MACHINE TYPE
MODEL
PLANT No
LOCATION
DATE


           REG. 5. SUITABILITY OF EQUIPMENT
IS IT SUITABLE FOR PURPOSE FOR WHICH IT IS USED




IS THE LOCATION SUITABLE




IS IT BEING USED AS INTENDED




         REG. 6. MAINTENANCE
IS EQUIPMENT MAINTAINED IN WORKING ORDER AND GOOD REPAIR




HAS THE EQUIPMENT AN UP TO DATE MAINTENANCE LOG




         REG. 7  TRAINED AND AUTHORISED PERSONNEL
IS THE EQUIPMENT ONLY USED BY AUTHORISED AND TRAINED PERSONS




IS MAINTENANCE ON EQUIPMENT ONLY CARRIED OUT BY AUTHORISED AND TRAINED PERSONNEL




         REG. 8 OPERATING PROCEDURES AND WORK INSTRUCTIONS
HAS THE EQUIPMENT AN OPERATING PROCEDURE OR WORK INSTRUCTIONS




        REG. 9  TRAINING
HAVE THE PERSONS USING THE EQUIPMENT HAD ADEQUATE TRAINING IN BOTH ITS USE AND
HEALTH AND SAFETY ISSUES




HAVE THE PERSONS MANAGING OR SUPERVISING THE USE OF THE EQUIPMENT HAD ADEQUATE
TRAINING IN BOTH ITS USE AND HEALTH AND SAFETY ISSUES
REG. 10 CONFORMITY WITH COMMUNITY REQUIREMENTS
DOES THE EQUIPMENT REQUIRE CE MARKING




IS THE EQUIPMENT CE MARKED




        REG. 11 DANGEROUS PARTS OF MACHINERY
ARE THERE SUITABLE MEASURES TO PREVENT PERSONS COMING INTO CONTACT WITH MOVING
PARTS




DO THE MOVING PARTS STOP BEFORE ANY PART OF THE PERSON ENTERS THE DANGER ZONE




ARE FIXED GUARDS FITTED AND ALL NIP POINTS PROTECTED




ARE THERE INTERLOCKED GUARDS, SAFETY MATS OR OTHER PROTECTIVE DEVICES FITTED




ARE THERE ANY JIGS, HOLDERS, PUSH-STICKS OR SIMILAR PROTECTION APPLIANCES PROVIDED


IS THERE SUFFICIENT:
INFORMATION
INSTRUCTIONS
TRAINING
SUPERVISION

ARE THE GUARDS SUITABLE FOR THE PURPOSE PROVIDED


ARE THEY OF GOOD CONSTRUCTION AND ADEQUATE STRENGTH


ARE THEY IN EFFICIENT WORKING ORDER AND IN GOOD REPAIR


DO THEY GIVE RISE TO ANY INCREASED RISK


CAN THEY BE EASILY BYPASSED OR DISABLED


ARE THEY A SUFFICIENT DISTANCE FROM THE DANGER ZONE


DO THEY RESTRICT THE VIEW WHERE A VIEW IS NECESSARY
ARE THEY DESIGNED, WHERE POSSIBLE, TO ALLOW ACCESS FOR MAINTENANCE


        REG12   PROTECTION AGAINST SPECIFIC HAZARDS
HAVE THE HAZARDS BEEN IDENTIFIED BY CARRINING OUT A RISK ASSESMENT


HAVE SUFFICIENT MEASURES BEEN TAKE TO REDUCE THE RISK OF SPECIFIC HAZARDS, OTHER
THAN BY P.P.E. OR INFORMATION ,INSTRUCTION, TRAINING AND SUPERVISION


IS THERE SUITABLE PROTECTION AGAINST ARTICLES FALLING, OR BEING EJECTED FROM THE
EQUIPMENT


IS THERE SUITABLE PROTECTION AGAINST RUPTURE OR DISINTEGRATION, DUE TO PRESSURE
BUILD UP ETC.


SUITABLE PROTECTION AGAINST THE EQUIPMENT CATCHING FIRE OF OVERHEATING


PROTECTION AGAINST DISCHARGES OF GAS, DUST, LIQUID OR ANY OTHER SUBSTANCE




SUITABLE PROTECTION AGAINST THE EQUIPMENT EXPLODING




         REG. 13 HIGH OR VERY LOW TEMPERATURE
IS THERE PROTECTION AGAINST BURNS, SCALDS OR SEARS




         REG14    CONTROLS FOR STARTING AND CHANGING OPERATING CONDITIONS
IS THE EQUIPMENT FITTED WITH START CONTROLS


DOES THE EQUIPMENT START AUTOMATICALLY AFTER THE STOP IS RELEASED



IS THE EQUIPMENT, WHERE NECESSARY, FITTED WITH CONTROLS FOR CHANGING THE SPEED,
PRESSURE OR OTHER OPERATING CONDITIONS




CAN ANY OF THESE CONTROLS BE OPERATED ACCIDENTALLY


         REG. 15 STOP CONTROLS
IS THE EQUIPMENT, WHERE APPROPRIATE, PROVIDED WITH STOP CONTROLS



DOES THE EQUIPMENT COME TO A COMPLETE STOP




ARE ALL SOURCES OF ENERGY REMOVED
DO THE STOP CONTROLS HAVE PRIORITY OVER THE START CONTROLS


        REG. 16 EMERGENCY STOP CONTROLS
ARE THERE EMERGENCY STOPS FITTED


ARE THEY READILY ACCESSIBLE




HAVE THEY PRIORITY OVER THE STOP CONTROLS


         REG. 17 CONTROLS
ARE ALL CONTROLS CLEARLY VISIBLE, IDENTIFIABLE AND APPROPRIATELY MARKED




DOES THE POSITION OF THE CONTROLS EXPOSE THE OPERATOR TO RISK




CAN THE OPERATOR SEE FROM THE CONTROL POSITION THAT NO-ONE IS AT RISK FROM HIM
STARTING THE EQUIPMENT




ARE SAFE SYSTEMS OF WORK IN PLACE SO THAT NO PERSON WILL BE IN AN UNSAFE POSITION
WHEN THE EQUIPMENT IS ABOUT TO START




IS THERE AN AUDIBLE OR VISIBLE ALARM INDICATING THE EQUIPMENT IS ABOUT TO START




IS THE WARNING GIVEN IN SUFFICIENT TIME TO ALLOW THOSE AT RISK TO GET CLEAR




ARE THERE MEANS TO RESPOND TO THE WARNINGS, SUCH AS A MEANS TO PREVENT STARTING
OR A PLACE TO WITHDRAW FROM THE DANGER AREA




         REG. 18 CONTROL SYSTEMS
IS THE CONTROL SYSTEM SAFE, IE. DOES IT "FAIL SAFE"




DOES ITS OPERATION INCREASE THE RISK TO HEALTH AND SAFETY




CAN A FAULT IN THE CONTROL SYSTEM, OR LOSS OF SUPPLY CREATE INCREASED RISK TO
HEALTH AND SAFETY
DOES THE CONTROL SYSTEM IMPEDE THE OPERATION OF ANY STOP OR EMERGENCY STOP




         REG. 19 ISOLATION FROM SOURCES OF ENERGY
HAS THE EQUIPMENT GOT A SUITABLE MEANS OF ISOLATION FROM ALL SOURCES OF ENERGY
ELECTRICITY

AIR

WATER


GAS


OIL


IS THERE ANY RISK OF INADVERTENT RECONNECTION




ARE THE ISOLATION POINTS CLEARLY IDENTIFIABLE

ARE THE ISOLATION POINTS READILY ACCESSIBLE

DOES RECONNECTION OF THE ENERGY SOURCE PUT PEOPLE AT RISK, SUCH AS BY INITIATING
MOVEMENT OR OTHER HAZARD




ARE THERE MEASURES IN PLACE TO ENSURE THAT GUARDS AND OTHER PROTECTION DEVICES
ARE FUNCTIONING CORRECTLY BEFORE OPERATION BEGINS




         REG. 20 STABILITY OF EQUIPMENT
IS THE EQUIPMENT STABLE, AND NOT LIABLE TO FALL OVER, COLLAPSE OR OVERTURN




IS THE EQUIPMENT FIXED TO THE GROUND, OF FIXED IN SOME OTHER WAY




HAVE ADDITIONAL MEASURES BEEN TAKEN FOR MOBILE EQUIPMENT




         REG. 21 LIGHTING
IS THE WORK AREA SUFFICIENTLY ILLUMINATED


IS GENERAL ILLUMINATION PROVIDED


IS LOCAL ILLUMINATION PROVIDED
IS ADDITIONAL LIGHTING AVAILABLE FOR WHEN MAINTENANCE WORK IS REQUIRED


IS FIXED LIGHTING FOR MAINTENANCE PURPOSES REQUIRED


         REG 22 MAINTENANCE OPERATIONS
CAN THE EQUIPMENT BE SHUT DOWN FOR MAINTENANCE OPERATIONS




IF THIS IS NOT PRACTICABLE ARE SUITABLE MEASURES TAKEN TO PROTECT PERSONS FROM RISK




        REG 23 MARKINGS
ARE STOP AND START CONTROLS IDENTIFIED


IS THE SAFE WORKING LOAD MARKED ON LIFTING EQUIPMENT


ARE SAFE WORKING PRESSURES INDICATED


IS THE MAXIMUM ROTATION SPEED MARKED ON ABRASIVE WHEELS


ARE GAS CYLINDERS MARKED CORRECTLY


ARE STORAGE VESSELS CORRECTLY MARKED


IS EQUIPMENT IDENTIFIED


ARE ISOLATORS IDENTIFIED




       REG 24 WARNINGS
ARE WARNING SIGNS FITTED


ARE THEY EASILY RECOGNISED, UNDERSTOOD AND UNAMBIGUOUS


ARE VISUAL WARNING DEVICES EFFECTIVE


ARE AUDIBLE WARNING DEVICES EFFECTIVE

More Related Content

What's hot

Safety instrumented functions (sif) safety integrity level (sil) evaluation t...
Safety instrumented functions (sif) safety integrity level (sil) evaluation t...Safety instrumented functions (sif) safety integrity level (sil) evaluation t...
Safety instrumented functions (sif) safety integrity level (sil) evaluation t...John Kingsley
 
Sil explained in valve actuators
Sil explained in valve actuatorsSil explained in valve actuators
Sil explained in valve actuatorsJohn Kingsley
 
Acci prev & Safety Management
Acci prev & Safety ManagementAcci prev & Safety Management
Acci prev & Safety ManagementHARSHAL KHODE
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentJoe Hayes
 
Loto verify awareness
Loto verify awarenessLoto verify awareness
Loto verify awarenessTony Bertram
 
Sayfa working-at-heights-manual
Sayfa working-at-heights-manualSayfa working-at-heights-manual
Sayfa working-at-heights-manualsawkariqbal
 
Understanding Safety Level Integrity Levels (SIL)
Understanding Safety Level Integrity Levels (SIL)Understanding Safety Level Integrity Levels (SIL)
Understanding Safety Level Integrity Levels (SIL)Power Specialties, Inc.
 
NavHoist_Installation_and_Maintenance_02172105_Rev_2
NavHoist_Installation_and_Maintenance_02172105_Rev_2NavHoist_Installation_and_Maintenance_02172105_Rev_2
NavHoist_Installation_and_Maintenance_02172105_Rev_2Richard Kwiatkowski
 
1. safety instrumented systems
1. safety instrumented systems1. safety instrumented systems
1. safety instrumented systemsSaiful Chowdhury
 

What's hot (14)

Safety instrumented functions (sif) safety integrity level (sil) evaluation t...
Safety instrumented functions (sif) safety integrity level (sil) evaluation t...Safety instrumented functions (sif) safety integrity level (sil) evaluation t...
Safety instrumented functions (sif) safety integrity level (sil) evaluation t...
 
Sil explained in valve actuators
Sil explained in valve actuatorsSil explained in valve actuators
Sil explained in valve actuators
 
Acci prev & Safety Management
Acci prev & Safety ManagementAcci prev & Safety Management
Acci prev & Safety Management
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Loto verify awareness
Loto verify awarenessLoto verify awareness
Loto verify awareness
 
Anil Resume
Anil ResumeAnil Resume
Anil Resume
 
Sayfa working-at-heights-manual
Sayfa working-at-heights-manualSayfa working-at-heights-manual
Sayfa working-at-heights-manual
 
Barnard Impacts of Demand Rates
Barnard Impacts of Demand RatesBarnard Impacts of Demand Rates
Barnard Impacts of Demand Rates
 
700a
700a700a
700a
 
Understanding Safety Level Integrity Levels (SIL)
Understanding Safety Level Integrity Levels (SIL)Understanding Safety Level Integrity Levels (SIL)
Understanding Safety Level Integrity Levels (SIL)
 
TRA presentation
TRA presentationTRA presentation
TRA presentation
 
NavHoist_Installation_and_Maintenance_02172105_Rev_2
NavHoist_Installation_and_Maintenance_02172105_Rev_2NavHoist_Installation_and_Maintenance_02172105_Rev_2
NavHoist_Installation_and_Maintenance_02172105_Rev_2
 
Instrumentation symbols and_identification
Instrumentation symbols and_identificationInstrumentation symbols and_identification
Instrumentation symbols and_identification
 
1. safety instrumented systems
1. safety instrumented systems1. safety instrumented systems
1. safety instrumented systems
 

Similar to Puwer 98 cb

Drilling Rig SMS Safety Presentation .pdf
Drilling Rig SMS  Safety Presentation .pdfDrilling Rig SMS  Safety Presentation .pdf
Drilling Rig SMS Safety Presentation .pdfMuhammadSaied3
 
SAFETY ORIENTATION TRAINING SEMINAR IN THE WORKPLACE.
SAFETY ORIENTATION TRAINING SEMINAR IN THE WORKPLACE.SAFETY ORIENTATION TRAINING SEMINAR IN THE WORKPLACE.
SAFETY ORIENTATION TRAINING SEMINAR IN THE WORKPLACE.ArielSungkipRuiz
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipmentsSelva Prakash
 
Health and safety representative inspection trainings.
Health and safety representative  inspection trainings.Health and safety representative  inspection trainings.
Health and safety representative inspection trainings.Sathak Thulla
 
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)DusanJankovic8
 
Working at Height - Risk Assessment Template
Working at Height - Risk Assessment Template Working at Height - Risk Assessment Template
Working at Height - Risk Assessment Template Jay Linehan
 
Supervisor training
Supervisor trainingSupervisor training
Supervisor trainingkarim49217
 
(Overall safety of plant)
(Overall safety of plant)(Overall safety of plant)
(Overall safety of plant)Ahmed Palari
 
Oil fieldsafetyneo1[1]
Oil fieldsafetyneo1[1]Oil fieldsafetyneo1[1]
Oil fieldsafetyneo1[1]snakehips1
 
Infraworks Induction v2.3
Infraworks Induction v2.3 Infraworks Induction v2.3
Infraworks Induction v2.3 Garry Pepper
 
03_RAWSO Combined Safety Program 5-2022 New Format 1.1 w TC (3) (1).pdf
03_RAWSO Combined Safety Program 5-2022 New Format 1.1 w TC (3) (1).pdf03_RAWSO Combined Safety Program 5-2022 New Format 1.1 w TC (3) (1).pdf
03_RAWSO Combined Safety Program 5-2022 New Format 1.1 w TC (3) (1).pdfJake Munn
 
Accident prevention for Qarries.ppt
Accident prevention for Qarries.pptAccident prevention for Qarries.ppt
Accident prevention for Qarries.pptUGOCHUKWU8
 

Similar to Puwer 98 cb (20)

fca-200411081619 (1).pdf
fca-200411081619 (1).pdffca-200411081619 (1).pdf
fca-200411081619 (1).pdf
 
FUNCTIONAL CAPACITY ASSESSMENT
FUNCTIONAL CAPACITY ASSESSMENTFUNCTIONAL CAPACITY ASSESSMENT
FUNCTIONAL CAPACITY ASSESSMENT
 
Drilling Rig SMS Safety Presentation .pdf
Drilling Rig SMS  Safety Presentation .pdfDrilling Rig SMS  Safety Presentation .pdf
Drilling Rig SMS Safety Presentation .pdf
 
SAFETY ORIENTATION TRAINING SEMINAR IN THE WORKPLACE.
SAFETY ORIENTATION TRAINING SEMINAR IN THE WORKPLACE.SAFETY ORIENTATION TRAINING SEMINAR IN THE WORKPLACE.
SAFETY ORIENTATION TRAINING SEMINAR IN THE WORKPLACE.
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipments
 
SEEN BREAKDOWN©final
SEEN BREAKDOWN©finalSEEN BREAKDOWN©final
SEEN BREAKDOWN©final
 
Health and safety representative inspection trainings.
Health and safety representative  inspection trainings.Health and safety representative  inspection trainings.
Health and safety representative inspection trainings.
 
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
 
Working at Height - Risk Assessment Template
Working at Height - Risk Assessment Template Working at Height - Risk Assessment Template
Working at Height - Risk Assessment Template
 
Supervisor training
Supervisor trainingSupervisor training
Supervisor training
 
(Overall safety of plant)
(Overall safety of plant)(Overall safety of plant)
(Overall safety of plant)
 
Induction v2.3
Induction v2.3 Induction v2.3
Induction v2.3
 
Oil fieldsafetyneo1[1]
Oil fieldsafetyneo1[1]Oil fieldsafetyneo1[1]
Oil fieldsafetyneo1[1]
 
HEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORTHEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORT
 
L fo-036-m-i
L fo-036-m-iL fo-036-m-i
L fo-036-m-i
 
Infraworks Induction v2.3
Infraworks Induction v2.3 Infraworks Induction v2.3
Infraworks Induction v2.3
 
03_RAWSO Combined Safety Program 5-2022 New Format 1.1 w TC (3) (1).pdf
03_RAWSO Combined Safety Program 5-2022 New Format 1.1 w TC (3) (1).pdf03_RAWSO Combined Safety Program 5-2022 New Format 1.1 w TC (3) (1).pdf
03_RAWSO Combined Safety Program 5-2022 New Format 1.1 w TC (3) (1).pdf
 
Accident prevention for Qarries.ppt
Accident prevention for Qarries.pptAccident prevention for Qarries.ppt
Accident prevention for Qarries.ppt
 
prevention.ppt
prevention.pptprevention.ppt
prevention.ppt
 
topic2.ppt
topic2.ppttopic2.ppt
topic2.ppt
 

More from Clive Burgess

The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...
The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...
The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...Clive Burgess
 
Pbog in defence of safety at work 2014 pp22
Pbog in defence of safety at work 2014 pp22Pbog in defence of safety at work 2014 pp22
Pbog in defence of safety at work 2014 pp22Clive Burgess
 
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!Clive Burgess
 
Pbog the sociology of organisational life - The problems with labour in relat...
Pbog the sociology of organisational life - The problems with labour in relat...Pbog the sociology of organisational life - The problems with labour in relat...
Pbog the sociology of organisational life - The problems with labour in relat...Clive Burgess
 
The problems of labour and the renewal of socialism by colin burgess
The problems of labour and the renewal of socialism by colin burgessThe problems of labour and the renewal of socialism by colin burgess
The problems of labour and the renewal of socialism by colin burgessClive Burgess
 
Action science 2 facebook may 2013 (2)
Action science 2 facebook may 2013 (2)Action science 2 facebook may 2013 (2)
Action science 2 facebook may 2013 (2)Clive Burgess
 
Pbog 50 days to save the planet 9 2012
Pbog 50 days to save the planet 9 2012Pbog 50 days to save the planet 9 2012
Pbog 50 days to save the planet 9 2012Clive Burgess
 
Pbog 50 days to save the planet behavioural economics 2012
Pbog 50 days to save the planet   behavioural economics 2012Pbog 50 days to save the planet   behavioural economics 2012
Pbog 50 days to save the planet behavioural economics 2012Clive Burgess
 
Pbog 50 days to save the planet 5 oct 2012
Pbog 50 days to save the planet 5 oct 2012Pbog 50 days to save the planet 5 oct 2012
Pbog 50 days to save the planet 5 oct 2012Clive Burgess
 
Pbog 50 days to save the planet 4 oct 2012
Pbog 50 days to save the planet 4 oct 2012Pbog 50 days to save the planet 4 oct 2012
Pbog 50 days to save the planet 4 oct 2012Clive Burgess
 
Pbog 50 days to save the planet 3 oct 2012
Pbog 50 days to save the planet 3 oct 2012Pbog 50 days to save the planet 3 oct 2012
Pbog 50 days to save the planet 3 oct 2012Clive Burgess
 
Pbog 50 days to save the planet 2 oct 2012
Pbog 50 days to save the planet 2 oct 2012Pbog 50 days to save the planet 2 oct 2012
Pbog 50 days to save the planet 2 oct 2012Clive Burgess
 
Pbog 50 days to save the planet oct 2012
Pbog 50 days to save the planet oct 2012Pbog 50 days to save the planet oct 2012
Pbog 50 days to save the planet oct 2012Clive Burgess
 
Pbog getting it together oct 2012 clive burgess, clive live, good stuff
Pbog getting it together oct 2012 clive burgess, clive live, good stuffPbog getting it together oct 2012 clive burgess, clive live, good stuff
Pbog getting it together oct 2012 clive burgess, clive live, good stuffClive Burgess
 
Pbog on sklair oct 2012 2
Pbog on sklair oct 2012   2Pbog on sklair oct 2012   2
Pbog on sklair oct 2012 2Clive Burgess
 
Pbog the brain to law oct 2012
Pbog   the brain to law oct 2012Pbog   the brain to law oct 2012
Pbog the brain to law oct 2012Clive Burgess
 
Twitter stuff 1 oct 2012
Twitter stuff 1 oct 2012Twitter stuff 1 oct 2012
Twitter stuff 1 oct 2012Clive Burgess
 
Sustainable development 2012 stuff 2
Sustainable development 2012 stuff 2Sustainable development 2012 stuff 2
Sustainable development 2012 stuff 2Clive Burgess
 
Site induction uks 2007 2011
Site induction uks 2007   2011Site induction uks 2007   2011
Site induction uks 2007 2011Clive Burgess
 
Wow complex pbog - they 2008
Wow   complex pbog - they 2008Wow   complex pbog - they 2008
Wow complex pbog - they 2008Clive Burgess
 

More from Clive Burgess (20)

The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...
The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...
The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...
 
Pbog in defence of safety at work 2014 pp22
Pbog in defence of safety at work 2014 pp22Pbog in defence of safety at work 2014 pp22
Pbog in defence of safety at work 2014 pp22
 
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!
 
Pbog the sociology of organisational life - The problems with labour in relat...
Pbog the sociology of organisational life - The problems with labour in relat...Pbog the sociology of organisational life - The problems with labour in relat...
Pbog the sociology of organisational life - The problems with labour in relat...
 
The problems of labour and the renewal of socialism by colin burgess
The problems of labour and the renewal of socialism by colin burgessThe problems of labour and the renewal of socialism by colin burgess
The problems of labour and the renewal of socialism by colin burgess
 
Action science 2 facebook may 2013 (2)
Action science 2 facebook may 2013 (2)Action science 2 facebook may 2013 (2)
Action science 2 facebook may 2013 (2)
 
Pbog 50 days to save the planet 9 2012
Pbog 50 days to save the planet 9 2012Pbog 50 days to save the planet 9 2012
Pbog 50 days to save the planet 9 2012
 
Pbog 50 days to save the planet behavioural economics 2012
Pbog 50 days to save the planet   behavioural economics 2012Pbog 50 days to save the planet   behavioural economics 2012
Pbog 50 days to save the planet behavioural economics 2012
 
Pbog 50 days to save the planet 5 oct 2012
Pbog 50 days to save the planet 5 oct 2012Pbog 50 days to save the planet 5 oct 2012
Pbog 50 days to save the planet 5 oct 2012
 
Pbog 50 days to save the planet 4 oct 2012
Pbog 50 days to save the planet 4 oct 2012Pbog 50 days to save the planet 4 oct 2012
Pbog 50 days to save the planet 4 oct 2012
 
Pbog 50 days to save the planet 3 oct 2012
Pbog 50 days to save the planet 3 oct 2012Pbog 50 days to save the planet 3 oct 2012
Pbog 50 days to save the planet 3 oct 2012
 
Pbog 50 days to save the planet 2 oct 2012
Pbog 50 days to save the planet 2 oct 2012Pbog 50 days to save the planet 2 oct 2012
Pbog 50 days to save the planet 2 oct 2012
 
Pbog 50 days to save the planet oct 2012
Pbog 50 days to save the planet oct 2012Pbog 50 days to save the planet oct 2012
Pbog 50 days to save the planet oct 2012
 
Pbog getting it together oct 2012 clive burgess, clive live, good stuff
Pbog getting it together oct 2012 clive burgess, clive live, good stuffPbog getting it together oct 2012 clive burgess, clive live, good stuff
Pbog getting it together oct 2012 clive burgess, clive live, good stuff
 
Pbog on sklair oct 2012 2
Pbog on sklair oct 2012   2Pbog on sklair oct 2012   2
Pbog on sklair oct 2012 2
 
Pbog the brain to law oct 2012
Pbog   the brain to law oct 2012Pbog   the brain to law oct 2012
Pbog the brain to law oct 2012
 
Twitter stuff 1 oct 2012
Twitter stuff 1 oct 2012Twitter stuff 1 oct 2012
Twitter stuff 1 oct 2012
 
Sustainable development 2012 stuff 2
Sustainable development 2012 stuff 2Sustainable development 2012 stuff 2
Sustainable development 2012 stuff 2
 
Site induction uks 2007 2011
Site induction uks 2007   2011Site induction uks 2007   2011
Site induction uks 2007 2011
 
Wow complex pbog - they 2008
Wow   complex pbog - they 2008Wow   complex pbog - they 2008
Wow complex pbog - they 2008
 

Recently uploaded

Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 

Recently uploaded (20)

Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 

Puwer 98 cb

  • 1. MACHINE TYPE MODEL PLANT No LOCATION DATE REG. 5. SUITABILITY OF EQUIPMENT IS IT SUITABLE FOR PURPOSE FOR WHICH IT IS USED IS THE LOCATION SUITABLE IS IT BEING USED AS INTENDED REG. 6. MAINTENANCE IS EQUIPMENT MAINTAINED IN WORKING ORDER AND GOOD REPAIR HAS THE EQUIPMENT AN UP TO DATE MAINTENANCE LOG REG. 7 TRAINED AND AUTHORISED PERSONNEL IS THE EQUIPMENT ONLY USED BY AUTHORISED AND TRAINED PERSONS IS MAINTENANCE ON EQUIPMENT ONLY CARRIED OUT BY AUTHORISED AND TRAINED PERSONNEL REG. 8 OPERATING PROCEDURES AND WORK INSTRUCTIONS HAS THE EQUIPMENT AN OPERATING PROCEDURE OR WORK INSTRUCTIONS REG. 9 TRAINING HAVE THE PERSONS USING THE EQUIPMENT HAD ADEQUATE TRAINING IN BOTH ITS USE AND HEALTH AND SAFETY ISSUES HAVE THE PERSONS MANAGING OR SUPERVISING THE USE OF THE EQUIPMENT HAD ADEQUATE TRAINING IN BOTH ITS USE AND HEALTH AND SAFETY ISSUES
  • 2. REG. 10 CONFORMITY WITH COMMUNITY REQUIREMENTS DOES THE EQUIPMENT REQUIRE CE MARKING IS THE EQUIPMENT CE MARKED REG. 11 DANGEROUS PARTS OF MACHINERY ARE THERE SUITABLE MEASURES TO PREVENT PERSONS COMING INTO CONTACT WITH MOVING PARTS DO THE MOVING PARTS STOP BEFORE ANY PART OF THE PERSON ENTERS THE DANGER ZONE ARE FIXED GUARDS FITTED AND ALL NIP POINTS PROTECTED ARE THERE INTERLOCKED GUARDS, SAFETY MATS OR OTHER PROTECTIVE DEVICES FITTED ARE THERE ANY JIGS, HOLDERS, PUSH-STICKS OR SIMILAR PROTECTION APPLIANCES PROVIDED IS THERE SUFFICIENT: INFORMATION INSTRUCTIONS TRAINING SUPERVISION ARE THE GUARDS SUITABLE FOR THE PURPOSE PROVIDED ARE THEY OF GOOD CONSTRUCTION AND ADEQUATE STRENGTH ARE THEY IN EFFICIENT WORKING ORDER AND IN GOOD REPAIR DO THEY GIVE RISE TO ANY INCREASED RISK CAN THEY BE EASILY BYPASSED OR DISABLED ARE THEY A SUFFICIENT DISTANCE FROM THE DANGER ZONE DO THEY RESTRICT THE VIEW WHERE A VIEW IS NECESSARY
  • 3. ARE THEY DESIGNED, WHERE POSSIBLE, TO ALLOW ACCESS FOR MAINTENANCE REG12 PROTECTION AGAINST SPECIFIC HAZARDS HAVE THE HAZARDS BEEN IDENTIFIED BY CARRINING OUT A RISK ASSESMENT HAVE SUFFICIENT MEASURES BEEN TAKE TO REDUCE THE RISK OF SPECIFIC HAZARDS, OTHER THAN BY P.P.E. OR INFORMATION ,INSTRUCTION, TRAINING AND SUPERVISION IS THERE SUITABLE PROTECTION AGAINST ARTICLES FALLING, OR BEING EJECTED FROM THE EQUIPMENT IS THERE SUITABLE PROTECTION AGAINST RUPTURE OR DISINTEGRATION, DUE TO PRESSURE BUILD UP ETC. SUITABLE PROTECTION AGAINST THE EQUIPMENT CATCHING FIRE OF OVERHEATING PROTECTION AGAINST DISCHARGES OF GAS, DUST, LIQUID OR ANY OTHER SUBSTANCE SUITABLE PROTECTION AGAINST THE EQUIPMENT EXPLODING REG. 13 HIGH OR VERY LOW TEMPERATURE IS THERE PROTECTION AGAINST BURNS, SCALDS OR SEARS REG14 CONTROLS FOR STARTING AND CHANGING OPERATING CONDITIONS IS THE EQUIPMENT FITTED WITH START CONTROLS DOES THE EQUIPMENT START AUTOMATICALLY AFTER THE STOP IS RELEASED IS THE EQUIPMENT, WHERE NECESSARY, FITTED WITH CONTROLS FOR CHANGING THE SPEED, PRESSURE OR OTHER OPERATING CONDITIONS CAN ANY OF THESE CONTROLS BE OPERATED ACCIDENTALLY REG. 15 STOP CONTROLS IS THE EQUIPMENT, WHERE APPROPRIATE, PROVIDED WITH STOP CONTROLS DOES THE EQUIPMENT COME TO A COMPLETE STOP ARE ALL SOURCES OF ENERGY REMOVED
  • 4. DO THE STOP CONTROLS HAVE PRIORITY OVER THE START CONTROLS REG. 16 EMERGENCY STOP CONTROLS ARE THERE EMERGENCY STOPS FITTED ARE THEY READILY ACCESSIBLE HAVE THEY PRIORITY OVER THE STOP CONTROLS REG. 17 CONTROLS ARE ALL CONTROLS CLEARLY VISIBLE, IDENTIFIABLE AND APPROPRIATELY MARKED DOES THE POSITION OF THE CONTROLS EXPOSE THE OPERATOR TO RISK CAN THE OPERATOR SEE FROM THE CONTROL POSITION THAT NO-ONE IS AT RISK FROM HIM STARTING THE EQUIPMENT ARE SAFE SYSTEMS OF WORK IN PLACE SO THAT NO PERSON WILL BE IN AN UNSAFE POSITION WHEN THE EQUIPMENT IS ABOUT TO START IS THERE AN AUDIBLE OR VISIBLE ALARM INDICATING THE EQUIPMENT IS ABOUT TO START IS THE WARNING GIVEN IN SUFFICIENT TIME TO ALLOW THOSE AT RISK TO GET CLEAR ARE THERE MEANS TO RESPOND TO THE WARNINGS, SUCH AS A MEANS TO PREVENT STARTING OR A PLACE TO WITHDRAW FROM THE DANGER AREA REG. 18 CONTROL SYSTEMS IS THE CONTROL SYSTEM SAFE, IE. DOES IT "FAIL SAFE" DOES ITS OPERATION INCREASE THE RISK TO HEALTH AND SAFETY CAN A FAULT IN THE CONTROL SYSTEM, OR LOSS OF SUPPLY CREATE INCREASED RISK TO HEALTH AND SAFETY
  • 5. DOES THE CONTROL SYSTEM IMPEDE THE OPERATION OF ANY STOP OR EMERGENCY STOP REG. 19 ISOLATION FROM SOURCES OF ENERGY HAS THE EQUIPMENT GOT A SUITABLE MEANS OF ISOLATION FROM ALL SOURCES OF ENERGY ELECTRICITY AIR WATER GAS OIL IS THERE ANY RISK OF INADVERTENT RECONNECTION ARE THE ISOLATION POINTS CLEARLY IDENTIFIABLE ARE THE ISOLATION POINTS READILY ACCESSIBLE DOES RECONNECTION OF THE ENERGY SOURCE PUT PEOPLE AT RISK, SUCH AS BY INITIATING MOVEMENT OR OTHER HAZARD ARE THERE MEASURES IN PLACE TO ENSURE THAT GUARDS AND OTHER PROTECTION DEVICES ARE FUNCTIONING CORRECTLY BEFORE OPERATION BEGINS REG. 20 STABILITY OF EQUIPMENT IS THE EQUIPMENT STABLE, AND NOT LIABLE TO FALL OVER, COLLAPSE OR OVERTURN IS THE EQUIPMENT FIXED TO THE GROUND, OF FIXED IN SOME OTHER WAY HAVE ADDITIONAL MEASURES BEEN TAKEN FOR MOBILE EQUIPMENT REG. 21 LIGHTING IS THE WORK AREA SUFFICIENTLY ILLUMINATED IS GENERAL ILLUMINATION PROVIDED IS LOCAL ILLUMINATION PROVIDED
  • 6. IS ADDITIONAL LIGHTING AVAILABLE FOR WHEN MAINTENANCE WORK IS REQUIRED IS FIXED LIGHTING FOR MAINTENANCE PURPOSES REQUIRED REG 22 MAINTENANCE OPERATIONS CAN THE EQUIPMENT BE SHUT DOWN FOR MAINTENANCE OPERATIONS IF THIS IS NOT PRACTICABLE ARE SUITABLE MEASURES TAKEN TO PROTECT PERSONS FROM RISK REG 23 MARKINGS ARE STOP AND START CONTROLS IDENTIFIED IS THE SAFE WORKING LOAD MARKED ON LIFTING EQUIPMENT ARE SAFE WORKING PRESSURES INDICATED IS THE MAXIMUM ROTATION SPEED MARKED ON ABRASIVE WHEELS ARE GAS CYLINDERS MARKED CORRECTLY ARE STORAGE VESSELS CORRECTLY MARKED IS EQUIPMENT IDENTIFIED ARE ISOLATORS IDENTIFIED REG 24 WARNINGS ARE WARNING SIGNS FITTED ARE THEY EASILY RECOGNISED, UNDERSTOOD AND UNAMBIGUOUS ARE VISUAL WARNING DEVICES EFFECTIVE ARE AUDIBLE WARNING DEVICES EFFECTIVE