This document provides design data and computations for the construction of a barrage, including:
1. Design flood discharge is 8000 cumec with a downstream high flood level of 533.472m.
2. Computations of afflux for various discharges show the maximum water level remains above the full reservoir level of 525.3m.
3. Charts and tables show relationships between discharge, area, elevation and other parameters for design of the barrage spillway and sluices.
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
COMPUTATION OF AFFLUX FOR CONSTRUCTION OF BARRAGE
1. CONSTRUCTION OF BARRAGE
COMPUTATION OF AFFLUX
Design data :
1 Max. Flood Discharge 8000.00 cumec
2 D/S HFL 533.472 m 534.73
3 FRL 525.30 m
4 Average bed level of river 521.00 m
5 Crest level 523.20 m
6 Afflux or Difference MWL & HFL(d/s)= 0.12 m
7 Height of Gate(FRL_CL+.3)= 2.40 m
8 Looseness factor
a) Minimum Stable Waterway (Pw), by Lacey's formula 432.01 m
b) No of bays 50 working + 5spare
c) Pier width 2 m
d) Gate width 8 m
e) The water way computed as per the opening & piers: 548.00 M
f) Looseness factor 1.268
9 Spillway bays
a) No. of bays = 50 working + 5spare
b) Width of each bay 8 m
c) P/H= (height of crest above RBL/Head of water over crest)= 1.048
d) Width of piers 2.00 m
e) Overall waterway excluding spare gates 498 m
10 Total waterway of the barrage between abutments 548 m
11 Discharge equqtion for submerged weir is given by
=Q1+Q2
Where,
Cd1=Coefficient discharge for submerged flow
Cd2=coeff. of dischrage due to difference u/s & d/s water level
L=Effective length of water way(m)
H=Difference in upstream & down stream water levels
ha =Head due to velocity of approach
d= Depth of down stream water above crest level
a
d
a
a
d h
H
g
d
LC
h
h
H
g
LC
Q
2
2
3
2
2
2
3
2
3
1
2. Discharge through scouring sluices(IS 6531)
Discharge through scouring sluices is given by
Where cd = coefficient of discharge = varies as per chart below
Sill level 521.00 m
Height of sluice 1.5 m
L = width of Sluice Barrel. 1.5 m
H1= Difference between upstream water level - sluice sill level.
H2 = Difference between u/s water level - top of gate level.
n=No of sluices 3
Total Discharge nQ
3
3
2
3
3
1
2
3
2
H
H
L
C
g
Q d