4. COMMUNITY INVOLVEMENT
MAY 29, 2014 1ST STEERING COMMITTEE MEETING
JUNE 3, 2014 1st WARD MEETING
JULY 10, 2014 2ND STEERING COMMITTEE MEETING
JULY 14, 2014 A&PW PRESENTATION
JULY 19, 2014 CORRIDOR BIKE RIDE
JULY 19, 2014 PUBLIC INFORMATION MEETING
AUG. 4, 2014 3RD STEERING COMMITTEE MEETING
4
6. SHERIDAN RD - CHICAGO TO CENTRAL
OPTION A - SPLIT CYCLE TRACK
3 LANES - NW PLACE TO CENTRAL ST
4 LANES – CHICAGO AVE TO FOSTER ST
EXISTING – 44’
W W
54’
6
7. SHERIDAN RD - CHICAGO TO CENTRAL
OPTION A - SPLIT CYCLE TRACK
PROS:
• Cyclists are protected/buffered from traffic
• Cyclists positioned with traffic
(less complex at intersections)
• High level bus stop designs with minimal impacts
• Easier transition at Chicago/Sheridan
• No transition required at Central St
CONS:
• Potentially impacted trees (10-20)
• Southbound cyclists along campus may ride
sidewalk
7
8. SHERIDAN RD - CHICAGO TO CENTRAL
OPTION B - SPLIT CYCLE TRACK W/ MEANDERING
3 LANES – NW PLACE TO CENTRAL ST
4 LANES – CHICAGO AVE TO FOSTER ST
EXISTING – 44’
W
48’
8
9. SHERIDAN RD - CHICAGO TO CENTRAL
OPTION B - SPLIT CYCLE TRACK W/ MEANDERING
PROS:
• Cyclists are protected/buffered from traffic
• Cyclists positioned with traffic
(less complex at intersections)
• High level bus stop designs with minimal impacts
• Easier transition at Chicago/Sheridan
• No transition required at Central St
• Potentially impacted trees (5-10)
CONS:
• Southbound cyclists along campus may ride
sidewalk
• Cycle track immediately adjacent to sidewalk
9
10. SHERIDAN RD - CHICAGO TO CENTRAL
OPTION C - EAST SIDE TWO WAY CYCLE TRACK
3 LANES – NW TO CENTRAL ST
4 LANES – CHICAGO AVE TO FOSTER ST
TRAVEL LANES SHIFTS WEST
52’
W
EXISTING – 44’
W
10
11. SHERIDAN RD - CHICAGO TO CENTRAL
EAST SIDE TWO WAY CYCLE TRACK
PROS:
• Cyclists are protected/buffered from traffic
• More attractive to cyclists along campus
CONS:
• Potentially impacted trees (5-15)
• Southbound through bike trips likely to remain on
road or sidewalk
• Chicago / Sheridan Transition very difficult
• Second transition required at Central St
• High Level Bus Stop Designs becomes difficult
• Southbound cyclists ride facing oncoming traffic
• Complex intersections
• Increased conflicts for vehicles turning across
cycle track
• Travel lanes shift west; complexity and cost
increase due to lane shift
11
12. NEXT STEPS
• 7th WARD RESIDENTIAL WORKSHOP
• NU STUDENT COORDINATION; SEPT. 2014
• FINAL DESIGN APPROVAL; SECOND
COUNCIL MEETING OCTOBER
12