SlideShare a Scribd company logo
1 of 3
Professional Summary
Of
Arijit Basu
A B.E.(Civil) from NIT Durgapur, MBA from IIT Kanpur and challenge oriented, entrepreneurial, self-motivated professional
having cumulative experience of 8 years, initially in execution of infrastructure projects as a civil engineer and later management
consultancy in infrastructure (real estate, water supply, plant establishment), pipe manufacturing, steel, textile and transmission
line projects (domestic & international). Recent exposure to the e-commerce start-up world in handyman services
WORK EXPERIENCE
Freelance Consultant (Project Management & E-commerce) Dec’15-Present
• Project 1: Capacity enhancement of a Steel Melting Shop at Ludhiana Client: Vardhman Special Steel
• Project 2: Operation management consultancy Client: Zimmber
Rejuvenate Solutions (Zimmber): One of the fastest growing Aggregator in handyman service May’15- Nov’15
Position-Associate Director (Mumbai)
• Supply Management: Establish a scalable model to ensure qualified, well trained supply of service providers:
o Demand vs. Supply analysis; Preparing target for ensuring Supply in specific zones
o Enrolment, Background verification, On-boarding & Training of Service Providers across all categories
o Payment reconciliation for Service Providers, Escalation management
o Design & drive dynamic incentive model. Imposing penalty as and when required
• New Category Launch: End to end responsibility for any new category launch:
o Market research for existing demand, Research on existing established market players, Competitor analysis
o Meeting & finalizing vendors in specific zones
o Establishing process flow in terms of service lead time, rates, profit sharing model with service provider
o Coordination with Tech team, testing of all parameters before making live
o Preparing knowledge base for Business Centre & Sales team training
• City Launch: Navi Mumbai & Thane:
o Market research to understand the potential & identify any city specific characteristics
o Team building, recruitment and training for Sales & Operations team
o Acting as City-Head for the initial period handling both Operations & Sales
• Product Management: Working closely with CTO. End to end project management for the following:
o Driver on Demand Category Automation (Auto assigning of champs)
o Automation of Payment modules (from payment input from customer to transfer to SP’s A/C)
o Laundry Category CRM redesign for both Zimmber backend and Vendor portal
o Champ App Referral Program, Captain App etc.
Realization Technologies May '12 – May’15
Project management consultancy with real-time project synchronization to enable organizations execute projects 20-50% faster
Position-Project Manager (Khopoli, Mumbai, Kinshasa- Democratic Republic of Congo, Patna)
Implementation Assignments:
• Project 1: Planning, Monitoring & Coordination for the execution of 6HI Rolling Mill project (INR 100 crores) for
Uttam Galva Steels Limited(UGSL) at Khopoli, Maharashtra Client: UGSL
o Coordination among stakeholders like Civil, Mechanical & Electrical Dept., Vendors, Contractors, Procurement
team and top management
o Understanding the process flow of execution including civil, mechanical, piping & electrical works
o Creating project plan as per critical chain project management methodology and validating the same with client
o Conducting project management workshop with client and major vendors like CMI & Siemens
o Conducting task management and task preparation to identify issues, resolve and ensure uninterrupted execution
o Buffer Recovery and Steering Committee Review meeting to escalate unresolved issues at site level and seek
resolution for the same from top management
• Project 2: Planning & standardizing process flows for international projects of Kalpataru Power Transmission
Limited (KPTL), specifically for Egypt & Rwanda Client:
KPTL
o Understanding the process flow for Procurement, Design, Manufacturing & Coordination in HO
o Creating project plan by work breakdown structure and assuming tentative timeline with each activity
o Validation of the project plans with departmental in-charges
o Formation of a generalized process flow for any upcoming project
• Project 3: Rehabilitation of existing transmission line (180 million US $) in D R Congo Client:
KPTL
o Acting as a project coordinator between site and HO management
o Setting up execution management processes at HO (Mumbai) and sites (Kinshasa & Lubumbashi, DR Congo)
o Identifying & prioritizing issues with the help of Concerto (patented project monitoring software of Realization)
o Suggesting probable solutions for issues through rigorous data analysis with resource & revenue calculation
Email: bonniebasu@gmail.com
Contact Number:
+91-7549203595
Present Location: Mumbai
DOB: 6-Dec-1983
Skills Summary
• Supply Chain Management
• Market Research
• Competitor Analysis
• Project Management
• Product Management
• Project Coordination
• Consulting
• Change Management
• Business Strategy
• Business Process Re-
engineering
Areas of Interest:
• Operations Management
• Business Development
• Business Analysis
• Project Management
Consulting
• Marketing
• Process Management
o Training the relevant stakeholders with CCPM methodology and hands on of Concerto
• Project 4: Infrastructure projects (18 nos.) in Water Supply, Sewerage & Roads funded by Central Govt., ADB, WB
Client: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo), Govt. of Bihar
o Managing the largest key account in the portfolio ( INR 548 crores Patna Water Supply project) funded through JnNurm (Jawaharlal Nehru
National Urban Renewal Mission) scheme to cater to 2041 population Patna city
o Coordination with Client and SPV (special purpose vehicle: a joint venture of Gammon India Ltd and Geo-Miller)
o Project planning through CCPM methodology and training the stakeholders with the same
o Cost analysis, preparation of tender document of upcoming projects, local liasioning with stakeholders like Municipal Corporation, Circle
Officer, State Electricity Board, NHAI, Road Construction Dept. etc.
o Facilitate the Managing Director by preparing relevant reports of meetings with contractors, funding agencies (like WB, ADB) etc.
o Follow up with Supervision Consultant, Design approval agencies like NIT and Vendors
Business Development Assignment:
o Contribution during analysis stage for pre sales assignment with Kalpataru Real Estate
o Participated for one successful sales assignment with Genus Power Infrastructures Ltd, Jaipur:
 Investigation with departmental in-charges of the client to understand tendering, funding & execution process
 Site visit to Ranchi to understand execution works for 220 KV transmission line project
 Site visit to Haridwar and Dehradun for the on-going distribution line project of Uttarakhand Power Corporation Ltd.
 Explain Realization’s project management methodology at site level
 Complete investigation with Site-in-charge and validation of the assumptions made from interaction at Client HO
 Analysis from the data collected through investigation and come out with a draft model for presentation to the management
Welspun Group June '11 - May '12
Position-Manager, Business Excellence and Corporate Strategy (Mumbai, Anjar, Vapi)
• Project 1: Business Process Reengineering with focus on cost reduction (INR 19 crores) in Terry towel of Welspun India:
o Identifying issues through discussion with stakeholders at both Anjar & Vapi plants
o Finding opportunities of improvement through As Is process analysis, time motion study etc.
o Reduce the manpower by 30% from the current scenario
•Project 2: Designing Standard Operating Procedure and Service Level Agreements for Welspun Corp. Ltd. (Pipes):
o Process Mapping & Gap Analysis in Operations & Quality for Business Process Standardization across all plants
o Identifying the scope of improvements and ensuring Implementation of the same
o Suggesting Process Automation wherever applicable
•Project 3: Designing Standard Operating Procedure for Welspun Projects Ltd (Infrastructure):
o Tendering SOP- EPC, PPP, Item Rate, Pre-Tendering, Post-Tendering
o Stores SOP- Raise Material Requisition, Material Receipt, Material Handling, Storage & Preservation,
Material Issue, Material Transfer, Preparation of RGP & NRGP, Material Reconciliation
o Subcontracting SOP- Subcontracting Schedule, Identification & Registration of Subcontractors, Floating of BOQ,
Techno commercial negotiations, Appointment of Subcontractors, Quarterly Review of Subcontracted works
L&T-ECC Group Jul '06 – Apr '09
Position- Senior Engineer (Hyderabad)
• Project: Kothakota-Jadcherla road project (248 crores) on NH-7 including major & minor bridges, ROB, culverts etc.
o Total site execution of several minor and major bridges and other cross drainage structures ensuring safety & quality
o Planning for resource management including mobilization of man, material and machinery
o Preparing monthly target and weekly inspection report for client approval.
o Coordinating with the clients regarding different technicalities related to drawings, site approval and quality clearance
o Training in Hyderabad Regional Office (HYRO) in different departments such as planning for resources, marketing of formwork materials to be
rented to other companies, cost estimation, mobilization of materials.
• Training: Worked as Graduate Engineering Trainee in a Ready Mix Concrete plant (average productivity 10000cum/month) in Hyderabad
EDUCATION
Year Degree Institute Percentage
2011 MBA (Operations & Marketing) IIT Kanpur 8.33/10
2006 BE (Civil Engineering) NIT Durgapur 65.5
2001 XII St Xavier’s College, Calcutta 76.3
1999 X Sodepur High School, Calcutta 89.5
INTERNSHIP: Madhya Pradesh School of Good Governance, Government of Madhya Pradesh May '10 – Jul '10
• Project: Consultancy to Madhya Pradesh Water Resource Department to analyse the process of recovery of water cess for irrigation projects of Madhya
Pradesh and giving recommendation for future improvement
ACHIEVEMENTS
• Successful implementation of CCPM methodology and Concerto for KPTL international account, resulting more projects from their domestic account
• Training of project coordinators at client office of KPTL within a month to enable them for effective and time bound project coordination using Concerto
• Set up a process and progress monitoring and review mechanism for BUIDCo (Govt. of Bihar) with proper cash flow analysis
• Total operational cost saving by 10% and man-hour saving by 20% through Business Process Re-Engineering in Welspun
• Completion of a complex minor bridge within a challenging deadline in adverse environment
POSITIONS & RESPONSIBILITY
• Member, Placement Committee (2009 –2011), IIT Kanpur: Develop and maintain relationship with the industry and facilitate the placement process
• Member, Admissions Committee 2010, IIT Kanpur: Manage the entire selection process for the MBA Batch of 2012
• Member, Hospitality Team, Prabandhan 2009: Annual management conclave at IIT Kanpur
• Member, Marketing Team, Finatics’10: Annual Financial Conclave of IIT Kanpur
• Placement Coordinator (2002-2006): Facilitate the final and summer placement for Civil Engineering batch of NIT Durgapur

More Related Content

What's hot (18)

AmoghKarambelkar Resume
AmoghKarambelkar ResumeAmoghKarambelkar Resume
AmoghKarambelkar Resume
 
CV-Padmanabh
CV-PadmanabhCV-Padmanabh
CV-Padmanabh
 
CV
CVCV
CV
 
CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)
 
riyasdeen - qs
riyasdeen - qsriyasdeen - qs
riyasdeen - qs
 
Updated resume
Updated resumeUpdated resume
Updated resume
 
MY PROFILE
MY PROFILEMY PROFILE
MY PROFILE
 
Resume Vivek R Singh - August 2019
Resume Vivek R Singh - August 2019Resume Vivek R Singh - August 2019
Resume Vivek R Singh - August 2019
 
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
 
Resume_raghvendra_1updated
Resume_raghvendra_1updatedResume_raghvendra_1updated
Resume_raghvendra_1updated
 
Professional with almost 4+ years of rich experience in Business Development ...
Professional with almost 4+ years of rich experience in Business Development ...Professional with almost 4+ years of rich experience in Business Development ...
Professional with almost 4+ years of rich experience in Business Development ...
 
MANJU ME NPD
MANJU ME NPDMANJU ME NPD
MANJU ME NPD
 
hisham ibrahim CV
hisham ibrahim CVhisham ibrahim CV
hisham ibrahim CV
 
Vivek R singh (resume)
Vivek R singh (resume)Vivek R singh (resume)
Vivek R singh (resume)
 
MAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANEMAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANE
 
mY cV PDF
mY cV PDFmY cV PDF
mY cV PDF
 
CV Dip 03-11-15
CV Dip 03-11-15CV Dip 03-11-15
CV Dip 03-11-15
 
PRR-RESUME-Project_New
PRR-RESUME-Project_NewPRR-RESUME-Project_New
PRR-RESUME-Project_New
 

Similar to Consultant profile

Resume- Project Management Analyst
Resume- Project Management AnalystResume- Project Management Analyst
Resume- Project Management AnalystAmol Gaikwad
 
Hemant Gajbhiye-CV (Updated)
Hemant Gajbhiye-CV (Updated)Hemant Gajbhiye-CV (Updated)
Hemant Gajbhiye-CV (Updated)HEMANT GAJBHIYE
 
Hemant Gajbhiye-CV (2016 Updated)
Hemant Gajbhiye-CV (2016 Updated)Hemant Gajbhiye-CV (2016 Updated)
Hemant Gajbhiye-CV (2016 Updated)HEMANT GAJBHIYE
 
CustomerCopy (1)(modified as on 20.05.16)
CustomerCopy (1)(modified as on 20.05.16)CustomerCopy (1)(modified as on 20.05.16)
CustomerCopy (1)(modified as on 20.05.16)RAJA DASGUPTA
 
Sheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdfSheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdfAl Darwish Engineering
 
Resume-Sanjay_Sahai-7
Resume-Sanjay_Sahai-7Resume-Sanjay_Sahai-7
Resume-Sanjay_Sahai-7sanjay sahai
 
Siddhant Singh Parmar-new resume (17.02.2016).compressed
Siddhant Singh Parmar-new resume (17.02.2016).compressedSiddhant Singh Parmar-new resume (17.02.2016).compressed
Siddhant Singh Parmar-new resume (17.02.2016).compressedsiddhant singh parmar
 
Resume - Chirag Sarang 26112016
Resume - Chirag Sarang 26112016Resume - Chirag Sarang 26112016
Resume - Chirag Sarang 26112016chirag sarang
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghushashi tr
 
Gokul Mahadevan- Business Analyst
Gokul Mahadevan- Business AnalystGokul Mahadevan- Business Analyst
Gokul Mahadevan- Business AnalystGokul Mahadevan
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfrinkumandaljis
 

Similar to Consultant profile (20)

Resume- Project Management Analyst
Resume- Project Management AnalystResume- Project Management Analyst
Resume- Project Management Analyst
 
Hemant Gajbhiye-CV (Updated)
Hemant Gajbhiye-CV (Updated)Hemant Gajbhiye-CV (Updated)
Hemant Gajbhiye-CV (Updated)
 
Hemant Gajbhiye-CV (2016 Updated)
Hemant Gajbhiye-CV (2016 Updated)Hemant Gajbhiye-CV (2016 Updated)
Hemant Gajbhiye-CV (2016 Updated)
 
CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015
 
CustomerCopy (1)(modified as on 20.05.16)
CustomerCopy (1)(modified as on 20.05.16)CustomerCopy (1)(modified as on 20.05.16)
CustomerCopy (1)(modified as on 20.05.16)
 
Sheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdfSheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdf
 
RESUME_31-Oct-16
RESUME_31-Oct-16RESUME_31-Oct-16
RESUME_31-Oct-16
 
Saravanan - Profile (2015-16)
Saravanan - Profile (2015-16)Saravanan - Profile (2015-16)
Saravanan - Profile (2015-16)
 
Varun Kumar_CV
Varun Kumar_CVVarun Kumar_CV
Varun Kumar_CV
 
Resume-Sanjay_Sahai-7
Resume-Sanjay_Sahai-7Resume-Sanjay_Sahai-7
Resume-Sanjay_Sahai-7
 
Siddhant Singh Parmar-new resume (17.02.2016).compressed
Siddhant Singh Parmar-new resume (17.02.2016).compressedSiddhant Singh Parmar-new resume (17.02.2016).compressed
Siddhant Singh Parmar-new resume (17.02.2016).compressed
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Resume
ResumeResume
Resume
 
Kiran H K 17-06-2016
Kiran H K 17-06-2016Kiran H K 17-06-2016
Kiran H K 17-06-2016
 
CV
CVCV
CV
 
Resume - Chirag Sarang 26112016
Resume - Chirag Sarang 26112016Resume - Chirag Sarang 26112016
Resume - Chirag Sarang 26112016
 
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
 
Gokul Mahadevan- Business Analyst
Gokul Mahadevan- Business AnalystGokul Mahadevan- Business Analyst
Gokul Mahadevan- Business Analyst
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
 

Consultant profile

  • 1. Professional Summary Of Arijit Basu A B.E.(Civil) from NIT Durgapur, MBA from IIT Kanpur and challenge oriented, entrepreneurial, self-motivated professional having cumulative experience of 8 years, initially in execution of infrastructure projects as a civil engineer and later management consultancy in infrastructure (real estate, water supply, plant establishment), pipe manufacturing, steel, textile and transmission line projects (domestic & international). Recent exposure to the e-commerce start-up world in handyman services WORK EXPERIENCE Freelance Consultant (Project Management & E-commerce) Dec’15-Present • Project 1: Capacity enhancement of a Steel Melting Shop at Ludhiana Client: Vardhman Special Steel • Project 2: Operation management consultancy Client: Zimmber Rejuvenate Solutions (Zimmber): One of the fastest growing Aggregator in handyman service May’15- Nov’15 Position-Associate Director (Mumbai) • Supply Management: Establish a scalable model to ensure qualified, well trained supply of service providers: o Demand vs. Supply analysis; Preparing target for ensuring Supply in specific zones o Enrolment, Background verification, On-boarding & Training of Service Providers across all categories o Payment reconciliation for Service Providers, Escalation management o Design & drive dynamic incentive model. Imposing penalty as and when required • New Category Launch: End to end responsibility for any new category launch: o Market research for existing demand, Research on existing established market players, Competitor analysis o Meeting & finalizing vendors in specific zones o Establishing process flow in terms of service lead time, rates, profit sharing model with service provider o Coordination with Tech team, testing of all parameters before making live o Preparing knowledge base for Business Centre & Sales team training • City Launch: Navi Mumbai & Thane: o Market research to understand the potential & identify any city specific characteristics o Team building, recruitment and training for Sales & Operations team o Acting as City-Head for the initial period handling both Operations & Sales • Product Management: Working closely with CTO. End to end project management for the following: o Driver on Demand Category Automation (Auto assigning of champs) o Automation of Payment modules (from payment input from customer to transfer to SP’s A/C) o Laundry Category CRM redesign for both Zimmber backend and Vendor portal o Champ App Referral Program, Captain App etc. Realization Technologies May '12 – May’15 Project management consultancy with real-time project synchronization to enable organizations execute projects 20-50% faster Position-Project Manager (Khopoli, Mumbai, Kinshasa- Democratic Republic of Congo, Patna) Implementation Assignments: • Project 1: Planning, Monitoring & Coordination for the execution of 6HI Rolling Mill project (INR 100 crores) for Uttam Galva Steels Limited(UGSL) at Khopoli, Maharashtra Client: UGSL o Coordination among stakeholders like Civil, Mechanical & Electrical Dept., Vendors, Contractors, Procurement team and top management o Understanding the process flow of execution including civil, mechanical, piping & electrical works o Creating project plan as per critical chain project management methodology and validating the same with client o Conducting project management workshop with client and major vendors like CMI & Siemens o Conducting task management and task preparation to identify issues, resolve and ensure uninterrupted execution o Buffer Recovery and Steering Committee Review meeting to escalate unresolved issues at site level and seek resolution for the same from top management • Project 2: Planning & standardizing process flows for international projects of Kalpataru Power Transmission Limited (KPTL), specifically for Egypt & Rwanda Client: KPTL o Understanding the process flow for Procurement, Design, Manufacturing & Coordination in HO o Creating project plan by work breakdown structure and assuming tentative timeline with each activity o Validation of the project plans with departmental in-charges o Formation of a generalized process flow for any upcoming project • Project 3: Rehabilitation of existing transmission line (180 million US $) in D R Congo Client: KPTL o Acting as a project coordinator between site and HO management o Setting up execution management processes at HO (Mumbai) and sites (Kinshasa & Lubumbashi, DR Congo) o Identifying & prioritizing issues with the help of Concerto (patented project monitoring software of Realization) o Suggesting probable solutions for issues through rigorous data analysis with resource & revenue calculation Email: bonniebasu@gmail.com Contact Number: +91-7549203595 Present Location: Mumbai DOB: 6-Dec-1983 Skills Summary • Supply Chain Management • Market Research • Competitor Analysis • Project Management • Product Management • Project Coordination • Consulting • Change Management • Business Strategy • Business Process Re- engineering Areas of Interest: • Operations Management • Business Development • Business Analysis • Project Management Consulting • Marketing • Process Management
  • 2. o Training the relevant stakeholders with CCPM methodology and hands on of Concerto • Project 4: Infrastructure projects (18 nos.) in Water Supply, Sewerage & Roads funded by Central Govt., ADB, WB Client: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo), Govt. of Bihar o Managing the largest key account in the portfolio ( INR 548 crores Patna Water Supply project) funded through JnNurm (Jawaharlal Nehru National Urban Renewal Mission) scheme to cater to 2041 population Patna city o Coordination with Client and SPV (special purpose vehicle: a joint venture of Gammon India Ltd and Geo-Miller) o Project planning through CCPM methodology and training the stakeholders with the same o Cost analysis, preparation of tender document of upcoming projects, local liasioning with stakeholders like Municipal Corporation, Circle Officer, State Electricity Board, NHAI, Road Construction Dept. etc. o Facilitate the Managing Director by preparing relevant reports of meetings with contractors, funding agencies (like WB, ADB) etc. o Follow up with Supervision Consultant, Design approval agencies like NIT and Vendors Business Development Assignment: o Contribution during analysis stage for pre sales assignment with Kalpataru Real Estate o Participated for one successful sales assignment with Genus Power Infrastructures Ltd, Jaipur:  Investigation with departmental in-charges of the client to understand tendering, funding & execution process  Site visit to Ranchi to understand execution works for 220 KV transmission line project  Site visit to Haridwar and Dehradun for the on-going distribution line project of Uttarakhand Power Corporation Ltd.  Explain Realization’s project management methodology at site level  Complete investigation with Site-in-charge and validation of the assumptions made from interaction at Client HO  Analysis from the data collected through investigation and come out with a draft model for presentation to the management Welspun Group June '11 - May '12 Position-Manager, Business Excellence and Corporate Strategy (Mumbai, Anjar, Vapi) • Project 1: Business Process Reengineering with focus on cost reduction (INR 19 crores) in Terry towel of Welspun India: o Identifying issues through discussion with stakeholders at both Anjar & Vapi plants o Finding opportunities of improvement through As Is process analysis, time motion study etc. o Reduce the manpower by 30% from the current scenario •Project 2: Designing Standard Operating Procedure and Service Level Agreements for Welspun Corp. Ltd. (Pipes): o Process Mapping & Gap Analysis in Operations & Quality for Business Process Standardization across all plants o Identifying the scope of improvements and ensuring Implementation of the same o Suggesting Process Automation wherever applicable •Project 3: Designing Standard Operating Procedure for Welspun Projects Ltd (Infrastructure): o Tendering SOP- EPC, PPP, Item Rate, Pre-Tendering, Post-Tendering o Stores SOP- Raise Material Requisition, Material Receipt, Material Handling, Storage & Preservation, Material Issue, Material Transfer, Preparation of RGP & NRGP, Material Reconciliation o Subcontracting SOP- Subcontracting Schedule, Identification & Registration of Subcontractors, Floating of BOQ, Techno commercial negotiations, Appointment of Subcontractors, Quarterly Review of Subcontracted works L&T-ECC Group Jul '06 – Apr '09 Position- Senior Engineer (Hyderabad) • Project: Kothakota-Jadcherla road project (248 crores) on NH-7 including major & minor bridges, ROB, culverts etc. o Total site execution of several minor and major bridges and other cross drainage structures ensuring safety & quality o Planning for resource management including mobilization of man, material and machinery o Preparing monthly target and weekly inspection report for client approval. o Coordinating with the clients regarding different technicalities related to drawings, site approval and quality clearance o Training in Hyderabad Regional Office (HYRO) in different departments such as planning for resources, marketing of formwork materials to be rented to other companies, cost estimation, mobilization of materials. • Training: Worked as Graduate Engineering Trainee in a Ready Mix Concrete plant (average productivity 10000cum/month) in Hyderabad EDUCATION Year Degree Institute Percentage 2011 MBA (Operations & Marketing) IIT Kanpur 8.33/10 2006 BE (Civil Engineering) NIT Durgapur 65.5 2001 XII St Xavier’s College, Calcutta 76.3 1999 X Sodepur High School, Calcutta 89.5 INTERNSHIP: Madhya Pradesh School of Good Governance, Government of Madhya Pradesh May '10 – Jul '10 • Project: Consultancy to Madhya Pradesh Water Resource Department to analyse the process of recovery of water cess for irrigation projects of Madhya Pradesh and giving recommendation for future improvement ACHIEVEMENTS • Successful implementation of CCPM methodology and Concerto for KPTL international account, resulting more projects from their domestic account
  • 3. • Training of project coordinators at client office of KPTL within a month to enable them for effective and time bound project coordination using Concerto • Set up a process and progress monitoring and review mechanism for BUIDCo (Govt. of Bihar) with proper cash flow analysis • Total operational cost saving by 10% and man-hour saving by 20% through Business Process Re-Engineering in Welspun • Completion of a complex minor bridge within a challenging deadline in adverse environment POSITIONS & RESPONSIBILITY • Member, Placement Committee (2009 –2011), IIT Kanpur: Develop and maintain relationship with the industry and facilitate the placement process • Member, Admissions Committee 2010, IIT Kanpur: Manage the entire selection process for the MBA Batch of 2012 • Member, Hospitality Team, Prabandhan 2009: Annual management conclave at IIT Kanpur • Member, Marketing Team, Finatics’10: Annual Financial Conclave of IIT Kanpur • Placement Coordinator (2002-2006): Facilitate the final and summer placement for Civil Engineering batch of NIT Durgapur