Date: May 2015
Location: Hong Kong
Managing projects across borders in East Asia
Contents
• Introduction
• Arup and a Selection of Projects
• Country Characteristics and Challenges in
East Asia
• Cross- Border Teamwork for Delivery
• Conclusion
Introduction &
Caveats
Introduction
• My Background
• This Talk –
• Part 1 - Project Experience in Japan, Mainland China,
South East Asia (& Hong Kong SAR)
• Part 2 - Lessons learnt in managing cross-border
teams/international projects.
Scope of Talk
Clients Government/
Statutory
Design Procure Construct
Japan x x x x
Mainland
China
x x x x x
SE Asia x x x
HK SAR x x x x
Caveats
• Projects discussed are predominantly private sector projects
and in building/industrial field. Not Government work.
• It’s not a judgment on nationalities and race, more of a
description on procedures and market characteristics of the
countries mentioned.
• Design management of external companies, seldom Arup
(unless internal design role)
• From a western perspective and as a PM
• Some generic observations only, from some cases, do not
wish to stereotype
Arup & A Selection
of Projects
Discipline
Number
of Staff
Civil, Structural, Geo. 5,169
E&M 2,228
Acoustics 123
Architecture & Urban Design 281
ICT 102
Computing 274
Environmental 321
Façade 203
Fire 223
PPM 468
QS/Cost Consulting 42
Transport Planning 393
Other disciplines 1,108
Total technical 10,935
Non-technical 1,721
Total = 12,656
Beijing Aquatics Centre
Full Design
International Commerce
Centre
Structural Engineering
Allianz Arena
Structural Engineering
California Academy of
Sciences
Total Engineering &
Sustainability
Heathrow Airport T5
Project Management and
Engineering
Stonecutters Bridge
Full Engineering Detailed
Design & Construction
Supervision
UK-MEA 120
Continental Europe 172
Americas 42
Australasia 56
East Asia 78
Sub Total PPM 468
The Wider PPM Network
America’s 42
staff with Lead
in New York
Continental
Europe - 172
staff with Lead
in Dublin
UKMEA - 120
staff with Lead
in London
Australasia – 56
staff with Lead
in Brisbane
Clark’s Logistics Centre
USA
Francis Crick Institute
UK
National Grid Power
Tunnels PMO
UK
Rolls Royce Programme
Management
USA
Saxion University
Enschede
Netherlands
Perth Airport Terminal 2
ORAT
Australia
East Asia
Japan 7
South Korea 1*
Mainland China 17
Hong Kong & Macau 27
India 3
Vietnam
Thailand
Philippines
3
1*
19
Sub Total
* Country rep.
78
Transport
- Airports
- Rail
- Highways
Industry
- Data Centres
- Factories
- Specialist Services
Move Management/OR
- Airports
- Hospitals
- Offices
Service Industries
- Leisure
- Financial
Automotive
- Workshops and
Showrooms
Educational
- Schools
- Higher Education
Country
Characteristics &
Project Challenges
Theory on Culture
EAST WEST
COLLECTIVE
• Family, group, team
• Others shape identity
• Uniformity (nail that sticks out…)
• Belonging to group
• Collaboration
INDIVIDUALISM
• Self
• personality/interests shape identity
• uniqueness
• own person
• own contribution
DUTY & OBLIGATION
• to collective community/ others
• group achievement
• loyalty
• compliant
RIGHT & PRIVILEGE
• personal development
• for time-being
HIERARCHY
• age, position, education
EQUALITY
• personality & skills
April 10, 2014
Paul Tokonaga
Theory on Culture
EAST WEST
DEFERENCE
• Modesty & self-effacing
• Share complete thoughts
• Ascribed authority
SELF-ASSERTION
• Leadership
• External processing
• Earned authority
RESTRAINT
• Don’t make a scene or show emotions
• Formality
• Tolerate crisis/ fatalism
EXPRESSIVENESS
• Self-expression
• Casualness
• Promote flexibility & change
EVENT/ PEOPLE-ORIENTED
• People/ relationships/ events are priority
• Rude to leave event/ person or to say no
TIME-ORIENTED
• Punctuality is priority
• Rude to be late
WHOLISTIC
•Big picture
•Circular
PARTICULAR
•details
•linear
April 10, 2014
Paul Tokonaga
Theory on Culture
EAST WEST
INDIRECT
• subtlety
• direct asks can shame someone
• not confrontational
DIRECT
• obvious
• indirect asks are frustrating & confusing
• Confrontational
HARMONY
• conflict-avoidance
• cooperative; compromising
CLARITY
• prefer knowing what someone wants/ thinks
• assert opinion
April 10, 2014
Paul Tokonaga
Japan = Detail
General Traits:
• Deadlines are met & Pride in delivery
• Attention to detail
• Super clean sites
• Keiretsu
• Chotto Muzikashi
• Technical Characteristics:
• Advanced Design
• A selection of off the shelf specifications
• Allowable stress design
• Steel (and wood) is big
• Seismicity and height limitations
Institutional Issues:
• Design often sits with contractors (zenicon)
• No Japan IstrucE
• Archs and Struc. Eng. the same at University
• System allows innovation
• Ateliers and then some big Architect house
• Not always competitive bidding
Japan Statutory Requirements
1. Hold initial consultation with local authority 24 days
2. Obtain consent of neighborhood 30 days
3. Obtain building permit from Japan Building Center 70 days
Agency: Japan Building Center
Issue - after the falsification of structural calculation byArchitect Aneha
4. Request workmen’s compensation insurance proof from Labor Control Office 60 days
5. Purchase and post statutory construction notice sign board 1 day
6. Submit construction method plan to local authority and obtain approval 7 days
7. Submit project safety and health and resources recycling plan for approval 7 days
8. Receive intermediate inspection by Japan Building Center and obtain permit 24 days
Agency: Japan Building Center
9. Request and receive connection to water and sewage services 21 days
10. Request and receive final inspection from Japan Building Center 7 days
11. Obtain completion certificate 18 days
12. Register the building with the Land and Building Registry 12 days
Japan Case Examples
• Dubai – Taking Advantage of Don’t Say No
• JST – Attention to Detail, Not knowing contract
• Dubai – Finding a Contractor
• SkyPlaza
China = Relationships
General Traits:
• Protected through certification (e.g. LDI’s, Jianli)
• Always developing
• Keen to adopt new design
• Increasing costs
• Greybeards still recognized
• Guangxi
• Technical Characteristics:
• Good design standards not always followed
• Quality poor but now not always so
• Predominance for concrete
• Off the shelf specifications
Institutional Issues:
• Design co-ordination between disciplines is poor
• Government approval process different in each
region, city
• LDI’s now free to roam and more upskilled
• Expert Reviews formalized but take time
• 3rd Party checker always required
China Statutory Requirements
China Statutory Requirements
S/N Item Government Department
1 Approval of Master Plan and Fang'An (方案)
District Planning Bureau, District Construction
Bureau
2 Receival of Permit for Land Planning (PART 1) District Planning Bureau
3 Issuance of Permit for Construction Planning (PART 2) District Planning Bureau
4 Approval of GI contract from Tender Board Tender Board
5 Application for Temporary Construction permit (Foundation) District Construction Bureau
6 Approval of foundation drawings
7 Approval of construction drawings
8 Civil Defence (人防) Approval City Civil Defence Department
9 Application for Construction permit (Main works) District Construction Bureau
10 Approval of Building Lightning design City Meteorological Bureau
11 Make payment for city infrastrature package fee
12 Fire Approval Fire Department
13 Pre-construction Checks District Construction Bureau
14 Construction quantity declaration District Quantity Monitoring Station
15 Construction safety declaration Construction Safety Monitoring Station
16 Submit Construction record District Construction Bureau
17 Report new wall materials funding District New Materials Office
18 Report bulk cement funding District Bulk Office
19 Submit project fixed cost determination fee District Construction Bureau
20 Construction unit signed contract with Termite prevention company Construction Unit
21 Aplication for the permit to start of construction work District Construction Bureau
22 Post-construction Checks District various
23 Apply Real Estate License City Real Estate Management District Office
China Case Examples
• Putian – Land Issues – Farmers, Neighbours and Contractors
• Heshan – Dealing with Strange Requests & Client Importance
• Tianjin – High Profile Projects and City Mayor
• Putian – Government Approvals
• Mingzhu – Clear Scope definition between parties especially hand-off
to LDI
South East Asia – Malaysia, Vietnam
Institutional Environment
• Relationships more important than contracts
• Local Government backing very important
• Significant funding by richer Asian countries affects market (e.g. ODA, Korea,
ADB, now China)
• Ethnicity issues (Malaysia)
• Red tape
• History of western and Japanese colonization
• Rise of China becoming an issue
South East Asia
Project Issues to Be Dealt With
• Not so systematic in management and project development
• Slower pace than China, Japan
• Corruption is an issue
• Construction quality is generally not good
• Lack of clear planning and execution
Hong Kong – Upon Reflection
• Design planning is weak - Continual pushing and updating
• Corporate Architects
• AP’s and RSE’s
• Statutory approvals (not unusual to have >50 initial approval and amendment
submissions for projects) resulting in programme delays
• Withdraws and resubmissions now automatically built in to programmes
• Proper checking and reviews
• Standard designs with little innovation often wins
• Govt and market restrict innovation
• Naturally many Clients now prefer Cantonese as spoken medium with Manadarin
becoming increasingly important but written form still english
Cross-Border Teams
& Delivery
Client &
Project
Location
Arch, SMEP
& Facade
Design Team
Vertical
Transport-
ation Team
Geotech &
Foundation
Team
Fire Engineers
& Review
Team
Project
Manager
Project 1 – Dubai Tall Building
Project
Location
Arch &
SMEP Design
Team
Local
Design
Institute
Project Manager
& QS
Client’s
Regional
Management
Project 2 – Fujian Factory
Client’s HQ &
Engineering
Team
Design Issues
• Most countries require a locally approved design company to certify the
design and submit this to the local authority and utility companies.
• In any event you need them for local conditions.
• The quality of local consultants will dictate how much of the design
responsibility is allocated to them.
• There should be a careful prequalification and vetting exercise undertaken
of local consultants and contractors (go to their offices in the process)
• Scheme Design in one country and detailed design in another can be
fraught difficulties without regular, strong communication
• Time zones are a problem for co-ordination.
Design Issues
• There needs to be a contingency in the event the
local designer does not deliver.
• Understand the local design approval process
before procuring any local design company.
• Set up a clear responsibility schedule as
handover of the design will be an issue.
• Architect has to understand local environment
and if small, needs to allocate, proper resource.
• Undertake reviews at key stages in the design.
Commercial & Procurement Issues
• Tax is often an issue while setting up international agreements, especially
where local consultants are concerned.
• Different countries have different requirements for contracts e.g. in Mainland
China, Construction Contracts need to registered with the government
bureaus.
• Have a contract or at least first payment before you start work.
• Ensure market is ready for what you are proposing (e.g. capable for Design
and Build?)
• Client will need active involvement with a difficult contractor (e.g. Putian
foundations)
• For longer term private projects understand the local economy (e.g. tall
buildings).
• Risk assessments should be undertaken.
Construction Issues
• Project does become more local at this point.
• Can not rely on local consultants in less developed countries for quality
control.
• Needs to be a full-time competent attendance on site at least to know
when problems arise.
• Regular visits (at least monthly) and progress meetings by Project
Manager with Main Contractor.
• Design team needs to be pushed to resolve technical and statutory issues
and so their terms should include for such and adequate resource
provided. They won’t want to travel.
• Consultant contracts should state clearly frequency and level of
attendance on site.
People, Processes & Systems
• A web-based document management system needs to be established (MS
sharepoint does suffice)
• Project Execution Plan should be thorough but not many people will read it and
many will forget it.
• Try to keep same key staff throughout project.
• Regular meetings at fixed times and unmovable.
• Understand the client organization and how it works.
• Know how to deal with bad practices.
• Senior management support to staff in the field is essential.
• Always be professional.
Conclusions
• Don’t spread your team all over the world if
you can help it
• Scheme Design can be undertaken close to
Client but not essential
• Try to minimize parties involved in design
development
• Set up regular meetings and face-to-face
reviews/visits and stick to them
• Have clear contracts with clear scope
demarcation and clarify at RFP stage so
everybody agrees.
• Have full-time supervision presence you trust
on site.
Thank You
Questions?

More Related Content

Viewers also liked

Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...Association for Project Management
 
What leaders need to know about establishing trust and defusing conflict
What leaders need to know about establishing trust and defusing conflictWhat leaders need to know about establishing trust and defusing conflict
What leaders need to know about establishing trust and defusing conflictAssociation for Project Management
 
Leading in difficult and uncertain times: The Battle of Britain, Stephen Carv...
Leading in difficult and uncertain times: The Battle of Britain, Stephen Carv...Leading in difficult and uncertain times: The Battle of Britain, Stephen Carv...
Leading in difficult and uncertain times: The Battle of Britain, Stephen Carv...Association for Project Management
 
Project management driven by the top ten critical improvements qu…
Project management driven by the top ten critical improvements qu…Project management driven by the top ten critical improvements qu…
Project management driven by the top ten critical improvements qu…Association for Project Management
 
Transport Oriented Development – from Strategy to Implementation
Transport Oriented Development – from Strategy to ImplementationTransport Oriented Development – from Strategy to Implementation
Transport Oriented Development – from Strategy to ImplementationAssociation for Project Management
 

Viewers also liked (20)

Stuart Mitchell, HSBC, Tiptoeing Elephants
Stuart Mitchell, HSBC, Tiptoeing ElephantsStuart Mitchell, HSBC, Tiptoeing Elephants
Stuart Mitchell, HSBC, Tiptoeing Elephants
 
Change survey analysis overview Martin Taylor
Change survey analysis overview Martin TaylorChange survey analysis overview Martin Taylor
Change survey analysis overview Martin Taylor
 
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
 
What leaders need to know about establishing trust and defusing conflict
What leaders need to know about establishing trust and defusing conflictWhat leaders need to know about establishing trust and defusing conflict
What leaders need to know about establishing trust and defusing conflict
 
Peter Taylor - The art of productive laziness
Peter Taylor - The art of productive lazinessPeter Taylor - The art of productive laziness
Peter Taylor - The art of productive laziness
 
Bringing it all together W1 programme
Bringing it all together W1 programmeBringing it all together W1 programme
Bringing it all together W1 programme
 
The meaning of communication: Jacqui Gatehouse
The meaning of communication: Jacqui GatehouseThe meaning of communication: Jacqui Gatehouse
The meaning of communication: Jacqui Gatehouse
 
New SIG on the block
New SIG on the blockNew SIG on the block
New SIG on the block
 
Women in Project Management 2014 AGM
Women in Project Management 2014 AGMWomen in Project Management 2014 AGM
Women in Project Management 2014 AGM
 
Leading in difficult and uncertain times: The Battle of Britain, Stephen Carv...
Leading in difficult and uncertain times: The Battle of Britain, Stephen Carv...Leading in difficult and uncertain times: The Battle of Britain, Stephen Carv...
Leading in difficult and uncertain times: The Battle of Britain, Stephen Carv...
 
Right people right result
Right people right resultRight people right result
Right people right result
 
Overview of APM vision and strategy
Overview of APM vision and strategyOverview of APM vision and strategy
Overview of APM vision and strategy
 
Delivering change in Scotland’s busiest airport
Delivering change in Scotland’s busiest airportDelivering change in Scotland’s busiest airport
Delivering change in Scotland’s busiest airport
 
Are we too busy with the urgent to focus on the important?
Are we too busy with the urgent to focus on the important?Are we too busy with the urgent to focus on the important?
Are we too busy with the urgent to focus on the important?
 
Ahead of the curve PMO - Mark Walsh
Ahead of the curve PMO - Mark WalshAhead of the curve PMO - Mark Walsh
Ahead of the curve PMO - Mark Walsh
 
South East Branch Knowledge cafe
South East Branch Knowledge cafe South East Branch Knowledge cafe
South East Branch Knowledge cafe
 
APM Four seasons of risk - Scotland
APM Four seasons of risk - ScotlandAPM Four seasons of risk - Scotland
APM Four seasons of risk - Scotland
 
Project management driven by the top ten critical improvements qu…
Project management driven by the top ten critical improvements qu…Project management driven by the top ten critical improvements qu…
Project management driven by the top ten critical improvements qu…
 
Transport Oriented Development – from Strategy to Implementation
Transport Oriented Development – from Strategy to ImplementationTransport Oriented Development – from Strategy to Implementation
Transport Oriented Development – from Strategy to Implementation
 
Communicating change - a practical and engaging approach
Communicating change - a practical and engaging approachCommunicating change - a practical and engaging approach
Communicating change - a practical and engaging approach
 

Similar to Managing projects across borders in East Asia, by Stuart Gethin, 19th May 2015

Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxAbdulrahmanAfabafal
 
Enhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in MinnesotaEnhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in MinnesotaRPO America
 
Project service provider K K Engineers (India) Pvt Ltd
Project service provider K K Engineers (India) Pvt LtdProject service provider K K Engineers (India) Pvt Ltd
Project service provider K K Engineers (India) Pvt Ltdarchwal
 
15_CoOp Report Out - Angelo Stekardis
15_CoOp Report Out - Angelo Stekardis15_CoOp Report Out - Angelo Stekardis
15_CoOp Report Out - Angelo StekardisAngelo Stekardis
 
The Land Development Life Cycle
The Land Development Life CycleThe Land Development Life Cycle
The Land Development Life CycleFairfax County
 
Pre-application good practice
Pre-application good practicePre-application good practice
Pre-application good practicePAS_Team
 
Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016Anil Kumar Gupta
 
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14Competition Advisory Services (India) LLP
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Lecture 1- Introduction.pptx
Lecture 1- Introduction.pptxLecture 1- Introduction.pptx
Lecture 1- Introduction.pptxPrabin Pandit
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Our pre application offer at Croydon Council
Our pre application offer at Croydon CouncilOur pre application offer at Croydon Council
Our pre application offer at Croydon CouncilPAS_Team
 
Dr. Zhou Mi - Chinese investment in residential construction in Africa: The r...
Dr. Zhou Mi - Chinese investment in residential construction in Africa: The r...Dr. Zhou Mi - Chinese investment in residential construction in Africa: The r...
Dr. Zhou Mi - Chinese investment in residential construction in Africa: The r...AfricaChinaUrbanInitiative
 
Approval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsApproval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsBrunswick County
 
Planning Performance Agreements use in Islington Council
Planning Performance Agreements use in Islington CouncilPlanning Performance Agreements use in Islington Council
Planning Performance Agreements use in Islington CouncilPAS_Team
 
CRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptxCRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptxPrasadKadam82
 
Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisalHachnayen
 
Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxSiharaGallage
 

Similar to Managing projects across borders in East Asia, by Stuart Gethin, 19th May 2015 (20)

Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
Enhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in MinnesotaEnhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in Minnesota
 
Project service provider K K Engineers (India) Pvt Ltd
Project service provider K K Engineers (India) Pvt LtdProject service provider K K Engineers (India) Pvt Ltd
Project service provider K K Engineers (India) Pvt Ltd
 
15_CoOp Report Out - Angelo Stekardis
15_CoOp Report Out - Angelo Stekardis15_CoOp Report Out - Angelo Stekardis
15_CoOp Report Out - Angelo Stekardis
 
The Land Development Life Cycle
The Land Development Life CycleThe Land Development Life Cycle
The Land Development Life Cycle
 
Pre-application good practice
Pre-application good practicePre-application good practice
Pre-application good practice
 
Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016
 
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Lecture 1- Introduction.pptx
Lecture 1- Introduction.pptxLecture 1- Introduction.pptx
Lecture 1- Introduction.pptx
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Our pre application offer at Croydon Council
Our pre application offer at Croydon CouncilOur pre application offer at Croydon Council
Our pre application offer at Croydon Council
 
Dr. Zhou Mi - Chinese investment in residential construction in Africa: The r...
Dr. Zhou Mi - Chinese investment in residential construction in Africa: The r...Dr. Zhou Mi - Chinese investment in residential construction in Africa: The r...
Dr. Zhou Mi - Chinese investment in residential construction in Africa: The r...
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
 
Approval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsApproval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned Developments
 
Planning Performance Agreements use in Islington Council
Planning Performance Agreements use in Islington CouncilPlanning Performance Agreements use in Islington Council
Planning Performance Agreements use in Islington Council
 
CRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptxCRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptx
 
Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisal
 
W1.pdf
W1.pdfW1.pdf
W1.pdf
 
Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptx
 

More from Association for Project Management

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Association for Project Management
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...Association for Project Management
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Association for Project Management
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...Association for Project Management
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Association for Project Management
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Association for Project Management
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Association for Project Management
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Association for Project Management
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...Association for Project Management
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 

More from Association for Project Management (20)

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 

Recently uploaded

B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 

Recently uploaded (20)

B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 

Managing projects across borders in East Asia, by Stuart Gethin, 19th May 2015

  • 1. Date: May 2015 Location: Hong Kong Managing projects across borders in East Asia
  • 2. Contents • Introduction • Arup and a Selection of Projects • Country Characteristics and Challenges in East Asia • Cross- Border Teamwork for Delivery • Conclusion
  • 4. Introduction • My Background • This Talk – • Part 1 - Project Experience in Japan, Mainland China, South East Asia (& Hong Kong SAR) • Part 2 - Lessons learnt in managing cross-border teams/international projects.
  • 5. Scope of Talk Clients Government/ Statutory Design Procure Construct Japan x x x x Mainland China x x x x x SE Asia x x x HK SAR x x x x
  • 6. Caveats • Projects discussed are predominantly private sector projects and in building/industrial field. Not Government work. • It’s not a judgment on nationalities and race, more of a description on procedures and market characteristics of the countries mentioned. • Design management of external companies, seldom Arup (unless internal design role) • From a western perspective and as a PM • Some generic observations only, from some cases, do not wish to stereotype
  • 7. Arup & A Selection of Projects
  • 8. Discipline Number of Staff Civil, Structural, Geo. 5,169 E&M 2,228 Acoustics 123 Architecture & Urban Design 281 ICT 102 Computing 274 Environmental 321 Façade 203 Fire 223 PPM 468 QS/Cost Consulting 42 Transport Planning 393 Other disciplines 1,108 Total technical 10,935 Non-technical 1,721 Total = 12,656
  • 9. Beijing Aquatics Centre Full Design International Commerce Centre Structural Engineering Allianz Arena Structural Engineering California Academy of Sciences Total Engineering & Sustainability Heathrow Airport T5 Project Management and Engineering Stonecutters Bridge Full Engineering Detailed Design & Construction Supervision
  • 10. UK-MEA 120 Continental Europe 172 Americas 42 Australasia 56 East Asia 78 Sub Total PPM 468 The Wider PPM Network America’s 42 staff with Lead in New York Continental Europe - 172 staff with Lead in Dublin UKMEA - 120 staff with Lead in London Australasia – 56 staff with Lead in Brisbane
  • 11. Clark’s Logistics Centre USA Francis Crick Institute UK National Grid Power Tunnels PMO UK Rolls Royce Programme Management USA Saxion University Enschede Netherlands Perth Airport Terminal 2 ORAT Australia
  • 12. East Asia Japan 7 South Korea 1* Mainland China 17 Hong Kong & Macau 27 India 3 Vietnam Thailand Philippines 3 1* 19 Sub Total * Country rep. 78
  • 13. Transport - Airports - Rail - Highways Industry - Data Centres - Factories - Specialist Services Move Management/OR - Airports - Hospitals - Offices Service Industries - Leisure - Financial Automotive - Workshops and Showrooms Educational - Schools - Higher Education
  • 15. Theory on Culture EAST WEST COLLECTIVE • Family, group, team • Others shape identity • Uniformity (nail that sticks out…) • Belonging to group • Collaboration INDIVIDUALISM • Self • personality/interests shape identity • uniqueness • own person • own contribution DUTY & OBLIGATION • to collective community/ others • group achievement • loyalty • compliant RIGHT & PRIVILEGE • personal development • for time-being HIERARCHY • age, position, education EQUALITY • personality & skills April 10, 2014 Paul Tokonaga
  • 16. Theory on Culture EAST WEST DEFERENCE • Modesty & self-effacing • Share complete thoughts • Ascribed authority SELF-ASSERTION • Leadership • External processing • Earned authority RESTRAINT • Don’t make a scene or show emotions • Formality • Tolerate crisis/ fatalism EXPRESSIVENESS • Self-expression • Casualness • Promote flexibility & change EVENT/ PEOPLE-ORIENTED • People/ relationships/ events are priority • Rude to leave event/ person or to say no TIME-ORIENTED • Punctuality is priority • Rude to be late WHOLISTIC •Big picture •Circular PARTICULAR •details •linear April 10, 2014 Paul Tokonaga
  • 17. Theory on Culture EAST WEST INDIRECT • subtlety • direct asks can shame someone • not confrontational DIRECT • obvious • indirect asks are frustrating & confusing • Confrontational HARMONY • conflict-avoidance • cooperative; compromising CLARITY • prefer knowing what someone wants/ thinks • assert opinion April 10, 2014 Paul Tokonaga
  • 18. Japan = Detail General Traits: • Deadlines are met & Pride in delivery • Attention to detail • Super clean sites • Keiretsu • Chotto Muzikashi • Technical Characteristics: • Advanced Design • A selection of off the shelf specifications • Allowable stress design • Steel (and wood) is big • Seismicity and height limitations Institutional Issues: • Design often sits with contractors (zenicon) • No Japan IstrucE • Archs and Struc. Eng. the same at University • System allows innovation • Ateliers and then some big Architect house • Not always competitive bidding
  • 19. Japan Statutory Requirements 1. Hold initial consultation with local authority 24 days 2. Obtain consent of neighborhood 30 days 3. Obtain building permit from Japan Building Center 70 days Agency: Japan Building Center Issue - after the falsification of structural calculation byArchitect Aneha 4. Request workmen’s compensation insurance proof from Labor Control Office 60 days 5. Purchase and post statutory construction notice sign board 1 day 6. Submit construction method plan to local authority and obtain approval 7 days 7. Submit project safety and health and resources recycling plan for approval 7 days 8. Receive intermediate inspection by Japan Building Center and obtain permit 24 days Agency: Japan Building Center 9. Request and receive connection to water and sewage services 21 days 10. Request and receive final inspection from Japan Building Center 7 days 11. Obtain completion certificate 18 days 12. Register the building with the Land and Building Registry 12 days
  • 20. Japan Case Examples • Dubai – Taking Advantage of Don’t Say No • JST – Attention to Detail, Not knowing contract • Dubai – Finding a Contractor • SkyPlaza
  • 21. China = Relationships General Traits: • Protected through certification (e.g. LDI’s, Jianli) • Always developing • Keen to adopt new design • Increasing costs • Greybeards still recognized • Guangxi • Technical Characteristics: • Good design standards not always followed • Quality poor but now not always so • Predominance for concrete • Off the shelf specifications Institutional Issues: • Design co-ordination between disciplines is poor • Government approval process different in each region, city • LDI’s now free to roam and more upskilled • Expert Reviews formalized but take time • 3rd Party checker always required
  • 23. China Statutory Requirements S/N Item Government Department 1 Approval of Master Plan and Fang'An (方案) District Planning Bureau, District Construction Bureau 2 Receival of Permit for Land Planning (PART 1) District Planning Bureau 3 Issuance of Permit for Construction Planning (PART 2) District Planning Bureau 4 Approval of GI contract from Tender Board Tender Board 5 Application for Temporary Construction permit (Foundation) District Construction Bureau 6 Approval of foundation drawings 7 Approval of construction drawings 8 Civil Defence (人防) Approval City Civil Defence Department 9 Application for Construction permit (Main works) District Construction Bureau 10 Approval of Building Lightning design City Meteorological Bureau 11 Make payment for city infrastrature package fee 12 Fire Approval Fire Department 13 Pre-construction Checks District Construction Bureau 14 Construction quantity declaration District Quantity Monitoring Station 15 Construction safety declaration Construction Safety Monitoring Station 16 Submit Construction record District Construction Bureau 17 Report new wall materials funding District New Materials Office 18 Report bulk cement funding District Bulk Office 19 Submit project fixed cost determination fee District Construction Bureau 20 Construction unit signed contract with Termite prevention company Construction Unit 21 Aplication for the permit to start of construction work District Construction Bureau 22 Post-construction Checks District various 23 Apply Real Estate License City Real Estate Management District Office
  • 24. China Case Examples • Putian – Land Issues – Farmers, Neighbours and Contractors • Heshan – Dealing with Strange Requests & Client Importance • Tianjin – High Profile Projects and City Mayor • Putian – Government Approvals • Mingzhu – Clear Scope definition between parties especially hand-off to LDI
  • 25. South East Asia – Malaysia, Vietnam Institutional Environment • Relationships more important than contracts • Local Government backing very important • Significant funding by richer Asian countries affects market (e.g. ODA, Korea, ADB, now China) • Ethnicity issues (Malaysia) • Red tape • History of western and Japanese colonization • Rise of China becoming an issue
  • 26. South East Asia Project Issues to Be Dealt With • Not so systematic in management and project development • Slower pace than China, Japan • Corruption is an issue • Construction quality is generally not good • Lack of clear planning and execution
  • 27. Hong Kong – Upon Reflection • Design planning is weak - Continual pushing and updating • Corporate Architects • AP’s and RSE’s • Statutory approvals (not unusual to have >50 initial approval and amendment submissions for projects) resulting in programme delays • Withdraws and resubmissions now automatically built in to programmes • Proper checking and reviews • Standard designs with little innovation often wins • Govt and market restrict innovation • Naturally many Clients now prefer Cantonese as spoken medium with Manadarin becoming increasingly important but written form still english
  • 29. Client & Project Location Arch, SMEP & Facade Design Team Vertical Transport- ation Team Geotech & Foundation Team Fire Engineers & Review Team Project Manager Project 1 – Dubai Tall Building
  • 30. Project Location Arch & SMEP Design Team Local Design Institute Project Manager & QS Client’s Regional Management Project 2 – Fujian Factory Client’s HQ & Engineering Team
  • 31. Design Issues • Most countries require a locally approved design company to certify the design and submit this to the local authority and utility companies. • In any event you need them for local conditions. • The quality of local consultants will dictate how much of the design responsibility is allocated to them. • There should be a careful prequalification and vetting exercise undertaken of local consultants and contractors (go to their offices in the process) • Scheme Design in one country and detailed design in another can be fraught difficulties without regular, strong communication • Time zones are a problem for co-ordination.
  • 32. Design Issues • There needs to be a contingency in the event the local designer does not deliver. • Understand the local design approval process before procuring any local design company. • Set up a clear responsibility schedule as handover of the design will be an issue. • Architect has to understand local environment and if small, needs to allocate, proper resource. • Undertake reviews at key stages in the design.
  • 33. Commercial & Procurement Issues • Tax is often an issue while setting up international agreements, especially where local consultants are concerned. • Different countries have different requirements for contracts e.g. in Mainland China, Construction Contracts need to registered with the government bureaus. • Have a contract or at least first payment before you start work. • Ensure market is ready for what you are proposing (e.g. capable for Design and Build?) • Client will need active involvement with a difficult contractor (e.g. Putian foundations) • For longer term private projects understand the local economy (e.g. tall buildings). • Risk assessments should be undertaken.
  • 34. Construction Issues • Project does become more local at this point. • Can not rely on local consultants in less developed countries for quality control. • Needs to be a full-time competent attendance on site at least to know when problems arise. • Regular visits (at least monthly) and progress meetings by Project Manager with Main Contractor. • Design team needs to be pushed to resolve technical and statutory issues and so their terms should include for such and adequate resource provided. They won’t want to travel. • Consultant contracts should state clearly frequency and level of attendance on site.
  • 35. People, Processes & Systems • A web-based document management system needs to be established (MS sharepoint does suffice) • Project Execution Plan should be thorough but not many people will read it and many will forget it. • Try to keep same key staff throughout project. • Regular meetings at fixed times and unmovable. • Understand the client organization and how it works. • Know how to deal with bad practices. • Senior management support to staff in the field is essential. • Always be professional.
  • 36. Conclusions • Don’t spread your team all over the world if you can help it • Scheme Design can be undertaken close to Client but not essential • Try to minimize parties involved in design development • Set up regular meetings and face-to-face reviews/visits and stick to them • Have clear contracts with clear scope demarcation and clarify at RFP stage so everybody agrees. • Have full-time supervision presence you trust on site.