Hello Sir/Madam,
Greetings!!!
I the undersigned have done BE in Electrical Engineering & working as Sr. Manager Project Planning & Maintenance in Cummins India Ltd, Phaltan,
And the past experiences are as below,
1) Siemens Ltd, Mumbai.
Work period : Aug'2007 to Oct'2010
2) Mahindra Vehicle Manufacturers Ltd, Chakan Pune
Work period : Nov'2010 to June'2016
3) Cummins India Ltd, Phaltan Satara.
Work period : Since Jul’2016.
I am attaching my latest updated Resume for your kind perusal. It is my request to you to forward the same to the suitable person / agency, to consider the same for the suitable post if any in your organization.
I have 9-years plus of enriched experience in Power Projects, Electrical Project Planning & Execution, Operation / Maintenance & Facility Management, Green field project, during in Siemens, Mahindra & in Current Organization.
Presently working as Sr. Manager - Projects (Electrical) Involved in the Design, Erection, Commissioning activities of HT, LT substation, plant Lighting, FADS, UPS, HVAC, DATA Centre etc…
Responsibilities included Electrical design & Control wiring design, Cable schedule and Electrical protection Design. Prepare annual maintenance Calendar for maintenance of all electrical system, Machine maintenance.
I will be highly obliged, if I can have an opportunity to serve to the world leading organization in India or in Abroad.
Have a nice day.
Best Regards,
Prashant B. Maulikar
Email – Prashant.maulikar@gmail.com
Mob. +91-9595504591
1. PRASHANT B. MAULIKAR
: +91-9595504591 : prashant.maulikar@gmail.com
: https://in.linkedin.com/pub/prashant-maulikar/92/84/21b
~ HIGH-PERFORMANCE PROFESSIONAL ~
--------------------------------------------------------------
EXPERT IN: Catalyst for Project Management | New Plant Setups | Greenfield Project Planning in
Automobile industry | Operations & Maintenance of HT/LT Substations| Installation & Commissioning
of 765KV, 400KV, 220KV, 132KV, 66KV Substation & 66KV Gas Insulated Substation, 33KV, 22KV, 11KV,
6.6KV HT Substation & 415Volts LT substations | Manpower Leadership | Operational Efficiency &
Execution| Facility Management and Organization Compliance (MSEB, ELECTRICAL INSPECTOR,
WATER, FUEL, FIRE etc)
~ Versatile, profit & value driven professional, seeking positions as Manager- (Projects – Power &
Utilities) to leverage 8years plus of enriched experience in driving benchmark-setting business growth
& expansion for Power Sector /Utility Industries /Automobile /Oil & Refineries ~
~ Offering hallmark career manifested by vertical and horizontal movements with success in planning &
managing the plant operations including maximizing plant profits & minimizing expenses & attaining zero
customer complaint ~
~ Awards and Laurels: Honored with the “Electrical Supervisory License Sr. No. 52250, March 2014 by PWD
Government of Maharashtra”, “SPOT Awards” for “successful commissioning of 220 KV Sub-station”, “Plant
Event Management”, “Milestone achievement award for 5-Years completion in Mahindra”, “Recognition
by C.Exe. Engineer of Power Grid Corporation of India Ltd for successful commissioning of India’s 1st
Mega Power Project 765/400/220KV Substation at Seoni MP” ‘’Recognition by CEO for cost saving
Programmed” and “Recognition by Government of India Ministry of New & Renewable Energy “ New
plant set-up for cummins at Phaltan in fuel system division. ~
CAREER HIGHLIGHTS & PROFILE SUMMARY
• Explore technical skill in new plant set-up in cummins fuel system at Phaltan in over-speeding time.
• Displayed prowess in overcoming various challenges, Managed successful commissioning of
765/400/220KV substation at very early stage of carrier including 500MVA transformers (ITC) &
500MVAR Reactors the India’s 1st Mega Power Substation Project at Seoni (MP) for PGCIL -
Government of India.
• Power/Energy project expertise in handling various size of voltages level
• Automobile industry expertise in handling project of Press shops, Body shops, Paint shops, TCF shops,
Utilities & ETP/STP
• Exhibited merit in standardizing Maintenance like PM/TPM schedule so that plant can avoid failure
modes of machines & increase the productivity & reduces the downtime
• Measurable in Electromechanical Project Management/Execution, Electrical substation with
Transformers, VCB / SF6 circuit breakers / MOCB, Numerical Relays, Battery charger, Bus Duct, Bus
Trunking, inplant Wiring/Cabling, Plant Lighting/Illumination, Earthing, DG sets, Power Distribution
System
• Fulfillment of day to day project requirements as per production demand & requirements related to
Utilities
• Proven abilities in planning, erection and commissioning of HV/EHV substations with reputed
Pioneers like Siemens and resolving critical issues associated with during and post commissioning of
HV/EHV Substations, ability to work in shift duties to solve shops day to day problem.
2. • Skilled in enquiry preparation, technical discussion with suppliers and finalization of various annual
maintenance contracts for power station, handling stock of material to avoid delay in completion of
projects, managing routine surveillance for the ongoing and planned activities at site
SOFT SERVICES EXPOSURE
• Resourceful in establishing finalization of annual rate contract for electrical installation work for
contractors with current market rates
• Displayed prowess in heading project teams based on remote locations, effectively communicating and
coordinating project tasks and handling vendor relationships by defining project expectations and
timeframes
• Showcased excellent aptitude as a capable business frontrunner in identifying resource needs &
assembling teams with skills needed to successfully implement projects
• Highly experienced in driving change across the organizational boundaries, standing-up new
processes, supporting an environment of continuous improvement
• People engagement specialist, excels at leading and realigning work groups and roles to foster an
environment of collective leadership and a shared vision
• Leading & Execution entire project life cycle including Greenfield project
ORGANIZATIONAL EXPERIENCE
Current Organization: - Since July’2016 – with M/S Cummins India Ltd, Phaltan-Satara as Sr.
Maintenance Manager (Dept. – Cummins Fuel System India)
ID Card No. OE560
Presently working as Sr. Manager- Projects (Electrical)
Involved in the Design, Erection, Commissioning activities of HT, LT system, Lighting, Fire alarm
system.
Responsibilities included Electrical design & Control wiring design, Cable schedule and Electrical
protection Design.
Prepare annual maintenance Calendar for maintenance of all electrical system & implement the same.
2nd Organization :- Nov 2010 – June’ 2016 with M/S Mahindra Vehicle Manufacturers Ltd.,
ID Card No. 23070150
Chakan Pune as Asst. Manager (Dept. - Utility – Projects/Planning/Maintenance)
1st Organization :- Aug 2007 – Oct 2010 with M/S SIEMENS Ltd., Mumbai as Testing &
ID Card No. 74213106
Commissioning Engineer – for Power Projects (Dept: Industrial Solutions & Services)
Accountabilities:
• Expert in handling Electrical substation project with Transformers, VCB / SF6 circuit breakers/ MOCB,
Numerical Relays, Battery charger, Bus Duct, Bus Trunking, Inplant Wiring, Plant
Lighting/Illumination, Earthing, DG sets, Power Distribution System
• Planning & executing projects, maintenance & troubleshooting for installation and developing
equipment.
• Overseeing the pre-commissioning inspection at manufacture plant for various substation equipment’s
• Heading purchase requisition for various AMC & ARC Contracts, Stock Monitoring, Material Indents,
Budget Monitoring, PR creation by using SAP system
• Administering the activities of introduction of new products & new technologies and energy
conservation using latest technologies & innovative methods
• Coordination with government agencies like State Electricity Boards (MSEDCL in Maharashtra),
Electrical Inspector for statutory Compliances
• Anchoring erection & commissioning of machines & equipment and ensuring completion of project in
minimum turnaround time effective resource utilization to maximize the output
3. • Accountable for acquiring various substation equipment’s such as LT Power Panels, LT Breaker Boards,
HT Switchboards and Transformers, handling power scheduling for entire plant with KSK & WPCL
• Ensuring enquiry preparation of various substation equipment’s, sending them to suppliers for
technical confirmation; managing entire Utility Areas (Air/Water/Power including MNGL & ETP)
• Evaluating resources for the new projects and identifying vendors for procurement, RFQ and receiving
quotations
• Taking part in various public hearings at MERC, Mumbai for Objections/Suggestions on
MSEDCL/MSPGCL tariff hike, MYT business plan petitions
PROFESSIONAL ENHANCEMENTS
• Actively participated in two days’ workshop on Campus Interview, Aptitude, Group discussion and
Managerial Skill by MITCON Aurangabad in 2007
• Certification Program on:
o “Authorization to operate SAP” by Mahindra Vehicle Manufacturers Ltd., Pune in 2014
o “PLC” by ISA, Pune in 2012
o “LVSSM” by L & T, Pune in 2013
o “SCADA” by Siemens, Pune in 2015
• Trainings Attended:
o “Project Management” Training by Mahindra Vehicle Manufacturers Ltd., Pune in 2014
o “Finance & Vendor Management” Training by Mahindra Vehicle Manufacturers Ltd., Pune in 2014
o “My Customers my Promoters” Training by Mahindra Vehicle Manufacturers Ltd., Pune in 2015
EDUCATION
• Graduation: Bachelor of Electrical Engineering from Dr. Babasaheb Ambedkar Marathawada
University, Aurangabad, Passed in 1st Class.
• Under-Graduation: Diploma in Electrical Engineering from Government Polytechnic, Aurangabad,
Passed in 1st Class with Distinction.
PERSONAL DETAILS
Date of Birth: 14th April, 1984
Languages Known: English, Hindi and Marathi
Communication Address: Celestial City, Near S.S Nursery, Dehuroad, Ravet, Pune- 412101
Location Preference: Pune / Bangalore / Chennai / Nagpur / Europe / US / UAE
Passport No: G9756331
Please refer the annexure below for additional details (projects and technical purview)
ANNEXURE
PROJECTS HANDLED
Title: 765/400/220KV PGCIL Substation, Seoni MP
Scope: It was focused on Testing & Commissioning of 765/400/220KV entire Switchyard includes 9-Bays
of 765KV SS with 10+10 Nos. of ITCs & Reactors, 18-Bays of 400KV SS including 3 Nos. of 315MVA Auto
Transformer & 8-Bays of 220KV SS
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of entire substation within the stipulated time period
Title: 220KV Substation, Vedanta Alumina Ltd., Jharsuguda
Scope: It was focused on Testing & Commissioning of Ph-1 220KV, 11KV & 6.6KV Switchboards of more
than 200 Panels (11-Substations) including 40MVA, 31.5MVA & Distribution Transformers
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of entire substation within the stipulated time period -
4. Title: 132KV Substation, OCL, Rajganjpur
Scope: It was focused on Testing & Commissioning of 500KW Motor, with 11KV switchboards
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of entire substation within the stipulated time period
Title: 132KV Substation, IOCL, Panipat
Scope: It was focused on Testing & Commissioning of 132KV Switchyard of 5 Bays including 50MVA
transformer & 6.6KV Switchboards 35 Nos. of panels
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of entire substation within the stipulated time period
Title: Tata Motors, Lucknow
Scope: It was focused on Testing & Commissioning of 132KV Switchyard of 5 Bays including 2 Nos.
50MVA transformers. Also testing & commissioning of 11KV switchboards with more than 100 panels (5
substations) including 2.5MVA transformers
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of entire substation within the stipulated time period
Title: 220/22KV Substation, Mahindra Vehicle Manufacturers Limited, Chakan
Scope: It was focused on Testing & Commissioning of 220 Switchyard equipment’s with 2-nos. of 50MVA
Power Transformer & 22KV switchboards at various substations
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of entire substation within the stipulated time period
Title: ITC West Side, Ranjangaon
Scope: It was focused on Testing & Commissioning of 415V PCC, MCC panels of SIVACON make (300
nos). SIVACON panels are first time supplied in India for this project
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of entire substation within the stipulated time period
Title: Finolex Industries Limited, Ratnagiri
Scope: It was focused on Testing & Commissioning of 220KV Switchyard of 7 Bays
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of entire substation within the stipulated time period
Title: Reliance Industries Limited, Jamnagar
Scope: It was focused on scheme modification of 220KV & 132KV Switchyard for power export to GETCO
at JERP as well as DTA end
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of entire substation within the stipulated time period
Title: 132KV Substation, Uttam Galva Steel Ltd, Wardha
Scope: It was focused on commissioning 132kV Switchyard 40MVA power transformer automatic voltage
regulator
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of Transformer within the stipulated time period
Title: Adani Power Plant, Mudra Gujarat
Scope: It was focused on Testing & commissioning of 220/66kV switchyard of 12-Bays, 66KV Gas Insulated
Substation of 6 Bays was including 2-nos of 25MVA Auto Transformer
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of entire substation within the stipulated time period
Title: Reliance Industries Limited, Kakinada
Scope: It was focused on Training to the employee on switchyard equipment’s, protection system,
Operation & Maintenance of power equipment’s
Role: System Trainer
Responsibility: To train the operational people on power handling equipment’s.
5. Title: 132KV Substation, Cipla, Goa
Scope: It was focused on Soil testing for 132KV switchyard fault current calculation & designing of Earth
pits.
Role: Testing & Commissioning Engineer
Responsibility: Parameterization & calculation for designing of earth pits
Title: 220KV Substation, General Motor
Scope: It was focused on Testing & Commissioning of 220KV SS of 5-Bays & 11KV Switchboards.
Role: Testing & Commissioning Engineer
Responsibility: Commissioning & final charging of entire substation within the stipulated time period
Other Projects:
Title: 66KV Gas Insulated Substation testing & commissioning at Mundra-Gujarat
Title: 220KV Substation project execution with 2-Nos of 50MVA Power Transformer Commissioned
Title: 22KV, 6.6KV & 415V Switchboards project execution with 32-Nos of 2MVA Dry Type Transformer
commissioned
Title: Execution of SCADA Project for 220KV Substation
Title: Execution of PLC & SCADA Project for whole plant (Energy, Water and Air Consumption)
Title: FDS (Fire Detection System) Project
TECHNICAL PURVIEW
• Conversant with:
o Line/Cable Protection: Directional/Non directional over current phase & Earth Fault, Line
differential with pilot fibre optic, SOTF, Distance protection with PLCC
o Transformer & Reactor Protection: Differential, REF Protection, Thermal Over load, REF, Stand by
Earth Fault
o Bus Bar Protection: Numerical Bus-bar protection, LBB protection
o Synchronization: Closing of breaker after synchronization& fulfilment of interlocks
o Motor Protection: Over current protection with voltage influence, thermal over load, over/under
voltage protection, Over/Under frequency protection, Start-up supervision, etc.
o Switch yard equipment’s testing: CT, CVT, PT, Breaker, Transformer, etc.
o Relay Parameterizations& Testing of Siemens-Siprotec relays of 7SA, 7SJ, 7UT, 7SD, 6MD, 7SS, &
7RW series with DIGSI 4.71/4.8/4.81/4.82/4.83 software Relay Testing of ABB Make, SPAJ, and
SPAM
o Communication Protocol of Relays: Modbus, Profibus, IEC-61850
o MS Office (Word, Power Point & Excel)
o SAP
o ERIBA - Procurements
!!! THANK YOU !!!