SlideShare a Scribd company logo
1 of 5
Download to read offline
MOHAMMED IMRAN
Mobile No: +971-50-2786020
e-mail: access.imran@live.com
P. O. Box: 109885, Abu Dhabi, UAE
Applicable Position : District Cooling Plant/Facilites/Operations/Maintenance Engineer.
Drive business growth and profits for the clients or internal business units through combined expertise
of efficient Operations & Maintenance.
Industry Preference: District Cooling/ Engineering & Consulting / Project Management Services Firm
PROFESSIONAL SYNOPSIS
EDUCATION
 Bachelors in Engineering (B.E.) from JNTU University, Hyderabad, A.P, India in 2007.
CORE COMPETENCIES
Plant / Facility Management
 Thorough knowledge of procedures & Technical know-how in Facility maintenance.
 Thorough knowledge of chiller plant Operation, Delta T issues and plant performance.
 Thorough knowledge in DCP energy optimization procedures.
 Hands on experience in drafting DCP/Facility operation procedures (Operations manual, work permit
procedures manual, PPM scheduling, various O&M forms etc required to begin Operations) from scratch.
 Highly experienced in Plant/Facility taking over procedures from construction contractors (Mazyad mall,
Barari Mall, Le Meridien DCP, Sweihan Airbase DCP, Abu Dhabi Airbase DCP & Nation Towers DCP)
 Ability to train & develop the Operator/Technician team from basics for DCP/Facility Operations.
 Planning, coordinating, scheduling, monitoring, updating & controlling plant operations using
management tools like SCADA (Cimpicity), BMS & CMMS.
 Well versed in operation of different PLCs Allen Bradley, GE Fanuc.
 Hands on Operating experience on different centrifugal chillers, York, Carrier.
 Preparation of annual budget and control.
 Preparation of various operations related DCP reports (daily reports, weekly reports, monthly reports,
load profiles etc).
Note: All the reports mentioned above shall be produced during the interview on request.
 A professional with rich experience in District Cooling/Facility Maintenance
industry.
 A Bachelor’s degree from JNTU University, India.
 Awareness of ISO standards 9001, 14001 & 18001.
 A Management professional with expertise in Operations,
Maintenance of DC Plants & Facility Maintenance.
 Comprehensive experience in leading plant / facility operations through a
structured methodology across performance measurement, organizational
management.
 Exceptionally well organized with a track record that demonstrates self
motivation, creativity & initiative to achieve personal & corporate goals
Functional Strengths
Plant/Facility
Management
Operations & Maint.
Plant Commissioning
Due Diligence
Engineering
O&M team formulation
Budget preparation
Site Administration
 Thorough understanding of maintenance requirement based on scope / Contract.
 Experienced in preparation / arrangement of teams for site deployment.
 Well versed in correspondence and formulation of Contractual letters and Notifications
Maintenance Planning & Management
 Hands on experience in Maintenance planning manual and through CMMS.
 Well versed with handling of contract scope Variations.
 Making effective use of cost analysis tools though the CMMS system.
 Optimize manpower and man-hours.
Risk Management
 Identifying risks to the equipment as well as employee safety.
 Identifying failure risk and plan contingencies especially related to Power and Air Conditioning
equipment.
 Organizing Risk Management sessions and come up with well defined Risk management Plans with the
required contingency.
 Consistently evaluating and monitoring risk performance to ensure adherence to management plan.
Team Management
 Training & Development of O&M team from scratch.
 Providing direction, motivation and training to the O&M team for ensuring optimum performance.
 Leading & motivating teams, while ensuring career development & positive contribution to company.
EMPLOYMENT DETAILS
Joule Central Cooling Company, Abu Dhabi, U.A.E June 2008-till date.
I am employed as a Project Engineer with a staff of 3 Engineers & 24 Technicians reporting to me.
Currently I am managing 4 projects (3 DCPS & 1 Mall). Below are the major projects I have worked
upon with respective tasks.
1. Le Meridien - Centrifugal Chiller plant (DCP) Period : On going
Project Engineer
Project Managed
Chiller Plant: Capacity 5,000 Tons
Details: The Chiller plant is a newly built serving Le Meridien Hotel. The plants consist of Five water-cooled chillers
from Trane, capacity 1000Tons each. I was involved from the commissioning stage of the plant and was
responsible for snag generation and taking over from the contractor. Below are my responsibilities in brief.
Responsibilities
 Planning and scheduling plant Operation & Maintenance activities.
 Monitor plant Performance based on Kw/T.
 Monitor and control water treatment program, perform in-house daily water testing.
 Record and update all parameters related to plant production and utilities.
 Prepare daily reports and send it to the client.
 Prepare monthly plant production reports and spread it across for quarterly and annual reports.
 Follow up with third party contractors for maintenance.
 Follow up on snag rectification
 Prepare operational snag list and raise claim under warranty or defect liability period as applicable.
2. Sweihan Airbase - Centrifugal Chiller plant (DCP) Period : On going
Project Engineer
Project Managed
Chiller Plant: Capacity 4000 Tons + 2500Ton Thermal Storage Plant.
Details: The Chiller plant is a newly built serving the Sweihan Airbase. The plants consist of Four water-cooled
chillers from Carrier, capacity 1000Tons each with a Thermal Storage Tank of capacity 2500Ton. I was involved
from the commissioning stage of the plant and was responsible for snag generation and taking over from the
contractor. Below are my responsibilities in brief.
Responsibilities
 Planning and scheduling plant Operation & Maintenance activities.
 Monitor plant Performance based on Kw/T.
 Monitor and control water treatment program, perform in-house daily water testing.
 Record and update all parameters related to plant production and utilities.
 Prepare daily reports and send it to the client.
 Prepare monthly plant production reports and spread it across for quarterly and annual reports.
 Follow up with third party contractors for maintenance.
 Follow up on snag rectification
 Prepare operational snag list and raise claim under warranty or defect liability period as applicable.
3. CMW Plant (Command of Military Works) - Centrifugal Chiller plant (DCP) Period : On going
Project Engineer
Project Managed
Chiller Plant: Capacity 3,300 Tons.
Details: The Chiller plant is a newly built serving CMW facility. The plants consist of Three water-cooled VFD
chillers from Carrier, capacity 1000Tons each. I was involved from the commissioning stage of the plant and was
responsible for snag generation and taking over from the contractor. Below are my responsibilities in brief.
Responsibilities
 Planning and scheduling plant Operation & Maintenance activities.
 Monitor plant Performance based on Kw/T.
 Monitor and control water treatment program, perform in-house daily water testing.
 Record and update all parameters related to plant production and utilities.
 Prepare daily reports and send it to the client.
 Prepare monthly plant production reports and spread it across for quarterly and annual reports.
 Follow up with third party contractors for maintenance.
 Follow up on snag rectification
 Prepare operational snag list and raise claim under warranty or defect liability period as applicable.
4. Barari Mall, Al Ain, U.A.E Period : On going
Project Engineer
Project Managed
Barari Mall : Barari Mall located in Mezyad, Al Ain. Equipped with Air Cooled plant with state of the art
equipment.
Responsibilities
 Compiling snag list as part of taking over from the construction contractor. Assisting the Client in having a
clean takeover from Contractor post DLP.
 Establishing, maintaining and managing the maintenance procedures.
 Implement PPM schedules generated from the CMMS system and make changes as per site condition.
 Analyze the efficiency of HVAC system, take required actions for improving the efficiency.
 Compiling the O&M report for the Mall indication HVAC system efficiency, Utility consumptions etc.
 Liaising with individual tenants/ client for maintenance & modification issues.
 Ensuring safety standards are maintained on site.
 Ensure quality of work is maintained and highlight recurring faults.
5. Nation Towers - Centrifugal Chiller plant (DCP) March 2012 - May 2013
Plant Engineer
Project Managed
Chiller Plant: Capacity 10,000 Tons + 2500Ton Thermal Storage Plant.
Details: The Chiller plant is a newly built serving one of the prestigious towers on Abu Dhabi Corniche. The plants
consist of Four water-cooled chillers from York (JCI), capacity 2500Tons each with a Thermal Storage Tank of
capacity 2500Ton. I was involved from the commissioning stage of the plant and was responsible for snag
generation and taking over from the contractor. Below are my responsibilities in brief.
Responsibilities
 Planning and scheduling plant Operation & Maintenance activities.
 Monitor plant Performance based on Kw/T.
 Monitor and control water treatment program, perform in-house daily water testing.
 Record and update all parameters related to plant production and utilities.
 Prepare daily reports and send it to the client.
 Prepare monthly plant production reports and spread it across for quarterly and annual reports.
 Follow up with third party contractors for maintenance.
 Follow up on snag rectification
 Prepare operational snag list and raise claim under warranty or defect liability period as applicable.
6. Tabreed, National Central Cooling Co. P.J.S.C Jan 2011 - May 2013
Lead Engineer
Project Managed
District Cooling Plants: Tabreed is a district cooling company with about 60 DC plants spread across UAE. Joule
has been responsible for Maintenance of Cooling towers –Mechanical, Chemical & Structure.
I was appointed as the lead engineer from Joule to lead the team responsible for the total scope. Below are my
responsibilities related to this project.
Responsibilities
 Establishing, maintaining and managing the maintenance procedures & task at sites.
 Prepare and implement schedule to meet the target days to complete each plant.
 Analyze tower performance and recommend action to the client.
 Preparing Service reports highlighting each tower efficiency individually.
 Preparing summary report for each area and sending it to each zone manager.
 Liaising with Tabreed staff for site access and other site issues.
 Coordinating with workshops to fabricate / refurbish damaged parts.
 Ensure quality of work is maintained and highlight recurring faults.
7. Abu Dhabi Business Hub- Office Towers Jan 2010 – Dec 2011
Facility Engineer
Project Managed
Abu Dhabi Business Hub: ADBH comprises of three high profile office towers located at ICAD, Abu Dhabi. The
towers have Air cooled chillers from Career. The Scope under my responsibility was Complete MEP, Fire Alarm &
Fire Fighting.
Responsibilities
 Establishing, maintaining and managing the maintenance procedures.
 Implement PPM schedules generated from the CMMS system and make changes as per site condition.
 Set up customer complaint procedures and close all the calls on daily basis.
 Prepare and send daily reports to the client.
 Liaising with individual tenants/ client for maintenance & modification issues.
 Attend weekly meetings with the client and prepare minutes and follow up with actions required.
 Ensuring safety standards are maintained on site.
 Conduct site meetings with staff and refresh the scope and any shortcomings.
 Guide the maintenance team on various rectifications and oversee replacements as required.
 Coordinating with workshops to fabricate / refurbish damaged parts.
 Ensure quality of work is maintained and highlight recurring faults.
8. Al Tayeb Centre- EMKE strategic Ware houses June 2009– Apr 2010
Commissioning Engineer
Project Managed
Al Tayeb Centre : Al Tayeb Centre is a strategic store spread across 1.5 Sq.Km belonging to EMKE. It consists of
one DC plant with four water-cooled chillers from Carrier, about 10 cold storages and 3 warehouses. I was
assigned to manage the commissioning of the above facilities.
Responsibilities
 Compiling commissioning management procedure.
 Implement all pre-commissioning checks as required by the contractor.
 Conduct site meetings with Consultant and contractor and provide our recommendation.
 Ensure all mechanical installations are done as manufacturers recommendation and good workmanship.
 Generate snag list and highlight it to the client.
 Follow up on snag rectification.
 Issue Job completion certificate for each equipment installed.
 Compile O&M Manuals with complete details including warranty certificate.
9. Mazyad Mall, Abu Dhabi, U.A.E Aug 2008 – Aug 2009
Facility Engineer
Project Managed
Mazyad Mall : Mazyad Mall located in Mussafah, Abu Dhabi. Connected to a DC plant with all the state of the art
equipments.
Responsibilities
 Compiling snag list as part of taking over from the construction contractor. Assisting the Client in having a
clean takeover from Contractor post DLP.
 Establishing, maintaining and managing the maintenance procedures.
 Implement PPM schedules generated from the CMMS system and make changes as per site condition.
 Monitor the Delta-T of ETS stations. Analyze the efficiency of HVAC system based on the Delta-T, take required
actions for improving the efficiency.
 Compiling the O&M report for the Mall indication HVAC system efficiency, Utility consumptions etc.
 Prepare and send daily reports to the client.
 Liaising with individual tenants/ client for maintenance & modification issues.
 Ensuring safety standards are maintained on site.
 Ensure quality of work is maintained and highlight recurring faults.
PERSONAL DETAILS
Nationality : Indian
Date of Birth : 24th
November 1984
Driving License : Valid UAE Driving License

More Related Content

What's hot

instrumentation Engineering Cv
instrumentation Engineering Cvinstrumentation Engineering Cv
instrumentation Engineering Cvsameer abdullah
 
CV of Damiano Rivera Reubal
CV of Damiano Rivera ReubalCV of Damiano Rivera Reubal
CV of Damiano Rivera ReubalDondon Reubal
 
BERR Industry / MAIN Presentation
BERR Industry / MAIN PresentationBERR Industry / MAIN Presentation
BERR Industry / MAIN PresentationMurat Cengiz
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For FoldersJessica Rearick
 
vikash resume.25.09
vikash resume.25.09vikash resume.25.09
vikash resume.25.09Vikash Pilli
 
Mechanical Maintenance Engineer
Mechanical Maintenance Engineer Mechanical Maintenance Engineer
Mechanical Maintenance Engineer VIVEK PANDEY
 
Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Dipak Kumar Banerjee
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer ResumeSuresh Selvaraju
 
gassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumegassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumeGassim Al-gassim
 
gassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumegassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumeGassim Al-gassim
 
Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster Menezes
 
Omar mohamed 's cv
Omar mohamed 's cvOmar mohamed 's cv
Omar mohamed 's cvOmar Amin
 
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYGENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYBerr Industry
 

What's hot (20)

instrumentation Engineering Cv
instrumentation Engineering Cvinstrumentation Engineering Cv
instrumentation Engineering Cv
 
SOP ENGINEERING
SOP ENGINEERINGSOP ENGINEERING
SOP ENGINEERING
 
CV of Damiano Rivera Reubal
CV of Damiano Rivera ReubalCV of Damiano Rivera Reubal
CV of Damiano Rivera Reubal
 
BERR Industry / MAIN Presentation
BERR Industry / MAIN PresentationBERR Industry / MAIN Presentation
BERR Industry / MAIN Presentation
 
eimCV
eimCVeimCV
eimCV
 
Sushil-Resume
Sushil-ResumeSushil-Resume
Sushil-Resume
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
 
vikash resume.25.09
vikash resume.25.09vikash resume.25.09
vikash resume.25.09
 
Mechanical Maintenance Engineer
Mechanical Maintenance Engineer Mechanical Maintenance Engineer
Mechanical Maintenance Engineer
 
Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
 
Resume-Subhakar
Resume-SubhakarResume-Subhakar
Resume-Subhakar
 
mp singh 15 12 2014
mp singh 15 12 2014mp singh 15 12 2014
mp singh 15 12 2014
 
gassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumegassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resume
 
gassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumegassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resume
 
Viresh Jugali CV
Viresh Jugali CVViresh Jugali CV
Viresh Jugali CV
 
Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical Engineer
 
Omar mohamed 's cv
Omar mohamed 's cvOmar mohamed 's cv
Omar mohamed 's cv
 
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYGENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 

Viewers also liked

Shri Guru Tegh Bahadur Khalsa college :- First Cut-off
Shri Guru Tegh Bahadur Khalsa college :- First Cut-offShri Guru Tegh Bahadur Khalsa college :- First Cut-off
Shri Guru Tegh Bahadur Khalsa college :- First Cut-offSynergy Web Designers
 
Satyawati college (Evening) :- First Cut-off
Satyawati college (Evening) :- First Cut-offSatyawati college (Evening) :- First Cut-off
Satyawati college (Evening) :- First Cut-offSynergy Web Designers
 
Ignite LG 2014 Fall <5> Peter Fisher
Ignite LG 2014 Fall <5> Peter FisherIgnite LG 2014 Fall <5> Peter Fisher
Ignite LG 2014 Fall <5> Peter FisherLife's Good
 
Layam Learning & Development
Layam Learning & DevelopmentLayam Learning & Development
Layam Learning & DevelopmentLayam Group
 
La Publicidad
La PublicidadLa Publicidad
La Publicidademeliis
 
Producto 1 bloque 2.pptx
Producto 1 bloque 2.pptxProducto 1 bloque 2.pptx
Producto 1 bloque 2.pptxangelrag572
 
Latihan tema 2
Latihan tema 2Latihan tema 2
Latihan tema 2roqilla
 
Knights of Columbus Honored as a 2016 World’s Most Ethical Company
Knights of Columbus Honored as a 2016 World’s Most Ethical CompanyKnights of Columbus Honored as a 2016 World’s Most Ethical Company
Knights of Columbus Honored as a 2016 World’s Most Ethical CompanyJohn Guandolo
 
Budget accessibility to participation in Latvia - Taisa Trubaca, Latvia
Budget accessibility to participation in Latvia - Taisa Trubaca, LatviaBudget accessibility to participation in Latvia - Taisa Trubaca, Latvia
Budget accessibility to participation in Latvia - Taisa Trubaca, LatviaOECD Governance
 
Office 365 Truths: The truth about Office 365 features releases
Office 365 Truths: The truth about Office 365 features releasesOffice 365 Truths: The truth about Office 365 features releases
Office 365 Truths: The truth about Office 365 features releasesJuan Carlos Gonzalez
 
Symposium on findings from the PIECES project: National policies and plans on...
Symposium on findings from the PIECES project: National policies and plans on...Symposium on findings from the PIECES project: National policies and plans on...
Symposium on findings from the PIECES project: National policies and plans on...BASPCAN
 
ερευνητική εργασία φως Ver 4 1
ερευνητική εργασία φως Ver 4 1ερευνητική εργασία φως Ver 4 1
ερευνητική εργασία φως Ver 4 1katkotsovou
 
Кейс по разработке приложения для akusherstvo.ru (iPad)
Кейс по разработке приложения для akusherstvo.ru (iPad)Кейс по разработке приложения для akusherstvo.ru (iPad)
Кейс по разработке приложения для akusherstvo.ru (iPad)WOX APP
 
Satyawati college (Day):- First Cut-off
Satyawati college (Day):- First Cut-offSatyawati college (Day):- First Cut-off
Satyawati college (Day):- First Cut-offSynergy Web Designers
 

Viewers also liked (20)

Shri Guru Tegh Bahadur Khalsa college :- First Cut-off
Shri Guru Tegh Bahadur Khalsa college :- First Cut-offShri Guru Tegh Bahadur Khalsa college :- First Cut-off
Shri Guru Tegh Bahadur Khalsa college :- First Cut-off
 
Science
ScienceScience
Science
 
wine_VDGlass L
wine_VDGlass Lwine_VDGlass L
wine_VDGlass L
 
Satyawati college (Evening) :- First Cut-off
Satyawati college (Evening) :- First Cut-offSatyawati college (Evening) :- First Cut-off
Satyawati college (Evening) :- First Cut-off
 
Ignite LG 2014 Fall <5> Peter Fisher
Ignite LG 2014 Fall <5> Peter FisherIgnite LG 2014 Fall <5> Peter Fisher
Ignite LG 2014 Fall <5> Peter Fisher
 
cv vx
cv vxcv vx
cv vx
 
Layam Learning & Development
Layam Learning & DevelopmentLayam Learning & Development
Layam Learning & Development
 
La Publicidad
La PublicidadLa Publicidad
La Publicidad
 
Producto 1 bloque 2.pptx
Producto 1 bloque 2.pptxProducto 1 bloque 2.pptx
Producto 1 bloque 2.pptx
 
Latihan tema 2
Latihan tema 2Latihan tema 2
Latihan tema 2
 
Knights of Columbus Honored as a 2016 World’s Most Ethical Company
Knights of Columbus Honored as a 2016 World’s Most Ethical CompanyKnights of Columbus Honored as a 2016 World’s Most Ethical Company
Knights of Columbus Honored as a 2016 World’s Most Ethical Company
 
Budget accessibility to participation in Latvia - Taisa Trubaca, Latvia
Budget accessibility to participation in Latvia - Taisa Trubaca, LatviaBudget accessibility to participation in Latvia - Taisa Trubaca, Latvia
Budget accessibility to participation in Latvia - Taisa Trubaca, Latvia
 
Mehrad Eslamifar- CV (2)
Mehrad Eslamifar- CV (2)Mehrad Eslamifar- CV (2)
Mehrad Eslamifar- CV (2)
 
B.S. Accountancy.PDF
B.S. Accountancy.PDFB.S. Accountancy.PDF
B.S. Accountancy.PDF
 
Office 365 Truths: The truth about Office 365 features releases
Office 365 Truths: The truth about Office 365 features releasesOffice 365 Truths: The truth about Office 365 features releases
Office 365 Truths: The truth about Office 365 features releases
 
Symposium on findings from the PIECES project: National policies and plans on...
Symposium on findings from the PIECES project: National policies and plans on...Symposium on findings from the PIECES project: National policies and plans on...
Symposium on findings from the PIECES project: National policies and plans on...
 
ερευνητική εργασία φως Ver 4 1
ερευνητική εργασία φως Ver 4 1ερευνητική εργασία φως Ver 4 1
ερευνητική εργασία φως Ver 4 1
 
Кейс по разработке приложения для akusherstvo.ru (iPad)
Кейс по разработке приложения для akusherstvo.ru (iPad)Кейс по разработке приложения для akusherstvo.ru (iPad)
Кейс по разработке приложения для akusherstvo.ru (iPad)
 
Ramjas college :- First Cut-off
Ramjas college :- First Cut-offRamjas college :- First Cut-off
Ramjas college :- First Cut-off
 
Satyawati college (Day):- First Cut-off
Satyawati college (Day):- First Cut-offSatyawati college (Day):- First Cut-off
Satyawati college (Day):- First Cut-off
 

Similar to MOHAMMED IMRAN_CV_O&M (20)

IBASCO ELPIDIO RESUME PDF
IBASCO ELPIDIO RESUME PDFIBASCO ELPIDIO RESUME PDF
IBASCO ELPIDIO RESUME PDF
 
CV 1
CV 1CV 1
CV 1
 
Job description factory services engineer
Job description   factory services engineerJob description   factory services engineer
Job description factory services engineer
 
CV
CVCV
CV
 
Shaik Abdul Khader Updated C.V. New
Shaik Abdul Khader Updated C.V. NewShaik Abdul Khader Updated C.V. New
Shaik Abdul Khader Updated C.V. New
 
Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015
 
MJ FM hvac
MJ FM hvacMJ FM hvac
MJ FM hvac
 
manju_cv_ updated
manju_cv_ updatedmanju_cv_ updated
manju_cv_ updated
 
Raj Gandhi
Raj GandhiRaj Gandhi
Raj Gandhi
 
The Projects
The ProjectsThe Projects
The Projects
 
CV
CVCV
CV
 
Refinery Overhauling Introduction
Refinery Overhauling IntroductionRefinery Overhauling Introduction
Refinery Overhauling Introduction
 
Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16
 
Resume
ResumeResume
Resume
 
Resume to I EC
Resume to I ECResume to I EC
Resume to I EC
 
Resume E&I
Resume E&IResume E&I
Resume E&I
 
Bob Kendall Resume 2015 current
Bob Kendall Resume 2015 currentBob Kendall Resume 2015 current
Bob Kendall Resume 2015 current
 
KASHF ALI
KASHF ALIKASHF ALI
KASHF ALI
 
Resume with cover latter pdf
Resume with cover latter pdfResume with cover latter pdf
Resume with cover latter pdf
 
Resume of Srinivas
Resume of SrinivasResume of Srinivas
Resume of Srinivas
 

MOHAMMED IMRAN_CV_O&M

  • 1. MOHAMMED IMRAN Mobile No: +971-50-2786020 e-mail: access.imran@live.com P. O. Box: 109885, Abu Dhabi, UAE Applicable Position : District Cooling Plant/Facilites/Operations/Maintenance Engineer. Drive business growth and profits for the clients or internal business units through combined expertise of efficient Operations & Maintenance. Industry Preference: District Cooling/ Engineering & Consulting / Project Management Services Firm PROFESSIONAL SYNOPSIS EDUCATION  Bachelors in Engineering (B.E.) from JNTU University, Hyderabad, A.P, India in 2007. CORE COMPETENCIES Plant / Facility Management  Thorough knowledge of procedures & Technical know-how in Facility maintenance.  Thorough knowledge of chiller plant Operation, Delta T issues and plant performance.  Thorough knowledge in DCP energy optimization procedures.  Hands on experience in drafting DCP/Facility operation procedures (Operations manual, work permit procedures manual, PPM scheduling, various O&M forms etc required to begin Operations) from scratch.  Highly experienced in Plant/Facility taking over procedures from construction contractors (Mazyad mall, Barari Mall, Le Meridien DCP, Sweihan Airbase DCP, Abu Dhabi Airbase DCP & Nation Towers DCP)  Ability to train & develop the Operator/Technician team from basics for DCP/Facility Operations.  Planning, coordinating, scheduling, monitoring, updating & controlling plant operations using management tools like SCADA (Cimpicity), BMS & CMMS.  Well versed in operation of different PLCs Allen Bradley, GE Fanuc.  Hands on Operating experience on different centrifugal chillers, York, Carrier.  Preparation of annual budget and control.  Preparation of various operations related DCP reports (daily reports, weekly reports, monthly reports, load profiles etc). Note: All the reports mentioned above shall be produced during the interview on request.  A professional with rich experience in District Cooling/Facility Maintenance industry.  A Bachelor’s degree from JNTU University, India.  Awareness of ISO standards 9001, 14001 & 18001.  A Management professional with expertise in Operations, Maintenance of DC Plants & Facility Maintenance.  Comprehensive experience in leading plant / facility operations through a structured methodology across performance measurement, organizational management.  Exceptionally well organized with a track record that demonstrates self motivation, creativity & initiative to achieve personal & corporate goals Functional Strengths Plant/Facility Management Operations & Maint. Plant Commissioning Due Diligence Engineering O&M team formulation Budget preparation
  • 2. Site Administration  Thorough understanding of maintenance requirement based on scope / Contract.  Experienced in preparation / arrangement of teams for site deployment.  Well versed in correspondence and formulation of Contractual letters and Notifications Maintenance Planning & Management  Hands on experience in Maintenance planning manual and through CMMS.  Well versed with handling of contract scope Variations.  Making effective use of cost analysis tools though the CMMS system.  Optimize manpower and man-hours. Risk Management  Identifying risks to the equipment as well as employee safety.  Identifying failure risk and plan contingencies especially related to Power and Air Conditioning equipment.  Organizing Risk Management sessions and come up with well defined Risk management Plans with the required contingency.  Consistently evaluating and monitoring risk performance to ensure adherence to management plan. Team Management  Training & Development of O&M team from scratch.  Providing direction, motivation and training to the O&M team for ensuring optimum performance.  Leading & motivating teams, while ensuring career development & positive contribution to company. EMPLOYMENT DETAILS Joule Central Cooling Company, Abu Dhabi, U.A.E June 2008-till date. I am employed as a Project Engineer with a staff of 3 Engineers & 24 Technicians reporting to me. Currently I am managing 4 projects (3 DCPS & 1 Mall). Below are the major projects I have worked upon with respective tasks. 1. Le Meridien - Centrifugal Chiller plant (DCP) Period : On going Project Engineer Project Managed Chiller Plant: Capacity 5,000 Tons Details: The Chiller plant is a newly built serving Le Meridien Hotel. The plants consist of Five water-cooled chillers from Trane, capacity 1000Tons each. I was involved from the commissioning stage of the plant and was responsible for snag generation and taking over from the contractor. Below are my responsibilities in brief. Responsibilities  Planning and scheduling plant Operation & Maintenance activities.  Monitor plant Performance based on Kw/T.  Monitor and control water treatment program, perform in-house daily water testing.  Record and update all parameters related to plant production and utilities.  Prepare daily reports and send it to the client.  Prepare monthly plant production reports and spread it across for quarterly and annual reports.  Follow up with third party contractors for maintenance.  Follow up on snag rectification  Prepare operational snag list and raise claim under warranty or defect liability period as applicable.
  • 3. 2. Sweihan Airbase - Centrifugal Chiller plant (DCP) Period : On going Project Engineer Project Managed Chiller Plant: Capacity 4000 Tons + 2500Ton Thermal Storage Plant. Details: The Chiller plant is a newly built serving the Sweihan Airbase. The plants consist of Four water-cooled chillers from Carrier, capacity 1000Tons each with a Thermal Storage Tank of capacity 2500Ton. I was involved from the commissioning stage of the plant and was responsible for snag generation and taking over from the contractor. Below are my responsibilities in brief. Responsibilities  Planning and scheduling plant Operation & Maintenance activities.  Monitor plant Performance based on Kw/T.  Monitor and control water treatment program, perform in-house daily water testing.  Record and update all parameters related to plant production and utilities.  Prepare daily reports and send it to the client.  Prepare monthly plant production reports and spread it across for quarterly and annual reports.  Follow up with third party contractors for maintenance.  Follow up on snag rectification  Prepare operational snag list and raise claim under warranty or defect liability period as applicable. 3. CMW Plant (Command of Military Works) - Centrifugal Chiller plant (DCP) Period : On going Project Engineer Project Managed Chiller Plant: Capacity 3,300 Tons. Details: The Chiller plant is a newly built serving CMW facility. The plants consist of Three water-cooled VFD chillers from Carrier, capacity 1000Tons each. I was involved from the commissioning stage of the plant and was responsible for snag generation and taking over from the contractor. Below are my responsibilities in brief. Responsibilities  Planning and scheduling plant Operation & Maintenance activities.  Monitor plant Performance based on Kw/T.  Monitor and control water treatment program, perform in-house daily water testing.  Record and update all parameters related to plant production and utilities.  Prepare daily reports and send it to the client.  Prepare monthly plant production reports and spread it across for quarterly and annual reports.  Follow up with third party contractors for maintenance.  Follow up on snag rectification  Prepare operational snag list and raise claim under warranty or defect liability period as applicable. 4. Barari Mall, Al Ain, U.A.E Period : On going Project Engineer Project Managed Barari Mall : Barari Mall located in Mezyad, Al Ain. Equipped with Air Cooled plant with state of the art equipment. Responsibilities  Compiling snag list as part of taking over from the construction contractor. Assisting the Client in having a clean takeover from Contractor post DLP.  Establishing, maintaining and managing the maintenance procedures.  Implement PPM schedules generated from the CMMS system and make changes as per site condition.  Analyze the efficiency of HVAC system, take required actions for improving the efficiency.  Compiling the O&M report for the Mall indication HVAC system efficiency, Utility consumptions etc.  Liaising with individual tenants/ client for maintenance & modification issues.  Ensuring safety standards are maintained on site.  Ensure quality of work is maintained and highlight recurring faults.
  • 4. 5. Nation Towers - Centrifugal Chiller plant (DCP) March 2012 - May 2013 Plant Engineer Project Managed Chiller Plant: Capacity 10,000 Tons + 2500Ton Thermal Storage Plant. Details: The Chiller plant is a newly built serving one of the prestigious towers on Abu Dhabi Corniche. The plants consist of Four water-cooled chillers from York (JCI), capacity 2500Tons each with a Thermal Storage Tank of capacity 2500Ton. I was involved from the commissioning stage of the plant and was responsible for snag generation and taking over from the contractor. Below are my responsibilities in brief. Responsibilities  Planning and scheduling plant Operation & Maintenance activities.  Monitor plant Performance based on Kw/T.  Monitor and control water treatment program, perform in-house daily water testing.  Record and update all parameters related to plant production and utilities.  Prepare daily reports and send it to the client.  Prepare monthly plant production reports and spread it across for quarterly and annual reports.  Follow up with third party contractors for maintenance.  Follow up on snag rectification  Prepare operational snag list and raise claim under warranty or defect liability period as applicable. 6. Tabreed, National Central Cooling Co. P.J.S.C Jan 2011 - May 2013 Lead Engineer Project Managed District Cooling Plants: Tabreed is a district cooling company with about 60 DC plants spread across UAE. Joule has been responsible for Maintenance of Cooling towers –Mechanical, Chemical & Structure. I was appointed as the lead engineer from Joule to lead the team responsible for the total scope. Below are my responsibilities related to this project. Responsibilities  Establishing, maintaining and managing the maintenance procedures & task at sites.  Prepare and implement schedule to meet the target days to complete each plant.  Analyze tower performance and recommend action to the client.  Preparing Service reports highlighting each tower efficiency individually.  Preparing summary report for each area and sending it to each zone manager.  Liaising with Tabreed staff for site access and other site issues.  Coordinating with workshops to fabricate / refurbish damaged parts.  Ensure quality of work is maintained and highlight recurring faults. 7. Abu Dhabi Business Hub- Office Towers Jan 2010 – Dec 2011 Facility Engineer Project Managed Abu Dhabi Business Hub: ADBH comprises of three high profile office towers located at ICAD, Abu Dhabi. The towers have Air cooled chillers from Career. The Scope under my responsibility was Complete MEP, Fire Alarm & Fire Fighting. Responsibilities  Establishing, maintaining and managing the maintenance procedures.  Implement PPM schedules generated from the CMMS system and make changes as per site condition.  Set up customer complaint procedures and close all the calls on daily basis.  Prepare and send daily reports to the client.  Liaising with individual tenants/ client for maintenance & modification issues.  Attend weekly meetings with the client and prepare minutes and follow up with actions required.  Ensuring safety standards are maintained on site.  Conduct site meetings with staff and refresh the scope and any shortcomings.  Guide the maintenance team on various rectifications and oversee replacements as required.  Coordinating with workshops to fabricate / refurbish damaged parts.  Ensure quality of work is maintained and highlight recurring faults.
  • 5. 8. Al Tayeb Centre- EMKE strategic Ware houses June 2009– Apr 2010 Commissioning Engineer Project Managed Al Tayeb Centre : Al Tayeb Centre is a strategic store spread across 1.5 Sq.Km belonging to EMKE. It consists of one DC plant with four water-cooled chillers from Carrier, about 10 cold storages and 3 warehouses. I was assigned to manage the commissioning of the above facilities. Responsibilities  Compiling commissioning management procedure.  Implement all pre-commissioning checks as required by the contractor.  Conduct site meetings with Consultant and contractor and provide our recommendation.  Ensure all mechanical installations are done as manufacturers recommendation and good workmanship.  Generate snag list and highlight it to the client.  Follow up on snag rectification.  Issue Job completion certificate for each equipment installed.  Compile O&M Manuals with complete details including warranty certificate. 9. Mazyad Mall, Abu Dhabi, U.A.E Aug 2008 – Aug 2009 Facility Engineer Project Managed Mazyad Mall : Mazyad Mall located in Mussafah, Abu Dhabi. Connected to a DC plant with all the state of the art equipments. Responsibilities  Compiling snag list as part of taking over from the construction contractor. Assisting the Client in having a clean takeover from Contractor post DLP.  Establishing, maintaining and managing the maintenance procedures.  Implement PPM schedules generated from the CMMS system and make changes as per site condition.  Monitor the Delta-T of ETS stations. Analyze the efficiency of HVAC system based on the Delta-T, take required actions for improving the efficiency.  Compiling the O&M report for the Mall indication HVAC system efficiency, Utility consumptions etc.  Prepare and send daily reports to the client.  Liaising with individual tenants/ client for maintenance & modification issues.  Ensuring safety standards are maintained on site.  Ensure quality of work is maintained and highlight recurring faults. PERSONAL DETAILS Nationality : Indian Date of Birth : 24th November 1984 Driving License : Valid UAE Driving License