Approach
Qualifying requirement
Tender preparation
Bid evaluation
Tender Document
A document to invite bids from the
eligible bidders to participate in the
Request for Selection (RFS) of Bidders for
Design, manufacture, supply, erection,
testing and commissioning including
warranty, operation & maintenance of
Solar PV Rooftop power system for a
particular site
DEFINITIONS & ABBREVIATIONS
“ Affiliate” shall mean a company that either directly or indirectly
 controls
 is controlled by
 is under common control with
a Bidding Company
“Control” means ownership by one company of at least twenty six percent (26%) of
the voting rights of the other company
 “B.I.S.” - specifications of Bureau of Indian Standards (BIS)
 “Bid” - Techno Commercial and Price Bid submitted by the Bidder along with all
documents / credentials / attachments annexure etc., in response to this RFS, in
accordance with the terms and conditions hereof
 “Bidder/Bidding Company” - Bidding Company submitting the Bid. Any reference
to the Bidder includes Bidding Company / including its successors, executors and
permitted assigns as the context may require
 “CEA” - Central Electricity Authority
 “Commissioning” - Successful operation of the Project / Works by the Contractor,
for the purpose of carrying out Performance Test(s) as defined in RFS
 “Capacity Utilization Factor” (CUF) - the ratio of actual energy generated by
SPVRT project over the year to the equivalent energy output at its rated capacity
over the yearly period
 CUF - actual annual energy generated from the plant in kWh / (installed plant
capacity in kW * 365 * 24)
 "IEC" - specifications of International Electro-technical Commission
 "kWp" - kilo-Watt Peak
 "kWh" - kilo-Watt-hour
 "MNRE" - Ministry of New and Renewable Energy, Government of India
 “O&M” - Operation & Maintenance of Solar PV Rooftop system for 5 years
 “Project Cost / Project Price” - price offered by the Bidder for the Scope of work
as per RFS document for a State
 “Project Capacity” - Capacity in kWp offered by the Bidder for each State
consisting of single or multiple roof tops. The project capacity specified is on
“DC” output Side only
 “Performance Ratio” (PR) - ratio of plant output versus installed plant capacity at
any instance with respect to the radiation measured.
PR= (Measured output in kW / Installed Plant capacity in kW * (1000 W/m2
/Measured radiation intensity in W/m2)
 “Parent” - a company, which holds more than 51% equity either directly or
indirectly in the Bidding Company or Project Company or a Member in a
Consortium developing the Project
 “RESCO” - Renewable Energy Service Companies
 “SNA” - State Nodal Agency
 “Subsidy” - 15% (or latest applicable subsidy as per MNRE) of Project Cost
quoted by the Successful Bidder for a (Location /State) sanctioned by MNRE,
Govt. of India and disbursed by [NAME OF THE ORGANISATION]
PROPOSAL OR TENDER DOCUMENT
Introduction, Bid Details & Instructions to the
Bidders
Example: DESIGN, ENGINEERING, PROCUREMENT & SUPPLY, CONSTRUCTION &
ERECTION, TESTING, COMMISSIONING, ASSOCIATED TRANSMISSION SYSTEM &
COMPREHENSIVE OPERATION & MAINTENANCE FOR 10 (TEN) YEARS OF 10 MW
(AC) SOLAR PV POWER PLANT AT PARADIP PORT TRUST’S PREMISES, (Odisha) NIT
No.: SECI/SD/NIT/2016/PPT/10 MW
Bid Document No SECI/SD/NIT/2016-17
Document availability 7/9/2017 to 20/09/2017
Last date for Bid submission 25/09/2017
Techno-commercial Bid opening 1/10/2017
Tender processing fee(RS.) 5% of the project cost or Rs.2,00,000/-
Qualifying Requirements for Bidders
General
 The Bidder should be a body incorporated in India under the Companies Act, 1956 or
2013 including any amendment thereto, engaged in the business of
Power/Infrastructure
 A copy of certificate of incorporation, Memorandum of Association & Article of
Association shall be furnished along with the bid in support of above
Incorporation of a Project Company
 In case the Bidder wishes to incorporate a Project Company, in such a case, Bidder if
selected as a Successful Bidder can incorporate a Project Company
 Bidder shall be responsible to get all clearance required/obtained in the name of the
Bidding Company transferred in the name of the Project Company
 The aggregate equity share holding of the Successful Bidder in the issued and paid
up equity share capital of the Project Company shall not be less than fifty one percent
(51%) up to a period of two(2) years from the date of commissioning of the entire
Sanctioned Capacity of the Project Developer
 The bidder should have designed, supplied, erected / supervised erection and
commissioned / supervised commissioning of Solar Photo Voltaic (SPV) based grid
connected power Plant(s) of following cumulative installed capacity of 20 MW or more of
Ground mounted Solar PV Plant, out of which at least one Plants should have been of 5
MW capacity or above & minimum capacity of plant of at least 1 MW (one megawatt)
 The reference Plant of 5 MW or above capacity must have been in successful operation
for at least One Year prior to the date of this Bid
Technical Eligibility Criteria
Example: The minimum average annual turnover of the Bidder in the preceding three (3)
financial years as on the date of Technical bid opening, shall be following:
 INR 45 Crores (Indian Rupees Forty-five Crores only) or in equivalent foreign currency
(Bill Selling Rate / TT Selling Rate of the foreign currency as established by State Bank
of India, prevalent as on 30 days prior to the scheduled date set for Techno-commercial
Bid opening)
 The Bidder will provide a copy each of audited annual report of previous three financial
years for ascertaining their turnover and Net Worth along with Bank Statements for the
purpose of verification
Financial Eligibility Criteria
 The [NAME OF THE ORGANISATION] will not enter into any correspondence with the
Bidders, except to furnish clarifications on RFS Documents, if necessary
 The Bidders may seek clarifications or suggest amendments to RFS in writing, through a
letter or by fax (and also soft copy by e-mail) to reach [NAME OF THE ORGANISATION]
at the address, date and time mentioned in Bid information sheet
Clarifications & Pre-Bid Meeting
Conditions of Contract
Scope of Work
 The scope of work for the bidder include Identification of buildings/leasing
rooftop of buildings for 25 years, Obtaining No Objection Certificate (NOC)”
from Distribution Company (DISCOM) for grid connectivity, complete design,
engineering, manufacture, supply, storage, civil work, erection, testing &
commissioning of the grid connected rooftop solar PV project including
operation and maintenance (O&M) of the project for a period of Five years after
commissioning
Project Cost / Levellized Tariff
 The Project cost / Levellized tariff shall include all the costs related to above
Scope of Work
 The Bidder shall be responsible and take an Insurance Policy for transit-cum storage-
cum-erection for all the materials to cover all risks and liabilities for supply of materials
on site basis, storage of materials at site, erection, testing and commissioning
 The bidder shall also take appropriate insurance during O&M period.
Insurance
The Bidder shall warrant that the goods supplied under this contract are new, unused, of
the most recent or latest technology and incorporate all recent improvements in design and
materials. The bidder shall provide system warrantee covering the rectification of any and
all defects in the design of equipment, materials and workmanship including spare parts for
a period of 5 years from the date of commissioning
Warranties & Guarantees
The Design, engineering, manufacture, supply, installation, testing and performance of the
equipment shall be in accordance with latest appropriate IEC/Indian Standards as detailed
in the Section- III (Technical specifications) of the bid document
Type & Quality of Materials & Workmanship
The bidder shall be responsible for Operation and Maintenance of the Roof top Solar PV
system of capacity above 10kWp for a period of 5 years, during which [NAME OF THE
ORGANISATION] will monitor the project for effective performance in line with conditions
specified elsewhere in the bid document and for project having capacity upto 10kWp (Part-
B consumers) project should have warranty for 5 years only.
Operation & Maintenance (O&M)
Metering and grid connectivity of the SPVRT system under this scheme would be the
responsibility of the Bidder in accordance with the prevailing guidelines of the concerned
DISCOM and / or CEA (if available by the time of implementation)
Metering & Grid Connectivity
The successful bidder shall be required to meet minimum guaranteed generation with
Performance Ratio (PR) at the time of commissioning and related Capacity Utilization
Factor (CUF) as per the GHI levels of the location during the O&M period
Plant Performance Evaluation
The bidder shall submit the progress report monthly to [NAME OF THE ORGANISATION] in
Prescribed Pro forma
Other Conditions:
The Successful bidder shall not transfer, assign or sublet the work under this contract or
any substantial part thereof to any other party without the prior consent of [NAME OF THE
ORGANISATION] in writing
Progress Report
Evaluation Criteria
The Evaluation Process comprises the following 4 steps
Step 1:
Responsiveness check of Techno-Commercial Bid
Step 2:
Evaluations of Bidder’s fulfillment of Eligibility Criteria as per Clause of
Section-I
Step 3:
Evaluation of Price Bid
Step 4:
Selection of successful Bidder
 Bid Bond and Processing Fee submission
 Requirement of approvals on makes of the components
 Time of completion of allocated capacity
 Penalty for delay in project implementation, example:
PENALTY = ((performance security)/180 days)*delayed days = (7, 50,000 /180)*36
 Commissioning / Completion Certificate
Other Conditions
Technical Specifications
 Solar PV modules consisting of
required number of Crystalline PV
modules
 Array structure
 Junction boxes
 DC distribution board
 AC distribution panel board
 Grid interactive Power Conditioning
Unit with Remote Monitoring System
 Mounting structures
 Junction Boxes
 Earthing and lightening protections
 IR/UV protected PVC Cables, pipes
and accessories
 Safety measures
Solar PV Rooftop system shall consist of following equipments/components
Price Bid (61)
S.
No.
Description Total bid
capacity
in kWp
Project cost
as per bid
document
Total
project
cost as
per
capacity
(Rs.)
1. Design, Engineering,
Manufacturing, Storage, Civil
Work, Supply, Erection, Testing &
Commissioning including trail
Operation, Operation &
Maintenance and other
requirements as per the RFS.
500kWp Unit price
(Rs.)
 Covering Letter
 Format-A (Shareholding Certificate)
 Format for Bid Bond
 Format for Performance Bank Guarantee (PBG)
 Check List for Bank Guarantees
 Power Of Attorney
 Financial Eligibility Criteria Requirement
 Format for Certificate of Relationship of Parent Company or Affiliate with the Bidding
Company
 Consortium Agreement
Format for Submitting RFS (66)
30
Anurag Mishra
Senior Clean Energy Specialist
USAID/India
Email: amishra@usaid.gov
Disclaimer:
This training material is made possible by the support of the American
People through the United States Agency for International
Development (USAID). The contents of this material are the sole
responsibility of Nexant, Inc. and do not necessarily reflect the views of
USAID or the United States Government. This material was prepared
under Contract Number AID-386-C-12-00001.

More Related Content

What's hot

Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl finalPRIYANK JAIN
 
Eai presentation investment challenges in small hydro in india delhi mar 2010
Eai presentation investment challenges in small hydro in india delhi mar 2010Eai presentation investment challenges in small hydro in india delhi mar 2010
Eai presentation investment challenges in small hydro in india delhi mar 2010Renganathan M G
 
Session 09 spvrt business models
Session 09   spvrt business modelsSession 09   spvrt business models
Session 09 spvrt business modelsChirag Jain
 
Drafting and Negotiating the Optimal Power Purchase Agreement
Drafting and Negotiating the Optimal Power Purchase AgreementDrafting and Negotiating the Optimal Power Purchase Agreement
Drafting and Negotiating the Optimal Power Purchase AgreementCenter for Sustainable Energy
 
Owner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilitiesOwner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilitiesGensol Engineering Limited
 
Solar PPA Presentation
Solar PPA PresentationSolar PPA Presentation
Solar PPA Presentationmatt_UCI
 
Intelligent power transmission asset management solutions
Intelligent power transmission asset management solutionsIntelligent power transmission asset management solutions
Intelligent power transmission asset management solutionsRavindranatha Reddy Bandi
 
Ozone - Corporate Profile Detailed
Ozone - Corporate Profile DetailedOzone - Corporate Profile Detailed
Ozone - Corporate Profile DetailedSetu Goyal
 
Solar and wind power forecasting
Solar and wind power forecastingSolar and wind power forecasting
Solar and wind power forecastingRCREEE
 
Energy Manager_MRV article pdf
Energy Manager_MRV article pdfEnergy Manager_MRV article pdf
Energy Manager_MRV article pdfAvijit Choudhury
 
MARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORMARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORRanbir Ghosh
 
Funding Digester Projects thru USDA - Lavin
Funding Digester Projects thru USDA - LavinFunding Digester Projects thru USDA - Lavin
Funding Digester Projects thru USDA - LavinMassRecycle .
 
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...ScottMadden, Inc.
 
Merc approach paper for determination of soalr tariff 2014
Merc approach paper for determination of soalr tariff 2014Merc approach paper for determination of soalr tariff 2014
Merc approach paper for determination of soalr tariff 2014indianpowerindustry.com
 
Renewable Energy Risk Assessment
Renewable Energy Risk AssessmentRenewable Energy Risk Assessment
Renewable Energy Risk AssessmentGrace Madingou
 

What's hot (20)

Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl final
 
2 sun shot perspective-pathways to reducing pv lcoe
2   sun shot perspective-pathways to reducing pv lcoe2   sun shot perspective-pathways to reducing pv lcoe
2 sun shot perspective-pathways to reducing pv lcoe
 
Eai presentation investment challenges in small hydro in india delhi mar 2010
Eai presentation investment challenges in small hydro in india delhi mar 2010Eai presentation investment challenges in small hydro in india delhi mar 2010
Eai presentation investment challenges in small hydro in india delhi mar 2010
 
Session 09 spvrt business models
Session 09   spvrt business modelsSession 09   spvrt business models
Session 09 spvrt business models
 
Drafting and Negotiating the Optimal Power Purchase Agreement
Drafting and Negotiating the Optimal Power Purchase AgreementDrafting and Negotiating the Optimal Power Purchase Agreement
Drafting and Negotiating the Optimal Power Purchase Agreement
 
Owner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilitiesOwner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilities
 
Solar PPA Presentation
Solar PPA PresentationSolar PPA Presentation
Solar PPA Presentation
 
Intelligent power transmission asset management solutions
Intelligent power transmission asset management solutionsIntelligent power transmission asset management solutions
Intelligent power transmission asset management solutions
 
Ozone - Corporate Profile Detailed
Ozone - Corporate Profile DetailedOzone - Corporate Profile Detailed
Ozone - Corporate Profile Detailed
 
MARG-OPENACCESS
MARG-OPENACCESSMARG-OPENACCESS
MARG-OPENACCESS
 
Solar and wind power forecasting
Solar and wind power forecastingSolar and wind power forecasting
Solar and wind power forecasting
 
9 incorporating energy storage into pv system design
9   incorporating energy storage into pv system design9   incorporating energy storage into pv system design
9 incorporating energy storage into pv system design
 
Energy Manager_MRV article pdf
Energy Manager_MRV article pdfEnergy Manager_MRV article pdf
Energy Manager_MRV article pdf
 
MARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORMARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTOR
 
Funding Digester Projects thru USDA - Lavin
Funding Digester Projects thru USDA - LavinFunding Digester Projects thru USDA - Lavin
Funding Digester Projects thru USDA - Lavin
 
Demand Response in the US
Demand Response in the US Demand Response in the US
Demand Response in the US
 
6.4_From Resiliency to Solvency_Horne_EPRI/SNL Microgrid Symposium
6.4_From Resiliency to Solvency_Horne_EPRI/SNL Microgrid Symposium6.4_From Resiliency to Solvency_Horne_EPRI/SNL Microgrid Symposium
6.4_From Resiliency to Solvency_Horne_EPRI/SNL Microgrid Symposium
 
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...
 
Merc approach paper for determination of soalr tariff 2014
Merc approach paper for determination of soalr tariff 2014Merc approach paper for determination of soalr tariff 2014
Merc approach paper for determination of soalr tariff 2014
 
Renewable Energy Risk Assessment
Renewable Energy Risk AssessmentRenewable Energy Risk Assessment
Renewable Energy Risk Assessment
 

Similar to Session 18 tender preparation & evaluation

Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderGensol Engineering Limited
 
Ntpc limited development of 750 mw( 6 x125 mw each )
Ntpc limited  development of 750 mw( 6 x125 mw each )Ntpc limited  development of 750 mw( 6 x125 mw each )
Ntpc limited development of 750 mw( 6 x125 mw each )Lawrence George
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Gensol Engineering Limited
 
Bid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandBid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandHeadway Solar
 
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarSummary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarPratap Malempati
 
Jnnsm phase ii summary
Jnnsm phase ii summaryJnnsm phase ii summary
Jnnsm phase ii summarypj_priyanka
 
Ipds volume i.35-39
Ipds volume i.35-39Ipds volume i.35-39
Ipds volume i.35-39Sanjay Kumar
 
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerRf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerPratap Malempati
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Gensol Engineering Limited
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
Lec 6.public procurement rules-2004
Lec 6.public procurement rules-2004Lec 6.public procurement rules-2004
Lec 6.public procurement rules-2004drshah965
 
Technical and financial_evaluation
Technical and financial_evaluationTechnical and financial_evaluation
Technical and financial_evaluationRCREEE
 
SPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdfSPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdfApoorvaR18
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesMANTHAN CHAUHAN
 
Rfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiRfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiHeadway Solar
 
Solar PV Net meetering explained
Solar PV Net meetering explainedSolar PV Net meetering explained
Solar PV Net meetering explainedAndy Varoshiotis
 

Similar to Session 18 tender preparation & evaluation (20)

Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Bihar rfp
Bihar rfpBihar rfp
Bihar rfp
 
Ntpc limited development of 750 mw( 6 x125 mw each )
Ntpc limited  development of 750 mw( 6 x125 mw each )Ntpc limited  development of 750 mw( 6 x125 mw each )
Ntpc limited development of 750 mw( 6 x125 mw each )
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
 
Bid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandBid document for Solar Plant in Jharkhand
Bid document for Solar Plant in Jharkhand
 
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarSummary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
 
Jnnsm phase ii summary
Jnnsm phase ii summaryJnnsm phase ii summary
Jnnsm phase ii summary
 
Ipds volume i.35-39
Ipds volume i.35-39Ipds volume i.35-39
Ipds volume i.35-39
 
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerRf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Lec 6.public procurement rules-2004
Lec 6.public procurement rules-2004Lec 6.public procurement rules-2004
Lec 6.public procurement rules-2004
 
Technical and financial_evaluation
Technical and financial_evaluationTechnical and financial_evaluation
Technical and financial_evaluation
 
SPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdfSPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdf
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 
Rfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiRfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in Delhi
 
Solar PV Net meetering explained
Solar PV Net meetering explainedSolar PV Net meetering explained
Solar PV Net meetering explained
 
CK2017: SIDBI Initiatives on Clean Energy Adoption
CK2017: SIDBI Initiatives on Clean Energy Adoption CK2017: SIDBI Initiatives on Clean Energy Adoption
CK2017: SIDBI Initiatives on Clean Energy Adoption
 
Potential next steps for developers if URD 14D/114 is passed
Potential next steps for developers if URD 14D/114 is passedPotential next steps for developers if URD 14D/114 is passed
Potential next steps for developers if URD 14D/114 is passed
 

More from Chirag Jain

quiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship Developmentquiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship DevelopmentChirag Jain
 
Session 19 project performance evaluation Operation & Maintenance planning
Session 19   project performance evaluation Operation & Maintenance planningSession 19   project performance evaluation Operation & Maintenance planning
Session 19 project performance evaluation Operation & Maintenance planningChirag Jain
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
Session 11 overview of simulation software
Session 11   overview of simulation softwareSession 11   overview of simulation software
Session 11 overview of simulation softwareChirag Jain
 
Session 10 grid interconnections & commissioning test procedures
Session 10   grid interconnections & commissioning test proceduresSession 10   grid interconnections & commissioning test procedures
Session 10 grid interconnections & commissioning test proceduresChirag Jain
 
Session 08 design & safety overview
Session 08   design & safety overviewSession 08   design & safety overview
Session 08 design & safety overviewChirag Jain
 
Session 07 site assessment & planning
Session 07   site assessment & planningSession 07   site assessment & planning
Session 07 site assessment & planningChirag Jain
 
Session 06 balance of system components
Session 06   balance of system componentsSession 06   balance of system components
Session 06 balance of system componentsChirag Jain
 
Session 05 grid connected inverter
Session 05   grid connected inverterSession 05   grid connected inverter
Session 05 grid connected inverterChirag Jain
 
Session 04 solar pv modules
Session 04   solar pv modulesSession 04   solar pv modules
Session 04 solar pv modulesChirag Jain
 
Session 03 solar pv rooftop technology overview
Session 03   solar pv rooftop technology overviewSession 03   solar pv rooftop technology overview
Session 03 solar pv rooftop technology overviewChirag Jain
 
Session 02 solar energy technologies
Session 02   solar energy technologiesSession 02   solar energy technologies
Session 02 solar energy technologiesChirag Jain
 

More from Chirag Jain (12)

quiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship Developmentquiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship Development
 
Session 19 project performance evaluation Operation & Maintenance planning
Session 19   project performance evaluation Operation & Maintenance planningSession 19   project performance evaluation Operation & Maintenance planning
Session 19 project performance evaluation Operation & Maintenance planning
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
Session 11 overview of simulation software
Session 11   overview of simulation softwareSession 11   overview of simulation software
Session 11 overview of simulation software
 
Session 10 grid interconnections & commissioning test procedures
Session 10   grid interconnections & commissioning test proceduresSession 10   grid interconnections & commissioning test procedures
Session 10 grid interconnections & commissioning test procedures
 
Session 08 design & safety overview
Session 08   design & safety overviewSession 08   design & safety overview
Session 08 design & safety overview
 
Session 07 site assessment & planning
Session 07   site assessment & planningSession 07   site assessment & planning
Session 07 site assessment & planning
 
Session 06 balance of system components
Session 06   balance of system componentsSession 06   balance of system components
Session 06 balance of system components
 
Session 05 grid connected inverter
Session 05   grid connected inverterSession 05   grid connected inverter
Session 05 grid connected inverter
 
Session 04 solar pv modules
Session 04   solar pv modulesSession 04   solar pv modules
Session 04 solar pv modules
 
Session 03 solar pv rooftop technology overview
Session 03   solar pv rooftop technology overviewSession 03   solar pv rooftop technology overview
Session 03 solar pv rooftop technology overview
 
Session 02 solar energy technologies
Session 02   solar energy technologiesSession 02   solar energy technologies
Session 02 solar energy technologies
 

Recently uploaded

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 

Recently uploaded (20)

TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 

Session 18 tender preparation & evaluation

  • 1. Partnership To Advance Clean Energy-Deployment (PACE-D) Technical Assistance Program Presented by USAID PACE-D TA Program Apr-18 Solar PV Rooftop Training Program For Entrepreneurs Session: Tender Preparation & Evaluation
  • 3. Tender Document A document to invite bids from the eligible bidders to participate in the Request for Selection (RFS) of Bidders for Design, manufacture, supply, erection, testing and commissioning including warranty, operation & maintenance of Solar PV Rooftop power system for a particular site
  • 5. “ Affiliate” shall mean a company that either directly or indirectly  controls  is controlled by  is under common control with a Bidding Company “Control” means ownership by one company of at least twenty six percent (26%) of the voting rights of the other company
  • 6.  “B.I.S.” - specifications of Bureau of Indian Standards (BIS)  “Bid” - Techno Commercial and Price Bid submitted by the Bidder along with all documents / credentials / attachments annexure etc., in response to this RFS, in accordance with the terms and conditions hereof  “Bidder/Bidding Company” - Bidding Company submitting the Bid. Any reference to the Bidder includes Bidding Company / including its successors, executors and permitted assigns as the context may require  “CEA” - Central Electricity Authority  “Commissioning” - Successful operation of the Project / Works by the Contractor, for the purpose of carrying out Performance Test(s) as defined in RFS
  • 7.  “Capacity Utilization Factor” (CUF) - the ratio of actual energy generated by SPVRT project over the year to the equivalent energy output at its rated capacity over the yearly period  CUF - actual annual energy generated from the plant in kWh / (installed plant capacity in kW * 365 * 24)  "IEC" - specifications of International Electro-technical Commission  "kWp" - kilo-Watt Peak  "kWh" - kilo-Watt-hour  "MNRE" - Ministry of New and Renewable Energy, Government of India
  • 8.  “O&M” - Operation & Maintenance of Solar PV Rooftop system for 5 years  “Project Cost / Project Price” - price offered by the Bidder for the Scope of work as per RFS document for a State  “Project Capacity” - Capacity in kWp offered by the Bidder for each State consisting of single or multiple roof tops. The project capacity specified is on “DC” output Side only  “Performance Ratio” (PR) - ratio of plant output versus installed plant capacity at any instance with respect to the radiation measured. PR= (Measured output in kW / Installed Plant capacity in kW * (1000 W/m2 /Measured radiation intensity in W/m2)
  • 9.  “Parent” - a company, which holds more than 51% equity either directly or indirectly in the Bidding Company or Project Company or a Member in a Consortium developing the Project  “RESCO” - Renewable Energy Service Companies  “SNA” - State Nodal Agency  “Subsidy” - 15% (or latest applicable subsidy as per MNRE) of Project Cost quoted by the Successful Bidder for a (Location /State) sanctioned by MNRE, Govt. of India and disbursed by [NAME OF THE ORGANISATION]
  • 10. PROPOSAL OR TENDER DOCUMENT
  • 11.
  • 12. Introduction, Bid Details & Instructions to the Bidders Example: DESIGN, ENGINEERING, PROCUREMENT & SUPPLY, CONSTRUCTION & ERECTION, TESTING, COMMISSIONING, ASSOCIATED TRANSMISSION SYSTEM & COMPREHENSIVE OPERATION & MAINTENANCE FOR 10 (TEN) YEARS OF 10 MW (AC) SOLAR PV POWER PLANT AT PARADIP PORT TRUST’S PREMISES, (Odisha) NIT No.: SECI/SD/NIT/2016/PPT/10 MW Bid Document No SECI/SD/NIT/2016-17 Document availability 7/9/2017 to 20/09/2017 Last date for Bid submission 25/09/2017 Techno-commercial Bid opening 1/10/2017 Tender processing fee(RS.) 5% of the project cost or Rs.2,00,000/-
  • 13. Qualifying Requirements for Bidders General  The Bidder should be a body incorporated in India under the Companies Act, 1956 or 2013 including any amendment thereto, engaged in the business of Power/Infrastructure  A copy of certificate of incorporation, Memorandum of Association & Article of Association shall be furnished along with the bid in support of above Incorporation of a Project Company  In case the Bidder wishes to incorporate a Project Company, in such a case, Bidder if selected as a Successful Bidder can incorporate a Project Company  Bidder shall be responsible to get all clearance required/obtained in the name of the Bidding Company transferred in the name of the Project Company  The aggregate equity share holding of the Successful Bidder in the issued and paid up equity share capital of the Project Company shall not be less than fifty one percent (51%) up to a period of two(2) years from the date of commissioning of the entire Sanctioned Capacity of the Project Developer
  • 14.  The bidder should have designed, supplied, erected / supervised erection and commissioned / supervised commissioning of Solar Photo Voltaic (SPV) based grid connected power Plant(s) of following cumulative installed capacity of 20 MW or more of Ground mounted Solar PV Plant, out of which at least one Plants should have been of 5 MW capacity or above & minimum capacity of plant of at least 1 MW (one megawatt)  The reference Plant of 5 MW or above capacity must have been in successful operation for at least One Year prior to the date of this Bid Technical Eligibility Criteria
  • 15. Example: The minimum average annual turnover of the Bidder in the preceding three (3) financial years as on the date of Technical bid opening, shall be following:  INR 45 Crores (Indian Rupees Forty-five Crores only) or in equivalent foreign currency (Bill Selling Rate / TT Selling Rate of the foreign currency as established by State Bank of India, prevalent as on 30 days prior to the scheduled date set for Techno-commercial Bid opening)  The Bidder will provide a copy each of audited annual report of previous three financial years for ascertaining their turnover and Net Worth along with Bank Statements for the purpose of verification Financial Eligibility Criteria
  • 16.  The [NAME OF THE ORGANISATION] will not enter into any correspondence with the Bidders, except to furnish clarifications on RFS Documents, if necessary  The Bidders may seek clarifications or suggest amendments to RFS in writing, through a letter or by fax (and also soft copy by e-mail) to reach [NAME OF THE ORGANISATION] at the address, date and time mentioned in Bid information sheet Clarifications & Pre-Bid Meeting
  • 17. Conditions of Contract Scope of Work  The scope of work for the bidder include Identification of buildings/leasing rooftop of buildings for 25 years, Obtaining No Objection Certificate (NOC)” from Distribution Company (DISCOM) for grid connectivity, complete design, engineering, manufacture, supply, storage, civil work, erection, testing & commissioning of the grid connected rooftop solar PV project including operation and maintenance (O&M) of the project for a period of Five years after commissioning Project Cost / Levellized Tariff  The Project cost / Levellized tariff shall include all the costs related to above Scope of Work
  • 18.  The Bidder shall be responsible and take an Insurance Policy for transit-cum storage- cum-erection for all the materials to cover all risks and liabilities for supply of materials on site basis, storage of materials at site, erection, testing and commissioning  The bidder shall also take appropriate insurance during O&M period. Insurance
  • 19. The Bidder shall warrant that the goods supplied under this contract are new, unused, of the most recent or latest technology and incorporate all recent improvements in design and materials. The bidder shall provide system warrantee covering the rectification of any and all defects in the design of equipment, materials and workmanship including spare parts for a period of 5 years from the date of commissioning Warranties & Guarantees
  • 20. The Design, engineering, manufacture, supply, installation, testing and performance of the equipment shall be in accordance with latest appropriate IEC/Indian Standards as detailed in the Section- III (Technical specifications) of the bid document Type & Quality of Materials & Workmanship
  • 21. The bidder shall be responsible for Operation and Maintenance of the Roof top Solar PV system of capacity above 10kWp for a period of 5 years, during which [NAME OF THE ORGANISATION] will monitor the project for effective performance in line with conditions specified elsewhere in the bid document and for project having capacity upto 10kWp (Part- B consumers) project should have warranty for 5 years only. Operation & Maintenance (O&M)
  • 22. Metering and grid connectivity of the SPVRT system under this scheme would be the responsibility of the Bidder in accordance with the prevailing guidelines of the concerned DISCOM and / or CEA (if available by the time of implementation) Metering & Grid Connectivity
  • 23. The successful bidder shall be required to meet minimum guaranteed generation with Performance Ratio (PR) at the time of commissioning and related Capacity Utilization Factor (CUF) as per the GHI levels of the location during the O&M period Plant Performance Evaluation
  • 24. The bidder shall submit the progress report monthly to [NAME OF THE ORGANISATION] in Prescribed Pro forma Other Conditions: The Successful bidder shall not transfer, assign or sublet the work under this contract or any substantial part thereof to any other party without the prior consent of [NAME OF THE ORGANISATION] in writing Progress Report
  • 25. Evaluation Criteria The Evaluation Process comprises the following 4 steps Step 1: Responsiveness check of Techno-Commercial Bid Step 2: Evaluations of Bidder’s fulfillment of Eligibility Criteria as per Clause of Section-I Step 3: Evaluation of Price Bid Step 4: Selection of successful Bidder
  • 26.  Bid Bond and Processing Fee submission  Requirement of approvals on makes of the components  Time of completion of allocated capacity  Penalty for delay in project implementation, example: PENALTY = ((performance security)/180 days)*delayed days = (7, 50,000 /180)*36  Commissioning / Completion Certificate Other Conditions
  • 27. Technical Specifications  Solar PV modules consisting of required number of Crystalline PV modules  Array structure  Junction boxes  DC distribution board  AC distribution panel board  Grid interactive Power Conditioning Unit with Remote Monitoring System  Mounting structures  Junction Boxes  Earthing and lightening protections  IR/UV protected PVC Cables, pipes and accessories  Safety measures Solar PV Rooftop system shall consist of following equipments/components
  • 28. Price Bid (61) S. No. Description Total bid capacity in kWp Project cost as per bid document Total project cost as per capacity (Rs.) 1. Design, Engineering, Manufacturing, Storage, Civil Work, Supply, Erection, Testing & Commissioning including trail Operation, Operation & Maintenance and other requirements as per the RFS. 500kWp Unit price (Rs.)
  • 29.  Covering Letter  Format-A (Shareholding Certificate)  Format for Bid Bond  Format for Performance Bank Guarantee (PBG)  Check List for Bank Guarantees  Power Of Attorney  Financial Eligibility Criteria Requirement  Format for Certificate of Relationship of Parent Company or Affiliate with the Bidding Company  Consortium Agreement Format for Submitting RFS (66)
  • 30. 30 Anurag Mishra Senior Clean Energy Specialist USAID/India Email: amishra@usaid.gov Disclaimer: This training material is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this material are the sole responsibility of Nexant, Inc. and do not necessarily reflect the views of USAID or the United States Government. This material was prepared under Contract Number AID-386-C-12-00001.