Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Data-Driven Operational Improvements
1. 0
5
10
15
20
25
Efficiency & NPT
Graphs Posted
Data Driven Pre-
shift Meetings
Blender Reliability
Focus Established
Industry Math
Stand-up
Speak-up
Post Well
Reviews
Maintenance
Program
Improvement
ABC’s of
Behavior
Supervisor
Swap-out
Small Works
Teams
Accelerating & Sustaining
Operational Excellence
NPT Focus
Established
ROI
NUMBERS
INTANGIBLES
UNEXPECTED
Safety
Tracker
Trust Tools Traction Our 3-phase approach
19% NPT
Reduction
= $63 million
annualized win!
Teamwork. Pride.
Transformed from
lowest to highest
revenue fleet.
Most-improved
safety record in
the district
Client’s highlights
Significant Coaching Events
NPT as % of Total Time
Client: North American Energy Services
2. 0
200
400
600
800
1000
1200
1400
1600
Reliability
Measure Posted
& Communicated
Change over
communication
Standardized &
Documented
T-Valve
Innovation
Blender
Maintenance
Sheets
Small Work
Teams
Stand up
Accountability
Established Blender
Reliability Focus
• 96% Reduction in Blender Down Time Annualized = $10,000,000 win!
• Safety hazard minimized thorugh T-Valve innovation
• Improved job quality and client customer relations
Blender Down Time in Minutes
Equipment
readiness plan
Industry Math
TRUST TRACTIONTOOLS
3. 0
200
400
600
800
1000
1200
1400
1600
Dec Jan Feb March April
Reliability Measure
Posted &
Change over
communication
Standardized &
Documented
T-Valve
Innovation
Blender
Maintenance
Small Work
Teams
Equipment
readiness plan
Established
Blender Reliability
• 96% Reduction in Blender Down Time Annualized = $10,000,000 win!
• Safety hazard minimized thorugh T-Valve innovation
• Improved job quality and client customer relations
Blender Down Time in Minutes
4.
5. 50
55
60
65
70
75
80
85
90
95
100
Pumping Efficiency
TRACTIONTOOLS
• Increased Pumping Efficiency 25% = $36 million annualized win!
• Decreased labor costs 28% with 0 impact to service quality
• Achieved best safety record in district > 320 days incident free
Industry
MathProcess
Improvement Work
Teams
Million Dollar
Road Map
Intro to
active
supervision
Established
PE Focus
Pre-job
planning
measure twice,
cut once!Big ticket million
dollar ideas
researched/tested
& rolled out across
all fleets
High impact low
cost opportunities
identified &
executed
Managers become
leaders by modeling
the right behaviors &
developing their
people
Young operators
with something to
prove set
ambitious goals
TRUST
$900,000 in missed revenue in December *1500 minutes X $600 per min*
$42,000 in missed revenue in April *70 minutes X $600 per min*
$858,000 Monthly Savings X 12 months = $10,296,000
At the hydration/blender connect there was usually a mess to clean up while swapping lines.
The guys came up with a t-valve to put there to help with the mess.
The valve was tested and proven not only to reduce the mess, but also created an efficient way to control/change flow as needed
New T-valve minimized NPT, doesn’t take 2 operators to swap out lines frees up man power etc.
Increased average Pumping Efficiency of 25% *Potential increased capacity of 26 stages/month equal to $36 million per year!
August 2014 107 stages completed at average $116,000/stage 107 x 25% = 26 stages per month x 12 months = 312 stages per year
Best safety record of any WTX fleet at > 320 days incident free
C&J WTX August 2014-April 2015
Young fleet, no supervisor or manager older than 30!
Told they were the best of the best and expectations were high
Million Dollar idea: Switching fluid end lube system from red grease to rock oil = less packing blown & millions in savings
When they realized safety was tied to performance it was pushed to the forefront and helped them achieve best record in the district
This data comes from the last WTX Business Review with Ron 2013