MATERIALS HANDLING Matimba Power Station Coal Stacker/ Reclaimer
Coal Stacker continue... ESKOM had identified the need for the replacement of the coal stacker/reclaimer control system at their dry cooled power station near Ellisras in the Northern province.   AEG's construction division were awarded the project to design, supply and install such a system to provide plant alarm status, monitoring and reporting. This was repeat business for AEG who also executed the station MV switchgear project and the overland Ash Handling conveyor systems.  The project was carried out during the transition period from AEG to AGE Engineering and was completed ahead of the prescribed contract period. The 12-month contract, which comprised 64 man-months effort, included the full project management, PLC engineering using a Modicon 'A' series PLC, full equipment supply, installation and commissioning.  A significant feature of this project  was the design, by one of AGE's engineers,  of unique connection terminals - housed in the PLC cabinet - which comprised full lightning protection on all inputs and outputs.  This type of terminal has now become a standard in the electrical industry AGE Technologies   contact us:  011 869 3925   www.age.co.za

More Related Content

What's hot

TowerLabs: Accelerating Adoption of Green Building Technologies for Condos
TowerLabs: Accelerating Adoption of Green Building Technologies for CondosTowerLabs: Accelerating Adoption of Green Building Technologies for Condos
TowerLabs: Accelerating Adoption of Green Building Technologies for CondosToronto 2030 District
 
NAES Power Contractors Hydro Services
NAES Power Contractors Hydro ServicesNAES Power Contractors Hydro Services
NAES Power Contractors Hydro ServicesNAES Corporation
 
KK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitKK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitRené Balle
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyIceland Geothermal
 
How latest EC fan technology improves air- and water-side efficiency in build...
How latest EC fan technology improves air- and water-side efficiency in build...How latest EC fan technology improves air- and water-side efficiency in build...
How latest EC fan technology improves air- and water-side efficiency in build...Carsten Ederer
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wireLeonardo ENERGY
 
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...Craig Heal
 
EMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building ControlsEMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building ControlsEMEX
 
MR12AB Tuesday15h00 - Gavin Puckle
MR12AB Tuesday15h00 - Gavin PuckleMR12AB Tuesday15h00 - Gavin Puckle
MR12AB Tuesday15h00 - Gavin Puckle7391456
 
Case study FCC model with integrated energy and yield
Case study FCC model with integrated energy and yieldCase study FCC model with integrated energy and yield
Case study FCC model with integrated energy and yieldKBC (A Yokogawa Company)
 
Opportunities in the Wind Industry Supply Chain
Opportunities in the Wind Industry Supply ChainOpportunities in the Wind Industry Supply Chain
Opportunities in the Wind Industry Supply ChainPorts-To-Plains Blog
 
A quick Review of SCE TOU-8 rate, 2-50 kv service, option b
A quick Review of SCE TOU-8 rate, 2-50 kv service, option bA quick Review of SCE TOU-8 rate, 2-50 kv service, option b
A quick Review of SCE TOU-8 rate, 2-50 kv service, option bCALMAC Manufacturing Corporation
 
Maintenance and outage strategies under NETA IRR/Innogy workshop, London, 2001
Maintenance and outage strategies under NETA IRR/Innogy workshop, London, 2001Maintenance and outage strategies under NETA IRR/Innogy workshop, London, 2001
Maintenance and outage strategies under NETA IRR/Innogy workshop, London, 2001Shaun West
 
Chris dowe-synergy’s-renewable-energy-integration
Chris dowe-synergy’s-renewable-energy-integrationChris dowe-synergy’s-renewable-energy-integration
Chris dowe-synergy’s-renewable-energy-integrationjames hamilton
 

What's hot (20)

TowerLabs: Accelerating Adoption of Green Building Technologies for Condos
TowerLabs: Accelerating Adoption of Green Building Technologies for CondosTowerLabs: Accelerating Adoption of Green Building Technologies for Condos
TowerLabs: Accelerating Adoption of Green Building Technologies for Condos
 
NAES Power Contractors Hydro Services
NAES Power Contractors Hydro ServicesNAES Power Contractors Hydro Services
NAES Power Contractors Hydro Services
 
AGX Slides
AGX SlidesAGX Slides
AGX Slides
 
KK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitKK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System Retrofit
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
 
WQ-2
WQ-2WQ-2
WQ-2
 
Linkedin-Doc
Linkedin-DocLinkedin-Doc
Linkedin-Doc
 
How latest EC fan technology improves air- and water-side efficiency in build...
How latest EC fan technology improves air- and water-side efficiency in build...How latest EC fan technology improves air- and water-side efficiency in build...
How latest EC fan technology improves air- and water-side efficiency in build...
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wire
 
Thermal energy storage in nyc: A winning proposition
Thermal energy storage in nyc:  A winning propositionThermal energy storage in nyc:  A winning proposition
Thermal energy storage in nyc: A winning proposition
 
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
 
EMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building ControlsEMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building Controls
 
Sustaining energy performance
Sustaining energy performanceSustaining energy performance
Sustaining energy performance
 
MR12AB Tuesday15h00 - Gavin Puckle
MR12AB Tuesday15h00 - Gavin PuckleMR12AB Tuesday15h00 - Gavin Puckle
MR12AB Tuesday15h00 - Gavin Puckle
 
Case study FCC model with integrated energy and yield
Case study FCC model with integrated energy and yieldCase study FCC model with integrated energy and yield
Case study FCC model with integrated energy and yield
 
Opportunities in the Wind Industry Supply Chain
Opportunities in the Wind Industry Supply ChainOpportunities in the Wind Industry Supply Chain
Opportunities in the Wind Industry Supply Chain
 
A quick Review of SCE TOU-8 rate, 2-50 kv service, option b
A quick Review of SCE TOU-8 rate, 2-50 kv service, option bA quick Review of SCE TOU-8 rate, 2-50 kv service, option b
A quick Review of SCE TOU-8 rate, 2-50 kv service, option b
 
Maintenance and outage strategies under NETA IRR/Innogy workshop, London, 2001
Maintenance and outage strategies under NETA IRR/Innogy workshop, London, 2001Maintenance and outage strategies under NETA IRR/Innogy workshop, London, 2001
Maintenance and outage strategies under NETA IRR/Innogy workshop, London, 2001
 
Simon Lovich, Air Engineers
Simon Lovich, Air Engineers Simon Lovich, Air Engineers
Simon Lovich, Air Engineers
 
Chris dowe-synergy’s-renewable-energy-integration
Chris dowe-synergy’s-renewable-energy-integrationChris dowe-synergy’s-renewable-energy-integration
Chris dowe-synergy’s-renewable-energy-integration
 

Similar to MATERIALS HANDLING Eskom Coal Stacker Control Upgrade

Special AKOTRACE® Electrical Heat Tracing Solution for Gemasolar Solar Power...
Special AKOTRACE®  Electrical Heat Tracing Solution for Gemasolar Solar Power...Special AKOTRACE®  Electrical Heat Tracing Solution for Gemasolar Solar Power...
Special AKOTRACE® Electrical Heat Tracing Solution for Gemasolar Solar Power...ako_corporate
 
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...ako_corporate
 
Electromechanical Contractors in Egypt
Electromechanical Contractors in EgyptElectromechanical Contractors in Egypt
Electromechanical Contractors in EgyptDailyBlog1
 
Company_IPP_Profile_Template
Company_IPP_Profile_TemplateCompany_IPP_Profile_Template
Company_IPP_Profile_TemplateAlan Simon
 
AGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefsAGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefsAGE Technologies
 
Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Jailton Rodrigues
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015???? ?????
 

Similar to MATERIALS HANDLING Eskom Coal Stacker Control Upgrade (20)

Special AKOTRACE® Electrical Heat Tracing Solution for Gemasolar Solar Power...
Special AKOTRACE®  Electrical Heat Tracing Solution for Gemasolar Solar Power...Special AKOTRACE®  Electrical Heat Tracing Solution for Gemasolar Solar Power...
Special AKOTRACE® Electrical Heat Tracing Solution for Gemasolar Solar Power...
 
Kendal Power Station
Kendal Power StationKendal Power Station
Kendal Power Station
 
Kendal power station
Kendal power station Kendal power station
Kendal power station
 
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
 
Electromechanical Contractors in Egypt
Electromechanical Contractors in EgyptElectromechanical Contractors in Egypt
Electromechanical Contractors in Egypt
 
Company_IPP_Profile_Template
Company_IPP_Profile_TemplateCompany_IPP_Profile_Template
Company_IPP_Profile_Template
 
AGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefsAGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefs
 
Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
Arcelor Mittal
Arcelor Mittal Arcelor Mittal
Arcelor Mittal
 
Ww cv 2016
Ww cv 2016Ww cv 2016
Ww cv 2016
 
Ww CV 2016
Ww CV 2016Ww CV 2016
Ww CV 2016
 
osama dwedar ..
osama dwedar ..osama dwedar ..
osama dwedar ..
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
Moore Subsea Dossier
Moore   Subsea DossierMoore   Subsea Dossier
Moore Subsea Dossier
 
Micks CV_10_07_16
Micks CV_10_07_16Micks CV_10_07_16
Micks CV_10_07_16
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
Akram CV- Updated
Akram CV- UpdatedAkram CV- Updated
Akram CV- Updated
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Izgen Engineering Ltd
Izgen Engineering LtdIzgen Engineering Ltd
Izgen Engineering Ltd
 

More from Site Web

Electro Reflex Energizer
Electro Reflex Energizer Electro Reflex Energizer
Electro Reflex Energizer Site Web
 
Public testimonials
Public testimonialsPublic testimonials
Public testimonialsSite Web
 
E power Machine
E power MachineE power Machine
E power MachineSite Web
 
Water Treatment
Water TreatmentWater Treatment
Water TreatmentSite Web
 
Randgolds Lorraine Gold Mine
Randgolds Lorraine Gold MineRandgolds Lorraine Gold Mine
Randgolds Lorraine Gold MineSite Web
 
Pretoria Council Various Pumpstations
Pretoria Council Various PumpstationsPretoria Council Various Pumpstations
Pretoria Council Various PumpstationsSite Web
 

More from Site Web (7)

Electro Reflex Energizer
Electro Reflex Energizer Electro Reflex Energizer
Electro Reflex Energizer
 
Public testimonials
Public testimonialsPublic testimonials
Public testimonials
 
E power Machine
E power MachineE power Machine
E power Machine
 
Water Treatment
Water TreatmentWater Treatment
Water Treatment
 
Randgolds Lorraine Gold Mine
Randgolds Lorraine Gold MineRandgolds Lorraine Gold Mine
Randgolds Lorraine Gold Mine
 
Pretoria Council Various Pumpstations
Pretoria Council Various PumpstationsPretoria Council Various Pumpstations
Pretoria Council Various Pumpstations
 
Pb Sishen
Pb SishenPb Sishen
Pb Sishen
 

MATERIALS HANDLING Eskom Coal Stacker Control Upgrade

  • 1. MATERIALS HANDLING Matimba Power Station Coal Stacker/ Reclaimer
  • 2. Coal Stacker continue... ESKOM had identified the need for the replacement of the coal stacker/reclaimer control system at their dry cooled power station near Ellisras in the Northern province. AEG's construction division were awarded the project to design, supply and install such a system to provide plant alarm status, monitoring and reporting. This was repeat business for AEG who also executed the station MV switchgear project and the overland Ash Handling conveyor systems. The project was carried out during the transition period from AEG to AGE Engineering and was completed ahead of the prescribed contract period. The 12-month contract, which comprised 64 man-months effort, included the full project management, PLC engineering using a Modicon 'A' series PLC, full equipment supply, installation and commissioning. A significant feature of this project was the design, by one of AGE's engineers, of unique connection terminals - housed in the PLC cabinet - which comprised full lightning protection on all inputs and outputs. This type of terminal has now become a standard in the electrical industry AGE Technologies contact us: 011 869 3925 www.age.co.za