The document outlines a training program on rooftop solar PV for utility engineers presented by USAID's Partnership To Advance Clean Energy-Deployment technical assistance program. It includes a quiz to test knowledge on topics like solar applications, system components, site assessment factors, and state targets for rooftop solar. The training aims to increase understanding of grid-connected rooftop solar PV systems.
quiz Solar PV Rooftop Training Entrepreneurship Development
1. Partnership To Advance Clean Energy-Deployment (PACE-D)
Technical Assistance Program
Presented by
USAID PACE-D TA Program
Apr-18
Solar PV Rooftop Training Program For Utility Engineers
Quiz:
Fastest Finger First
2. Which among the below is not an off-grid solar application?
Solar Street Light Home Lighting
System
Net Metered Solar Plant None of the
A solar system is not classified as distributed system when it is installed
in:
Residence
Industry
Commercial Complex
Solar Park
3. Which irradiance is used for solar
energy calculations?
Global Reflected
Both a & b None of the
above
What are the components of rooftop
grid connected solar PV rooftop
system
i) Modules ii) Inverter iii) Earthing
iv) Charge Regulator
i), iii) & iv) i), ii) & iv)
i), ii) & iii) All of the above
What are the factors used to
calculate Energy Yield for a 10 KW
Plant?
i) Peak Sun Hour ii) Derating Factor
iii) Module Efficiency
i) & iii) ii) & iii)
i) & ii) All of the above
Which factor causes maximum loss
in a solar PV rooftop system?
Cables Soiling
Temperature Inverter
4. What is the target of rooftop solar
PV under India’s National Solar
Mission 2022?
5 GW 10 GW
25 GW 40 GW
How are cells connected in a solar
module?
In parallel In series
Either a or b Combination of
a & b
How can a shadow analysis be done
for a site?
Visual Inspection Distance Meter
Compass Sun Eye
What is the thumb rule for minimum
distance from the object to have
shadow free installation (h being
height of shadow object)?
h 2h
3h 4h
5. How do you identify an isolated or non-isolated grid-connected inverter?
Transformer in the inverter Voltage levels
Transformer connected after the inverter Power rating
How is a micro inverter functionally better than other inverters?
Works with each module Better system safety
Low cost High Efficiency
6. What factor is irrelevant while doing site assessment?
Place of inverter installation Roof area
Size of cable to be used Access to
What is meant by the Standard Test Conditions (STC)?
Radiation: 1,000W/m2, cell temperature: 25ºC, and Air Mass: 1.5
Radiation: 1,000W/m2, ambient temperature:20ºC, and Air Mass: 1.5
Radiation: 1,024W/m2, cell temperature:25ºC, and Air Mass: 1.5
Radiation: 1,000W/m2, ambient temperature:18ºC, and Air Mass: 1.0
7. The available surface area of a building is 108m2 (length=12.0m and width =9.0m)
and the module dimensions are length=1.64m and width =0.98m. If 62 modules are
to be installed without leaving any space for walkways, the optimum layout will be:
Landscape format Portrait format
There is no difference Neither format is appropriate
What data should be collected on site?
i) roof orientation and inclination ii) equipment characteristics iii) location of shadings
iv) climate data v) possible locations for placing BoS
i), iv) & v) i), ii) & iii)
i), iii) & v) All of the above
8. Which state has highest rooftop
target by 2022?
West Bengal
Maharashtra
Odisha
Kerala
What is the constraint for balancing
a project?
Quality Scope
Risk All of the above
What is / are the advantage(s) of
SPVRT over large-scale solar PV
power plant?
Less T&D losses
No land requirement
Close to load centres
All of the above
Which is not an primary selection
criterion of SPVRT components
Price Service need
Quality risk Technical
parameters
9. When you are not doing end to end
execution but doing the entire
procurement which implementation
model will it be categorized as:
EPC EPC Lite
EPC (part) & O&M None of the
above
A copy of the commissioning report
should be given to the owner
together with relevant conformity
certificates and guarantees.
True False
The on-site mounting process consists of the following steps. Number them
according to the correct order:
i) Connect modules electrically ii) Erect mounting structures iii) Mount modules iv)
Lay out trenches and conduits
iii), ii), i) & iv) iii), i), ii) & iv)
ii), iv), iii) & i) ii), iii), i) & iv)