2023 Rate Update and
Meter Assessment
CITY COUNCIL PRESENTATION
September 11, 2023
METER ASSESSMENT SUMMARY
2
Business Confidential - Willdan
Staff will have the information needed to educate residents and oversee efficient water use.
Modernizing the Metering System
3
Real-Time Data Enables Significant Capabilities
Operating Analytics
Remote/Automated
Communications
Customer Notifications Leak Detection
Alarms
Customer Portals
Provide Residents & Staff Actionable Information
Cloud-Based Access (any web browser)
 Provide customers with comprehensive self service
 View consumption 24/7
 Prevent and manage high bill complaints
 Estimated and project bills
 User-set thresholds
 Leak alerts
 Provide staff the tools to operate efficiently
 Proactively communicate with customers
 Built-in staff notification to customers on potential leaks
 Monitor accounts in bulk or by segment
 Water restrictions
 Abnormal usage (potential leaks)
 Real-time data for customer service to diagnose complaints
4
 Testing performed by MARS
Company in San Antonio
(top of the line testing operation)
 20 out of 23 meters failed AWWA
standards at one or all flow rates
 Analysis of test results and
current meter population
indicates an inaccuracy of 12.7%
 A contractual performance
guarantee of 10% improvement
in accuracy can be incorporated
in a solid-state meter upgrade
Meter Test Results
5
Alamo Heights
Tester: MARS San Antonio 60% 25% 15%
MARS
# Brand Serial # Service Address Size
Accuracy
(%)
Accuracy
(%)
Accuracy
(%) WAA %
MARS
Pass/Fail
Meter
Age
1 Elster 16650618 120 Corona 5/8" 86.7% 94.4% 97.2% 90.2% F 17
2 Neptune 37313858 123 Harrison 5/8" 98.7% 100.4% 99.4% 99.2% P 4
3 Elster 16652613 533 College 5/8" 78.7% 97.4% 95.7% 85.9% F 17
4 Neptune 378313829 216 Claiborne Way 5/8" 98.7% 100.4% 95.7% 98.7% P 17
5 Neptune 14129274 155 Oakview East 5/8" 95.7% 99.4% 99.1% 97.1% F/L 12
6 Elster 16652585 114 Evans 5/8" 87.7% 99.4% 97.1% 92.0% F/LH 17
7 Neptune 36082294 222 Argyle 5/8" 84.7% 99.4% 99.5% 90.6% F/L 6
1 Elster 21755835 904 Estes 5/8" 96.7% 99.4% 98.2% 97.6% F/LH 11
2 Neptune 35464940 622 Ogden 5/8" 97.7% 100.0% 99.6% 98.6% F/L 6
3 Neptune 37260035 220 Grove C 5/8" 96.7% 100.4% 99.0% 98.0% F/L 5
4 Neptune 36962261 219 Harrison 5/8" 90.7% 99.4% 100.0% 94.3% F/L 5
5 Elster 16652630 103 Lamont 5/8" 88.7% 98.4% 96.9% 92.4% F 17
6 Elster 16652223 325 Abiso 5/8" 77.7% 95.4% 94.8% 84.7% F 17
1 Neptune 48547224 202 Chichester 3 5/8" 98.0% 101.0% 99.0% 98.9% F/M 16
2 Neptune 49863154 143 Cloverleaf 5/8" 0.0% 0.0% 0.0% 0.0% F 17
3 Neptune 53747664 7410 Broadway 3/4" 97.5% 99.1% 99.4% 98.2% F/L 7
4 Neptune 10811719 7231 Broadway 3/4" 98.5% 100.0% 99.3% 99.0% P 2
5 Neptune 49944553 141 Edgewood W 3/4" 0.0% 0.0% 0.0% 0.0% F 17
1 Neptune 11346959 7307 Broadway 1" 97.6% 100.0% 99.1% 98.4% F/L 2
2 Neptune 54299827 220 Grove A 1" 99.6% 101.9% 99.3% 100.1% F/M 5
3 Badger 6259066 725 College 1" 96.7% 100.0% 99.3% 97.9% F/L 17
4 Badger 6258906 241 Argyle 1" 97.0% 100.0% 99.0% 98.1% F/L 17
5 Badger 6259114 110 Rosemary 1" 96.7% 99.9% 99.6% 97.9% F/L 17
Systemwide Weighted Accuracy 87.29% 11.7
Flow Weight Factor Weighted Results
Low Flow Mid Flow High Flow
Selecting a System for Alamo Heights
 Regardless of network type, solid-state meters
should be pursued, maintaining high accuracy
throughout system life
 Real-time data (AMI) can be delivered through
cellular or fixed-base technology
 SAWS is currently pursuing one of the countries
largest fixed-base, solid state meter upgrades
 Alamo Heights would not achieve similar
economies of scale and would require
negotiating with CES and increase in long-term
capital assets to be managed
 A cellular system is the most cost effective,
when including all networking costs over a 20-
year period
Comprehensive System Upgrade
Cost Comparison of 20-Year Operation
6
Meters Meters
Networking
Networking
Installation
Installation
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
Cellular Fixed Base
Hardware Hardware
Software & Data Software & Data
Setup
Setup
Maintenance
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$3,500,000
$4,000,000
Cellular Fixed Base
Network Cost Structure
$3.86 M
$6.21 M
Business Confidential - Willdan
Upgrade the system with limited capital contributions.
Baseline Cashflow Projection After Testing
7
Cellular Network with New Meters
No grant or incentive dollars included in baseline
Equipment, material and software selections will influence project costs,
revenue recovery, and other estimates.
An accuracy improvement of
10% can be guaranteed as part
of a performance contract.
A predictable cashflow to
allocate towards debt service.
Annual Debt
Service
Accuracy
Benefits
Operating
Savings
Capital
Contributions
Grant
Awards
Net Project
Cash Flow
Cumulative
Cashflow
2023 -
$ 83,286
$ -
$ -
$ -
$ 83,286
$ 83,286
$
2024 (288,199)
$ 166,572
$ 35,600
$ 86,027
$ -
$ -
$ 83,286
$
2025 (288,199)
$ 199,482
$ 36,668
$ 52,049
$ -
$ -
$ 83,286
$
2026 (288,199)
$ 221,422
$ 37,768
$ 29,009
$ -
$ -
$ 83,286
$
2027 (288,199)
$ 236,048
$ 38,901
$ 13,250
$ -
$ -
$ 83,286
$
2028 (288,199)
$ 265,301
$ 40,068
$ -
$ -
$ 17,170
$ 100,456
$
2029 (288,199)
$ 265,301
$ 41,270
$ -
$ -
$ 18,373
$ 118,829
$
2030 (288,199)
$ 265,301
$ 42,508
$ -
$ -
$ 19,611
$ 138,440
$
2031 (288,199)
$ 265,301
$ 43,784
$ -
$ -
$ 20,886
$ 159,326
$
2032 (288,199)
$ 265,301
$ 45,097
$ -
$ -
$ 22,199
$ 181,525
$
2033 (288,199)
$ 265,301
$ 46,450
$ -
$ -
$ 23,552
$ 205,077
$
2034 (288,199)
$ 265,301
$ 47,843
$ -
$ -
$ 24,946
$ 230,023
$
2035 (288,199)
$ 265,301
$ 49,279
$ -
$ -
$ 26,381
$ 256,404
$
2036 (288,199)
$ 265,301
$ 50,757
$ -
$ -
$ 27,859
$ 284,264
$
2037 (288,199)
$ 265,301
$ 52,280
$ -
$ -
$ 29,382
$ 313,646
$
2038 (288,199)
$ 265,301
$ 53,848
$ -
$ -
$ 30,951
$ 344,596
$
2039 (288,199)
$ 265,301
$ 55,464
$ -
$ -
$ 32,566
$ 377,162
$
2040 (288,199)
$ 265,301
$ 57,128
$ -
$ -
$ 34,230
$ 411,392
$
2041 (288,199)
$ 265,301
$ 58,841
$ -
$ -
$ 35,944
$ 447,336
$
2042 (288,199)
$ 265,301
$ 60,607
$ -
$ -
$ 37,709
$ 485,045
$
2043 (288,199)
$ 265,301
$ 62,425
$ -
$ -
$ 39,527
$ 524,572
$
$ (5,763,976) $ 5,151,629 $ 956,585 $ 180,335 $ - $ 524,572
Baseline Project Cashflow
20-Year Financing
Business Confidential - Willdan
Cashflow Projection with Grant Funding
8
The Water SMART grant and leak detection represent substantial additional opportunity.
Cellular Network with New Meters
No grant or incentive dollars included in baseline
Equipment, material and software selections will influence
project costs, revenue recovery, and other estimates.
Performance Guarantee of
10% accuracy improvement
Annual Debt
Service
Accuracy
Benefits
Operating
Savings
Capital
Contributions
Grant
Awards
Net Project
Cash Flow
Cumulative
Cashflow
2023 -
$ 83,286
$ -
$ -
$ -
$ 83,286
$ 83,286
$
2024 (288,199)
$ 166,572
$ 35,600
$ -
$ 1,932,602
$ 1,846,575
$ 1,929,861
$
2025 (288,199)
$ 199,482
$ 36,668
$ -
$ -
$ (52,049)
$ 1,877,812
$
2026 (288,199)
$ 221,422
$ 37,768
$ -
$ -
$ (29,009)
$ 1,848,802
$
2027 (288,199)
$ 236,048
$ 38,901
$ -
$ -
$ (13,250)
$ 1,835,553
$
2028 (288,199)
$ 265,301
$ 40,068
$ -
$ -
$ 17,170
$ 1,852,723
$
2029 (288,199)
$ 265,301
$ 41,270
$ -
$ -
$ 18,373
$ 1,871,096
$
2030 (288,199)
$ 265,301
$ 42,508
$ -
$ -
$ 19,611
$ 1,890,706
$
2031 (288,199)
$ 265,301
$ 43,784
$ -
$ -
$ 20,886
$ 1,911,592
$
2032 (288,199)
$ 265,301
$ 45,097
$ -
$ -
$ 22,199
$ 1,933,792
$
2033 (288,199)
$ 265,301
$ 46,450
$ -
$ -
$ 23,552
$ 1,957,344
$
2034 (288,199)
$ 265,301
$ 47,843
$ -
$ -
$ 24,946
$ 1,982,290
$
2035 (288,199)
$ 265,301
$ 49,279
$ -
$ -
$ 26,381
$ 2,008,671
$
2036 (288,199)
$ 265,301
$ 50,757
$ -
$ -
$ 27,859
$ 2,036,530
$
2037 (288,199)
$ 265,301
$ 52,280
$ -
$ -
$ 29,382
$ 2,065,913
$
2038 (288,199)
$ 265,301
$ 53,848
$ -
$ -
$ 30,951
$ 2,096,863
$
2039 (288,199)
$ 265,301
$ 55,464
$ -
$ -
$ 32,566
$ 2,129,429
$
2040 (288,199)
$ 265,301
$ 57,128
$ -
$ -
$ 34,230
$ 2,163,659
$
2041 (288,199)
$ 265,301
$ 58,841
$ -
$ -
$ 35,944
$ 2,199,603
$
2042 (288,199)
$ 265,301
$ 60,607
$ -
$ -
$ 37,709
$ 2,237,312
$
2043 (288,199)
$ 265,301
$ 62,425
$ -
$ -
$ 39,527
$ 2,276,839
$
$ (5,763,976) $ 5,151,629 $ 956,585 $ - $ 1,932,602 $ 2,276,839
Baseline Project Cashflow
20-Year Financing
Leak
Detection
Cumulative
Cashflow
-
$ 83,286
$
42,055
$ 1,971,916
$
83,269
$ 2,003,135
$
126,165
$ 2,100,291
$
126,165
$ 2,213,207
$
126,165
$ 2,356,542
$
126,165
$ 2,501,080
$
126,165
$ 2,646,855
$
126,165
$ 2,793,906
$
126,165
$ 2,942,271
$
126,165
$ 3,091,988
$
126,165
$ 3,243,099
$
126,165
$ 3,395,645
$
126,165
$ 3,549,669
$
126,165
$ 3,705,217
$
126,165
$ 3,862,332
$
126,165
$ 4,021,063
$
126,165
$ 4,181,458
$
126,165
$ 4,343,567
$
126,165
$ 4,507,441
$
126,165
$ 4,673,133
$
$ 2,396,294
Incremental Opportunities
(Post-Project)
The surplus cashflow from a
federally reimbursed grant could
be used for other pressing needs.
Alternatively, it could be used to
buy-down the financing, saving
$950k in interest.
BACKGROUND ON RATES
9
21st Century Water & Wastewater Rate Facts
 Average utility has been increasing rates 5-6% per year, a trend that is expected to
continue
 American Water Works Association (AWWA) forecasts that water and wastewater
rates across the U.S. will triple in the next 15 years
 30-40% of utilities charge rates that do not cover their costs
 Rate adjustments are primarily due to reasons beyond a utility’s direct control –
inflation, necessary Capital Improvement Plans, wholesale costs, and other indirect
expenses
10
 City has not adjusted rates since 2020
 Current thin rate margin, capital
improvement needs, and escalating
operating costs are driving a need to
reassess rate plan
 Current rates will not continue to
support operating costs, and do not
recover funding for CIP projects or
additional debt service payments for
new debt
 New rate plan will include increased
revenue and capital contributions from
meter program
Water and Wastewater Rate Background
11
Current Water and Wastewater Rate Structure
12
Residential, Institutional, & Irrigation
5/8" 3.47
$ Volume Rate (per 100 Cubic Feet) Volume Rate (per 100 Cubic Feet)
3/4" 10.42 - 500 0.96
$ - 500 1.37
$
1" 17.36 501 1,000 1.31 501 1,000 1.71
1 1/2" 43.41 1,001 2,300 1.89 1,001 2,300 2.29
2" 69.46 2,301 Above 3.20 2,301 Above 3.61
3" 173.64
4" 260.47 Volume Rate (per 1000 Gallons)* Volume Rate (per 1000 Gallons)*
6" 260.47 - 4,000 1.28
$ - 4,000 1.83
$
4,001 7,000 1.75 4,001 7,000 2.29
7,001 17,000 2.53 7,001 17,000 3.06
17,001 Above 4.28 17,001 Above 4.83
*Gallon conversions are rounded to the nearest 1,000 gallons
All Customers 25.88
$ Volume Rate (per 100 Cubic Feet)
0 500 -
501 Above 4.32
$
Volume Rate (per 1000 Gallons)*
- 4,000
4,001 Above 5.77
$
Monthly Charge Commercial
Water Rates
Wastewater -- All Customers
Monthly Charge All Customers
Current Monthly Residential Charges
1,500 ft³ (11.2kGal) Water & 800 ft³ (6kGal) Wastewater
13
SAWS Mix
SAWS
Other
CUSTOMERS & VOLUMES
14
Water and Wastewater Accounts | Test Year 2023
15
Residential 2,482 Residential 2,487
Commercial 175 Commercial 245
Multi-Family 79 School 12
Institutional 21 Total 2,744
Irrigation 360
FH Meters 1
Total 3,118
WATER Customers WASTEWATER Customers
RATE MODEL CUSTOMER CLASS
NOTE: forecast assumes virtually no new growth in customer accounts over next decade
Test Year | Retail Water Consumption by Rate Class
16
Residential comprises the
clear majority of
consumption and accounts
within the City.
Most (73%) of the Irrigation
use is Residential Irrigation.
Average monthly
residential usage per
account:
1,536 CF
11,487 Gallons
Residential
62%
Commercial
7%
Multi-Family
5%
Institutional
7%
Irrigation
19%
FH Meters
0%
WATER & WASTEWATER
CURRENT AND FORECAST COST OF SERVICE
17
Forecast Operating Costs & Capital Outlay | Combined W/WW
18
This chart excludes debt
service expenses
(except potential debt
associated with meter
change-out).
$450,000 annual
contribution towards
general Capital Outlay
remains constant.
Includes debt and
capital costs associated
with meter-changeout
program.
Overall OpEx increase
averages 6%.
Forecast Annual Capital Outlay Expenditures
19
FY FY FY FY FY FY FY FY FY
2024 2025 2026 2027 2028 2029 2030 2031 2032
Water
Annual Capital Outlay Other than Vehicles 450,000
$ 240,000
$ 30,000
$ 310,000
$ 450,000
$ 450,000
$ 415,000
$ 450,000
$ 330,000
$
Meter Replacement Program 374,226 340,248 317,208 301,449 288,199 288,199 288,199 288,199 288,199
Wastewater
Capital Outlay - - - - - - - - -
Water/ Wastewater
Vactor Truck - - - - - - - - -
Water Truck (Share w/ GF) - - - 70,000 - - - - -
Backhoe (2) - - 135,000 - - - - - -
Pothole Patch Truck - - 100,000 - - - - - -
9-Yard Dump Truck (2) - 140,000 - - - - - - -
12-Yard Dump Truck (Share w/ GF) - 70,000 - - - - - - -
Bobcat-770 - - - - - - - - 120,000
1-Ton Crew Cab Service Body (2) - - 65,000 70,000 - - - - -
4WD Crew Cab Diesel - - - - - - - - -
Capital Outlay - - - - - - 35,000 - -
Capital Outlay - - - - - - - - -
Total Capital Outlays 824,226
$ 790,248
$ 767,208
$ 751,449
$ 738,199
$ 738,199
$ 738,199
$ 738,199
$ 738,199
$
Total 6,824,126
$
Forecast Annual Capital Improvement Plan Expenditures
20
Test Year
2023
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032
Water Treatment Total Cost
Well Overhaul (Wells 3 & 5) - -
$ 140,000
$ 160,000
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$
Future Project - - - - - - - - - - -
Total Water Treatment 300,000 -
$ 140,000
$ 160,000
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$
Water Distribution
Future Project -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$
Moving Water Line 4x2 (TCEQ) 1,100,000 1,685,000 260,000 - 585,000 - - - - -
Lower Broadway Water & Sewer1 120,000 130,000 140,000 2,140,000 3,150,000 2,160,000 870,000 170,000 - -
Recondition Evans water tower - - 225,000 225,000 - - - - - -
Repaint and blast 2 CH water towers - - 400,000 400,000 - - - - - -
Future Project - - - - - - - - - -
Total Water Distribution 13,760,000 1,220,000
$ 1,815,000
$ 1,025,000
$ 2,765,000
$ 3,735,000
$ 2,160,000
$ 870,000
$ 170,000
$ -
$ -
$
Wastewater Collection
Sewer Improvements -
$ 125,000
$ 125,000
$ 125,000
$ 150,000
$ 150,000
$ 150,000
$ 175,000
$ 175,000
$ 175,000
$ 200,000
$
Future Project - - - - - - - - - -
Total WW Collection 1,550,000
$ 125,000
$ 125,000
$ 125,000
$ 150,000
$ 150,000
$ 150,000
$ 175,000
$ 175,000
$ 175,000
$ 200,000
$
Total 15,610,000 1,345,000 2,080,000 1,310,000 2,915,000 3,885,000 2,310,000 1,045,000 345,000 175,000 200,000
CITY OF ALAMO HEIGHTS
WATER/WASTEWATER COST OF SERVICE MODEL
Forecast Debt Issuances
21
Total of $14.0M in
new debt issuances
through 2032 to
support CIP.
Forecast Net Revenue Requirement
22
Net Revenue
Requirement is
the amount of
funding required
to be raised by
water and sewer
rates.
Debt Service
includes selling an
additional $14.0M
in future debt
Total Cost of
Service forecast to
increase at annual
average of 7.3%.
Operating Capital Debt Transfers & Cost of Non-Rate Revenue
Expenses Outlays Service Contingencies Service Revenues Requirement
TOTAL Revenue Requirement
2023 3,733,681
$ -
$ 161,300
$ 92,748
$ 3,987,729
$ 388,220
$ 3,599,509
$
2024 4,062,074 824,226 163,600 95,994 5,145,894 388,220 4,757,674
2025 4,240,070 790,248 341,362 99,354 5,471,034 388,220 5,082,814
2026 4,427,437 767,208 429,743 102,831 5,727,220 388,220 5,339,000
2027 4,624,728 751,449 681,423 106,430 6,164,030 388,220 5,775,810
2028 4,832,530 738,199 876,947 110,156 6,557,832 388,220 6,169,612
2029 5,051,470 738,199 1,099,900 114,011 7,003,580 388,220 6,615,360
2030 5,282,214 738,199 1,159,354 118,001 7,297,769 388,220 6,909,549
2031 5,525,475 738,199 1,159,354 122,131 7,545,160 388,220 7,156,940
2032 5,782,011 738,199 1,114,764 126,406 7,761,379 388,220 7,373,159
CURRENT AND FORECAST REVENUE REQUIREMENT
WATER & WASTEWATER
RATE PLAN SCENARIOS
23
Forecast with No Rate Increases
24
With no rate
increases, the fund
balance will be
negative by 2028.
Net Operating
Revenues would
stay positive
through 2024, but
not enough to fund
projects with cash.
Debt coverage
ratios would be
insufficient by 2026.
Proposed Rate Plan
 Recommend implementing a 5-year rate plan with
adjustments on October 1 of each year 2023 –
2027
 Council retains the ability to adjust annually as
necessary
 Assumes no change in fundamental rate structure;
uniform percentage adjustments for base and
volume charges
 If CIP or operational assumptions change, a
significant impact on the rate plan is to be expected
25
Given the relative
amount of CIP
expenditures and
significant increase in
debt service expenses,
we recommend
reevaluating the rate
plan every 2-3 years
Proposed Rate Plan | Summary
26
The proposed rate plan
maintains the current
rate structure, while
increasing rates to cover
operational cost
increases and new debt
service payments.
The combined impact on
average residential
customer bills is
$2.96/month (4.7%) in
year 1.
Effective Effective Effective Effective Effective
Current Oct-23 Oct-24 Oct-25 Oct-26 Oct-27
Monthly Minimum Charge --All Customer Classes
5/8" 3.47
$ 3.78
$ 4.12
$ 4.49
$ 4.90
$ 5.34
$
3/4" 10.42 11.36 12.38 13.49 14.71 16.03
1" 17.36 18.92 20.63 22.48 24.51 26.71
1 1/2" 43.41 47.32 51.58 56.22 61.28 66.79
2" 69.46 75.71 82.53 89.95 98.05 106.87
3" 173.64 189.27 206.30 224.87 245.11 267.17
4" 260.47 283.91 309.46 337.32 367.67 400.77
Residential and Irrigation
Volume Rate Per 100 Cubic Feet
- 500 0.96 1.05 1.14 1.24 1.36 1.48
501 1,000 1.31 1.43 1.56 1.70 1.85 2.02
1,001 2,300 1.89 2.06 2.25 2.45 2.67 2.91
2,301 Above 3.20 3.49 3.80 4.14 4.52 4.92
Volume Rate Per 1,000 Gallons
- 4,000 1.28 1.40 1.52 1.66 1.81 1.97
4,001 7,000 1.75 1.91 2.08 2.27 2.47 2.69
7,001 17,000 2.53 2.75 3.00 3.27 3.57 3.89
17,001 Above 4.28 4.66 5.08 5.54 6.04 6.58
Proposed Rate Plan | Summary
27
The proposed rate plan
maintains the current
rate structure, but
increases rates to cover
operational cost
increases and new debt
service payments.
The combined impact on
average residential
customer bills is
$2.96/month (4.7%) in
year 1.
Effective Effective Effective Effective Effective
Current Oct-23 Oct-24 Oct-25 Oct-26 Oct-27
Commercial
Volume Rate Per 100 Cubic Feet
- 500 1.37 1.49 1.63 1.77 1.93 2.11
501 1,000 1.71 1.86 2.03 2.21 2.41 2.63
1,001 2,300 2.29 2.50 2.72 2.97 3.23 3.52
2,301 Above 3.61 3.93 4.29 4.68 5.10 5.55
Volume Rate Per 1,000 Gallons
- 4,000 1.83 2.00 2.18 2.37 2.59 2.82
4,001 7,000 2.29 2.49 2.72 2.96 3.23 3.52
7,001 17,000 3.06 3.34 3.64 3.96 4.32 4.71
17,001 Above 4.83 5.26 5.73 6.25 6.81 7.43
Multi Family and Institutional
Volume Rate Per 100 Cubic Feet
- 500 0.96 1.05 1.14 1.24 1.36 1.48
501 1,000 1.31 1.43 1.56 1.70 1.85 2.02
1,001 2,300 1.89 2.06 2.25 2.45 2.67 2.91
2,301 Above 3.20 3.49 3.80 4.14 4.52 4.92
Volume Rate Per 1,000 Gallons
- 500 1.28 1.40 1.52 1.66 1.81 1.97
501 1,000 1.75 1.91 2.08 2.27 2.47 2.69
1,001 2,300 2.53 2.75 3.00 3.27 3.57 3.89
2,301 Above 4.28 4.66 5.08 5.54 6.04 6.58
Proposed Rate Plan | Summary
28
Wastewater base rates
and volume rates
increase at 2% annually
each year of the plan.
Scenario: Scenario 1 | Status Quo
Effective Effective Effective Effective Effective
Current Oct-23 Oct-24 Oct-25 Oct-26 Oct-27
Wastewater Rates - All Customers
Monthly Minimum Charge 25.88
$ 26.40
$ 26.93
$ 27.73
$ 28.57
$ 29.42
$
(Includes 500 Cubic Feet/3,740 Gallons)
Volume Rate per 100 Cubic Feet 4.32
$ 4.41
$ 4.49
$ 4.63
$ 4.77
$ 4.91
$
Volume Rate per 1,000 Gallons 5.77 5.89 6.01 6.19 6.37 6.57
Proposed Wastewater Rate Plan
Projected Impact on Monthly Bill
29
Average
Residential
User
Effective Effective Effective Effective Effective
Current Oct-23 Oct-24 Oct-25 Oct-26 Oct-27
Residential Average Monthly Bill - 5/8"
800 ft³ Water 12.20
$ 13.30
$ 14.49
$ 15.80
$ 17.22
$ 18.77
$
800 ft³ Wastewater 38.84 39.62 40.41 41.62 42.87 44.16
(6.3kGal) Total 51.04 52.91 54.90 57.42 60.09 62.93
Increase -- $ 1.87
$ 1.99
$ 2.52
$ 2.67
$ 2.84
$
3.7% 3.8% 4.6% 4.7% 4.7%
1,500 ft³ Water 24.27
$ 26.45
$ 28.84
$ 31.43
$ 34.26
$ 37.34
$
800 ft³ Wastewater 38.84 39.62 40.41 41.62 42.87 44.16
(11.8kGal) Total 63.11 66.07 69.24 73.05 77.13 81.50
Increase -- $ 2.96
$ 3.17
$ 3.81
$ 4.08
$ 4.37
$
4.7% 4.8% 5.5% 5.6% 5.7%
3,000 ft³ Water 61.79
$ 67.35
$ 73.41
$ 80.02
$ 87.22
$ 95.07
$
800 ft³ Wastewater 38.84 39.62 40.41 41.62 42.87 44.16
(23.5 kGal) Total 100.63 106.97 113.82 121.64 130.09 139.23
Increase -- $ 6.34
$ 6.85
$ 7.82
$ 8.45
$ 9.14
$
6.3% 6.4% 6.9% 6.9% 7.0%
Commercial Monthly Bill - 2"
3,000 ft³ Water 139.90
$ 152.49
$ 166.22
$ 181.17
$ 197.48
$ 215.25
$
3,000 ft³ Wastewater 155.48 158.59 161.76 166.61 171.61 176.76
(23.5 kGal) Total 295.38 311.08 327.98 347.79 369.09 392.01
Increase -- $ 15.70
$ 16.90
$ 19.81
$ 21.30
$ 22.92
$
5.3% 5.4% 6.0% 6.1% 6.2%
8,000 ft³ Water 320.40
$ 349.24
$ 380.67
$ 414.93
$ 452.27
$ 492.98
$
8,000 ft³ Wastewater 371.48 378.91 386.49 398.08 410.02 422.33
(63 kGal) Total 691.88 728.15 767.16 813.01 862.30 915.30
Increase -- $ 36.27
$ 39.01
$ 45.85
$ 49.29
$ 53.01
$
5.2% 5.4% 6.0% 6.1% 6.1%
Proposed Rate Plan – Impact on City Utility
30
With $14.0M in
new debt
issuances* and
moderate rate
increases, the
fund is forecast to
remain in sound
financial
condition,
including debt
coverage ratios.
*Assumed 20-year
term debt @ 4%.
 The proposed rate plan enables the City to fully
fund all water and wastewater costs and CIP over
next decade
 Will enable the Utility Fund to operate self-
sufficiently with no need for subsidies from fund
balance
 Enables the City to provide safe drinking water
and effectively treat wastewater continually for
forecast period
How Does Rate Plan Benefit Ratepayers & City?
31
QUESTIONS & DISCUSSION
32

More Related Content

Similar to PPT Item # 5&6 - Water & Sewer Rate Study

Page 1 Front PagePage 2 Stocks & BondsPage 3 Financial Sum.docx
Page 1 Front PagePage 2 Stocks & BondsPage 3 Financial Sum.docxPage 1 Front PagePage 2 Stocks & BondsPage 3 Financial Sum.docx
Page 1 Front PagePage 2 Stocks & BondsPage 3 Financial Sum.docxgerardkortney
 
M20Lesson070111100Financial0Modeling.pdf
M20Lesson070111100Financial0Modeling.pdfM20Lesson070111100Financial0Modeling.pdf
M20Lesson070111100Financial0Modeling.pdfMohammedYASEEN963424
 
Pavilion Condo Budget 2018 analysis variances to 2017
Pavilion Condo Budget 2018 analysis variances to 2017Pavilion Condo Budget 2018 analysis variances to 2017
Pavilion Condo Budget 2018 analysis variances to 2017al karajo jr
 
2222020 Report Pagehttpsww3.capsim.comcgi-bindispla.docx
2222020 Report Pagehttpsww3.capsim.comcgi-bindispla.docx2222020 Report Pagehttpsww3.capsim.comcgi-bindispla.docx
2222020 Report Pagehttpsww3.capsim.comcgi-bindispla.docxRAJU852744
 
Solutions Manual for Basic Business Statistics 13th Edition by Berenson
Solutions Manual for Basic Business Statistics 13th Edition by BerensonSolutions Manual for Basic Business Statistics 13th Edition by Berenson
Solutions Manual for Basic Business Statistics 13th Edition by Berensonriven063
 
Potential Study Presentation - 6/11/14
Potential Study Presentation - 6/11/14Potential Study Presentation - 6/11/14
Potential Study Presentation - 6/11/14CapeLightEnergy
 
Nodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmpNodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmpEPIS Inc
 
2Q11 Presentation
2Q11 Presentation2Q11 Presentation
2Q11 PresentationGafisa RI !
 
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsMichael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsJohn Blue
 
Presentación energía linea industrial
Presentación energía linea industrialPresentación energía linea industrial
Presentación energía linea industrialGUSTAVO HURTADO
 
Investment Presentation
Investment PresentationInvestment Presentation
Investment PresentationChia-Yi Liu
 
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPYBrunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPYJonathan Chang
 
AH CCM 10.22.18 Item #4 AH Rate Study
AH CCM 10.22.18 Item #4 AH Rate StudyAH CCM 10.22.18 Item #4 AH Rate Study
AH CCM 10.22.18 Item #4 AH Rate Studyahcitycouncil
 

Similar to PPT Item # 5&6 - Water & Sewer Rate Study (20)

Tegtora final
Tegtora finalTegtora final
Tegtora final
 
Page 1 Front PagePage 2 Stocks & BondsPage 3 Financial Sum.docx
Page 1 Front PagePage 2 Stocks & BondsPage 3 Financial Sum.docxPage 1 Front PagePage 2 Stocks & BondsPage 3 Financial Sum.docx
Page 1 Front PagePage 2 Stocks & BondsPage 3 Financial Sum.docx
 
M20Lesson070111100Financial0Modeling.pdf
M20Lesson070111100Financial0Modeling.pdfM20Lesson070111100Financial0Modeling.pdf
M20Lesson070111100Financial0Modeling.pdf
 
Pavilion Condo Budget 2018 analysis variances to 2017
Pavilion Condo Budget 2018 analysis variances to 2017Pavilion Condo Budget 2018 analysis variances to 2017
Pavilion Condo Budget 2018 analysis variances to 2017
 
2222020 Report Pagehttpsww3.capsim.comcgi-bindispla.docx
2222020 Report Pagehttpsww3.capsim.comcgi-bindispla.docx2222020 Report Pagehttpsww3.capsim.comcgi-bindispla.docx
2222020 Report Pagehttpsww3.capsim.comcgi-bindispla.docx
 
9. Source Cost Methodology
9. Source Cost Methodology9. Source Cost Methodology
9. Source Cost Methodology
 
Corporate presentation 2 q 14 vf wa
Corporate presentation 2 q 14 vf  waCorporate presentation 2 q 14 vf  wa
Corporate presentation 2 q 14 vf wa
 
Solutions Manual for Basic Business Statistics 13th Edition by Berenson
Solutions Manual for Basic Business Statistics 13th Edition by BerensonSolutions Manual for Basic Business Statistics 13th Edition by Berenson
Solutions Manual for Basic Business Statistics 13th Edition by Berenson
 
Weekly marketing update sample
Weekly marketing update  sampleWeekly marketing update  sample
Weekly marketing update sample
 
Potential Study Presentation - 6/11/14
Potential Study Presentation - 6/11/14Potential Study Presentation - 6/11/14
Potential Study Presentation - 6/11/14
 
Nodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmpNodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmp
 
2Q11 Presentation
2Q11 Presentation2Q11 Presentation
2Q11 Presentation
 
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsMichael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
 
Presentación energía linea industrial
Presentación energía linea industrialPresentación energía linea industrial
Presentación energía linea industrial
 
ASG Sector Snapshots
ASG Sector SnapshotsASG Sector Snapshots
ASG Sector Snapshots
 
Forecasting Assignment Help
Forecasting Assignment HelpForecasting Assignment Help
Forecasting Assignment Help
 
Investment Presentation
Investment PresentationInvestment Presentation
Investment Presentation
 
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPYBrunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPY
 
bebobinder
bebobinderbebobinder
bebobinder
 
AH CCM 10.22.18 Item #4 AH Rate Study
AH CCM 10.22.18 Item #4 AH Rate StudyAH CCM 10.22.18 Item #4 AH Rate Study
AH CCM 10.22.18 Item #4 AH Rate Study
 

More from ahcitycouncil

PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23ahcitycouncil
 
Item # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial ReportItem # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial Reportahcitycouncil
 
Item # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation PlanItem # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation Planahcitycouncil
 
PPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation PlanPPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation Planahcitycouncil
 
PPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdfPPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdfahcitycouncil
 
Item # 6 - Public Health Authority Designation
Item # 6 - Public Health Authority DesignationItem # 6 - Public Health Authority Designation
Item # 6 - Public Health Authority Designationahcitycouncil
 
Item # 5 - VIA Telecom Tax Exemption Repeal
Item # 5 - VIA Telecom Tax Exemption RepealItem # 5 - VIA Telecom Tax Exemption Repeal
Item # 5 - VIA Telecom Tax Exemption Repealahcitycouncil
 
PPT Item # 5 - VIA Repeal Telecom Tax Exemption
PPT Item # 5 - VIA Repeal Telecom Tax ExemptionPPT Item # 5 - VIA Repeal Telecom Tax Exemption
PPT Item # 5 - VIA Repeal Telecom Tax Exemptionahcitycouncil
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpointahcitycouncil
 
Item # 1a - April 09, 2024 CCM Minutes.pdf
Item # 1a - April 09, 2024 CCM Minutes.pdfItem # 1a - April 09, 2024 CCM Minutes.pdf
Item # 1a - April 09, 2024 CCM Minutes.pdfahcitycouncil
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processesahcitycouncil
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfahcitycouncil
 
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfPPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfahcitycouncil
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpointahcitycouncil
 
Item # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure ProcessesItem # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure Processesahcitycouncil
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Servicesahcitycouncil
 
Item # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. ReplatItem # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. Replatahcitycouncil
 
Item # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM MinutesItem # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM Minutesahcitycouncil
 

More from ahcitycouncil (20)

PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23
 
Item # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial ReportItem # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial Report
 
Item # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation PlanItem # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation Plan
 
PPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation PlanPPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation Plan
 
PPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdfPPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdf
 
Item # 6 - Public Health Authority Designation
Item # 6 - Public Health Authority DesignationItem # 6 - Public Health Authority Designation
Item # 6 - Public Health Authority Designation
 
Item # 5 - VIA Telecom Tax Exemption Repeal
Item # 5 - VIA Telecom Tax Exemption RepealItem # 5 - VIA Telecom Tax Exemption Repeal
Item # 5 - VIA Telecom Tax Exemption Repeal
 
PPT Item # 5 - VIA Repeal Telecom Tax Exemption
PPT Item # 5 - VIA Repeal Telecom Tax ExemptionPPT Item # 5 - VIA Repeal Telecom Tax Exemption
PPT Item # 5 - VIA Repeal Telecom Tax Exemption
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Item # 1a - April 09, 2024 CCM Minutes.pdf
Item # 1a - April 09, 2024 CCM Minutes.pdfItem # 1a - April 09, 2024 CCM Minutes.pdf
Item # 1a - April 09, 2024 CCM Minutes.pdf
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processes
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
 
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfPPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Item # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure ProcessesItem # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure Processes
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Services
 
Item # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. ReplatItem # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. Replat
 
Item # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM MinutesItem # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM Minutes
 

Recently uploaded

Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.Christina Parmionova
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...ranjana rawat
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Roomishabajaj13
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 

Recently uploaded (20)

Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 

PPT Item # 5&6 - Water & Sewer Rate Study

  • 1. 2023 Rate Update and Meter Assessment CITY COUNCIL PRESENTATION September 11, 2023
  • 3. Business Confidential - Willdan Staff will have the information needed to educate residents and oversee efficient water use. Modernizing the Metering System 3 Real-Time Data Enables Significant Capabilities Operating Analytics Remote/Automated Communications Customer Notifications Leak Detection Alarms Customer Portals
  • 4. Provide Residents & Staff Actionable Information Cloud-Based Access (any web browser)  Provide customers with comprehensive self service  View consumption 24/7  Prevent and manage high bill complaints  Estimated and project bills  User-set thresholds  Leak alerts  Provide staff the tools to operate efficiently  Proactively communicate with customers  Built-in staff notification to customers on potential leaks  Monitor accounts in bulk or by segment  Water restrictions  Abnormal usage (potential leaks)  Real-time data for customer service to diagnose complaints 4
  • 5.  Testing performed by MARS Company in San Antonio (top of the line testing operation)  20 out of 23 meters failed AWWA standards at one or all flow rates  Analysis of test results and current meter population indicates an inaccuracy of 12.7%  A contractual performance guarantee of 10% improvement in accuracy can be incorporated in a solid-state meter upgrade Meter Test Results 5 Alamo Heights Tester: MARS San Antonio 60% 25% 15% MARS # Brand Serial # Service Address Size Accuracy (%) Accuracy (%) Accuracy (%) WAA % MARS Pass/Fail Meter Age 1 Elster 16650618 120 Corona 5/8" 86.7% 94.4% 97.2% 90.2% F 17 2 Neptune 37313858 123 Harrison 5/8" 98.7% 100.4% 99.4% 99.2% P 4 3 Elster 16652613 533 College 5/8" 78.7% 97.4% 95.7% 85.9% F 17 4 Neptune 378313829 216 Claiborne Way 5/8" 98.7% 100.4% 95.7% 98.7% P 17 5 Neptune 14129274 155 Oakview East 5/8" 95.7% 99.4% 99.1% 97.1% F/L 12 6 Elster 16652585 114 Evans 5/8" 87.7% 99.4% 97.1% 92.0% F/LH 17 7 Neptune 36082294 222 Argyle 5/8" 84.7% 99.4% 99.5% 90.6% F/L 6 1 Elster 21755835 904 Estes 5/8" 96.7% 99.4% 98.2% 97.6% F/LH 11 2 Neptune 35464940 622 Ogden 5/8" 97.7% 100.0% 99.6% 98.6% F/L 6 3 Neptune 37260035 220 Grove C 5/8" 96.7% 100.4% 99.0% 98.0% F/L 5 4 Neptune 36962261 219 Harrison 5/8" 90.7% 99.4% 100.0% 94.3% F/L 5 5 Elster 16652630 103 Lamont 5/8" 88.7% 98.4% 96.9% 92.4% F 17 6 Elster 16652223 325 Abiso 5/8" 77.7% 95.4% 94.8% 84.7% F 17 1 Neptune 48547224 202 Chichester 3 5/8" 98.0% 101.0% 99.0% 98.9% F/M 16 2 Neptune 49863154 143 Cloverleaf 5/8" 0.0% 0.0% 0.0% 0.0% F 17 3 Neptune 53747664 7410 Broadway 3/4" 97.5% 99.1% 99.4% 98.2% F/L 7 4 Neptune 10811719 7231 Broadway 3/4" 98.5% 100.0% 99.3% 99.0% P 2 5 Neptune 49944553 141 Edgewood W 3/4" 0.0% 0.0% 0.0% 0.0% F 17 1 Neptune 11346959 7307 Broadway 1" 97.6% 100.0% 99.1% 98.4% F/L 2 2 Neptune 54299827 220 Grove A 1" 99.6% 101.9% 99.3% 100.1% F/M 5 3 Badger 6259066 725 College 1" 96.7% 100.0% 99.3% 97.9% F/L 17 4 Badger 6258906 241 Argyle 1" 97.0% 100.0% 99.0% 98.1% F/L 17 5 Badger 6259114 110 Rosemary 1" 96.7% 99.9% 99.6% 97.9% F/L 17 Systemwide Weighted Accuracy 87.29% 11.7 Flow Weight Factor Weighted Results Low Flow Mid Flow High Flow
  • 6. Selecting a System for Alamo Heights  Regardless of network type, solid-state meters should be pursued, maintaining high accuracy throughout system life  Real-time data (AMI) can be delivered through cellular or fixed-base technology  SAWS is currently pursuing one of the countries largest fixed-base, solid state meter upgrades  Alamo Heights would not achieve similar economies of scale and would require negotiating with CES and increase in long-term capital assets to be managed  A cellular system is the most cost effective, when including all networking costs over a 20- year period Comprehensive System Upgrade Cost Comparison of 20-Year Operation 6 Meters Meters Networking Networking Installation Installation $- $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $7,000,000 Cellular Fixed Base Hardware Hardware Software & Data Software & Data Setup Setup Maintenance $- $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 $4,000,000 Cellular Fixed Base Network Cost Structure $3.86 M $6.21 M
  • 7. Business Confidential - Willdan Upgrade the system with limited capital contributions. Baseline Cashflow Projection After Testing 7 Cellular Network with New Meters No grant or incentive dollars included in baseline Equipment, material and software selections will influence project costs, revenue recovery, and other estimates. An accuracy improvement of 10% can be guaranteed as part of a performance contract. A predictable cashflow to allocate towards debt service. Annual Debt Service Accuracy Benefits Operating Savings Capital Contributions Grant Awards Net Project Cash Flow Cumulative Cashflow 2023 - $ 83,286 $ - $ - $ - $ 83,286 $ 83,286 $ 2024 (288,199) $ 166,572 $ 35,600 $ 86,027 $ - $ - $ 83,286 $ 2025 (288,199) $ 199,482 $ 36,668 $ 52,049 $ - $ - $ 83,286 $ 2026 (288,199) $ 221,422 $ 37,768 $ 29,009 $ - $ - $ 83,286 $ 2027 (288,199) $ 236,048 $ 38,901 $ 13,250 $ - $ - $ 83,286 $ 2028 (288,199) $ 265,301 $ 40,068 $ - $ - $ 17,170 $ 100,456 $ 2029 (288,199) $ 265,301 $ 41,270 $ - $ - $ 18,373 $ 118,829 $ 2030 (288,199) $ 265,301 $ 42,508 $ - $ - $ 19,611 $ 138,440 $ 2031 (288,199) $ 265,301 $ 43,784 $ - $ - $ 20,886 $ 159,326 $ 2032 (288,199) $ 265,301 $ 45,097 $ - $ - $ 22,199 $ 181,525 $ 2033 (288,199) $ 265,301 $ 46,450 $ - $ - $ 23,552 $ 205,077 $ 2034 (288,199) $ 265,301 $ 47,843 $ - $ - $ 24,946 $ 230,023 $ 2035 (288,199) $ 265,301 $ 49,279 $ - $ - $ 26,381 $ 256,404 $ 2036 (288,199) $ 265,301 $ 50,757 $ - $ - $ 27,859 $ 284,264 $ 2037 (288,199) $ 265,301 $ 52,280 $ - $ - $ 29,382 $ 313,646 $ 2038 (288,199) $ 265,301 $ 53,848 $ - $ - $ 30,951 $ 344,596 $ 2039 (288,199) $ 265,301 $ 55,464 $ - $ - $ 32,566 $ 377,162 $ 2040 (288,199) $ 265,301 $ 57,128 $ - $ - $ 34,230 $ 411,392 $ 2041 (288,199) $ 265,301 $ 58,841 $ - $ - $ 35,944 $ 447,336 $ 2042 (288,199) $ 265,301 $ 60,607 $ - $ - $ 37,709 $ 485,045 $ 2043 (288,199) $ 265,301 $ 62,425 $ - $ - $ 39,527 $ 524,572 $ $ (5,763,976) $ 5,151,629 $ 956,585 $ 180,335 $ - $ 524,572 Baseline Project Cashflow 20-Year Financing
  • 8. Business Confidential - Willdan Cashflow Projection with Grant Funding 8 The Water SMART grant and leak detection represent substantial additional opportunity. Cellular Network with New Meters No grant or incentive dollars included in baseline Equipment, material and software selections will influence project costs, revenue recovery, and other estimates. Performance Guarantee of 10% accuracy improvement Annual Debt Service Accuracy Benefits Operating Savings Capital Contributions Grant Awards Net Project Cash Flow Cumulative Cashflow 2023 - $ 83,286 $ - $ - $ - $ 83,286 $ 83,286 $ 2024 (288,199) $ 166,572 $ 35,600 $ - $ 1,932,602 $ 1,846,575 $ 1,929,861 $ 2025 (288,199) $ 199,482 $ 36,668 $ - $ - $ (52,049) $ 1,877,812 $ 2026 (288,199) $ 221,422 $ 37,768 $ - $ - $ (29,009) $ 1,848,802 $ 2027 (288,199) $ 236,048 $ 38,901 $ - $ - $ (13,250) $ 1,835,553 $ 2028 (288,199) $ 265,301 $ 40,068 $ - $ - $ 17,170 $ 1,852,723 $ 2029 (288,199) $ 265,301 $ 41,270 $ - $ - $ 18,373 $ 1,871,096 $ 2030 (288,199) $ 265,301 $ 42,508 $ - $ - $ 19,611 $ 1,890,706 $ 2031 (288,199) $ 265,301 $ 43,784 $ - $ - $ 20,886 $ 1,911,592 $ 2032 (288,199) $ 265,301 $ 45,097 $ - $ - $ 22,199 $ 1,933,792 $ 2033 (288,199) $ 265,301 $ 46,450 $ - $ - $ 23,552 $ 1,957,344 $ 2034 (288,199) $ 265,301 $ 47,843 $ - $ - $ 24,946 $ 1,982,290 $ 2035 (288,199) $ 265,301 $ 49,279 $ - $ - $ 26,381 $ 2,008,671 $ 2036 (288,199) $ 265,301 $ 50,757 $ - $ - $ 27,859 $ 2,036,530 $ 2037 (288,199) $ 265,301 $ 52,280 $ - $ - $ 29,382 $ 2,065,913 $ 2038 (288,199) $ 265,301 $ 53,848 $ - $ - $ 30,951 $ 2,096,863 $ 2039 (288,199) $ 265,301 $ 55,464 $ - $ - $ 32,566 $ 2,129,429 $ 2040 (288,199) $ 265,301 $ 57,128 $ - $ - $ 34,230 $ 2,163,659 $ 2041 (288,199) $ 265,301 $ 58,841 $ - $ - $ 35,944 $ 2,199,603 $ 2042 (288,199) $ 265,301 $ 60,607 $ - $ - $ 37,709 $ 2,237,312 $ 2043 (288,199) $ 265,301 $ 62,425 $ - $ - $ 39,527 $ 2,276,839 $ $ (5,763,976) $ 5,151,629 $ 956,585 $ - $ 1,932,602 $ 2,276,839 Baseline Project Cashflow 20-Year Financing Leak Detection Cumulative Cashflow - $ 83,286 $ 42,055 $ 1,971,916 $ 83,269 $ 2,003,135 $ 126,165 $ 2,100,291 $ 126,165 $ 2,213,207 $ 126,165 $ 2,356,542 $ 126,165 $ 2,501,080 $ 126,165 $ 2,646,855 $ 126,165 $ 2,793,906 $ 126,165 $ 2,942,271 $ 126,165 $ 3,091,988 $ 126,165 $ 3,243,099 $ 126,165 $ 3,395,645 $ 126,165 $ 3,549,669 $ 126,165 $ 3,705,217 $ 126,165 $ 3,862,332 $ 126,165 $ 4,021,063 $ 126,165 $ 4,181,458 $ 126,165 $ 4,343,567 $ 126,165 $ 4,507,441 $ 126,165 $ 4,673,133 $ $ 2,396,294 Incremental Opportunities (Post-Project) The surplus cashflow from a federally reimbursed grant could be used for other pressing needs. Alternatively, it could be used to buy-down the financing, saving $950k in interest.
  • 10. 21st Century Water & Wastewater Rate Facts  Average utility has been increasing rates 5-6% per year, a trend that is expected to continue  American Water Works Association (AWWA) forecasts that water and wastewater rates across the U.S. will triple in the next 15 years  30-40% of utilities charge rates that do not cover their costs  Rate adjustments are primarily due to reasons beyond a utility’s direct control – inflation, necessary Capital Improvement Plans, wholesale costs, and other indirect expenses 10
  • 11.  City has not adjusted rates since 2020  Current thin rate margin, capital improvement needs, and escalating operating costs are driving a need to reassess rate plan  Current rates will not continue to support operating costs, and do not recover funding for CIP projects or additional debt service payments for new debt  New rate plan will include increased revenue and capital contributions from meter program Water and Wastewater Rate Background 11
  • 12. Current Water and Wastewater Rate Structure 12 Residential, Institutional, & Irrigation 5/8" 3.47 $ Volume Rate (per 100 Cubic Feet) Volume Rate (per 100 Cubic Feet) 3/4" 10.42 - 500 0.96 $ - 500 1.37 $ 1" 17.36 501 1,000 1.31 501 1,000 1.71 1 1/2" 43.41 1,001 2,300 1.89 1,001 2,300 2.29 2" 69.46 2,301 Above 3.20 2,301 Above 3.61 3" 173.64 4" 260.47 Volume Rate (per 1000 Gallons)* Volume Rate (per 1000 Gallons)* 6" 260.47 - 4,000 1.28 $ - 4,000 1.83 $ 4,001 7,000 1.75 4,001 7,000 2.29 7,001 17,000 2.53 7,001 17,000 3.06 17,001 Above 4.28 17,001 Above 4.83 *Gallon conversions are rounded to the nearest 1,000 gallons All Customers 25.88 $ Volume Rate (per 100 Cubic Feet) 0 500 - 501 Above 4.32 $ Volume Rate (per 1000 Gallons)* - 4,000 4,001 Above 5.77 $ Monthly Charge Commercial Water Rates Wastewater -- All Customers Monthly Charge All Customers
  • 13. Current Monthly Residential Charges 1,500 ft³ (11.2kGal) Water & 800 ft³ (6kGal) Wastewater 13 SAWS Mix SAWS Other
  • 15. Water and Wastewater Accounts | Test Year 2023 15 Residential 2,482 Residential 2,487 Commercial 175 Commercial 245 Multi-Family 79 School 12 Institutional 21 Total 2,744 Irrigation 360 FH Meters 1 Total 3,118 WATER Customers WASTEWATER Customers RATE MODEL CUSTOMER CLASS NOTE: forecast assumes virtually no new growth in customer accounts over next decade
  • 16. Test Year | Retail Water Consumption by Rate Class 16 Residential comprises the clear majority of consumption and accounts within the City. Most (73%) of the Irrigation use is Residential Irrigation. Average monthly residential usage per account: 1,536 CF 11,487 Gallons Residential 62% Commercial 7% Multi-Family 5% Institutional 7% Irrigation 19% FH Meters 0%
  • 17. WATER & WASTEWATER CURRENT AND FORECAST COST OF SERVICE 17
  • 18. Forecast Operating Costs & Capital Outlay | Combined W/WW 18 This chart excludes debt service expenses (except potential debt associated with meter change-out). $450,000 annual contribution towards general Capital Outlay remains constant. Includes debt and capital costs associated with meter-changeout program. Overall OpEx increase averages 6%.
  • 19. Forecast Annual Capital Outlay Expenditures 19 FY FY FY FY FY FY FY FY FY 2024 2025 2026 2027 2028 2029 2030 2031 2032 Water Annual Capital Outlay Other than Vehicles 450,000 $ 240,000 $ 30,000 $ 310,000 $ 450,000 $ 450,000 $ 415,000 $ 450,000 $ 330,000 $ Meter Replacement Program 374,226 340,248 317,208 301,449 288,199 288,199 288,199 288,199 288,199 Wastewater Capital Outlay - - - - - - - - - Water/ Wastewater Vactor Truck - - - - - - - - - Water Truck (Share w/ GF) - - - 70,000 - - - - - Backhoe (2) - - 135,000 - - - - - - Pothole Patch Truck - - 100,000 - - - - - - 9-Yard Dump Truck (2) - 140,000 - - - - - - - 12-Yard Dump Truck (Share w/ GF) - 70,000 - - - - - - - Bobcat-770 - - - - - - - - 120,000 1-Ton Crew Cab Service Body (2) - - 65,000 70,000 - - - - - 4WD Crew Cab Diesel - - - - - - - - - Capital Outlay - - - - - - 35,000 - - Capital Outlay - - - - - - - - - Total Capital Outlays 824,226 $ 790,248 $ 767,208 $ 751,449 $ 738,199 $ 738,199 $ 738,199 $ 738,199 $ 738,199 $ Total 6,824,126 $
  • 20. Forecast Annual Capital Improvement Plan Expenditures 20 Test Year 2023 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Water Treatment Total Cost Well Overhaul (Wells 3 & 5) - - $ 140,000 $ 160,000 $ - $ - $ - $ - $ - $ - $ - $ Future Project - - - - - - - - - - - Total Water Treatment 300,000 - $ 140,000 $ 160,000 $ - $ - $ - $ - $ - $ - $ - $ Water Distribution Future Project - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ Moving Water Line 4x2 (TCEQ) 1,100,000 1,685,000 260,000 - 585,000 - - - - - Lower Broadway Water & Sewer1 120,000 130,000 140,000 2,140,000 3,150,000 2,160,000 870,000 170,000 - - Recondition Evans water tower - - 225,000 225,000 - - - - - - Repaint and blast 2 CH water towers - - 400,000 400,000 - - - - - - Future Project - - - - - - - - - - Total Water Distribution 13,760,000 1,220,000 $ 1,815,000 $ 1,025,000 $ 2,765,000 $ 3,735,000 $ 2,160,000 $ 870,000 $ 170,000 $ - $ - $ Wastewater Collection Sewer Improvements - $ 125,000 $ 125,000 $ 125,000 $ 150,000 $ 150,000 $ 150,000 $ 175,000 $ 175,000 $ 175,000 $ 200,000 $ Future Project - - - - - - - - - - Total WW Collection 1,550,000 $ 125,000 $ 125,000 $ 125,000 $ 150,000 $ 150,000 $ 150,000 $ 175,000 $ 175,000 $ 175,000 $ 200,000 $ Total 15,610,000 1,345,000 2,080,000 1,310,000 2,915,000 3,885,000 2,310,000 1,045,000 345,000 175,000 200,000 CITY OF ALAMO HEIGHTS WATER/WASTEWATER COST OF SERVICE MODEL
  • 21. Forecast Debt Issuances 21 Total of $14.0M in new debt issuances through 2032 to support CIP.
  • 22. Forecast Net Revenue Requirement 22 Net Revenue Requirement is the amount of funding required to be raised by water and sewer rates. Debt Service includes selling an additional $14.0M in future debt Total Cost of Service forecast to increase at annual average of 7.3%. Operating Capital Debt Transfers & Cost of Non-Rate Revenue Expenses Outlays Service Contingencies Service Revenues Requirement TOTAL Revenue Requirement 2023 3,733,681 $ - $ 161,300 $ 92,748 $ 3,987,729 $ 388,220 $ 3,599,509 $ 2024 4,062,074 824,226 163,600 95,994 5,145,894 388,220 4,757,674 2025 4,240,070 790,248 341,362 99,354 5,471,034 388,220 5,082,814 2026 4,427,437 767,208 429,743 102,831 5,727,220 388,220 5,339,000 2027 4,624,728 751,449 681,423 106,430 6,164,030 388,220 5,775,810 2028 4,832,530 738,199 876,947 110,156 6,557,832 388,220 6,169,612 2029 5,051,470 738,199 1,099,900 114,011 7,003,580 388,220 6,615,360 2030 5,282,214 738,199 1,159,354 118,001 7,297,769 388,220 6,909,549 2031 5,525,475 738,199 1,159,354 122,131 7,545,160 388,220 7,156,940 2032 5,782,011 738,199 1,114,764 126,406 7,761,379 388,220 7,373,159 CURRENT AND FORECAST REVENUE REQUIREMENT
  • 23. WATER & WASTEWATER RATE PLAN SCENARIOS 23
  • 24. Forecast with No Rate Increases 24 With no rate increases, the fund balance will be negative by 2028. Net Operating Revenues would stay positive through 2024, but not enough to fund projects with cash. Debt coverage ratios would be insufficient by 2026.
  • 25. Proposed Rate Plan  Recommend implementing a 5-year rate plan with adjustments on October 1 of each year 2023 – 2027  Council retains the ability to adjust annually as necessary  Assumes no change in fundamental rate structure; uniform percentage adjustments for base and volume charges  If CIP or operational assumptions change, a significant impact on the rate plan is to be expected 25 Given the relative amount of CIP expenditures and significant increase in debt service expenses, we recommend reevaluating the rate plan every 2-3 years
  • 26. Proposed Rate Plan | Summary 26 The proposed rate plan maintains the current rate structure, while increasing rates to cover operational cost increases and new debt service payments. The combined impact on average residential customer bills is $2.96/month (4.7%) in year 1. Effective Effective Effective Effective Effective Current Oct-23 Oct-24 Oct-25 Oct-26 Oct-27 Monthly Minimum Charge --All Customer Classes 5/8" 3.47 $ 3.78 $ 4.12 $ 4.49 $ 4.90 $ 5.34 $ 3/4" 10.42 11.36 12.38 13.49 14.71 16.03 1" 17.36 18.92 20.63 22.48 24.51 26.71 1 1/2" 43.41 47.32 51.58 56.22 61.28 66.79 2" 69.46 75.71 82.53 89.95 98.05 106.87 3" 173.64 189.27 206.30 224.87 245.11 267.17 4" 260.47 283.91 309.46 337.32 367.67 400.77 Residential and Irrigation Volume Rate Per 100 Cubic Feet - 500 0.96 1.05 1.14 1.24 1.36 1.48 501 1,000 1.31 1.43 1.56 1.70 1.85 2.02 1,001 2,300 1.89 2.06 2.25 2.45 2.67 2.91 2,301 Above 3.20 3.49 3.80 4.14 4.52 4.92 Volume Rate Per 1,000 Gallons - 4,000 1.28 1.40 1.52 1.66 1.81 1.97 4,001 7,000 1.75 1.91 2.08 2.27 2.47 2.69 7,001 17,000 2.53 2.75 3.00 3.27 3.57 3.89 17,001 Above 4.28 4.66 5.08 5.54 6.04 6.58
  • 27. Proposed Rate Plan | Summary 27 The proposed rate plan maintains the current rate structure, but increases rates to cover operational cost increases and new debt service payments. The combined impact on average residential customer bills is $2.96/month (4.7%) in year 1. Effective Effective Effective Effective Effective Current Oct-23 Oct-24 Oct-25 Oct-26 Oct-27 Commercial Volume Rate Per 100 Cubic Feet - 500 1.37 1.49 1.63 1.77 1.93 2.11 501 1,000 1.71 1.86 2.03 2.21 2.41 2.63 1,001 2,300 2.29 2.50 2.72 2.97 3.23 3.52 2,301 Above 3.61 3.93 4.29 4.68 5.10 5.55 Volume Rate Per 1,000 Gallons - 4,000 1.83 2.00 2.18 2.37 2.59 2.82 4,001 7,000 2.29 2.49 2.72 2.96 3.23 3.52 7,001 17,000 3.06 3.34 3.64 3.96 4.32 4.71 17,001 Above 4.83 5.26 5.73 6.25 6.81 7.43 Multi Family and Institutional Volume Rate Per 100 Cubic Feet - 500 0.96 1.05 1.14 1.24 1.36 1.48 501 1,000 1.31 1.43 1.56 1.70 1.85 2.02 1,001 2,300 1.89 2.06 2.25 2.45 2.67 2.91 2,301 Above 3.20 3.49 3.80 4.14 4.52 4.92 Volume Rate Per 1,000 Gallons - 500 1.28 1.40 1.52 1.66 1.81 1.97 501 1,000 1.75 1.91 2.08 2.27 2.47 2.69 1,001 2,300 2.53 2.75 3.00 3.27 3.57 3.89 2,301 Above 4.28 4.66 5.08 5.54 6.04 6.58
  • 28. Proposed Rate Plan | Summary 28 Wastewater base rates and volume rates increase at 2% annually each year of the plan. Scenario: Scenario 1 | Status Quo Effective Effective Effective Effective Effective Current Oct-23 Oct-24 Oct-25 Oct-26 Oct-27 Wastewater Rates - All Customers Monthly Minimum Charge 25.88 $ 26.40 $ 26.93 $ 27.73 $ 28.57 $ 29.42 $ (Includes 500 Cubic Feet/3,740 Gallons) Volume Rate per 100 Cubic Feet 4.32 $ 4.41 $ 4.49 $ 4.63 $ 4.77 $ 4.91 $ Volume Rate per 1,000 Gallons 5.77 5.89 6.01 6.19 6.37 6.57 Proposed Wastewater Rate Plan
  • 29. Projected Impact on Monthly Bill 29 Average Residential User Effective Effective Effective Effective Effective Current Oct-23 Oct-24 Oct-25 Oct-26 Oct-27 Residential Average Monthly Bill - 5/8" 800 ft³ Water 12.20 $ 13.30 $ 14.49 $ 15.80 $ 17.22 $ 18.77 $ 800 ft³ Wastewater 38.84 39.62 40.41 41.62 42.87 44.16 (6.3kGal) Total 51.04 52.91 54.90 57.42 60.09 62.93 Increase -- $ 1.87 $ 1.99 $ 2.52 $ 2.67 $ 2.84 $ 3.7% 3.8% 4.6% 4.7% 4.7% 1,500 ft³ Water 24.27 $ 26.45 $ 28.84 $ 31.43 $ 34.26 $ 37.34 $ 800 ft³ Wastewater 38.84 39.62 40.41 41.62 42.87 44.16 (11.8kGal) Total 63.11 66.07 69.24 73.05 77.13 81.50 Increase -- $ 2.96 $ 3.17 $ 3.81 $ 4.08 $ 4.37 $ 4.7% 4.8% 5.5% 5.6% 5.7% 3,000 ft³ Water 61.79 $ 67.35 $ 73.41 $ 80.02 $ 87.22 $ 95.07 $ 800 ft³ Wastewater 38.84 39.62 40.41 41.62 42.87 44.16 (23.5 kGal) Total 100.63 106.97 113.82 121.64 130.09 139.23 Increase -- $ 6.34 $ 6.85 $ 7.82 $ 8.45 $ 9.14 $ 6.3% 6.4% 6.9% 6.9% 7.0% Commercial Monthly Bill - 2" 3,000 ft³ Water 139.90 $ 152.49 $ 166.22 $ 181.17 $ 197.48 $ 215.25 $ 3,000 ft³ Wastewater 155.48 158.59 161.76 166.61 171.61 176.76 (23.5 kGal) Total 295.38 311.08 327.98 347.79 369.09 392.01 Increase -- $ 15.70 $ 16.90 $ 19.81 $ 21.30 $ 22.92 $ 5.3% 5.4% 6.0% 6.1% 6.2% 8,000 ft³ Water 320.40 $ 349.24 $ 380.67 $ 414.93 $ 452.27 $ 492.98 $ 8,000 ft³ Wastewater 371.48 378.91 386.49 398.08 410.02 422.33 (63 kGal) Total 691.88 728.15 767.16 813.01 862.30 915.30 Increase -- $ 36.27 $ 39.01 $ 45.85 $ 49.29 $ 53.01 $ 5.2% 5.4% 6.0% 6.1% 6.1%
  • 30. Proposed Rate Plan – Impact on City Utility 30 With $14.0M in new debt issuances* and moderate rate increases, the fund is forecast to remain in sound financial condition, including debt coverage ratios. *Assumed 20-year term debt @ 4%.
  • 31.  The proposed rate plan enables the City to fully fund all water and wastewater costs and CIP over next decade  Will enable the Utility Fund to operate self- sufficiently with no need for subsidies from fund balance  Enables the City to provide safe drinking water and effectively treat wastewater continually for forecast period How Does Rate Plan Benefit Ratepayers & City? 31