SlideShare a Scribd company logo
1 of 2
WATER TREATMENT Pretoria City Council  Various Pumpstations  
WATER TREATMENT In one of the longest ongoing contracts on AGE Engineering's order book, their contract to provide automation packages to Pretoria City Council pump-stations must rate as their longest. Started in mid 1995 - whilst still operating as AEG Construction - their brief was to supply an automation system to 5 pumpstations within the greater Pretoria metropole.  The first one completed was at the Fountains station, followed by Garsfontein, Elardus Park, Klapperkop and finally Mooikloof over a period of four-and-a-half years. The project was run out of Pretoria's department of water environment and executed as five separate contracts.  AGE's brief was to provide the project management, PLC Engineering using Modicon Compact and Micro PLC's, the equipment supply, installation and commissioning. What started out as first-time business for AGE developed into a long-term relationship and resulted in repeat business. AGE Technologies   Contact us   011 869 3925   www.age.co.za

More Related Content

Similar to Pretoria Council Various Pumpstations

Saran Entec Corporate Presentation 2015 Eng
Saran Entec Corporate Presentation 2015 EngSaran Entec Corporate Presentation 2015 Eng
Saran Entec Corporate Presentation 2015 Eng
Kyriakos Agiannidis
 
IPA_2010-2013_WORKING_PROFILED
IPA_2010-2013_WORKING_PROFILEDIPA_2010-2013_WORKING_PROFILED
IPA_2010-2013_WORKING_PROFILED
Nattaphoom Tewarun
 
Corporate-Profile
Corporate-ProfileCorporate-Profile
Corporate-Profile
Qusay Nader
 
Hennie - Experience and Training Summary 2016
Hennie - Experience and Training Summary 2016Hennie - Experience and Training Summary 2016
Hennie - Experience and Training Summary 2016
Hennie Grobler
 
Ayub M. Mundu CV-December 2015
Ayub M. Mundu CV-December 2015Ayub M. Mundu CV-December 2015
Ayub M. Mundu CV-December 2015
ayub mundu
 
Resume of Meramat Anak Tajak
Resume of Meramat Anak TajakResume of Meramat Anak Tajak
Resume of Meramat Anak Tajak
meramat tajak
 

Similar to Pretoria Council Various Pumpstations (20)

Saran Entec Corporate Presentation 2015 Eng
Saran Entec Corporate Presentation 2015 EngSaran Entec Corporate Presentation 2015 Eng
Saran Entec Corporate Presentation 2015 Eng
 
KAELOK PTY LTD
KAELOK PTY LTDKAELOK PTY LTD
KAELOK PTY LTD
 
Triangle Group
Triangle GroupTriangle Group
Triangle Group
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2
 
Michael said CV
Michael said CVMichael said CV
Michael said CV
 
IPA_2010-2013_WORKING_PROFILED
IPA_2010-2013_WORKING_PROFILEDIPA_2010-2013_WORKING_PROFILED
IPA_2010-2013_WORKING_PROFILED
 
Corporate-Profile
Corporate-ProfileCorporate-Profile
Corporate-Profile
 
Covering letter
Covering letterCovering letter
Covering letter
 
Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cv
 
Ppp projects-in-malaysia
Ppp projects-in-malaysiaPpp projects-in-malaysia
Ppp projects-in-malaysia
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1
 
Geraldine_Goh-CV
Geraldine_Goh-CVGeraldine_Goh-CV
Geraldine_Goh-CV
 
CV
CVCV
CV
 
Hennie - Experience and Training Summary 2016
Hennie - Experience and Training Summary 2016Hennie - Experience and Training Summary 2016
Hennie - Experience and Training Summary 2016
 
Ayub M. Mundu CV-December 2015
Ayub M. Mundu CV-December 2015Ayub M. Mundu CV-December 2015
Ayub M. Mundu CV-December 2015
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
Romelectro_presentation 2017
Romelectro_presentation 2017Romelectro_presentation 2017
Romelectro_presentation 2017
 
Resume of Meramat Anak Tajak
Resume of Meramat Anak TajakResume of Meramat Anak Tajak
Resume of Meramat Anak Tajak
 
LNG Cap - Jan 2016
LNG Cap - Jan 2016LNG Cap - Jan 2016
LNG Cap - Jan 2016
 

More from Site Web

Electro Reflex Energizer
Electro Reflex Energizer Electro Reflex Energizer
Electro Reflex Energizer
Site Web
 
Public testimonials
Public testimonialsPublic testimonials
Public testimonials
Site Web
 
E power Machine
E power MachineE power Machine
E power Machine
Site Web
 
Water Treatment
Water TreatmentWater Treatment
Water Treatment
Site Web
 
Randgolds Lorraine Gold Mine
Randgolds Lorraine Gold MineRandgolds Lorraine Gold Mine
Randgolds Lorraine Gold Mine
Site Web
 
Tutuka Power Station
Tutuka Power StationTutuka Power Station
Tutuka Power Station
Site Web
 

More from Site Web (7)

Electro Reflex Energizer
Electro Reflex Energizer Electro Reflex Energizer
Electro Reflex Energizer
 
Public testimonials
Public testimonialsPublic testimonials
Public testimonials
 
E power Machine
E power MachineE power Machine
E power Machine
 
Water Treatment
Water TreatmentWater Treatment
Water Treatment
 
Randgolds Lorraine Gold Mine
Randgolds Lorraine Gold MineRandgolds Lorraine Gold Mine
Randgolds Lorraine Gold Mine
 
Tutuka Power Station
Tutuka Power StationTutuka Power Station
Tutuka Power Station
 
Pb Sishen
Pb SishenPb Sishen
Pb Sishen
 

Pretoria Council Various Pumpstations

  • 1. WATER TREATMENT Pretoria City Council Various Pumpstations  
  • 2. WATER TREATMENT In one of the longest ongoing contracts on AGE Engineering's order book, their contract to provide automation packages to Pretoria City Council pump-stations must rate as their longest. Started in mid 1995 - whilst still operating as AEG Construction - their brief was to supply an automation system to 5 pumpstations within the greater Pretoria metropole. The first one completed was at the Fountains station, followed by Garsfontein, Elardus Park, Klapperkop and finally Mooikloof over a period of four-and-a-half years. The project was run out of Pretoria's department of water environment and executed as five separate contracts. AGE's brief was to provide the project management, PLC Engineering using Modicon Compact and Micro PLC's, the equipment supply, installation and commissioning. What started out as first-time business for AGE developed into a long-term relationship and resulted in repeat business. AGE Technologies Contact us 011 869 3925 www.age.co.za