SlideShare a Scribd company logo
1 of 53
Download to read offline
Nav-Hoist
Installation & Maintenance
ORIGINAL INSTRUCTIONS REVISION 1.0 FEBRUARY 2015
Nav-Hoist
Installation & Maintenance
ORIGINAL INSTRUCTIONS REVISION 1.0 FEBRUARY 2015
Nav-Hoist
F10-1.001
© 2015, Tait
AER
MACH
OBLIG
ASSESS
SAFE
OPERA
DAMAGE
REHEAR
FOR P
DAILY.
t Installation a
t Towers Manufa
RIAL PERFOR
HINERY OPE
ATION OF T
THE SAFET
E PERFORMA
ATORS AND
E, PERSONA
RSE ALL MAN
PERFORMER
TEST AND V
and Maintena
acturing, LLC. All
RMANCES, S
ERATION AR
HE PURCHA
TY ASPECTS
ANCE PARAM
PERFORME
AL INJURY O
NUAL AND A
R FLIGHT OR
VALIDATE A
ance – Revisio
l rights reserved.
WA
STUNTS, POW
RE DANGERO
ASER AND/O
S OF ITS USE
METERS, UT
RS, AND AS
R DEATH. R
AUTOMATIC
R OVERHEAD
ALL EMERGE
on 1.0
Rev. 1.0
ARNING
WERED OVE
OUS ACTIVIT
R USER OF
E AND APPLI
TILIZE TRAIN
SSUME ALL R
EAD THE OP
OPERATION
D HOISTING.
ENCY STOPS
ERHEAD LIFT
TIES. IT IS TH
THIS EQUIP
ICATION, OP
NED AND QU
RISKS OF US
PERATION M
N WITH TEST
INSPECT AN
S AND SAFET
Issue D
TING, AND A
HE RESPONS
MENT AND S
PERATE EQU
UALIFIED PE
SE, INCLUDI
MANUAL PRI
T WEIGHT B
ND TEST AL
TY SYSTEMS
P
Date: February 17
AUTOMATED
SIBILITY AN
SOFTWARE
UIPMENT WI
RSONNEL A
NG PROPER
OR TO USE,
EFORE ANY
LL EQUIPMEN
S REGULAR
Page | 1
7, 2015
D
D
TO
THIN
AS
RTY
, AND
Y USE
NT
RLY.
Nav-Hoist
F10-1.001
© 2015, Tait
SAFE
Operator
 
 
 
 
 
 
 
t Installation a
t Towers Manufa
ETY STATE
The use
damage
for maxim
TAIT req
to opera
and to th
manufac
hoists m
industria
safety in
that this
If the ho
the hoist
the hoist
taken ou
examine
operator
Operato
attachme
Hoist op
or under
cause a
Neither t
to perso
 Using
operat
 Modify
manuf
 Opera
weight
 Failing
 Modify
 Using
The follo
with all s
containe
understa
responsi
involving
r Name (print
and Maintena
acturing, LLC. All
EMENT
of any electr
. This manua
mum safety a
quires that ea
ting or mainta
he recommen
cturer recomm
ust be operat
al electric hois
structions in t
manual be st
ist displays a
t is damaged
t or if the hois
ut of service a
e the equipme
r not in compl
rs must be fa
ent of the load
erators are no
r the influence
hazard to the
the manufactu
n or property
the electric c
tion as descri
ying the electr
facturer
ating the elect
t for such hois
g to inspect an
ying the hoist
the hoist for p
owing operato
safety informa
ed in this man
ands that any
ibility. Operat
g the hoist.
ted)
ance – Revisio
l rights reserved.
ic chain hoist
l contains imp
and performan
ch operator re
aining the hoi
ded preventa
mendations w
ted and maint
sts. Any perso
this manual is
tored to allow
n unexpected
or malfunctio
st has not bee
and isolated u
ent. Immediate
iance with thi
miliar with pro
d to the hoist
ot to operate
e of medicatio
e operator or o
urer nor deale
or the lack of
chain hoist in a
bed in this m
ric chain hois
tric chain hois
st
nd maintain th
purposes oth
ors have read
ation, warning
ual as well as
accidents tha
tor understand
Date
 
 
 
 
 
 
 
on 1.0
Rev. 1.0
t presents som
portant inform
nce.
ead and unde
st. Adherence
ative maintena
will ensure safe
tained by per
on who has no
s not qualified
w quick access
d behavior (no
ons, if you hav
en inspected o
ntil a trained
ely inform a s
s manual or t
oper rigging p
.
a hoist when
on that would
others.
er of this hois
f operation of
a manner tha
anual
t without the
st with a load
he hoist
er than provid
, understood,
gs, cautions, r
s any labels o
at occur with
ds that TAIT w
Si
 
 
 
 
 
 
 
me risk of per
mation to oper
erstand the co
e to the corre
ance schedul
e and depend
rsonnel traine
ot read and u
d to operate t
s for future re
oise, vibration
ve doubt conc
or maintained
and qualified
supervisor of
the procedure
procedures to
under the inf
result in actio
st accepts res
f the hoist cau
at deviates fro
explicit writte
that exceeds
ded for.
, and have be
recommendat
or warning on
the hoist are
will not be res
ignature
Issue D
rsonal injury o
rate and main
ontents of this
ect operating p
le, as well as
dable hoist se
ed and qualifie
understood al
he hoist. TAIT
eference and
n, frequently b
cerning the sa
d; then the ho
d hoist special
such an actio
es contained
o be followed
fluence of alc
ons by operat
sponsibility for
used by the fo
om its intende
en authorizatio
s the maximum
ecome thorou
tions, and ins
n the hoist. Th
the operator’
sponsible for
P
Date: February 17
or property
ntain your hoi
s manual prio
procedures
other
ervice. All
ed in the use
l operation an
T recommend
consultation.
blown fuses),
afe operation
oist must be
list can
on of another
in the manua
in the
cohol or drugs
tor which may
r any damage
ollowing:
ed normal
on of the
m allowed
ughly familiar
structions
he operator
s
any accident
Page | 2
7, 2015
st
or
of
nd
ds
if
of
al.
s
y
e
s
Nav-Hoist
F10-1.001
© 2015, Tait
TABLE
WARNI
Safety S
1:  Intro
1.1 
1.2 
1.3 
1.4 
1.5 
1.6 
1.7 
1.8 
1.9 
1.10 
1.10
1.10
2:  Safet
2.1 
2.2 
2.3 
2.4 
3:  Gloss
4:  Syste
4.1 
4.2 
4.2.1
4.2.2
4.3 
4.4 
4.5 
4.6 
t Installation a
t Towers Manufa
E OF CON
NG ...............
Statement ...
oduction .......
General .......
Purpose of th
Who Should 
Referenced D
Technical Su
Symbols and
Important Sa
Limited Warr
Manual Accu
Legal Inform
.1  Copyrig
.2  Tradem
ty .................
Electrical Saf
System Desig
Important No
Maintenance
sary of Terms
em Overview 
Unpacking ..
Parts List .....
1  Single‐f
2  Double‐
General .......
Specification
BGV Hoist Sp
BGV Allowan
and Maintena
acturing, LLC. All
TENTS
.....................
.....................
.....................
.....................
his Manual ...
Read this Ma
Documents...
pport ...........
 Nomenclatu
afety Instruct
ranty ............
uracy .............
ation ............
ht .................
arks .............
.....................
fety – Genera
gn and Safety
otices ...........
e and Service
s ....................
....................
.....................
.....................
all, Motor‐up
‐fall, Motor‐u
.....................
ns ..................
pecifications .
nces ..............
ance – Revisio
l rights reserved.
.....................
.....................
.....................
.....................
.....................
anual .............
.....................
.....................
ure .................
ions ..............
.....................
.....................
.....................
.....................
.....................
.....................
al Warning .....
y of Personne
.....................
.....................
.....................
.....................
.....................
.....................
p and Motor‐d
up and Motor
.....................
.....................
.....................
.....................
on 1.0
Rev. 1.0
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
l ....................
......................
......................
......................
......................
......................
......................
down ............
‐down ..........
......................
......................
......................
......................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
Issue D
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
P
Date: February 17
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
Page | 3
7, 2015
....... 1 
....... 2 
....... 6 
....... 6 
....... 6 
....... 6 
....... 7 
....... 7 
....... 8 
....... 9 
..... 10 
..... 10 
..... 11 
..... 11 
..... 11 
..... 12 
..... 12 
..... 12 
..... 12 
..... 13 
..... 14 
..... 15 
..... 15 
..... 15 
..... 16 
..... 16 
..... 17 
..... 18 
..... 19 
..... 19 
Nav-Hoist
F10-1.001
© 2015, Tait
4.7 
4.7.1
4.7.2
5:  Setu
5.1 
5.2 
5.3 
5.4 
5.5 
5.6 
5.7 
5.8 
5.8.1
5.8.2
5.8.3
5.9 
5.10 
5.10
5.10
5.11 
5.12 
6:  Main
6.1 
6.2 
6.3 
6.4 
6.5 
6.5.1
6.5.2
6.6 
6.7 
t Installation a
t Towers Manufa
Dimensions .
1  Nav‐Ho
2  Nav‐Ho
p, Adjustmen
General .......
Safety Preca
Operating th
Prohibitions 
Safely Disabl
Safely Using 
Making Conn
Suspending t
1  Mounti
2  Mounti
3  Changin
Attaching the
Installing the
.1  Configu
.2  Configu
Mounting th
Configuring t
ntenance ......
General .......
Hoist Mainte
Daily Safety C
Daily Mainte
Inspection In
1  Daily M
2  Three‐m
Functional B
Adjustment t
and Maintena
acturing, LLC. All
.....................
ist with Single
ist with Suspe
nt and Operat
.....................
utions ..........
he Hoist .........
for Use ........
ing Machiner
the NAV Hois
nections .......
the Hoist ......
ng the Suspe
ng the Single‐
ng the Suspen
e Load Cell to
e Load Chain .
ring the Hois
ring the Hois
e Chain Bag .
the Hoist for 
.....................
.....................
enance Sched
Check ...........
enance ..........
nstructions ....
aintenance ..
month Mainte
rake Test ......
to Brake and 
ance – Revisio
l rights reserved.
.....................
e‐Hole Suspe
ension Hook .
tion ...............
.....................
.....................
.....................
.....................
ry ..................
st ..................
.....................
.....................
nsion Hook ...
‐hole Suspen
nsion Adapter
o the Hoist ....
.....................
t for a Single‐
t for a Double
.....................
Inverted Use
.....................
.....................
dule ...............
.....................
.....................
.....................
.....................
enance ..........
.....................
Clutch ..........
on 1.0
Rev. 1.0
......................
nsion Eye .....
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
sion Eye ........
r ....................
......................
......................
‐fall Applicati
e‐fall Applicat
......................
.....................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
on ................
tion ..............
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
Issue D
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
P
Date: February 17
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
Page | 4
7, 2015
..... 20 
..... 20 
..... 20 
..... 21 
..... 21 
..... 21 
..... 22 
..... 22 
..... 22 
..... 22 
..... 23 
..... 24 
..... 25 
..... 26 
..... 27 
..... 29 
..... 31 
..... 32 
..... 33 
..... 35 
..... 36 
..... 40 
..... 40 
..... 40 
..... 41 
..... 43 
..... 44 
..... 44 
..... 45 
..... 45 
..... 45 
Nav-Hoist
F10-1.001
© 2015, Tait
6.8 
6.8.1
6.8.2
6.8.3
6.9 
6.10 
 
t Installation a
t Towers Manufa
Load Chain M
1  Inspecti
2  Measur
3  Lubricat
Hook Tackle/
Returning Eq
and Maintena
acturing, LLC. All
Maintenance 
ing the Load C
ring the Load 
ting the Load
/Hook Block M
quipment For 
ance – Revisio
l rights reserved.
.....................
Chain ............
Chain ...........
 Chain...........
Maintenance
Service ........
on 1.0
Rev. 1.0
......................
......................
......................
......................
.....................
......................
.....................
.....................
.....................
.....................
.....................
.....................
Issue D
.....................
.....................
.....................
.....................
.....................
.....................
P
Date: February 17
......................
......................
......................
......................
......................
......................
Page | 5
7, 2015
..... 45 
..... 46 
..... 46 
..... 48 
..... 48 
..... 49 
Nav-Hoist
F10-1.001
© 2015, Tait
 
 
 
1.1
1.2
1.3
t Installation a
t Towers Manufa
GENER
The TAIT
the highe
BGV-D8
applicati
The Nav
pocket li
for overlo
D8+ or th
10:1. Th
highest a
grade ho
The Nav
solution,
control, I
and trou
system p
Hoist, wh
and prec
standard
PURPO
This man
operatio
maintain
that the s
procedu
this man
service i
assistan
WHO S
The follo
concepts
• A
• A
•
and Maintena
acturing, LLC. All
RAL
T Nav-Hoist is
est level of ho
8, BGV-D8+, o
on; and it com
v-Hoist feature
ft wheel for fa
oad and unde
he BGV-C1 s
e addition of
and lowest lift
oist.
v-Hoist is a pa
encompassi
I/O control, su
bleshooting f
provides the t
hile maintaini
cision ensures
ds.
OSE OF THI
nual offers re
n, maintenan
ning the hoist.
system has a
res, such as m
nual, nor are t
s required on
ce.
SHOULD RE
owing personn
s and procedu
Automation s
Automation s
Rigging main
ance – Revisio
l rights reserved.
s a fully autom
oist safety. Th
or with the BG
mplies with U
es variable sp
ast, quiet, and
erload monito
safety rating, t
top and botto
t positions, m
art of the Nav
ng an operato
upervisory sa
unctions with
tools to perfor
ng complete
s adherence t
S MANUAL
ference mate
ce, and troub
It does not c
already been p
motor replace
they intended
n your machin
EAD THIS M
nel should rea
ures describe
system operat
system mainte
tenance and
on 1.0
Rev. 1.0
mated and int
he Nav-Hoist
GV-C1 safety
L, CE, and C
peed operatio
d smooth liftin
oring; and with
the hoist can
om limits, as w
akes the Nav
igator automa
or programmi
afety control, e
in one compr
rm intricate an
control over t
to the most st
erial and gene
bleshooting, a
cover installat
permanently
ement or syst
to be perform
nery, please c
MANUAL
ad this manua
ed herein:
tors and show
enance perso
service perso
1
tegrated elec
can be config
standard, de
SA standards
on, dual indep
ng. The Nav-H
h specific con
achieve a ma
well as two ult
v-Hoist a safe
ation system;
ing environme
external syste
rehensive env
nd precise mo
the load. This
tringent indus
eral informatio
and is intende
ion of the sys
installed. Com
tem recommis
med by the en
contact TAIT T
al and familia
w personnel
onnel
onnel
Issue D
: Intro
ctric chain hois
gured to comp
epending on th
s for industria
pendent brake
Hoist is fitted
nfiguration to
aximum safet
timate limits t
e and reliable
a complete a
ent, motion co
ems interface
vironment. Th
ovements wit
s combination
stry safety rul
on about the b
ed for use in o
stem, but rath
mplicated ser
ssioning, are
nd user. If this
Technical Ser
arize themselv
P
Date: February 17
oducti
st that meets
ply with the
he required
al equipment.
es, and a five
with a load ce
meet the BGV
ty factor of
to set the
professional-
automation
ontrol, show
s, and setup
he Navigator
th the Nav-
n of movemen
es and
basic
operating and
her assumes
rvice
not covered i
s type of
rvice for
ves with the
Page | 6
7, 2015
on
-
ell
V-
-
nt
in
Nav-Hoist
F10-1.001
© 2015, Tait
1.4
1.5
 
t Installation a
t Towers Manufa
REFER
This man
images a
2011) in
Section
Section
Section
TECHN
For direc
TAIT Tow
9 Wynfie
Lititz, PA
1 (844) A
(717) 62
http://ww
taitsuppo
Emergen
and Maintena
acturing, LLC. All
ENCED DO
nual referenc
and text from
the following
5.8: Suspend
5.9: Attaching
6.8: Load Ch
ICAL SUPP
ct technical su
wers Manufac
eld Dr.
A 17543
ASK-TAIT
26-9571
ww.taittowers.
ort@taittower
ncy/after hour
ance – Revisio
l rights reserved.
OCUMENTS
es the TAIT N
the Liftket El
sections:
ding the Hoist
g the Load Ce
ain Maintenan
PORT
upport, contac
cturing, LLC
.com
rs.com
rs (855) NAV-
on 1.0
Rev. 1.0
Navigator Sof
ectric Chain H
ell to the Hois
nce
ct TAIT at ou
-CTRL
ftware Operat
Hoist Operati
st
r offices in Lit
Issue D
tor Manual, a
ing Instruction
titz:
P
Date: February 17
nd uses
ns (issue Apri
Page | 7
7, 2015
il
Nav-Hoist
F10-1.001
© 2015, Tait
1.6
Dan
War
Cau
Ove
Stop
Info
 
t Installation a
t Towers Manufa
SYMBO
Several
highlight
are expla
nger
rning
ution
erhead Cautio
p
ormation
This s
not av
This s
minor
This s
could
impor
This s
suspe
an ove
This s
neces
This s
inform
or pro
and Maintena
acturing, LLC. All
OLS AND NO
symbols are
t potentially da
ained as follo
n
symbol indicate
voided, this wil
symbol indicate
r or moderate i
symbol indicate
cause damag
rtant instruction
symbol indicate
ended overhea
erhead load.
symbol highligh
ssary before m
symbol describ
mation or a com
otection of prop
ance – Revisio
l rights reserved.
OMENCLAT
used through
angerous act
ows:
es an imminen
ll result in an e
es a potentially
injury and dam
es information
ge to the unit o
ns accompany
es that a user
ad and specifie
hts a point in a
moving to the n
bes an operati
mpany policy t
perty.
on 1.0
Rev. 1.0
URE
hout this manu
tions, or to de
ntly hazardous
electrical shock
y hazardous s
mage or risk of
n necessary to
or to other equ
ying the unit.
action is requ
es additional in
a procedure w
next step.
ng or a progra
that relates dir
ual to highligh
escribe operat
s situation or a
k, serious bod
situation. If not
f damage to th
o avoid a poten
ipment. The s
uired in an env
nformation to w
where an additi
amming tip. Th
rectly or indirec
Issue D
ht operating o
tional steps. T
a potential elec
dily injury, or de
t avoided, this
he unit.
ntially hazardo
symbol also ale
vironment that
work safely in
ional step or c
he symbol may
ctly to the safe
P
Date: February 17
or usage tips,
These symbo
ctrical hazard.
eath.
may result in
ous situation th
erts the user to
contains a loa
the presence
check may be
y also indicate
ety of personne
Page | 8
7, 2015
to
ols
If
hat
o
ad
of
e
el
Nav-Hoist
F10-1.001
© 2015, Tait
1.7
Cau
War
 
t Installation a
t Towers Manufa
IMPORT
ution – System
rning – Estop
Navig
system
emerg
and its
specia
an imm
encou
take s
depen
encou
Due to
techn
unexp
perfor
care s
stop a
condit
safe u
the op
either
action
perso
All sys
reach
MUST
MUST
and Maintena
acturing, LLC. All
TANT SAFE
m Failsafe Fau
Application R
ator machiner
m detects a cr
gency stop init
s associated h
ally configured
mediate and c
untered. The a
some finite per
nd on the com
untered, and th
o this fail safe
ical personnel
pected initiatio
rmance state o
should be take
as well as the k
tion when adju
use. An emerg
perator, or auto
of these cond
n of stopping a
nnel or perform
stem operators
ANY TIME TH
T BE USED A
T NOT BE OP
ance – Revisio
l rights reserved.
ETY INSTRU
lt Reaction
Requirements
ry and softwar
ritical fault, enc
tiated the syste
hardware and
d otherwise, an
complete halt a
axis will not mo
riod of time. Th
plexity of the o
he skill and ex
behavior, care
or performers
n of the safe m
or position for
en with the sett
known decele
usting the perfo
gency stop or it
omatically due
ditions will caus
and the rates o
mers.
s MUST have
HE SYSTEM
AS THE PRIMA
PERATED with
on 1.0
Rev. 1.0
UCTIONS
re operate colle
counters a loss
em “fails” to a
software, that
n axis operate
and set its bra
ove again until
he length of tim
overall automa
xperience of th
e should be ta
s when staging
machinery stat
any persons in
tings of the de
ration rates of
formance para
ts equivalent c
e to unexpecte
se the machin
of deceleration
a physical, re
IS POWERED
ARY MEANS
hout a physica
ectively as a “f
s of power or k
known safe st
t known safe s
ed under the N
akes when a m
l this fault is cle
me for recover
ation system in
e operator in c
aken in the pla
g a show, so t
te of “all stop”
n, around, or o
efault decelera
f the machiner
ameters of the
can be initiated
ed conditions s
nery to come to
n do not presen
ed Emergency
D AND IN OP
OF EMERGE
al Estop button
Issue D
fail safe” syste
key communic
tate. In the cas
state is “all stop
Navigator syste
malfunction or E
eared or bypa
ry of operation
nstallation, the
control at the t
cement and p
hat in no insta
result in an un
on the machin
ation rates on a
ry during an em
machinery or
d intentionally
such as a pow
o a rapid stop
nt a danger to
y Stop mushro
ERATION, an
ENCY STOP. T
n within reach
P
Date: February 17
em. When the
cation, or has
se of Navigato
p”. Unless
em will come to
Estop is
assed, which w
nal capability w
e type of fault
time of the fau
performance of
ance can the
nsafe
nery. Additiona
a commanded
mergency stop
r assessing its
at any time by
wer failure, and
. Be sure that
technical
om button with
nd this device
The system
of the operato
Page | 9
7, 2015
an
or
o
will
will
ult.
f
ally,
d
p
y
d
the
hin
or.
Nav-Hoist
F10-1.001
© 2015, Tait
1.8
1.9
 
t Installation a
t Towers Manufa
LIMITE
Unless o
mechani
flaws for
the contr
TAIT’s fa
question
the repla
for repai
and equ
Equipme
by Client
control o
condition
obtained
time per
EXPRES
INCLUD
PARTIC
REPRES
TAIT BE
CONSEQ
POSSIB
FAILUR
IN ANY
WILL BE
PRODU
RELATE
BASED
ACKNO
FAILUR
REFLEC
AGREEM
THE CA
MANUA
Although
typograp
alteration
the infor
for corre
and Maintena
acturing, LLC. All
D WARRAN
otherwise stat
isms, structur
r a period of o
ract documen
ault TAIT’s so
n at TAIT's so
acement of th
r only. Shippi
ipment to and
ent failure due
t or third parti
of TAIT will no
ns would be b
d by contractin
iod beyond th
SSLY IN LIEU
DING THE WA
CULAR PURP
SENTATION
E LIABLE FO
QUENTIAL D
BILITY OF SU
E TO PERFO
EVENT, CUM
E LIMITED TO
CTS OR SER
ED TO THE G
ON TORT, C
WLEDGE TH
E BETWEEN
CTED IN THE
MENT MAY B
AUSE OF ACT
AL ACCURA
h every effort
phical errors a
ns may occur
mation detaile
ections or clar
ance – Revisio
l rights reserved.
NTY
ted in the Agr
res, electrical
one (1) year u
nts. Should a
ole obligation
le expense. T
e defective E
ng costs for t
d from the ins
e to misuse, a
ies, incidenta
ot be covered
billed at stand
ng for mainte
he initial perio
U OF ALL OT
ARRANTY OF
POSE. NO O
OR WARRA
OR ANY SPEC
DAMAGES EV
UCH DAMAG
ORM COULD
MULATIVE D
O THE AMOU
RVICES. THIS
GOODS AND
CONTRACT O
HAT THIS PA
N TAIT AND C
E PRICE PAID
BE BROUGH
TION HAS AC
ACY
has been ma
and/or change
r. If you encou
ed in this man
rification.
on 1.0
Rev. 1.0
reement of Sa
controls, and
upon delivery
defect in mat
is to repair or
TAIT's liability
Equipment and
transport of de
stallation site a
abuse, neglec
l or shipping d
under this wa
dard rates. Wa
nance, inspec
od covered un
THER WARR
F MERCHAN
RAL AGREE
NTY SHALL
CIAL, INDIRE
VEN IF TAIT
ES AND EVE
CAUSE CON
AMAGES FO
UNT ACTUA
S PARAGRA
SERVICES P
OR OTHER T
ARAGRAPH A
CLIENT AND
D. NO ACTIO
HT BY CLIEN
CCRUED.
ade to assure
es in data due
unter an error
nual, please c
ale or Lease T
d software wil
of the system
terials or work
r replace the
y under this Li
d the direct TA
efective equip
are the respo
ct, lack of pro
damage, or o
arranty, and r
arranty period
ction, and rep
nder the warra
RANTIES, EXP
NTABILITY A
EMENT, GUA
BE BINDING
ECT, INCIDEN
HAS BEEN A
EN IF TAIT HA
NSEQUENTIA
OR BREACH
LLY PAID TO
APH SHALL A
PROVIDED B
THEORIES. T
ALLOCATES
D THAT THIS
ON ARISING
T MORE THA
this manual
e to future eq
r or have any
contact our of
Issue D
TAIT warrants
ll be free of de
m or the perio
kmanship occ
part(s) or equ
imited Warran
TAIT personne
pment and/or
onsibility of the
per maintena
other means b
repair service
d extension m
pair services w
anty. THIS W
PRESS OR I
ND FITNESS
ARANTY, PRO
G. IN NO EVE
NTAL OR
ADVISED OF
AS KNOWLE
AL ECONOM
OF THIS CO
O TAIT FOR T
APPLY TO A
BY TAIT, WH
THE PARTIE
S THE RISK O
ALLOCATIO
OUT OF THI
AN ONE (1) Y
is as accurate
quipment or so
y questions re
ffice at the ad
Pa
Date: February 17
s that all
efects and
d indicated pe
cur due to
uipment in
nty is limited t
el labor costs
r repair tools
e Client.
ance performe
beyond the
es under thes
may be
with TAIT for
WARRANTY IS
MPLIED,
S FOR A
OMISE,
ENT WILL
F THE
EDGE THAT
MIC LOSSES
ONTRACT
THE
LL ACTIONS
HETHER
S
OF PRODUCT
ON IS
IS
YEAR AFTER
e as possible
oftware
garding any o
ddress above
age | 10
7, 2015
er
to
ed
e
a
S
.
S
T
R
,
of
Nav-Hoist
F10-1.001
© 2015, Tait
1.10
1.1
1.1
t Installation a
t Towers Manufa
0 LEGAL
10.1 Copyrig
This man
This man
LLC, and
Electric C
permissi
this docu
applicab
10.2 Tradema
All hardw
registere
and Maintena
acturing, LLC. All
INFORMAT
ght
nual is ©2015
nual contains
d is intended
Chain Hoist. I
on of TAIT. U
ument by any
ble laws.
arks
ware and soft
ed trademarks
ance – Revisio
l rights reserved.
TION
5, TAIT Towe
s information t
for use only b
It may be cop
Unauthorized
y method is st
tware product
s and must be
on 1.0
Rev. 1.0
rs Manufactu
that is proprie
by purchasers
pied or distribu
duplication, d
trictly prohibite
t names used
e treated acco
uring, LLC.
etary to TAIT
s and license
uted only with
distribution, o
ed and may r
d in this docum
ordingly.
Issue D
Towers Manu
es of the TAIT
h the express
r disclosure o
result in prose
ment are likely
Pa
Date: February 17
ufacturing,
T Nav-Hoist
s written
of any part of
ecution under
y to be
age | 11
7, 2015
r
Nav-Hoist
F10-1.001
© 2015, Tait
 
 
 
2.1
2.2
2.3
t Installation a
t Towers Manufa
ELECT
The volta
could be
the equip
SYSTE
All equip
incorpor
a safety
stored e
Close at
hazards
design, i
personn
IMPORT
 ADJUS
instruc
 GROU
device
 MOVIN
Exces
 DAMAG
refer s
occurr
 SERVI
qualifie
and Maintena
acturing, LLC. All
RICAL SAF
ages used in
e lethal. Extre
pment.
M DESIGN
pment discuss
ation into a co
hazard. Som
lectrical energ
ttention is req
either in norm
nstallation, co
el who have t
TANT NOTI
STMENT OF CO
ctions. Improp
NDING – Follo
e connected to
NG – Disconne
sive force or
GE REQUIRING
servicing to qu
red, such as:
- the p
- an ob
- the u
- the u
instru
- the u
CING – Do no
ed service pe
ance – Revisio
l rights reserved.
ETY – GEN
the system c
me care is ne
AND SAFE
sed in this ma
omplete syste
e pieces use
gy, or are use
uired to the e
mal operation
ommissioning
the necessary
CES
ONTROLS – Ad
per adjustmen
ow proper saf
o this unit.
ect the power
shock may da
G SERVICE – U
ualified servic
ower supply c
bject has falle
nit has been
nit does not o
uctions correc
nit has opera
ot attempt to s
ersonnel.
on 1.0
Rev. 1.0
NERAL WAR
an cause sev
ecessary at al
TY OF PER
anual is intend
em. If installed
high voltages
ed to control e
electrical insta
n or in the eve
g/start-up and
y training and
djust only tho
nt of other con
fety precautio
r before movin
amage the un
Unplug the un
ce personnel w
cable is dama
en on the unit
dropped, or it
operate norm
ctly.
ated with a loa
service this de
RNING
vere electrica
ll times when
RSONNEL
ded as a com
d incorrectly,
s and current
equipment wh
allation and th
ent of equipme
d maintenance
d experience.
ose controls s
ntrols may ca
ons such as g
ng the unit. M
nit.
nit from the m
whenever any
aged;
;
ts enclosure h
ally when the
ad in excess o
evice yourself
Issue D
2:
l shock and/o
working with
mponent for pr
the equipme
ts, carry a hig
hich can caus
he system des
ent malfunctio
e must be ca
pecified in the
ause damage
rounding for a
Move the unit
main AC powe
y damage to
has been dam
e user follows
of its rated ca
f. Refer all se
Pa
Date: February 17
: Safe
or burns, and
h or adjacent t
rofessional
nt may prese
gh level of
se injury.
sign to avoid
on. System
rried out by
e operating
to the unit.
any outdoor
with care.
er source and
the device ha
maged;
the operating
apacity
ervicing to
age | 12
7, 2015
ety
to
ent
as
g
Nav-Hoist
F10-1.001
© 2015, Tait
2.4
Dan
War
War
t Installation a
t Towers Manufa
MAINT
nger
rning
rning
Before
incom
Prior t
proce
Havin
In add
secure
mainte
and Maintena
acturing, LLC. All
ENANCE AN
e servicing or
ming and outgo
to performing a
dures and obs
g Jurisdiction
dition to ensuri
e in place, or d
enance do not
ance – Revisio
l rights reserved.
ND SERVIC
removing equ
oing electrical p
any maintenan
serve all releva
(AHJ).
ing that power
detach and rem
t cause damag
on 1.0
Rev. 1.0
CE
ipment de-ene
power.
nce on the equ
ant safety prec
r cannot be res
move, any sus
ge to any equ
ergize all circu
uipment, follow
cautions requi
stored to the s
spended load
ipment or end
Issue D
uit breakers as
w all lockout/ta
ired by the app
system inadve
so that any er
danger any per
Pa
Date: February 17
ssociated with
agout
plicable Autho
ertently, either
rrors during
rsonnel.
age | 13
7, 2015
ority
Nav-Hoist
F10-1.001
© 2015, Tait
 
 
 
t Installation a
t Towers Manufa
The follo
 Autho
determ
govern
 Carab
 Emerg
of an E
contro
brakes
button
 Hoist:
and fly
 Lifting
 Load:
 Load
 Load
directl
 Rated
 Safe W
or sus
 Safety
materi
 Three
indust
and Maintena
acturing, LLC. All
owing terms a
ority Having J
mine, mandate
ning bodies.
biner: A conne
gency Stop:
Estop button
ol system drop
s. Gray Estop
ns indicate a b
: A lifting mac
ying bars).
g System: As
The item sus
Capacity: Th
Cell: A transd
y proportiona
d Load: The s
Working Loa
pended.
y Factor: The
ial or equipme
Phase: A sy
rial applicatio
ance – Revisio
l rights reserved.
and abbreviati
Jurisdiction
e, and enforc
ector with a lo
A condition tr
or automatic
ps the secure
p buttons indic
button that ma
chine (includin
ssembly of lift
spended from
he maximum w
ducer that is u
al to the force
sum of the loa
d (SWL): Ma
e ratio of the u
ent to the actu
ystem requirin
ons.
on 1.0
Rev. 1.0
3:
ions are used
(AHJ): A per
ce code requir
ockable, self-
riggered by o
activation by
disable signa
cate a button
ay not be unp
ng lighting ho
ting machines
m the lifting sy
weight that th
used to create
being measu
ad and the dyn
aximum mass
ultimate break
ual working s
ng three powe
: Glos
d throughout t
rson who has
rements estab
closing and lo
ne of two me
Navigator. U
al, cuts motor
that is able to
plugged.
ists, chain ho
s and accesso
ystem.
he hoist can lif
e an electrica
ured.
namic forces
that is permi
king strength
stress of safe
er leads plus a
Issue D
ssary o
this manual:
s the delegate
blished by jur
oad bearing g
ethods: intenti
pon entering
r power, and
o be unplugge
oist, winches,
ories.
ft safely.
al signal whos
during opera
tted to be rais
of a member
working load
a ground, use
Pa
Date: February 17
of Term
ed authority to
risdictional
gate.
onal activatio
Estop, the
applies the
ed, red Estop
power hoists
se magnitude
ation.
sed, lowered,
r or piece of
when in use
ed in most
age | 14
7, 2015
ms
o
on
p
s
is
,
.
Nav-Hoist
F10-1.001
© 2015, Tait
 
 
 
4.1
4.2
t Installation a
t Towers Manufa
UNPAC
This equ
been da
Section
Technica
PARTS
The com
configura
 Norma
 Norma
 Inverte
 Inverte
and Maintena
acturing, LLC. All
CKING
uipment shoul
maged in ship
4.2: Parts Lis
al Support.
LIST
mponents cont
ation:
al use (motor-
al use (motor-
ed use (motor
ed use (motor
ance – Revisio
l rights reserved.
ld be unpacke
pment, notify
st, below, are
tained with th
-up): Single-fa
-up): Double-f
r-down): Sing
r-down): Dou
on 1.0
Rev. 1.0
4
ed and handle
the shipper im
included. If a
he Nav-Hoist p
all
fall
gle-fall
ble-fall
4: Sys
ed with care.
mmediately. V
any items are
package depe
Issue D
stem O
If an item ap
Verify that all
missing, notif
end on the ch
Pa
Date: February 17
Overvie
pears to have
parts listed in
fy TAIT
hosen
age | 15
7, 2015
ew
e
n
Nav-Hoist
F10-1.001
© 2015, Tait
4.2
4.2
t Installation a
t Towers Manufa
2.1 Single-f
Quanti
1
1
1
1
1
1
1
1
2.2 Double-
Quanti
1
1
1
1
1
1
1
1
and Maintena
acturing, LLC. All
fall, Motor-up
ty Descript
Nav-Hois
Nav-Hois
Load Ho
Chain Ba
Chain Di
Load Ce
Single-h
Suspens
Cable Pa
PowerLo
5-pole, L
4-pin XL
7-pin XL
5-pin XL
Ethercon
Control P
Connect
2 Eye Lo
4 Bow T
4 Washe
1 Soft-lin
2 Carabi
1 Swivel
1 Pear R
-fall, Motor-u
ty Descript
Nav-Hois
Nav-Hois
Load Blo
Chain Ba
Chain Di
Load Ce
Single-h
Suspens
Cable Pa
PowerLo
5-pole, L
4-pin XL
7-pin XL
5-pin XL
Ethercon
Control P
Connect
2 Eye Lo
4 Bow T
4 Washe
1 Soft-lin
2 Carabi
1 Swivel
1 Pear R
ance – Revisio
l rights reserved.
p and Motor-
tion
st Body
st Head with
ook, single-ga
ag (various si
iverter (motor
ell
ole Suspensi
sion Hook
ackage:
ock
L21-30 cable
R Cable (E-S
R Cable (Con
R Cable, 3-ft
n
Pickle
tion Hardware
oop Pins, 110
ie Cotter Pins
ers
nk lap link
iners, used to
Cable (bullet
Ring, ½-in.
p and Motor
tion
st Body
st Head with
ock and Tackl
ag (various si
iverter (motor
ell
ole Suspensi
sion Hook
ackage:
ock
L21-30 cable
R Cable (E-S
R Cable (Con
R Cable, 3-ft
n
Pickle
tion Hardware
oop Pins, 110
ie Cotter Pins
ers
nk lap link
iners, used to
Cable (bullet
Ring, ½-in.
on 1.0
Rev. 1.0
down
Encoder Cap
ted Crosby w
izes available
r-down config
on Eye with 2
(Power)
Stop)
ntrol)
(Load Cell)
e:
0-mm
s, ½-in.
o secure chain
t), 3.5-in.
r-down
Encoder Cap
le
izes available
r-down config
on Eye
(Power)
Stop)
ntrol)
(Load Cell)
e:
0-mm
s, ½-in.
o secure chain
t), 3.5-in.
p
with self-closin
e)
guration only)
2 spacers
n bag to hoist
p
e)
guration only)
n bag to hoist
Issue D
ng gate
t
t
Pa
Date: February 17
age | 16
7, 2015
Nav-Hoist
F10-1.001
© 2015, Tait
4.3
t Installation a
t Towers Manufa
GENER
The follo
explaine
Figure 4.1
Ref. Des
1 Hea
2 Res
3 Loa
4 Sus
5 Mo
and Maintena
acturing, LLC. All
RAL
owing diagram
ed in this guid
: Nav‐Hoist Key 
scription
ad-end Unit w
sistor
ad Cell
spension Ada
unt Bracket
ance – Revisio
l rights reserved.
ms provide a r
e.
Components 
with Connectio
apter
on 1.0
Rev. 1.0
reference for
Ref. D
ons 6 C
7 C
8 L
9 B
10 L
the maintena
Description
Chain Bag M
Chain Bag
Load Chain (
Block or Tack
Load Hook
Issue D
ance of critica
ount and Loa
Double-fall sh
kle
Pa
Date: February 17
al parts
ad Chain Supp
hown)
age | 17
7, 2015
port
Nav-Hoist
F10-1.001
© 2015, Tait
4.4
Electrica
Motor Ph
Duty Cyc
Rated Vo
Power
Current
Full Load
Connect
Power
Control, p
Control, n
Network
Load Cel
Encoder
Mechani
Lift Capa
Lift Spee
Length of
Maximum
Standa
(280 n
High-ro
(470 n
Environm
Operating
Enclosure
Construc
Dimensio
with su
with su
Weight, n
Certifica
Safety
Accesso
Chain
Type
Size
Weight
Load Cel
Type
Load C
Curren
Input V
Precisi
Operat
Compe
Safety
t Installation a
t Towers Manufa
SPECIF
al
hase
cle
oltage
d Amps (FLA)
tions
pickle
network
Switch Ports
l Ports
cal
acity
d
f Lift, standar
m Length of L
ard Limit Box
ominal rotatio
otation Limit B
ominal rotatio
mental
g Temperatur
e Rating
ction
ons (L x W x H
uspension hoo
uspension eye
not including c
ations and Ap
ories
t
l
Capacity
nt Rating
Voltage
ion
ting Tempera
ensated Temp
Factor
and Maintena
acturing, LLC. All
FICATIONS
)
rd
ift, achievable
ons)
Box
ons), optional
re
H)
ok
e
chain
pprovals
ature
perature
ance – Revisio
l rights reserved.
3 Φ + PE
25%
200–240
2.6 kW
9.7 A at 2
15 A (pan
5-pole, L2
4-pin XLR
Ethernet
Two (2) E
Two (2), 5
Incremen
require
Refer to S
Refer to S
22.86 m (
e
Single-fal
Double-fa
Single-fal
Double-fa
40° C (10
Type 1
703.46 m
(27.69 in.
703.46 m
(27.69 in.
51.38 kg
Conforms
Certified
RUD EN
7 x 22 mm
0.74 kg/m
Double-s
2948.35 k
4–20 mA
14–40 VD
±2% FSO
−46° C to
15° C to 7
10:1 @ 2
on 1.0
Rev. 1.0
E
VAC, 50/60 H
208 VAC typic
nel)
21-30 cable (
R + 7-pin XLR
Ethernet, built
5-pin XLR ca
ntal HTL Enco
ed configuratio
Section 4.5, B
Section 4.5, B
(75.0 ft)
ll: 56.0 m (18
all: 28.35 m (9
ll: 87.78 m (2
all: 43.89 m (1
04° F), maxim
mm x 375.55 m
. x 14.78 in. x
mm x 375.55 m
. x 14.78 in. x
(113.27 lbs),
s to UL 508, C
to CSA 22.2
818-7-DAT
m
m (0.50 lb/ft)
train dog bon
kg (6500.0 lbs
(3-wire)
DC
O
o 121° C (−50
71° C (60° F t
Tons (907.18
Hz
cal
3 phase + 1 g
R
t-in
bles (4–20 m
oder or SSI A
on
BGV Hoist Sp
BGV Hoist Sp
7.0 ft)
93.0 ft)
88.0 ft)
144.0 ft)
mum
mm x 355.08
x 13.98 in.)
mm x 309.36
x 12.18 in.)
hoist with su
Complies with
No. 14
ne
s)
0° F to 250° F
to 160° F)
8 kg)
Issue D
ground + 1 ne
mA with 24 VD
bsolute Enco
pecifications
pecifications
mm
mm
spension dev
h CE Standar
F)
Pa
Date: February 17
eutral)
DC supply)
oder, based on
vice
rds,
age | 18
7, 2015
n
Nav-Hoist
F10-1.001
© 2015, Tait
4.5
BGV Ratin
D8
D8
D8+
D8+
C1
C1
4.6
t Installation a
t Towers Manufa
BGV H
The Nav
standard
requirem
Theatre
Testing a
Safety re
This tab
independ
specific
g Safety Factor
5:1
5:1
10:1
10:1
10:1
10:1
The safe
material
(absolute
structura
how muc
BGV A
The BGV
entertain
the safet
(static lo
This tab
BGV Ra
D8
D8+
C1
and Maintena
acturing, LLC. All
HOIST SPEC
v-Hoist is capa
ds for hoist sa
ments. BGV is
Engineering,
and DIN 5695
equirements a
le lists specifi
dent dual bra
BGV safety ra
r Lift Ca
½ ton, 500.0 k
1 ton, 1000.0 k
¼ ton, 250.0
½ ton, 500.0 k
¼ ton, 250.0
½ ton, 500.0 k
ety factor is a
or equipmen
e lifting capac
al capacity of
ch stronger th
ALLOWANCE
V standard sp
nment industr
ty requiremen
oads) or movin
le summarize
ting
Assemb
duri
ance – Revisio
l rights reserved.
CIFICATION
able of compl
afety, depend
s a German st
Stage Machi
50: Entertainm
and inspectio
ic parameters
akes, and an i
ating and safe
apacity
kg (1102.31 lbs)
kg (2204.62 lbs)
kg (551.16 lbs)
kg (1102.31 lbs)
kg (551.16 lbs)
kg (1102.31 lbs)
ratio of the u
t to the actua
city to the act
a system bey
he system is t
ES
pecifies the co
ry specifically
nts for hoist a
ng above peo
es the actions
ling/Dismantling
ng setup/breakd
NO
NO
YES
on 1.0
Rev. 1.0
NS
lying with the
ing on lift cap
tandard for ho
inery - Scene
ment technolo
ns).
s that a ½-ton
ncremental e
ety factor.
Falls Clutc
1 130% of
2 130% of
1 130% of
2 130% of
1
2
ltimate break
al working stre
ual applied lo
yond the expe
than it usually
odes of practi
for chain hos
pplications w
ople (dynamic
allowed unde
People allow
the hoist
down
A st
BGV-D8, BG
pacities, lift sp
oist safety, sp
ery Hoist - Saf
ogy - Machine
n (500 kg) hoi
encoder, must
ch Setting
f nominal load
f nominal load
f nominal load
f nominal load
N/A
N/A
king strength o
ess or safe wo
oad). A safety
ected loads o
y needs to be
ice that cover
st applications
where loads ar
c loads).
er BGV rating
wed under the lo
taging process in
movement
NO
NO
YES
Issue D
GV-D8+, and t
peeds, and rig
pecifically DIN
fety Requirem
ery installation
st, fitted with
t meet to com
Lif
2.40 to 25.0 m/m
0.30 to 12.0 m/m
2.40 to 25.0 m/m
0.30 to 12.0 m/m
2.40 to 25.0 m/m
0.30 to 12.0 m/m
of a member
orking load w
y factor indica
r actual loads
for an intend
r lifting operat
s. The standa
re suspended
gs D8, D8+, a
oad when:
nvolves The h
Pa
Date: February 17
the BGV-C1
gging
N 56925:
ments And
ns - Part 1:
a load cell,
mply with a
ft Speed
min (8.0 to 84.0 f
min (1.0 to 42.0 f
min (8.0 to 84.0 f
min (1.0 to 42.0 f
min (8.0 to 84.0 f
min (1.0 to 42.0 f
or a piece of
when in use
ates the
s. Essentially,
ded load.
tions within th
ard specifies
d overhead
and C1:
hoist is holding a
load
NO
YES
YES
age | 19
7, 2015
ft/min)
ft/min)
ft/min)
ft/min)
ft/min)
ft/min)
,
he
static
Nav-Hoist
F10-1.001
© 2015, Tait
4.7
4.7
4.7
t Installation a
t Towers Manufa
DIMEN
7.1 Nav-Hoi
Figure 4.2
7.2 Nav-Hoi
Figure 4.3
and Maintena
acturing, LLC. All
SIONS
ist with Sing
: Dimensional v
ist with Susp
: Dimensional v
ance – Revisio
l rights reserved.
le-Hole Susp
view, top and sid
pension Hoo
view, top and sid
on 1.0
Rev. 1.0
pension Eye
de 
k
de 
Issue D
Pa
Date: February 17
age | 20
7, 2015
Nav-Hoist
F10-1.001
© 2015, Tait
 
 
 
5.1
5.2
Dan
t Installation a
t Towers Manufa
GENER
Electrica
horizonta
safety cl
hold a lif
five-pock
SAFETY
TAIT pro
personn
installed
nger
For thos
machine
distance
machine
operator
Before s
de-energ
During
ensur
proce
all loc
and Maintena
acturing, LLC. All
5: S
RAL
al chain hoists
ally with lifted
utch, located
fted load witho
ket lift wheel s
Y PRECAUT
oducts are pro
el should ope
and tested to
e procedures
e is clear of al
e from any mo
e operation, be
rs and service
servicing or re
gize all circuit
g any mainten
re that the mac
dures. Lockou
al and nationa
ance – Revisio
l rights reserved.
Setup,
s are designe
d loads with th
between the
out any powe
so it can be in
TIONS
ofessional the
erate them at
o function with
s requiring ope
l obstructions
oving machine
e sure an em
e technicians
emoving the c
t breakers ass
nance procedu
chinery is in a
ut/Tagout polic
al codes as en
on 1.0
Rev. 1.0
Adjus
d to lift and to
he use of an o
motor and th
er transmitted
nstalled in eith
eatrical equipm
any time. It is
hin rated ope
eration of the
s and debris, a
ery parts or lo
mergency stop
at all times.
controllers obs
sociated with
ure, the operat
safely disable
cy and procedu
forced by the
stment
o lower loads
optional trolle
he brake, whic
by the clutch
her the motor
ment, and on
s important th
erating parame
e machinery, b
and that all p
oads prior to i
p button is wit
serve the follo
incoming and
tor must secur
ed state prior to
ures must be
AHJ.
Issue D
and O
vertically and
y. This hoist f
ch allows the
h. The Nav-Ho
r up or motor
nly trained, qu
hat the equipm
eters.
be sure the a
ersonnel are
nitiating motio
hin immediate
owing safety
d outgoing ele
re all suspende
o starting any
implemented a
Pa
Date: February 17
Operati
d to travel
features a
hoist brake to
oist utilizes a
down positio
ualified
ment be
rea around th
a safe
on. During
e reach of
precautions,
ectrical powe
ed loads and
service or setu
and followed p
age | 21
7, 2015
on
o
n.
he
er.
up
per
Nav-Hoist
F10-1.001
© 2015, Tait
5.3
5.4
5.5
War
5.6
t Installation a
t Towers Manufa
OPERA
Use the
 Inspec
Sched
 Determ
BGV H
 Ensure
top of
 Ensure
proces
 Check
cause
 Ensure
 Confir
config
 Place
 Use th
PROHIB
DO NOT
unsafe c
 DO NO
 DO NO
 DO NO
allowe
Specif
 DO NO
 DO NO
 DO NO
 DO NO
bag.
 DO NO
SAFELY
rning
SAFELY
The safe
understa
are free
connecto
emergen
Prior t
pushb
panel
and Maintena
acturing, LLC. All
ATING THE
following guid
ct the hoist us
dule.
mine if the ho
Hoist Specific
e the correct
the hoist for a
e that the loa
ss and that th
k that the hoo
d a chain twis
e the hard an
m the chain is
urations.
the load verti
he slowest sp
BITIONS FO
T perform any
condition that
OT operate th
OT allow the
OT operate th
ed by the BGV
fications.
OT operate th
OT use the lo
OT operate th
OT use a load
OT use the ho
Y DISABLIN
Y USING T
e operation of
and the prope
of defects an
ors. In additio
ncy stop butto
to performing a
button. Ensure
.
ance – Revisio
l rights reserved.
HOIST
delines to ope
sing the maint
ist requires a
cation above.
mounting pat
a single-fall o
d chain, when
he chain is no
k block, on a
st.
nd soft limits h
s not twisted
ically under th
eed possible
OR USE
y of the follow
can lead to b
he hoist using
load to swing
he hoist with a
V rating for ea
he hoist with l
oad chain to s
he hoist when
d chain that is
oist at a duty
NG MACHIN
HE NAV H
f the Nav-Hois
er use of the h
d are securel
on, ensure tha
on. The hoist
any maintenan
e that it is illum
on 1.0
Rev. 1.0
erate the hois
tenance sche
single-fall or
Refer to Sect
ttern is used t
r a double-fal
n not under lo
t twisted whe
double-fall co
have been res
as it enters th
he hoist.
to lift the load
wing actions w
bodily injury o
g a start/stop o
g or twist while
a load that ex
ach hoist. Ref
oads that are
ling the loads
n the load cha
s longer or he
rate higher th
NERY
OIST
st depends on
hoist. Before o
ly connected
at the hoist ca
is considered
nce on an indi
inated and ve
st in a safe an
edule in Sectio
r a double-fall
tion 4.5: BGV
to mount the
ll configuratio
oad, is held ta
en entering the
onfiguration, h
set to the requ
he chain dive
d from the gro
with the hoist.
r damage to t
or a jerking a
e hoisting.
xceeds the ma
fer to Section
e tilted or drag
s.
ain is twisted.
eavier than th
han indicated
n the diligenc
operation, en
to their appro
an be switche
d usable only
ividual hoist, p
rify that “Estop
Issue D
nd effective m
on 6.2: Hoist
configuration
V Hoist Specif
suspension d
on.
aut during the
e jam-free pla
has not turne
uired fall conf
rter for motor
ound.
These action
the hoist.
action.
aximum load
4.5: BGV Ho
gging along th
e rated capac
on the specif
ce of the oper
sure that all e
opriate outlets
ed off by a ma
when:
press the locko
p” is displayed
Pa
Date: February 17
manner:
Maintenance
n based on th
fications.
device on the
e feeding-in
ate.
ed on itself an
figuration.
r-down
ns cause an
capacity
oist
he floor.
city of the cha
fication plate.
rator to fully
electrical wire
s or
ain switch or a
out/tagout Esto
d on the status
age | 22
7, 2015
e
he
d
ain
.
es
an
op
s
Nav-Hoist
F10-1.001
© 2015, Tait
Cau
5.7
t Installation a
t Towers Manufa
 The ho
Hoist.
 The lo
load c
Sectio
 The lo
Config
Hoist f
 The lif
 The ch
to Sec
 The ch
 The ho
Safety
ution
MAKIN
The Nav
monitorin
external
Figure 5.1
Ref D
1 L
2 P
3 N
4 L
Ensur
hoist w
and Maintena
acturing, LLC. All
oist is secure
oad cell is pro
ell is required
on 5.9: Attach
oad chain is re
guring the Hoi
for a Double-f
ft limiter is sec
hain bag and
ction 5.11: Mo
hain bag can
oist operator
y Check prior
G CONNEC
v-Hoist head-e
ng and contro
devices to th
: Nav‐Hoist Con
Device Conn
Load Cell
Pickle
Navigator Net
L-Com
re that the cha
when the dead
ance – Revisio
l rights reserved.
ly and safely
perly attache
d to achieve th
ing the Load
eeved proper
ist for a Singl
fall Applicatio
cured to the d
the dead end
ounting the Ch
accommodat
performs the
to hoist opera
CTIONS
end unit conta
ol devices. Us
e Nav-Hoist.
ntrol Connection
ection Co
Co
Co
E-
Co
twork In/
In/
Et
ain bag has suf
d end of the lo
on 1.0
Rev. 1.0
suspended. R
d to the hoist
he desired sa
Cell to the Ho
ly in the relev
le-fall Applica
on.
dead end of th
d of the chain
hain Bag
te the weight
daily safety c
ation.
ains a connec
se this illustra
ns 
onnection Ty
onnection A
onnection B
Stop
ontrol
/Out 1
/Out 2
hernet
fficient capacit
oad chain is no
Refer to Sect
t and to the su
afety factor an
oist for detaile
vant direction.
tion or to Sec
he chain.
are attached
and the lengt
check as deta
ction box for m
ation as a refe
ype Cabl
XLR-
XLR-
XLR-
XLR-
Ether
Ether
Cat 5
ty to contain th
ot inside the ch
Issue D
ion 5.8: Susp
upporting stru
nd BGV rating
ed instruction
. Refer to Sec
ction 5.10.2: C
d to the moun
th of the chain
ailed in Sectio
making conne
erence when c
le Type
-5
-5
-4
-7
rnet
rnet
5e
he load chain.
hain bag.
Pa
Date: February 17
pending the
ucture. The
g. Refer to
s.
ction 5.10.1:
Configuring th
t bracket. Ref
n.
on 6.3: Daily
ections to
connecting
Never run the
age | 23
7, 2015
he
fer
e
Nav-Hoist
F10-1.001
© 2015, Tait
5.8
 
t Installation a
t Towers Manufa
SUSPE
The Nav
adapter
two mou
applicati
under th
Figure 5.2
Ref. De
1 Su
2 Su
3 Su
4 Su
5 Su
6 Su
7 Ch
The susp
configura
point mu
double-f
The num
lift, the s
Specifica
informat
and Maintena
acturing, LLC. All
NDING THE
v-Hoist offers
to suspend th
unting pattern
on. The differ
e chain sproc
: Single‐hole Su
escription
uspension Ey
uspension Ey
uspension Ey
uspension Ho
uspension Ho
uspension Ho
hain Bag Sup
pension point
ation, either a
ust move whe
all application
mber of falls d
safety factor, a
ations and to
ion.
ance – Revisio
l rights reserved.
E HOIST
a single-hole
he hoist from
s, one for a s
rent mounting
cket wheel.
spension Eye Ad
e: Single-fall
e: Double-fal
e: Marking Ar
ook: Single-fa
ook: Double-fa
ook: Marking A
pport
t for the Nav-H
as a single-fal
en the Nav-Ho
n.
etermines the
and the safety
Section 4.5:
on 1.0
Rev. 1.0
suspension e
an appropria
ingle-fall app
g locations en
dapter and Hoo
Hole-pattern
l Hole Pattern
rrow
ll Hole-pattern
all Hole Patte
Arrow
Hoist suspens
ll or as a doub
oist configurat
e lift capacity,
y rating for th
BGV Hoist Sp
eye adapter a
te rigging stru
lication and o
nsure that the
ok Suspension Ad
n
n
ern
sion adapter
ble-fall config
tion changes
, the lift speed
e hoist. Refe
pecifications f
Issue D
and a hook su
ucture. Both a
one for a doub
e load is prope
dapter 
depends on t
guration. This
between a si
d, the maximu
r to Section 4
for detailed lo
Pa
Date: February 17
uspension
adapters have
ble-fall
erly located
the chain
suspension
ingle-fall and
um length of
4.4:
oad and safet
age | 24
7, 2015
e
a
ty
Nav-Hoist
F10-1.001
© 2015, Tait
5.8
War
Cau
t Installation a
t Towers Manufa
8.1 Mountin
rning
ution
Use the
Figure 5.3
Ref.
1
2
3
4
5
1. Det
sing
2. Inse
the
arro
3. Alig
app
bra
4. Inse
the
5. Thr
6. Fee
Ensur
the ho
single
Ensur
as the
and Maintena
acturing, LLC. All
ng the Suspe
following illus
: Suspension Ho
Description
Suspension H
Mount Bracke
Washer
110-mm Eye
½-in. Bow Tie
termine the a
gle-fall or as a
ert the suspe
hoist. Ensure
ow on the hoi
gn the hole-pa
plication (depe
cket.
ert the two ey
holes in the m
read the rema
ed a bow tie c
re that the sus
oist. Make sure
e-fall or a doub
re that the mar
e chain bag.
ance – Revisio
l rights reserved.
ension Hook
stration as a g
ook Configuratio
Hook
et
Loop Pin
e Cotter Pin
ppropriate co
a double-fall c
nsion hook (F
e the marking
st body, locat
attern on the
ending on the
ye loop pins (4
mount bracke
aining washer
cotter pin (5) t
pension hook
e the position
ble-fall applicat
rking arrow on
on 1.0
Rev. 1.0
guide to moun
on 
onfiguration fo
configuration.
Figure 5.3, ite
g arrow on the
ted on the sid
suspension h
e hoist configu
4) through a w
et and the sus
rs (3) onto the
through the h
is mounted pr
of the suspens
tion.
n the suspensi
nt the suspen
or the hoist to
.
em 1) into the
e suspension
de with the ch
hook for a sing
uration) with t
washer (3) an
spension ada
e other side o
holes on both
roperly for the
sion device is
on adapter is
Issue D
nsion hook to
support the l
mount brack
adapter is al
hain bag.
gle-fall or for
the hole-patte
nd then feed t
apter.
of the eye loop
ends of each
e current load c
mounted prop
on the same s
Pa
Date: February 17
the hoist.
oad, either as
ket (2) on the
igned with the
a double-fall
ern on the mo
the pins throu
p pin.
h eye loop pin
configuration o
perly to suppo
side of the hois
age | 25
7, 2015
s a
top of
e
ount
ugh
n (4).
of
ort a
st
Nav-Hoist
F10-1.001
© 2015, Tait
5.8
War
Cau
t Installation a
t Towers Manufa
8.2 Mountin
The sing
suspens
rning
ution
1. Det
sing
2. Pla
eac
3. Inse
the
the
Ensur
config
prope
Ensur
as the
and Maintena
acturing, LLC. All
ng the Single
gle-hole suspe
sion eye to the
termine the a
gle-fall or as a
ce the space
ch side of the
ert the suspe
top of the ho
arrow on the
re that the sing
guration of the
erly to support
re that the mar
e chain bag.
ance – Revisio
l rights reserved.
e-hole Suspe
ension eye re
e Nav-Hoist m
ppropriate co
a double-fall c
rs (item 1) be
suspension e
nsion eye (4)
oist. Ensure th
e hoist body, l
gle-hole suspe
hoist. Make s
a single-fall or
rking arrow on
on 1.0
Rev. 1.0
ension Eye
equires the us
mount bracket
onfiguration fo
configuration.
etween the ho
eye.
between the
he marking ar
ocated on the
ension eye is m
ure the positio
r a double-fall
n the suspensi
se of two spac
t.
or the hoist to
.
oist casing (2)
e hoist suspen
rrow on the su
e side with the
mounted prope
on of the suspe
application.
on adapter is
Issue D
cers that help
support the l
) and the mou
nsion support
uspension ey
e chain bag.
erly for the cur
ension device
on the same s
Pa
Date: February 17
p to secure the
oad, either as
unt bracket (3
ts (5), located
ye is aligned w
rrent load
is mounted
side of the hois
age | 26
7, 2015
e
s a
3) on
d on
with
st
Nav-Hoist
F10-1.001
© 2015, Tait
5.8
War
Cau
t Installation a
t Towers Manufa
4. Alig
app
sup
the
5. Inse
thro
6. Thr
7. Fee
(7).
8.3 Changin
rning
ution
To chang
(to suppo
1. Low
ada
2. Det
3. Rem
Res
4. Pul
the
5. To
sus
a.
b.
c.
d.
Ensur
of the
suppo
Ensur
as the
and Maintena
acturing, LLC. All
gn the hole-pa
plication (depe
pport and the
suspension e
ert the two 11
ough the hole
read the rema
ed a ½-in. bow
.
ng the Suspe
ge the suspe
ort a single-fa
wer the hoist a
apter.
tach the load
move the ½-in
serve the two
l the eye loop
four washers
support a diff
spension adap
Reposition t
or double-fa
Ensure the m
the hoist bod
Feed the eye
Attach the w
side of each
re that the sus
hoist. Make s
ort a single-fall
re that the mar
e chain bag.
ance – Revisio
l rights reserved.
attern on the
ending on the
mount bracke
eye.
10-mm eye lo
es in the moun
aining washer
w tie cotter pi
ension Adap
nsion adapte
all or double-f
and ensure it
cell from the
n. bow tie cot
o pins.
p pins out of t
s.
ferent hoist ap
ptor:
he mounting
ll application.
marking arrow
dy.
e loop pins th
washer and th
eye loop pin
pension adap
sure the positio
or a double-fa
rking arrow on
on 1.0
Rev. 1.0
suspension e
e hoist configu
et. Align the h
op pins (6) th
nt bracket and
rs onto the oth
n (8) through
ter
r or to change
fall hoist confi
is supported
suspension a
tter pins from
he suspensio
pplication (sin
holes on the
w on the susp
hrough the mo
en feed a bow
.
ter is mounted
on of the suspe
all application.
n the suspensi
eye for a singl
uration) with t
holes on the s
hrough the wa
d the suspens
her side of th
h the holes on
e the orientat
iguration):
from below b
adapter.
the same en
on adapter an
ngle-fall or do
suspension a
pension adapt
ount bracket a
w tie cotter pi
d properly for t
ension device
.
on adapter is
Issue D
le-fall or for a
the hole-patte
spaces with th
asher (7) and
sion adapter.
e eye loop pi
n both ends of
tion of the cur
before remov
d of each eye
nd the mount
ouble-fall) with
adapter to sup
ter is aligned
and the suspe
in through the
the current loa
e is mounted p
on the same s
Pa
Date: February 17
a double-fall
ern on the ho
he hole-patte
then feed the
n.
f each eye loo
rrent adapter
ing the suspe
e loop pin.
bracket. Rese
h the same
pport a single
with the arrow
ension adapte
e hole on the
ad configuratio
roperly to
side of the hois
age | 27
7, 2015
ist
rn on
e pins
op pin
ension
erve
e-fall
w on
er.
other
on
st
Nav-Hoist
F10-1.001
© 2015, Tait
 
t Installation a
t Towers Manufa
6. To
a.
b.
c.
d.
e.
7. To
a.
b.
c.
d.
e.
f.
and Maintena
acturing, LLC. All
switch from a
Remove the
Insert the su
the suspens
side with the
Align the ho
application (
mount brack
Feed the eye
Attach the w
side of each
switch from a
Remove the
Place the sp
on each side
Insert the su
marking arro
located on th
Align the ho
application (
mount brack
Feed the eye
Attach the w
side of each
ance – Revisio
l rights reserved.
a single-hole s
e suspension e
uspension hoo
sion hook is a
e chain bag.
le-pattern on
(depending on
ket.
e loop pin thr
washer and th
eye loop pin
a suspension
e suspension
pacers betwee
e of the suspe
uspension eye
ow on the sus
he side with t
le-pattern on
(depending on
ket.
e loop pin thr
washer and th
eye loop pin
on 1.0
Rev. 1.0
suspension e
eye and the t
ok into the mo
ligned with th
the suspensi
n the hoist co
rough the mou
en feed a bow
.
hook to a sin
hook from the
en the hoist s
ension eye.
e between the
spension eye
he chain bag
the suspensi
n the hoist co
rough the mou
en feed a bow
.
eye to a suspe
two spacers f
ount bracket.
he arrow on th
on hook for a
onfiguration) w
unt bracket a
w tie cotter pi
ngle-hole susp
e mount brac
suspension su
e hoist suspe
is aligned wit
.
on hook for a
onfiguration) w
unt bracket a
w tie cotter pi
Issue D
ension hook:
from the moun
Ensure the m
he hoist body,
a single-fall or
with the hole-p
nd the suspe
in through the
pension eye:
ket.
upport and the
nsion suppor
th the arrow o
a single-fall or
with the hole-p
nd the suspe
in through the
Pa
Date: February 17
nt bracket.
marking arrow
, located on th
r for a double
pattern on the
nsion adapte
e hole on the
e mount brac
rts. Ensure the
on the hoist b
r for a double
pattern on the
nsion adapte
e hole on the
age | 28
7, 2015
w on
he
-fall
e
r.
other
cket
e
body,
-fall
e
r.
other
Nav-Hoist
F10-1.001
© 2015, Tait
5.9
t Installation a
t Towers Manufa
ATTAC
A load c
directly p
style loa
encounte
2948.35
structure
The follo
the Nav-
Figure 5.4
Ref. De
1 XL
2 Lo
3 ¾-
4 Lo
5 Su
Proper p
be orient
Hoist (Fi
other co
load cell
and Maintena
acturing, LLC. All
HING THE
ell is a transd
proportional to
d cell that mo
ers an underl
kg (6500.0 lb
e.
owing illustrat
-Hoist.
: Load Cell Conf
escription
LR-5 connecto
oad Cell Bolt
-in. Bow Tie C
oad Cell
uspension Ad
planning is es
tated at a 90°
gure 5.4, abo
nnection devi
remains at a
ance – Revisio
l rights reserved.
LOAD CELL
ducer that crea
o the force be
onitors the loa
oad or an ove
bs) and attach
ion shows the
figuration 
or and cable
Cotter Pin
apter
sential for acc
° angle in rela
ove, shows th
ice to the sup
a 90° angle.
on 1.0
Rev. 1.0
L TO THE H
ates an electr
eing measure
ad attached to
erload situatio
hes directly to
e proper insta
curate operat
ation to the su
e proper orie
pporting struct
HOIST
rical signal w
ed. The Nav-H
o the hoist an
on. The load c
o the hoist an
allation and al
tion of the loa
uspension ada
entation). Con
ture may be r
Issue D
ith a magnitu
Hoist comes w
nd sends a sig
cell has a cap
d to the supp
lignment of th
ad cell. The lo
apter connec
nnection of a p
required to en
Pa
Date: February 17
de that is
with a dog-bo
gnal when it
pacity of
porting
he load cell on
oad cell must
ted to the Na
pear ring or
nsure that the
age | 29
7, 2015
ne
n
v-
e
Nav-Hoist
F10-1.001
© 2015, Tait
t Installation a
t Towers Manufa
1. Ens
2. Rem
the
3. Pla
ada
(1).
4. Rot
face
5. Pos
to t
sus
stru
6. Slid
sec
spin
7. Con
of t
Sec
and Maintena
acturing, LLC. All
sure the hoist
move the ¾-i
bow tie pin, b
ce the open e
apter, with the
.
tate the load c
es the head-e
sition the top
he truss. Ens
spension adap
ucture to ensu
de the bolt thr
cure with the ¾
ndle ensures
nnect the fem
he XLR-5 cab
ction 5.7: Mak
ance – Revisio
l rights reserved.
t is supported
n. bow tie cot
bolt, and the
end of the loa
e load cell con
cell through th
end of the hoi
part of the loa
sure the top a
pter. Use a pe
ure proper alig
rough the load
¾-in bow tie c
the bolt is ce
male end of th
ble to the Loa
king Connecti
on 1.0
Rev. 1.0
d from below p
tter pin from t
bolt spindle.
ad cell (item 2
nnector (3) fa
he suspensio
ist and the op
ad cell so it st
nd bottom of
ear ring betwe
gnment, if ne
d cell, the bol
cotter pin. En
ntered.
e XLR-5 cabl
ad Cell port on
ions).
prior to attach
the bolt from t
2) so it straddl
acing away fro
on adapter so
pen end of the
traddles the s
the load cell
een the load
cessary.
lt spindle, and
sure the bolt
le to the load
n the Nav-Ho
Issue D
hing the load
the top of the
les the hoist s
om the head-e
that the load
e load cell fac
supporting str
is at a 90° an
cell and the s
d the grapple
is inside the s
cell; then con
oist head-end
Pa
Date: February 17
cell.
load cell. Re
suspension
end of the ho
cell connecto
ces up.
ructure conne
ngle relative to
supporting
or pear ring a
spindle; the
nnect the mal
unit (refer to
age | 30
7, 2015
eserve
oist
or (3)
ected
o the
and
le end
Nav-Hoist
F10-1.001
© 2015, Tait
5.10
t Installation a
t Towers Manufa
0 INSTAL
The Nav
number
safety fa
to Sectio
The illus
installati
Figure 5.5
Ref. D
1 C
2 L
3 L
and Maintena
acturing, LLC. All
LLING THE
v-Hoist suppo
of falls determ
actor, and the
on 4.5: BGV H
stration below
on.
: Load Chain Ins
Description
Chain Bag Su
Load Chain E
Load Chain E
ance – Revisio
l rights reserved.
LOAD CHA
orts a single-fa
mines the lift c
safety rating
Hoist Specific
w shows the e
stallation 
upport
Enters Nav-Ho
Exits Nav-Hois
on 1.0
Rev. 1.0
AIN
all or a double
capacity, the
for the hoist.
cations for det
ntry and exit p
oist
st
e-fall load cha
lift speed, the
. Refer to Sec
tailed load an
points for the
Issue D
ain configurat
e maximum le
ction 4.4: Spe
nd safety infor
e load chain d
Pa
Date: February 17
tion. The
ength of lift, th
ecifications an
rmation.
uring
age | 31
7, 2015
he
nd
Nav-Hoist
F10-1.001
© 2015, Tait
5.1
t Installation a
t Towers Manufa
10.1 Configu
1. Ens
unit
2. Con
Ma
3. Atta
the
4. Fee
the
5. Use
guid
ava
6. Fee
7. Atta
a.
b.
c.
8. Low
cha
9. Pre
with
and Maintena
acturing, LLC. All
uring the Hois
sure the Nav-
t. Refer to Se
nnect the pow
king Connect
ach the pull-in
side closest
ed the pull-in
hoist from th
e the inching
de. Inch the c
ailable to acco
ed the rubber
ach the Crosb
Remove the
Feed the firs
Insert the pin
link of the lo
wer the load c
ain extends fro
ess the rubber
h the steel wa
ance – Revisio
l rights reserved.
st for a Sing
-Hoist is prope
ection 5.8: Sus
wer cord and t
tions for inform
n wire to the f
to the mount
wire through
e other side o
control button
chain through
ommodate the
r limit stop ont
by single-gate
e pin from the
st link of the lo
n through the
ad chain, and
chain until app
om the under
r buffer (part
asher end fac
on 1.0
Rev. 1.0
le-fall Applic
erly supporte
spending the
the control pi
mation about
first flat chain
bracket (Figu
the jam-free
of the jam-fre
n on the contr
the hoist unt
e load hook.
to the end of
ed load hook
top of the ho
oad chain (ite
e hole on one
d then through
proximately 5
rside of the ho
of the lift limit
cing the hoist.
cation
d to allow acc
Hoist.
ckle to the ho
connecting d
link and inse
ure 5.5, item 2
plate and the
e plate.
rol pickle to fe
til a sufficient
the chain com
to the chain,
ook (item 2, ab
em 1) into the
side of the lo
h the hole on
50 cm (19.69
oist.
ter assembly)
Issue D
cess to the un
oist. Refer to S
devices to the
ert into the jam
2).
e chain guide
eed the chain
amount of th
ming from the
below the lim
bove).
top of the ho
oad hook, then
the other sid
in.) of the dea
) onto the dea
Pa
Date: February 17
nderside of th
Section 5.7:
e hoist.
m-free plate fr
until the wire
n into the chai
e chain is
e hoist.
mit stop:
ook.
n through the
de of the hook
ad-end of the
ad-end of the
age | 32
7, 2015
he
rom
exits
in
e first
k.
load
chain
Nav-Hoist
F10-1.001
© 2015, Tait
Cau
War
5.1
t Installation a
t Towers Manufa
10. Atta
buf
ution
11. Mo
12. Lub
Lub
bag
rning
13. Mo
twis
10.2 Configu
1. Ens
unit
2. Con
Ma
3. Atta
the
4. Use
guid
5. Pul
The lif
chain
Do no
twists
and Maintena
acturing, LLC. All
ach the lift lim
ffer so it rests
unt the chain
bricate the loa
bricating the L
g using only th
nitor the load
sts. Ensure th
uring the Hois
sure the Nav-
t. Refer to Se
nnect the pow
king Connect
ach the pull-in
side closest
e the inching
de until the en
l the live-end
ft limiter is des
from running o
ot place the loa
in the chain.
ance – Revisio
l rights reserved.
miter to the thi
on top of the
bag. Refer to
ad chain and
Load Chain).
he hoist moto
chain as it m
he load chain
st for a Doub
-Hoist is prope
ection 5.8: Sus
wer cord and t
tions for inform
n wire to the f
to the mount
control button
nd of the cha
of the load c
signed as a me
out of the hois
ad chain into th
on 1.0
Rev. 1.0
rd link from th
e lift limiter.
o Section 5.11
let it run into t
Feed the load
or.
moves through
is held taut w
ble-fall Appli
erly supporte
spending the
the control pi
mation about
first flat chain
bracket (Figu
n on the contr
in exits the bo
hain through
echanical ends
st. DO NOT re
he chain bag m
he dead-end
1: Mounting t
the chain bag
d chain throug
h the hoist bo
when feeding
ication
d to allow acc
Hoist.
ckle to the ho
connecting d
link and inse
ure 5.5, item 2
rol pickle to fe
ody of the ho
the hook bloc
stop to preven
ely on the lift lim
manually; this
Issue D
of the chain.
the Chain Bag
g (refer to Sec
gh the hoist a
ody and the ch
into the hoist
cess to the un
oist. Refer to S
devices to the
ert into the jam
2).
eed the chain
ist.
ck using the p
nt the dead en
miter as a lowe
action may ca
Pa
Date: February 17
Move the rub
g.
ction 6.8.3:
and into the c
hain bag for a
t.
nderside of th
Section 5.7:
e hoist.
m-free plate fr
n into the chai
pull-in wire.
nd of the load
er-limit switch.
ause knots or
age | 33
7, 2015
bber
hain
any
he
rom
in
Nav-Hoist
F10-1.001
© 2015, Tait
Cau
t Installation a
t Towers Manufa
ution
6. Rem
7. Pla
a fla
8. Sec
is n
9. Use
app
und
10. Pre
cha
Never
with a
assem
not be
and Maintena
acturing, LLC. All
move the fou
ce the chain
at position.
cure the chain
not twisted.
e the inching
proximately 50
derside of the
ess the rubber
ain with the st
r allow the cha
an untwisted ch
mbly. Ensure th
ecome tangled
ance – Revisio
l rights reserved.
r (4) bolts from
end coming o
n guide to the
control button
0 cm (19.69 i
hoist.
r buffer (part
teel washer e
ain to twist betw
hain is not pos
hat the hook b
d.
on 1.0
Rev. 1.0
m the chain g
out of the hoo
e hoist casing
n on the contr
n.) of the dea
of the lift limit
nd facing the
ween the chai
ssible, cut one
block does not
guide and low
ok block into t
using the fou
rol pickle to lo
ad-end of the
ter assembly)
hoist.
in outlet and th
e chain link and
t turn or swive
Issue D
wer.
he chain hois
ur bolts. Ensu
ower the load
load chain ex
) onto the dea
he hook block
d remove to al
l so that the tw
Pa
Date: February 17
st casing pock
ure the load c
hook until
xtends from th
ad-end of the
. If an assemb
llow correct
wo chain falls d
age | 34
7, 2015
ket in
hain
he
load
bly
do
Nav-Hoist
F10-1.001
© 2015, Tait
War
5.11
t Installation a
t Towers Manufa
11. Atta
buf
12. Mo
13. Lub
the
only
rning
14. Mo
Ens
1 MOUNT
The cha
for hoist
where it
The cha
bracket a
the load
Use the
support f
Figure 5.6
Ref. D
1 C
2 S
3 C
4 L
5 C
Do no
twists
and Maintena
acturing, LLC. All
ach the lift lim
ffer so it rests
unt the chain
bricate the ch
Load Chain)
y the hoist mo
nitor the load
sure the load
TING THE C
in bag is an a
applications
is more aesth
in bag mount
also provides
chain is conn
following illus
for the load c
: Chain Bag and
Description
Chain Bag Su
Soft-link lap li
Carabiner
Load Chain S
Chain Bag St
ot place the loa
in the chain.
ance – Revisio
l rights reserved.
miter to the thi
on top of the
bag. Refer to
ain and let it r
. Feed the loa
otor.
chain as it m
chain is held
CHAIN BAG
accessory use
where a slack
hetic to conce
ts to the rear o
s a separate s
nected directly
stration as a r
hain.
 Load Chain Sup
upport (one su
nk (connects
Support (one s
rap
ad chain into th
on 1.0
Rev. 1.0
rd link from th
e lift limiter.
o Section 5.11
run into the c
ad chain throu
moves into the
taut when fe
ed to hold sla
k chain may i
eal the slack c
of the mount
support for the
y to the hoist.
reference to m
pport 
upport on eac
dead-end of
support on ea
he chain bag m
he dead-end
1: Mounting t
chain bag (refe
ugh the hoist
e hoist body a
eding into the
ck chain. The
nterfere with
chain.
bracket on th
e load chain.
.
mount the cha
ch side of mo
load chain to
ach side on ea
manually; this
Issue D
of the chain.
the Chain Bag
er to Section
and into the
and the chain
e hoist.
e chain bag is
the load or fo
he Nav-Hoist.
This support
ain bag and to
ount bracket)
o chain bag su
ach side of m
action may ca
Pa
Date: February 17
Move the rub
g.
6.8.3: Lubrica
chain bag us
bag for any t
s recommend
or applications
The mount
ensures that
o attach the
upport)
mount bracket
ause knots or
age | 35
7, 2015
bber
ating
ing
twists.
ed
s
)
Nav-Hoist
F10-1.001
© 2015, Tait
Cau
War
5.12
t Installation a
t Towers Manufa
1. Fee
for
App
2. Atta
mo
with
3. Atta
stra
4. Clo
5. Atta
bra
6. Fee
7. Clo
ution
8. Lub
Lub
bag
9. Mo
twis
rning
2 CONFIG
The Nav
configura
ceiling ra
which al
To config
convertin
1. Rem
2. Rem
3. Low
4. Rem
5. Rem
6. Dis
7. Obt
Sec
The s
soft-lin
Do no
twists
and Maintena
acturing, LLC. All
ed the load ch
a Single-fall A
plication, dep
ach the narrow
unting holes (
h the load gat
ach each stra
ap rests on th
ose the gate o
ach the soft-li
cket.
ed the first lin
ose the soft-lin
bricate the loa
bricating the L
g using only th
nitor the load
sts. Ensure th
GURING TH
v-Hoist can be
ation the load
ather than the
lows the load
gure the Nav-
ng the hoist:
move the load
move the load
wer the hoist a
move the load
move the cha
connect the p
tain a chain d
ction 1.5: Tec
oft-link lap link
nk lap link afte
ot place the loa
in the chain.
ance – Revisio
l rights reserved.
hain into the N
Application or
ending on the
w end of each
(1) on the mo
te facing the h
ap (5), located
e wider end o
on each carab
nk lap link to
k of the dead
nk lap link to s
ad chain and
Load Chain).
he hoist moto
chain as it m
he load chain
HE HOIST F
e converted fo
d fall and the d
e floor. Inverte
chain to feed
-Hoist for mot
d from the ho
d hook from t
and ensure th
d chain from t
ain bag.
power supply
diverter from T
chnical Suppo
k must be com
er it has been c
ad chain into th
on 1.0
Rev. 1.0
Nav-Hoist. Re
r to Section 5
e application.
h carabiner (F
ount bracket. T
hoist.
d on the top o
of the carabin
biner and twis
one of the loa
-end of the lo
secure the loa
let it run into t
Feed the load
or.
moves through
is held taut w
FOR INVERT
or inverted, or
dead-end of t
ed operation r
d into the cha
tor-down use
ist.
he chain.
hat it is secure
the hoist.
from the hois
TAIT, if one d
ort for contact
mpletely closed
closed.
he chain bag m
efer to Section
.10.2: Config
Figure 5.6, ite
The carabine
of the chain ba
ner.
st the lock sle
ad chain supp
oad chain to th
ad chain to th
the chain bag
d chain throug
h the hoist bo
when feeding
TED USE
r motor-down
the load chain
requires the u
ain bag.
perform the f
ely supported
st.
did not ship wi
t information.
d to perform as
manually; this
Issue D
n 5.10.1: Con
guring the Hois
em 3) to the c
ers must hang
ag, to a carab
eve to secure
port locations
he soft-link la
he mount brac
g (refer to Sec
gh the hoist a
ody and the ch
into the hoist
n, operation. I
n are orientat
use of a chain
following acti
d.
ith the Nav-H
s expected. Ne
action may ca
Pa
Date: February 17
nfiguring the H
ist for a Doubl
chain bag
g straight dow
biner. Ensure
e the gate.
s (4) on the m
ap link (2).
cket.
ction 6.8.3:
and into the c
hain bag for a
t.
n the inverted
ed toward the
n diverter,
ons prior to
oist. Refer to
ever reuse a
ause knots or
age | 36
7, 2015
Hoist
le-fall
wn
the
mount
hain
any
d
e
Nav-Hoist
F10-1.001
© 2015, Tait
t Installation a
t Towers Manufa
Use the
load cha
Figure 5.7
Ref. Des
1 Loa
2 Loa
3 Cha
4 Mo
and Maintena
acturing, LLC. All
following illus
ain into the ch
7: Nav‐Hoist Con
scription
ad Hook
ad Chain
ain Diverter
unt Bracket
ance – Revisio
l rights reserved.
stration as a r
hain bag.
nfigured for Inve
Ref. Des
5 Car
6 Qui
7 Cha
on 1.0
Rev. 1.0
reference to a
erted Operation
scription
rabiner (for ch
ck Release L
ain Bag
add the chain
 
hain bag supp
Link
Issue D
diverter and
port)
Pa
Date: February 17
to feed the
age | 37
7, 2015
Nav-Hoist
F10-1.001
© 2015, Tait
Cau
War
t Installation a
t Towers Manufa
ution
rning
1. Ens
sup
2. Rem
the
3. Pla
fou
of t
4. Rec
5. Atta
bra
6. Fee
belo
7. Clo
8. Atta
Alw
with
Ensur
hoist w
Prior t
proce
and Maintena
acturing, LLC. All
sure the powe
pported so the
move the jam
jam-free plat
ce the chain
r screw holes
he diverter is
connect the h
ach the soft-li
cket.
ed the first lin
ow).
ose the soft-lin
ach the wire h
ways feed the
h the wire hoo
re that the cha
when the dead
to performing a
dures and obs
ance – Revisio
l rights reserved.
er is disconne
e jam-free pla
m-free plate by
te for later use
diverter (2) ov
s with the thre
positioned ov
hoist to the po
nk lap link to
k of the dead
nk lap link to s
hook to the fir
chain from th
ok into the ch
ain bag has suf
d end of the lo
any maintenan
serve all releva
on 1.0
Rev. 1.0
ected from the
ate (item 1, be
y removing th
e.
ver the area t
eads on the ho
ver the chain
ower supply a
one of the loa
-end of the lo
secure the loa
rst flat chain li
he side oppos
ain pocket.
fficient capacit
oad chain is no
nce on the equ
ant safety prec
e hoist and th
elow) is on top
he four screws
that held the j
oist. Align the
bag support.
and attach the
ad chain supp
oad chain to th
ad chain to th
ink and feed t
site the chain
ty to contain th
ot inside the ch
uipment, follow
cautions requi
Issue D
hat the hoist is
p.
s. Retain the
jam-free plate
e chain diverte
.
e pickle contro
port holes on
he soft-link la
he mount brac
the wire into t
bag (2) and p
he load chain.
hain bag.
w all lockout/ta
ired by the app
Pa
Date: February 17
s securely
screws and s
e and align th
er so the tall
ol.
the mount
ap link (item 1
cket.
the chain dive
push the chai
Never run the
agout
plicable AHJ.
age | 38
7, 2015
store
he
end
,
erter.
in
e
Nav-Hoist
F10-1.001
© 2015, Tait
t Installation a
t Towers Manufa
9. Use
and
bag
10. Con
out
11. Atta
Cha
12. Atta
and Maintena
acturing, LLC. All
e the inching
d then into the
g side of the h
ntinue to mov
side the hoist
ach the chain
ain Bag. Plac
ach the load h
ance – Revisio
l rights reserved.
control button
e chain divert
hoist (3).
ve the chain th
t.
bag to the m
ce the slack en
hook or load b
on 1.0
Rev. 1.0
n on the contr
er until the ch
hrough the ho
mounting brac
nd of the cha
block to the liv
rol pickle to fe
hain emerges
oist until the d
ket. Refer to
in into the ch
ve end of the
Issue D
eed the chain
s from the dive
desired length
Section 5.11:
ain bag.
e chain.
Pa
Date: February 17
n into the moto
erter on the c
h of chain rem
: Mounting the
age | 39
7, 2015
or
chain
mains
e
Nav-Hoist
F10-1.001
© 2015, Tait
 
 
 
6.1
6.2
Cau
t Installation a
t Towers Manufa
GENER
This sec
intervals
equipme
lubricatio
HOIST
The tabl
performe
Hoist Op
ution
Inspec
Genera
inspect
inspect
inspect
Functio
of the b
of the li
Adjust
of the b
of the c
Load C
inspect
lubricat
measur
Hook T
inspect
measur
lubricat
Only a
parts.
hoist m
and Maintena
acturing, LLC. All
RAL
ction describe
s to perform th
ent, regular re
on of the parts
MAINTENA
e below provi
ed on a daily,
perating Instru
ction
al Hoist Insp
t external hois
t jam-free plat
t chain bag
onal Check
brake
ift limiter
ment
brake
clutch
Chain Mainte
t for wear and
te chain
re chain
Tackle/Block
t rubber buffe
re load hook
te bearings
a trained and q
In addition, an
maintenance.
ance – Revisio
l rights reserved.
s basic hoist
hese procedu
eplacement of
s that require
ANCE SCHE
ides a summa
a quarterly, o
uctions (issue
ection
st body
te
enance
d deformities
k Maintenanc
r
qualified hoist
nnual hoist ins
on 1.0
Rev. 1.0
maintenance
res. This sec
f items that ar
e it.
EDULE
ary of the ma
or a yearly ba
e April 2011) f
Daily
X
X
X
X
X
X
ce
X
specialist can
spections mus
6:
e procedures a
ction includes
re expected to
intenance act
asis. Refer to
for further ma
Quarterly
X
X
X
n examine, disa
st be performed
Issue D
Main
and provides
general inspe
o wear out ov
tions that mu
the Liftket Ele
aintenance ins
Annual
X
X
X
assemble, and
d by an agenc
Pa
Date: February 17
ntenan
recommende
ections of
ver time, and
st be
ectric Chain
structions.
d replace hois
cy certified in
age | 40
7, 2015
nce
ed
st
Nav-Hoist
F10-1.001
© 2015, Tait
Info
6.3
1. Are the h
the requi
2. Is the loa
sufficient
3. Is the loa
under loa
process?
4. Is the sin
eye or th
connecte
bracket u
5. Are the b
suspens
Hoist alig
6. Can the
the lengt
chain? T
complete
not spill o
t Installation a
t Towers Manufa
ormation
DAILY
The follo
prior to o
before o
hard and soft lim
ired fall configura
ad chain lubricate
tly?
ad chain taut, wh
ad, during the fee
?
ngle-hole suspen
he hook suspens
ed to the hoist m
using the proper
blue arrows on th
ion device and th
gned?
chain bag accom
th and weight of t
The slack chain m
ely inside the bag
over the top.
The m
applic
freque
and Maintena
acturing, LLC. All
SAFETY C
owing table su
operating the
operating the h
its set to
ation?
ed Corre
due to t
runs sm
hen not
eding-in
DO fe
and into
Ensure
feeding
nsion
ion
ount
pattern?
he
he Nav-
mmodate
the load
must fit
g and
maintenance sc
cation. Hoists u
ency of the abo
A
ance – Revisio
l rights reserved.
HECK
ummarizes th
hoist. Make s
hoist.
Refer to the Liftk
ect: The load cha
the presence of s
moothly into and
eed the load cha
o the chain bag u
the load chain is
into the hoist.
chedule is des
used in outdoo
ove listed task
Double‐Fa
Aligned 
Co
on 1.0
Rev. 1.0
e safety chec
sure you can
ket Electric Chain
ain has a glossy
sufficient lubrican
out of the hoist.
ain through the ho
using only the mo
s held taut when
signed for hois
or or touring ap
ks.
ll Alignment
orrect 
cks that must
answer “Yes
n Hoist Operatin
y sheen
nt and
Inco
appe
TAIT rec
 HIPER
 Lubripl
oist
otor.
DO N
bag man
the moto
chain.
sts installed in
pplications ma
Issue D
be performed
” to each que
ng Instructions (is
orrect: The load
earance.
commends the fo
RTECH SLP Sup
late Bar and Cha
NOT place the lo
nually; DO NOT le
or to prevent knot
a permanent
ay need to incr
Single‐Fall A
Not Aligned
Pa
Date: February 17
d each day
estion below
ssue April 2011)
chain has a dull
ollowing lubricant
er Lubricant Pen
ain Oil 1-04
oad chain into the
et a slack chain
ts or twists in the
indoor
rease the
Alignment 
d 
Incorrect
age | 41
7, 2015
ts:
netrant
e chain
enter
e
t 
Nav-Hoist
F10-1.001
© 2015, Tait
7. Is the loa
and kinks
perpendi
and belo
parallel t
on the ot
fall chain
8. Is the loa
of any ob
vertical p
9. Will the h
specified
operation
listed on
the red a
t Installation a
t Towers Manufa
ad chain free of t
s? Each link is
icular to the link a
ow (1), and each
o its correspond
ther side of the d
n (2).
ad chain free and
bstructions along
path?
hoist remain belo
d duty cycle durin
n? The duty cycle
the hoist’s label
area).
and Maintena
acturing, LLC. All
wists
above
link is
ing link
double-
d clear
g its
ow its
ng this
e is
(refer to
ance – Revisio
l rights reserved.
Correct
on 1.0
Rev. 1.0 Issue D
Inco
Pa
Date: February 17
orrect 
age | 42
7, 2015
Nav-Hoist
F10-1.001
© 2015, Tait
6.4
In
General Ho
inspect ex
inspect ja
inspect ch
Functional
of the bra
of the lift l
Load Chain
inspect fo
deformitie
lubricate c
Hook Tack
Maintena
inspect ru
inspect th
t Installation a
t Towers Manufa
DAILY
The tabl
prior to u
Correct a
that is de
Ensure t
possible
nspection
oist Inspection
xternal hoist bod
am-free plate
hain bag
l Check
ake
limiter
n Maintenance
or wear and
es
chain
kle/Block
ance
ubber buffer
he hook
and Maintena
acturing, LLC. All
MAINTENA
e below is su
using the hois
any deficienc
eemed unserv
that the unser
reuse.
 Opera
excess
 Inspec
the ½-
 Check
 Inspec
Check
 Inspec
for dam
 Inspec
y
 Load t
determ
load to
 Check
the loa
 Check
chain a
person
 Inspec
or mat
 Replac
 Inspec
or twis
 Inspec
operat
 Check
ance – Revisio
l rights reserved.
NCE
mmary of the
st.
ies found bef
viceable with
rviceable part
te the hoist witho
sive vibration or
ct the suspension
-in. bow tie cotter
k that all fastener
ct the electrical c
k for cuts in the w
ct the jam-free pl
mage or twists.
ct the chain bag f
the maximum allo
mined height. Ho
o just above the f
k the lift limiter fo
ad chain.
k the entire load c
and check the ja
nnel should repla
ct the load chain
tte appearance w
ce the jam-free p
ct the rubber buff
sts.
ct the hook tackle
tion.
k for external evid
on 1.0
Rev. 1.0
e daily mainte
fore the hoist
new parts be
ts are destroy
out a load and pe
movement. Liste
n adapter to mak
r pins are secure
rs are adequately
ords and the con
wire and exposed
ate for wear. Re
for wear. Replac
owed weight to t
ld the weight for
floor. Repeat this
r wear or damag
chain for wear, c
am-free plate, rub
ace the load chai
for sufficient lub
with a lubricant pe
plate, chain guide
fer. Replace if wo
e or hook block f
dence of damage
enance action
is returned to
efore the hois
yed and prope
Actions
erform a visual in
en for abnormal n
ke sure it is fully s
ed to the eye-loo
y tight and secur
ntrol cables for s
d copper.
place if the plate
ce if tears are pre
the hoist and slow
10 seconds, and
s procedure.
ge and ensure it i
cracks, and defor
bber buffer, and c
in.
ricant. Lubricate
enetrant with ant
e, and the hold d
orn or deformed
for wear, damage
e to the hook saf
Issue D
s that must b
o service. Rep
st is returned t
erly disposed
nspection of the
noises, which co
seated in the mo
p pins.
re.
igns of wear or d
e is deformed and
esent.
wly and smoothly
d then slowly and
is securely attach
rmities. If damag
chain guide for d
the chain, as re
ti-friction treatme
down when the c
and check the lo
e, twists, latch en
fety pin and hook
Pa
Date: February 17
e performed
place any par
to service.
to prevent
hoist component
uld indicate a pro
ount bracket and
damaged insulati
d check the load
y raise the load a
d smoothly lower
hed to the dead
ed, replace the l
damage. Only tra
quired, if it has a
ent.
hain is replaced.
oad chain for dam
ngagement and l
k nut.
age | 43
7, 2015
rt
ts for
oblem.
that
ion.
d chain
a pre-
r the
end of
oad
ained
a dull
.
mage
latch
Nav-Hoist
F10-1.001
© 2015, Tait
6.5
6.5
t Installation a
t Towers Manufa
INSPEC
The follo
maintena
hook.
5.1 Daily Ma
1. Insp
sec
2. Insp
and
3. Insp
mu
poin
Figu
4. If th



5. Insp
a d
to S
6. Insp
Ens
wea
7. Insp
dam
and Maintena
acturing, LLC. All
CTION INST
owing sections
ance, as well
aintenance
pect the entir
cure. Tighten
pect the susp
d that the ½-in
pect the jam-f
st slide freely
nts should be
ure 6.1: Jam‐free
he jam-free pl
Replace the
chain or cau
Inspect the l
free plate. R
Inspect the c
chain guide.
pect the load
ull or matte a
Section 6.8.3:
pect the lift lim
sure that the l
ar or stress.
pect the elect
maged insulat
ance – Revisio
l rights reserved.
TRUCTIONS
s provide deta
as specific in
e hoist casing
any fasteners
pension adapt
n. bow tie cot
free plate for
y through the j
e clear with we
e Plate 
late is damag
jam-free plat
use the load c
oad chain. A
Refer to Sectio
chain guide. A
chain for suff
ppearance w
Lubricating t
miter, attache
lift limiter is se
trical cords, c
tion. Check fo
on 1.0
Rev. 1.0
S
ailed instructi
nstructions for
g and check t
s that are loos
ter to make su
ter pins are s
any wear or d
jam-free plate
ell-defined ed
ged:
te. A damage
chain to twist.
damaged or
on 6.8: Load C
A damaged ja
ficient lubrica
with a lubricant
the Load Cha
ed to the dead
ecurely attach
control cables
or cuts in the
ions for perfo
r maintaining
that all fasten
se and replac
ure it is fully s
secured to the
deformation (
e and the cha
dges, as illust
ed plate may c
twisted load c
Chain Mainte
am-free plate
ant. Lubricate
t penetrant w
ain.
d end of the lo
hed to the loa
, and connec
wire and exp
Issue D
rming daily a
the load cha
ers are adeq
ce any fastene
seated in the
e eye-loop pin
(item 1, below
ain guide. The
trated below:
cause damag
chain may da
enance.
may cause d
the chain, as
with anti-frictio
oad chain ins
ad chain and
ctors for signs
posed copper.
Pa
Date: February 17
nd monthly
in and the loa
uately tight an
er that is strip
mount bracke
ns.
w). The load c
e chain entry
ge to the load
amage the jam
damage to the
s required, if it
on treatment.
ide the chain
shows no sig
s of wear or
.
age | 44
7, 2015
ad
nd
pped.
et
chain
m-
e
t has
Refer
bag.
gns of
Nav-Hoist
F10-1.001
© 2015, Tait
6.5
6.6
Ove
6.7
War
6.8
t Installation a
t Towers Manufa
5.2 Three-m
1. Insp
the
or d
2. Ens
bra
3. Ens
a.
b.
c.
4. Insp
dam


FUNCT
The func
capacity
maximum
erhead Load C
1. Low
load
2. Con
3. Rai
sec
issu
4. Low
5. Rep
low
res
insp
6. Low
7. Rem
ADJUS
Refer to
instructio
rning
LOAD C
The load
hoists fo
the hoist
Ensur
functio
Only c
and Maintena
acturing, LLC. All
month Mainte
pect the chain
hoist mount
damage is vis
sure the gate
cket) is locke
sure that the c
Insert the ch
Run the enti
Check that t
the chain ba
pect the chain
maged, replac
Inspect the l
Inspect the j
IONAL BRA
ctional brake t
allowed for e
m load capac
Caution
wer the load c
d to the chain
nnect the max
ise the load c
conds. Ensure
ued.
wer the load c
peat the raisin
wer the chain i
ponse to the
pection or ser
wer the load c
move the load
TMENT TO
the Liftket Ele
on.
CHAIN MAI
d chain suppli
or lifting loads
t body.
re that the area
onal brake tes
certified perso
ance – Revisio
l rights reserved.
enance
n bag for any
bracket for an
sible.
on each cara
ed and secure
chain does no
hain end with
re chain throu
he length of t
ag.
n guide and th
ce it and the h
oad chain for
am-free plate
AKE TEST
test requires
each hoist. Re
city.
chain so that h
n while the loa
ximum allowe
chain so that t
e the hoist sto
chain so that t
ng and loweri
in smooth ma
stop comman
rvice.
chain so the lo
d from the ho
BRAKE AN
ectric Chain H
NTENANCE
ed with the N
. The load ch
a below the ho
st.
nnel should ad
on 1.0
Rev. 1.0
tears or sign
ny tearing or f
abiner (which
e.
ot overload th
the lift limiter
ugh the hoist
the load chain
he hold down
hold down an
r damage.
e.
a load of a w
efer to Sectio
hook tackle o
ad is securely
ed weight to th
the hoist fully
ops lifting the
the load is jus
ing procedure
anner to avoid
nd is not imm
oad is secure
ok tackle or t
D CLUTCH
Hoist Operatin
E
Nav-Hoist is in
ain should fe
oist is clear of
djust the brake
ns of wear. Ch
fraying. Repla
connects the
he chain bag.
and its rubbe
and into the
n does not ex
n for any dam
nd:
eight that equ
n 4.5: BGV H
or the hook blo
y resting on th
he hook tackl
supports the
load promptly
st suspended
e one more tim
d jerking the c
ediate, conta
ely on the floo
the hook bloc
ng Instruction
ntended for us
ed smoothly a
people and ob
e and clutch.
Issue D
heck the strap
ace the chain
e chain bag to
er bumper ins
chain bag.
xceed the max
age. If the ch
uals the maxi
Hoist Specifica
ock is low eno
he floor.
le or to the ho
load and hol
y after the sto
d above the flo
me. Take car
chain. If the lo
act TAIT for a
or.
k.
ns (issue Apri
se solely with
and quietly in
bjects prior to
Pa
Date: February 17
ps connected
n bag if any te
o the mount
side the chain
ximum capac
hain guide is
mum load
ations for
ough to apply
ook block.
d for ten (10)
op command
oor.
re to raise and
oad slips or th
full brake
l 2011) for
h electric chai
nto and out of
performing the
age | 45
7, 2015
to
ears
n bag.
city of
y a
is
d
he
n
f
e
Nav-Hoist
F10-1.001
© 2015, Tait
6.8
Info
6.8
t Installation a
t Towers Manufa
8.1 Inspecti
The load
accident
operatio
normal c
load cha
1. Vis



2. If yo
guid
3. Doc
4. Rep
guid
Liftk
rep
ormation
8.2 Measuri
Measure
nominal
compone
and chec
replace a
Proper c
and the
Only p
load c
and Maintena
acturing, LLC. All
ing the Load
d chain must b
t prevention s
n and after ap
conditions. Th
ain is increase
ually inspect
Exterior defe
Wear, crack
Deformed or
plate and the
guide can tw
ou detect def
de. The load
cument all ins
place the load
de and the ho
ket Electric C
lace the load
ing the Load
e the load cha
length or thic
ents. If the loa
ck the jam-fre
as necessary
chain measure
eleven-link pi
personnel train
chain.
ance – Revisio
l rights reserved.
Chain
be inspected
standard requ
pproximately
he frequency o
ed due to the
the load chai
ects, including
s, or deforma
r twisted links
e chain guide
wist or deform
formed or twis
chain must sl
spection findin
d chain if any
old down mus
Chain Hoist Op
chain, the ch
Chain
ain every thre
ckness under
ad chain mea
ee plate, the c
y.
ement require
tch.
ned in installin
on 1.0
Rev. 1.0
at regular int
ires that the l
200 operating
of inspections
effects of hea
n for:
g rusted, dent
ation of the po
s. Deformed o
e. Conversely
m the load cha
sted links, the
lide freely thro
ngs in the app
of the above
st be replaced
perating Instr
hain guide, an
e months. Th
normal use, w
asurements a
chain guide, a
es measuring
g, removing, a
ervals. Comp
oad chain be
g hours or 10
s must be inc
at and wear.
ted, or burred
oints of contac
or twisted link
, a damaged
ain.
en inspect the
ough the jam
propriate insp
e defects are d
d if the load c
ructions (issue
nd the hold do
he load chain
which may ca
re out of toler
and the hook
g the average
and inspecting
Issue D
pliance to the
e tested before
0,000 load cyc
creased if the
d links.
ct between lin
ks can damag
or worn jam-f
e jam-free pla
-free plate an
pection log.
detected. Not
hain is replac
e April 2011)
own.
may deviate
ause damage
rance then re
tackle/block f
wire diamete
g load chains m
Pa
Date: February 17
BVG 8
e starting
cles, under
demand on t
nks.
ge the jam-fre
free plate or c
te and the ch
nd the chain g
te that the cha
ced. Refer to t
for instruction
from its
e to other hois
eplace the cha
for wear and
er, inner pitch
must replace t
age | 46
7, 2015
he
e
chain
hain
guide.
ain
the
ns to
st
ain
,
he
Nav-Hoist
F10-1.001
© 2015, Tait
Note
t Installation a
t Towers Manufa
1. Me
ave
oth
Figu
2. Use
3. Me
Figu
4. Me
belo
Figu
5. Rep
cha
Ch
Av
In
In
e
Repla
Refer
instruc
and Maintena
acturing, LLC. All
asure and rec
erage wire dia
er measurem
ure 6.2: Dimensi
e the following
asure and rec
ure 6.3: Measure
asure and rec
ow. A gauge
ure 6.4: Measure
place the cha
ain):
hain Measure
verage wire d
ner pitch of o
ner pitch of 1
ace the jam-fre
to the Liftket E
ctions.
ance – Revisio
l rights reserved.
cord the diam
ameter. Take
ment.
onal measurem
g formula to c
cord the inne
ement of inner p
cord the inner
is available fr
ement of 11‐link
ain if any of th
ement
imension (dm
ne link (t)
1 links (11t)
ee plate, chain
Electric Chain
on 1.0
Rev. 1.0
meters d1 and
the measure
ments for chain w
calculate the a
r pitch (t) of e
pitch 
r pitch of ever
rom the chain
k interval 
ese measure
Repla
m) 6.3
(10%
23.
(5% i
246
(2% i
guide, and th
Hoist Operatin
d d2, as illustr
ments at a 90
wire 
average wire
every individu
ry eleven (11
n manufacture
ements are ou
ace chain if m
3 mm
% reduction in
.1 mm
ncrease in no
6.8 mm
ncrease in no
e hold down w
ing Instructions
Issue D
rated below, t
0° angle with
diameter (dm
al link as illus
) links (11t) a
er, RUD, at ht
ut of tolerance
measuremen
nominal thick
ominal length
ominal length
when the chain
s (issue April 2
Pa
Date: February 17
o determine t
respect to the
m):
strated below
as illustrated
ttp://www.rud
e (for a 7 x 22
nt is
kness)
)
)
n is replaced.
2011) for
age | 47
7, 2015
the
e
:
.com.
2 mm
Nav-Hoist
F10-1.001
© 2015, Tait
6.8
6.9
t Installation a
t Towers Manufa
8.3 Lubricat
Proper lu
operatio
condition
hot or di
1. Vis
glos
cau
2. If th
3. Pla
on
4. Low
5. Spr
to c
rec


6. Rai
thro
app
7. Low
coa
HOOK
A hook t
a double
Figure 6.5
The follo
1. Insp
dam
2. Insp
latc
a.
b.
c.
d.
3. Che
and Maintena
acturing, LLC. All
ting the Load
ubrication inc
n. Lubricate t
ns, but you m
rty environme
ually inspect
ssy sheen du
use drips.
he load chain
ce a bucket o
the floor unde
wer the load c
ray the load c
coat the load
ommends the
HIPERTECH
(http://www.
Lubriplate B
(http://www.
ise the load c
ough the hois
plied to the en
wer the load c
ats the entire
TACKLE/HO
tackle is used
e-fall hoist con
: Hook tackle (le
owing mainten
pect the rubb
mage or twists
pect the hook
ch and the ho
Replace the
Inspect the o
Check the sc
screw that s
Check the h
cracks or de
eck for extern
ance – Revisio
l rights reserved.
d Chain
reases the life
the load chain
ay need to ap
ent.
the load chai
ue to the prese
has a dull or
or container th
er the hoist.
chain into the
chain with a lu
chain but not
e following lub
H SLP Super
hipertech.com
ar and Chain
lubriplate.com
chain again un
t. Spray the n
ntire length of
chain until the
load chain.
OOK BLOC
with a single
nfiguration.
eft) and hook bl
nance proced
er buffer. Rep
s.
k and check fo
ok body. If th
hook.
other load sus
crews in the t
hows signs o
ook tackle or
eformities are
nal evidence o
on 1.0
Rev. 1.0
e of the load
n every three
pply lubricant
n for sufficien
ence of suffic
matte appea
hat is large en
bucket until y
ubricant pene
as much to c
bricants:
Lubricant Pe
m/spip/pdf/SL
Oil 1-04
m/Products/Sp
ntil the spraye
next section o
f chain.
e lift limiter is a
K MAINTEN
e-fall hoist con
lock (right) deta
dures apply to
place if worn
or any twists
e hook is twis
staining parts
tackle or bloc
of wear.
the hook bloc
present.
of damage to
chain and he
months unde
t more freque
nt lubricant. T
cient lubricant
arance, then lu
nough to cont
you reach the
trant with ant
cause drips o
netrant
LPLEN.pdf)
pecialty-Lubr
ed section of t
of the chain. R
at its upper lim
NANCE
nfiguration an
ail 
o hook tackles
or deformed
or an excess
sted:
s for defects.
ck for any ben
ck body for d
the hook saf
Issue D
elps to ensure
er normal ope
ntly if the hois
The load chain
t, but not too
ubricate the c
tain the lengt
e lower limit.
ti-friction treat
r pools of lub
icants/Bar-Ch
the load chai
Repeat until lu
mit to ensure
nd a hook bloc
s and to hook
and check th
ive opening b
nds or breaks
amage and re
fety pin and h
Pa
Date: February 17
e safe hoist
erating
st is used in a
n should have
much lubrican
chain.
h of the load
tment sufficie
ricant. TAIT
hain-Oil.aspx)
n has passed
ubricant has b
that the lubri
ck is used wit
k blocks.
e load chain f
between the s
. Replace any
eplace if any
ook nut.
age | 48
7, 2015
a
e a
nt to
chain
ntly
)
d
been
icant
th
for
safety
y
Nav-Hoist
F10-1.001
© 2015, Tait
6.10
t Installation a
t Towers Manufa
4. Che
pro
hoo
latc
5. Me
on
Figure 6.6
6. Com
the
7. Che
a.
b.
Des
Ho
7
8. Lub
spr
0 RETURN
If you ha
1. Em
2. Onc
Num
3. Pac
4. Incl
con
5. Shi
res
prio
equ
and Maintena
acturing, LLC. All
eck the safety
perly with suf
ok and allow t
ch or the hook
asure the len
the load hook
: Hook measure
mpare the y-d
measured le
eck the screw
The screws
Check the to
signation
ok block for a
7 x 22 chain
bricate the an
ocket with an
ING EQUIP
ave to return a
mail a descript
ce contact ha
mber” (RMA #
ck the equipm
lude the RMA
ntainer.
p the unit with
ponsible for d
or to completi
uipment as so
ance – Revisio
l rights reserved.
y latch for dam
fficient spring
the latch to sp
k if the latch d
gth between
k.
ement 
dimension me
ngth is greate
ws that secure
should be tig
orque values
Screw Qu
a 2
(screws c
1
(screw clo
ti-friction bea
n anti-friction b
PMENT FOR
any equipmen
ion of the pro
as been estab
#) and shippin
ment securely
A # on the shi
h insurance fo
damage incur
ng the repair.
oon as possib
on 1.0
Rev. 1.0
mage or bend
pressure to k
pring back to
does not oper
the chisel pun
easurement to
er than 10% o
e the hook tac
ht and show
for each scre
uantity
closer to the h
oser to the ru
rings after 20
bearing greas
R SERVICE
nt to TAIT for
oblem or failur
blished, obtain
ng instruction
in a sturdy sh
pping manife
or the full valu
rred during sh
. Once costs
ble.
ds. Ensure the
keep the latch
the tip when
rate properly.
nch marks (d
o the value lis
of the listed v
ckle or hook b
no signs of w
ew to the follow
hook)
bber buffer)
0,000 lifting cy
se.
service, plea
re to navigato
n a “Returned
ns from the Se
hipping crate
st/documents
ue of the mer
hipping. TAIT
are approved
Issue D
e latch opens
h tightly again
released. Re
imension y in
sted in the ho
alue, replace
block casing.
wear or strippi
wing toleranc
Screw
Dimensions
M8x50 DIN 9
M8x50 DIN 9
ycles on the h
ase follow the
orsupport@ta
d Merchandise
ervice Depart
.
s and exterior
rchandise. TA
will advise on
d, we will repa
Pa
Date: February 17
s and closes
nst the tip of t
place the safe
n the figure be
ook certificate
the load hoo
ng.
ces:
s
Tighte
Torque
912 20 Nm
912 10 Nm
hook and cha
se steps:
ittowers.com
e Authorizatio
tment.
r of the shippi
AIT cannot be
n costs to rep
air and return
age | 49
7, 2015
the
ety
elow)
. If
ok.
ning
e
in
.
on
ing
e held
pair
your
Nav-Hoist
Installation & Maintenance
ORIGINAL INSTRUCTIONS REVISION 1.0 FEBRUARY 2015

More Related Content

Similar to NavHoist_Installation_and_Maintenance_02172105_Rev_2

Fiat kobelco e22 sr mini crawler excavator service repair manual
Fiat kobelco e22 sr mini crawler excavator service repair manualFiat kobelco e22 sr mini crawler excavator service repair manual
Fiat kobelco e22 sr mini crawler excavator service repair manualfhsejkdkme
 
Fiat kobelco e25 sr mini crawler excavator service repair manual
Fiat kobelco e25 sr mini crawler excavator service repair manualFiat kobelco e25 sr mini crawler excavator service repair manual
Fiat kobelco e25 sr mini crawler excavator service repair manualfhsejkdkme
 
Fiat kobelco e22 sr mini crawler excavator service repair manual
Fiat kobelco e22 sr mini crawler excavator service repair manualFiat kobelco e22 sr mini crawler excavator service repair manual
Fiat kobelco e22 sr mini crawler excavator service repair manualidkkmdmd
 
New holland mh plus wheel excavator service repair manual
New holland mh plus wheel excavator service repair manualNew holland mh plus wheel excavator service repair manual
New holland mh plus wheel excavator service repair manualfjjskekmsemm
 
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...fujdfjjjsekkemme
 
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...iekkdmmem
 
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...fusjejfskekfsmem
 
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...fujjsefjkskem
 
Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...fujsjfjkskekmm
 
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...fujdwjjsekkemme
 
Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...fujfjjjskekemm
 
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...fujdfjjskekmwem
 
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...fuksfemmeme
 
Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...fusjefjsekksemm
 
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...fjskkddmmmse
 
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...fsefkksefmme
 
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...fjsjefksekkksemm
 
Case tv380 tier 4 a alpha series compact track loader service repair manual p...
Case tv380 tier 4 a alpha series compact track loader service repair manual p...Case tv380 tier 4 a alpha series compact track loader service repair manual p...
Case tv380 tier 4 a alpha series compact track loader service repair manual p...fujdfjjskkkemw
 
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...fdujdfjjsekkem
 

Similar to NavHoist_Installation_and_Maintenance_02172105_Rev_2 (20)

Fiat kobelco e22 sr mini crawler excavator service repair manual
Fiat kobelco e22 sr mini crawler excavator service repair manualFiat kobelco e22 sr mini crawler excavator service repair manual
Fiat kobelco e22 sr mini crawler excavator service repair manual
 
Fiat kobelco e25 sr mini crawler excavator service repair manual
Fiat kobelco e25 sr mini crawler excavator service repair manualFiat kobelco e25 sr mini crawler excavator service repair manual
Fiat kobelco e25 sr mini crawler excavator service repair manual
 
Fiat kobelco e22 sr mini crawler excavator service repair manual
Fiat kobelco e22 sr mini crawler excavator service repair manualFiat kobelco e22 sr mini crawler excavator service repair manual
Fiat kobelco e22 sr mini crawler excavator service repair manual
 
New holland mh plus wheel excavator service repair manual
New holland mh plus wheel excavator service repair manualNew holland mh plus wheel excavator service repair manual
New holland mh plus wheel excavator service repair manual
 
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...
 
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
 
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
 
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
 
Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...
 
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
 
Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...
 
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr250 tier 4 a alpha series skid steer loader service repair manual pin ...
 
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
 
Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...Case tr320 tier 4 a alpha series compact track loader service repair manual p...
Case tr320 tier 4 a alpha series compact track loader service repair manual p...
 
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv300 tier 4 a alpha series skid steer loader service repair manual pin ...
 
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sr220 tier 4 a alpha series skid steer loader service repair manual pin ...
 
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
 
Case tv380 tier 4 a alpha series compact track loader service repair manual p...
Case tv380 tier 4 a alpha series compact track loader service repair manual p...Case tv380 tier 4 a alpha series compact track loader service repair manual p...
Case tv380 tier 4 a alpha series compact track loader service repair manual p...
 
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
Case sv250 tier 4 a alpha series skid steer loader service repair manual pin ...
 
Pick carry-cranes-risk-assessment
Pick carry-cranes-risk-assessmentPick carry-cranes-risk-assessment
Pick carry-cranes-risk-assessment
 

NavHoist_Installation_and_Maintenance_02172105_Rev_2

  • 1. Nav-Hoist Installation & Maintenance ORIGINAL INSTRUCTIONS REVISION 1.0 FEBRUARY 2015
  • 2. Nav-Hoist Installation & Maintenance ORIGINAL INSTRUCTIONS REVISION 1.0 FEBRUARY 2015
  • 3. Nav-Hoist F10-1.001 © 2015, Tait AER MACH OBLIG ASSESS SAFE OPERA DAMAGE REHEAR FOR P DAILY. t Installation a t Towers Manufa RIAL PERFOR HINERY OPE ATION OF T THE SAFET E PERFORMA ATORS AND E, PERSONA RSE ALL MAN PERFORMER TEST AND V and Maintena acturing, LLC. All RMANCES, S ERATION AR HE PURCHA TY ASPECTS ANCE PARAM PERFORME AL INJURY O NUAL AND A R FLIGHT OR VALIDATE A ance – Revisio l rights reserved. WA STUNTS, POW RE DANGERO ASER AND/O S OF ITS USE METERS, UT RS, AND AS R DEATH. R AUTOMATIC R OVERHEAD ALL EMERGE on 1.0 Rev. 1.0 ARNING WERED OVE OUS ACTIVIT R USER OF E AND APPLI TILIZE TRAIN SSUME ALL R EAD THE OP OPERATION D HOISTING. ENCY STOPS ERHEAD LIFT TIES. IT IS TH THIS EQUIP ICATION, OP NED AND QU RISKS OF US PERATION M N WITH TEST INSPECT AN S AND SAFET Issue D TING, AND A HE RESPONS MENT AND S PERATE EQU UALIFIED PE SE, INCLUDI MANUAL PRI T WEIGHT B ND TEST AL TY SYSTEMS P Date: February 17 AUTOMATED SIBILITY AN SOFTWARE UIPMENT WI RSONNEL A NG PROPER OR TO USE, EFORE ANY LL EQUIPMEN S REGULAR Page | 1 7, 2015 D D TO THIN AS RTY , AND Y USE NT RLY.
  • 4. Nav-Hoist F10-1.001 © 2015, Tait SAFE Operator               t Installation a t Towers Manufa ETY STATE The use damage for maxim TAIT req to opera and to th manufac hoists m industria safety in that this If the ho the hoist the hoist taken ou examine operator Operato attachme Hoist op or under cause a Neither t to perso  Using operat  Modify manuf  Opera weight  Failing  Modify  Using The follo with all s containe understa responsi involving r Name (print and Maintena acturing, LLC. All EMENT of any electr . This manua mum safety a quires that ea ting or mainta he recommen cturer recomm ust be operat al electric hois structions in t manual be st ist displays a t is damaged t or if the hois ut of service a e the equipme r not in compl rs must be fa ent of the load erators are no r the influence hazard to the the manufactu n or property the electric c tion as descri ying the electr facturer ating the elect t for such hois g to inspect an ying the hoist the hoist for p owing operato safety informa ed in this man ands that any ibility. Operat g the hoist. ted) ance – Revisio l rights reserved. ic chain hoist l contains imp and performan ch operator re aining the hoi ded preventa mendations w ted and maint sts. Any perso this manual is tored to allow n unexpected or malfunctio st has not bee and isolated u ent. Immediate iance with thi miliar with pro d to the hoist ot to operate e of medicatio e operator or o urer nor deale or the lack of chain hoist in a bed in this m ric chain hois tric chain hois st nd maintain th purposes oth ors have read ation, warning ual as well as accidents tha tor understand Date               on 1.0 Rev. 1.0 t presents som portant inform nce. ead and unde st. Adherence ative maintena will ensure safe tained by per on who has no s not qualified w quick access d behavior (no ons, if you hav en inspected o ntil a trained ely inform a s s manual or t oper rigging p . a hoist when on that would others. er of this hois f operation of a manner tha anual t without the st with a load he hoist er than provid , understood, gs, cautions, r s any labels o at occur with ds that TAIT w Si               me risk of per mation to oper erstand the co e to the corre ance schedul e and depend rsonnel traine ot read and u d to operate t s for future re oise, vibration ve doubt conc or maintained and qualified supervisor of the procedure procedures to under the inf result in actio st accepts res f the hoist cau at deviates fro explicit writte that exceeds ded for. , and have be recommendat or warning on the hoist are will not be res ignature Issue D rsonal injury o rate and main ontents of this ect operating p le, as well as dable hoist se ed and qualifie understood al he hoist. TAIT eference and n, frequently b cerning the sa d; then the ho d hoist special such an actio es contained o be followed fluence of alc ons by operat sponsibility for used by the fo om its intende en authorizatio s the maximum ecome thorou tions, and ins n the hoist. Th the operator’ sponsible for P Date: February 17 or property ntain your hoi s manual prio procedures other ervice. All ed in the use l operation an T recommend consultation. blown fuses), afe operation oist must be list can on of another in the manua in the cohol or drugs tor which may r any damage ollowing: ed normal on of the m allowed ughly familiar structions he operator s any accident Page | 2 7, 2015 st or of nd ds if of al. s y e s
  • 5. Nav-Hoist F10-1.001 © 2015, Tait TABLE WARNI Safety S 1:  Intro 1.1  1.2  1.3  1.4  1.5  1.6  1.7  1.8  1.9  1.10  1.10 1.10 2:  Safet 2.1  2.2  2.3  2.4  3:  Gloss 4:  Syste 4.1  4.2  4.2.1 4.2.2 4.3  4.4  4.5  4.6  t Installation a t Towers Manufa E OF CON NG ............... Statement ... oduction ....... General ....... Purpose of th Who Should  Referenced D Technical Su Symbols and Important Sa Limited Warr Manual Accu Legal Inform .1  Copyrig .2  Tradem ty ................. Electrical Saf System Desig Important No Maintenance sary of Terms em Overview  Unpacking .. Parts List ..... 1  Single‐f 2  Double‐ General ....... Specification BGV Hoist Sp BGV Allowan and Maintena acturing, LLC. All TENTS ..................... ..................... ..................... ..................... his Manual ... Read this Ma Documents... pport ...........  Nomenclatu afety Instruct ranty ............ uracy ............. ation ............ ht ................. arks ............. ..................... fety – Genera gn and Safety otices ........... e and Service s .................... .................... ..................... ..................... all, Motor‐up ‐fall, Motor‐u ..................... ns .................. pecifications . nces .............. ance – Revisio l rights reserved. ..................... ..................... ..................... ..................... ..................... anual ............. ..................... ..................... ure ................. ions .............. ..................... ..................... ..................... ..................... ..................... ..................... al Warning ..... y of Personne ..................... ..................... ..................... ..................... ..................... ..................... p and Motor‐d up and Motor ..................... ..................... ..................... ..................... on 1.0 Rev. 1.0 ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... l .................... ...................... ...................... ...................... ...................... ...................... ...................... down ............ ‐down .......... ...................... ...................... ...................... ...................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... Issue D ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... P Date: February 17 ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... Page | 3 7, 2015 ....... 1  ....... 2  ....... 6  ....... 6  ....... 6  ....... 6  ....... 7  ....... 7  ....... 8  ....... 9  ..... 10  ..... 10  ..... 11  ..... 11  ..... 11  ..... 12  ..... 12  ..... 12  ..... 12  ..... 13  ..... 14  ..... 15  ..... 15  ..... 15  ..... 16  ..... 16  ..... 17  ..... 18  ..... 19  ..... 19 
  • 6. Nav-Hoist F10-1.001 © 2015, Tait 4.7  4.7.1 4.7.2 5:  Setu 5.1  5.2  5.3  5.4  5.5  5.6  5.7  5.8  5.8.1 5.8.2 5.8.3 5.9  5.10  5.10 5.10 5.11  5.12  6:  Main 6.1  6.2  6.3  6.4  6.5  6.5.1 6.5.2 6.6  6.7  t Installation a t Towers Manufa Dimensions . 1  Nav‐Ho 2  Nav‐Ho p, Adjustmen General ....... Safety Preca Operating th Prohibitions  Safely Disabl Safely Using  Making Conn Suspending t 1  Mounti 2  Mounti 3  Changin Attaching the Installing the .1  Configu .2  Configu Mounting th Configuring t ntenance ...... General ....... Hoist Mainte Daily Safety C Daily Mainte Inspection In 1  Daily M 2  Three‐m Functional B Adjustment t and Maintena acturing, LLC. All ..................... ist with Single ist with Suspe nt and Operat ..................... utions .......... he Hoist ......... for Use ........ ing Machiner the NAV Hois nections ....... the Hoist ...... ng the Suspe ng the Single‐ ng the Suspen e Load Cell to e Load Chain . ring the Hois ring the Hois e Chain Bag . the Hoist for  ..................... ..................... enance Sched Check ........... enance .......... nstructions .... aintenance .. month Mainte rake Test ...... to Brake and  ance – Revisio l rights reserved. ..................... e‐Hole Suspe ension Hook . tion ............... ..................... ..................... ..................... ..................... ry .................. st .................. ..................... ..................... nsion Hook ... ‐hole Suspen nsion Adapter o the Hoist .... ..................... t for a Single‐ t for a Double ..................... Inverted Use ..................... ..................... dule ............... ..................... ..................... ..................... ..................... enance .......... ..................... Clutch .......... on 1.0 Rev. 1.0 ...................... nsion Eye ..... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... sion Eye ........ r .................... ...................... ...................... ‐fall Applicati e‐fall Applicat ...................... ..................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... on ................ tion .............. ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... Issue D ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... ..................... P Date: February 17 ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... ...................... Page | 4 7, 2015 ..... 20  ..... 20  ..... 20  ..... 21  ..... 21  ..... 21  ..... 22  ..... 22  ..... 22  ..... 22  ..... 23  ..... 24  ..... 25  ..... 26  ..... 27  ..... 29  ..... 31  ..... 32  ..... 33  ..... 35  ..... 36  ..... 40  ..... 40  ..... 40  ..... 41  ..... 43  ..... 44  ..... 44  ..... 45  ..... 45  ..... 45 
  • 7. Nav-Hoist F10-1.001 © 2015, Tait 6.8  6.8.1 6.8.2 6.8.3 6.9  6.10    t Installation a t Towers Manufa Load Chain M 1  Inspecti 2  Measur 3  Lubricat Hook Tackle/ Returning Eq and Maintena acturing, LLC. All Maintenance  ing the Load C ring the Load  ting the Load /Hook Block M quipment For  ance – Revisio l rights reserved. ..................... Chain ............ Chain ...........  Chain........... Maintenance Service ........ on 1.0 Rev. 1.0 ...................... ...................... ...................... ...................... ..................... ...................... ..................... ..................... ..................... ..................... ..................... ..................... Issue D ..................... ..................... ..................... ..................... ..................... ..................... P Date: February 17 ...................... ...................... ...................... ...................... ...................... ...................... Page | 5 7, 2015 ..... 45  ..... 46  ..... 46  ..... 48  ..... 48  ..... 49 
  • 8. Nav-Hoist F10-1.001 © 2015, Tait       1.1 1.2 1.3 t Installation a t Towers Manufa GENER The TAIT the highe BGV-D8 applicati The Nav pocket li for overlo D8+ or th 10:1. Th highest a grade ho The Nav solution, control, I and trou system p Hoist, wh and prec standard PURPO This man operatio maintain that the s procedu this man service i assistan WHO S The follo concepts • A • A • and Maintena acturing, LLC. All RAL T Nav-Hoist is est level of ho 8, BGV-D8+, o on; and it com v-Hoist feature ft wheel for fa oad and unde he BGV-C1 s e addition of and lowest lift oist. v-Hoist is a pa encompassi I/O control, su bleshooting f provides the t hile maintaini cision ensures ds. OSE OF THI nual offers re n, maintenan ning the hoist. system has a res, such as m nual, nor are t s required on ce. SHOULD RE owing personn s and procedu Automation s Automation s Rigging main ance – Revisio l rights reserved. s a fully autom oist safety. Th or with the BG mplies with U es variable sp ast, quiet, and erload monito safety rating, t top and botto t positions, m art of the Nav ng an operato upervisory sa unctions with tools to perfor ng complete s adherence t S MANUAL ference mate ce, and troub It does not c already been p motor replace they intended n your machin EAD THIS M nel should rea ures describe system operat system mainte tenance and on 1.0 Rev. 1.0 mated and int he Nav-Hoist GV-C1 safety L, CE, and C peed operatio d smooth liftin oring; and with the hoist can om limits, as w akes the Nav igator automa or programmi afety control, e in one compr rm intricate an control over t to the most st erial and gene bleshooting, a cover installat permanently ement or syst to be perform nery, please c MANUAL ad this manua ed herein: tors and show enance perso service perso 1 tegrated elec can be config standard, de SA standards on, dual indep ng. The Nav-H h specific con achieve a ma well as two ult v-Hoist a safe ation system; ing environme external syste rehensive env nd precise mo the load. This tringent indus eral informatio and is intende ion of the sys installed. Com tem recommis med by the en contact TAIT T al and familia w personnel onnel onnel Issue D : Intro ctric chain hois gured to comp epending on th s for industria pendent brake Hoist is fitted nfiguration to aximum safet timate limits t e and reliable a complete a ent, motion co ems interface vironment. Th ovements wit s combination stry safety rul on about the b ed for use in o stem, but rath mplicated ser ssioning, are nd user. If this Technical Ser arize themselv P Date: February 17 oducti st that meets ply with the he required al equipment. es, and a five with a load ce meet the BGV ty factor of to set the professional- automation ontrol, show s, and setup he Navigator th the Nav- n of movemen es and basic operating and her assumes rvice not covered i s type of rvice for ves with the Page | 6 7, 2015 on - ell V- - nt in
  • 9. Nav-Hoist F10-1.001 © 2015, Tait 1.4 1.5   t Installation a t Towers Manufa REFER This man images a 2011) in Section Section Section TECHN For direc TAIT Tow 9 Wynfie Lititz, PA 1 (844) A (717) 62 http://ww taitsuppo Emergen and Maintena acturing, LLC. All ENCED DO nual referenc and text from the following 5.8: Suspend 5.9: Attaching 6.8: Load Ch ICAL SUPP ct technical su wers Manufac eld Dr. A 17543 ASK-TAIT 26-9571 ww.taittowers. ort@taittower ncy/after hour ance – Revisio l rights reserved. OCUMENTS es the TAIT N the Liftket El sections: ding the Hoist g the Load Ce ain Maintenan PORT upport, contac cturing, LLC .com rs.com rs (855) NAV- on 1.0 Rev. 1.0 Navigator Sof ectric Chain H ell to the Hois nce ct TAIT at ou -CTRL ftware Operat Hoist Operati st r offices in Lit Issue D tor Manual, a ing Instruction titz: P Date: February 17 nd uses ns (issue Apri Page | 7 7, 2015 il
  • 10. Nav-Hoist F10-1.001 © 2015, Tait 1.6 Dan War Cau Ove Stop Info   t Installation a t Towers Manufa SYMBO Several highlight are expla nger rning ution erhead Cautio p ormation This s not av This s minor This s could impor This s suspe an ove This s neces This s inform or pro and Maintena acturing, LLC. All OLS AND NO symbols are t potentially da ained as follo n symbol indicate voided, this wil symbol indicate r or moderate i symbol indicate cause damag rtant instruction symbol indicate ended overhea erhead load. symbol highligh ssary before m symbol describ mation or a com otection of prop ance – Revisio l rights reserved. OMENCLAT used through angerous act ows: es an imminen ll result in an e es a potentially injury and dam es information ge to the unit o ns accompany es that a user ad and specifie hts a point in a moving to the n bes an operati mpany policy t perty. on 1.0 Rev. 1.0 URE hout this manu tions, or to de ntly hazardous electrical shock y hazardous s mage or risk of n necessary to or to other equ ying the unit. action is requ es additional in a procedure w next step. ng or a progra that relates dir ual to highligh escribe operat s situation or a k, serious bod situation. If not f damage to th o avoid a poten ipment. The s uired in an env nformation to w where an additi amming tip. Th rectly or indirec Issue D ht operating o tional steps. T a potential elec dily injury, or de t avoided, this he unit. ntially hazardo symbol also ale vironment that work safely in ional step or c he symbol may ctly to the safe P Date: February 17 or usage tips, These symbo ctrical hazard. eath. may result in ous situation th erts the user to contains a loa the presence check may be y also indicate ety of personne Page | 8 7, 2015 to ols If hat o ad of e el
  • 11. Nav-Hoist F10-1.001 © 2015, Tait 1.7 Cau War   t Installation a t Towers Manufa IMPORT ution – System rning – Estop Navig system emerg and its specia an imm encou take s depen encou Due to techn unexp perfor care s stop a condit safe u the op either action perso All sys reach MUST MUST and Maintena acturing, LLC. All TANT SAFE m Failsafe Fau Application R ator machiner m detects a cr gency stop init s associated h ally configured mediate and c untered. The a some finite per nd on the com untered, and th o this fail safe ical personnel pected initiatio rmance state o should be take as well as the k tion when adju use. An emerg perator, or auto of these cond n of stopping a nnel or perform stem operators ANY TIME TH T BE USED A T NOT BE OP ance – Revisio l rights reserved. ETY INSTRU lt Reaction Requirements ry and softwar ritical fault, enc tiated the syste hardware and d otherwise, an complete halt a axis will not mo riod of time. Th plexity of the o he skill and ex behavior, care or performers n of the safe m or position for en with the sett known decele usting the perfo gency stop or it omatically due ditions will caus and the rates o mers. s MUST have HE SYSTEM AS THE PRIMA PERATED with on 1.0 Rev. 1.0 UCTIONS re operate colle counters a loss em “fails” to a software, that n axis operate and set its bra ove again until he length of tim overall automa xperience of th e should be ta s when staging machinery stat any persons in tings of the de ration rates of formance para ts equivalent c e to unexpecte se the machin of deceleration a physical, re IS POWERED ARY MEANS hout a physica ectively as a “f s of power or k known safe st t known safe s ed under the N akes when a m l this fault is cle me for recover ation system in e operator in c aken in the pla g a show, so t te of “all stop” n, around, or o efault decelera f the machiner ameters of the can be initiated ed conditions s nery to come to n do not presen ed Emergency D AND IN OP OF EMERGE al Estop button Issue D fail safe” syste key communic tate. In the cas state is “all stop Navigator syste malfunction or E eared or bypa ry of operation nstallation, the control at the t cement and p hat in no insta result in an un on the machin ation rates on a ry during an em machinery or d intentionally such as a pow o a rapid stop nt a danger to y Stop mushro ERATION, an ENCY STOP. T n within reach P Date: February 17 em. When the cation, or has se of Navigato p”. Unless em will come to Estop is assed, which w nal capability w e type of fault time of the fau performance of ance can the nsafe nery. Additiona a commanded mergency stop r assessing its at any time by wer failure, and . Be sure that technical om button with nd this device The system of the operato Page | 9 7, 2015 an or o will will ult. f ally, d p y d the hin or.
  • 12. Nav-Hoist F10-1.001 © 2015, Tait 1.8 1.9   t Installation a t Towers Manufa LIMITE Unless o mechani flaws for the contr TAIT’s fa question the repla for repai and equ Equipme by Client control o condition obtained time per EXPRES INCLUD PARTIC REPRES TAIT BE CONSEQ POSSIB FAILUR IN ANY WILL BE PRODU RELATE BASED ACKNO FAILUR REFLEC AGREEM THE CA MANUA Although typograp alteration the infor for corre and Maintena acturing, LLC. All D WARRAN otherwise stat isms, structur r a period of o ract documen ault TAIT’s so n at TAIT's so acement of th r only. Shippi ipment to and ent failure due t or third parti of TAIT will no ns would be b d by contractin iod beyond th SSLY IN LIEU DING THE WA CULAR PURP SENTATION E LIABLE FO QUENTIAL D BILITY OF SU E TO PERFO EVENT, CUM E LIMITED TO CTS OR SER ED TO THE G ON TORT, C WLEDGE TH E BETWEEN CTED IN THE MENT MAY B AUSE OF ACT AL ACCURA h every effort phical errors a ns may occur mation detaile ections or clar ance – Revisio l rights reserved. NTY ted in the Agr res, electrical one (1) year u nts. Should a ole obligation le expense. T e defective E ng costs for t d from the ins e to misuse, a ies, incidenta ot be covered billed at stand ng for mainte he initial perio U OF ALL OT ARRANTY OF POSE. NO O OR WARRA OR ANY SPEC DAMAGES EV UCH DAMAG ORM COULD MULATIVE D O THE AMOU RVICES. THIS GOODS AND CONTRACT O HAT THIS PA N TAIT AND C E PRICE PAID BE BROUGH TION HAS AC ACY has been ma and/or change r. If you encou ed in this man rification. on 1.0 Rev. 1.0 reement of Sa controls, and upon delivery defect in mat is to repair or TAIT's liability Equipment and transport of de stallation site a abuse, neglec l or shipping d under this wa dard rates. Wa nance, inspec od covered un THER WARR F MERCHAN RAL AGREE NTY SHALL CIAL, INDIRE VEN IF TAIT ES AND EVE CAUSE CON AMAGES FO UNT ACTUA S PARAGRA SERVICES P OR OTHER T ARAGRAPH A CLIENT AND D. NO ACTIO HT BY CLIEN CCRUED. ade to assure es in data due unter an error nual, please c ale or Lease T d software wil of the system terials or work r replace the y under this Li d the direct TA efective equip are the respo ct, lack of pro damage, or o arranty, and r arranty period ction, and rep nder the warra RANTIES, EXP NTABILITY A EMENT, GUA BE BINDING ECT, INCIDEN HAS BEEN A EN IF TAIT HA NSEQUENTIA OR BREACH LLY PAID TO APH SHALL A PROVIDED B THEORIES. T ALLOCATES D THAT THIS ON ARISING T MORE THA this manual e to future eq r or have any contact our of Issue D TAIT warrants ll be free of de m or the perio kmanship occ part(s) or equ imited Warran TAIT personne pment and/or onsibility of the per maintena other means b repair service d extension m pair services w anty. THIS W PRESS OR I ND FITNESS ARANTY, PRO G. IN NO EVE NTAL OR ADVISED OF AS KNOWLE AL ECONOM OF THIS CO O TAIT FOR T APPLY TO A BY TAIT, WH THE PARTIE S THE RISK O ALLOCATIO OUT OF THI AN ONE (1) Y is as accurate quipment or so y questions re ffice at the ad Pa Date: February 17 s that all efects and d indicated pe cur due to uipment in nty is limited t el labor costs r repair tools e Client. ance performe beyond the es under thes may be with TAIT for WARRANTY IS MPLIED, S FOR A OMISE, ENT WILL F THE EDGE THAT MIC LOSSES ONTRACT THE LL ACTIONS HETHER S OF PRODUCT ON IS IS YEAR AFTER e as possible oftware garding any o ddress above age | 10 7, 2015 er to ed e a S . S T R , of
  • 13. Nav-Hoist F10-1.001 © 2015, Tait 1.10 1.1 1.1 t Installation a t Towers Manufa 0 LEGAL 10.1 Copyrig This man This man LLC, and Electric C permissi this docu applicab 10.2 Tradema All hardw registere and Maintena acturing, LLC. All INFORMAT ght nual is ©2015 nual contains d is intended Chain Hoist. I on of TAIT. U ument by any ble laws. arks ware and soft ed trademarks ance – Revisio l rights reserved. TION 5, TAIT Towe s information t for use only b It may be cop Unauthorized y method is st tware product s and must be on 1.0 Rev. 1.0 rs Manufactu that is proprie by purchasers pied or distribu duplication, d trictly prohibite t names used e treated acco uring, LLC. etary to TAIT s and license uted only with distribution, o ed and may r d in this docum ordingly. Issue D Towers Manu es of the TAIT h the express r disclosure o result in prose ment are likely Pa Date: February 17 ufacturing, T Nav-Hoist s written of any part of ecution under y to be age | 11 7, 2015 r
  • 14. Nav-Hoist F10-1.001 © 2015, Tait       2.1 2.2 2.3 t Installation a t Towers Manufa ELECT The volta could be the equip SYSTE All equip incorpor a safety stored e Close at hazards design, i personn IMPORT  ADJUS instruc  GROU device  MOVIN Exces  DAMAG refer s occurr  SERVI qualifie and Maintena acturing, LLC. All RICAL SAF ages used in e lethal. Extre pment. M DESIGN pment discuss ation into a co hazard. Som lectrical energ ttention is req either in norm nstallation, co el who have t TANT NOTI STMENT OF CO ctions. Improp NDING – Follo e connected to NG – Disconne sive force or GE REQUIRING servicing to qu red, such as: - the p - an ob - the u - the u instru - the u CING – Do no ed service pe ance – Revisio l rights reserved. ETY – GEN the system c me care is ne AND SAFE sed in this ma omplete syste e pieces use gy, or are use uired to the e mal operation ommissioning the necessary CES ONTROLS – Ad per adjustmen ow proper saf o this unit. ect the power shock may da G SERVICE – U ualified servic ower supply c bject has falle nit has been nit does not o uctions correc nit has opera ot attempt to s ersonnel. on 1.0 Rev. 1.0 NERAL WAR an cause sev ecessary at al TY OF PER anual is intend em. If installed high voltages ed to control e electrical insta n or in the eve g/start-up and y training and djust only tho nt of other con fety precautio r before movin amage the un Unplug the un ce personnel w cable is dama en on the unit dropped, or it operate norm ctly. ated with a loa service this de RNING vere electrica ll times when RSONNEL ded as a com d incorrectly, s and current equipment wh allation and th ent of equipme d maintenance d experience. ose controls s ntrols may ca ons such as g ng the unit. M nit. nit from the m whenever any aged; ; ts enclosure h ally when the ad in excess o evice yourself Issue D 2: l shock and/o working with mponent for pr the equipme ts, carry a hig hich can caus he system des ent malfunctio e must be ca pecified in the ause damage rounding for a Move the unit main AC powe y damage to has been dam e user follows of its rated ca f. Refer all se Pa Date: February 17 : Safe or burns, and h or adjacent t rofessional nt may prese gh level of se injury. sign to avoid on. System rried out by e operating to the unit. any outdoor with care. er source and the device ha maged; the operating apacity ervicing to age | 12 7, 2015 ety to ent as g
  • 15. Nav-Hoist F10-1.001 © 2015, Tait 2.4 Dan War War t Installation a t Towers Manufa MAINT nger rning rning Before incom Prior t proce Havin In add secure mainte and Maintena acturing, LLC. All ENANCE AN e servicing or ming and outgo to performing a dures and obs g Jurisdiction dition to ensuri e in place, or d enance do not ance – Revisio l rights reserved. ND SERVIC removing equ oing electrical p any maintenan serve all releva (AHJ). ing that power detach and rem t cause damag on 1.0 Rev. 1.0 CE ipment de-ene power. nce on the equ ant safety prec r cannot be res move, any sus ge to any equ ergize all circu uipment, follow cautions requi stored to the s spended load ipment or end Issue D uit breakers as w all lockout/ta ired by the app system inadve so that any er danger any per Pa Date: February 17 ssociated with agout plicable Autho ertently, either rrors during rsonnel. age | 13 7, 2015 ority
  • 16. Nav-Hoist F10-1.001 © 2015, Tait       t Installation a t Towers Manufa The follo  Autho determ govern  Carab  Emerg of an E contro brakes button  Hoist: and fly  Lifting  Load:  Load  Load directl  Rated  Safe W or sus  Safety materi  Three indust and Maintena acturing, LLC. All owing terms a ority Having J mine, mandate ning bodies. biner: A conne gency Stop: Estop button ol system drop s. Gray Estop ns indicate a b : A lifting mac ying bars). g System: As The item sus Capacity: Th Cell: A transd y proportiona d Load: The s Working Loa pended. y Factor: The ial or equipme Phase: A sy rial applicatio ance – Revisio l rights reserved. and abbreviati Jurisdiction e, and enforc ector with a lo A condition tr or automatic ps the secure p buttons indic button that ma chine (includin ssembly of lift spended from he maximum w ducer that is u al to the force sum of the loa d (SWL): Ma e ratio of the u ent to the actu ystem requirin ons. on 1.0 Rev. 1.0 3: ions are used (AHJ): A per ce code requir ockable, self- riggered by o activation by disable signa cate a button ay not be unp ng lighting ho ting machines m the lifting sy weight that th used to create being measu ad and the dyn aximum mass ultimate break ual working s ng three powe : Glos d throughout t rson who has rements estab closing and lo ne of two me Navigator. U al, cuts motor that is able to plugged. ists, chain ho s and accesso ystem. he hoist can lif e an electrica ured. namic forces that is permi king strength stress of safe er leads plus a Issue D ssary o this manual: s the delegate blished by jur oad bearing g ethods: intenti pon entering r power, and o be unplugge oist, winches, ories. ft safely. al signal whos during opera tted to be rais of a member working load a ground, use Pa Date: February 17 of Term ed authority to risdictional gate. onal activatio Estop, the applies the ed, red Estop power hoists se magnitude ation. sed, lowered, r or piece of when in use ed in most age | 14 7, 2015 ms o on p s is , .
  • 17. Nav-Hoist F10-1.001 © 2015, Tait       4.1 4.2 t Installation a t Towers Manufa UNPAC This equ been da Section Technica PARTS The com configura  Norma  Norma  Inverte  Inverte and Maintena acturing, LLC. All CKING uipment shoul maged in ship 4.2: Parts Lis al Support. LIST mponents cont ation: al use (motor- al use (motor- ed use (motor ed use (motor ance – Revisio l rights reserved. ld be unpacke pment, notify st, below, are tained with th -up): Single-fa -up): Double-f r-down): Sing r-down): Dou on 1.0 Rev. 1.0 4 ed and handle the shipper im included. If a he Nav-Hoist p all fall gle-fall ble-fall 4: Sys ed with care. mmediately. V any items are package depe Issue D stem O If an item ap Verify that all missing, notif end on the ch Pa Date: February 17 Overvie pears to have parts listed in fy TAIT hosen age | 15 7, 2015 ew e n
  • 18. Nav-Hoist F10-1.001 © 2015, Tait 4.2 4.2 t Installation a t Towers Manufa 2.1 Single-f Quanti 1 1 1 1 1 1 1 1 2.2 Double- Quanti 1 1 1 1 1 1 1 1 and Maintena acturing, LLC. All fall, Motor-up ty Descript Nav-Hois Nav-Hois Load Ho Chain Ba Chain Di Load Ce Single-h Suspens Cable Pa PowerLo 5-pole, L 4-pin XL 7-pin XL 5-pin XL Ethercon Control P Connect 2 Eye Lo 4 Bow T 4 Washe 1 Soft-lin 2 Carabi 1 Swivel 1 Pear R -fall, Motor-u ty Descript Nav-Hois Nav-Hois Load Blo Chain Ba Chain Di Load Ce Single-h Suspens Cable Pa PowerLo 5-pole, L 4-pin XL 7-pin XL 5-pin XL Ethercon Control P Connect 2 Eye Lo 4 Bow T 4 Washe 1 Soft-lin 2 Carabi 1 Swivel 1 Pear R ance – Revisio l rights reserved. p and Motor- tion st Body st Head with ook, single-ga ag (various si iverter (motor ell ole Suspensi sion Hook ackage: ock L21-30 cable R Cable (E-S R Cable (Con R Cable, 3-ft n Pickle tion Hardware oop Pins, 110 ie Cotter Pins ers nk lap link iners, used to Cable (bullet Ring, ½-in. p and Motor tion st Body st Head with ock and Tackl ag (various si iverter (motor ell ole Suspensi sion Hook ackage: ock L21-30 cable R Cable (E-S R Cable (Con R Cable, 3-ft n Pickle tion Hardware oop Pins, 110 ie Cotter Pins ers nk lap link iners, used to Cable (bullet Ring, ½-in. on 1.0 Rev. 1.0 down Encoder Cap ted Crosby w izes available r-down config on Eye with 2 (Power) Stop) ntrol) (Load Cell) e: 0-mm s, ½-in. o secure chain t), 3.5-in. r-down Encoder Cap le izes available r-down config on Eye (Power) Stop) ntrol) (Load Cell) e: 0-mm s, ½-in. o secure chain t), 3.5-in. p with self-closin e) guration only) 2 spacers n bag to hoist p e) guration only) n bag to hoist Issue D ng gate t t Pa Date: February 17 age | 16 7, 2015
  • 19. Nav-Hoist F10-1.001 © 2015, Tait 4.3 t Installation a t Towers Manufa GENER The follo explaine Figure 4.1 Ref. Des 1 Hea 2 Res 3 Loa 4 Sus 5 Mo and Maintena acturing, LLC. All RAL owing diagram ed in this guid : Nav‐Hoist Key  scription ad-end Unit w sistor ad Cell spension Ada unt Bracket ance – Revisio l rights reserved. ms provide a r e. Components  with Connectio apter on 1.0 Rev. 1.0 reference for Ref. D ons 6 C 7 C 8 L 9 B 10 L the maintena Description Chain Bag M Chain Bag Load Chain ( Block or Tack Load Hook Issue D ance of critica ount and Loa Double-fall sh kle Pa Date: February 17 al parts ad Chain Supp hown) age | 17 7, 2015 port
  • 20. Nav-Hoist F10-1.001 © 2015, Tait 4.4 Electrica Motor Ph Duty Cyc Rated Vo Power Current Full Load Connect Power Control, p Control, n Network Load Cel Encoder Mechani Lift Capa Lift Spee Length of Maximum Standa (280 n High-ro (470 n Environm Operating Enclosure Construc Dimensio with su with su Weight, n Certifica Safety Accesso Chain Type Size Weight Load Cel Type Load C Curren Input V Precisi Operat Compe Safety t Installation a t Towers Manufa SPECIF al hase cle oltage d Amps (FLA) tions pickle network Switch Ports l Ports cal acity d f Lift, standar m Length of L ard Limit Box ominal rotatio otation Limit B ominal rotatio mental g Temperatur e Rating ction ons (L x W x H uspension hoo uspension eye not including c ations and Ap ories t l Capacity nt Rating Voltage ion ting Tempera ensated Temp Factor and Maintena acturing, LLC. All FICATIONS ) rd ift, achievable ons) Box ons), optional re H) ok e chain pprovals ature perature ance – Revisio l rights reserved. 3 Φ + PE 25% 200–240 2.6 kW 9.7 A at 2 15 A (pan 5-pole, L2 4-pin XLR Ethernet Two (2) E Two (2), 5 Incremen require Refer to S Refer to S 22.86 m ( e Single-fal Double-fa Single-fal Double-fa 40° C (10 Type 1 703.46 m (27.69 in. 703.46 m (27.69 in. 51.38 kg Conforms Certified RUD EN 7 x 22 mm 0.74 kg/m Double-s 2948.35 k 4–20 mA 14–40 VD ±2% FSO −46° C to 15° C to 7 10:1 @ 2 on 1.0 Rev. 1.0 E VAC, 50/60 H 208 VAC typic nel) 21-30 cable ( R + 7-pin XLR Ethernet, built 5-pin XLR ca ntal HTL Enco ed configuratio Section 4.5, B Section 4.5, B (75.0 ft) ll: 56.0 m (18 all: 28.35 m (9 ll: 87.78 m (2 all: 43.89 m (1 04° F), maxim mm x 375.55 m . x 14.78 in. x mm x 375.55 m . x 14.78 in. x (113.27 lbs), s to UL 508, C to CSA 22.2 818-7-DAT m m (0.50 lb/ft) train dog bon kg (6500.0 lbs (3-wire) DC O o 121° C (−50 71° C (60° F t Tons (907.18 Hz cal 3 phase + 1 g R t-in bles (4–20 m oder or SSI A on BGV Hoist Sp BGV Hoist Sp 7.0 ft) 93.0 ft) 88.0 ft) 144.0 ft) mum mm x 355.08 x 13.98 in.) mm x 309.36 x 12.18 in.) hoist with su Complies with No. 14 ne s) 0° F to 250° F to 160° F) 8 kg) Issue D ground + 1 ne mA with 24 VD bsolute Enco pecifications pecifications mm mm spension dev h CE Standar F) Pa Date: February 17 eutral) DC supply) oder, based on vice rds, age | 18 7, 2015 n
  • 21. Nav-Hoist F10-1.001 © 2015, Tait 4.5 BGV Ratin D8 D8 D8+ D8+ C1 C1 4.6 t Installation a t Towers Manufa BGV H The Nav standard requirem Theatre Testing a Safety re This tab independ specific g Safety Factor 5:1 5:1 10:1 10:1 10:1 10:1 The safe material (absolute structura how muc BGV A The BGV entertain the safet (static lo This tab BGV Ra D8 D8+ C1 and Maintena acturing, LLC. All HOIST SPEC v-Hoist is capa ds for hoist sa ments. BGV is Engineering, and DIN 5695 equirements a le lists specifi dent dual bra BGV safety ra r Lift Ca ½ ton, 500.0 k 1 ton, 1000.0 k ¼ ton, 250.0 ½ ton, 500.0 k ¼ ton, 250.0 ½ ton, 500.0 k ety factor is a or equipmen e lifting capac al capacity of ch stronger th ALLOWANCE V standard sp nment industr ty requiremen oads) or movin le summarize ting Assemb duri ance – Revisio l rights reserved. CIFICATION able of compl afety, depend s a German st Stage Machi 50: Entertainm and inspectio ic parameters akes, and an i ating and safe apacity kg (1102.31 lbs) kg (2204.62 lbs) kg (551.16 lbs) kg (1102.31 lbs) kg (551.16 lbs) kg (1102.31 lbs) ratio of the u t to the actua city to the act a system bey he system is t ES pecifies the co ry specifically nts for hoist a ng above peo es the actions ling/Dismantling ng setup/breakd NO NO YES on 1.0 Rev. 1.0 NS lying with the ing on lift cap tandard for ho inery - Scene ment technolo ns). s that a ½-ton ncremental e ety factor. Falls Clutc 1 130% of 2 130% of 1 130% of 2 130% of 1 2 ltimate break al working stre ual applied lo yond the expe than it usually odes of practi for chain hos pplications w ople (dynamic allowed unde People allow the hoist down A st BGV-D8, BG pacities, lift sp oist safety, sp ery Hoist - Saf ogy - Machine n (500 kg) hoi encoder, must ch Setting f nominal load f nominal load f nominal load f nominal load N/A N/A king strength o ess or safe wo oad). A safety ected loads o y needs to be ice that cover st applications where loads ar c loads). er BGV rating wed under the lo taging process in movement NO NO YES Issue D GV-D8+, and t peeds, and rig pecifically DIN fety Requirem ery installation st, fitted with t meet to com Lif 2.40 to 25.0 m/m 0.30 to 12.0 m/m 2.40 to 25.0 m/m 0.30 to 12.0 m/m 2.40 to 25.0 m/m 0.30 to 12.0 m/m of a member orking load w y factor indica r actual loads for an intend r lifting operat s. The standa re suspended gs D8, D8+, a oad when: nvolves The h Pa Date: February 17 the BGV-C1 gging N 56925: ments And ns - Part 1: a load cell, mply with a ft Speed min (8.0 to 84.0 f min (1.0 to 42.0 f min (8.0 to 84.0 f min (1.0 to 42.0 f min (8.0 to 84.0 f min (1.0 to 42.0 f or a piece of when in use ates the s. Essentially, ded load. tions within th ard specifies d overhead and C1: hoist is holding a load NO YES YES age | 19 7, 2015 ft/min) ft/min) ft/min) ft/min) ft/min) ft/min) , he static
  • 22. Nav-Hoist F10-1.001 © 2015, Tait 4.7 4.7 4.7 t Installation a t Towers Manufa DIMEN 7.1 Nav-Hoi Figure 4.2 7.2 Nav-Hoi Figure 4.3 and Maintena acturing, LLC. All SIONS ist with Sing : Dimensional v ist with Susp : Dimensional v ance – Revisio l rights reserved. le-Hole Susp view, top and sid pension Hoo view, top and sid on 1.0 Rev. 1.0 pension Eye de  k de  Issue D Pa Date: February 17 age | 20 7, 2015
  • 23. Nav-Hoist F10-1.001 © 2015, Tait       5.1 5.2 Dan t Installation a t Towers Manufa GENER Electrica horizonta safety cl hold a lif five-pock SAFETY TAIT pro personn installed nger For thos machine distance machine operator Before s de-energ During ensur proce all loc and Maintena acturing, LLC. All 5: S RAL al chain hoists ally with lifted utch, located fted load witho ket lift wheel s Y PRECAUT oducts are pro el should ope and tested to e procedures e is clear of al e from any mo e operation, be rs and service servicing or re gize all circuit g any mainten re that the mac dures. Lockou al and nationa ance – Revisio l rights reserved. Setup, s are designe d loads with th between the out any powe so it can be in TIONS ofessional the erate them at o function with s requiring ope l obstructions oving machine e sure an em e technicians emoving the c t breakers ass nance procedu chinery is in a ut/Tagout polic al codes as en on 1.0 Rev. 1.0 Adjus d to lift and to he use of an o motor and th er transmitted nstalled in eith eatrical equipm any time. It is hin rated ope eration of the s and debris, a ery parts or lo mergency stop at all times. controllers obs sociated with ure, the operat safely disable cy and procedu forced by the stment o lower loads optional trolle he brake, whic by the clutch her the motor ment, and on s important th erating parame e machinery, b and that all p oads prior to i p button is wit serve the follo incoming and tor must secur ed state prior to ures must be AHJ. Issue D and O vertically and y. This hoist f ch allows the h. The Nav-Ho r up or motor nly trained, qu hat the equipm eters. be sure the a ersonnel are nitiating motio hin immediate owing safety d outgoing ele re all suspende o starting any implemented a Pa Date: February 17 Operati d to travel features a hoist brake to oist utilizes a down positio ualified ment be rea around th a safe on. During e reach of precautions, ectrical powe ed loads and service or setu and followed p age | 21 7, 2015 on o n. he er. up per
  • 24. Nav-Hoist F10-1.001 © 2015, Tait 5.3 5.4 5.5 War 5.6 t Installation a t Towers Manufa OPERA Use the  Inspec Sched  Determ BGV H  Ensure top of  Ensure proces  Check cause  Ensure  Confir config  Place  Use th PROHIB DO NOT unsafe c  DO NO  DO NO  DO NO allowe Specif  DO NO  DO NO  DO NO  DO NO bag.  DO NO SAFELY rning SAFELY The safe understa are free connecto emergen Prior t pushb panel and Maintena acturing, LLC. All ATING THE following guid ct the hoist us dule. mine if the ho Hoist Specific e the correct the hoist for a e that the loa ss and that th k that the hoo d a chain twis e the hard an m the chain is urations. the load verti he slowest sp BITIONS FO T perform any condition that OT operate th OT allow the OT operate th ed by the BGV fications. OT operate th OT use the lo OT operate th OT use a load OT use the ho Y DISABLIN Y USING T e operation of and the prope of defects an ors. In additio ncy stop butto to performing a button. Ensure . ance – Revisio l rights reserved. HOIST delines to ope sing the maint ist requires a cation above. mounting pat a single-fall o d chain, when he chain is no k block, on a st. nd soft limits h s not twisted ically under th eed possible OR USE y of the follow can lead to b he hoist using load to swing he hoist with a V rating for ea he hoist with l oad chain to s he hoist when d chain that is oist at a duty NG MACHIN HE NAV H f the Nav-Hois er use of the h d are securel on, ensure tha on. The hoist any maintenan e that it is illum on 1.0 Rev. 1.0 erate the hois tenance sche single-fall or Refer to Sect ttern is used t r a double-fal n not under lo t twisted whe double-fall co have been res as it enters th he hoist. to lift the load wing actions w bodily injury o g a start/stop o g or twist while a load that ex ach hoist. Ref oads that are ling the loads n the load cha s longer or he rate higher th NERY OIST st depends on hoist. Before o ly connected at the hoist ca is considered nce on an indi inated and ve st in a safe an edule in Sectio r a double-fall tion 4.5: BGV to mount the ll configuratio oad, is held ta en entering the onfiguration, h set to the requ he chain dive d from the gro with the hoist. r damage to t or a jerking a e hoisting. xceeds the ma fer to Section e tilted or drag s. ain is twisted. eavier than th han indicated n the diligenc operation, en to their appro an be switche d usable only ividual hoist, p rify that “Estop Issue D nd effective m on 6.2: Hoist configuration V Hoist Specif suspension d on. aut during the e jam-free pla has not turne uired fall conf rter for motor ound. These action the hoist. action. aximum load 4.5: BGV Ho gging along th e rated capac on the specif ce of the oper sure that all e opriate outlets ed off by a ma when: press the locko p” is displayed Pa Date: February 17 manner: Maintenance n based on th fications. device on the e feeding-in ate. ed on itself an figuration. r-down ns cause an capacity oist he floor. city of the cha fication plate. rator to fully electrical wire s or ain switch or a out/tagout Esto d on the status age | 22 7, 2015 e he d ain . es an op s
  • 25. Nav-Hoist F10-1.001 © 2015, Tait Cau 5.7 t Installation a t Towers Manufa  The ho Hoist.  The lo load c Sectio  The lo Config Hoist f  The lif  The ch to Sec  The ch  The ho Safety ution MAKIN The Nav monitorin external Figure 5.1 Ref D 1 L 2 P 3 N 4 L Ensur hoist w and Maintena acturing, LLC. All oist is secure oad cell is pro ell is required on 5.9: Attach oad chain is re guring the Hoi for a Double-f ft limiter is sec hain bag and ction 5.11: Mo hain bag can oist operator y Check prior G CONNEC v-Hoist head-e ng and contro devices to th : Nav‐Hoist Con Device Conn Load Cell Pickle Navigator Net L-Com re that the cha when the dead ance – Revisio l rights reserved. ly and safely perly attache d to achieve th ing the Load eeved proper ist for a Singl fall Applicatio cured to the d the dead end ounting the Ch accommodat performs the to hoist opera CTIONS end unit conta ol devices. Us e Nav-Hoist. ntrol Connection ection Co Co Co E- Co twork In/ In/ Et ain bag has suf d end of the lo on 1.0 Rev. 1.0 suspended. R d to the hoist he desired sa Cell to the Ho ly in the relev le-fall Applica on. dead end of th d of the chain hain Bag te the weight daily safety c ation. ains a connec se this illustra ns  onnection Ty onnection A onnection B Stop ontrol /Out 1 /Out 2 hernet fficient capacit oad chain is no Refer to Sect t and to the su afety factor an oist for detaile vant direction. tion or to Sec he chain. are attached and the lengt check as deta ction box for m ation as a refe ype Cabl XLR- XLR- XLR- XLR- Ether Ether Cat 5 ty to contain th ot inside the ch Issue D ion 5.8: Susp upporting stru nd BGV rating ed instruction . Refer to Sec ction 5.10.2: C d to the moun th of the chain ailed in Sectio making conne erence when c le Type -5 -5 -4 -7 rnet rnet 5e he load chain. hain bag. Pa Date: February 17 pending the ucture. The g. Refer to s. ction 5.10.1: Configuring th t bracket. Ref n. on 6.3: Daily ections to connecting Never run the age | 23 7, 2015 he fer e
  • 26. Nav-Hoist F10-1.001 © 2015, Tait 5.8   t Installation a t Towers Manufa SUSPE The Nav adapter two mou applicati under th Figure 5.2 Ref. De 1 Su 2 Su 3 Su 4 Su 5 Su 6 Su 7 Ch The susp configura point mu double-f The num lift, the s Specifica informat and Maintena acturing, LLC. All NDING THE v-Hoist offers to suspend th unting pattern on. The differ e chain sproc : Single‐hole Su escription uspension Ey uspension Ey uspension Ey uspension Ho uspension Ho uspension Ho hain Bag Sup pension point ation, either a ust move whe all application mber of falls d safety factor, a ations and to ion. ance – Revisio l rights reserved. E HOIST a single-hole he hoist from s, one for a s rent mounting cket wheel. spension Eye Ad e: Single-fall e: Double-fal e: Marking Ar ook: Single-fa ook: Double-fa ook: Marking A pport t for the Nav-H as a single-fal en the Nav-Ho n. etermines the and the safety Section 4.5: on 1.0 Rev. 1.0 suspension e an appropria ingle-fall app g locations en dapter and Hoo Hole-pattern l Hole Pattern rrow ll Hole-pattern all Hole Patte Arrow Hoist suspens ll or as a doub oist configurat e lift capacity, y rating for th BGV Hoist Sp eye adapter a te rigging stru lication and o nsure that the ok Suspension Ad n n ern sion adapter ble-fall config tion changes , the lift speed e hoist. Refe pecifications f Issue D and a hook su ucture. Both a one for a doub e load is prope dapter  depends on t guration. This between a si d, the maximu r to Section 4 for detailed lo Pa Date: February 17 uspension adapters have ble-fall erly located the chain suspension ingle-fall and um length of 4.4: oad and safet age | 24 7, 2015 e a ty
  • 27. Nav-Hoist F10-1.001 © 2015, Tait 5.8 War Cau t Installation a t Towers Manufa 8.1 Mountin rning ution Use the Figure 5.3 Ref. 1 2 3 4 5 1. Det sing 2. Inse the arro 3. Alig app bra 4. Inse the 5. Thr 6. Fee Ensur the ho single Ensur as the and Maintena acturing, LLC. All ng the Suspe following illus : Suspension Ho Description Suspension H Mount Bracke Washer 110-mm Eye ½-in. Bow Tie termine the a gle-fall or as a ert the suspe hoist. Ensure ow on the hoi gn the hole-pa plication (depe cket. ert the two ey holes in the m read the rema ed a bow tie c re that the sus oist. Make sure e-fall or a doub re that the mar e chain bag. ance – Revisio l rights reserved. ension Hook stration as a g ook Configuratio Hook et Loop Pin e Cotter Pin ppropriate co a double-fall c nsion hook (F e the marking st body, locat attern on the ending on the ye loop pins (4 mount bracke aining washer cotter pin (5) t pension hook e the position ble-fall applicat rking arrow on on 1.0 Rev. 1.0 guide to moun on  onfiguration fo configuration. Figure 5.3, ite g arrow on the ted on the sid suspension h e hoist configu 4) through a w et and the sus rs (3) onto the through the h is mounted pr of the suspens tion. n the suspensi nt the suspen or the hoist to . em 1) into the e suspension de with the ch hook for a sing uration) with t washer (3) an spension ada e other side o holes on both roperly for the sion device is on adapter is Issue D nsion hook to support the l mount brack adapter is al hain bag. gle-fall or for the hole-patte nd then feed t apter. of the eye loop ends of each e current load c mounted prop on the same s Pa Date: February 17 the hoist. oad, either as ket (2) on the igned with the a double-fall ern on the mo the pins throu p pin. h eye loop pin configuration o perly to suppo side of the hois age | 25 7, 2015 s a top of e ount ugh n (4). of ort a st
  • 28. Nav-Hoist F10-1.001 © 2015, Tait 5.8 War Cau t Installation a t Towers Manufa 8.2 Mountin The sing suspens rning ution 1. Det sing 2. Pla eac 3. Inse the the Ensur config prope Ensur as the and Maintena acturing, LLC. All ng the Single gle-hole suspe sion eye to the termine the a gle-fall or as a ce the space ch side of the ert the suspe top of the ho arrow on the re that the sing guration of the erly to support re that the mar e chain bag. ance – Revisio l rights reserved. e-hole Suspe ension eye re e Nav-Hoist m ppropriate co a double-fall c rs (item 1) be suspension e nsion eye (4) oist. Ensure th e hoist body, l gle-hole suspe hoist. Make s a single-fall or rking arrow on on 1.0 Rev. 1.0 ension Eye equires the us mount bracket onfiguration fo configuration. etween the ho eye. between the he marking ar ocated on the ension eye is m ure the positio r a double-fall n the suspensi se of two spac t. or the hoist to . oist casing (2) e hoist suspen rrow on the su e side with the mounted prope on of the suspe application. on adapter is Issue D cers that help support the l ) and the mou nsion support uspension ey e chain bag. erly for the cur ension device on the same s Pa Date: February 17 p to secure the oad, either as unt bracket (3 ts (5), located ye is aligned w rrent load is mounted side of the hois age | 26 7, 2015 e s a 3) on d on with st
  • 29. Nav-Hoist F10-1.001 © 2015, Tait 5.8 War Cau t Installation a t Towers Manufa 4. Alig app sup the 5. Inse thro 6. Thr 7. Fee (7). 8.3 Changin rning ution To chang (to suppo 1. Low ada 2. Det 3. Rem Res 4. Pul the 5. To sus a. b. c. d. Ensur of the suppo Ensur as the and Maintena acturing, LLC. All gn the hole-pa plication (depe pport and the suspension e ert the two 11 ough the hole read the rema ed a ½-in. bow . ng the Suspe ge the suspe ort a single-fa wer the hoist a apter. tach the load move the ½-in serve the two l the eye loop four washers support a diff spension adap Reposition t or double-fa Ensure the m the hoist bod Feed the eye Attach the w side of each re that the sus hoist. Make s ort a single-fall re that the mar e chain bag. ance – Revisio l rights reserved. attern on the ending on the mount bracke eye. 10-mm eye lo es in the moun aining washer w tie cotter pi ension Adap nsion adapte all or double-f and ensure it cell from the n. bow tie cot o pins. p pins out of t s. ferent hoist ap ptor: he mounting ll application. marking arrow dy. e loop pins th washer and th eye loop pin pension adap sure the positio or a double-fa rking arrow on on 1.0 Rev. 1.0 suspension e e hoist configu et. Align the h op pins (6) th nt bracket and rs onto the oth n (8) through ter r or to change fall hoist confi is supported suspension a tter pins from he suspensio pplication (sin holes on the w on the susp hrough the mo en feed a bow . ter is mounted on of the suspe all application. n the suspensi eye for a singl uration) with t holes on the s hrough the wa d the suspens her side of th h the holes on e the orientat iguration): from below b adapter. the same en on adapter an ngle-fall or do suspension a pension adapt ount bracket a w tie cotter pi d properly for t ension device . on adapter is Issue D le-fall or for a the hole-patte spaces with th asher (7) and sion adapter. e eye loop pi n both ends of tion of the cur before remov d of each eye nd the mount ouble-fall) with adapter to sup ter is aligned and the suspe in through the the current loa e is mounted p on the same s Pa Date: February 17 a double-fall ern on the ho he hole-patte then feed the n. f each eye loo rrent adapter ing the suspe e loop pin. bracket. Rese h the same pport a single with the arrow ension adapte e hole on the ad configuratio roperly to side of the hois age | 27 7, 2015 ist rn on e pins op pin ension erve e-fall w on er. other on st
  • 30. Nav-Hoist F10-1.001 © 2015, Tait   t Installation a t Towers Manufa 6. To a. b. c. d. e. 7. To a. b. c. d. e. f. and Maintena acturing, LLC. All switch from a Remove the Insert the su the suspens side with the Align the ho application ( mount brack Feed the eye Attach the w side of each switch from a Remove the Place the sp on each side Insert the su marking arro located on th Align the ho application ( mount brack Feed the eye Attach the w side of each ance – Revisio l rights reserved. a single-hole s e suspension e uspension hoo sion hook is a e chain bag. le-pattern on (depending on ket. e loop pin thr washer and th eye loop pin a suspension e suspension pacers betwee e of the suspe uspension eye ow on the sus he side with t le-pattern on (depending on ket. e loop pin thr washer and th eye loop pin on 1.0 Rev. 1.0 suspension e eye and the t ok into the mo ligned with th the suspensi n the hoist co rough the mou en feed a bow . hook to a sin hook from the en the hoist s ension eye. e between the spension eye he chain bag the suspensi n the hoist co rough the mou en feed a bow . eye to a suspe two spacers f ount bracket. he arrow on th on hook for a onfiguration) w unt bracket a w tie cotter pi ngle-hole susp e mount brac suspension su e hoist suspe is aligned wit . on hook for a onfiguration) w unt bracket a w tie cotter pi Issue D ension hook: from the moun Ensure the m he hoist body, a single-fall or with the hole-p nd the suspe in through the pension eye: ket. upport and the nsion suppor th the arrow o a single-fall or with the hole-p nd the suspe in through the Pa Date: February 17 nt bracket. marking arrow , located on th r for a double pattern on the nsion adapte e hole on the e mount brac rts. Ensure the on the hoist b r for a double pattern on the nsion adapte e hole on the age | 28 7, 2015 w on he -fall e r. other cket e body, -fall e r. other
  • 31. Nav-Hoist F10-1.001 © 2015, Tait 5.9 t Installation a t Towers Manufa ATTAC A load c directly p style loa encounte 2948.35 structure The follo the Nav- Figure 5.4 Ref. De 1 XL 2 Lo 3 ¾- 4 Lo 5 Su Proper p be orient Hoist (Fi other co load cell and Maintena acturing, LLC. All HING THE ell is a transd proportional to d cell that mo ers an underl kg (6500.0 lb e. owing illustrat -Hoist. : Load Cell Conf escription LR-5 connecto oad Cell Bolt -in. Bow Tie C oad Cell uspension Ad planning is es tated at a 90° gure 5.4, abo nnection devi remains at a ance – Revisio l rights reserved. LOAD CELL ducer that crea o the force be onitors the loa oad or an ove bs) and attach ion shows the figuration  or and cable Cotter Pin apter sential for acc ° angle in rela ove, shows th ice to the sup a 90° angle. on 1.0 Rev. 1.0 L TO THE H ates an electr eing measure ad attached to erload situatio hes directly to e proper insta curate operat ation to the su e proper orie pporting struct HOIST rical signal w ed. The Nav-H o the hoist an on. The load c o the hoist an allation and al tion of the loa uspension ada entation). Con ture may be r Issue D ith a magnitu Hoist comes w nd sends a sig cell has a cap d to the supp lignment of th ad cell. The lo apter connec nnection of a p required to en Pa Date: February 17 de that is with a dog-bo gnal when it pacity of porting he load cell on oad cell must ted to the Na pear ring or nsure that the age | 29 7, 2015 ne n v- e
  • 32. Nav-Hoist F10-1.001 © 2015, Tait t Installation a t Towers Manufa 1. Ens 2. Rem the 3. Pla ada (1). 4. Rot face 5. Pos to t sus stru 6. Slid sec spin 7. Con of t Sec and Maintena acturing, LLC. All sure the hoist move the ¾-i bow tie pin, b ce the open e apter, with the . tate the load c es the head-e sition the top he truss. Ens spension adap ucture to ensu de the bolt thr cure with the ¾ ndle ensures nnect the fem he XLR-5 cab ction 5.7: Mak ance – Revisio l rights reserved. t is supported n. bow tie cot bolt, and the end of the loa e load cell con cell through th end of the hoi part of the loa sure the top a pter. Use a pe ure proper alig rough the load ¾-in bow tie c the bolt is ce male end of th ble to the Loa king Connecti on 1.0 Rev. 1.0 d from below p tter pin from t bolt spindle. ad cell (item 2 nnector (3) fa he suspensio ist and the op ad cell so it st nd bottom of ear ring betwe gnment, if ne d cell, the bol cotter pin. En ntered. e XLR-5 cabl ad Cell port on ions). prior to attach the bolt from t 2) so it straddl acing away fro on adapter so pen end of the traddles the s the load cell een the load cessary. lt spindle, and sure the bolt le to the load n the Nav-Ho Issue D hing the load the top of the les the hoist s om the head-e that the load e load cell fac supporting str is at a 90° an cell and the s d the grapple is inside the s cell; then con oist head-end Pa Date: February 17 cell. load cell. Re suspension end of the ho cell connecto ces up. ructure conne ngle relative to supporting or pear ring a spindle; the nnect the mal unit (refer to age | 30 7, 2015 eserve oist or (3) ected o the and le end
  • 33. Nav-Hoist F10-1.001 © 2015, Tait 5.10 t Installation a t Towers Manufa 0 INSTAL The Nav number safety fa to Sectio The illus installati Figure 5.5 Ref. D 1 C 2 L 3 L and Maintena acturing, LLC. All LLING THE v-Hoist suppo of falls determ actor, and the on 4.5: BGV H stration below on. : Load Chain Ins Description Chain Bag Su Load Chain E Load Chain E ance – Revisio l rights reserved. LOAD CHA orts a single-fa mines the lift c safety rating Hoist Specific w shows the e stallation  upport Enters Nav-Ho Exits Nav-Hois on 1.0 Rev. 1.0 AIN all or a double capacity, the for the hoist. cations for det ntry and exit p oist st e-fall load cha lift speed, the . Refer to Sec tailed load an points for the Issue D ain configurat e maximum le ction 4.4: Spe nd safety infor e load chain d Pa Date: February 17 tion. The ength of lift, th ecifications an rmation. uring age | 31 7, 2015 he nd
  • 34. Nav-Hoist F10-1.001 © 2015, Tait 5.1 t Installation a t Towers Manufa 10.1 Configu 1. Ens unit 2. Con Ma 3. Atta the 4. Fee the 5. Use guid ava 6. Fee 7. Atta a. b. c. 8. Low cha 9. Pre with and Maintena acturing, LLC. All uring the Hois sure the Nav- t. Refer to Se nnect the pow king Connect ach the pull-in side closest ed the pull-in hoist from th e the inching de. Inch the c ailable to acco ed the rubber ach the Crosb Remove the Feed the firs Insert the pin link of the lo wer the load c ain extends fro ess the rubber h the steel wa ance – Revisio l rights reserved. st for a Sing -Hoist is prope ection 5.8: Sus wer cord and t tions for inform n wire to the f to the mount wire through e other side o control button chain through ommodate the r limit stop ont by single-gate e pin from the st link of the lo n through the ad chain, and chain until app om the under r buffer (part asher end fac on 1.0 Rev. 1.0 le-fall Applic erly supporte spending the the control pi mation about first flat chain bracket (Figu the jam-free of the jam-fre n on the contr the hoist unt e load hook. to the end of ed load hook top of the ho oad chain (ite e hole on one d then through proximately 5 rside of the ho of the lift limit cing the hoist. cation d to allow acc Hoist. ckle to the ho connecting d link and inse ure 5.5, item 2 plate and the e plate. rol pickle to fe til a sufficient the chain com to the chain, ook (item 2, ab em 1) into the side of the lo h the hole on 50 cm (19.69 oist. ter assembly) Issue D cess to the un oist. Refer to S devices to the ert into the jam 2). e chain guide eed the chain amount of th ming from the below the lim bove). top of the ho oad hook, then the other sid in.) of the dea ) onto the dea Pa Date: February 17 nderside of th Section 5.7: e hoist. m-free plate fr until the wire n into the chai e chain is e hoist. mit stop: ook. n through the de of the hook ad-end of the ad-end of the age | 32 7, 2015 he rom exits in e first k. load chain
  • 35. Nav-Hoist F10-1.001 © 2015, Tait Cau War 5.1 t Installation a t Towers Manufa 10. Atta buf ution 11. Mo 12. Lub Lub bag rning 13. Mo twis 10.2 Configu 1. Ens unit 2. Con Ma 3. Atta the 4. Use guid 5. Pul The lif chain Do no twists and Maintena acturing, LLC. All ach the lift lim ffer so it rests unt the chain bricate the loa bricating the L g using only th nitor the load sts. Ensure th uring the Hois sure the Nav- t. Refer to Se nnect the pow king Connect ach the pull-in side closest e the inching de until the en l the live-end ft limiter is des from running o ot place the loa in the chain. ance – Revisio l rights reserved. miter to the thi on top of the bag. Refer to ad chain and Load Chain). he hoist moto chain as it m he load chain st for a Doub -Hoist is prope ection 5.8: Sus wer cord and t tions for inform n wire to the f to the mount control button nd of the cha of the load c signed as a me out of the hois ad chain into th on 1.0 Rev. 1.0 rd link from th e lift limiter. o Section 5.11 let it run into t Feed the load or. moves through is held taut w ble-fall Appli erly supporte spending the the control pi mation about first flat chain bracket (Figu n on the contr in exits the bo hain through echanical ends st. DO NOT re he chain bag m he dead-end 1: Mounting t the chain bag d chain throug h the hoist bo when feeding ication d to allow acc Hoist. ckle to the ho connecting d link and inse ure 5.5, item 2 rol pickle to fe ody of the ho the hook bloc stop to preven ely on the lift lim manually; this Issue D of the chain. the Chain Bag g (refer to Sec gh the hoist a ody and the ch into the hoist cess to the un oist. Refer to S devices to the ert into the jam 2). eed the chain ist. ck using the p nt the dead en miter as a lowe action may ca Pa Date: February 17 Move the rub g. ction 6.8.3: and into the c hain bag for a t. nderside of th Section 5.7: e hoist. m-free plate fr n into the chai pull-in wire. nd of the load er-limit switch. ause knots or age | 33 7, 2015 bber hain any he rom in
  • 36. Nav-Hoist F10-1.001 © 2015, Tait Cau t Installation a t Towers Manufa ution 6. Rem 7. Pla a fla 8. Sec is n 9. Use app und 10. Pre cha Never with a assem not be and Maintena acturing, LLC. All move the fou ce the chain at position. cure the chain not twisted. e the inching proximately 50 derside of the ess the rubber ain with the st r allow the cha an untwisted ch mbly. Ensure th ecome tangled ance – Revisio l rights reserved. r (4) bolts from end coming o n guide to the control button 0 cm (19.69 i hoist. r buffer (part teel washer e ain to twist betw hain is not pos hat the hook b d. on 1.0 Rev. 1.0 m the chain g out of the hoo e hoist casing n on the contr n.) of the dea of the lift limit nd facing the ween the chai ssible, cut one block does not guide and low ok block into t using the fou rol pickle to lo ad-end of the ter assembly) hoist. in outlet and th e chain link and t turn or swive Issue D wer. he chain hois ur bolts. Ensu ower the load load chain ex ) onto the dea he hook block d remove to al l so that the tw Pa Date: February 17 st casing pock ure the load c hook until xtends from th ad-end of the . If an assemb llow correct wo chain falls d age | 34 7, 2015 ket in hain he load bly do
  • 37. Nav-Hoist F10-1.001 © 2015, Tait War 5.11 t Installation a t Towers Manufa 11. Atta buf 12. Mo 13. Lub the only rning 14. Mo Ens 1 MOUNT The cha for hoist where it The cha bracket a the load Use the support f Figure 5.6 Ref. D 1 C 2 S 3 C 4 L 5 C Do no twists and Maintena acturing, LLC. All ach the lift lim ffer so it rests unt the chain bricate the ch Load Chain) y the hoist mo nitor the load sure the load TING THE C in bag is an a applications is more aesth in bag mount also provides chain is conn following illus for the load c : Chain Bag and Description Chain Bag Su Soft-link lap li Carabiner Load Chain S Chain Bag St ot place the loa in the chain. ance – Revisio l rights reserved. miter to the thi on top of the bag. Refer to ain and let it r . Feed the loa otor. chain as it m chain is held CHAIN BAG accessory use where a slack hetic to conce ts to the rear o s a separate s nected directly stration as a r hain.  Load Chain Sup upport (one su nk (connects Support (one s rap ad chain into th on 1.0 Rev. 1.0 rd link from th e lift limiter. o Section 5.11 run into the c ad chain throu moves into the taut when fe ed to hold sla k chain may i eal the slack c of the mount support for the y to the hoist. reference to m pport  upport on eac dead-end of support on ea he chain bag m he dead-end 1: Mounting t chain bag (refe ugh the hoist e hoist body a eding into the ck chain. The nterfere with chain. bracket on th e load chain. . mount the cha ch side of mo load chain to ach side on ea manually; this Issue D of the chain. the Chain Bag er to Section and into the and the chain e hoist. e chain bag is the load or fo he Nav-Hoist. This support ain bag and to ount bracket) o chain bag su ach side of m action may ca Pa Date: February 17 Move the rub g. 6.8.3: Lubrica chain bag us bag for any t s recommend or applications The mount ensures that o attach the upport) mount bracket ause knots or age | 35 7, 2015 bber ating ing twists. ed s )
  • 38. Nav-Hoist F10-1.001 © 2015, Tait Cau War 5.12 t Installation a t Towers Manufa 1. Fee for App 2. Atta mo with 3. Atta stra 4. Clo 5. Atta bra 6. Fee 7. Clo ution 8. Lub Lub bag 9. Mo twis rning 2 CONFIG The Nav configura ceiling ra which al To config convertin 1. Rem 2. Rem 3. Low 4. Rem 5. Rem 6. Dis 7. Obt Sec The s soft-lin Do no twists and Maintena acturing, LLC. All ed the load ch a Single-fall A plication, dep ach the narrow unting holes ( h the load gat ach each stra ap rests on th ose the gate o ach the soft-li cket. ed the first lin ose the soft-lin bricate the loa bricating the L g using only th nitor the load sts. Ensure th GURING TH v-Hoist can be ation the load ather than the lows the load gure the Nav- ng the hoist: move the load move the load wer the hoist a move the load move the cha connect the p tain a chain d ction 1.5: Tec oft-link lap link nk lap link afte ot place the loa in the chain. ance – Revisio l rights reserved. hain into the N Application or ending on the w end of each (1) on the mo te facing the h ap (5), located e wider end o on each carab nk lap link to k of the dead nk lap link to s ad chain and Load Chain). he hoist moto chain as it m he load chain HE HOIST F e converted fo d fall and the d e floor. Inverte chain to feed -Hoist for mot d from the ho d hook from t and ensure th d chain from t ain bag. power supply diverter from T chnical Suppo k must be com er it has been c ad chain into th on 1.0 Rev. 1.0 Nav-Hoist. Re r to Section 5 e application. h carabiner (F ount bracket. T hoist. d on the top o of the carabin biner and twis one of the loa -end of the lo secure the loa let it run into t Feed the load or. moves through is held taut w FOR INVERT or inverted, or dead-end of t ed operation r d into the cha tor-down use ist. he chain. hat it is secure the hoist. from the hois TAIT, if one d ort for contact mpletely closed closed. he chain bag m efer to Section .10.2: Config Figure 5.6, ite The carabine of the chain ba ner. st the lock sle ad chain supp oad chain to th ad chain to th the chain bag d chain throug h the hoist bo when feeding TED USE r motor-down the load chain requires the u ain bag. perform the f ely supported st. did not ship wi t information. d to perform as manually; this Issue D n 5.10.1: Con guring the Hois em 3) to the c ers must hang ag, to a carab eve to secure port locations he soft-link la he mount brac g (refer to Sec gh the hoist a ody and the ch into the hoist n, operation. I n are orientat use of a chain following acti d. ith the Nav-H s expected. Ne action may ca Pa Date: February 17 nfiguring the H ist for a Doubl chain bag g straight dow biner. Ensure e the gate. s (4) on the m ap link (2). cket. ction 6.8.3: and into the c hain bag for a t. n the inverted ed toward the n diverter, ons prior to oist. Refer to ever reuse a ause knots or age | 36 7, 2015 Hoist le-fall wn the mount hain any d e
  • 39. Nav-Hoist F10-1.001 © 2015, Tait t Installation a t Towers Manufa Use the load cha Figure 5.7 Ref. Des 1 Loa 2 Loa 3 Cha 4 Mo and Maintena acturing, LLC. All following illus ain into the ch 7: Nav‐Hoist Con scription ad Hook ad Chain ain Diverter unt Bracket ance – Revisio l rights reserved. stration as a r hain bag. nfigured for Inve Ref. Des 5 Car 6 Qui 7 Cha on 1.0 Rev. 1.0 reference to a erted Operation scription rabiner (for ch ck Release L ain Bag add the chain   hain bag supp Link Issue D diverter and port) Pa Date: February 17 to feed the age | 37 7, 2015
  • 40. Nav-Hoist F10-1.001 © 2015, Tait Cau War t Installation a t Towers Manufa ution rning 1. Ens sup 2. Rem the 3. Pla fou of t 4. Rec 5. Atta bra 6. Fee belo 7. Clo 8. Atta Alw with Ensur hoist w Prior t proce and Maintena acturing, LLC. All sure the powe pported so the move the jam jam-free plat ce the chain r screw holes he diverter is connect the h ach the soft-li cket. ed the first lin ow). ose the soft-lin ach the wire h ways feed the h the wire hoo re that the cha when the dead to performing a dures and obs ance – Revisio l rights reserved. er is disconne e jam-free pla m-free plate by te for later use diverter (2) ov s with the thre positioned ov hoist to the po nk lap link to k of the dead nk lap link to s hook to the fir chain from th ok into the ch ain bag has suf d end of the lo any maintenan serve all releva on 1.0 Rev. 1.0 ected from the ate (item 1, be y removing th e. ver the area t eads on the ho ver the chain ower supply a one of the loa -end of the lo secure the loa rst flat chain li he side oppos ain pocket. fficient capacit oad chain is no nce on the equ ant safety prec e hoist and th elow) is on top he four screws that held the j oist. Align the bag support. and attach the ad chain supp oad chain to th ad chain to th ink and feed t site the chain ty to contain th ot inside the ch uipment, follow cautions requi Issue D hat the hoist is p. s. Retain the jam-free plate e chain diverte . e pickle contro port holes on he soft-link la he mount brac the wire into t bag (2) and p he load chain. hain bag. w all lockout/ta ired by the app Pa Date: February 17 s securely screws and s e and align th er so the tall ol. the mount ap link (item 1 cket. the chain dive push the chai Never run the agout plicable AHJ. age | 38 7, 2015 store he end , erter. in e
  • 41. Nav-Hoist F10-1.001 © 2015, Tait t Installation a t Towers Manufa 9. Use and bag 10. Con out 11. Atta Cha 12. Atta and Maintena acturing, LLC. All e the inching d then into the g side of the h ntinue to mov side the hoist ach the chain ain Bag. Plac ach the load h ance – Revisio l rights reserved. control button e chain divert hoist (3). ve the chain th t. bag to the m ce the slack en hook or load b on 1.0 Rev. 1.0 n on the contr er until the ch hrough the ho mounting brac nd of the cha block to the liv rol pickle to fe hain emerges oist until the d ket. Refer to in into the ch ve end of the Issue D eed the chain s from the dive desired length Section 5.11: ain bag. e chain. Pa Date: February 17 n into the moto erter on the c h of chain rem : Mounting the age | 39 7, 2015 or chain mains e
  • 42. Nav-Hoist F10-1.001 © 2015, Tait       6.1 6.2 Cau t Installation a t Towers Manufa GENER This sec intervals equipme lubricatio HOIST The tabl performe Hoist Op ution Inspec Genera inspect inspect inspect Functio of the b of the li Adjust of the b of the c Load C inspect lubricat measur Hook T inspect measur lubricat Only a parts. hoist m and Maintena acturing, LLC. All RAL ction describe s to perform th ent, regular re on of the parts MAINTENA e below provi ed on a daily, perating Instru ction al Hoist Insp t external hois t jam-free plat t chain bag onal Check brake ift limiter ment brake clutch Chain Mainte t for wear and te chain re chain Tackle/Block t rubber buffe re load hook te bearings a trained and q In addition, an maintenance. ance – Revisio l rights reserved. s basic hoist hese procedu eplacement of s that require ANCE SCHE ides a summa a quarterly, o uctions (issue ection st body te enance d deformities k Maintenanc r qualified hoist nnual hoist ins on 1.0 Rev. 1.0 maintenance res. This sec f items that ar e it. EDULE ary of the ma or a yearly ba e April 2011) f Daily X X X X X X ce X specialist can spections mus 6: e procedures a ction includes re expected to intenance act asis. Refer to for further ma Quarterly X X X n examine, disa st be performed Issue D Main and provides general inspe o wear out ov tions that mu the Liftket Ele aintenance ins Annual X X X assemble, and d by an agenc Pa Date: February 17 ntenan recommende ections of ver time, and st be ectric Chain structions. d replace hois cy certified in age | 40 7, 2015 nce ed st
  • 43. Nav-Hoist F10-1.001 © 2015, Tait Info 6.3 1. Are the h the requi 2. Is the loa sufficient 3. Is the loa under loa process? 4. Is the sin eye or th connecte bracket u 5. Are the b suspens Hoist alig 6. Can the the lengt chain? T complete not spill o t Installation a t Towers Manufa ormation DAILY The follo prior to o before o hard and soft lim ired fall configura ad chain lubricate tly? ad chain taut, wh ad, during the fee ? ngle-hole suspen he hook suspens ed to the hoist m using the proper blue arrows on th ion device and th gned? chain bag accom th and weight of t The slack chain m ely inside the bag over the top. The m applic freque and Maintena acturing, LLC. All SAFETY C owing table su operating the operating the h its set to ation? ed Corre due to t runs sm hen not eding-in DO fe and into Ensure feeding nsion ion ount pattern? he he Nav- mmodate the load must fit g and maintenance sc cation. Hoists u ency of the abo A ance – Revisio l rights reserved. HECK ummarizes th hoist. Make s hoist. Refer to the Liftk ect: The load cha the presence of s moothly into and eed the load cha o the chain bag u the load chain is into the hoist. chedule is des used in outdoo ove listed task Double‐Fa Aligned  Co on 1.0 Rev. 1.0 e safety chec sure you can ket Electric Chain ain has a glossy sufficient lubrican out of the hoist. ain through the ho using only the mo s held taut when signed for hois or or touring ap ks. ll Alignment orrect  cks that must answer “Yes n Hoist Operatin y sheen nt and Inco appe TAIT rec  HIPER  Lubripl oist otor. DO N bag man the moto chain. sts installed in pplications ma Issue D be performed ” to each que ng Instructions (is orrect: The load earance. commends the fo RTECH SLP Sup late Bar and Cha NOT place the lo nually; DO NOT le or to prevent knot a permanent ay need to incr Single‐Fall A Not Aligned Pa Date: February 17 d each day estion below ssue April 2011) chain has a dull ollowing lubricant er Lubricant Pen ain Oil 1-04 oad chain into the et a slack chain ts or twists in the indoor rease the Alignment  d  Incorrect age | 41 7, 2015 ts: netrant e chain enter e t 
  • 44. Nav-Hoist F10-1.001 © 2015, Tait 7. Is the loa and kinks perpendi and belo parallel t on the ot fall chain 8. Is the loa of any ob vertical p 9. Will the h specified operation listed on the red a t Installation a t Towers Manufa ad chain free of t s? Each link is icular to the link a ow (1), and each o its correspond ther side of the d n (2). ad chain free and bstructions along path? hoist remain belo d duty cycle durin n? The duty cycle the hoist’s label area). and Maintena acturing, LLC. All wists above link is ing link double- d clear g its ow its ng this e is (refer to ance – Revisio l rights reserved. Correct on 1.0 Rev. 1.0 Issue D Inco Pa Date: February 17 orrect  age | 42 7, 2015
  • 45. Nav-Hoist F10-1.001 © 2015, Tait 6.4 In General Ho inspect ex inspect ja inspect ch Functional of the bra of the lift l Load Chain inspect fo deformitie lubricate c Hook Tack Maintena inspect ru inspect th t Installation a t Towers Manufa DAILY The tabl prior to u Correct a that is de Ensure t possible nspection oist Inspection xternal hoist bod am-free plate hain bag l Check ake limiter n Maintenance or wear and es chain kle/Block ance ubber buffer he hook and Maintena acturing, LLC. All MAINTENA e below is su using the hois any deficienc eemed unserv that the unser reuse.  Opera excess  Inspec the ½-  Check  Inspec Check  Inspec for dam  Inspec y  Load t determ load to  Check the loa  Check chain a person  Inspec or mat  Replac  Inspec or twis  Inspec operat  Check ance – Revisio l rights reserved. NCE mmary of the st. ies found bef viceable with rviceable part te the hoist witho sive vibration or ct the suspension -in. bow tie cotter k that all fastener ct the electrical c k for cuts in the w ct the jam-free pl mage or twists. ct the chain bag f the maximum allo mined height. Ho o just above the f k the lift limiter fo ad chain. k the entire load c and check the ja nnel should repla ct the load chain tte appearance w ce the jam-free p ct the rubber buff sts. ct the hook tackle tion. k for external evid on 1.0 Rev. 1.0 e daily mainte fore the hoist new parts be ts are destroy out a load and pe movement. Liste n adapter to mak r pins are secure rs are adequately ords and the con wire and exposed ate for wear. Re for wear. Replac owed weight to t ld the weight for floor. Repeat this r wear or damag chain for wear, c am-free plate, rub ace the load chai for sufficient lub with a lubricant pe plate, chain guide fer. Replace if wo e or hook block f dence of damage enance action is returned to efore the hois yed and prope Actions erform a visual in en for abnormal n ke sure it is fully s ed to the eye-loo y tight and secur ntrol cables for s d copper. place if the plate ce if tears are pre the hoist and slow 10 seconds, and s procedure. ge and ensure it i cracks, and defor bber buffer, and c in. ricant. Lubricate enetrant with ant e, and the hold d orn or deformed for wear, damage e to the hook saf Issue D s that must b o service. Rep st is returned t erly disposed nspection of the noises, which co seated in the mo p pins. re. igns of wear or d e is deformed and esent. wly and smoothly d then slowly and is securely attach rmities. If damag chain guide for d the chain, as re ti-friction treatme down when the c and check the lo e, twists, latch en fety pin and hook Pa Date: February 17 e performed place any par to service. to prevent hoist component uld indicate a pro ount bracket and damaged insulati d check the load y raise the load a d smoothly lower hed to the dead ed, replace the l damage. Only tra quired, if it has a ent. hain is replaced. oad chain for dam ngagement and l k nut. age | 43 7, 2015 rt ts for oblem. that ion. d chain a pre- r the end of oad ained a dull . mage latch
  • 46. Nav-Hoist F10-1.001 © 2015, Tait 6.5 6.5 t Installation a t Towers Manufa INSPEC The follo maintena hook. 5.1 Daily Ma 1. Insp sec 2. Insp and 3. Insp mu poin Figu 4. If th    5. Insp a d to S 6. Insp Ens wea 7. Insp dam and Maintena acturing, LLC. All CTION INST owing sections ance, as well aintenance pect the entir cure. Tighten pect the susp d that the ½-in pect the jam-f st slide freely nts should be ure 6.1: Jam‐free he jam-free pl Replace the chain or cau Inspect the l free plate. R Inspect the c chain guide. pect the load ull or matte a Section 6.8.3: pect the lift lim sure that the l ar or stress. pect the elect maged insulat ance – Revisio l rights reserved. TRUCTIONS s provide deta as specific in e hoist casing any fasteners pension adapt n. bow tie cot free plate for y through the j e clear with we e Plate  late is damag jam-free plat use the load c oad chain. A Refer to Sectio chain guide. A chain for suff ppearance w Lubricating t miter, attache lift limiter is se trical cords, c tion. Check fo on 1.0 Rev. 1.0 S ailed instructi nstructions for g and check t s that are loos ter to make su ter pins are s any wear or d jam-free plate ell-defined ed ged: te. A damage chain to twist. damaged or on 6.8: Load C A damaged ja ficient lubrica with a lubricant the Load Cha ed to the dead ecurely attach control cables or cuts in the ions for perfo r maintaining that all fasten se and replac ure it is fully s secured to the deformation ( e and the cha dges, as illust ed plate may c twisted load c Chain Mainte am-free plate ant. Lubricate t penetrant w ain. d end of the lo hed to the loa , and connec wire and exp Issue D rming daily a the load cha ers are adeq ce any fastene seated in the e eye-loop pin (item 1, below ain guide. The trated below: cause damag chain may da enance. may cause d the chain, as with anti-frictio oad chain ins ad chain and ctors for signs posed copper. Pa Date: February 17 nd monthly in and the loa uately tight an er that is strip mount bracke ns. w). The load c e chain entry ge to the load amage the jam damage to the s required, if it on treatment. ide the chain shows no sig s of wear or . age | 44 7, 2015 ad nd pped. et chain m- e t has Refer bag. gns of
  • 47. Nav-Hoist F10-1.001 © 2015, Tait 6.5 6.6 Ove 6.7 War 6.8 t Installation a t Towers Manufa 5.2 Three-m 1. Insp the or d 2. Ens bra 3. Ens a. b. c. 4. Insp dam   FUNCT The func capacity maximum erhead Load C 1. Low load 2. Con 3. Rai sec issu 4. Low 5. Rep low res insp 6. Low 7. Rem ADJUS Refer to instructio rning LOAD C The load hoists fo the hoist Ensur functio Only c and Maintena acturing, LLC. All month Mainte pect the chain hoist mount damage is vis sure the gate cket) is locke sure that the c Insert the ch Run the enti Check that t the chain ba pect the chain maged, replac Inspect the l Inspect the j IONAL BRA ctional brake t allowed for e m load capac Caution wer the load c d to the chain nnect the max ise the load c conds. Ensure ued. wer the load c peat the raisin wer the chain i ponse to the pection or ser wer the load c move the load TMENT TO the Liftket Ele on. CHAIN MAI d chain suppli or lifting loads t body. re that the area onal brake tes certified perso ance – Revisio l rights reserved. enance n bag for any bracket for an sible. on each cara ed and secure chain does no hain end with re chain throu he length of t ag. n guide and th ce it and the h oad chain for am-free plate AKE TEST test requires each hoist. Re city. chain so that h n while the loa ximum allowe chain so that t e the hoist sto chain so that t ng and loweri in smooth ma stop comman rvice. chain so the lo d from the ho BRAKE AN ectric Chain H NTENANCE ed with the N . The load ch a below the ho st. nnel should ad on 1.0 Rev. 1.0 tears or sign ny tearing or f abiner (which e. ot overload th the lift limiter ugh the hoist the load chain he hold down hold down an r damage. e. a load of a w efer to Sectio hook tackle o ad is securely ed weight to th the hoist fully ops lifting the the load is jus ing procedure anner to avoid nd is not imm oad is secure ok tackle or t D CLUTCH Hoist Operatin E Nav-Hoist is in ain should fe oist is clear of djust the brake ns of wear. Ch fraying. Repla connects the he chain bag. and its rubbe and into the n does not ex n for any dam nd: eight that equ n 4.5: BGV H or the hook blo y resting on th he hook tackl supports the load promptly st suspended e one more tim d jerking the c ediate, conta ely on the floo the hook bloc ng Instruction ntended for us ed smoothly a people and ob e and clutch. Issue D heck the strap ace the chain e chain bag to er bumper ins chain bag. xceed the max age. If the ch uals the maxi Hoist Specifica ock is low eno he floor. le or to the ho load and hol y after the sto d above the flo me. Take car chain. If the lo act TAIT for a or. k. ns (issue Apri se solely with and quietly in bjects prior to Pa Date: February 17 ps connected n bag if any te o the mount side the chain ximum capac hain guide is mum load ations for ough to apply ook block. d for ten (10) op command oor. re to raise and oad slips or th full brake l 2011) for h electric chai nto and out of performing the age | 45 7, 2015 to ears n bag. city of y a is d he n f e
  • 48. Nav-Hoist F10-1.001 © 2015, Tait 6.8 Info 6.8 t Installation a t Towers Manufa 8.1 Inspecti The load accident operatio normal c load cha 1. Vis    2. If yo guid 3. Doc 4. Rep guid Liftk rep ormation 8.2 Measuri Measure nominal compone and chec replace a Proper c and the Only p load c and Maintena acturing, LLC. All ing the Load d chain must b t prevention s n and after ap conditions. Th ain is increase ually inspect Exterior defe Wear, crack Deformed or plate and the guide can tw ou detect def de. The load cument all ins place the load de and the ho ket Electric C lace the load ing the Load e the load cha length or thic ents. If the loa ck the jam-fre as necessary chain measure eleven-link pi personnel train chain. ance – Revisio l rights reserved. Chain be inspected standard requ pproximately he frequency o ed due to the the load chai ects, including s, or deforma r twisted links e chain guide wist or deform formed or twis chain must sl spection findin d chain if any old down mus Chain Hoist Op chain, the ch Chain ain every thre ckness under ad chain mea ee plate, the c y. ement require tch. ned in installin on 1.0 Rev. 1.0 at regular int ires that the l 200 operating of inspections effects of hea n for: g rusted, dent ation of the po s. Deformed o e. Conversely m the load cha sted links, the lide freely thro ngs in the app of the above st be replaced perating Instr hain guide, an e months. Th normal use, w asurements a chain guide, a es measuring g, removing, a ervals. Comp oad chain be g hours or 10 s must be inc at and wear. ted, or burred oints of contac or twisted link , a damaged ain. en inspect the ough the jam propriate insp e defects are d d if the load c ructions (issue nd the hold do he load chain which may ca re out of toler and the hook g the average and inspecting Issue D pliance to the e tested before 0,000 load cyc creased if the d links. ct between lin ks can damag or worn jam-f e jam-free pla -free plate an pection log. detected. Not hain is replac e April 2011) own. may deviate ause damage rance then re tackle/block f wire diamete g load chains m Pa Date: February 17 BVG 8 e starting cles, under demand on t nks. ge the jam-fre free plate or c te and the ch nd the chain g te that the cha ced. Refer to t for instruction from its e to other hois eplace the cha for wear and er, inner pitch must replace t age | 46 7, 2015 he e chain hain guide. ain the ns to st ain , he
  • 49. Nav-Hoist F10-1.001 © 2015, Tait Note t Installation a t Towers Manufa 1. Me ave oth Figu 2. Use 3. Me Figu 4. Me belo Figu 5. Rep cha Ch Av In In e Repla Refer instruc and Maintena acturing, LLC. All asure and rec erage wire dia er measurem ure 6.2: Dimensi e the following asure and rec ure 6.3: Measure asure and rec ow. A gauge ure 6.4: Measure place the cha ain): hain Measure verage wire d ner pitch of o ner pitch of 1 ace the jam-fre to the Liftket E ctions. ance – Revisio l rights reserved. cord the diam ameter. Take ment. onal measurem g formula to c cord the inne ement of inner p cord the inner is available fr ement of 11‐link ain if any of th ement imension (dm ne link (t) 1 links (11t) ee plate, chain Electric Chain on 1.0 Rev. 1.0 meters d1 and the measure ments for chain w calculate the a r pitch (t) of e pitch  r pitch of ever rom the chain k interval  ese measure Repla m) 6.3 (10% 23. (5% i 246 (2% i guide, and th Hoist Operatin d d2, as illustr ments at a 90 wire  average wire every individu ry eleven (11 n manufacture ements are ou ace chain if m 3 mm % reduction in .1 mm ncrease in no 6.8 mm ncrease in no e hold down w ing Instructions Issue D rated below, t 0° angle with diameter (dm al link as illus ) links (11t) a er, RUD, at ht ut of tolerance measuremen nominal thick ominal length ominal length when the chain s (issue April 2 Pa Date: February 17 o determine t respect to the m): strated below as illustrated ttp://www.rud e (for a 7 x 22 nt is kness) ) ) n is replaced. 2011) for age | 47 7, 2015 the e : .com. 2 mm
  • 50. Nav-Hoist F10-1.001 © 2015, Tait 6.8 6.9 t Installation a t Towers Manufa 8.3 Lubricat Proper lu operatio condition hot or di 1. Vis glos cau 2. If th 3. Pla on 4. Low 5. Spr to c rec   6. Rai thro app 7. Low coa HOOK A hook t a double Figure 6.5 The follo 1. Insp dam 2. Insp latc a. b. c. d. 3. Che and Maintena acturing, LLC. All ting the Load ubrication inc n. Lubricate t ns, but you m rty environme ually inspect ssy sheen du use drips. he load chain ce a bucket o the floor unde wer the load c ray the load c coat the load ommends the HIPERTECH (http://www. Lubriplate B (http://www. ise the load c ough the hois plied to the en wer the load c ats the entire TACKLE/HO tackle is used e-fall hoist con : Hook tackle (le owing mainten pect the rubb mage or twists pect the hook ch and the ho Replace the Inspect the o Check the sc screw that s Check the h cracks or de eck for extern ance – Revisio l rights reserved. d Chain reases the life the load chain ay need to ap ent. the load chai ue to the prese has a dull or or container th er the hoist. chain into the chain with a lu chain but not e following lub H SLP Super hipertech.com ar and Chain lubriplate.com chain again un t. Spray the n ntire length of chain until the load chain. OOK BLOC with a single nfiguration. eft) and hook bl nance proced er buffer. Rep s. k and check fo ok body. If th hook. other load sus crews in the t hows signs o ook tackle or eformities are nal evidence o on 1.0 Rev. 1.0 e of the load n every three pply lubricant n for sufficien ence of suffic matte appea hat is large en bucket until y ubricant pene as much to c bricants: Lubricant Pe m/spip/pdf/SL Oil 1-04 m/Products/Sp ntil the spraye next section o f chain. e lift limiter is a K MAINTEN e-fall hoist con lock (right) deta dures apply to place if worn or any twists e hook is twis staining parts tackle or bloc of wear. the hook bloc present. of damage to chain and he months unde t more freque nt lubricant. T cient lubricant arance, then lu nough to cont you reach the trant with ant cause drips o netrant LPLEN.pdf) pecialty-Lubr ed section of t of the chain. R at its upper lim NANCE nfiguration an ail  o hook tackles or deformed or an excess sted: s for defects. ck for any ben ck body for d the hook saf Issue D elps to ensure er normal ope ntly if the hois The load chain t, but not too ubricate the c tain the lengt e lower limit. ti-friction treat r pools of lub icants/Bar-Ch the load chai Repeat until lu mit to ensure nd a hook bloc s and to hook and check th ive opening b nds or breaks amage and re fety pin and h Pa Date: February 17 e safe hoist erating st is used in a n should have much lubrican chain. h of the load tment sufficie ricant. TAIT hain-Oil.aspx) n has passed ubricant has b that the lubri ck is used wit k blocks. e load chain f between the s . Replace any eplace if any ook nut. age | 48 7, 2015 a e a nt to chain ntly ) d been icant th for safety y
  • 51. Nav-Hoist F10-1.001 © 2015, Tait 6.10 t Installation a t Towers Manufa 4. Che pro hoo latc 5. Me on Figure 6.6 6. Com the 7. Che a. b. Des Ho 7 8. Lub spr 0 RETURN If you ha 1. Em 2. Onc Num 3. Pac 4. Incl con 5. Shi res prio equ and Maintena acturing, LLC. All eck the safety perly with suf ok and allow t ch or the hook asure the len the load hook : Hook measure mpare the y-d measured le eck the screw The screws Check the to signation ok block for a 7 x 22 chain bricate the an ocket with an ING EQUIP ave to return a mail a descript ce contact ha mber” (RMA # ck the equipm lude the RMA ntainer. p the unit with ponsible for d or to completi uipment as so ance – Revisio l rights reserved. y latch for dam fficient spring the latch to sp k if the latch d gth between k. ement  dimension me ngth is greate ws that secure should be tig orque values Screw Qu a 2 (screws c 1 (screw clo ti-friction bea n anti-friction b PMENT FOR any equipmen ion of the pro as been estab #) and shippin ment securely A # on the shi h insurance fo damage incur ng the repair. oon as possib on 1.0 Rev. 1.0 mage or bend pressure to k pring back to does not oper the chisel pun easurement to er than 10% o e the hook tac ht and show for each scre uantity closer to the h oser to the ru rings after 20 bearing greas R SERVICE nt to TAIT for oblem or failur blished, obtain ng instruction in a sturdy sh pping manife or the full valu rred during sh . Once costs ble. ds. Ensure the keep the latch the tip when rate properly. nch marks (d o the value lis of the listed v ckle or hook b no signs of w ew to the follow hook) bber buffer) 0,000 lifting cy se. service, plea re to navigato n a “Returned ns from the Se hipping crate st/documents ue of the mer hipping. TAIT are approved Issue D e latch opens h tightly again released. Re imension y in sted in the ho alue, replace block casing. wear or strippi wing toleranc Screw Dimensions M8x50 DIN 9 M8x50 DIN 9 ycles on the h ase follow the orsupport@ta d Merchandise ervice Depart . s and exterior rchandise. TA will advise on d, we will repa Pa Date: February 17 s and closes nst the tip of t place the safe n the figure be ook certificate the load hoo ng. ces: s Tighte Torque 912 20 Nm 912 10 Nm hook and cha se steps: ittowers.com e Authorizatio tment. r of the shippi AIT cannot be n costs to rep air and return age | 49 7, 2015 the ety elow) . If ok. ning e in . on ing e held pair your
  • 52.
  • 53. Nav-Hoist Installation & Maintenance ORIGINAL INSTRUCTIONS REVISION 1.0 FEBRUARY 2015