SlideShare a Scribd company logo
1 of 1
Download to read offline
Name : Abdulmeguid Ali Ali
Year of Birth : 06-Sep-1986
Nationality : Egyptian
Educational Attainment : B.Sc of Civil Engineering - 2009
Total Experience : 6 Years
PHONE : 966544076565 - 966544455214
Professional Experience Al-ayuni Investment & Contracting - KSA ( Planning Engineer ) PMO
2015 - PRESENT 1. Plan and schedule the project by developing a project master schedule in line with the proposal
requirements through the application of the primavera P6 software.
2. Indentify the project deliverables, milestones, and required tasks and targets to determine the staffing
requirements, and allotment of available resources to various phases of the project through the project
measurement system.
3. Implement the work schedule and monitor progress of the work for timely execution of the project
through daily/weekly/monthly/ reports with respect to review of the overall project.
4. Progress monitoring of specific projects on a regular basis. Anticipate and resolve any problems,
bottlenecks/scheduling conflicts. Prepare and maintain package work plans and monitor progress to
achieve on time or earlier deliveries to keep the project on schedule.
5. Co‐ordinate internal project team reviews followed by an approval and review by the client of the work
schedule, progress measurement and reporting systems. Review status reports, modify schedules and
plans as required and keep the management and Project director apprised of the progress on a regular
basis.
6. Ensure that project controls documents such as resources histogram, schedules, reporting systems,
material controls systems, etc. are fully developed by the designated personnel and reviewed by
Construction Management and that Engineering and Procurement interfaces are properly addressed.
7. Perform any other duties and responsibilities as and when directed by the Supervisor.
2013 - 2015 : Al Mobty Co. for Contracting - KSA
Planning Engineer (PMO)
* Processing schedule of the projects using Primavera.
* Add schedule of subcontractor to main schedule of the project and ensure
commitment to the time specified stages.
* Sort responsibilites, coordination with the managers, finance and accounting
to ensure safety cash flow in all phases of projects.
* Reliability clarify the relationships between task and activities.
* Develops overall project controls system.
* Integrates engineering, construction and startup controls system.
* Manage change decision process foe engineering design.
* Recieve, analyze, and integrate cost and schedule reports.
* Report status and variation from plan to the project on periodic basis.
* Determine risk of the projects with the calculation risk-based budget.
* Update work schedule of the project with the completion of proj. account and
follow-up reports in the proj. workflow
2011 - 2012 : Sakan for Engineering & Consultancy Co. - KSA
* Structural design of school in a way computer-aided structural analysis of
civil engineers, modeling and analysis building (sap 2000 Tabuk city)
* Supervising projects of the Ministry of Interior.
* Technical work office (work amounts inventory of projects, ministry of interior,
and prepare drawings implementation and preparation of extract contractors)
* Preparing schedule with follow-up schedule for contractors.
* Preparation of bids and tenders for projects, work schedules of quantities
and engineering specifications for construction and architectural works.
2010 - 2011 : Abery for Construction & Development Co. - UAE, Abu Dhabi
* Technical Site Engineer in Zayed Military City
* Planner Engineer for Construction Building-Scheduling & Updating
* Design of the Construction of the Foundation of the Building
* Design of the Construction of Steel and Concrete Column with Glass
Façade in Zayed Military City
2009 - 2010 : General Nile Works for Roads & Bridges Co. - EGYPT
* Site Engineer at Bridge of Aswan Project
* Supervisor of the Construction of Mechanical Workshop, Aggregate Shed,
and Two Patch Plants (Two Eleba & One Stetter)
* Participating in the Construction of Foundation of the Bridge.
ALMOBTY CO. for Contracting
‫شركة‬‫سعد‬‫المبطي‬‫وشركاه‬‫للمقاوالت‬
ALAYUNI INVESTMENT & CONTRACTING
‫شركة‬‫العيونى‬‫لالستثمار‬‫والمقاوالت‬
CURRICULUM VITAE
PLANNING ENGINEER

More Related Content

What's hot (20)

Mehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cv
 
Ahmed Elsamahy CV _
Ahmed Elsamahy CV _Ahmed Elsamahy CV _
Ahmed Elsamahy CV _
 
CV
CVCV
CV
 
CV NK
CV NKCV NK
CV NK
 
EZZAT SHAHEEN CV.compressed
EZZAT SHAHEEN  CV.compressedEZZAT SHAHEEN  CV.compressed
EZZAT SHAHEEN CV.compressed
 
Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16
 
C.V
C.VC.V
C.V
 
AYMAN HELMY_CV
AYMAN HELMY_CVAYMAN HELMY_CV
AYMAN HELMY_CV
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
eng. nabih cv
eng. nabih cveng. nabih cv
eng. nabih cv
 
Project Planning Engr. CV
Project Planning Engr. CVProject Planning Engr. CV
Project Planning Engr. CV
 
Waqar Azeem -QS
Waqar Azeem -QSWaqar Azeem -QS
Waqar Azeem -QS
 
Raman Rezaei Infographic
Raman Rezaei InfographicRaman Rezaei Infographic
Raman Rezaei Infographic
 
Ibrahim's Resume
Ibrahim's ResumeIbrahim's Resume
Ibrahim's Resume
 
Hanin qreis 2018 cv
Hanin qreis 2018 cvHanin qreis 2018 cv
Hanin qreis 2018 cv
 
CV - Mohammed El Sayed
CV - Mohammed El SayedCV - Mohammed El Sayed
CV - Mohammed El Sayed
 
Ashraf final_english_cv
Ashraf final_english_cvAshraf final_english_cv
Ashraf final_english_cv
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
 
Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]
 

Viewers also liked

Viewers also liked (11)

CV Prashant Thakkar
CV Prashant ThakkarCV Prashant Thakkar
CV Prashant Thakkar
 
TASS Presentation
TASS PresentationTASS Presentation
TASS Presentation
 
Aziz sancar
Aziz sancarAziz sancar
Aziz sancar
 
Group3
Group3Group3
Group3
 
Obesity
ObesityObesity
Obesity
 
Service learning
Service learningService learning
Service learning
 
Eboni_Myrick_CV_Draft_1[2]
Eboni_Myrick_CV_Draft_1[2]Eboni_Myrick_CV_Draft_1[2]
Eboni_Myrick_CV_Draft_1[2]
 
FOUNDATION_lAYOUT
FOUNDATION_lAYOUTFOUNDATION_lAYOUT
FOUNDATION_lAYOUT
 
Bootstrap PPT by Mukesh
Bootstrap PPT by MukeshBootstrap PPT by Mukesh
Bootstrap PPT by Mukesh
 
Evolutionary explanation
Evolutionary explanationEvolutionary explanation
Evolutionary explanation
 
Mixed methods research2012
Mixed methods research2012Mixed methods research2012
Mixed methods research2012
 

Similar to 12741

Mahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida finalAhmad Eida
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
Amgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad Barakat
 
project engineer-planning engineer
project engineer-planning engineerproject engineer-planning engineer
project engineer-planning engineerMohammed Soliman
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCEAbdoo Sowar
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project managementDr. Pramod Deshpande
 
160226 muhammad alhanbali cv-rev00
160226 muhammad  alhanbali cv-rev00160226 muhammad  alhanbali cv-rev00
160226 muhammad alhanbali cv-rev00Muhammad Al-hanbali
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016belal alrwadieh
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project managementDr Bhavana Deshpande
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Mehtab Zaidi
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 finalHaytham Taalab
 

Similar to 12741 (20)

012741
012741012741
012741
 
81800178CV
81800178CV81800178CV
81800178CV
 
Mahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CV
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida final
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Amgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CV
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
project engineer-planning engineer
project engineer-planning engineerproject engineer-planning engineer
project engineer-planning engineer
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)
 
160226 muhammad alhanbali cv-rev00
160226 muhammad  alhanbali cv-rev00160226 muhammad  alhanbali cv-rev00
160226 muhammad alhanbali cv-rev00
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
MOATAZ GHANEM - CV
MOATAZ GHANEM - CVMOATAZ GHANEM - CV
MOATAZ GHANEM - CV
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 final
 
Updated Resume.DOC
Updated Resume.DOCUpdated Resume.DOC
Updated Resume.DOC
 

More from Majed Com

شهادة خبرة عبد المجيد - العيونى (1)
شهادة خبرة عبد المجيد - العيونى (1)شهادة خبرة عبد المجيد - العيونى (1)
شهادة خبرة عبد المجيد - العيونى (1)Majed Com
 
cv17832925_abdelmeguid-ali_planning-engineer (1)
cv17832925_abdelmeguid-ali_planning-engineer (1)cv17832925_abdelmeguid-ali_planning-engineer (1)
cv17832925_abdelmeguid-ali_planning-engineer (1)Majed Com
 
cv17832925_abdelmeguid-ali_planning-engineer (1)
cv17832925_abdelmeguid-ali_planning-engineer (1)cv17832925_abdelmeguid-ali_planning-engineer (1)
cv17832925_abdelmeguid-ali_planning-engineer (1)Majed Com
 
certificate oracle
certificate oraclecertificate oracle
certificate oracleMajed Com
 

More from Majed Com (6)

شهادة خبرة عبد المجيد - العيونى (1)
شهادة خبرة عبد المجيد - العيونى (1)شهادة خبرة عبد المجيد - العيونى (1)
شهادة خبرة عبد المجيد - العيونى (1)
 
12741
1274112741
12741
 
cv17832925_abdelmeguid-ali_planning-engineer (1)
cv17832925_abdelmeguid-ali_planning-engineer (1)cv17832925_abdelmeguid-ali_planning-engineer (1)
cv17832925_abdelmeguid-ali_planning-engineer (1)
 
cv17832925_abdelmeguid-ali_planning-engineer (1)
cv17832925_abdelmeguid-ali_planning-engineer (1)cv17832925_abdelmeguid-ali_planning-engineer (1)
cv17832925_abdelmeguid-ali_planning-engineer (1)
 
certificate oracle
certificate oraclecertificate oracle
certificate oracle
 
Untitled
UntitledUntitled
Untitled
 

12741

  • 1. Name : Abdulmeguid Ali Ali Year of Birth : 06-Sep-1986 Nationality : Egyptian Educational Attainment : B.Sc of Civil Engineering - 2009 Total Experience : 6 Years PHONE : 966544076565 - 966544455214 Professional Experience Al-ayuni Investment & Contracting - KSA ( Planning Engineer ) PMO 2015 - PRESENT 1. Plan and schedule the project by developing a project master schedule in line with the proposal requirements through the application of the primavera P6 software. 2. Indentify the project deliverables, milestones, and required tasks and targets to determine the staffing requirements, and allotment of available resources to various phases of the project through the project measurement system. 3. Implement the work schedule and monitor progress of the work for timely execution of the project through daily/weekly/monthly/ reports with respect to review of the overall project. 4. Progress monitoring of specific projects on a regular basis. Anticipate and resolve any problems, bottlenecks/scheduling conflicts. Prepare and maintain package work plans and monitor progress to achieve on time or earlier deliveries to keep the project on schedule. 5. Co‐ordinate internal project team reviews followed by an approval and review by the client of the work schedule, progress measurement and reporting systems. Review status reports, modify schedules and plans as required and keep the management and Project director apprised of the progress on a regular basis. 6. Ensure that project controls documents such as resources histogram, schedules, reporting systems, material controls systems, etc. are fully developed by the designated personnel and reviewed by Construction Management and that Engineering and Procurement interfaces are properly addressed. 7. Perform any other duties and responsibilities as and when directed by the Supervisor. 2013 - 2015 : Al Mobty Co. for Contracting - KSA Planning Engineer (PMO) * Processing schedule of the projects using Primavera. * Add schedule of subcontractor to main schedule of the project and ensure commitment to the time specified stages. * Sort responsibilites, coordination with the managers, finance and accounting to ensure safety cash flow in all phases of projects. * Reliability clarify the relationships between task and activities. * Develops overall project controls system. * Integrates engineering, construction and startup controls system. * Manage change decision process foe engineering design. * Recieve, analyze, and integrate cost and schedule reports. * Report status and variation from plan to the project on periodic basis. * Determine risk of the projects with the calculation risk-based budget. * Update work schedule of the project with the completion of proj. account and follow-up reports in the proj. workflow 2011 - 2012 : Sakan for Engineering & Consultancy Co. - KSA * Structural design of school in a way computer-aided structural analysis of civil engineers, modeling and analysis building (sap 2000 Tabuk city) * Supervising projects of the Ministry of Interior. * Technical work office (work amounts inventory of projects, ministry of interior, and prepare drawings implementation and preparation of extract contractors) * Preparing schedule with follow-up schedule for contractors. * Preparation of bids and tenders for projects, work schedules of quantities and engineering specifications for construction and architectural works. 2010 - 2011 : Abery for Construction & Development Co. - UAE, Abu Dhabi * Technical Site Engineer in Zayed Military City * Planner Engineer for Construction Building-Scheduling & Updating * Design of the Construction of the Foundation of the Building * Design of the Construction of Steel and Concrete Column with Glass Façade in Zayed Military City 2009 - 2010 : General Nile Works for Roads & Bridges Co. - EGYPT * Site Engineer at Bridge of Aswan Project * Supervisor of the Construction of Mechanical Workshop, Aggregate Shed, and Two Patch Plants (Two Eleba & One Stetter) * Participating in the Construction of Foundation of the Bridge. ALMOBTY CO. for Contracting ‫شركة‬‫سعد‬‫المبطي‬‫وشركاه‬‫للمقاوالت‬ ALAYUNI INVESTMENT & CONTRACTING ‫شركة‬‫العيونى‬‫لالستثمار‬‫والمقاوالت‬ CURRICULUM VITAE PLANNING ENGINEER