reproduction of this design and/or document in whole or in part
without prior written consent is an infringement of copyright.
Project
FOR APPROVAL
NOT FOR CONSTRUCTION
BLOCK 1 SECTION 146 BONNER -
Client
JAMES AND ALISON FOLK
01 NORTH ELEVATION
02 WEST ELEVATION
ISSUE FOR INFORMATION
P2 AL&CH 05.09.15
LINE
OF
BOUNDARY
2400
300
2700
COLORBOND ROOF AT 15
DEGREE PITCH.
RENDERED AND PAINTED FINISH
TO LIGHTWEIGHT CLADDING.
PROVIDE SARKING AND
INSULATION.
LINE
OF
BOUNDARY
COLORBOND ROOF OVER
GARAGE AT 5 DEGREE PITCH
TIMBER LOOK TILE CLADDING OR
EQUAL. PROVIDE SARKING AND
INSULATION.
50
GLASS BALUSTRADE PANELS TO
CLIENT SELECTION.
FFL 672.720 LIVING
FCL 675.120 LIVING
FFL 675.420 UPPER
FCL 678.120 UPPER
FFL 672.670 GARAGE
900
1500
8400
NOM
4
5
D
E
G
R
E
E
B
U
I
L
D
I
N
G
E
N
V
E
L
O
P
E
L
I
N
E
TIMBER PERGOLA FRAMING
OVER ALFRESCO AREA TO
ENGINEERS DETAIL.
COLORBOND ROOF AT 15
DEGREE PITCH.
RENDERED AND PAINTED FINISH
ON THERMACELL WALL SYSTEM.
RENDERED AND PAINTED FINISH
ON THERMACELL WALL SYSTEM.
FEATURE SANDSTONE CLADDING
RETURNS AROUND CORNER.
LINE
OF
BOUNDARY
2400
2700
50
2400
METALDECK ENTRY ROOF
CONCEALED BY TIMBER FRAMED
SURROUND. PROVIDE TIMBER
CLAD LINING TO UNDERSIDE
WITH RECESSED DOWNLIGHTS.
RENDERED AND PAINTED FINISH
ON THERMACELL WALL SYSTEM.
COLORBOND ROOF
AT 15 DEGREE PITCH.
FEATURE HARDWOOD OR EQUAL
SCREENING TO ENTRY AREA.
RENDERED AND PAINTED
LIGHWEIGHT CLADDING. PROVIDE
SARKING AND INSULATION.
RENDERED AND PAINTED FINISH
ON THERMACELL WALL SYSTEM.
COLORBOND ROOF
AT 15 DEGREE PITCH.
COLORBOND ROOF
AT 30 DEGREE PITCH.
31 DEGREE BUILDING ENVELOPE LINE
AT BUILDING FACE
RENDERED AND PAINTED FINISH ON
THERMACELL WALL SYSTEM. PARAPET TO
CONCEAL 5 DEGREE COLORBOND ROOF
BEHIND(SHOWN DASHED).
RENDERED AND PAINTED FINISH
ON THERMACELL WALL SYSTEM.
400
1700
600
900
TIMBER SUPPORT TO DECK OVER
TO ENGINEERS DETAIL.
300
300
FFL 670.870 RUMPUS
FCL 673.270 RUMPUS
FFL 673.570 STORAGE
FFL 672.720 LIVING
FCL 675.120 LIVING
FFL 675.420 UPPER
FCL 678.120 UPPER
FFL 672.670 GARAGE
1:8 TRANSITION 1:4 MAX DRIVEWAY 1:8 TRANSITION
8070
NOM
NGL
2400
PROVIDE GRATED DRAIN
TO DRIVEWAY BASE
RENDERED PRIVACY SCREEN TO
SIDE OF BALCONY
TIMBER LOOK TILE CLADDING OR
EQUAL. PROVIDE SARKING AND
INSULATION.
FEATURE SANDSTONE CLADDING
ON THERMACELL WALL SYSTEM.
Description
Rev drawn Date
Drawing Title
Drawing Number Rev
Date
Project Director
Project Architect Coord.
Reviewed
Verified
Approved
North
Scale Drawn
ELEVATIONS
SHEET 02
1:100(A3) A202
.
AL&CH
AL&CH
P2
05.09.15
heyward lance architecture
31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com
All dimensions are in millimetres. All levels are in metres.
Do not scale off drawing. All structure to engineers specification.
All dimensions, levels and site conditions must be verified
by contractor prior to commencement of any work.
All work must be carried out in accordance with the current edition of
the Building Code of Australia and all relevant Australian Standards.
Notes
Copyright
ISSUE FOR INFORMATION
P1 AL&CH 20.12.13
h e y w a r d l a n c e
a r c h i t e c t u r e
C copyright heyward lance architecture
Reproduction of this design and/or document in whole or in part
without prior written consent is an infringement of copyright.
Project
FOR APPROVAL
NOT FOR CONSTRUCTION
BLOCK 1 SECTION 146 BONNER -
Client
JAMES AND ALISON FOLK
01 SOUTH ELEVATION
02 EAST ELEVATION
ISSUE FOR INFORMATION
P2 AL&CH 05.09.15
LINE
OF
BOUNDARY
2400
300
2700
FFL 672.720 LIVING
FCL 675.120 LIVING
FFL 675.420 UPPER
FCL 678.120 UPPER
FFL 670.870 RUMPUS
PROVIDE SARKING AND
INSULATION IN ACCORDANCE
WITH EER REPORT
COLORBOND ROOF
AT 30 DEGREE PITCH.
RENDERED AND PAINTED FINISH
ON THERMACELL WALL SYSTEM.
INSTALL TO MANUFACTURERS
SPECIFICATIONS.
RAKED PLASTERBOARD
CEILING AT 30 DEGREE
PITCH.
ALL FOOTINGS AND SLABS
TO STRUCTURAL
ENGINEERS DETAIL
ROOF STRUCTURE TO
ENGINEERS DETAIL
FFL 672.670 GARAGE
BREAKOUT ROOM
LAUNDRY
GARAGE
MASTER BED ROBE / ENSUITE WIP KITCHEN
COLORBOND ROOF
AT 15 DEGREE PITCH.
TIMBER LOOK TILED CLADDING
OR EQUAL. PROVIDE SARKING
AND INSULATION.
RENDERED PRIVACY SCREEN TO
SIDE OF BALCONY
GLASS BALUSTRADE
PANELS TO CLIENT
SELECTION.
TIMBER PERGOLA FRAMING
OVER ALFRESCO AREA TO
ENGINEERS DETAIL.
ROOF TRUSSES TO
MANUFACTURERS
SPECIFICATIONS
PROVIDE SARKING AND
INSULATION IN ACCORDANCE
WITH EER REPORT
FLOOR STRUCTURE TO
ENGINEERS DETAIL.
ALL FOOTINGS AND SLABS
TO STRUCTURAL
ENGINEERS DETAIL
1:8 TRANSITION 1:4 MAX DRIVEWAY 1:8 TRANSITION
PROVIDE GRATED DRAIN
TO DRIVEWAY BASE
NGL
PROVIDE FILL TO
ENGINEERS DETAIL
RETAINING WALL TO SIDE OF
DRIVEWAY AS REQUIRED
PERGOLA STRUCTURE
OVER LINKWAY
RUMPUS ROOM
Description
Rev drawn Date
Drawing Title
Drawing Number Rev
Date
Project Director
Project Architect Coord.
Reviewed
Verified
Approved
North
Scale Drawn
SECTION
1:100(A3) A301
.
AL&CH
AL&CH
P2
05.09.15
heyward lance architecture
31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com
All dimensions are in millimetres. All levels are in metres.
Do not scale off drawing. All structure to engineers specification.
All dimensions, levels and site conditions must be verified
by contractor prior to commencement of any work.
All work must be carried out in accordance with the current edition of
the Building Code of Australia and all relevant Australian Standards.
Notes
Copyright
ISSUE FOR INFORMATION
P1 AL&CH 20.12.13
h e y w a r d l a n c e
a r c h i t e c t u r e
C copyright heyward lance architecture
Reproduction of this design and/or document in whole or in part
without prior written consent is an infringement of copyright.
Project
FOR APPROVAL
NOT FOR CONSTRUCTION
BLOCK 1 SECTION 146 BONNER -
Client
JAMES AND ALISON FOLK
01 SECTION
ISSUE FOR INFORMATION
P2 AL&CH 05.09.15

More Related Content

What's hot

Install lining, panelling and moulding -Moulding presentation
Install lining, panelling and moulding -Moulding presentationInstall lining, panelling and moulding -Moulding presentation
Install lining, panelling and moulding -Moulding presentationCanberra Institute of technology
 
Practical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairsPractical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairsCanberra Institute of technology
 
Confined space entry ppt slide
Confined space entry ppt slideConfined space entry ppt slide
Confined space entry ppt slidePersonal Secret
 
Safety precautions during demolition
Safety precautions during demolitionSafety precautions during demolition
Safety precautions during demolitionManthan Vaghasiya
 
Scaffolding
ScaffoldingScaffolding
Scaffoldingstooty s
 

What's hot (20)

ICANZ Insulation installation handbook P:2 V:5
ICANZ Insulation installation handbook P:2 V:5 ICANZ Insulation installation handbook P:2 V:5
ICANZ Insulation installation handbook P:2 V:5
 
Stair Workbook.pdf
Stair Workbook.pdfStair Workbook.pdf
Stair Workbook.pdf
 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
 
Makita cold cut manual
Makita cold cut manualMakita cold cut manual
Makita cold cut manual
 
Gyprock-Wet Areas-installation-guide.pdf
Gyprock-Wet Areas-installation-guide.pdfGyprock-Wet Areas-installation-guide.pdf
Gyprock-Wet Areas-installation-guide.pdf
 
Dempolition notes Part 1.pdf
Dempolition notes Part 1.pdfDempolition notes Part 1.pdf
Dempolition notes Part 1.pdf
 
CAM-SDS-0001 General Purpose Cement.pdf
CAM-SDS-0001 General Purpose Cement.pdfCAM-SDS-0001 General Purpose Cement.pdf
CAM-SDS-0001 General Purpose Cement.pdf
 
Form Release Agent SDS
Form Release Agent SDSForm Release Agent SDS
Form Release Agent SDS
 
Install lining, panelling and moulding -Moulding presentation
Install lining, panelling and moulding -Moulding presentationInstall lining, panelling and moulding -Moulding presentation
Install lining, panelling and moulding -Moulding presentation
 
Trench Mesh Quantities Calculations
Trench Mesh Quantities CalculationsTrench Mesh Quantities Calculations
Trench Mesh Quantities Calculations
 
Masonry Components
Masonry ComponentsMasonry Components
Masonry Components
 
Practical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairsPractical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairs
 
OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Confined space entry ppt slide
Confined space entry ppt slideConfined space entry ppt slide
Confined space entry ppt slide
 
Excavations ppt
Excavations pptExcavations ppt
Excavations ppt
 
Special structure
Special structureSpecial structure
Special structure
 
Scaffolds ppt construction
Scaffolds ppt constructionScaffolds ppt construction
Scaffolds ppt construction
 
Safety precautions during demolition
Safety precautions during demolitionSafety precautions during demolition
Safety precautions during demolition
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 

Similar to Bonner House - Set.pdf

Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major projectYolanda Sewpersad
 
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMLuciano D'Amico Rebord
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad SubmissionYolanda Sewpersad
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINELee Yung Anchor
 
Tempe Micro Estates
Tempe Micro EstatesTempe Micro Estates
Tempe Micro EstatesNewtownCDC
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Pratap Bhunia
 
CORPORATE FOYER. PORTFOLIO.
CORPORATE FOYER. PORTFOLIO.CORPORATE FOYER. PORTFOLIO.
CORPORATE FOYER. PORTFOLIO.Mlungisi Mhlungu
 
Phippen, Clifford & Theresa - PERMIT SET 2 - 30 Lantern Lane- Pembroke, MA 02...
Phippen, Clifford & Theresa - PERMIT SET 2 - 30 Lantern Lane- Pembroke, MA 02...Phippen, Clifford & Theresa - PERMIT SET 2 - 30 Lantern Lane- Pembroke, MA 02...
Phippen, Clifford & Theresa - PERMIT SET 2 - 30 Lantern Lane- Pembroke, MA 02...Shervin Radfar
 
15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility Plan15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility PlanKevin Stober
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 
BD 1232 rev E 07-01 Licensing
BD 1232 rev E  07-01 LicensingBD 1232 rev E  07-01 Licensing
BD 1232 rev E 07-01 LicensingMaja Myall
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestationYousef Riad
 
15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan15RDM01-Academy Demo Plan
15RDM01-Academy Demo PlanKevin Stober
 

Similar to Bonner House - Set.pdf (20)

Studiowork submission
Studiowork submission Studiowork submission
Studiowork submission
 
15-0478_WD_B
15-0478_WD_B15-0478_WD_B
15-0478_WD_B
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
 
working drawings
working drawingsworking drawings
working drawings
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad Submission
 
House Dhanilal Submission
House Dhanilal SubmissionHouse Dhanilal Submission
House Dhanilal Submission
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE
 
Tempe Micro Estates
Tempe Micro EstatesTempe Micro Estates
Tempe Micro Estates
 
house plans
house planshouse plans
house plans
 
You need the house plans
You need the house plansYou need the house plans
You need the house plans
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 
CORPORATE FOYER. PORTFOLIO.
CORPORATE FOYER. PORTFOLIO.CORPORATE FOYER. PORTFOLIO.
CORPORATE FOYER. PORTFOLIO.
 
Phippen, Clifford & Theresa - PERMIT SET 2 - 30 Lantern Lane- Pembroke, MA 02...
Phippen, Clifford & Theresa - PERMIT SET 2 - 30 Lantern Lane- Pembroke, MA 02...Phippen, Clifford & Theresa - PERMIT SET 2 - 30 Lantern Lane- Pembroke, MA 02...
Phippen, Clifford & Theresa - PERMIT SET 2 - 30 Lantern Lane- Pembroke, MA 02...
 
15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility Plan15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility Plan
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 
Riparazione piste aeroportuali
Riparazione piste aeroportualiRiparazione piste aeroportuali
Riparazione piste aeroportuali
 
BD 1232 rev E 07-01 Licensing
BD 1232 rev E  07-01 LicensingBD 1232 rev E  07-01 Licensing
BD 1232 rev E 07-01 Licensing
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
 
15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan
 

More from Canberra Institute of technology

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxCanberra Institute of technology
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxCanberra Institute of technology
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfCanberra Institute of technology
 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerCanberra Institute of technology
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Canberra Institute of technology
 

More from Canberra Institute of technology (20)

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
 
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptxDemolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
 
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docxPractical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
 
Deck and Screen plans & Calculations
Deck and Screen plans & CalculationsDeck and Screen plans & Calculations
Deck and Screen plans & Calculations
 
CIT Subject Guide EPT
CIT Subject Guide EPTCIT Subject Guide EPT
CIT Subject Guide EPT
 
Example Site Induction Map .pdf
Example Site Induction Map .pdfExample Site Induction Map .pdf
Example Site Induction Map .pdf
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
 
Axon Cladding Installation Guide
Axon Cladding Installation GuideAxon Cladding Installation Guide
Axon Cladding Installation Guide
 
Woodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boardsWoodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boards
 
Cladding introduction class presentation
Cladding introduction class presentationCladding introduction class presentation
Cladding introduction class presentation
 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal corner
 
Practical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboardsPractical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboards
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
 
Small House Calculations
Small House CalculationsSmall House Calculations
Small House Calculations
 
3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx
 
Practical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docxPractical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docx
 
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - ReinforcementPractical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
 

Recently uploaded

Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 

Recently uploaded (20)

Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 

Bonner House - Set.pdf

  • 1. TYPICAL COURTYARD WALL ELEVATION NTS 1500 RENDERED AND PAINTED FINISH TIMBER INFILL PANEL 6.0 x 6.0m POS 1500 3000 1500 3000 4000 6000 FLOOR AREAS LOWER FLOOR LIVING GFA: GARAGE GFA: RUMPUS GFA: UPPER FLOOR LIVING GFA: (EXCLUDING STAIRS) TOTAL GFA: ALFRESCO AREA: BLOCK 1 SECTION 146 BONNER BLOCK AREA 713m GENERAL NOTES: CARRY OUT ALL WORK IN COMPLIANCE WITH THE RELEVANT CODES OF PRACTICE, IN THE BEST TRADESPERSON LIKE MANNER TO THE APPROVAL OF THE PROJECT MANAGER AND ALL AUTHORITIES HAVING JURISDICTION OVER THE WORKS INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: - ACT GOVERNMENT - CURRENT BUILDING CODE OF AUSTRALIA - ACT ELECTRICITY AND WATER (ACTEW) - ALL RELEVANT AUSTRALIAN STANDARDS POSITION OF STORMWATER LINES ARE APPROXIMATE ONLY AND MAY VARY TO SUIT SITE CONDITIONS. POSITION OF DOWNPIPES AND STORMWATER LINES TO BE VERIFIED BY BUILDER PRIOR TO COMMENCEMENT OF WORK ON SITE. CONTOURS AND DRAINAGE: POST DEVELOPMENT CONTOURS AND LEVELS SHOWN ON THE PLAN ARE TAKEN FROM PLANS SUPPLIED AND NO RESPONSIBILITY IS TAKEN FOR SUBSEQUENT CUT/FILL LEVELS. SITE SETOUT: ALL BOUNDARY CLEARANCES SHOWN ARE TO BE VERIFIED BY THE BUILDER AT SETOUT AND PRIOR TO ANY CONSTRUCTION COMMENCING. BLOCK DIMENSIONS AND LEVELS HAVE BEEN TAKEN FROM INFORMATION PROVIDED AND NO RESPONSIBILITY IS TAKEN FOR THE ACCURACY OF THIS INFORMATION. IT IS RECOMMENDED THAT A LICENCED SURVEYOR BE ENGAGED TO SETOUT THE BUILDING TO ENSURE THAT APPROVED SETBACKS ARE NOT ENCROACHED UPON. FOR CONSTRUCTION DETAILS OF TIMBER FRAMEWORK, FOOTINGS AND SLABS REFER TO THE BCA AND RELEVANT CODES AND STANDARDS. TRUSSES TO BE DESIGNED AND INSTALLED TO MANUFACTURERS SPECIFICATIONS AND ENGINEERS SPECIFICATIONS AND DETAILS. ALL FOOTINGS, SLABS, COLUMNS, BEAMS, FLOOR STRUCTURE, BRACING AND ALL OTHER STRUCTURAL ELEMENTS TO BE DESIGNED AND APPROVED BY A QUALIFIED STRUCTURAL ENGINEER PRIOR TO CONSTRUCTION. NO RESPONSIBILITY IS TAKEN FOR THE DESIGN OF ANY STRUCTURAL ELEMENTS. ALL WORK MUST BE COMPLIANT WITH THE LEASE AND DEVELOPMENT CONDITIONS FOR BLOCK 1 SECTION 146 BONNER. GROUND FLOOR FOOTPRINT UPPER LEVEL FOOTPRINT CONCRETE ALL CONSTRUCTION MUST COMPLY WITH BUSHFIRE PROTECTION BAL 12.5 IN ACCORDANCE WITH AS 3959 GARAGE FFL 672.670 LOWER LIVING FFL 672.720 RUMPUS FFL 670.870 UPPER LIVING FFL 672.720 ENTRY AREA ALFRESCO AREA UP 3150 7270 1000 WATER FEATURE WATER FEATURE 1.5m HIGH COURTYARD WALL. COURTYARD WALL TO BE RENDERED AND PAINTED THERMACELL WITH TIMBER INFILL PANELS. 15750 4610 7930 TRANSITION 1:8 DRIVEWAY 1:4 TRANSITION 1:8 GRATED DRAIN TO BASE OF DRIVEWAY 4000L WATER TANK PROVIDE CONCRETE SLAB FOR WATER TANK. WATER TANK TO BE CONNECTED TO 50% OR LESSER) AND THE TANK IS TO BE CONNECTED TO AT LEAST THE TOILET, LAUNDRY COLD WATER AND ALL EXTERNAL TAPS. 1.8m HIGH TIMBER BOUNDARY FENCE 1.8m HIGH TIMBER BOUNDARY FENCE 4360 8570 9850 6590 3400 2970 6760 6710 1790 4360 6500 3000 1500 8900 7270 6020 2750 9440 PROVIDE HEDGE SCREENING TO COURTYARD WALL. CLOTHES LINE RETAINING WALL AS REQUIRED RETAINING WALL AS REQUIRED GRADE AS REQUIRED RETAINING WALL AS REQUIRED PROPOSED DRIVEWAY PROPOSED NEW DRIVEWAY TO COMPLY WITH ACT GOVERNMENT DESIGN STANDARD URBAN INFRASTRUCTURE DRAWING DS5-01 AND DS5-03. FINISH TO COMPLY WITH LEASE & DEVELOPMENT CONDITIONS. VERGE PROTECTION: NO PARKING OR STORAGE OF MATERIALS ON THE VERGE. PROVIDE TEMPORARY 1.8M HIGH CHAIN WIRE FENCING TO PROTECT VERGE. Description Rev drawn Date Drawing Title Drawing Number Rev Date Project Director Project Architect Coord. Reviewed Verified Approved North Scale Drawn SITE PLAN 1:150(A3) A001 . AL&CH AL&CH P2 05.09.15 heyward lance architecture 31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com All dimensions are in millimetres. All levels are in metres. Do not scale off drawing. All structure to engineers specification. All dimensions, levels and site conditions must be verified by contractor prior to commencement of any work. All work must be carried out in accordance with the current edition of the Building Code of Australia and all relevant Australian Standards. Notes Copyright ISSUE FOR INFORMATION P1 AL&CH 23.12.13 h e y w a r d l a n c e a r c h i t e c t u r e C copyright heyward lance architecture Reproduction of this design and/or document in whole or in part without prior written consent is an infringement of copyright. Project FOR APPROVAL NOT FOR CONSTRUCTION BLOCK 1 SECTION 146 BONNER - Client JAMES AND ALISON FOLK ISSUE FOR INFORMATION P2 AL&CH 05.09.15
  • 2. 3000 GARAGE FFL 672.670 LOWER LIVING FFL 672.720 RUMPUS FFL 670.870 UPPER LIVING FFL 672.720 ENTRY AREA ALFRESCO AREA UP WATER FEATURE WATER FEATURE TRANSITION 1:8 DRIVEWAY 1:4 TRANSITION 1:8 4000L WATER TANK 1.8m HIGH TIMBER BOUNDARY FENCE GENERAL NOTES: CARRY OUT ALL WORK IN COMPLIANCE WITH THE RELEVANT CODES OF PRACTICE, IN THE BEST TRADESPERSON LIKE MANNER TO THE APPROVAL OF THE PROJECT MANAGER AND ALL AUTHORITIES HAVING JURISDICTION OVER THE WORKS INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: - ACT GOVERNMENT - CURRENT BUILDING CODE OF AUSTRALIA - ACT ELECTRICITY AND WATER (ACTEW) - ALL RELEVANT AUSTRALIAN STANDARDS STOCKPILE SITE TOPSOIL FOR RE-USE IN THE NEW WORKS WHERE POSSIBLE. ALL TREES, SHRUBS AND VEGETATION IS TO BE RETAINED UNLESS NOTED OTHERWISE. PROTECT ALL VEGETATION DURING SITE CLEARING. CONTOURS AND LEVELS ARE APPROXIMATE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL LEVELS ON SITE. THE DRAWINGS DO NOT SHOW ANY UNDERGROUND SERVICES ON, OR SURROUNDING THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING THE LOCATION OF ALL UNDERGROUND SERVICES ON THE SITE PRIOR TO COMMENCEMENT OF WORKS. IT IS THE RESPONSIBILITY OF THE BUILDER TO ENSURE THAT ANY DISTURBANCES TO THE VERGE GROUND COVER, TREES, PATHS, KERBS, ROADWAYS OR SERVICES OCCURRING FROM EITHER CONSTRUCTION OR STORAGE OF MACHINERY/MATERIALS DURING CONSTRUCTION WORKS ARE RECTIFIED TO THE SATISFACTION OF ALL RELEVANT AUTHORITIES. NO CONSTRUCTION MATERIAL IS TO BE STORED ON VERGES OR PUBLIC OPEN SPACES. NO CONSTRUCTION MATERIAL IS TO BE STORED ON VERGES OR UNDER THE DRIPLINE OF RETAINED TREES. THE CONTRACTOR IS RESPONSIBLE FOR RECTIFYING ANY DAMAGE TO THE EXISTING KERB CROSSING, FOOTPATHS AND SURROUNDS DURING THE CONSTRUCTION PERIOD. SOIL EROSION MEASURES MUST COMPLY WITH EPS GUIDELINES. ONE WAY CONSTRUCTION ACCESS POINT ONE WAY ACCESS POINT TO BE FINISHED WITH 150mm DEEP - 75mm DIAMETER (NOMINAL) RIVER GRAVEL LAID ON HIGH TENSILE STRENGTH GEOTEXTILE FABRIC PLACED AT THE NATURAL GROUND LEVEL. ROAD SUMPS ROADS SUMPS ARE TO BE PROTECTED WITH 75mm DIAMETER (NOMINAL) RIVER GRAVEL WRAPPED IN HIGH TENSILE STRENGTH GEOTEXTILE FABRIC. THE PROTECTION MEASURES ARE TO BE LOCATED TO CREATE A TRIANGLE IN FRONT OF THE SUMP. ALL WORK MUST BE COMPLIANT WITH LEASE CONDITIONS AND DEVELOPMENT REQUIREMENTS FOR B1 S146 BONNER. PROVIDE SILT FENCING TO EXTENT OF HATCHED AREA SITE ACCESS POINT TO BE FINISHED WITH 150mm DEEP - 75mm DIAMETER (NOMINAL) RIVER GRAVEL LAID ON HIGH TENSILE STRENGTH GEOTEXTILE FABRIC PLACED AT THE NATURAL GROUND LEVEL. Description Rev drawn Date Drawing Title Drawing Number Rev Date Project Director Project Architect Coord. Reviewed Verified Approved North Scale Drawn EROSION AND SEDIMENT CONTROL PLAN 1:150(A3) A002 . AL&CH AL&CH P2 05.09.15 heyward lance architecture 31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com All dimensions are in millimetres. All levels are in metres. Do not scale off drawing. All structure to engineers specification. All dimensions, levels and site conditions must be verified by contractor prior to commencement of any work. All work must be carried out in accordance with the current edition of the Building Code of Australia and all relevant Australian Standards. Notes Copyright ISSUE FOR INFORMATION P1 AL&CH 23.12.13 h e y w a r d l a n c e a r c h i t e c t u r e C copyright heyward lance architecture Reproduction of this design and/or document in whole or in part without prior written consent is an infringement of copyright. Project BLOCK 1 SECTION 146 BONNER - Client JAMES AND ALISON FOLK ISSUE FOR INFORMATION P2 AL&CH 05.09.15
  • 3. 820 FW SHOWER 1000 x 1000mm ROBE LINEN WM DRYER 820 CS UNDER STAIR LANDING 820 820 820 820 ROBE ROBE BREAKOUT ROOM CARPET MUSIC STUDIO CARPET BEDROOM 02 CARPET BEDROOM 03 CARPET BEDROOM 04 CARPET GARAGE CONCRETE STEP 01 02 03 04 05 06 07 08 09 10 11 BATH LAUNDRY UP RUMPUS ROOM 4000L WATER TANK FW FFL 672.670 FFL 672.720 ALL CONCRETE SLABS AND FOOTINGS SHALL BE DETERMINED BY SITE CLASSIFICATION AND AS2870.1-1996 PROVIDE TERMITE PROTECTION IN ACCORDANCE WITH AS3660-2000 PARTS 1,2 AND 3 ALL TIMBER FRAMING AND CONSTRUCTION MUST COMPLY WITH THE CURRENT VERSION OF THE TIMBER FRAMING CODE AS1684 AND THE BCA ALL LOWER LEVEL EXTERNAL WALLS TO BE THERMACELL WALL SYSTEM UNLESS NOTED OTHERWISE ON THE DRAWINGS. INSTALL TO MANUFACTURERS SPECIFICATIONS. UPPER LEVEL WALLS TO BE LIGHTWEIGHT CLAD WITH SARKING AND INSULATION.UNLESS NOTED OTHERWISE ON THE DRAWINGS. ALL INSULATION TO COMPLY WITH ENERGY RATING REPORT. NOTES PROVIDE SMOKE ALARMS IN ACCORDANCE WITH PART 3.7.2 OF THE BCA AND AS3786.WIRING TO AS3000 WINDOWS TO COMPLY WITH ENERGY RATING REQUIREMENTS AND TO COMPLY WITH ALL RELEVANT WINDOW CODES AND STANDARDS. ALL FIRE RATED SEPARATION MUST BE UNDERTAKEN IN ACCORDANCE WITH THE BUILDING CODE OF AUSTRALIA AND ALL RELEVENT AUSTRALIAN STANDARDS. ALL FIRE RATING CONSTRUCTION MUST BE CERTIFIED BY A QUALIFIED PROFESSIONAL. THE LOCATION OF SMOKE DETECTORS ARE INDICATIVE ONLY AND THE LOCATION AND INSTALLATION OF SMOKE DETECTORS MUST BE POSITIONED AND INSTALLED BY A SUITABLY QUALIFIED PROFFESSIONAL AND IN ACCORDANCE WITH ALL CURRENT CODES AND STANDARDS. S LIGHTING NOTE: ALL LIGHTING PROVISIONS MUST COMPLY WITH SECTION 3.12.5.55 OF THE CURRENT VERSION OF THE BUILDING CODE OF AUSTRALIA. S S 02 A201 01 A202 01 A201 02 A202 6000 6500 250 6370 250 6000 250 2090 90 4440 1640 4360 250 2960 90 2950 250 MUSIC STUDIO GARAGE LAUNDRY BREAKOUT ROOM BED 6620 6500 2090 4780 1640 4360 850 32490 12170 5920 6250 250 5420 250 6000 250 MUSIC STUDIO GARAGE 5920 590 4810 850 19990 6500 250 6370 250 3000 90 2000 90 3800 90 3800 250 1640 MUSIC STUDIO BEDROOM 02 BATH BEDROOM 03 BEDROOM 04 BED 7500 1810 750 1810 880 2410 2170 2410 250 1640 8900 BED RUMPUS ROOM 1500 10670 500 1000 250 5750 90 600 3730 250 BREAKOUT ROOM BEDROOM 04 820 4120 3380 2100 250 (CATHEDRAL CEILING OVER) 1000 90 1000 90 2710 90 1000 1000 90 2710 1000 90 1410 500 2590 1410 90 1000 VERANDAH PANEL LIFT GARAGE DOOR 1218 REFER ELEVATION 1218 REFER ELEVATION 1824 REFER ELEVATION 1824 REFER ELEVATION AA1821 REFER ELEVATION 2100mm HIGH BIFOLD GLASS DOORS ASD2430FSF 1812 AF0620 REFER ELEVATION FFL 670.870 01 A301 820 CS 820 CS 820 CS 820 CS FEATURE WALL TO CENTRE OF STAIRS OPEN STAIRS TO CLIENT SELECTION 6870 6500 6620 820 820 820 820 WET BAR 820 820CS 1812 1812OBS 1812 SKYLIGHT OVER SKYLIGHT OVER SKYLIGHT OVER SKYLIGHT OVER SKYLIGHT OVER BED BED BED COVERED LINK TO RUMPUS ROOM AREA 250 2500 90 3220 90 1500 90 910 250 WC 1200 2400 1200 850 BED 6000 4360 (CATHEDRAL CEILING OVER) (CATHEDRAL CEILING OVER) (CATHEDRAL CEILING OVER) 250 2960 90 1000 90 1860 250 SHOWER BATH 4360 850 1200 2400 1200 850 BATH WC S 2950 3000 2950 STAIRS DOWN Description Rev drawn Date Drawing Title Drawing Number Rev Date Project Director Project Architect Coord. Reviewed Verified Approved North Scale Drawn LOWER FLOOR PLAN 1:100(A3) A101 . AL&CH AL&CH P3 05.09.15 heyward lance architecture 31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com All dimensions are in millimetres. All levels are in metres. Do not scale off drawing. All structure to engineers specification. All dimensions, levels and site conditions must be verified by contractor prior to commencement of any work. All work must be carried out in accordance with the current edition of the Building Code of Australia and all relevant Australian Standards. Notes Copyright ISSUE FOR INFORMATION P1 AL&CH 20.12.13 h e y w a r d l a n c e a r c h i t e c t u r e C copyright heyward lance architecture Reproduction of this design and/or document in whole or in part without prior written consent is an infringement of copyright. Project PRELIMINARY ONLY NOT FOR CONSTRUCTION BLOCK 1 SECTION 146 BONNER - Client JAMES AND ALISON FOLK ISSUE FOR INFORMATION P2 AL&CH 23.12.13 ISSUE FOR INFORMATION P3 AL&CH 05.09.15
  • 4. LIVING ROOM TIMBER 01 02 03 04 05 06 07 08 09 10 11 DN 12 13 14 15 16 720 820 1200 FW SHOWER 1840 x 1000mm ENSUITE ROBE ROBE NOOK BATH WIP KITCHEN 2100mm HIGH FEATURE STONE CLAD WALL WITH INTEGRATED FIREPLACE MEALS BALUSTRADE MASTER BED CARPET ENTRY 1500H x 2480mm BIFOLD WINDOWS ENTRY PORCH ALFRESCO AREA WATER FEATURE WATER FEATURE CUPD RAKED CEILING AT 5 DEGREE PITCH S S 02 A201 01 A202 01 A201 02 A202 ALL CONCRETE SLABS AND FOOTINGS SHALL BE DETERMINED BY SITE CLASSIFICATION AND AS2870.1-1996 PROVIDE TERMITE PROTECTION IN ACCORDANCE WITH AS3660-2000 PARTS 1,2 AND 3 ALL TIMBER FRAMING AND CONSTRUCTION MUST COMPLY WITH THE CURRENT VERSION OF THE TIMBER FRAMING CODE AS1684 AND THE BCA ALL LOWER LEVEL EXTERNAL WALLS TO BE THERMACELL WALL SYSTEM UNLESS NOTED OTHERWISE ON THE DRAWINGS. INSTALL TO MANUFACTURERS SPECIFICATIONS. UPPER LEVEL WALLS TO BE LIGHTWEIGHT CLAD WITH SARKING AND INSULATION.UNLESS NOTED OTHERWISE ON THE DRAWINGS. ALL INSULATION TO COMPLY WITH ENERGY RATING REPORT. NOTES PROVIDE SMOKE ALARMS IN ACCORDANCE WITH PART 3.7.2 OF THE BCA AND AS3786.WIRING TO AS3000 WINDOWS TO COMPLY WITH ENERGY RATING REQUIREMENTS AND TO COMPLY WITH ALL RELEVANT WINDOW CODES AND STANDARDS. ALL FIRE RATED SEPARATION MUST BE UNDERTAKEN IN ACCORDANCE WITH THE BUILDING CODE OF AUSTRALIA AND ALL RELEVENT AUSTRALIAN STANDARDS. ALL FIRE RATING CONSTRUCTION MUST BE CERTIFIED BY A QUALIFIED PROFESSIONAL. THE LOCATION OF SMOKE DETECTORS ARE INDICATIVE ONLY AND THE LOCATION AND INSTALLATION OF SMOKE DETECTORS MUST BE POSITIONED AND INSTALLED BY A SUITABLY QUALIFIED PROFFESSIONAL AND IN ACCORDANCE WITH ALL CURRENT CODES AND STANDARDS. S LIGHTING NOTE: ALL LIGHTING PROVISIONS MUST COMPLY WITH SECTION 3.12.5.55 OF THE CURRENT VERSION OF THE BUILDING CODE OF AUSTRALIA. 21630 5270 600 13970 1790 600 100 3500 90 1780 90 1000 2690 90 4440 100 1790 MASTER BED WIP KITCHEN / MEALS 3390 1000 600 750 2410 12600 12170 1650 4600 1380 4400 150 100 4660 90 150 MASTER BED LIVING / ENTRY 1100 2650 850 125 1125 125 3170 125 1125 125 600 870 1000 600 LINE OF ENTRY AWNING ROOF OVER LINE OF BULKHEAD OVER STRUCTURE OVER TO ENGINEERS DETAIL 90 1780 90 1600 90 1000 90 1000 90 1000 500 1000 21630 5270 1100 1910 2940 1910 6710 1790 6370 100 1200 400 4960 90 2090 90 4440 100 1790 ENTRY LIVING ROOM STAIRS KITCHEN / MEALS FFL 675.420 3400 870 2100 380 2100 70 4440 100 1790 HANDRAIL AND BALUSTRADE TO CLIENT SELECTION. FEATURE HARDWOOD OR EQUAL SCREENING TO ENTRY 10520 100 5850 4420 150 RENDERED PRIVACY SCREEN TO SIDE OF BALCONY 100 600 4150 1000 100 600 1100 900 600 2 x CS TIMBER TIMBER TIMBER 900 2640 900 2680 2480 690 710 3610 100 600 600 830 1200 830 600 2460 REFER ELEVATION 2400mm HIGH ENTRY DOORS AND SIDELIGHTS. 0631 LOUVRES AT HIGH LEVEL REFER ELEVATION AA2127 REFER ELEVATION AA0424 REFER ELEVATION FLOOR SURFACE TO CLIENT SELECTION. PROVIDE WATERPROOFING AND DRAINAGE TO ALL RELEVANT STANDARDS. FLOOR SURFACE TO CLIENT SELECTION. PROVIDE WATERPROOFING AND DRAINAGE TO ALL RELEVANT STANDARDS. 2400mm HIGH BIFOLD DOORS REFER ELEVATION 2400mm HIGH BIFOLD GLASS DOORS REFER ELEVATION 01 A301 CONCEALED CAVITY SLIDING DOOR 90 1530 940 300 FULL HEIGHT FEATURE WALL TO CENTRE OF STAIRS 380 6000 4440 100 100 4320 5270 870 5420 100 Description Rev drawn Date Drawing Title Drawing Number Rev Date Project Director Project Architect Coord. Reviewed Verified Approved North Scale Drawn UPPER FLOOR PLAN 1:100(A3) A102 . AL&CH AL&CH P3 05.09.15 heyward lance architecture 31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com All dimensions are in millimetres. All levels are in metres. Do not scale off drawing. All structure to engineers specification. All dimensions, levels and site conditions must be verified by contractor prior to commencement of any work. All work must be carried out in accordance with the current edition of the Building Code of Australia and all relevant Australian Standards. Notes Copyright ISSUE FOR INFORMATION P1 AL&CH 20.12.13 h e y w a r d l a n c e a r c h i t e c t u r e C copyright heyward lance architecture Reproduction of this design and/or document in whole or in part without prior written consent is an infringement of copyright. Project FOR APPROVAL NOT FOR CONSTRUCTION BLOCK 1 SECTION 146 BONNER - Client JAMES AND ALISON FOLK ISSUE FOR INFORMATION P2 AL&CH 23.12.13 ISSUE FOR INFORMATION P3 AL&CH 05.09.15
  • 5. COLORBOND ROOF. COLORBOND ROOF. COLORBOND ROOF. COLORBOND ROOF. COLORBOND ROOF. EAVES GUTTER EAVES GUTTER DP DP DP DP COLORBOND ROOF OVER GARAGE. PARAPET PARAPET METALDECK ROOF. TIMBER EDGE BEAM TIMBER EDGE BEAM TIMBER EDGE BEAM METALDECK ROOF CONCEALED BEHIND FRAMING TO ENGINEERS DETAIL. PROVIDE BOX GUTTER AND CLAD UNDERSIDE OF AWNING WITH TIMBER CLADDING. PROVIDE OVERFLOWS. PERGOLA FRAMING OVER ALFRESCO AREA TO STRUCTURAL ENGINEERS DETAIL. DP DP WITH SPREADER DP EAVES GUTTER EAVES GUTTER WATER TANK NOTES: ALL EAVES GUTTERS TO BE COLORBOND QUAD GUTTERING. INSTALL TO MANUFACTURERS RECOMMENDATION. ALL ROOFING TO BE COLORBOND UNLESS NOTED OTHERWISE. INSTALL TO MANUFACTURERS SPECIFICATIONS. PROVIDE FASCIA, FLASHINGS AND PARAPET CAPPINGS AS REQUIRED. DOWNPIPES AND SPREADERS TO BE COLORBOND TO MATCH GUTTERING. PROVIDE PAINTED FC SHEET LINING TO ALL EAVES. 1200 1200 600 600 600 600 SOLAR PANELS COLORBOND ROOF. SKYLIGHT SOLAR PANELS SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT Description Rev drawn Date Drawing Title Drawing Number Rev Date Project Director Project Architect Coord. Reviewed Verified Approved North Scale Drawn ROOF PLAN 1:100(A3) A103 . AL&CH AL&CH P2 05.09.15 heyward lance architecture 31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com All dimensions are in millimetres. All levels are in metres. Do not scale off drawing. All structure to engineers specification. All dimensions, levels and site conditions must be verified by contractor prior to commencement of any work. All work must be carried out in accordance with the current edition of the Building Code of Australia and all relevant Australian Standards. Notes Copyright ISSUE FOR INFORMATION P1 AL&CH 20.12.13 h e y w a r d l a n c e a r c h i t e c t u r e C copyright heyward lance architecture Reproduction of this design and/or document in whole or in part without prior written consent is an infringement of copyright. Project FOR APPROVAL NOT FOR CONSTRUCTION BLOCK 1 SECTION 146 BONNER - Client JAMES AND ALISON FOLK ISSUE FOR INFORMATION P2 AL&CH 05.09.15
  • 6. LINE OF BOUNDARY 2400 300 2700 COLORBOND ROOF AT 15 DEGREE PITCH. TIMBER LOOK TILE CLADDING OR EQUAL. PROVIDE SARKING AND INSULATION. LINE OF BOUNDARY RENDERED FINISH ON THERMACELL WALL SYSTEM. FEATURE SANDSTONE VENEER CLADDING ON THERMACELL WALL SYSTEM. HIGH LEVEL LOUVRED WINDOWS ABOVE ENTRY DOOR TIMBER LOOK TILE CLADDING OR EQUAL. PROVIDE SARKING AND INSULATION. METALDECK ENTRY ROOF CONCEALED BY TIMBER FRAMED SURROUND. PROVIDE TIMBER CLAD LINING TO UNDERSIDE WITH RECESSED DOWNLIGHTS. 50 PANEL LIFT GARAGE DOOR IN TIMBER FINISH FFL 672.720 LIVING FCL 675.120 LIVING FFL 675.420 UPPER FCL 678.120 UPPER FFL 672.670 GARAGE RETAINING WALLS AS REQUIRED NGL AT GARAGE FACE NGL AT RESIDENCE FACE 6700 NOM PROVIDE HANDRAIL AND BLAUSTRADE AS REQUIRED FEATURE HARDWOOD OR SIMILAR SCREENING TO ENTRY AREA LINE OF BOUNDARY 2400 300 2700 FFL 672.720 LIVING FCL 675.120 LIVING FFL 675.420 UPPER FCL 678.120 UPPER 2400 300 FFL 670.870 RUMPUS FCL 673.270 RUMPUS FFL 673.57 STORAGE FEATURE SANDSTONE VENEER CLADDING ON THERMACELL WALL SYSTEM. METALDECK ENTRY ROOF CONCEALED BY TIMBER FRAMED SURROUND. PROVIDE TIMBER CLAD LINING TO UNDERSIDE WITH RECESSED DOWNLIGHTS. RENDERED AND PAINTED FINISH ON THERMACELL WALL SYSTEM. COLORBOND ROOF AT 5 DEGREE PITCH. RENDERED AND PAINTED FINISH AT HIGH LEVEL. TIMBER PERGOLA FRAMING OVER ALFRESCO AREA TO ENGINEERS DETAIL. GLASS BALUSTRADE PANELS TO CLIENT SELECTION. RENDERED AND PAINTED FINISH ON THERMACELL WALL SYSTEM. COLORBOND ROOF AT 15 DEGREE PITCH. COLORBOND ROOF AT 30 DEGREE PITCH. 31 DEGREE BUILDING ENVELOPE LINE AT BUILDING FACE TIMBER LOOK TILE CLADDING OR EQUAL. PROVIDE SARKING AND INSULATION. 2400 8500 NOM NGL FEATURE SANDSTONE VENEER CLADDING ON THERMACELL WALL SYSTEM. FEATURE HARDWOOD OR SIMILAR SCREENING TO ENTRY AREA Description Rev drawn Date Drawing Title Drawing Number Rev Date Project Director Project Architect Coord. Reviewed Verified Approved North Scale Drawn ELEVATIONS SHEET 01 1:100(A3) A201 . AL&CH AL&CH P2 05.09.15 heyward lance architecture 31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com All dimensions are in millimetres. All levels are in metres. Do not scale off drawing. All structure to engineers specification. All dimensions, levels and site conditions must be verified by contractor prior to commencement of any work. All work must be carried out in accordance with the current edition of the Building Code of Australia and all relevant Australian Standards. Notes Copyright ISSUE FOR INFORMATION P1 AL&CH 20.12.13 h e y w a r d l a n c e a r c h i t e c t u r e C copyright heyward lance architecture Reproduction of this design and/or document in whole or in part without prior written consent is an infringement of copyright. Project FOR APPROVAL NOT FOR CONSTRUCTION BLOCK 1 SECTION 146 BONNER - Client JAMES AND ALISON FOLK 01 NORTH ELEVATION 02 WEST ELEVATION ISSUE FOR INFORMATION P2 AL&CH 05.09.15
  • 7. LINE OF BOUNDARY 2400 300 2700 COLORBOND ROOF AT 15 DEGREE PITCH. RENDERED AND PAINTED FINISH TO LIGHTWEIGHT CLADDING. PROVIDE SARKING AND INSULATION. LINE OF BOUNDARY COLORBOND ROOF OVER GARAGE AT 5 DEGREE PITCH TIMBER LOOK TILE CLADDING OR EQUAL. PROVIDE SARKING AND INSULATION. 50 GLASS BALUSTRADE PANELS TO CLIENT SELECTION. FFL 672.720 LIVING FCL 675.120 LIVING FFL 675.420 UPPER FCL 678.120 UPPER FFL 672.670 GARAGE 900 1500 8400 NOM 4 5 D E G R E E B U I L D I N G E N V E L O P E L I N E TIMBER PERGOLA FRAMING OVER ALFRESCO AREA TO ENGINEERS DETAIL. COLORBOND ROOF AT 15 DEGREE PITCH. RENDERED AND PAINTED FINISH ON THERMACELL WALL SYSTEM. RENDERED AND PAINTED FINISH ON THERMACELL WALL SYSTEM. FEATURE SANDSTONE CLADDING RETURNS AROUND CORNER. LINE OF BOUNDARY 2400 2700 50 2400 METALDECK ENTRY ROOF CONCEALED BY TIMBER FRAMED SURROUND. PROVIDE TIMBER CLAD LINING TO UNDERSIDE WITH RECESSED DOWNLIGHTS. RENDERED AND PAINTED FINISH ON THERMACELL WALL SYSTEM. COLORBOND ROOF AT 15 DEGREE PITCH. FEATURE HARDWOOD OR EQUAL SCREENING TO ENTRY AREA. RENDERED AND PAINTED LIGHWEIGHT CLADDING. PROVIDE SARKING AND INSULATION. RENDERED AND PAINTED FINISH ON THERMACELL WALL SYSTEM. COLORBOND ROOF AT 15 DEGREE PITCH. COLORBOND ROOF AT 30 DEGREE PITCH. 31 DEGREE BUILDING ENVELOPE LINE AT BUILDING FACE RENDERED AND PAINTED FINISH ON THERMACELL WALL SYSTEM. PARAPET TO CONCEAL 5 DEGREE COLORBOND ROOF BEHIND(SHOWN DASHED). RENDERED AND PAINTED FINISH ON THERMACELL WALL SYSTEM. 400 1700 600 900 TIMBER SUPPORT TO DECK OVER TO ENGINEERS DETAIL. 300 300 FFL 670.870 RUMPUS FCL 673.270 RUMPUS FFL 673.570 STORAGE FFL 672.720 LIVING FCL 675.120 LIVING FFL 675.420 UPPER FCL 678.120 UPPER FFL 672.670 GARAGE 1:8 TRANSITION 1:4 MAX DRIVEWAY 1:8 TRANSITION 8070 NOM NGL 2400 PROVIDE GRATED DRAIN TO DRIVEWAY BASE RENDERED PRIVACY SCREEN TO SIDE OF BALCONY TIMBER LOOK TILE CLADDING OR EQUAL. PROVIDE SARKING AND INSULATION. FEATURE SANDSTONE CLADDING ON THERMACELL WALL SYSTEM. Description Rev drawn Date Drawing Title Drawing Number Rev Date Project Director Project Architect Coord. Reviewed Verified Approved North Scale Drawn ELEVATIONS SHEET 02 1:100(A3) A202 . AL&CH AL&CH P2 05.09.15 heyward lance architecture 31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com All dimensions are in millimetres. All levels are in metres. Do not scale off drawing. All structure to engineers specification. All dimensions, levels and site conditions must be verified by contractor prior to commencement of any work. All work must be carried out in accordance with the current edition of the Building Code of Australia and all relevant Australian Standards. Notes Copyright ISSUE FOR INFORMATION P1 AL&CH 20.12.13 h e y w a r d l a n c e a r c h i t e c t u r e C copyright heyward lance architecture Reproduction of this design and/or document in whole or in part without prior written consent is an infringement of copyright. Project FOR APPROVAL NOT FOR CONSTRUCTION BLOCK 1 SECTION 146 BONNER - Client JAMES AND ALISON FOLK 01 SOUTH ELEVATION 02 EAST ELEVATION ISSUE FOR INFORMATION P2 AL&CH 05.09.15
  • 8. LINE OF BOUNDARY 2400 300 2700 FFL 672.720 LIVING FCL 675.120 LIVING FFL 675.420 UPPER FCL 678.120 UPPER FFL 670.870 RUMPUS PROVIDE SARKING AND INSULATION IN ACCORDANCE WITH EER REPORT COLORBOND ROOF AT 30 DEGREE PITCH. RENDERED AND PAINTED FINISH ON THERMACELL WALL SYSTEM. INSTALL TO MANUFACTURERS SPECIFICATIONS. RAKED PLASTERBOARD CEILING AT 30 DEGREE PITCH. ALL FOOTINGS AND SLABS TO STRUCTURAL ENGINEERS DETAIL ROOF STRUCTURE TO ENGINEERS DETAIL FFL 672.670 GARAGE BREAKOUT ROOM LAUNDRY GARAGE MASTER BED ROBE / ENSUITE WIP KITCHEN COLORBOND ROOF AT 15 DEGREE PITCH. TIMBER LOOK TILED CLADDING OR EQUAL. PROVIDE SARKING AND INSULATION. RENDERED PRIVACY SCREEN TO SIDE OF BALCONY GLASS BALUSTRADE PANELS TO CLIENT SELECTION. TIMBER PERGOLA FRAMING OVER ALFRESCO AREA TO ENGINEERS DETAIL. ROOF TRUSSES TO MANUFACTURERS SPECIFICATIONS PROVIDE SARKING AND INSULATION IN ACCORDANCE WITH EER REPORT FLOOR STRUCTURE TO ENGINEERS DETAIL. ALL FOOTINGS AND SLABS TO STRUCTURAL ENGINEERS DETAIL 1:8 TRANSITION 1:4 MAX DRIVEWAY 1:8 TRANSITION PROVIDE GRATED DRAIN TO DRIVEWAY BASE NGL PROVIDE FILL TO ENGINEERS DETAIL RETAINING WALL TO SIDE OF DRIVEWAY AS REQUIRED PERGOLA STRUCTURE OVER LINKWAY RUMPUS ROOM Description Rev drawn Date Drawing Title Drawing Number Rev Date Project Director Project Architect Coord. Reviewed Verified Approved North Scale Drawn SECTION 1:100(A3) A301 . AL&CH AL&CH P2 05.09.15 heyward lance architecture 31 nellie hamilton avenue : gungahlin act 2912 p: 02 6255 4454 e: cbh.architect@gmail.com All dimensions are in millimetres. All levels are in metres. Do not scale off drawing. All structure to engineers specification. All dimensions, levels and site conditions must be verified by contractor prior to commencement of any work. All work must be carried out in accordance with the current edition of the Building Code of Australia and all relevant Australian Standards. Notes Copyright ISSUE FOR INFORMATION P1 AL&CH 20.12.13 h e y w a r d l a n c e a r c h i t e c t u r e C copyright heyward lance architecture Reproduction of this design and/or document in whole or in part without prior written consent is an infringement of copyright. Project FOR APPROVAL NOT FOR CONSTRUCTION BLOCK 1 SECTION 146 BONNER - Client JAMES AND ALISON FOLK 01 SECTION ISSUE FOR INFORMATION P2 AL&CH 05.09.15