Process & Project
    Management Seminar


April 8, 2009
                Copyright   ©   ESI Group, 2007. All rights reserved.   Innovation with Realistic Simulation
Standard Processes: Key to
                                                 Improvement

Today’s    standardization    is   the
necessary    foundation    on    which
tomorrow’s improvement will be based.
                                           Henry Ford
                  …any company that simply tries new things
                  without standardizing … is “randomly wandering
                  through a maze”
                       “The Toyota Product Development System”,
                                                   Morgan & Liker

           Vdot: Usable Standard Processes
               Copyright© ESI Group, 2007. All rights reserved.   Innovation with Realistic Simulation
Shared Platform for Planning,
                                                 Doing, Managing
Graphical Process                    • Information Flow
Definition and Execution • Active connection to the work

Better Planning                      • Integrated platform for resource
                                       requirements and information flows

Better Execution                     • Right task with right data & tools
                                     • Reduce non-value adding effort

Better Management                    • Real-time status visibility
                                     • As-performed database

               Faster, Better, Cheaper Results
                    Copyright© ESI Group, 2007. All rights reserved.   Innovation with Realistic Simulation
Define, Execute and Manage
                                                   with Smart Tasks
                                                                        Full Resource Definition:
Tasks: Defined and Traceable
                                                                      Tool/Sub-process, Engineer,
                                                                   Instructions, Man-hours, Duration
       Detailed
  Information Flows
                                            Create Initial Model
                                                                              Model File
                                             Start: 03-04-2004
                  Geometry
                                             Due: 03-09-2004
                                                   Patran
                                                                             Analysis File

              Reference Data
                                                                             Analysis File
                                            Strength Engineer




 Flexible: Recall, Loop, Branch,                                Automatic Status: As Planned
                                                                                  As Performed
            Cut & Paste Processes

                             Your Work - Delivered
                        Copyright© ESI Group, 2007. All rights reserved.        Innovation with Realistic Simulation
Vdot™: Define, Execute,
                                                     Track, Improve
 Vdot: Lean Process Platform
                                                              Visual Process Controls
                                                              Smart Tasks
                                        Nested
                                                              Connected to the Work
                                       Processes


                                                              Real-Time Dashboards
            Applications




Unified Project, Workflow, Tool and Data Management
                 Copyright© ESI Group, 2007. All rights reserved.    Innovation with Realistic Simulation
Demo
Rich Client and Web Interfaces
  Process Database
  Project Data Store(s)
Easy Template Creation & Activation
Integrated Features
  Flexible Workflow & Communication
  Project Management Status
  Results (Technical) Status


    Verifiable, Efficient Best Practice Execution
             Copyright© ESI Group, 2007. All rights reserved.   Innovation with Realistic Simulation
Lean Results for
                                                              a Variety of Teams

     Industries                                                Projects
Aerospace & Defense              New Product Development - Engineering
Auto                             Business Development
Financial Services               Software Development
Construction                     Requirements Management
                                 Building Re-commissioning (Energy
                                 Savings)
               Example Project Scopes to Date
     # Tasks                        # Data Items                          Team Size
    20 – 2,000                         70 – 7,000                          5 – 250




   Method scales well for a variety of domains

                 Copyright© ESI Group, 2007. All rights reserved.         Innovation with Realistic Simulation
Success Story #1:
                                                          Unmanned Air Vehicle
52% Cycle Time Savings • Reduced data-chase
                       • Reduced rework
37% Cost Savings
    ($178K)            • Reduced reporting effort
                                     • Better management information
                                     • 3 Days: initial process capture
11X ROI
                                     • 2 Weeks: improvements & deployment
                                     • $16,200 investment
Process Visibility                   • Improved product information flow and
                                     • Automatic management information
Cycle Time & Cost Savings, Best Practices Compliance

                     Copyright© ESI Group, 2007. All rights reserved.   Innovation with Realistic Simulation
Success Story #2:
                                       Business Acquisition Process
Rapid Deployment                   •   3 days to convert MS Project Plan
                                   •   Included fixes to problems uncovered
                                   •   Easily added unexpected work
                                   •   Numerous on the fly improvements

Better Management                  • Visible compliance to plan
                                   • Tracked U.S. team while in Japan
                                   • Real-time status for multiple efforts

Summary                            • 3 responses instead of the 1 expected
                                   • Within original schedule and budget

       Lessons learned reusable by other teams

                   Copyright© ESI Group, 2007. All rights reserved.   Innovation with Realistic Simulation
Summary:
                                             Entire Enterprise Benefits
                       Enterprise Management
               On time product development results
                Better process performance visibility
                   Better coordinated team efforts
          Better products    Better sales   At lower costs




        Working Team                                        Program Management
  Reduced data chase effort                            Increased performance visibility
       Reduced rework                                 Increased project status visibility
Reduced status reporting effort                           Better partner coordination
  Better process knowledge                             Better as-performed information

                 Work Together, Better
                  Copyright© ESI Group, 2007. All rights reserved.   Innovation with Realistic Simulation

More Related Content

What's hot

Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement InitiativesExploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Mahesh Singh
 
Bridging the c suite gap
Bridging the c suite gapBridging the c suite gap
Bridging the c suite gap
Interop
 
2nd day 1 - alm overview
2nd day   1 - alm overview 2nd day   1 - alm overview
2nd day 1 - alm overview
Lilian Schaffer
 
Keynote at Depsa07 - architectural view of event processing
Keynote at Depsa07 - architectural view of event processingKeynote at Depsa07 - architectural view of event processing
Keynote at Depsa07 - architectural view of event processing
Opher Etzion
 
Talk IT_ Oracle_박소희_110809
Talk IT_ Oracle_박소희_110809Talk IT_ Oracle_박소희_110809
Talk IT_ Oracle_박소희_110809
Cana Ko
 
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...
InSync2011
 
Case study: Glassbeam
  Case study: Glassbeam  Case study: Glassbeam
Case study: Glassbeam
OpSource
 
Northstar Bluescope Steel Maximo BIRT Case Study
Northstar Bluescope Steel Maximo BIRT Case StudyNorthstar Bluescope Steel Maximo BIRT Case Study
Northstar Bluescope Steel Maximo BIRT Case Study
Actuate Corporation
 
Integrated it portfolio management using epm live's it engine app
Integrated it portfolio management using epm live's it engine appIntegrated it portfolio management using epm live's it engine app
Integrated it portfolio management using epm live's it engine app
EPM Live
 
WorkEngine Overview
WorkEngine OverviewWorkEngine Overview
WorkEngine Overview
EPM Live
 

What's hot (20)

To Each Their Own: How to Solve Analytic Complexity
To Each Their Own: How to Solve Analytic ComplexityTo Each Their Own: How to Solve Analytic Complexity
To Each Their Own: How to Solve Analytic Complexity
 
Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement InitiativesExploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
 
Bridging the c suite gap
Bridging the c suite gapBridging the c suite gap
Bridging the c suite gap
 
Innov8ion in enterprise content management
Innov8ion in enterprise content managementInnov8ion in enterprise content management
Innov8ion in enterprise content management
 
2nd day 1 - alm overview
2nd day   1 - alm overview 2nd day   1 - alm overview
2nd day 1 - alm overview
 
Keynote at Depsa07 - architectural view of event processing
Keynote at Depsa07 - architectural view of event processingKeynote at Depsa07 - architectural view of event processing
Keynote at Depsa07 - architectural view of event processing
 
Talk IT_ Oracle_박소희_110809
Talk IT_ Oracle_박소희_110809Talk IT_ Oracle_박소희_110809
Talk IT_ Oracle_박소희_110809
 
10 Strategies for Resolving Common Fleet Management Challenges
10 Strategies for Resolving Common Fleet Management Challenges10 Strategies for Resolving Common Fleet Management Challenges
10 Strategies for Resolving Common Fleet Management Challenges
 
Smarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBM
Smarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBMSmarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBM
Smarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBM
 
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...
 
Case study: Glassbeam
  Case study: Glassbeam  Case study: Glassbeam
Case study: Glassbeam
 
Northstar Bluescope Steel Maximo BIRT Case Study
Northstar Bluescope Steel Maximo BIRT Case StudyNorthstar Bluescope Steel Maximo BIRT Case Study
Northstar Bluescope Steel Maximo BIRT Case Study
 
EPM Live Overview
EPM Live OverviewEPM Live Overview
EPM Live Overview
 
Integrated it portfolio management using epm live's it engine app
Integrated it portfolio management using epm live's it engine appIntegrated it portfolio management using epm live's it engine app
Integrated it portfolio management using epm live's it engine app
 
Timelytrendsin appdelivery
Timelytrendsin appdeliveryTimelytrendsin appdelivery
Timelytrendsin appdelivery
 
Extend Your PPM Application for Projects Products and Services
Extend Your PPM Application for Projects Products and ServicesExtend Your PPM Application for Projects Products and Services
Extend Your PPM Application for Projects Products and Services
 
GMCR Gets Greener with Paperless PeopleSoft Employee Onboarding
GMCR Gets Greener with Paperless PeopleSoft Employee OnboardingGMCR Gets Greener with Paperless PeopleSoft Employee Onboarding
GMCR Gets Greener with Paperless PeopleSoft Employee Onboarding
 
Exploration Production Portals
Exploration Production Portals Exploration Production Portals
Exploration Production Portals
 
Ibm rational-eclipse-demo camp-2012-06
Ibm rational-eclipse-demo camp-2012-06Ibm rational-eclipse-demo camp-2012-06
Ibm rational-eclipse-demo camp-2012-06
 
WorkEngine Overview
WorkEngine OverviewWorkEngine Overview
WorkEngine Overview
 

Similar to Process Project Mgt Seminar 8 Apr 2009(2)

Big Data Needs Big Analytics
Big Data Needs Big AnalyticsBig Data Needs Big Analytics
Big Data Needs Big Analytics
Deepak Ramanathan
 
Next Generation Datacenter Oracle - Alan Hartwell
Next Generation Datacenter Oracle - Alan HartwellNext Generation Datacenter Oracle - Alan Hartwell
Next Generation Datacenter Oracle - Alan Hartwell
HPDutchWorld
 
Oracle - Next Generation Datacenter - Alan Hartwell
Oracle - Next Generation Datacenter - Alan HartwellOracle - Next Generation Datacenter - Alan Hartwell
Oracle - Next Generation Datacenter - Alan Hartwell
HPDutchWorld
 
Aspeo Corporate Presentation
Aspeo Corporate PresentationAspeo Corporate Presentation
Aspeo Corporate Presentation
ratieh
 
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02Ppwithagileyannhamonqconbeijing 090423081417-phpapp02
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02
youzitang
 
Dnv Improving Your Process Performances With Agile
Dnv   Improving Your Process Performances With AgileDnv   Improving Your Process Performances With Agile
Dnv Improving Your Process Performances With Agile
George Ang
 

Similar to Process Project Mgt Seminar 8 Apr 2009(2) (20)

Manufacturing Performance
Manufacturing PerformanceManufacturing Performance
Manufacturing Performance
 
Big Data Needs Big Analytics
Big Data Needs Big AnalyticsBig Data Needs Big Analytics
Big Data Needs Big Analytics
 
Child Wear Ea Blueprint V0.7
Child Wear Ea Blueprint V0.7Child Wear Ea Blueprint V0.7
Child Wear Ea Blueprint V0.7
 
Agile Software Development - making programming fun again
Agile Software Development - making programming fun againAgile Software Development - making programming fun again
Agile Software Development - making programming fun again
 
Agile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun AgainAgile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun Again
 
Agile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun AgainAgile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun Again
 
Applying a BPM Approach to Three Similar but Distinct Business Environments
Applying a BPM Approach to Three Similar but Distinct Business EnvironmentsApplying a BPM Approach to Three Similar but Distinct Business Environments
Applying a BPM Approach to Three Similar but Distinct Business Environments
 
Keynote Day 1 2009
Keynote Day 1 2009Keynote Day 1 2009
Keynote Day 1 2009
 
Oracle Fusion applications 101 [2010 OAUG Collaborate]
Oracle Fusion applications 101 [2010 OAUG Collaborate]Oracle Fusion applications 101 [2010 OAUG Collaborate]
Oracle Fusion applications 101 [2010 OAUG Collaborate]
 
Java Batch for Cost Optimized Efficiency
Java Batch for Cost Optimized EfficiencyJava Batch for Cost Optimized Efficiency
Java Batch for Cost Optimized Efficiency
 
Sage ERPX3 "A vision for growth"
Sage ERPX3 "A vision for growth"Sage ERPX3 "A vision for growth"
Sage ERPX3 "A vision for growth"
 
Microsoft Business Intelligence Vision and Strategy
Microsoft Business Intelligence Vision and StrategyMicrosoft Business Intelligence Vision and Strategy
Microsoft Business Intelligence Vision and Strategy
 
Next Generation Datacenter Oracle - Alan Hartwell
Next Generation Datacenter Oracle - Alan HartwellNext Generation Datacenter Oracle - Alan Hartwell
Next Generation Datacenter Oracle - Alan Hartwell
 
Oracle - Next Generation Datacenter - Alan Hartwell
Oracle - Next Generation Datacenter - Alan HartwellOracle - Next Generation Datacenter - Alan Hartwell
Oracle - Next Generation Datacenter - Alan Hartwell
 
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...
 
Freenet project ralf_sigmund_opitz_activiti_days_2012
Freenet project ralf_sigmund_opitz_activiti_days_2012Freenet project ralf_sigmund_opitz_activiti_days_2012
Freenet project ralf_sigmund_opitz_activiti_days_2012
 
Aspeo Corporate Presentation
Aspeo Corporate PresentationAspeo Corporate Presentation
Aspeo Corporate Presentation
 
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02Ppwithagileyannhamonqconbeijing 090423081417-phpapp02
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02
 
Dnv Improving Your Process Performances With Agile
Dnv   Improving Your Process Performances With AgileDnv   Improving Your Process Performances With Agile
Dnv Improving Your Process Performances With Agile
 
Dallas Mpug
Dallas MpugDallas Mpug
Dallas Mpug
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 

Process Project Mgt Seminar 8 Apr 2009(2)

  • 1. Process & Project Management Seminar April 8, 2009 Copyright © ESI Group, 2007. All rights reserved. Innovation with Realistic Simulation
  • 2. Standard Processes: Key to Improvement Today’s standardization is the necessary foundation on which tomorrow’s improvement will be based. Henry Ford …any company that simply tries new things without standardizing … is “randomly wandering through a maze” “The Toyota Product Development System”, Morgan & Liker Vdot: Usable Standard Processes Copyright© ESI Group, 2007. All rights reserved. Innovation with Realistic Simulation
  • 3. Shared Platform for Planning, Doing, Managing Graphical Process • Information Flow Definition and Execution • Active connection to the work Better Planning • Integrated platform for resource requirements and information flows Better Execution • Right task with right data & tools • Reduce non-value adding effort Better Management • Real-time status visibility • As-performed database Faster, Better, Cheaper Results Copyright© ESI Group, 2007. All rights reserved. Innovation with Realistic Simulation
  • 4. Define, Execute and Manage with Smart Tasks Full Resource Definition: Tasks: Defined and Traceable Tool/Sub-process, Engineer, Instructions, Man-hours, Duration Detailed Information Flows Create Initial Model Model File Start: 03-04-2004 Geometry Due: 03-09-2004 Patran Analysis File Reference Data Analysis File Strength Engineer Flexible: Recall, Loop, Branch, Automatic Status: As Planned As Performed Cut & Paste Processes Your Work - Delivered Copyright© ESI Group, 2007. All rights reserved. Innovation with Realistic Simulation
  • 5. Vdot™: Define, Execute, Track, Improve Vdot: Lean Process Platform Visual Process Controls Smart Tasks Nested Connected to the Work Processes Real-Time Dashboards Applications Unified Project, Workflow, Tool and Data Management Copyright© ESI Group, 2007. All rights reserved. Innovation with Realistic Simulation
  • 6. Demo Rich Client and Web Interfaces Process Database Project Data Store(s) Easy Template Creation & Activation Integrated Features Flexible Workflow & Communication Project Management Status Results (Technical) Status Verifiable, Efficient Best Practice Execution Copyright© ESI Group, 2007. All rights reserved. Innovation with Realistic Simulation
  • 7. Lean Results for a Variety of Teams Industries Projects Aerospace & Defense New Product Development - Engineering Auto Business Development Financial Services Software Development Construction Requirements Management Building Re-commissioning (Energy Savings) Example Project Scopes to Date # Tasks # Data Items Team Size 20 – 2,000 70 – 7,000 5 – 250 Method scales well for a variety of domains Copyright© ESI Group, 2007. All rights reserved. Innovation with Realistic Simulation
  • 8. Success Story #1: Unmanned Air Vehicle 52% Cycle Time Savings • Reduced data-chase • Reduced rework 37% Cost Savings ($178K) • Reduced reporting effort • Better management information • 3 Days: initial process capture 11X ROI • 2 Weeks: improvements & deployment • $16,200 investment Process Visibility • Improved product information flow and • Automatic management information Cycle Time & Cost Savings, Best Practices Compliance Copyright© ESI Group, 2007. All rights reserved. Innovation with Realistic Simulation
  • 9. Success Story #2: Business Acquisition Process Rapid Deployment • 3 days to convert MS Project Plan • Included fixes to problems uncovered • Easily added unexpected work • Numerous on the fly improvements Better Management • Visible compliance to plan • Tracked U.S. team while in Japan • Real-time status for multiple efforts Summary • 3 responses instead of the 1 expected • Within original schedule and budget Lessons learned reusable by other teams Copyright© ESI Group, 2007. All rights reserved. Innovation with Realistic Simulation
  • 10. Summary: Entire Enterprise Benefits Enterprise Management On time product development results Better process performance visibility Better coordinated team efforts Better products Better sales At lower costs Working Team Program Management Reduced data chase effort Increased performance visibility Reduced rework Increased project status visibility Reduced status reporting effort Better partner coordination Better process knowledge Better as-performed information Work Together, Better Copyright© ESI Group, 2007. All rights reserved. Innovation with Realistic Simulation