Sheridan Road Improvement Project 
Sat Nagar, P.E. 
Assistant Director of Engineering and Infrastructure
Public Works 
SHERIDAN ROAD 
• Limits 
- Chicago Avenue to Isabella Street 
• Scope 
- Resurfacing, Water Main, Bike Lane, Sustainable Parkway 
• Budget 
- TBD based on alternate selected 
• Next Steps 
- Hold Community Meeting for northeast Evanston September 
2014 
- Historical Preservation Review September 2014 
- NU to coordinate student comments Sept 2014 
- Finalize Alternate Selection October 2014 
- IDOT Approval Winter 2014 
- Construction Summer 2015 
Note: If consensus is not reached on alternate by mid October the project will be 
moved to 2017.
Public Works 
SHERIDAN ROAD 
BY THE NUMBERS 
2
Public Works 
SHERIDAN ROAD 
BY THE NUMBERS 
3
Public Works 
COMMUNITY INVOLVEMENT 
MAY 29, 2014 1ST STEERING COMMITTEE MEETING 
JUNE 3, 2014 1st WARD MEETING 
JULY 10, 2014 2ND STEERING COMMITTEE MEETING 
JULY 14, 2014 A&PW PRESENTATION 
JULY 19, 2014 CORRIDOR BIKE RIDE 
JULY 19, 2014 PUBLIC INFORMATION MEETING 
AUG. 4, 2014 3RD STEERING COMMITTEE MEETING 
4
Public Works 
LANE ANALYSIS 
EXISTING PROPOSED 
5
Public Works 
SHERIDAN RD - CHICAGO TO CENTRAL 
OPTION A - SPLIT CYCLE TRACK 
3 LANES - NW PLACE TO CENTRAL ST 
4 LANES – CHICAGO AVE TO FOSTER ST 
EXISTING – 44’ 
W W 
54’ 
6
Public Works 
SHERIDAN RD - CHICAGO TO CENTRAL 
OPTION A - SPLIT CYCLE TRACK 
PROS: 
• Cyclists are protected/buffered from traffic 
• Cyclists positioned with traffic 
(less complex at intersections) 
• High level bus stop designs with minimal impacts 
• Easier transition at Chicago/Sheridan 
• No transition required at Central St 
CONS: 
• Potentially impacted trees (10-20) 
• Southbound cyclists along campus may ride 
sidewalk 
7
Public Works 
SHERIDAN RD - CHICAGO TO CENTRAL 
OPTION B - SPLIT CYCLE TRACK W/ MEANDERING 
3 LANES – NW PLACE TO CENTRAL ST 
4 LANES – CHICAGO AVE TO FOSTER ST 
EXISTING – 44’ 
W 
48’ 
8
Public Works 
SHERIDAN RD - CHICAGO TO CENTRAL 
OPTION B - SPLIT CYCLE TRACK W/ MEANDERING 
PROS: 
• Cyclists are protected/buffered from traffic 
• Cyclists positioned with traffic 
(less complex at intersections) 
• High level bus stop designs with minimal impacts 
• Easier transition at Chicago/Sheridan 
• No transition required at Central St 
• Potentially impacted trees (5-10) 
CONS: 
• Southbound cyclists along campus may ride 
sidewalk 
• Cycle track immediately adjacent to sidewalk 
9
Public Works 
SHERIDAN RD - CHICAGO TO CENTRAL 
OPTION C - EAST SIDE TWO WAY CYCLE TRACK 
3 LANES – NW TO CENTRAL ST 
4 LANES – CHICAGO AVE TO FOSTER ST 
TRAVEL LANES SHIFTS WEST 
52’ 
W 
EXISTING – 44’ 
W 
10
Public Works 
SHERIDAN RD - CHICAGO TO CENTRAL 
EAST SIDE TWO WAY CYCLE TRACK 
PROS: 
• Cyclists are protected/buffered from traffic 
• More attractive to cyclists along campus 
CONS: 
• Potentially impacted trees (5-15) 
• Southbound through bike trips likely to remain on road or 
sidewalk 
• Chicago / Sheridan Transition very difficult 
• Second transition required at Central St 
• High Level Bus Stop Designs becomes difficult 
• Southbound cyclists ride facing oncoming traffic 
• Complex intersections 
• Increased conflicts for vehicles turning across cycle track 
• Travel lanes shift west; complexity and cost increase due 
to lane shift 
11
Public Works 
4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK) 
4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK) MEANDERING 
SHERIDAN RD. EAST SIDE TW-WAY CYCLE TRACK 
SHERIDAN ROAD
Public Works 
SHERIDAN ROAD
Public Works 
4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK) 
4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK) MEANDERING 
SHERIDAN RD. EAST SIDE TW-WAY CYCLE TRACK 
SHERIDAN ROAD
Public Works 
NEXT STEPS 
• 7th WARD RESIDENTIAL WORKSHOP 
• NU STUDENT COORDINATION; SEPT. 2014 
• FINAL DESIGN APPROVAL; SECOND 
COUNCIL MEETING OCTOBER 
12

More Related Content

What's hot

Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014West Central Association
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Toronto Public Consultation Unit
 
Road Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic DevelopmentRoad Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic DevelopmentRPO America
 
A7 itep grant sheridan chicago bike path presentation 8.12.13
A7 itep grant sheridan chicago bike path presentation 8.12.13A7 itep grant sheridan chicago bike path presentation 8.12.13
A7 itep grant sheridan chicago bike path presentation 8.12.13cityofevanston
 
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...BTAOregon
 
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...BTAOregon
 
Urban Form and Design - Elements of Urban Design - Streets
Urban Form and Design - Elements of Urban Design - StreetsUrban Form and Design - Elements of Urban Design - Streets
Urban Form and Design - Elements of Urban Design - StreetsAnuradha Mukherji
 
Fulton Market Streetscape - July 15th, 2014 Workshop
Fulton Market Streetscape - July 15th, 2014 WorkshopFulton Market Streetscape - July 15th, 2014 Workshop
Fulton Market Streetscape - July 15th, 2014 WorkshopWest Central Association
 
Client Report Presentation
Client Report PresentationClient Report Presentation
Client Report PresentationSeung Yen Hong
 
Sp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 finalSp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 finalcityofevanston
 
Simmons us 82 fm 989 txk 060909
Simmons   us 82 fm 989 txk 060909Simmons   us 82 fm 989 txk 060909
Simmons us 82 fm 989 txk 060909Brian Bochner
 
Sp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 finalSp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 finalcityofevanston
 
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22Planning_1
 
Davis street improvement project final2 21-13 4.16.13
Davis street improvement project final2 21-13 4.16.13Davis street improvement project final2 21-13 4.16.13
Davis street improvement project final2 21-13 4.16.13cityofevanston
 
WS 2D Goldilocks & Streets: What's Just Right for You
WS 2D   Goldilocks & Streets: What's Just Right for YouWS 2D   Goldilocks & Streets: What's Just Right for You
WS 2D Goldilocks & Streets: What's Just Right for YouTheOpenStreetsProject
 
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement RehabilitationMulti-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitationcitygb
 
Southside Green - Opening Presentation
Southside Green - Opening PresentationSouthside Green - Opening Presentation
Southside Green - Opening PresentationM. Damon Weiss
 

What's hot (20)

Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
 
Road Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic DevelopmentRoad Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic Development
 
A7 itep grant sheridan chicago bike path presentation 8.12.13
A7 itep grant sheridan chicago bike path presentation 8.12.13A7 itep grant sheridan chicago bike path presentation 8.12.13
A7 itep grant sheridan chicago bike path presentation 8.12.13
 
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
 
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
 
Urban Form and Design - Elements of Urban Design - Streets
Urban Form and Design - Elements of Urban Design - StreetsUrban Form and Design - Elements of Urban Design - Streets
Urban Form and Design - Elements of Urban Design - Streets
 
Fulton Market Streetscape - July 15th, 2014 Workshop
Fulton Market Streetscape - July 15th, 2014 WorkshopFulton Market Streetscape - July 15th, 2014 Workshop
Fulton Market Streetscape - July 15th, 2014 Workshop
 
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
 
Client Report Presentation
Client Report PresentationClient Report Presentation
Client Report Presentation
 
Sp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 finalSp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 final
 
Simmons us 82 fm 989 txk 060909
Simmons   us 82 fm 989 txk 060909Simmons   us 82 fm 989 txk 060909
Simmons us 82 fm 989 txk 060909
 
Exclusive Bicycle Facilities
Exclusive Bicycle FacilitiesExclusive Bicycle Facilities
Exclusive Bicycle Facilities
 
Sp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 finalSp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 final
 
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
 
Davis street improvement project final2 21-13 4.16.13
Davis street improvement project final2 21-13 4.16.13Davis street improvement project final2 21-13 4.16.13
Davis street improvement project final2 21-13 4.16.13
 
WS 2D Goldilocks & Streets: What's Just Right for You
WS 2D   Goldilocks & Streets: What's Just Right for YouWS 2D   Goldilocks & Streets: What's Just Right for You
WS 2D Goldilocks & Streets: What's Just Right for You
 
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement RehabilitationMulti-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
 
Team 1 final
Team 1   finalTeam 1   final
Team 1 final
 
Southside Green - Opening Presentation
Southside Green - Opening PresentationSouthside Green - Opening Presentation
Southside Green - Opening Presentation
 

Viewers also liked

Pre stressed concrete- modular construction technology
Pre stressed concrete- modular construction technologyPre stressed concrete- modular construction technology
Pre stressed concrete- modular construction technologyAnjith Augustine
 
Specification writting civil construction
Specification writting civil constructionSpecification writting civil construction
Specification writting civil constructiondiasawada12345
 
L 16 pilfoundation
L 16 pilfoundationL 16 pilfoundation
L 16 pilfoundationkarna13
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 

Viewers also liked (7)

Piling of a flyover (AUST 2.2 A)
Piling of a flyover (AUST 2.2 A)Piling of a flyover (AUST 2.2 A)
Piling of a flyover (AUST 2.2 A)
 
Pre stressed concrete- modular construction technology
Pre stressed concrete- modular construction technologyPre stressed concrete- modular construction technology
Pre stressed concrete- modular construction technology
 
Flyover bridge
Flyover bridgeFlyover bridge
Flyover bridge
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
Specification writting civil construction
Specification writting civil constructionSpecification writting civil construction
Specification writting civil construction
 
L 16 pilfoundation
L 16 pilfoundationL 16 pilfoundation
L 16 pilfoundation
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 

Similar to Sheridan Road Improvement Project

CPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCrowdbrite
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Fairfax County
 
Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Thomas Downs
 
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14cityofevanston
 
Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14West Central Association
 
Reimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsReimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsknelischer
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snydernjbikeped
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)GardinerEast
 
I-66 Beltway to Haymarket - VDOT
 I-66 Beltway to Haymarket - VDOT I-66 Beltway to Haymarket - VDOT
I-66 Beltway to Haymarket - VDOTFairfax County
 
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra ParadeNorth East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra ParadeGreenlivingpedia
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureMobility Lab
 
Beal Parkway Public Meeting (Oct. 14, 2014)
Beal Parkway Public Meeting (Oct. 14, 2014)Beal Parkway Public Meeting (Oct. 14, 2014)
Beal Parkway Public Meeting (Oct. 14, 2014)City of Midland
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12cityofevanston
 
2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...
2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...
2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...Fairfax County
 
The Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonThe Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonTrailnet
 
ThinkBike Workshops DC Recommendations
ThinkBike Workshops DC RecommendationsThinkBike Workshops DC Recommendations
ThinkBike Workshops DC RecommendationsNLandUSA
 
Wpc.sw barriers
Wpc.sw barriersWpc.sw barriers
Wpc.sw barriersWPCwalks
 
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
Steeles Bridge  EA PIC#2 powerpoint 04_01_2017Steeles Bridge  EA PIC#2 powerpoint 04_01_2017
Steeles Bridge EA PIC#2 powerpoint 04_01_2017Paul B. Martin
 

Similar to Sheridan Road Improvement Project (20)

CPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panels
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
 
Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014
 
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14
 
Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14
 
Reimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsReimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panels
 
July 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual WorkshopJuly 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual Workshop
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snyder
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 
I-66 Beltway to Haymarket - VDOT
 I-66 Beltway to Haymarket - VDOT I-66 Beltway to Haymarket - VDOT
I-66 Beltway to Haymarket - VDOT
 
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra ParadeNorth East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation Future
 
Beal Parkway Public Meeting (Oct. 14, 2014)
Beal Parkway Public Meeting (Oct. 14, 2014)Beal Parkway Public Meeting (Oct. 14, 2014)
Beal Parkway Public Meeting (Oct. 14, 2014)
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12
 
East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
 
2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...
2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...
2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...
 
The Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonThe Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David Peterson
 
ThinkBike Workshops DC Recommendations
ThinkBike Workshops DC RecommendationsThinkBike Workshops DC Recommendations
ThinkBike Workshops DC Recommendations
 
Wpc.sw barriers
Wpc.sw barriersWpc.sw barriers
Wpc.sw barriers
 
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
Steeles Bridge  EA PIC#2 powerpoint 04_01_2017Steeles Bridge  EA PIC#2 powerpoint 04_01_2017
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
 

More from cityofevanston

SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020cityofevanston
 
Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015cityofevanston
 
Human services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentationHuman services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentationcityofevanston
 
Age friendlyhealth summit
Age friendlyhealth summitAge friendlyhealth summit
Age friendlyhealth summitcityofevanston
 
Divvy Community Meeting Presentation
Divvy Community Meeting PresentationDivvy Community Meeting Presentation
Divvy Community Meeting Presentationcityofevanston
 
Human services noyes ctr successes 2014
Human services noyes ctr successes 2014Human services noyes ctr successes 2014
Human services noyes ctr successes 2014cityofevanston
 
Leathers & Associates Penny Park Presentation
Leathers & Associates Penny Park PresentationLeathers & Associates Penny Park Presentation
Leathers & Associates Penny Park Presentationcityofevanston
 
Penny Park Renovations
Penny Park RenovationsPenny Park Renovations
Penny Park Renovationscityofevanston
 
FY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial ReviewFY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial Reviewcityofevanston
 
SP1 Second Quarter Financial Review
SP1 Second Quarter Financial ReviewSP1 Second Quarter Financial Review
SP1 Second Quarter Financial Reviewcityofevanston
 
P1 Sports Dome Planned Development
P1 Sports Dome Planned DevelopmentP1 Sports Dome Planned Development
P1 Sports Dome Planned Developmentcityofevanston
 
Sp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentationSp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentationcityofevanston
 
Presentation - japanese visitors
Presentation - japanese visitorsPresentation - japanese visitors
Presentation - japanese visitorscityofevanston
 
Evanston committee 3 5-2012
Evanston committee 3 5-2012Evanston committee 3 5-2012
Evanston committee 3 5-2012cityofevanston
 
A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10cityofevanston
 
Council meeting 3.20.12 cross fit e-town
Council meeting 3.20.12  cross fit e-townCouncil meeting 3.20.12  cross fit e-town
Council meeting 3.20.12 cross fit e-towncityofevanston
 
TIF presentation final 12.10.12
TIF presentation final 12.10.12TIF presentation final 12.10.12
TIF presentation final 12.10.12cityofevanston
 
Pd1 1890 maple 11.22.12
Pd1 1890 maple 11.22.12Pd1 1890 maple 11.22.12
Pd1 1890 maple 11.22.12cityofevanston
 

More from cityofevanston (20)

SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020
 
Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015
 
Human services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentationHuman services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentation
 
Age friendlyhealth summit
Age friendlyhealth summitAge friendlyhealth summit
Age friendlyhealth summit
 
Divvy Community Meeting Presentation
Divvy Community Meeting PresentationDivvy Community Meeting Presentation
Divvy Community Meeting Presentation
 
Human services noyes ctr successes 2014
Human services noyes ctr successes 2014Human services noyes ctr successes 2014
Human services noyes ctr successes 2014
 
Hs cagngfrndlyupdte
Hs cagngfrndlyupdteHs cagngfrndlyupdte
Hs cagngfrndlyupdte
 
Leathers & Associates Penny Park Presentation
Leathers & Associates Penny Park PresentationLeathers & Associates Penny Park Presentation
Leathers & Associates Penny Park Presentation
 
Penny Park Renovations
Penny Park RenovationsPenny Park Renovations
Penny Park Renovations
 
FY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial ReviewFY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial Review
 
SP1 Second Quarter Financial Review
SP1 Second Quarter Financial ReviewSP1 Second Quarter Financial Review
SP1 Second Quarter Financial Review
 
P1 Sports Dome Planned Development
P1 Sports Dome Planned DevelopmentP1 Sports Dome Planned Development
P1 Sports Dome Planned Development
 
Sp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentationSp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentation
 
Presentation - japanese visitors
Presentation - japanese visitorsPresentation - japanese visitors
Presentation - japanese visitors
 
Evanston committee 3 5-2012
Evanston committee 3 5-2012Evanston committee 3 5-2012
Evanston committee 3 5-2012
 
A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10
 
Council meeting 3.20.12 cross fit e-town
Council meeting 3.20.12  cross fit e-townCouncil meeting 3.20.12  cross fit e-town
Council meeting 3.20.12 cross fit e-town
 
Public announcement 1
Public announcement 1Public announcement 1
Public announcement 1
 
TIF presentation final 12.10.12
TIF presentation final 12.10.12TIF presentation final 12.10.12
TIF presentation final 12.10.12
 
Pd1 1890 maple 11.22.12
Pd1 1890 maple 11.22.12Pd1 1890 maple 11.22.12
Pd1 1890 maple 11.22.12
 

Recently uploaded

2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26JSchaus & Associates
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.Christina Parmionova
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfyalehistoricalreview
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...Christina Parmionova
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolSERUDS INDIA
 
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMadurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
Building the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageBuilding the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageTechSoup
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...ankitnayak356677
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Christina Parmionova
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...narwatsonia7
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Christina Parmionova
 
VIP Call Girls Doodh Bowli ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Doodh Bowli ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Doodh Bowli ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Doodh Bowli ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
(官方原版办理)BU毕业证国外大学毕业证样本
(官方原版办理)BU毕业证国外大学毕业证样本(官方原版办理)BU毕业证国外大学毕业证样本
(官方原版办理)BU毕业证国外大学毕业证样本mbetknu
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...narwatsonia7
 

Recently uploaded (20)

2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnool
 
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMadurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
Building the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageBuilding the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized Storage
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
Model Town (Delhi)  9953330565 Escorts, Call Girls ServicesModel Town (Delhi)  9953330565 Escorts, Call Girls Services
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
 
Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.
 
VIP Call Girls Doodh Bowli ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Doodh Bowli ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Doodh Bowli ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Doodh Bowli ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
(官方原版办理)BU毕业证国外大学毕业证样本
(官方原版办理)BU毕业证国外大学毕业证样本(官方原版办理)BU毕业证国外大学毕业证样本
(官方原版办理)BU毕业证国外大学毕业证样本
 
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 

Sheridan Road Improvement Project

  • 1. Public Works EVANSTON ILLINOIS September 5, 2014 Sheridan Road Improvement Project Sat Nagar, P.E. Assistant Director of Engineering and Infrastructure
  • 2. Public Works SHERIDAN ROAD • Limits - Chicago Avenue to Isabella Street • Scope - Resurfacing, Water Main, Bike Lane, Sustainable Parkway • Budget - TBD based on alternate selected • Next Steps - Hold Community Meeting for northeast Evanston September 2014 - Historical Preservation Review September 2014 - NU to coordinate student comments Sept 2014 - Finalize Alternate Selection October 2014 - IDOT Approval Winter 2014 - Construction Summer 2015 Note: If consensus is not reached on alternate by mid October the project will be moved to 2017.
  • 3. Public Works SHERIDAN ROAD BY THE NUMBERS 2
  • 4. Public Works SHERIDAN ROAD BY THE NUMBERS 3
  • 5. Public Works COMMUNITY INVOLVEMENT MAY 29, 2014 1ST STEERING COMMITTEE MEETING JUNE 3, 2014 1st WARD MEETING JULY 10, 2014 2ND STEERING COMMITTEE MEETING JULY 14, 2014 A&PW PRESENTATION JULY 19, 2014 CORRIDOR BIKE RIDE JULY 19, 2014 PUBLIC INFORMATION MEETING AUG. 4, 2014 3RD STEERING COMMITTEE MEETING 4
  • 6. Public Works LANE ANALYSIS EXISTING PROPOSED 5
  • 7. Public Works SHERIDAN RD - CHICAGO TO CENTRAL OPTION A - SPLIT CYCLE TRACK 3 LANES - NW PLACE TO CENTRAL ST 4 LANES – CHICAGO AVE TO FOSTER ST EXISTING – 44’ W W 54’ 6
  • 8. Public Works SHERIDAN RD - CHICAGO TO CENTRAL OPTION A - SPLIT CYCLE TRACK PROS: • Cyclists are protected/buffered from traffic • Cyclists positioned with traffic (less complex at intersections) • High level bus stop designs with minimal impacts • Easier transition at Chicago/Sheridan • No transition required at Central St CONS: • Potentially impacted trees (10-20) • Southbound cyclists along campus may ride sidewalk 7
  • 9. Public Works SHERIDAN RD - CHICAGO TO CENTRAL OPTION B - SPLIT CYCLE TRACK W/ MEANDERING 3 LANES – NW PLACE TO CENTRAL ST 4 LANES – CHICAGO AVE TO FOSTER ST EXISTING – 44’ W 48’ 8
  • 10. Public Works SHERIDAN RD - CHICAGO TO CENTRAL OPTION B - SPLIT CYCLE TRACK W/ MEANDERING PROS: • Cyclists are protected/buffered from traffic • Cyclists positioned with traffic (less complex at intersections) • High level bus stop designs with minimal impacts • Easier transition at Chicago/Sheridan • No transition required at Central St • Potentially impacted trees (5-10) CONS: • Southbound cyclists along campus may ride sidewalk • Cycle track immediately adjacent to sidewalk 9
  • 11. Public Works SHERIDAN RD - CHICAGO TO CENTRAL OPTION C - EAST SIDE TWO WAY CYCLE TRACK 3 LANES – NW TO CENTRAL ST 4 LANES – CHICAGO AVE TO FOSTER ST TRAVEL LANES SHIFTS WEST 52’ W EXISTING – 44’ W 10
  • 12. Public Works SHERIDAN RD - CHICAGO TO CENTRAL EAST SIDE TWO WAY CYCLE TRACK PROS: • Cyclists are protected/buffered from traffic • More attractive to cyclists along campus CONS: • Potentially impacted trees (5-15) • Southbound through bike trips likely to remain on road or sidewalk • Chicago / Sheridan Transition very difficult • Second transition required at Central St • High Level Bus Stop Designs becomes difficult • Southbound cyclists ride facing oncoming traffic • Complex intersections • Increased conflicts for vehicles turning across cycle track • Travel lanes shift west; complexity and cost increase due to lane shift 11
  • 13. Public Works 4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK) 4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK) MEANDERING SHERIDAN RD. EAST SIDE TW-WAY CYCLE TRACK SHERIDAN ROAD
  • 15. Public Works 4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK) 4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK) MEANDERING SHERIDAN RD. EAST SIDE TW-WAY CYCLE TRACK SHERIDAN ROAD
  • 16. Public Works NEXT STEPS • 7th WARD RESIDENTIAL WORKSHOP • NU STUDENT COORDINATION; SEPT. 2014 • FINAL DESIGN APPROVAL; SECOND COUNCIL MEETING OCTOBER 12