DRAWING LIST
PROJECT: PROPOSED 18 ROOM LODGE, KAZANGULA
CLIENT : ADAM YOUNG
DRAWING #: DRAWING TITLE DESCRIPTION
PAGE
FORMAT
AYMK-SP-02 SITE PLAN SITE LAYOUT SHOWING BUILDINGS + SERVICES A1 P
AYMK-MB-01 MAIN BUILDING PLAN + SECTION FOR MAIN BUILDING A1 L
AYMK-MBEV-01 MAIN BUILDING ELEVATIONS ELEVATIONS FOR MAIN BUILDING A3 L
AYMK-DU-01 DOUBLE UNITS PLANS SECTION + ELEVATIONS FOR DOUBLE UNITS A3 L
AYMK-LP-01 LOCATION PLAN SHOWS SITE IN RELATION TO NEARBY TOWNS AND AREAS A3 L
AYMK-MBFP-01 MAIN BUILDING FIRE PLAN FIRE PLAN LAYOUT IN MAIN BUILDING A3 L
SITE PLAN
1:250
FAP
H
A
D
S
FCP
F
FB
FAP
H
TANK
BOOSTER
PUMP
H
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT/APPLICANT:
PLOT: SIGNED:
SITE PLAN
-FIRE LAYOUT
-WASTE WATER LAYOUT
1:250
G H
PAGE #:
MKNU-SLP-01
CLIENT ADDRESS:
APRIL 2013
PAGE FORMAT: A1
DRAWING NUMBER:
/
PROPOSED 18 ROOM LODGE
SUBMITTED:
97-RO,KANANGA, KAZANGULA
A YOUNG
P.O. Box 544, Kasane
NOTES
AREAS
SITE AREA
MAIN BUILDING
TWIN UNITS
TOTAL BUILDING
COVERAGE - 11.6%
PARKING (REQUIRED 33)
39 STANDARD PARKING (2.5x5)
2 DISABLED (3.8x5)
1 LOADING BAY (9x5)
(ALL PARKING HAS MIN 6m BEHIND IT)
WASTE WATER
-20000 L CONSERVACY TANK AS SHOWN
-RODDING EYES AND INSPECTION CHAMBERS TO BE
PROVIDED WHERE REQUIRED
133177
90000
125365
90338
6023
6023
14268
12692
5843
9901
13138
11896
8631
11625
10003
3800
2500
5000
3800
2500
5000
6795
2500
2500
5000
6223
6028
6000
5142
9000
2500
5000
5149
FLOOR PLAN
1:100
TABLETABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
KITCHEN
DINING
CREW
ROOM
STAFF
RECEPTION
OFFICEGUEST
TOILETS
ENTRANCE
STAFF
LOUNGE
tree
tree
tree
tree
treetree
tree
tree
tree
extractor
STORE
STORE
SECTION A-A
1:100
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT/APPLICANT:
PLOT: SIGNED:
MAIN BUILDING
- FLOOR PLAN + SECTION AA
1:100
G H
PAGE #:
AYMK-MB-01
CLIENT ADDRESS:
APRIL 2013
PAGE FORMAT: A1
DRAWING NUMBER:
/
PROPOSED 18 ROOM LODGE
SUBMITTED:
97-RO, KANANGA, KAZANGULA
A YOUNG
P.O. Box 544, Kasane
10000
25000
100005000
2550
62233
62241
22992
20765
10000
74501660
50051870
230
230
20535 10000 6690 3950
26631
41175
7000
8690
3000
11816
2896
4000
4000
4000
4000
2896
4000
3000
4000 4000 4000 4000 3385 7510 900 900 1200 900 900 1000 2000
4770
3725
3725
3126
30253025
8225
3040
1725
1200
1000
1915
2025
3455
1200
37535
20765 10000 7000
4230 4230 4230 4230 3615
50005000
2161 697 1022 350 2161 697 1022 350 2161 697 1022 350 2161 697 1022 1131 533 1217 533 551 614 1511 1228 1511 614 1511 1048 533 482 533 414 298 533 482 533 482 533 349 870 298 533 529 230
807
1511
1387
1022
697
2144
350
1022
697
2144
350
1022
697
2144
350
1022
697
2144
580
10075
230
2320
5005
230
115
1870
230
2550
7450
4230
4230
3230
4230
4230
2382
4000
4000
3000
4000
4000
6690
4885 4885
4655 4655
3951
4060
2320
230
230 230 230
6936
46291774
3835
3633
2922
952
1252
5385
2585
FFL
FRL
2100
2574
2577
1154
A
A
NORTH ELEVATION
SOUTH ELEVATION
EAST ELEVATION WEST ELEVATION
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT/APPLICANT:
PLOT: SIGNED:
MAIN BUILDING
-ELEVATIONS
1:200
G H
PAGE #:
AYMK-MBEV-01
CLIENT ADDRESS:
APRIL 2013
PAGE FORMAT: A3
DRAWING NUMBER:
/
PROPOSED 18 ROOM LODGE
SUBMITTED:
97-RO, KANANGA, KAZANGULA
A YOUNG
P.O. Box 544, Kasane
SIDE ELEVATION
1:200
SIDE ELEVATION
1:200
FRONT ELEVATION
1:200
REAR ELEVATION
1:200
FLOOR PLAN
1:100
SECTION A-A
1:100
FFL1
NGL2
NGL1
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT/APPLICANT:
PLOT: SIGNED:
DOUBLE UNITS
- PLAN, SECTION + ELEVATION
1:100 1:200
G H
PAGE #:
AYMK-DU-01
CLIENT ADDRESS:
APRIL 2013
PAGE FORMAT: A3
DRAWING NUMBER:
/
PROPOSED 18 ROOM LODGE
SUBMITTED:
97-RO, KANANGA, KAZANGULA
A YOUNG
P.O. Box 544, Kasane
14600
9200
18507350
584533892102229701350625
275
950
350
350
1000
250
21001300
350
18831500
2400 4425
2700 218 1022218218 1022 1511 218
35044252000 350350
1650
2500
1100
975
1300
1130
895
1000
117
228
9478
14600
2350 1550 6800
1500
350 2000 350 950 250 3475
23501550
35020003509502503225
24004425
27002181022 218 21810221511218
350 4425 2000350 350
350
9200
18507350
584533892102229701350625
275
950
350
350
1000
250
21001300
350
18831500
117
228
9478
5677
8009503019
2100
2500
2400
1761
439
1628
3289
3711
KASANE FOREST RESERVE
LOCATION PLAN
1:7500
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT/APPLICANT:
PLOT: SIGNED:
LOCATION PLAN
SITE SHOWN IN RED
1:7500
G H
PAGE #:
AYMK-LP-01
CLIENT ADDRESS:
APRIL 2013
PAGE FORMAT: A3
DRAWING NUMBER:
/
PROPOSED 18 ROOM LODGE
SUBMITTED:
97-RO, KANANGA, KAZANGULA
A YOUNG
P.O. Box 544, Kasane
FIRE PLAN
1:200
KITCHEN
DINING
CREW
ROOM
STAFF
RECEPTION
GUEST
TOILETS
ENTRANCE
STAFF
LOUNGE
tree
tree
tree
STORE
STORE
H
A
D
S
FCP
F
FB
FB
A
F
FCP
S
S
S
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT/APPLICANT:
PLOT: SIGNED:
MAIN BUILDING - FIRE PLAN
1:200
G H
PAGE #:
AYMK-MBFP-01
CLIENT ADDRESS:
APRIL 2013
PAGE FORMAT: A3
DRAWING NUMBER:
/
PROPOSED 18 ROOM LODGE
SUBMITTED:
97-RO, KANANGA, KAZANGULA
A YOUNG
P.O. Box 544, Kasane
61575
25000

More Related Content

What's hot

Power Point Presentation for PPA 30
Power Point Presentation for PPA 30Power Point Presentation for PPA 30
Power Point Presentation for PPA 30TABREZ AKHTAR
 
MODULE-CB-02-CB_CHT_Z1_RL_DR_ME_50_02-C02
MODULE-CB-02-CB_CHT_Z1_RL_DR_ME_50_02-C02MODULE-CB-02-CB_CHT_Z1_RL_DR_ME_50_02-C02
MODULE-CB-02-CB_CHT_Z1_RL_DR_ME_50_02-C02Douglas Hart Snr
 
DGI-CHT-ENC-B1-XX-M-60-0019
DGI-CHT-ENC-B1-XX-M-60-0019DGI-CHT-ENC-B1-XX-M-60-0019
DGI-CHT-ENC-B1-XX-M-60-0019Douglas Hart Snr
 
pRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - SubstationpRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - SubstationRAMESH PANIGRAHI PMP
 
LGA Capital Plan Presentation 2009
LGA Capital Plan Presentation 2009LGA Capital Plan Presentation 2009
LGA Capital Plan Presentation 2009Jimmy Gracia
 
Tampa articulada ec 13
Tampa articulada ec 13Tampa articulada ec 13
Tampa articulada ec 13Antonio Braga
 
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENTDESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENTRene Aguilar
 
REVERSE ENGINEERING OF W16 ENGINE
REVERSE ENGINEERING OF W16 ENGINE REVERSE ENGINEERING OF W16 ENGINE
REVERSE ENGINEERING OF W16 ENGINE Kandhan Siva
 
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01DGI-CHT-ENC-B1-XX-ME-XX-0004-C01
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01Douglas Hart Snr
 
sony george design portfolio
 sony george design portfolio sony george design portfolio
sony george design portfolioSony George
 
Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann
 
Carl_Smith_Resume_3
Carl_Smith_Resume_3Carl_Smith_Resume_3
Carl_Smith_Resume_3Carl Smith
 
DGI-CHT-ENC-B1-DR-E-60-0008-C01
DGI-CHT-ENC-B1-DR-E-60-0008-C01DGI-CHT-ENC-B1-DR-E-60-0008-C01
DGI-CHT-ENC-B1-DR-E-60-0008-C01Douglas Hart Snr
 

What's hot (18)

M Halsey CV
M Halsey CVM Halsey CV
M Halsey CV
 
Cl1
Cl1Cl1
Cl1
 
Power Point Presentation for PPA 30
Power Point Presentation for PPA 30Power Point Presentation for PPA 30
Power Point Presentation for PPA 30
 
MODULE-CB-02-CB_CHT_Z1_RL_DR_ME_50_02-C02
MODULE-CB-02-CB_CHT_Z1_RL_DR_ME_50_02-C02MODULE-CB-02-CB_CHT_Z1_RL_DR_ME_50_02-C02
MODULE-CB-02-CB_CHT_Z1_RL_DR_ME_50_02-C02
 
DGI-CHT-ENC-B1-XX-M-60-0019
DGI-CHT-ENC-B1-XX-M-60-0019DGI-CHT-ENC-B1-XX-M-60-0019
DGI-CHT-ENC-B1-XX-M-60-0019
 
Mbh 2700-es-asm-1000
Mbh 2700-es-asm-1000Mbh 2700-es-asm-1000
Mbh 2700-es-asm-1000
 
pRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - SubstationpRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - Substation
 
LGA Capital Plan Presentation 2009
LGA Capital Plan Presentation 2009LGA Capital Plan Presentation 2009
LGA Capital Plan Presentation 2009
 
Tampa articulada ec 13
Tampa articulada ec 13Tampa articulada ec 13
Tampa articulada ec 13
 
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENTDESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
 
REVERSE ENGINEERING OF W16 ENGINE
REVERSE ENGINEERING OF W16 ENGINE REVERSE ENGINEERING OF W16 ENGINE
REVERSE ENGINEERING OF W16 ENGINE
 
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01DGI-CHT-ENC-B1-XX-ME-XX-0004-C01
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01
 
sony george design portfolio
 sony george design portfolio sony george design portfolio
sony george design portfolio
 
Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann Resume 2016
Warren Tann Resume 2016
 
PPT Section 179
PPT Section 179PPT Section 179
PPT Section 179
 
Carl_Smith_Resume_3
Carl_Smith_Resume_3Carl_Smith_Resume_3
Carl_Smith_Resume_3
 
Firepumpdesignintent4.01
Firepumpdesignintent4.01Firepumpdesignintent4.01
Firepumpdesignintent4.01
 
DGI-CHT-ENC-B1-DR-E-60-0008-C01
DGI-CHT-ENC-B1-DR-E-60-0008-C01DGI-CHT-ENC-B1-DR-E-60-0008-C01
DGI-CHT-ENC-B1-DR-E-60-0008-C01
 

Viewers also liked

Land preparation and potato planting
Land preparation and potato plantingLand preparation and potato planting
Land preparation and potato plantingHarahagazwe
 
Okna Schuco Poznań schuco-centrum.pl
Okna Schuco Poznań schuco-centrum.plOkna Schuco Poznań schuco-centrum.pl
Okna Schuco Poznań schuco-centrum.plPiotr Mrówczyński
 
11 función buscarv buscarh
11 función buscarv buscarh11 función buscarv buscarh
11 función buscarv buscarhpantracio
 
Lisa Hanna Sectoral Debate 2016
Lisa Hanna Sectoral Debate 2016 Lisa Hanna Sectoral Debate 2016
Lisa Hanna Sectoral Debate 2016 Corve DaCosta
 
Site Pro UB1300
Site Pro UB1300Site Pro UB1300
Site Pro UB1300savomir
 
Liderazgo en-la-empresa
Liderazgo en-la-empresaLiderazgo en-la-empresa
Liderazgo en-la-empresaMarisa Toledo
 
Compliance at a Crossroads: One Step Forward, Two Steps Back?
Compliance at a Crossroads: One Step Forward, Two Steps Back?Compliance at a Crossroads: One Step Forward, Two Steps Back?
Compliance at a Crossroads: One Step Forward, Two Steps Back?Accenture Insurance
 

Viewers also liked (12)

Land preparation and potato planting
Land preparation and potato plantingLand preparation and potato planting
Land preparation and potato planting
 
Envases verdes
Envases verdesEnvases verdes
Envases verdes
 
Okna Schuco Poznań schuco-centrum.pl
Okna Schuco Poznań schuco-centrum.plOkna Schuco Poznań schuco-centrum.pl
Okna Schuco Poznań schuco-centrum.pl
 
AS Fairways Brochure
AS Fairways BrochureAS Fairways Brochure
AS Fairways Brochure
 
11 función buscarv buscarh
11 función buscarv buscarh11 función buscarv buscarh
11 función buscarv buscarh
 
Lisa Hanna Sectoral Debate 2016
Lisa Hanna Sectoral Debate 2016 Lisa Hanna Sectoral Debate 2016
Lisa Hanna Sectoral Debate 2016
 
onlineopioids
onlineopioidsonlineopioids
onlineopioids
 
Site Pro UB1300
Site Pro UB1300Site Pro UB1300
Site Pro UB1300
 
Partes de un computador
Partes de un computadorPartes de un computador
Partes de un computador
 
Proper Ergonomics_How Employers Save $$$_3.24.16
Proper Ergonomics_How Employers Save $$$_3.24.16Proper Ergonomics_How Employers Save $$$_3.24.16
Proper Ergonomics_How Employers Save $$$_3.24.16
 
Liderazgo en-la-empresa
Liderazgo en-la-empresaLiderazgo en-la-empresa
Liderazgo en-la-empresa
 
Compliance at a Crossroads: One Step Forward, Two Steps Back?
Compliance at a Crossroads: One Step Forward, Two Steps Back?Compliance at a Crossroads: One Step Forward, Two Steps Back?
Compliance at a Crossroads: One Step Forward, Two Steps Back?
 

Similar to Mukusi Guesthouse

Bakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseBakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseGrant Hepburn
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00Mansoor Sakharkar
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdfMODI20077
 
Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,NIZAM ISMAIL
 
Last Eden Eco Bush Lodge
Last Eden Eco Bush LodgeLast Eden Eco Bush Lodge
Last Eden Eco Bush LodgeGrant Hepburn
 
LIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdfLIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdfYogaSaputra89
 
12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdfDaizukiIchiro
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSunit Dhingra
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASunit Dhingra
 
At of modern building which create abvolated view
At of modern building which create abvolated viewAt of modern building which create abvolated view
At of modern building which create abvolated viewdreem073
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 sMike Darwich
 
Salma Mahgoub Portfolio.pdf Dec 2016
Salma Mahgoub Portfolio.pdf Dec 2016Salma Mahgoub Portfolio.pdf Dec 2016
Salma Mahgoub Portfolio.pdf Dec 2016Salma Mahgoub
 

Similar to Mukusi Guesthouse (20)

Bakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseBakwena Lodge Mgmt House
Bakwena Lodge Mgmt House
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf
 
Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,
 
Last Eden Eco Bush Lodge
Last Eden Eco Bush LodgeLast Eden Eco Bush Lodge
Last Eden Eco Bush Lodge
 
LIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdfLIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdf
 
12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
 
At of modern building which create abvolated view
At of modern building which create abvolated viewAt of modern building which create abvolated view
At of modern building which create abvolated view
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 
final project_FINAL
final project_FINALfinal project_FINAL
final project_FINAL
 
BASEMENT PLUMBING LAYOUT-SECTOR-2
BASEMENT PLUMBING LAYOUT-SECTOR-2BASEMENT PLUMBING LAYOUT-SECTOR-2
BASEMENT PLUMBING LAYOUT-SECTOR-2
 
2D.pdf
2D.pdf2D.pdf
2D.pdf
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
SIEMENS HQ
SIEMENS HQSIEMENS HQ
SIEMENS HQ
 
LANDSIDE.pdf
LANDSIDE.pdfLANDSIDE.pdf
LANDSIDE.pdf
 
Legazpi City, Philippines
Legazpi City, PhilippinesLegazpi City, Philippines
Legazpi City, Philippines
 
Salma Mahgoub Portfolio.pdf Dec 2016
Salma Mahgoub Portfolio.pdf Dec 2016Salma Mahgoub Portfolio.pdf Dec 2016
Salma Mahgoub Portfolio.pdf Dec 2016
 

Mukusi Guesthouse

  • 1. DRAWING LIST PROJECT: PROPOSED 18 ROOM LODGE, KAZANGULA CLIENT : ADAM YOUNG DRAWING #: DRAWING TITLE DESCRIPTION PAGE FORMAT AYMK-SP-02 SITE PLAN SITE LAYOUT SHOWING BUILDINGS + SERVICES A1 P AYMK-MB-01 MAIN BUILDING PLAN + SECTION FOR MAIN BUILDING A1 L AYMK-MBEV-01 MAIN BUILDING ELEVATIONS ELEVATIONS FOR MAIN BUILDING A3 L AYMK-DU-01 DOUBLE UNITS PLANS SECTION + ELEVATIONS FOR DOUBLE UNITS A3 L AYMK-LP-01 LOCATION PLAN SHOWS SITE IN RELATION TO NEARBY TOWNS AND AREAS A3 L AYMK-MBFP-01 MAIN BUILDING FIRE PLAN FIRE PLAN LAYOUT IN MAIN BUILDING A3 L
  • 2. SITE PLAN 1:250 FAP H A D S FCP F FB FAP H TANK BOOSTER PUMP H DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT/APPLICANT: PLOT: SIGNED: SITE PLAN -FIRE LAYOUT -WASTE WATER LAYOUT 1:250 G H PAGE #: MKNU-SLP-01 CLIENT ADDRESS: APRIL 2013 PAGE FORMAT: A1 DRAWING NUMBER: / PROPOSED 18 ROOM LODGE SUBMITTED: 97-RO,KANANGA, KAZANGULA A YOUNG P.O. Box 544, Kasane NOTES AREAS SITE AREA MAIN BUILDING TWIN UNITS TOTAL BUILDING COVERAGE - 11.6% PARKING (REQUIRED 33) 39 STANDARD PARKING (2.5x5) 2 DISABLED (3.8x5) 1 LOADING BAY (9x5) (ALL PARKING HAS MIN 6m BEHIND IT) WASTE WATER -20000 L CONSERVACY TANK AS SHOWN -RODDING EYES AND INSPECTION CHAMBERS TO BE PROVIDED WHERE REQUIRED 133177 90000 125365 90338 6023 6023 14268 12692 5843 9901 13138 11896 8631 11625 10003 3800 2500 5000 3800 2500 5000 6795 2500 2500 5000 6223 6028 6000 5142 9000 2500 5000 5149
  • 3. FLOOR PLAN 1:100 TABLETABLE TABLE TABLE TABLE TABLE TABLE TABLE KITCHEN DINING CREW ROOM STAFF RECEPTION OFFICEGUEST TOILETS ENTRANCE STAFF LOUNGE tree tree tree tree treetree tree tree tree extractor STORE STORE SECTION A-A 1:100 DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT/APPLICANT: PLOT: SIGNED: MAIN BUILDING - FLOOR PLAN + SECTION AA 1:100 G H PAGE #: AYMK-MB-01 CLIENT ADDRESS: APRIL 2013 PAGE FORMAT: A1 DRAWING NUMBER: / PROPOSED 18 ROOM LODGE SUBMITTED: 97-RO, KANANGA, KAZANGULA A YOUNG P.O. Box 544, Kasane 10000 25000 100005000 2550 62233 62241 22992 20765 10000 74501660 50051870 230 230 20535 10000 6690 3950 26631 41175 7000 8690 3000 11816 2896 4000 4000 4000 4000 2896 4000 3000 4000 4000 4000 4000 3385 7510 900 900 1200 900 900 1000 2000 4770 3725 3725 3126 30253025 8225 3040 1725 1200 1000 1915 2025 3455 1200 37535 20765 10000 7000 4230 4230 4230 4230 3615 50005000 2161 697 1022 350 2161 697 1022 350 2161 697 1022 350 2161 697 1022 1131 533 1217 533 551 614 1511 1228 1511 614 1511 1048 533 482 533 414 298 533 482 533 482 533 349 870 298 533 529 230 807 1511 1387 1022 697 2144 350 1022 697 2144 350 1022 697 2144 350 1022 697 2144 580 10075 230 2320 5005 230 115 1870 230 2550 7450 4230 4230 3230 4230 4230 2382 4000 4000 3000 4000 4000 6690 4885 4885 4655 4655 3951 4060 2320 230 230 230 230 6936 46291774 3835 3633 2922 952 1252 5385 2585 FFL FRL 2100 2574 2577 1154 A A
  • 4. NORTH ELEVATION SOUTH ELEVATION EAST ELEVATION WEST ELEVATION DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT/APPLICANT: PLOT: SIGNED: MAIN BUILDING -ELEVATIONS 1:200 G H PAGE #: AYMK-MBEV-01 CLIENT ADDRESS: APRIL 2013 PAGE FORMAT: A3 DRAWING NUMBER: / PROPOSED 18 ROOM LODGE SUBMITTED: 97-RO, KANANGA, KAZANGULA A YOUNG P.O. Box 544, Kasane
  • 5. SIDE ELEVATION 1:200 SIDE ELEVATION 1:200 FRONT ELEVATION 1:200 REAR ELEVATION 1:200 FLOOR PLAN 1:100 SECTION A-A 1:100 FFL1 NGL2 NGL1 DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT/APPLICANT: PLOT: SIGNED: DOUBLE UNITS - PLAN, SECTION + ELEVATION 1:100 1:200 G H PAGE #: AYMK-DU-01 CLIENT ADDRESS: APRIL 2013 PAGE FORMAT: A3 DRAWING NUMBER: / PROPOSED 18 ROOM LODGE SUBMITTED: 97-RO, KANANGA, KAZANGULA A YOUNG P.O. Box 544, Kasane 14600 9200 18507350 584533892102229701350625 275 950 350 350 1000 250 21001300 350 18831500 2400 4425 2700 218 1022218218 1022 1511 218 35044252000 350350 1650 2500 1100 975 1300 1130 895 1000 117 228 9478 14600 2350 1550 6800 1500 350 2000 350 950 250 3475 23501550 35020003509502503225 24004425 27002181022 218 21810221511218 350 4425 2000350 350 350 9200 18507350 584533892102229701350625 275 950 350 350 1000 250 21001300 350 18831500 117 228 9478 5677 8009503019 2100 2500 2400 1761 439 1628 3289 3711
  • 6. KASANE FOREST RESERVE LOCATION PLAN 1:7500 DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT/APPLICANT: PLOT: SIGNED: LOCATION PLAN SITE SHOWN IN RED 1:7500 G H PAGE #: AYMK-LP-01 CLIENT ADDRESS: APRIL 2013 PAGE FORMAT: A3 DRAWING NUMBER: / PROPOSED 18 ROOM LODGE SUBMITTED: 97-RO, KANANGA, KAZANGULA A YOUNG P.O. Box 544, Kasane
  • 7. FIRE PLAN 1:200 KITCHEN DINING CREW ROOM STAFF RECEPTION GUEST TOILETS ENTRANCE STAFF LOUNGE tree tree tree STORE STORE H A D S FCP F FB FB A F FCP S S S DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT/APPLICANT: PLOT: SIGNED: MAIN BUILDING - FIRE PLAN 1:200 G H PAGE #: AYMK-MBFP-01 CLIENT ADDRESS: APRIL 2013 PAGE FORMAT: A3 DRAWING NUMBER: / PROPOSED 18 ROOM LODGE SUBMITTED: 97-RO, KANANGA, KAZANGULA A YOUNG P.O. Box 544, Kasane 61575 25000