Contents
SPVRT Array Configuration
Determining SPVRT Array Capacity
SPVRT Array – Inverter Matching
Array Mounting Structure – Materials & Design
Contents
Safety Issues – Personal & System Safety
Grid Protection – Anti Islanding
Selection of SPVRT Array and Array BOS Components
Installation Best Practices
SPVRT Array Configuration –
SPVRT Array with Multiple Parallel Strings
SPVRT Array Configuration –
Using Inverter with Multiple MPPT DC Input
SPVRT Array Configuration –
Using Inverter with Single MPPT at Common DC Bus
SPVRT Array Configuration –
Single MPPTs Vs. Multiple MPPT Input
 According to IEC 62548 Photovoltaic array design requirement, when inverters
have multiple MPPT inputs, overcurrent protection of the section of the array
may be treated as a separate PV array and each PV array shall have a switch
disconnector to provide isolation of the inverter
 Where inverter has a single MPPT and multiple input circuits are internally
paralleled onto a common DC bus, each PV section connected to one of those
inputs shall be treated as a sub-array and each PV sub-array shall have a switch
disconnector to provide isolation of the inverter.
Determining SPVRT System Capacity
 Availability of shadow free area
 Installation purpose and budget
 Government program and incentive guidelines
 State Electricity Regulation
 Distribution Transformer capacity
 Connected load
SPVRT Array & Inverter Matching
Matching of SPVRT Array to the voltage specification
of an inverter
Matching of SPVRT Array to the inverter’s current
rating
Matching of SPVRT Array to the inverter’s power rating
Solar PV Rooftop Array & Inverter Matching – Voltage
Matching
Array Mounting Structure – Design & Materials
Thermal Aspects
Expansion /
Contraction of
modules /
Structure
Mechanical
Loads on PV
Structures
To comply with
related standards
Wind
To be rated for
maximum
expected wind
speeds
Material
Accumulation on
PV Array
Snow, ice, others
Corrosion
Mounting to be
made from
corrosion resistant
materials
Support structures and module
mounting arrangements should
comply with
 Applicable building codes
regulations and
 Standards and module
manufacturer’s mounting
requirements
Aspects to be considered
while designing array
mounting structure
IEC 62548
Array Mounting Structure – Flat RCC Roof
Array Mounting Structure – Flat RCC Roof
Array Mounting Structure – Installation on Slant
Roof
Array Mounting Structure – Installation on Slant
Roof
Safety Issues – Personnel & System Safety
 According to IEC 62548 PV arrays for installation on buildings shall have
maximum voltages not greater than 1000V DC
 For protection against electric shock, the requirements of IEC 60364-4-41 shall
apply
 The system shall comply with the Central Electricity Authority (Measures Relating
to Safety and Electricity Supply) Regulations, 2010
 PV module exposed metal earthing and bonding shall be according to 7.4.2 of
IEC 62548
 If a lightning protection system (LPS) is already installed on the building, the PV
system should be integrated into the LPS as appropriate in accordance with IEC
62305-3
SPVRT Array Functional Earthing/Bonding Decision
Tree
Entry
Is the
PV array
maximum voltage
>DVC-A?
Is array
exposed-conductive part
required to be earthed for
lightning protection?
(a)
Is array
exposed-conductive part
required to be earthed for
lightning protection?
(a)
Earth
with conductor sized
according to 7.4.2.1 and
IEC 60364-5-54
Maximum size 6mm2
Earth
with conductor sized
according to 7.4.2.1 and
IEC 60364-5-54
Maximum size 16mm2
NO
YES
NO
YES
No
requirement
NO
YES
IEC 62548
Lightning Protection System for SPVRT System
Installation without external lightning
protection
1. DC input to inverter (per MPPT)
2. AC output of inverter
3. Low voltage input to metering
4. Communication – Data interface
5. Functional Earthing
Source: www.dehn-international.com
Lightning Protection System for SPVRT System
Installation with external lightning
protection with sufficient separation
distance
1. DC input to inverter (per MPPT)
2. AC output of inverter
3. Low voltage input to metering
4. Communication – Data interface
5. Functional Earthing / External
Lightning Protection
Source: www.dehn-international.com
Lightning Protection System for SPVRT System
Installation with external lightning
protection without sufficient
separation distance
1. DC input to inverter (per MPPT)
2. AC output of inverter
3. Low voltage input to metering
4. Communication – Data interface
5. Functional Earthing / External
Lightning Protection
Source: www.dehn-international.com
Grid Protection – Anti-islanding
Anti-islanding Mechanism Disconnects inverter from grid when
Grid power supply is disrupted
Grid goes outside preset inverter
parameters
Passive protection: the inverter
disconnects if it detects grid conditions
which are over or under the voltage
and / or over or under the frequency
settings of the inverter
Active protection: the inverter will either
include frequency or voltage drift- such
that when the inverter is disconnected
from the larger grid, the voltage or
frequency will drift to the point where the
passive protection will cause the inverter
to trip
The inverters disconnect from the grid in either of the above situations to avoid
‘islanding’ through two types of internal protection called passive and active protection
Grid Protection – Anti Islanding
 According to IEEE 1547 and CEA (technical standards for connectivity of the
distributed generation resources) Regulation 2013 - for an unintentional island
the grid tied inverter shall detect the island and cease to energize within two
seconds of the formation of an island
 According to IEEE 1547 the grid connected rooftop soar system shall include an
adjustable delay (or a fixed delay of 5 minutes) that may delay reconnection for
up to five minutes after the grid voltage and frequency restored. As per CEA
Regulation 2013 it shall be for at least 60 seconds
 In case another power generation source like DG set in the consumer facility is
operated when grid is not available, the inverter may sense the grid availability
and in case operation parameters are within the working range it will start
functioning and will start feeding to the DG grid; depends on regulation if
allowed or not
Installation of Isolators
PV Array DC Isolator:
 A double-pole, load-breaking, DC rated isolating (disconnect) switch should be
installed on the DC side of the inverter
 It should be rated appropriately for the voltage and current of the PV system
Inverter AC Isolator:
 Central Electricity Authority (Technical Standards for Connectivity of the Distributed
Generation Resources) Regulations, 2013 requires an inverter AC isolator to be
installed on the output of the inverter
 A Main Switch lockable in off position is required to be installed in the switchboard,
which is located at a height of at-least 2.44m above the ground level
 This allows the PV system to be disconnected from the mains power supply. This
main switch may not be rated for load break nor may have feature of overcurrent
protection
Lidded Cable Tray
Labelled Every 2m
Virtually No
Exposed Conduit
Roof penetrations under solar module
Using fit for purpose equipment
Using black UV rated corrugated
Using SS Cable Ties
Appropriately Labelled
Source: www.gses.in
Cable Management at Array
 Wiring must complied with IEC 60364 or equivalent national standard
 Minimize the area of conductive loops to reduce the magnitude of lightening-
induced overvoltage
Cabling & Interconnection
Marking and signage
Marking & Signage
Documentation
Documentation
As per IEC 62446: Grid-Connected Photovoltaic Systems—Minimum Requirements
for System Documentation, Commissioning Tests and Inspection
 System data
 Nameplate data – Rated power, manufacturers, models and quantities
of PV modules and inverters
 Cover page data - contact information for the customer, system
designer and system installer, relevant project dates
 Wiring Diagrams (Single line diagram with equipment information)
 Data sheets (Module and inverter)
 O&M information
 Test results and commission data
28
Anurag Mishra
Senior Clean Energy Specialist
USAID/India
Email: amishra@usaid.gov
Disclaimer:
This training material is made possible by the support of the American
People through the United States Agency for International
Development (USAID). The contents of this material are the sole
responsibility of Nexant, Inc. and do not necessarily reflect the views of
USAID or the United States Government. This material was prepared
under Contract Number AID-386-C-12-00001.

More Related Content

What's hot

Session 11 overview of simulation software
Session 11   overview of simulation softwareSession 11   overview of simulation software
Session 11 overview of simulation softwareChirag Jain
 
Session 09 spvrt business models
Session 09   spvrt business modelsSession 09   spvrt business models
Session 09 spvrt business modelsChirag Jain
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011iplon
 
Photovoltaic Training Course - Module 2.7 - Commissioning tests
Photovoltaic Training Course - Module 2.7 - Commissioning testsPhotovoltaic Training Course - Module 2.7 - Commissioning tests
Photovoltaic Training Course - Module 2.7 - Commissioning testsLeonardo ENERGY
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenanceLeonardo ENERGY
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Headway Solar
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterAshish Verma
 
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...Leonardo ENERGY
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringAnil Kumar Bohra
 
Photovoltaic Training Course - Module 6.1 - Introduction to offgrid PV
Photovoltaic Training Course - Module 6.1 - Introduction to offgrid PVPhotovoltaic Training Course - Module 6.1 - Introduction to offgrid PV
Photovoltaic Training Course - Module 6.1 - Introduction to offgrid PVLeonardo ENERGY
 
Photovoltaic Training Course - Module 3.1 - Control and telecom systems
Photovoltaic Training Course - Module 3.1 - Control and telecom systemsPhotovoltaic Training Course - Module 3.1 - Control and telecom systems
Photovoltaic Training Course - Module 3.1 - Control and telecom systemsLeonardo ENERGY
 
Hybrid Controller | Design 150KW PV with DG1:700KW
Hybrid  Controller | Design 150KW PV with DG1:700KWHybrid  Controller | Design 150KW PV with DG1:700KW
Hybrid Controller | Design 150KW PV with DG1:700KWEyad Adnan
 
Renewable energy and grid integration energy transition
Renewable energy and grid integration   energy transitionRenewable energy and grid integration   energy transition
Renewable energy and grid integration energy transitionNarinporn Malasri
 
Brian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building PowerBrian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building PowerEnergyTech2015
 
Josh Long: Minimum Cyber Security Requirements for a 20 MW Photo Voltaic Field
Josh Long: Minimum Cyber Security Requirements for a 20 MW Photo Voltaic Field Josh Long: Minimum Cyber Security Requirements for a 20 MW Photo Voltaic Field
Josh Long: Minimum Cyber Security Requirements for a 20 MW Photo Voltaic Field EnergyTech2015
 

What's hot (20)

Session 11 overview of simulation software
Session 11   overview of simulation softwareSession 11   overview of simulation software
Session 11 overview of simulation software
 
Session 09 spvrt business models
Session 09   spvrt business modelsSession 09   spvrt business models
Session 09 spvrt business models
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
 
Photovoltaic Training Course - Module 2.7 - Commissioning tests
Photovoltaic Training Course - Module 2.7 - Commissioning testsPhotovoltaic Training Course - Module 2.7 - Commissioning tests
Photovoltaic Training Course - Module 2.7 - Commissioning tests
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverter
 
8.2_IEEE 1547 and Microgrids_Key_EPRI/SNL Microgrid Symposium
8.2_IEEE 1547 and Microgrids_Key_EPRI/SNL Microgrid Symposium8.2_IEEE 1547 and Microgrids_Key_EPRI/SNL Microgrid Symposium
8.2_IEEE 1547 and Microgrids_Key_EPRI/SNL Microgrid Symposium
 
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
 
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
 
Photovoltaic Training Course - Module 6.1 - Introduction to offgrid PV
Photovoltaic Training Course - Module 6.1 - Introduction to offgrid PVPhotovoltaic Training Course - Module 6.1 - Introduction to offgrid PV
Photovoltaic Training Course - Module 6.1 - Introduction to offgrid PV
 
Photovoltaic Training Course - Module 3.1 - Control and telecom systems
Photovoltaic Training Course - Module 3.1 - Control and telecom systemsPhotovoltaic Training Course - Module 3.1 - Control and telecom systems
Photovoltaic Training Course - Module 3.1 - Control and telecom systems
 
Hybrid Controller | Design 150KW PV with DG1:700KW
Hybrid  Controller | Design 150KW PV with DG1:700KWHybrid  Controller | Design 150KW PV with DG1:700KW
Hybrid Controller | Design 150KW PV with DG1:700KW
 
Renewable energy and grid integration energy transition
Renewable energy and grid integration   energy transitionRenewable energy and grid integration   energy transition
Renewable energy and grid integration energy transition
 
Analysis of PVSyst Loss Diagram
Analysis of PVSyst Loss DiagramAnalysis of PVSyst Loss Diagram
Analysis of PVSyst Loss Diagram
 
Brian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building PowerBrian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building Power
 
Josh Long: Minimum Cyber Security Requirements for a 20 MW Photo Voltaic Field
Josh Long: Minimum Cyber Security Requirements for a 20 MW Photo Voltaic Field Josh Long: Minimum Cyber Security Requirements for a 20 MW Photo Voltaic Field
Josh Long: Minimum Cyber Security Requirements for a 20 MW Photo Voltaic Field
 

Similar to Session 08 design & safety overview

Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PVQuality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PVArpo Mukherjee
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantHarish Sharma
 
DG interconnection protection ieee 1547
DG interconnection protection ieee 1547DG interconnection protection ieee 1547
DG interconnection protection ieee 1547michaeljmack
 
Внедрение распределенной энергетики в систему централизованного энергоснабжен...
Внедрение распределенной энергетики в систему централизованного энергоснабжен...Внедрение распределенной энергетики в систему централизованного энергоснабжен...
Внедрение распределенной энергетики в систему централизованного энергоснабжен...НП "Сообщество потребителей энергии"
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionMahesh Chandra Manav
 
Advancements in inverter technology
Advancements  in inverter technologyAdvancements  in inverter technology
Advancements in inverter technologyBhanu Teja
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfMahesh Chandra Manav
 
Session 5 - Grid Connected Inverter.pptx
Session 5 - Grid Connected Inverter.pptxSession 5 - Grid Connected Inverter.pptx
Session 5 - Grid Connected Inverter.pptxTaashish
 
Electric vehicle and charging infra by link vue system
Electric vehicle and charging infra by link vue systemElectric vehicle and charging infra by link vue system
Electric vehicle and charging infra by link vue systemMahesh Chandra Manav
 
IRPTF_Workshop_Presentations (1).pdf
IRPTF_Workshop_Presentations (1).pdfIRPTF_Workshop_Presentations (1).pdf
IRPTF_Workshop_Presentations (1).pdfPowerSystemDynamicsS
 
Photovoltaic Training Course - Module 1.2 choosing components
Photovoltaic Training Course - Module 1.2 choosing componentsPhotovoltaic Training Course - Module 1.2 choosing components
Photovoltaic Training Course - Module 1.2 choosing componentsLeonardo ENERGY
 
Specification grid tie_spv_plant
Specification grid tie_spv_plantSpecification grid tie_spv_plant
Specification grid tie_spv_plantJay Ranvir
 
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET Journal
 
Design & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemDesign & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemSulaman Muhammad
 
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unitSolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unitOptimus Energy Philippines
 
Your electrical safety specilist for all equipments Powered AC and DC
Your electrical safety specilist for all equipments   Powered AC and DCYour electrical safety specilist for all equipments   Powered AC and DC
Your electrical safety specilist for all equipments Powered AC and DCMahesh Chandra Manav
 

Similar to Session 08 design & safety overview (20)

Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PVQuality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PV
 
8.1.1_PAR 2030.7_Bower_EPRI/SNL Microgrid Symposium
8.1.1_PAR 2030.7_Bower_EPRI/SNL Microgrid Symposium8.1.1_PAR 2030.7_Bower_EPRI/SNL Microgrid Symposium
8.1.1_PAR 2030.7_Bower_EPRI/SNL Microgrid Symposium
 
file-9.pptx
file-9.pptxfile-9.pptx
file-9.pptx
 
file-9.pptx
file-9.pptxfile-9.pptx
file-9.pptx
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
 
DG interconnection protection ieee 1547
DG interconnection protection ieee 1547DG interconnection protection ieee 1547
DG interconnection protection ieee 1547
 
Внедрение распределенной энергетики в систему централизованного энергоснабжен...
Внедрение распределенной энергетики в систему централизованного энергоснабжен...Внедрение распределенной энергетики в систему централизованного энергоснабжен...
Внедрение распределенной энергетики в систему централизованного энергоснабжен...
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protection
 
Advancements in inverter technology
Advancements  in inverter technologyAdvancements  in inverter technology
Advancements in inverter technology
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
 
Session 5 - Grid Connected Inverter.pptx
Session 5 - Grid Connected Inverter.pptxSession 5 - Grid Connected Inverter.pptx
Session 5 - Grid Connected Inverter.pptx
 
Electric vehicle and charging infra by link vue system
Electric vehicle and charging infra by link vue systemElectric vehicle and charging infra by link vue system
Electric vehicle and charging infra by link vue system
 
IRPTF_Workshop_Presentations (1).pdf
IRPTF_Workshop_Presentations (1).pdfIRPTF_Workshop_Presentations (1).pdf
IRPTF_Workshop_Presentations (1).pdf
 
Photovoltaic Training Course - Module 1.2 choosing components
Photovoltaic Training Course - Module 1.2 choosing componentsPhotovoltaic Training Course - Module 1.2 choosing components
Photovoltaic Training Course - Module 1.2 choosing components
 
Specification grid tie_spv_plant
Specification grid tie_spv_plantSpecification grid tie_spv_plant
Specification grid tie_spv_plant
 
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
 
Design & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemDesign & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic System
 
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unitSolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
 
Swot
SwotSwot
Swot
 
Your electrical safety specilist for all equipments Powered AC and DC
Your electrical safety specilist for all equipments   Powered AC and DCYour electrical safety specilist for all equipments   Powered AC and DC
Your electrical safety specilist for all equipments Powered AC and DC
 

More from Chirag Jain

Session 21 preparation of techno commercial report
Session 21   preparation of techno commercial reportSession 21   preparation of techno commercial report
Session 21 preparation of techno commercial reportChirag Jain
 
Session 20 interacting with the client
Session 20   interacting with the clientSession 20   interacting with the client
Session 20 interacting with the clientChirag Jain
 
Session 18 tender preparation & evaluation
Session 18   tender preparation & evaluationSession 18   tender preparation & evaluation
Session 18 tender preparation & evaluationChirag Jain
 
Session 17 project management & monitoring
Session 17   project management & monitoringSession 17   project management & monitoring
Session 17 project management & monitoringChirag Jain
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreementChirag Jain
 
Session 15 spvrt project financing
Session 15   spvrt project financingSession 15   spvrt project financing
Session 15 spvrt project financingChirag Jain
 
Session 14 market trends & business proposals
Session 14   market trends & business proposalsSession 14   market trends & business proposals
Session 14 market trends & business proposalsChirag Jain
 
Session 12 project costing & economics
Session 12   project costing & economicsSession 12   project costing & economics
Session 12 project costing & economicsChirag Jain
 
Session 02 solar energy technologies
Session 02   solar energy technologiesSession 02   solar energy technologies
Session 02 solar energy technologiesChirag Jain
 
Session 01 Introduction to the course
Session 01   Introduction to the courseSession 01   Introduction to the course
Session 01 Introduction to the courseChirag Jain
 

More from Chirag Jain (10)

Session 21 preparation of techno commercial report
Session 21   preparation of techno commercial reportSession 21   preparation of techno commercial report
Session 21 preparation of techno commercial report
 
Session 20 interacting with the client
Session 20   interacting with the clientSession 20   interacting with the client
Session 20 interacting with the client
 
Session 18 tender preparation & evaluation
Session 18   tender preparation & evaluationSession 18   tender preparation & evaluation
Session 18 tender preparation & evaluation
 
Session 17 project management & monitoring
Session 17   project management & monitoringSession 17   project management & monitoring
Session 17 project management & monitoring
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreement
 
Session 15 spvrt project financing
Session 15   spvrt project financingSession 15   spvrt project financing
Session 15 spvrt project financing
 
Session 14 market trends & business proposals
Session 14   market trends & business proposalsSession 14   market trends & business proposals
Session 14 market trends & business proposals
 
Session 12 project costing & economics
Session 12   project costing & economicsSession 12   project costing & economics
Session 12 project costing & economics
 
Session 02 solar energy technologies
Session 02   solar energy technologiesSession 02   solar energy technologies
Session 02 solar energy technologies
 
Session 01 Introduction to the course
Session 01   Introduction to the courseSession 01   Introduction to the course
Session 01 Introduction to the course
 

Recently uploaded

Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 

Recently uploaded (20)

Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 

Session 08 design & safety overview

  • 1. Partnership To Advance Clean Energy-Deployment (PACE-D) Technical Assistance Program Presented by USAID PACE-D TA Program Apr-18 Solar PV Rooftop Training Program For Entrepreneurs Session: SPVRT System Design & Safety Overview
  • 2. Contents SPVRT Array Configuration Determining SPVRT Array Capacity SPVRT Array – Inverter Matching Array Mounting Structure – Materials & Design
  • 3. Contents Safety Issues – Personal & System Safety Grid Protection – Anti Islanding Selection of SPVRT Array and Array BOS Components Installation Best Practices
  • 4. SPVRT Array Configuration – SPVRT Array with Multiple Parallel Strings
  • 5. SPVRT Array Configuration – Using Inverter with Multiple MPPT DC Input
  • 6. SPVRT Array Configuration – Using Inverter with Single MPPT at Common DC Bus
  • 7. SPVRT Array Configuration – Single MPPTs Vs. Multiple MPPT Input  According to IEC 62548 Photovoltaic array design requirement, when inverters have multiple MPPT inputs, overcurrent protection of the section of the array may be treated as a separate PV array and each PV array shall have a switch disconnector to provide isolation of the inverter  Where inverter has a single MPPT and multiple input circuits are internally paralleled onto a common DC bus, each PV section connected to one of those inputs shall be treated as a sub-array and each PV sub-array shall have a switch disconnector to provide isolation of the inverter.
  • 8. Determining SPVRT System Capacity  Availability of shadow free area  Installation purpose and budget  Government program and incentive guidelines  State Electricity Regulation  Distribution Transformer capacity  Connected load
  • 9. SPVRT Array & Inverter Matching Matching of SPVRT Array to the voltage specification of an inverter Matching of SPVRT Array to the inverter’s current rating Matching of SPVRT Array to the inverter’s power rating
  • 10. Solar PV Rooftop Array & Inverter Matching – Voltage Matching
  • 11. Array Mounting Structure – Design & Materials Thermal Aspects Expansion / Contraction of modules / Structure Mechanical Loads on PV Structures To comply with related standards Wind To be rated for maximum expected wind speeds Material Accumulation on PV Array Snow, ice, others Corrosion Mounting to be made from corrosion resistant materials Support structures and module mounting arrangements should comply with  Applicable building codes regulations and  Standards and module manufacturer’s mounting requirements Aspects to be considered while designing array mounting structure IEC 62548
  • 12. Array Mounting Structure – Flat RCC Roof
  • 13. Array Mounting Structure – Flat RCC Roof
  • 14. Array Mounting Structure – Installation on Slant Roof
  • 15. Array Mounting Structure – Installation on Slant Roof
  • 16. Safety Issues – Personnel & System Safety  According to IEC 62548 PV arrays for installation on buildings shall have maximum voltages not greater than 1000V DC  For protection against electric shock, the requirements of IEC 60364-4-41 shall apply  The system shall comply with the Central Electricity Authority (Measures Relating to Safety and Electricity Supply) Regulations, 2010  PV module exposed metal earthing and bonding shall be according to 7.4.2 of IEC 62548  If a lightning protection system (LPS) is already installed on the building, the PV system should be integrated into the LPS as appropriate in accordance with IEC 62305-3
  • 17. SPVRT Array Functional Earthing/Bonding Decision Tree Entry Is the PV array maximum voltage >DVC-A? Is array exposed-conductive part required to be earthed for lightning protection? (a) Is array exposed-conductive part required to be earthed for lightning protection? (a) Earth with conductor sized according to 7.4.2.1 and IEC 60364-5-54 Maximum size 6mm2 Earth with conductor sized according to 7.4.2.1 and IEC 60364-5-54 Maximum size 16mm2 NO YES NO YES No requirement NO YES IEC 62548
  • 18. Lightning Protection System for SPVRT System Installation without external lightning protection 1. DC input to inverter (per MPPT) 2. AC output of inverter 3. Low voltage input to metering 4. Communication – Data interface 5. Functional Earthing Source: www.dehn-international.com
  • 19. Lightning Protection System for SPVRT System Installation with external lightning protection with sufficient separation distance 1. DC input to inverter (per MPPT) 2. AC output of inverter 3. Low voltage input to metering 4. Communication – Data interface 5. Functional Earthing / External Lightning Protection Source: www.dehn-international.com
  • 20. Lightning Protection System for SPVRT System Installation with external lightning protection without sufficient separation distance 1. DC input to inverter (per MPPT) 2. AC output of inverter 3. Low voltage input to metering 4. Communication – Data interface 5. Functional Earthing / External Lightning Protection Source: www.dehn-international.com
  • 21. Grid Protection – Anti-islanding Anti-islanding Mechanism Disconnects inverter from grid when Grid power supply is disrupted Grid goes outside preset inverter parameters Passive protection: the inverter disconnects if it detects grid conditions which are over or under the voltage and / or over or under the frequency settings of the inverter Active protection: the inverter will either include frequency or voltage drift- such that when the inverter is disconnected from the larger grid, the voltage or frequency will drift to the point where the passive protection will cause the inverter to trip The inverters disconnect from the grid in either of the above situations to avoid ‘islanding’ through two types of internal protection called passive and active protection
  • 22. Grid Protection – Anti Islanding  According to IEEE 1547 and CEA (technical standards for connectivity of the distributed generation resources) Regulation 2013 - for an unintentional island the grid tied inverter shall detect the island and cease to energize within two seconds of the formation of an island  According to IEEE 1547 the grid connected rooftop soar system shall include an adjustable delay (or a fixed delay of 5 minutes) that may delay reconnection for up to five minutes after the grid voltage and frequency restored. As per CEA Regulation 2013 it shall be for at least 60 seconds  In case another power generation source like DG set in the consumer facility is operated when grid is not available, the inverter may sense the grid availability and in case operation parameters are within the working range it will start functioning and will start feeding to the DG grid; depends on regulation if allowed or not
  • 23. Installation of Isolators PV Array DC Isolator:  A double-pole, load-breaking, DC rated isolating (disconnect) switch should be installed on the DC side of the inverter  It should be rated appropriately for the voltage and current of the PV system Inverter AC Isolator:  Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013 requires an inverter AC isolator to be installed on the output of the inverter  A Main Switch lockable in off position is required to be installed in the switchboard, which is located at a height of at-least 2.44m above the ground level  This allows the PV system to be disconnected from the mains power supply. This main switch may not be rated for load break nor may have feature of overcurrent protection
  • 24. Lidded Cable Tray Labelled Every 2m Virtually No Exposed Conduit Roof penetrations under solar module Using fit for purpose equipment Using black UV rated corrugated Using SS Cable Ties Appropriately Labelled Source: www.gses.in Cable Management at Array
  • 25.  Wiring must complied with IEC 60364 or equivalent national standard  Minimize the area of conductive loops to reduce the magnitude of lightening- induced overvoltage Cabling & Interconnection
  • 27. Documentation Documentation As per IEC 62446: Grid-Connected Photovoltaic Systems—Minimum Requirements for System Documentation, Commissioning Tests and Inspection  System data  Nameplate data – Rated power, manufacturers, models and quantities of PV modules and inverters  Cover page data - contact information for the customer, system designer and system installer, relevant project dates  Wiring Diagrams (Single line diagram with equipment information)  Data sheets (Module and inverter)  O&M information  Test results and commission data
  • 28. 28 Anurag Mishra Senior Clean Energy Specialist USAID/India Email: amishra@usaid.gov Disclaimer: This training material is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this material are the sole responsibility of Nexant, Inc. and do not necessarily reflect the views of USAID or the United States Government. This material was prepared under Contract Number AID-386-C-12-00001.

Editor's Notes

  1. Note to presenter: 1 Presenter must be familiar with the types/ examples of signage that should be fixed in a grid connected PV system