4. 4
Public Works Department
The people:
• Over 200 employees
The programs:
• Over 100 programs
The financial responsibility:
• Over $100 million in 2012 budget
5. 5
• WATER & SEWER DIVISION
Water Treatment
Treats over 16 billion gallons of water per year (over 40m gallons/day)
– Around the clock analyses of water quality
– Extensive regulatory requirements consistently met and exceeded
Water Pumping
Supplies clean water to over 350,000 people
– Evanston & Surrounding suburbs
Water Distribution
– Maintains and repairs over 160 miles of water main
6. 6
• WATER & SEWER DIVISION
Sewer Collection System
– Maintains and repairs over 180 miles of sewer main
– Maintains, repairs and replaces as needed 5,000 manhole
structures and 8,000 drainage structures
– Responds to basement backup and street flooding concerns
during rain events
Relief Sewer Program
– Over $210 million
– Over a decade to construct
– Over 55 miles of relief sewer main
– Direct impact on Quality of Life
7. 7
• STREETS AND SANITATION DIVISION
SANITATION
– Refuse Collection and Disposal (Over 18,000 tons)
– Residential Recycling (Over 7,000 tons)
– Yard Waste and Leaf Pick-up (Over 6,000 tons)
STREETS
– Street Sweeping (147 miles)
– Alley Maintenance (600 alleys)
– Snow Removal
Recycling Center
8. 8
• FLEET SERVICES
Maintains Over 350 Vehicles
– Marked Police Cars (35)
– Fire Engines and Ladder Trucks (11)
– Sanitation Trucks (19)
– Dump Trucks (34)
Municipal Service CenterSanitation Truck
9. 9
• TRANSPORTATION DIVISION
Administration, Planning, and Studies
– Infrastructure Planning – Multi-Modal Transportation Plan
– Traffic Studies (100 studies)
– Bike Plan Implementation
– Review and Issue Permits (Over 1000)
Design and Construction
– Street Design and Construction (Over 8 miles)
– Alley Paving and Sidewalk Programs – 50/50 Program
– Traffic Signal and Streetlight Maintenance (100 signals/6000 lights)
Parking Operations
– Three Parking garages (Over 3500 spaces)
– Metered Spaces (Over 2300 spaces)
10. 10
Comprehensive Planning
Multi-Modal
Transportation
Plan
Bike Plan (2003)
Downtown Plan
Capital Improvement
Program
Traffic Model/Studies
Comprehensive Plan (2000)
Streetscape Studies
Development Regulations
Transit and Parking Studies
Climate Action Plan (2008)
Strategic Plan (2006)
15. 15
Public Works provides a wide variety of important
programs and services, most related to public
health, safety and the general welfare of our
residents.
PUBLIC WORKS
MISSION…