NTPC, the largest power Company in India, was setup in 1975
to acceleratepower development in the country. It is among the
world’s largest and most efficient power generation companies.
InForbes list of World’s 2000 Largest Companies for the year
2007, NTPC occupies 411
th
place.
A View of Badarpur Thermal Power Station, Delhi
NTPC has installed capacity of 29,394 MW. It has 15 coal
based power stations (23,395 MW), 7gas based power stations
(3,955 MW) and 4 power stations in Joint Ventures (1,794
MW). Thecompany has power generating facilities in all major
regions of the country. It plans to be a75,000 MW company by
2017. NTPC has gone beyond the thermal power generation.
Ithas diversified intohydro power, coalmining,
power equipmentmanufacturing, oil &gas exploration,
power trading & distribution. NTPC is now in theentire power
valuechain and is poised to become an Integrated Power
Major. NTPC's share on 31 Mar 2008 in the total installed
capacity of the country was 19.1% and itcontributed 28.50% of
the total power generation of the country during 2007-08.
NTPC has set
new benchmarks for the power industry both in the area of
power plant construction andoperations.With its experience
and expertise in the power sector, NTPC is extending
consultancy servicesto various organizations in the power
business. It provides consultancy in the area of power plant
constructions and power generation to companies in India and
abroad.In November 2004, NTPC came out with its Initial
Public Offering (IPO) consisting of 5.25% asfresh issue and
5.25% as offer for sale by Government of India. NTPC thus
became a listedcompany with Government holding 89.5% of
the equity share capital and rest held byInstitutional Investors
and Public. The issue was a resounding success. NTPC is
among thelargest five companies in India in terms of market
capitalization.Recognizing its excellent performance and vast
potential, Government of the India has identified NTPC as one
of the jewels of Public Sector 'Navratnas'- a potential global
giant. Inspired by itsglorious past and vibrant present, NTPC is
well on its way to realize its vision of being "A worldclass
integrated power major, powering India's growth, with
increasing global presence".
3)
Steam Turbine:
The steam generated in the boiler is sent through a steam
turbine. Theturbine has blades that rotate when high velocity
steam flows across them. This rotation of turbine blades is used
to generate electricity.4)
Generator:
A generator is connected to the steam turbine. When the turbine
rotates, thegenerator produces electricity which is then passed
on to the power distribution systems.5)
Special mountings:
There is some other equipment like the economizer and air pre-
heater.An economizer uses the heat from the exhaust gases to
heat the feed water. An air pre-heater heats the air sent into the
combustion chamber to improve the efficiency of the
combustion process.6)
Ash collection system:
There is a separate residue and ash collection system in place
tocollect all the waste materials from the combustion process
and to prevent them fromescaping into the atmosphere.Apart
from this, there are various other monitoring systems and
instruments in place to keeptrack of the functioning of all the
devices. This prevents any hazards from taking place in
the plant.

More Related Content

What's hot

gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadriVirat Shishodia
 
Suzlon Powering a Greener - A case study analysis
Suzlon Powering a Greener - A case study analysisSuzlon Powering a Greener - A case study analysis
Suzlon Powering a Greener - A case study analysisashwinkumarc100
 
Industrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpurIndustrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpurMadhur Sharma
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauliDevanshu Yadav
 
Ntpc badarpur training ppt
Ntpc badarpur training pptNtpc badarpur training ppt
Ntpc badarpur training pptanuj_kumar57
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC SimhadriAshish Uppu
 
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power StationAyush Khare
 
Presentation by Shigeki (Sean) Miwa, Director, Executive Vice President, Soft...
Presentation by Shigeki (Sean) Miwa, Director, Executive Vice President, Soft...Presentation by Shigeki (Sean) Miwa, Director, Executive Vice President, Soft...
Presentation by Shigeki (Sean) Miwa, Director, Executive Vice President, Soft...The Business Council of Mongolia
 
Lean Energy: A Framework for Achieving Continuous Increase in Industrial Ener...
Lean Energy: A Framework for Achieving Continuous Increase in Industrial Ener...Lean Energy: A Framework for Achieving Continuous Increase in Industrial Ener...
Lean Energy: A Framework for Achieving Continuous Increase in Industrial Ener...i-media-international
 

What's hot (19)

Nl energy oct 24 - oct 30, 2015
Nl energy oct 24 - oct 30, 2015Nl energy oct 24 - oct 30, 2015
Nl energy oct 24 - oct 30, 2015
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
 
Suzlon Powering a Greener - A case study analysis
Suzlon Powering a Greener - A case study analysisSuzlon Powering a Greener - A case study analysis
Suzlon Powering a Greener - A case study analysis
 
Industrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpurIndustrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpur
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauli
 
Power plants
Power plantsPower plants
Power plants
 
Ntpc badarpur training ppt
Ntpc badarpur training pptNtpc badarpur training ppt
Ntpc badarpur training ppt
 
Reports ntpc
Reports ntpcReports ntpc
Reports ntpc
 
Ntpc report
Ntpc reportNtpc report
Ntpc report
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
Ntpc
NtpcNtpc
Ntpc
 
Suzlon energy
Suzlon energySuzlon energy
Suzlon energy
 
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power Station
 
Vikas
VikasVikas
Vikas
 
Suzlon
SuzlonSuzlon
Suzlon
 
Budget 2014
Budget 2014Budget 2014
Budget 2014
 
Presentation by Shigeki (Sean) Miwa, Director, Executive Vice President, Soft...
Presentation by Shigeki (Sean) Miwa, Director, Executive Vice President, Soft...Presentation by Shigeki (Sean) Miwa, Director, Executive Vice President, Soft...
Presentation by Shigeki (Sean) Miwa, Director, Executive Vice President, Soft...
 
Lean Energy: A Framework for Achieving Continuous Increase in Industrial Ener...
Lean Energy: A Framework for Achieving Continuous Increase in Industrial Ener...Lean Energy: A Framework for Achieving Continuous Increase in Industrial Ener...
Lean Energy: A Framework for Achieving Continuous Increase in Industrial Ener...
 

Viewers also liked

Career and career management
Career and career managementCareer and career management
Career and career managementBindal Heena
 
PLATS PRECUINATS ALS MENÚS
PLATS PRECUINATS ALS MENÚSPLATS PRECUINATS ALS MENÚS
PLATS PRECUINATS ALS MENÚSalbaparcerisas
 
Brandbank - Ensuring retailers are EU1169 compliant
Brandbank - Ensuring retailers are EU1169 compliantBrandbank - Ensuring retailers are EU1169 compliant
Brandbank - Ensuring retailers are EU1169 compliantbrandbankltd
 
CONDIMENTS, SALSES I ESPÈCIES ALS MENÚS
CONDIMENTS, SALSES I ESPÈCIES ALS MENÚSCONDIMENTS, SALSES I ESPÈCIES ALS MENÚS
CONDIMENTS, SALSES I ESPÈCIES ALS MENÚSalbaparcerisas
 
Shivani financial plan
Shivani financial planShivani financial plan
Shivani financial planBindal Heena
 
Presentatie eindscriptie hbo bachelor bedrijfskunde - ICT
Presentatie eindscriptie hbo bachelor bedrijfskunde - ICTPresentatie eindscriptie hbo bachelor bedrijfskunde - ICT
Presentatie eindscriptie hbo bachelor bedrijfskunde - ICTHumphry Troenokarso
 
Seven Common Myths about Meditation (The Buddha Pill)
Seven Common Myths about Meditation (The Buddha Pill)Seven Common Myths about Meditation (The Buddha Pill)
Seven Common Myths about Meditation (The Buddha Pill)Watkins Publishing
 

Viewers also liked (15)

FRUITES ALS MENÚS
FRUITES ALS MENÚSFRUITES ALS MENÚS
FRUITES ALS MENÚS
 
LÀCTICS ALS MENÚS
LÀCTICS ALS MENÚSLÀCTICS ALS MENÚS
LÀCTICS ALS MENÚS
 
OUS ALS MENÚS
OUS ALS MENÚSOUS ALS MENÚS
OUS ALS MENÚS
 
CARN ALS MENÚS
CARN ALS MENÚSCARN ALS MENÚS
CARN ALS MENÚS
 
Career and career management
Career and career managementCareer and career management
Career and career management
 
PLATS PRECUINATS ALS MENÚS
PLATS PRECUINATS ALS MENÚSPLATS PRECUINATS ALS MENÚS
PLATS PRECUINATS ALS MENÚS
 
Brandbank - Ensuring retailers are EU1169 compliant
Brandbank - Ensuring retailers are EU1169 compliantBrandbank - Ensuring retailers are EU1169 compliant
Brandbank - Ensuring retailers are EU1169 compliant
 
CONDIMENTS, SALSES I ESPÈCIES ALS MENÚS
CONDIMENTS, SALSES I ESPÈCIES ALS MENÚSCONDIMENTS, SALSES I ESPÈCIES ALS MENÚS
CONDIMENTS, SALSES I ESPÈCIES ALS MENÚS
 
Shivani financial plan
Shivani financial planShivani financial plan
Shivani financial plan
 
VERDURES ALS MENÚS
VERDURES ALS MENÚSVERDURES ALS MENÚS
VERDURES ALS MENÚS
 
prueba
prueba prueba
prueba
 
CEREALS ALS MENÚS
CEREALS ALS MENÚSCEREALS ALS MENÚS
CEREALS ALS MENÚS
 
PEIXOS AL MENÚ
PEIXOS AL MENÚPEIXOS AL MENÚ
PEIXOS AL MENÚ
 
Presentatie eindscriptie hbo bachelor bedrijfskunde - ICT
Presentatie eindscriptie hbo bachelor bedrijfskunde - ICTPresentatie eindscriptie hbo bachelor bedrijfskunde - ICT
Presentatie eindscriptie hbo bachelor bedrijfskunde - ICT
 
Seven Common Myths about Meditation (The Buddha Pill)
Seven Common Myths about Meditation (The Buddha Pill)Seven Common Myths about Meditation (The Buddha Pill)
Seven Common Myths about Meditation (The Buddha Pill)
 

Similar to About the company

Similar to About the company (20)

ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Power industry
Power industryPower industry
Power industry
 
report2
report2report2
report2
 
NTPC LTD.
NTPC LTD.NTPC LTD.
NTPC LTD.
 
Training report btps
Training report btpsTraining report btps
Training report btps
 
power sector in india 2014
power sector in india 2014power sector in india 2014
power sector in india 2014
 
Ntpc
NtpcNtpc
Ntpc
 
NTPC Training Report
NTPC Training ReportNTPC Training Report
NTPC Training Report
 
Industrial Analysis on power Industry
Industrial Analysis on power IndustryIndustrial Analysis on power Industry
Industrial Analysis on power Industry
 
Geeta power industry
Geeta power industryGeeta power industry
Geeta power industry
 
Power corporation in india
Power corporation in indiaPower corporation in india
Power corporation in india
 
Ntpc Ltd.
Ntpc Ltd.Ntpc Ltd.
Ntpc Ltd.
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
177683808 case-study
177683808 case-study177683808 case-study
177683808 case-study
 
Ntpc tranning report
Ntpc tranning report Ntpc tranning report
Ntpc tranning report
 
Power industry
Power industryPower industry
Power industry
 
Ntpc power plant
Ntpc power plantNtpc power plant
Ntpc power plant
 
Coal Mining Project Report
Coal Mining Project ReportCoal Mining Project Report
Coal Mining Project Report
 
India : Power Sector Report_August 2013
India : Power Sector Report_August 2013India : Power Sector Report_August 2013
India : Power Sector Report_August 2013
 
Report ntpc
Report ntpcReport ntpc
Report ntpc
 

About the company

  • 1. ABOUT THE COMPANY NTPC, the largest power Company in India, was setup in 1975 to acceleratepower development in the country. It is among the world’s largest and most efficient power generation companies. InForbes list of World’s 2000 Largest Companies for the year 2007, NTPC occupies 411 th place. A View of Badarpur Thermal Power Station, Delhi NTPC has installed capacity of 29,394 MW. It has 15 coal based power stations (23,395 MW), 7gas based power stations (3,955 MW) and 4 power stations in Joint Ventures (1,794 MW). Thecompany has power generating facilities in all major regions of the country. It plans to be a75,000 MW company by 2017. NTPC has gone beyond the thermal power generation. Ithas diversified intohydro power, coalmining, power equipmentmanufacturing, oil &gas exploration, power trading & distribution. NTPC is now in theentire power valuechain and is poised to become an Integrated Power Major. NTPC's share on 31 Mar 2008 in the total installed capacity of the country was 19.1% and itcontributed 28.50% of the total power generation of the country during 2007-08. NTPC has set
  • 2.
  • 3.
  • 4. new benchmarks for the power industry both in the area of power plant construction andoperations.With its experience and expertise in the power sector, NTPC is extending consultancy servicesto various organizations in the power business. It provides consultancy in the area of power plant constructions and power generation to companies in India and abroad.In November 2004, NTPC came out with its Initial Public Offering (IPO) consisting of 5.25% asfresh issue and 5.25% as offer for sale by Government of India. NTPC thus
  • 5. became a listedcompany with Government holding 89.5% of the equity share capital and rest held byInstitutional Investors and Public. The issue was a resounding success. NTPC is among thelargest five companies in India in terms of market capitalization.Recognizing its excellent performance and vast potential, Government of the India has identified NTPC as one of the jewels of Public Sector 'Navratnas'- a potential global giant. Inspired by itsglorious past and vibrant present, NTPC is well on its way to realize its vision of being "A worldclass integrated power major, powering India's growth, with increasing global presence".
  • 6.
  • 7. 3) Steam Turbine: The steam generated in the boiler is sent through a steam turbine. Theturbine has blades that rotate when high velocity steam flows across them. This rotation of turbine blades is used to generate electricity.4) Generator:
  • 8. A generator is connected to the steam turbine. When the turbine rotates, thegenerator produces electricity which is then passed on to the power distribution systems.5) Special mountings: There is some other equipment like the economizer and air pre- heater.An economizer uses the heat from the exhaust gases to heat the feed water. An air pre-heater heats the air sent into the combustion chamber to improve the efficiency of the combustion process.6) Ash collection system: There is a separate residue and ash collection system in place tocollect all the waste materials from the combustion process and to prevent them fromescaping into the atmosphere.Apart from this, there are various other monitoring systems and instruments in place to keeptrack of the functioning of all the devices. This prevents any hazards from taking place in the plant.