Business-oriented Korea’s Flagship R&D Program:
Korea Micro Energy Grid (K-MEG) Project
Youngmin Kwon, Ph.D., LEED AP
Technology R&D Center
SAMSUNG C&T Corp.
Contents
| 2 |
OverviewⅠ
ConceptⅡ
Biz ModelingⅢ
StrategiesⅣ
Demonstration PlanⅤ
Project Overview
| 3 |
| 4 |
Project Period
- July 2011 ~ June 2013 (3 years)
Budget
- Approx. 100 mil. USD (64% government fund + 36% matching fund)
Korea’s Future Flagship Program – Project in Energy Field:
Korea Micro Energy Grid (K-MEG)
Project Administrator
- Korea Ministry of Knowledge Economy (MKE)
Summary
Project Leader
- Samsung C&T Corporation
| 5 |
Objectives
 To develop an optimal total energy solution
in response to energy production/supply/consumption
 To develop a systematized solution w/ a highly efficient O&M system
 To develop a custom-ready solution for the target market
 To improve building energy saving by 30% w/ active systems
and limited renewable energy till 2015
 To implement and validate the developed solutions
in domestic and overseas public or commercial buildings
Develop Total Energy Solution Packages for Energy-Saving
Implementing IT, Smart Grid Technologies, EMS, Building Automation, DR, Security,
Decentralized Power Sources, Renewables, etc.
| 6 |
Consortium Members
11 Large Companies
12 R&D Centers, Universities, etc.
33 Small & Medium Enterprises
5 Foreign Partners
56 Members + 13 Supporting Partners
across Energy/IT/Engineering/Construction/etc.
| 7 |
Key Players
• ’11년 2.5GW규모의 캐나다 온타리
오주 풍력, 태양광 복합단지 개발
사업 수행
• ’10년 현재 204,706㎡ 규모의
LEED 인증 빌딩 7개 설계 진
행 중
• IT Integration Service
• ’08년 미국 멕시코만 심해 탐사사
업 외 다수 자원개발 사업 진행 중
• ’10년 14,000세대 규모
광명역세권 집단에너지 사업
• ’09년 38억$ 규모의 카자흐스탄
발전사업 및 프로젝트 파이낸싱
성공
Operation &
Management
Design/Construction
/System Integration
Development /
Manufacturing
Business Planning/
Project Management
Emerging
Technology
• 스마트그리드 실증 운영
• 전국 4,000여개 전화국사 EMS
15년간 운영 중
• 반월/시화 지역에너지그리드
실증단지 운영
• 국내 최고의 ESCO사
• ’부천 EMS 실증단지 운영
• ’11년 400kV 초고압 케이블 인증
• ’09년 230kV 변압기 국내 최초 KEMA인증
• 국내 중전기기 생산 1위
초고압 변압기 국내 57%
차단기 (GIS, GCB) 국내 52%
배전 변압기 국내 48%
• 800kW급 2절점 가스절연 개폐기
세계 최초 개발
• 국내 최초 소형 열병합 발전 시스템 개발
• 정밀 소재 부품 전문 기업
• 튜너, 정밀모터 분야 세계 1등 제품 생산
• 스팀플라즈마 마이크로 웨이브 토치
• 플라즈마 가스화 발전 기술
• DC 배전망 기술 / 누전차단 접지
PE-IGCC
DC
• DC 배전 실증
• DC IDC
Value Chain & Global Positioning
| 8 |
Organization Chart
Steering Committee
R&D and Business
Supporting Councils
Unit 1
# of Members: 23
Leader:
Samsung C&T Corp.
K-MEG R&D Center
Unit 2
# of Members: 11
Unit 3
# of Members: 13
Unit 4
# of Members: 21
Unit 5
# of Members: 14
| 9 |
Unit Projects
Unit
Project 1 K-MEG Feasibility Test & Business Development
Unit
Project 2 K-MEG Energy Total Operation & Management System
Unit
Project 3 K-MEG Energy Grid Implementation
Unit
Project 4 K-MEG Optimal Energy Management System
Unit
Project 5
K-MEG Open-ended Test Bed Established by
DC Distribution Grid
K-MEG Concept
| 10 |
| 11 |
Macro Grid to Micro Grid
Integration of Electric Power, Heat, Gas and Water
Integration
Independent MACRO Grid Integrated MICRO Grid
COP
(Coefficient Of Performance)
w/ an IT Infrastructure on the K-MEG Smart Platform
| 12 |
K-MEG System Overall Palette: Energy Block Platform
Plug & Play Interoperability
| 13 |
Energy Block Platform Concept
Platform Modeling/Customizing
Custom Modeling of Energy Supply/Consumption Systems
Custom Modeling _ Various Energy Block Platforms
Based on Energy Block Platform Concept Interlaced with IT Infrastructure
Biz Modeling
| 14 |
| 15 |
Biz Points _ Demand Side
Consumer
1
2
3
Improvement of
Energy Use Pattern
Reduction of
Energy Consumption
Efficiency of
Energy Sources
Use of Renewables
High-cost Energy
Low-cost Energy
Energy Provider 4
| 16 |
Biz Points _ Supply Side
3 Bio Mass High-cost Energy
2
Energy after Use
(ex. wasted heat)
Consumer
Generatedenergyby-product
from incinerators, etc.
Energy Provider
Low-cost Energy
1
Energy By-product
(ex. heat in process)
4
Plasma Enhanced
IGCC
| 17 |
Biz Models
01_Building
Energy Efficiency
Model
03_Energy
Independent
Off Grid Model
02_Industrial Heat
Recovery Model
04_Mixed-use
Energy Saving
Model
Energy Efficient Biz Models
Strategies
| 18 |
| 19 |
Approach
G2G
Investment
& Funding
Technology
Convergence
Nation’s
Top Small
Business
| 20 |
Biz Models Domestic Demo Sites Overseas Demo Sites
1_Building
Energy Efficiency
 G-Valley
 COEX
 Seoul Nat’l University
 AIG Tower, NY, USA
 CITRIS HQ, CA, USA
 VTT Tech. Research Ctr., Finland
 Aalto Univ. Library, Finland
 St. Petersburg State Univ., Russia
2_Industrial
Heat Recovery
 Banwol/Shihwa
Industrial Complex
3_Mixed-use
Energy Saving
 Bucheon Mixed-use
4_Off Grid
Energy Independent
 Gunjang Industrial Complex
- PE-IGCC Plant
 PE-IGCC Plant, India
 Solar Power Plant, Indonesia
 Wind Power Plant, Australia
First Global References Diverse K-MEG Solution Packages
Global Validation
| 21 |
Global Business & Financing Plan
* 유럽부흥개발은행 [ European Bank for Reconstruction and Development ]
* 아시아개발은행 [ ADB ; Asian Development Bank ]
* 한국수출입은행[ the Export-Import Bank of Korea]
* SPC [ Special Purpose Company ]
G2G InvestmentReturn
OfficeofStrategicR&DPlanning
Projects
Special Purpose Company [SPC]
K-MEG
CONSORTIUM
Governments of
Target Countries
KICOX
KoreaIndustrialComplexCorp.
Demonstration Plan
| 22 |
| 23 |
Demo Sites in Korea
Gunjang –
Industrial Complex
Korea University –
Education & Research
Facility Design
Bucheon –
Mixed-use
Banwol/Shihwa –
Industrial Complex
Seoul National
University –
Education/Research
Coex –
Commercial
Guro –
Industrial Complex
| 24 |
Overseas Demo Sites
Russia
Education/Research
Finland
Education & Research
India – Energy
Independence
Indonesia – Energy
Independence
Australia – Energy
Independence
USA
Education/Research
USA
Commercial
| 25 |
Demo Plan by K-MEG Smart Grids
Gas Grid Off Grid
Bucheon Mixed-use Building
Gunjang Industrial Complex
- PE-IGCC Plant
PE-IGCC Plant in India
X-Island in Australia (Wind)
X-Island in Indonesia (Solar)
K-MEG
Electric Grid
Guro Digital Industrial Complex
COEX
Seoul National University
VTT in Finland
CITRIS HQ in US
AIG Tower in US
Heat Grid
Banwol/Shihaw
National Industrial Complex
St. Petersburg State Univ.
in Russia
Aalto Univ. Library in Finland
Banwol/Shihwa Nat’l Industrial Complex
Korea
Location: Gyeonggi-Do Ansan-Si Danwon-Gu, Wonsi-Dong / Siheung-Si, Junwond-Dong | Use: Banwal
(5,099 companies) Shihwa (8,389 Companies)
Size: Banwal (15,374,000m2), Shihwa (16,568,000m2) | Completed: Banwal(1987), Shihwa(2006)
| 26 |
“The Biggest Industrial Complex in Capital Region
Using Variety of Energy Sources”
St. Petersburg State Univ.
Russia
Location St. Petersburg, Russia | Use Lecture Hall, Research Facility | Completed 1789
Size Below ground 1, Above ground 4 (GFA : 31,800 m2)
| 27 |
“Russia‟s
Cultural Assets built in 1789”
| 28 |
Aalto University Library
Finland
Location Espoo, Finland | Use Library, Education/Research | Completed 1969
Size 5-story (GFA : 9,864 m2)
“Representative of
Finland‟s Famous Architect,
Alvar Aalto‟s Work”
Guro Digital Nat’l Industrial Complex (G-Valley)
Korea
Toward World First Micro Grid Industrial Complex
Location Guro-Dong, Guro-Gu, Seoul, Korea | Use Manufacturers, Offices (4,221)
Size Site Area : 452,647㎡ 32 Buildings 4,100 Companies | Completed 1974
| 29 |
“The World Largest Building-type
Manufacturing Complex”
COEX Complex
Korea
Location Samsung-Dong, Gangnam-Gu, Seoul | Use Commercial Buildings
Size GFA 1,217,970 m*m (368,436 PY), COEX Area 213,691PY (approx 58%) | Completed 1964
| 30 |
“Korea‟s Biggest Mixed-use Complex,
the Hub of
Global Business in Asia,
which held G20”
- Convention & Exhibition Center (COEX)
- Office Building
- Retails
Seoul National University
Korea
Location 56-1 Shinrim-Dong, Kwonak-Gu, Seoul | Use Lecture and Research Facility | Completed 1974
Size : B1 ~ 4F, GFA 7,500㎡
| 31 |
“The Biggest Energy Consumer per Unit Area
among State-run Building Properties in Korea”
AIG Tower
NY, United States
Location 70 Pine Street, New York, NY. US | Use Office | Completed 1932
Size 66 Floors (GFA 102,193 m2)
| 32 |
“Historical Landmark Building
Built in 1932 in Manhattan, NY”
VTT Tech. Research Center
Finland
Location Espoo, Finland | Use Research and Office
Size 12 buildings with 3~4 floors | Completed 1970
| 33 |
“The Biggest Non-profit Research Institute
in Northern Europe”
CITRIS HQ
CA, United States
Location Berkeley, CA, US | Use Office, Research | Completed 2009
Size Sutardja Dai Hall GFA : 13,100 m2
| 34 |
“The Institute in California
Running a Test Bed to Implement
„Building-to-Grid‟ Technology”
Bucheon Joong-Dong Mixed-use Complex
Korea
Location Jung-Dong, Wonmi-Gu, Bucheon-Si, Gyeonggi-Do | Use Commercial / Residential |
Completed 2006 Size 225 Units (1~3 Floors Commercial, 4~14 Residential)
| 35 |
“Concurrent Validation
of a Biz Model w/
Residential & Commercial Units”
Gunjang Nat’l Industrial Complex
Korea
Location 53-8 Soryong-Dong Gunsan-Si, Jeonrahbuk-Do | Use Plant | Completed 2012
Size 2MW PE-IGCC (Plasma Enhanced Integrated Gasification Combined Cycle)
| 36 |
“Off-Grid Model to Validate
at the Industrial Complex
w/ a Combined Heat & Power Plant in Operation”
PE-IGCC Plant
India
Location TBD | USe Plant | Size 20ton/day, 2MW | Groundbreaking 2012
Plasma Enhanced-IGCC can be the solution for
power shortage in India.
| 37 |
“More than 100,000 Towns
with no Power
become our New Market”
Island Off-Grid
Australia
Location Classified | Use Residential | Groundbreaking 2012
| 38 |
“Australia‟s Standard Off-Grid Model,
Potentially for its 8,000 Islands”
Location Classified | Use Plant | Groundbreaking 2012
Island Off-Grid
Indonesia
| 39 |
“Indonesia‟s Typical Off-Grid Model,
Potentially for its 13,700 Islands”
| 40 |
Business Vision
Smart Platform
Smart Energy Grids
Smart Cities
- Easy to Adopt during Urban Planning
30% Building Energy Saving
- w/ Active Systems
Waste Energy (Heat) Recovery
Independent Energy Supply
Total
Energy
Service
Provider
K-MEG

More Related Content

What's hot

Technology Bundle Approach with Parameter estimated from Bottom-up model to I...
Technology Bundle Approach with Parameter estimated from Bottom-up model to I...Technology Bundle Approach with Parameter estimated from Bottom-up model to I...
Technology Bundle Approach with Parameter estimated from Bottom-up model to I...IEA-ETSAP
 
FinalPaperS2015-CornellTech-Planning
FinalPaperS2015-CornellTech-PlanningFinalPaperS2015-CornellTech-Planning
FinalPaperS2015-CornellTech-PlanningIlia Savin
 
Successful R&I in Europe 2017 - 8th European Networking Event
Successful R&I in Europe 2017 - 8th European Networking Event Successful R&I in Europe 2017 - 8th European Networking Event
Successful R&I in Europe 2017 - 8th European Networking Event Cluster TWEED
 
REE4EU brochure-first-year-results
REE4EU brochure-first-year-resultsREE4EU brochure-first-year-results
REE4EU brochure-first-year-resultsJokin Hidalgo
 
Workshop on high efficiency and low-cost drivetrains for electric vehicles
Workshop on high efficiency and low-cost drivetrains for electric vehiclesWorkshop on high efficiency and low-cost drivetrains for electric vehicles
Workshop on high efficiency and low-cost drivetrains for electric vehiclesLeonardo ENERGY
 
Assessment of renewable energy in nation-wide power grid in Japan by optimal ...
Assessment of renewable energy in nation-wide power grid in Japan by optimal ...Assessment of renewable energy in nation-wide power grid in Japan by optimal ...
Assessment of renewable energy in nation-wide power grid in Japan by optimal ...IEA-ETSAP
 
Presentation Solar Technologies Leonardo Energy - ICREPQ Congress 2009
Presentation Solar Technologies   Leonardo Energy   - ICREPQ Congress 2009Presentation Solar Technologies   Leonardo Energy   - ICREPQ Congress 2009
Presentation Solar Technologies Leonardo Energy - ICREPQ Congress 2009Leonardo ENERGY
 
Embodied Energy In Building Construction
Embodied Energy In Building ConstructionEmbodied Energy In Building Construction
Embodied Energy In Building ConstructionSandeep Jaiswal
 
2018 03 Embodied Energy in Buildings
2018 03 Embodied Energy in Buildings2018 03 Embodied Energy in Buildings
2018 03 Embodied Energy in BuildingsJennifer Fox
 
IEA Bioenergy TCP: preparing the role of bioenergy in the future energy system
IEA Bioenergy TCP: preparing the role of bioenergy in the future energy systemIEA Bioenergy TCP: preparing the role of bioenergy in the future energy system
IEA Bioenergy TCP: preparing the role of bioenergy in the future energy systemIEA-ETSAP
 
Zero Energy Buildings
Zero Energy BuildingsZero Energy Buildings
Zero Energy BuildingsJeffrey Funk
 
Modelling flexible electric vehicle charging in local energy communities
Modelling flexible electric vehicle charging in local energy communitiesModelling flexible electric vehicle charging in local energy communities
Modelling flexible electric vehicle charging in local energy communitiesIEA-ETSAP
 
Energy efficiency building code
Energy  efficiency building codeEnergy  efficiency building code
Energy efficiency building codeJhanvi Desai
 
Zero Energy Building in Malaysia by SEDA Malaysia
Zero Energy Building in Malaysia by SEDA MalaysiaZero Energy Building in Malaysia by SEDA Malaysia
Zero Energy Building in Malaysia by SEDA MalaysiaSteve Lojuntin
 
2021 hidalgo et al. - development of an innovative process involving the us...
2021   hidalgo et al. - development of an innovative process involving the us...2021   hidalgo et al. - development of an innovative process involving the us...
2021 hidalgo et al. - development of an innovative process involving the us...Jokin Hidalgo
 

What's hot (20)

ECBC User Guide
ECBC User GuideECBC User Guide
ECBC User Guide
 
Technology Bundle Approach with Parameter estimated from Bottom-up model to I...
Technology Bundle Approach with Parameter estimated from Bottom-up model to I...Technology Bundle Approach with Parameter estimated from Bottom-up model to I...
Technology Bundle Approach with Parameter estimated from Bottom-up model to I...
 
FinalPaperS2015-CornellTech-Planning
FinalPaperS2015-CornellTech-PlanningFinalPaperS2015-CornellTech-Planning
FinalPaperS2015-CornellTech-Planning
 
Successful R&I in Europe 2017 - 8th European Networking Event
Successful R&I in Europe 2017 - 8th European Networking Event Successful R&I in Europe 2017 - 8th European Networking Event
Successful R&I in Europe 2017 - 8th European Networking Event
 
REE4EU brochure-first-year-results
REE4EU brochure-first-year-resultsREE4EU brochure-first-year-results
REE4EU brochure-first-year-results
 
Workshop on high efficiency and low-cost drivetrains for electric vehicles
Workshop on high efficiency and low-cost drivetrains for electric vehiclesWorkshop on high efficiency and low-cost drivetrains for electric vehicles
Workshop on high efficiency and low-cost drivetrains for electric vehicles
 
Assessment of renewable energy in nation-wide power grid in Japan by optimal ...
Assessment of renewable energy in nation-wide power grid in Japan by optimal ...Assessment of renewable energy in nation-wide power grid in Japan by optimal ...
Assessment of renewable energy in nation-wide power grid in Japan by optimal ...
 
Presentation Solar Technologies Leonardo Energy - ICREPQ Congress 2009
Presentation Solar Technologies   Leonardo Energy   - ICREPQ Congress 2009Presentation Solar Technologies   Leonardo Energy   - ICREPQ Congress 2009
Presentation Solar Technologies Leonardo Energy - ICREPQ Congress 2009
 
Towards a decarbonised heating and cooling sector in Europe – Unlocking the ...
 Towards a decarbonised heating and cooling sector in Europe – Unlocking the ... Towards a decarbonised heating and cooling sector in Europe – Unlocking the ...
Towards a decarbonised heating and cooling sector in Europe – Unlocking the ...
 
Embodied Energy In Building Construction
Embodied Energy In Building ConstructionEmbodied Energy In Building Construction
Embodied Energy In Building Construction
 
2018 03 Embodied Energy in Buildings
2018 03 Embodied Energy in Buildings2018 03 Embodied Energy in Buildings
2018 03 Embodied Energy in Buildings
 
IEA Bioenergy TCP: preparing the role of bioenergy in the future energy system
IEA Bioenergy TCP: preparing the role of bioenergy in the future energy systemIEA Bioenergy TCP: preparing the role of bioenergy in the future energy system
IEA Bioenergy TCP: preparing the role of bioenergy in the future energy system
 
Zero Energy Buildings
Zero Energy BuildingsZero Energy Buildings
Zero Energy Buildings
 
Modelling flexible electric vehicle charging in local energy communities
Modelling flexible electric vehicle charging in local energy communitiesModelling flexible electric vehicle charging in local energy communities
Modelling flexible electric vehicle charging in local energy communities
 
Europe’s Future Energy System: Local, Smart & 100% Renewable
Europe’s Future Energy System: Local, Smart & 100% Renewable Europe’s Future Energy System: Local, Smart & 100% Renewable
Europe’s Future Energy System: Local, Smart & 100% Renewable
 
Energy efficiency building code
Energy  efficiency building codeEnergy  efficiency building code
Energy efficiency building code
 
Ecbc heating and pumping
Ecbc heating and pumpingEcbc heating and pumping
Ecbc heating and pumping
 
Zero Energy Building in Malaysia by SEDA Malaysia
Zero Energy Building in Malaysia by SEDA MalaysiaZero Energy Building in Malaysia by SEDA Malaysia
Zero Energy Building in Malaysia by SEDA Malaysia
 
2021 hidalgo et al. - development of an innovative process involving the us...
2021   hidalgo et al. - development of an innovative process involving the us...2021   hidalgo et al. - development of an innovative process involving the us...
2021 hidalgo et al. - development of an innovative process involving the us...
 
Low embodied energy
Low embodied energyLow embodied energy
Low embodied energy
 

Viewers also liked

Real-time simulator requirement for micro-grid simulation vs large power system
Real-time simulator requirement for micro-grid simulation vs large power systemReal-time simulator requirement for micro-grid simulation vs large power system
Real-time simulator requirement for micro-grid simulation vs large power systemOPAL-RT TECHNOLOGIES
 
Modular Scalable Micro Grid: ICEPAG 2016 Presentation
Modular Scalable Micro Grid: ICEPAG 2016 PresentationModular Scalable Micro Grid: ICEPAG 2016 Presentation
Modular Scalable Micro Grid: ICEPAG 2016 PresentationEnergy Technologies, Inc. (ETI)
 
Roof top solar PV connected DC micro grids as smart grids
Roof top solar PV connected DC micro grids as smart gridsRoof top solar PV connected DC micro grids as smart grids
Roof top solar PV connected DC micro grids as smart gridsBrhamesh Alipuria
 
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREASBangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREASSmart Villages
 
PV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvementPV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvementNiteesh Shanbog
 
Micro-Grid Power: Working Intelligently and Working Together
Micro-Grid Power: Working Intelligently and Working TogetherMicro-Grid Power: Working Intelligently and Working Together
Micro-Grid Power: Working Intelligently and Working TogetherBrian Lucke
 
Impact of Distributed Generation on Energy Loss
Impact of Distributed Generation on Energy LossImpact of Distributed Generation on Energy Loss
Impact of Distributed Generation on Energy LossNadineCroes
 
Smart Microgrids: Overview and Outlook
Smart Microgrids: Overview and OutlookSmart Microgrids: Overview and Outlook
Smart Microgrids: Overview and OutlookWilfried Elmenreich
 
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...Smart Villages
 
RECENT TRENDS IN MICRO GRIDS
     RECENT TRENDS IN MICRO GRIDS     RECENT TRENDS IN MICRO GRIDS
RECENT TRENDS IN MICRO GRIDSbetha divya
 
Microgrid Presentation
Microgrid PresentationMicrogrid Presentation
Microgrid PresentationShahab Khan
 
MicroGrid and Energy Storage System COMPLETE DETAILS NEW PPT
MicroGrid and Energy Storage System COMPLETE DETAILS NEW PPTMicroGrid and Energy Storage System COMPLETE DETAILS NEW PPT
MicroGrid and Energy Storage System COMPLETE DETAILS NEW PPT Abin Baby
 
Micro-Grid in India
Micro-Grid in IndiaMicro-Grid in India
Micro-Grid in Indiasanjeevirny
 

Viewers also liked (16)

Real-time simulator requirement for micro-grid simulation vs large power system
Real-time simulator requirement for micro-grid simulation vs large power systemReal-time simulator requirement for micro-grid simulation vs large power system
Real-time simulator requirement for micro-grid simulation vs large power system
 
Modular Scalable Micro Grid: ICEPAG 2016 Presentation
Modular Scalable Micro Grid: ICEPAG 2016 PresentationModular Scalable Micro Grid: ICEPAG 2016 Presentation
Modular Scalable Micro Grid: ICEPAG 2016 Presentation
 
Roof top solar PV connected DC micro grids as smart grids
Roof top solar PV connected DC micro grids as smart gridsRoof top solar PV connected DC micro grids as smart grids
Roof top solar PV connected DC micro grids as smart grids
 
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREASBangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
 
PV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvementPV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvement
 
Micro-Grid Power: Working Intelligently and Working Together
Micro-Grid Power: Working Intelligently and Working TogetherMicro-Grid Power: Working Intelligently and Working Together
Micro-Grid Power: Working Intelligently and Working Together
 
Impact of Distributed Generation on Energy Loss
Impact of Distributed Generation on Energy LossImpact of Distributed Generation on Energy Loss
Impact of Distributed Generation on Energy Loss
 
Smart Microgrids: Overview and Outlook
Smart Microgrids: Overview and OutlookSmart Microgrids: Overview and Outlook
Smart Microgrids: Overview and Outlook
 
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
 
RECENT TRENDS IN MICRO GRIDS
     RECENT TRENDS IN MICRO GRIDS     RECENT TRENDS IN MICRO GRIDS
RECENT TRENDS IN MICRO GRIDS
 
Microgrid
MicrogridMicrogrid
Microgrid
 
Microgrid Presentation
Microgrid PresentationMicrogrid Presentation
Microgrid Presentation
 
MicroGrid and Energy Storage System COMPLETE DETAILS NEW PPT
MicroGrid and Energy Storage System COMPLETE DETAILS NEW PPTMicroGrid and Energy Storage System COMPLETE DETAILS NEW PPT
MicroGrid and Energy Storage System COMPLETE DETAILS NEW PPT
 
PPT ON POWER SYSTEM STABILITY
PPT ON POWER SYSTEM STABILITYPPT ON POWER SYSTEM STABILITY
PPT ON POWER SYSTEM STABILITY
 
Micro-Grid in India
Micro-Grid in IndiaMicro-Grid in India
Micro-Grid in India
 
isolation
isolationisolation
isolation
 

Similar to Business Oriented R&D Program: Introduction of Korea Micro Energy Grid (K-MEG) Project

Lam Khin Yong: Inputs on Opportunities in Research, ISCN
Lam Khin Yong: Inputs on Opportunities in Research, ISCNLam Khin Yong: Inputs on Opportunities in Research, ISCN
Lam Khin Yong: Inputs on Opportunities in Research, ISCNISCN_Secretariat
 
Paper presentation
Paper presentationPaper presentation
Paper presentationSudeep Kc
 
EN-Sunwod Energy solution Co., Ltd presentaion.pptx
EN-Sunwod Energy solution Co., Ltd presentaion.pptxEN-Sunwod Energy solution Co., Ltd presentaion.pptx
EN-Sunwod Energy solution Co., Ltd presentaion.pptxZhong Huimin
 
Energy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildingsEnergy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildingschirag aggarwal
 
NZC - Olgyay Scaling
NZC - Olgyay ScalingNZC - Olgyay Scaling
NZC - Olgyay ScalingWRONG PERSON
 
Wallonia Meets Energy Campus Nürnberg | LLN - 09 décembre 2019
Wallonia Meets Energy Campus Nürnberg | LLN - 09 décembre 2019Wallonia Meets Energy Campus Nürnberg | LLN - 09 décembre 2019
Wallonia Meets Energy Campus Nürnberg | LLN - 09 décembre 2019Cluster TWEED
 
Business Models for Ultra Low Emission Vehicles & Sustainability
Business Models for Ultra Low Emission Vehicles & SustainabilityBusiness Models for Ultra Low Emission Vehicles & Sustainability
Business Models for Ultra Low Emission Vehicles & SustainabilityGavin Harper
 
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET-  	  Design of Small Hydro Electric Power Plant at CheeyapparaIRJET-  	  Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET- Design of Small Hydro Electric Power Plant at CheeyapparaIRJET Journal
 
150316 case studies
150316 case studies150316 case studies
150316 case studiesTieng Wei
 
GCL System PPT July 2016
GCL System PPT July 2016GCL System PPT July 2016
GCL System PPT July 2016Maria Samoila
 
Beautiful beijing esco report summary 9 nov 2015
Beautiful beijing esco report summary 9 nov 2015Beautiful beijing esco report summary 9 nov 2015
Beautiful beijing esco report summary 9 nov 2015Business Finland
 
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...Amanda Finkenbinder, MPM
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Shanti Pless
 
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...Amanda Finkenbinder, MPM
 

Similar to Business Oriented R&D Program: Introduction of Korea Micro Energy Grid (K-MEG) Project (20)

Lam Khin Yong: Inputs on Opportunities in Research, ISCN
Lam Khin Yong: Inputs on Opportunities in Research, ISCNLam Khin Yong: Inputs on Opportunities in Research, ISCN
Lam Khin Yong: Inputs on Opportunities in Research, ISCN
 
VTT wind and solar innovation activities and offering, Matti Paljakka VTT
VTT wind and solar innovation activities and offering, Matti Paljakka VTTVTT wind and solar innovation activities and offering, Matti Paljakka VTT
VTT wind and solar innovation activities and offering, Matti Paljakka VTT
 
Paper presentation
Paper presentationPaper presentation
Paper presentation
 
bca
bcabca
bca
 
EN-Sunwod Energy solution Co., Ltd presentaion.pptx
EN-Sunwod Energy solution Co., Ltd presentaion.pptxEN-Sunwod Energy solution Co., Ltd presentaion.pptx
EN-Sunwod Energy solution Co., Ltd presentaion.pptx
 
Energy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildingsEnergy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildings
 
NZC - Olgyay Scaling
NZC - Olgyay ScalingNZC - Olgyay Scaling
NZC - Olgyay Scaling
 
Imagineering
ImagineeringImagineering
Imagineering
 
Wallonia Meets Energy Campus Nürnberg | LLN - 09 décembre 2019
Wallonia Meets Energy Campus Nürnberg | LLN - 09 décembre 2019Wallonia Meets Energy Campus Nürnberg | LLN - 09 décembre 2019
Wallonia Meets Energy Campus Nürnberg | LLN - 09 décembre 2019
 
Business Models for Ultra Low Emission Vehicles & Sustainability
Business Models for Ultra Low Emission Vehicles & SustainabilityBusiness Models for Ultra Low Emission Vehicles & Sustainability
Business Models for Ultra Low Emission Vehicles & Sustainability
 
YOKO NEDO: Smart Community Projects
YOKO NEDO: Smart Community ProjectsYOKO NEDO: Smart Community Projects
YOKO NEDO: Smart Community Projects
 
The Energy-Water Nexus (Thirsty Energy), by Pol Adarve from Abengoa
The Energy-Water Nexus (Thirsty Energy), by Pol Adarve from AbengoaThe Energy-Water Nexus (Thirsty Energy), by Pol Adarve from Abengoa
The Energy-Water Nexus (Thirsty Energy), by Pol Adarve from Abengoa
 
Co e poster_14.08.2017_final
Co e poster_14.08.2017_finalCo e poster_14.08.2017_final
Co e poster_14.08.2017_final
 
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET-  	  Design of Small Hydro Electric Power Plant at CheeyapparaIRJET-  	  Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
 
150316 case studies
150316 case studies150316 case studies
150316 case studies
 
GCL System PPT July 2016
GCL System PPT July 2016GCL System PPT July 2016
GCL System PPT July 2016
 
Beautiful beijing esco report summary 9 nov 2015
Beautiful beijing esco report summary 9 nov 2015Beautiful beijing esco report summary 9 nov 2015
Beautiful beijing esco report summary 9 nov 2015
 
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
 
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...
 

More from IEA DSM Implementing Agreement (IA)

Converting Demand Side Operation in to an Accurate Tool for the Transmission ...
Converting Demand Side Operation in to an Accurate Tool for the Transmission ...Converting Demand Side Operation in to an Accurate Tool for the Transmission ...
Converting Demand Side Operation in to an Accurate Tool for the Transmission ...IEA DSM Implementing Agreement (IA)
 
Utilities Industry & the Capital Market - Under Pressure - Utilities Global S...
Utilities Industry & the Capital Market - Under Pressure - Utilities Global S...Utilities Industry & the Capital Market - Under Pressure - Utilities Global S...
Utilities Industry & the Capital Market - Under Pressure - Utilities Global S...IEA DSM Implementing Agreement (IA)
 
Practical experiences with internal and external energy performance contracti...
Practical experiences with internal and external energy performance contracti...Practical experiences with internal and external energy performance contracti...
Practical experiences with internal and external energy performance contracti...IEA DSM Implementing Agreement (IA)
 
From theory based policy evaluation to smart policy design: lessons learned f...
From theory based policy evaluation to smart policy design: lessons learned f...From theory based policy evaluation to smart policy design: lessons learned f...
From theory based policy evaluation to smart policy design: lessons learned f...IEA DSM Implementing Agreement (IA)
 
Registration and validation in Denmark – the principles and the chosen solutions
Registration and validation in Denmark – the principles and the chosen solutionsRegistration and validation in Denmark – the principles and the chosen solutions
Registration and validation in Denmark – the principles and the chosen solutionsIEA DSM Implementing Agreement (IA)
 
The New Structure for PSO Activities in Denmark – Goals and Overall Set-up
The New Structure for PSO Activities in Denmark – Goals and Overall Set-upThe New Structure for PSO Activities in Denmark – Goals and Overall Set-up
The New Structure for PSO Activities in Denmark – Goals and Overall Set-upIEA DSM Implementing Agreement (IA)
 
Measuring and verifying energy savings within the Energy Fund Model in Norway
Measuring and verifying energy savings within the Energy Fund Model in NorwayMeasuring and verifying energy savings within the Energy Fund Model in Norway
Measuring and verifying energy savings within the Energy Fund Model in NorwayIEA DSM Implementing Agreement (IA)
 
The Italian white certificates market and the measurement and verification of...
The Italian white certificates market and the measurement and verification of...The Italian white certificates market and the measurement and verification of...
The Italian white certificates market and the measurement and verification of...IEA DSM Implementing Agreement (IA)
 
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...Energy Efficiency Obligations - the UK Practical Experience on Validating & E...
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...IEA DSM Implementing Agreement (IA)
 
Energy services in practice – Saving energy and directly earn money
Energy services in practice – Saving energy and directly earn moneyEnergy services in practice – Saving energy and directly earn money
Energy services in practice – Saving energy and directly earn moneyIEA DSM Implementing Agreement (IA)
 
Australian Energy Efficiency and Demand Side Management Activities
Australian Energy Efficiency and Demand Side Management ActivitiesAustralian Energy Efficiency and Demand Side Management Activities
Australian Energy Efficiency and Demand Side Management ActivitiesIEA DSM Implementing Agreement (IA)
 

More from IEA DSM Implementing Agreement (IA) (20)

Converting Demand Side Operation in to an Accurate Tool for the Transmission ...
Converting Demand Side Operation in to an Accurate Tool for the Transmission ...Converting Demand Side Operation in to an Accurate Tool for the Transmission ...
Converting Demand Side Operation in to an Accurate Tool for the Transmission ...
 
Customer Organizations
Customer OrganizationsCustomer Organizations
Customer Organizations
 
Market Mechanisms for White Certificates
Market Mechanisms for White CertificatesMarket Mechanisms for White Certificates
Market Mechanisms for White Certificates
 
Consumer's Services Companies
Consumer's Services CompaniesConsumer's Services Companies
Consumer's Services Companies
 
Utilities Industry & the Capital Market - Under Pressure - Utilities Global S...
Utilities Industry & the Capital Market - Under Pressure - Utilities Global S...Utilities Industry & the Capital Market - Under Pressure - Utilities Global S...
Utilities Industry & the Capital Market - Under Pressure - Utilities Global S...
 
Practical experiences with internal and external energy performance contracti...
Practical experiences with internal and external energy performance contracti...Practical experiences with internal and external energy performance contracti...
Practical experiences with internal and external energy performance contracti...
 
Efficiency Valuation: Fine Tuning M&V for Business Transactions
Efficiency Valuation: Fine Tuning M&V for Business TransactionsEfficiency Valuation: Fine Tuning M&V for Business Transactions
Efficiency Valuation: Fine Tuning M&V for Business Transactions
 
From theory based policy evaluation to smart policy design: lessons learned f...
From theory based policy evaluation to smart policy design: lessons learned f...From theory based policy evaluation to smart policy design: lessons learned f...
From theory based policy evaluation to smart policy design: lessons learned f...
 
Registration and validation in Denmark – the principles and the chosen solutions
Registration and validation in Denmark – the principles and the chosen solutionsRegistration and validation in Denmark – the principles and the chosen solutions
Registration and validation in Denmark – the principles and the chosen solutions
 
The New Structure for PSO Activities in Denmark – Goals and Overall Set-up
The New Structure for PSO Activities in Denmark – Goals and Overall Set-upThe New Structure for PSO Activities in Denmark – Goals and Overall Set-up
The New Structure for PSO Activities in Denmark – Goals and Overall Set-up
 
Measuring and verifying energy savings within the Energy Fund Model in Norway
Measuring and verifying energy savings within the Energy Fund Model in NorwayMeasuring and verifying energy savings within the Energy Fund Model in Norway
Measuring and verifying energy savings within the Energy Fund Model in Norway
 
The Italian white certificates market and the measurement and verification of...
The Italian white certificates market and the measurement and verification of...The Italian white certificates market and the measurement and verification of...
The Italian white certificates market and the measurement and verification of...
 
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...Energy Efficiency Obligations - the UK Practical Experience on Validating & E...
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...
 
EU Directive on Energy End-Use and Services
EU Directive on Energy End-Use and ServicesEU Directive on Energy End-Use and Services
EU Directive on Energy End-Use and Services
 
Automatic meter management – A customer's perspective
Automatic meter management – A customer's perspectiveAutomatic meter management – A customer's perspective
Automatic meter management – A customer's perspective
 
Options for a White Certificates scheme in the Netherlands
Options for a White Certificates scheme in the NetherlandsOptions for a White Certificates scheme in the Netherlands
Options for a White Certificates scheme in the Netherlands
 
Energy services in practice – Saving energy and directly earn money
Energy services in practice – Saving energy and directly earn moneyEnergy services in practice – Saving energy and directly earn money
Energy services in practice – Saving energy and directly earn money
 
Monitoring information for EU reporting
Monitoring information for EU reportingMonitoring information for EU reporting
Monitoring information for EU reporting
 
Australian Energy Efficiency and Demand Side Management Activities
Australian Energy Efficiency and Demand Side Management ActivitiesAustralian Energy Efficiency and Demand Side Management Activities
Australian Energy Efficiency and Demand Side Management Activities
 
USA Activities on DSM (Demand Response & Energy Efficiency)
USA Activities on DSM (Demand Response & Energy Efficiency)USA Activities on DSM (Demand Response & Energy Efficiency)
USA Activities on DSM (Demand Response & Energy Efficiency)
 

Business Oriented R&D Program: Introduction of Korea Micro Energy Grid (K-MEG) Project

  • 1. Business-oriented Korea’s Flagship R&D Program: Korea Micro Energy Grid (K-MEG) Project Youngmin Kwon, Ph.D., LEED AP Technology R&D Center SAMSUNG C&T Corp.
  • 2. Contents | 2 | OverviewⅠ ConceptⅡ Biz ModelingⅢ StrategiesⅣ Demonstration PlanⅤ
  • 4. | 4 | Project Period - July 2011 ~ June 2013 (3 years) Budget - Approx. 100 mil. USD (64% government fund + 36% matching fund) Korea’s Future Flagship Program – Project in Energy Field: Korea Micro Energy Grid (K-MEG) Project Administrator - Korea Ministry of Knowledge Economy (MKE) Summary Project Leader - Samsung C&T Corporation
  • 5. | 5 | Objectives  To develop an optimal total energy solution in response to energy production/supply/consumption  To develop a systematized solution w/ a highly efficient O&M system  To develop a custom-ready solution for the target market  To improve building energy saving by 30% w/ active systems and limited renewable energy till 2015  To implement and validate the developed solutions in domestic and overseas public or commercial buildings Develop Total Energy Solution Packages for Energy-Saving Implementing IT, Smart Grid Technologies, EMS, Building Automation, DR, Security, Decentralized Power Sources, Renewables, etc.
  • 6. | 6 | Consortium Members 11 Large Companies 12 R&D Centers, Universities, etc. 33 Small & Medium Enterprises 5 Foreign Partners 56 Members + 13 Supporting Partners across Energy/IT/Engineering/Construction/etc.
  • 7. | 7 | Key Players • ’11년 2.5GW규모의 캐나다 온타리 오주 풍력, 태양광 복합단지 개발 사업 수행 • ’10년 현재 204,706㎡ 규모의 LEED 인증 빌딩 7개 설계 진 행 중 • IT Integration Service • ’08년 미국 멕시코만 심해 탐사사 업 외 다수 자원개발 사업 진행 중 • ’10년 14,000세대 규모 광명역세권 집단에너지 사업 • ’09년 38억$ 규모의 카자흐스탄 발전사업 및 프로젝트 파이낸싱 성공 Operation & Management Design/Construction /System Integration Development / Manufacturing Business Planning/ Project Management Emerging Technology • 스마트그리드 실증 운영 • 전국 4,000여개 전화국사 EMS 15년간 운영 중 • 반월/시화 지역에너지그리드 실증단지 운영 • 국내 최고의 ESCO사 • ’부천 EMS 실증단지 운영 • ’11년 400kV 초고압 케이블 인증 • ’09년 230kV 변압기 국내 최초 KEMA인증 • 국내 중전기기 생산 1위 초고압 변압기 국내 57% 차단기 (GIS, GCB) 국내 52% 배전 변압기 국내 48% • 800kW급 2절점 가스절연 개폐기 세계 최초 개발 • 국내 최초 소형 열병합 발전 시스템 개발 • 정밀 소재 부품 전문 기업 • 튜너, 정밀모터 분야 세계 1등 제품 생산 • 스팀플라즈마 마이크로 웨이브 토치 • 플라즈마 가스화 발전 기술 • DC 배전망 기술 / 누전차단 접지 PE-IGCC DC • DC 배전 실증 • DC IDC Value Chain & Global Positioning
  • 8. | 8 | Organization Chart Steering Committee R&D and Business Supporting Councils Unit 1 # of Members: 23 Leader: Samsung C&T Corp. K-MEG R&D Center Unit 2 # of Members: 11 Unit 3 # of Members: 13 Unit 4 # of Members: 21 Unit 5 # of Members: 14
  • 9. | 9 | Unit Projects Unit Project 1 K-MEG Feasibility Test & Business Development Unit Project 2 K-MEG Energy Total Operation & Management System Unit Project 3 K-MEG Energy Grid Implementation Unit Project 4 K-MEG Optimal Energy Management System Unit Project 5 K-MEG Open-ended Test Bed Established by DC Distribution Grid
  • 11. | 11 | Macro Grid to Micro Grid Integration of Electric Power, Heat, Gas and Water Integration Independent MACRO Grid Integrated MICRO Grid COP (Coefficient Of Performance) w/ an IT Infrastructure on the K-MEG Smart Platform
  • 12. | 12 | K-MEG System Overall Palette: Energy Block Platform Plug & Play Interoperability
  • 13. | 13 | Energy Block Platform Concept Platform Modeling/Customizing Custom Modeling of Energy Supply/Consumption Systems Custom Modeling _ Various Energy Block Platforms Based on Energy Block Platform Concept Interlaced with IT Infrastructure
  • 15. | 15 | Biz Points _ Demand Side Consumer 1 2 3 Improvement of Energy Use Pattern Reduction of Energy Consumption Efficiency of Energy Sources Use of Renewables High-cost Energy Low-cost Energy Energy Provider 4
  • 16. | 16 | Biz Points _ Supply Side 3 Bio Mass High-cost Energy 2 Energy after Use (ex. wasted heat) Consumer Generatedenergyby-product from incinerators, etc. Energy Provider Low-cost Energy 1 Energy By-product (ex. heat in process) 4 Plasma Enhanced IGCC
  • 17. | 17 | Biz Models 01_Building Energy Efficiency Model 03_Energy Independent Off Grid Model 02_Industrial Heat Recovery Model 04_Mixed-use Energy Saving Model Energy Efficient Biz Models
  • 19. | 19 | Approach G2G Investment & Funding Technology Convergence Nation’s Top Small Business
  • 20. | 20 | Biz Models Domestic Demo Sites Overseas Demo Sites 1_Building Energy Efficiency  G-Valley  COEX  Seoul Nat’l University  AIG Tower, NY, USA  CITRIS HQ, CA, USA  VTT Tech. Research Ctr., Finland  Aalto Univ. Library, Finland  St. Petersburg State Univ., Russia 2_Industrial Heat Recovery  Banwol/Shihwa Industrial Complex 3_Mixed-use Energy Saving  Bucheon Mixed-use 4_Off Grid Energy Independent  Gunjang Industrial Complex - PE-IGCC Plant  PE-IGCC Plant, India  Solar Power Plant, Indonesia  Wind Power Plant, Australia First Global References Diverse K-MEG Solution Packages Global Validation
  • 21. | 21 | Global Business & Financing Plan * 유럽부흥개발은행 [ European Bank for Reconstruction and Development ] * 아시아개발은행 [ ADB ; Asian Development Bank ] * 한국수출입은행[ the Export-Import Bank of Korea] * SPC [ Special Purpose Company ] G2G InvestmentReturn OfficeofStrategicR&DPlanning Projects Special Purpose Company [SPC] K-MEG CONSORTIUM Governments of Target Countries KICOX KoreaIndustrialComplexCorp.
  • 23. | 23 | Demo Sites in Korea Gunjang – Industrial Complex Korea University – Education & Research Facility Design Bucheon – Mixed-use Banwol/Shihwa – Industrial Complex Seoul National University – Education/Research Coex – Commercial Guro – Industrial Complex
  • 24. | 24 | Overseas Demo Sites Russia Education/Research Finland Education & Research India – Energy Independence Indonesia – Energy Independence Australia – Energy Independence USA Education/Research USA Commercial
  • 25. | 25 | Demo Plan by K-MEG Smart Grids Gas Grid Off Grid Bucheon Mixed-use Building Gunjang Industrial Complex - PE-IGCC Plant PE-IGCC Plant in India X-Island in Australia (Wind) X-Island in Indonesia (Solar) K-MEG Electric Grid Guro Digital Industrial Complex COEX Seoul National University VTT in Finland CITRIS HQ in US AIG Tower in US Heat Grid Banwol/Shihaw National Industrial Complex St. Petersburg State Univ. in Russia Aalto Univ. Library in Finland
  • 26. Banwol/Shihwa Nat’l Industrial Complex Korea Location: Gyeonggi-Do Ansan-Si Danwon-Gu, Wonsi-Dong / Siheung-Si, Junwond-Dong | Use: Banwal (5,099 companies) Shihwa (8,389 Companies) Size: Banwal (15,374,000m2), Shihwa (16,568,000m2) | Completed: Banwal(1987), Shihwa(2006) | 26 | “The Biggest Industrial Complex in Capital Region Using Variety of Energy Sources”
  • 27. St. Petersburg State Univ. Russia Location St. Petersburg, Russia | Use Lecture Hall, Research Facility | Completed 1789 Size Below ground 1, Above ground 4 (GFA : 31,800 m2) | 27 | “Russia‟s Cultural Assets built in 1789”
  • 28. | 28 | Aalto University Library Finland Location Espoo, Finland | Use Library, Education/Research | Completed 1969 Size 5-story (GFA : 9,864 m2) “Representative of Finland‟s Famous Architect, Alvar Aalto‟s Work”
  • 29. Guro Digital Nat’l Industrial Complex (G-Valley) Korea Toward World First Micro Grid Industrial Complex Location Guro-Dong, Guro-Gu, Seoul, Korea | Use Manufacturers, Offices (4,221) Size Site Area : 452,647㎡ 32 Buildings 4,100 Companies | Completed 1974 | 29 | “The World Largest Building-type Manufacturing Complex”
  • 30. COEX Complex Korea Location Samsung-Dong, Gangnam-Gu, Seoul | Use Commercial Buildings Size GFA 1,217,970 m*m (368,436 PY), COEX Area 213,691PY (approx 58%) | Completed 1964 | 30 | “Korea‟s Biggest Mixed-use Complex, the Hub of Global Business in Asia, which held G20” - Convention & Exhibition Center (COEX) - Office Building - Retails
  • 31. Seoul National University Korea Location 56-1 Shinrim-Dong, Kwonak-Gu, Seoul | Use Lecture and Research Facility | Completed 1974 Size : B1 ~ 4F, GFA 7,500㎡ | 31 | “The Biggest Energy Consumer per Unit Area among State-run Building Properties in Korea”
  • 32. AIG Tower NY, United States Location 70 Pine Street, New York, NY. US | Use Office | Completed 1932 Size 66 Floors (GFA 102,193 m2) | 32 | “Historical Landmark Building Built in 1932 in Manhattan, NY”
  • 33. VTT Tech. Research Center Finland Location Espoo, Finland | Use Research and Office Size 12 buildings with 3~4 floors | Completed 1970 | 33 | “The Biggest Non-profit Research Institute in Northern Europe”
  • 34. CITRIS HQ CA, United States Location Berkeley, CA, US | Use Office, Research | Completed 2009 Size Sutardja Dai Hall GFA : 13,100 m2 | 34 | “The Institute in California Running a Test Bed to Implement „Building-to-Grid‟ Technology”
  • 35. Bucheon Joong-Dong Mixed-use Complex Korea Location Jung-Dong, Wonmi-Gu, Bucheon-Si, Gyeonggi-Do | Use Commercial / Residential | Completed 2006 Size 225 Units (1~3 Floors Commercial, 4~14 Residential) | 35 | “Concurrent Validation of a Biz Model w/ Residential & Commercial Units”
  • 36. Gunjang Nat’l Industrial Complex Korea Location 53-8 Soryong-Dong Gunsan-Si, Jeonrahbuk-Do | Use Plant | Completed 2012 Size 2MW PE-IGCC (Plasma Enhanced Integrated Gasification Combined Cycle) | 36 | “Off-Grid Model to Validate at the Industrial Complex w/ a Combined Heat & Power Plant in Operation”
  • 37. PE-IGCC Plant India Location TBD | USe Plant | Size 20ton/day, 2MW | Groundbreaking 2012 Plasma Enhanced-IGCC can be the solution for power shortage in India. | 37 | “More than 100,000 Towns with no Power become our New Market”
  • 38. Island Off-Grid Australia Location Classified | Use Residential | Groundbreaking 2012 | 38 | “Australia‟s Standard Off-Grid Model, Potentially for its 8,000 Islands”
  • 39. Location Classified | Use Plant | Groundbreaking 2012 Island Off-Grid Indonesia | 39 | “Indonesia‟s Typical Off-Grid Model, Potentially for its 13,700 Islands”
  • 40. | 40 | Business Vision Smart Platform Smart Energy Grids Smart Cities - Easy to Adopt during Urban Planning 30% Building Energy Saving - w/ Active Systems Waste Energy (Heat) Recovery Independent Energy Supply Total Energy Service Provider
  • 41. K-MEG