DEFINE DELIVERABLES
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Pre DMAIC Analysis
Project Charter
Terms & Acronyms Used
ARMI/RASIC
Process Map (Flow Chart)
SIPOC/COPIS
PROJECT MAPPING
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Customer Sample Comments
Key Output Characteristics
Important to Business
VP Operations & Quality Assurance
Need to initiate the project on service quality as from last 6
months i.e. Aug-17 to Jan’18 we are unable to meet the desired
target of 90%. The objective is to increase the internal quality
score without compromise on the process productivity.
Service Quality
Client Satisfaction
R&P
Customer Relationship Manager
From last 3 months the average quality scores are stagnant at
87%, Need to work with all the team members and understand
where is the gap so that the new target 90%(monthly) can be
achieved and sustained.
Quality Target
Customer Service
Customer Experience Management
Manager (OPS)
Urgent attention required on quality as we have not been able to
achieve the target 90% from last 6 months despite the incentive
program rolled out for quality.
Weekly Quality Scores
Monthly incentives on quality
Number of agents meeting the target
Productivity
Dec-17toFeb-18QualitySummary
0.980.840.700.560.420.280.140.00
Median
Mean
0.8900.8850.8800.8750.870
1st Q uartile 0.85420
Median 0.88540
3rd Q uartile 0.91670
Maximum 1.00000
0.86917 0.87706
0.88540 0.89000
0.10866 0.11424
A -Squared 352.84
P-V alue < 0.005
Mean 0.87311
StDev 0.11138
V ariance 0.01241
Skewness -6.2990
Kurtosis 46.5711
N 3064
Minimum 0.00000
A nderson-Darling Normality Test
95% C onfidence Interv al for Mean
95% C onfidence Interv al for Median
95% C onfidence Interv al for StDev
95% Confidence Intervals
Summary for AQS
3 MONTHS DATA GRAPHICAL SUMMARY
1.41.21.00.80.60.40.20.0
99.99
99
95
80
50
20
5
1
0.01
AQS
Percent
Mean 0.8731
StDev 0.1114
N 3064
AD 352.844
P-Value <0.005
Probability Plot of AQS
Normal - 95% CI
• Since, P-Value is less than 0.05, hence data distribution is Non - Normal
• Since data is Normal so, central tendency should be taken as Median
PROJECT CHARTER
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Six Sigma Project Charter
Belt Name: Vijay Kumar Project Name: Quality improvement in PHD process
Division: PHD Process Champion (PO): Nitin Sachdeva
Start Date: 1-Feb
Master Black
Belt:
Nitin Sachdeva
End Date: Team Members: Syed Ali
Gaurav Kumar
Vinay Sharma
Shivangi Tripathi
Kannu Bhardwaj
Problem Statement: Objective & Scope
Internal call quality, an important
performance metric at Pizza Hut contact
centre operations in inTarvo Technologies
Pvt. Ltd, was dipping from 87.9% to 86.7%
during Dec-17 to Feb-18. Analyzing the data
from last three months the average quality
was observed to be 86% which is 4% less
than the desired target of 90%.
The objective of the project is to improve the quality stats through
the identification of the variables that influence the quality. The
goal of the project is to sustain an incremental improvement in
quality so as to reach to desired target of 90%, gain reward on its
billing and enable maximum of its operational employees to
achieve incentives. The scope of the project is centralized order
taking centre at inTarvo Technologies Pvt Ltd connected by a call
centre number 011-39883988.
Primary Metric: Internal Quality Secondary Metrics: Average Call Handling Time
Consequences
Metrics:
PROJECT CHARTER: Primary & Secondary Metric
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
90% 90% 90%
88%
87%
87%
85%
86%
87%
88%
89%
90%
91%
Dec-17 Jan-18 Feb-18
AvgQTYscores
Primary Metric
Target
Actual
165 165 165
179 178
179
150
155
160
165
170
175
180
185
190
195
Dec-17 Jan-18 Feb-18
AverageCallHandlingTime
Secondary Metric
Target
Actual
TERMS & ACRONYMS USED
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Indicators Definition
AQS Average Quality Score
QA Quality Analyst
IVR Interactive Voice Response
FCR First Call Resolution
SL Service Level
AHT Average Handling Time
QTY Quality
STAKEHOLDER ANALYSIS: ARMI
When Populating the Stakeholder, consider the ARMI:
• A= Approver of team decisions
• R= Resource or subject matter expert (ad hoc)
• M= Member of team
• I= Interested parties who are to be informed
Key Stakeholders Define Measure Analyze Improve Control
VP Operations & Quality Assurance - Intarvo
CRM Head – DIL
GM - Ops & Quality
Project Mentor - IMT
Customer Relationship Manager – DIL
Operations Manager
Quality Manager I/R I/R I/R I/R I/R
Team Members M M M M M
I/A I/A I/A I/A I/A
I/A I/A I/A I/A I/A
I/A I/A I/A I/A I/A
I I I I I
I/A I/A I/A I/A I/A
I I I I I
RASIC
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
• Responsible (R) : Solely and directly responsible for the activity (Owner) - Includes approving authority (A)
• Approve (A) : Reviews and assures that the activity is being done as per expectations
• Support (S) : Provides the necessary help and support in the project
• Inform (I) : Is to be kept informed of the status/progress being made
• Consult (C) : Is to be consulted for this activity for inputs
RASIC Chart for Define & Measure
Activities
VP
Opera
tions
&
Qualit
y
Assur
ance-
Intarv
oCRM
Head-
DIL
Projec
t
Ment
or-
IMTCusto
mer
Relati
onshi
p
Mana
ger-
DIL
Opera
tions
Mana
ger
Qualit
y
Mana
ger
Team
Memb
ers
Memb
ers
(Assoc
iates)
Pre- DMAIC
Collection of VOB from all stakeholders I I I I/A S/C/R R - -
Data Collection for last 3 months I I I I/C R/S R S -
Analysis of data I I I C I R S -
Report out on the Pre DMAIC Analysis I I I I/C I/C R - -
DEFINE
Project Charter Creation I I A I/S/C I R - -
Charter Approval from Executives/Project Guide A I A S/R - - - -
Build SIPOC I I I I I R S -
Build Process Map - - - S/C S/C R - -
MEASURE
Build the data collection plan I I I S/C S R - -
Get the DCP Approval - - C A - R - -
Approve DCP I I A - - R - -
Collect Data - - I/C I S R - -
Validate data - - C S/C S R - -
Publish next steps to stakeholder I I I I I R - -
PROCESS MAP
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
PROCESS MAP CONTINUE..
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
THE SIPOC PROCESS MAP
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Suppliers Inputs Process Output Customer Requirements
• Phones
• Office depot
• System
• CRM
• Customer
• Store
• Accounting
team
• Complete call <
3mins
• Correct address
• Correct price
• Accuracy of
punching
• Customer’s query
• Customer details
• Address
• Name
• Time, date
• Volume
• CRM navigation
• Training, Coaching &
feedback
• Shifts
• Hold
Call received
by CC
Associate
Customer’s
concern
identified
Customer details
verified in CRM
Information
provided to
customer
Call is
documented in
CRM
Call closed by cc
Associate
Quality Audit
done next
day/same day
• Call completion
• Case tagged
• Data on cycle
time
• Process metrics
data saved
MEASURE DELIVERABLES
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Data Collection Plan
Measurement System Analysis
Process Capability
DATA COLLECTION PLAN
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Y
Operational
Definition
Defect Definition
Required Performance
Standard
Specification Limit Opportunity
Improvement in internal Call
Quality
Points Achieved/Points
Available
<85% 90%
USL- NA
LSL- 85%
Weekly
Y Data Type Unit of Measurement Decimal Places
Database
Container
Existing/New
Database
If new, when
would the
database be
ready
Planned Start
date for Data
Collection
Improvement in internal
Call Quality
Discrete % Yes Excel Existing NA 15h
Apr
Data Items
Needed
Formula to be
Used
Equipment Used for
Measurement
Equipment
Calibration Info
Responsibility Training Need
Operator
Information
Quality data for last 3
months
Points
Achieved/Points
Available
Audit Legend Quality Lead NA Quality Team
MODE OF COLLECTING DATA
MSA: MEASUREMENT SYSTEM ANALYSIS
VinaySyedShivangi
95
90
85
80
75
70
Appraiser
Percent
95.0% C I
Percent
VinaySyedShivangi
95
90
85
80
75
70
Appraiser
Percent
95.0% C I
Percent
Date of study: 20-March-2018
Reported by: Vijay Kumar
Name of product:
Misc:
Assessment Agreement
Within Appraisers Appraiser vs Standard
ATTRIBUTE AGREEMENT ANALYSIS
• The sample of 60 units has been evaluated by 3 different evaluators and the audit variance
of 3 appraisers is ranging between 85% to 87%
• The appraiser vs standard agreement has also been observed between 80% to
81%
• Above results are enough to conclude that the evaluation scores are accurate and
precise, however appraisers need some calibration with master calibrator
MSA: MEASUREMENT SYSTEM ANALYSIS
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Process Sigma Level Calculator - Discrete Data
Sample Data (user inputs):
Number of units n 3,064
Total number of defects observed d 1,889
Number of defect opportunities per unit o 1
Sigma Shift (typically +1.5 for long term data) 1.5
Results:
Defects per Unit dpu 0.61651436
Defects per Million Opportunities dpmo 616,514.4
Defects per Opportunity dpo% 61.65%
Yield yield% 38.35%
Process Sigma Level sigma 1.204
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
CAUSE & EFFECT DIAGRAM
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Hypothesis Testing – Overall Summary
Key Input Variables Input Type Data Collection possible Data Type - X Data Type - Y Data Normality (Y) Test Used Outcome
Call Type N Yes Discrete Continuous No Kruskal-Wallis test Reject Null Hypothesis
Duration P Yes Continuous Continuous No Spearman Correlation Reject Null Hypothesis
Trainers C Yes Discrete Continuous Yes ANOVA Fail to reject the null hypothesis
Feedback Delivery C Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis
Team leader wise QTY scores C Yes Discrete Continuous No Kruskal-Wallis test Reject Null Hypothesis
Shift Stretch/Overtime P Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis
FCR C Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis
Gender C Yes Discrete Continuous Yes Two Sample t-test Reject Null Hypothesis
Peak non peak N Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis
Age C Yes Continuous Continuous Yes Pearson Correlation Reject Null Hypothesis
Different Shift C Yes Discrete Continuous No Kruskal-Wallis test Reject Null Hypothesis
Part time/full time C Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis
Associate's Tenurity P Yes Continuous Continuous Yes Pearson Correlation Reject Null Hypothesis
Experienced vs Fresher Associate C Yes Discrete Continuous Yes Two Sample t-test Reject Null Hypothesis
High hold usage/avg hold C Yes Continuous Continuous Yes Pearson Correlation Fail to reject the null hypothesis
Day Hours N Yes Discrete Continuous No Kruskal-Wallis test Reject Null Hypothesis
Week Day N Yes Discrete Continuous No Kruskal-Wallis test Reject Null Hypothesis
Education background C Yes Discrete Continuous Yes Two Sample t-test Reject Null Hypothesis
Hiring Source C Yes Discrete Continuous Yes ANOVA Reject Null Hypothesis
Rushing on call C Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis
Training, feedback & coaching C Yes Continuous Continuous Yes Pearson Correlation Fail to reject the null hypothesis
Call Length C Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis
Attrition C Yes Discrete Continuous Yes Two Sample t-test Fail to reject the null hypothesis
Pressure of Other Metrics N Yes Continuous Continuous No Pearson Correlation Fail to reject the null hypothesis
Top Call Drivers C Yes Discrete Discrete No Pareto Analysis NA
Tagging % N No Discrete Discrete NA NA NA
Technical issues N No Discrete Continuous NA NA NA
Process Complexity N No Discrete Continuous NA NA NA
Floor Environment C No Discrete Continuous NA NA NA
Training Material N No Discrete Continuous NA NA NA
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Paramatric Testing – Data Normality
Shapiro-Wilk normality test data:
Agentwise_data_Monthly$QTY_Score W =
0.98135, p-value = 0.07097
Anderson-Darling normality test data:
Agentwise_data_Monthly$QTY_Score A =
0.48113, p-value = 0.2284
Null Hypothesis: The agent wise quality score follows a normal
distribution
Alternate Hypothesis: The agent wise quality score does not follow a
normal distribution
Result: As the p-value in both the test (Shapiro-Wilk normality test &
Anderson-Darling normality test) is greater than 0.05, we fail to reject
the null hypothesis of data follows a normal distribution.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
2 Sample T-Test – Gender wise QTY scores
Null Hypothesis: Average quality score are equal in male & female
both categories
Alternate Hypothesis: Average quality score for females is higher
than that of males
Result: As the p-value for t-test is less than 0.05, we reject the null
hypothesis of mean quality scores are equal and conclude at 95%
confidence level that we have enough evidence of assuming that
mean quality scores of female employees are higher than the male
employees.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
2 Sample T-Test – Experience wise QTY scores
Null Hypothesis: Average quality score for fresher & experienced
employees are equal
Alternate Hypothesis: Average quality score of experienced employees
is higher than that of fresher employees
Test result: As the p-value for t-test is less than 0.05, we reject the null
hypothesis of mean quality scores are equal and conclude at 95%
confidence level that we have enough evidence of assuming that mean
quality scores of experienced employees are higher than the fresher
employees.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
2 Sample T-Test – Attrition
Null Hypothesis: Average quality scores are equal for attired and non
attired employees
Alternate Hypothesis: Average quality scores are not equal for attired
and non attired employees
Test result: As the p-value for t-test is greater than 0.05, we fail to
reject the null hypothesis of mean quality scores are equal and
conclude at 95% confidence level that we have enough evidence of
assuming that mean quality scores of both category of employees are
same.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
2 Sample T-Test – Educational Background
Null Hypothesis: Average quality scores are equal for graduate and
under graduate employees
Alternate Hypothesis: Average quality scores of graduate employees
are greater than of under graduate employee
Test result: As the p-value for t-test above is less than 0.05, we reject
the null hypothesis of mean quality scores are equal for both level of
education background and conclude at 95% confidence level that we
have enough evidence of assuming that mean quality scores of
graduate employees are greater than under graduate employees.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
ANOVA - Trainers
Null Hypothesis: There is no significant difference in trainer wise (3
trainers) average quality scores
Alternate Hypothesis: At least one trainer trained trainees’ quality
scores are different
Test result: As the p-value for t-test above is greater than 0.05, we fail to reject
the null hypothesis of trainer wise mean quality scores are equal and conclude
at 95% confidence level that we have enough evidence of assuming that mean
quality scores are same irrespective of the batch trained by any trainer.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Trainers – Residuals vs Fitted Plots
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
ANOVA - Hiring Source
Null Hypothesis: There is no significant difference in average
quality scores of employees hired from different sources
Alternate Hypothesis: At least one group of employees’ quality
scores are different
Test result: As the p-value for t-test above is less than 0.05, we reject the null hypothesis of mean quality scores are
equal for associates hired from different hiring sources and conclude at 95% confidence level that we have enough
evidence of assuming that mean quality scores of at least one hiring source employees is different.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Hiring Source Pairwise Probabilities Matrix
Pairwise
Probabilities
Campus
Drive
Job
Portal
Referral Walk in
Campus Drive 0.0000 0.0002 0.0058
Job Portal 0.1605 0.0039
Referral 0.2086
Walk in
As the P-Values in pairwise probabilities matrix for campus drive
are less than 0.05 against the other sources of hirings, we
concluded that scores are poor for employees those who have
been hired from campus drive. Similarly walk in.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Correlation Test – Hold and Feedback
Null Hypothesis: There is no correlation between
average quality scores and average hold time
Alternate Hypothesis: There is a correlation between
average quality scores and average hold time
data: Avg_Feedback_Break and QTY_Score
t = 1.0884, df = 128, p-value = 0.2785
alternative hypothesis: true correlation is not equal to 0
95 percent confidence interval:
-0.07770563 0.26360135
sample estimates:
cor
0.09576174
data: Avg_Hold_Time and QTY_Score
t = -1.3789, df = 128, p-value = 0.1703
alternative hypothesis: true correlation is not equal to 0
95 percent confidence interval:
-0.28718967 0.05228902
sample estimates:
cor
-0.1209864
Test result: As the p-value for t-test above is greater than 0.05, we fail to reject
the null hypothesis and conclude at 95% confidence level that we have enough
evidence of assuming that there is no correlation between average quality scores
and average hold time.
Test result: As the p-value for t-test above is greater than 0.05, we fail to reject
the null hypothesis and conclude at 95% confidence level that we have enough
evidence of assuming that There is no correlation between average quality scores
and average feedback breaks.
Null Hypothesis: There is no correlation between
average quality scores and average feedback breaks
Alternate Hypothesis: There is a correlation between
average quality scores and average feedback breaks
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Correlation Test – Age and Tenurity
Null Hypothesis: There is no correlation between average
quality scores and age of the associates
Alternate Hypothesis: There is a correlation between
average quality scores and age of the associates
Null Hypothesis: There is no correlation between average
quality scores and tenurity of the associates
Alternate Hypothesis: There is a correlation between
average quality scores and tenurity of the associates
Test result: As the p-value for t-test above is less than 0.05, we reject the null
hypothesis that there is correlation between quality scores and age of the
associates and conclude at 95% confidence level that we have evidence of
assuming that there is a moderate correlation between average quality scores
and age of the associates.
Test result: As the p-value for t-test above is less than 0.05, we reject the null
hypothesis that there is correlation between quality scores and tenurity of the
associates and conclude at 95% confidence level that we have enough evidence
of assuming that there is a correlation between average quality scores and
tenurity of the associates.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Linear Regression - Age
Null Hypothesis: There is no significant prediction of quality
scores through age of the associates
Alternate Hypothesis: There is a significant prediction of quality
scores through age of the associates
Result: Since the R sq value is 13%, associates age predict only
13% variation in quality scores. We can not consider the model
as R sq value is below 50% and conclude at 95% confidence
interval that there can not be a significant prediction of quality
scores through age of the associates.
RegressionModel:QTY_Score = (0.739839) + (0.005364)*Age
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Regression
Null Hypothesis: There is no significant prediction of quality
scores through tenurity of the associates
Alternate Hypothesis: There is a significant prediction of quality
scores through tenurity of the associates
Regression Model: QTY_Score = (0.822761) + (0.000262) * AssociatesTenurity
Result: Since the R sq value is 51%, associates tenurity predict
51% variation in quality scores. We can consider the model as R sq
value is above 50% and conclude at 95% confidence interval that
there can be a significant prediction of quality scores through
tenurity of the associates.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Regression
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Pareto Analysis – Top Call Drivers
1. As shown in above Pareto graph 80% of the defects on the calls are due to 20% of the parameters available
in quality sheet.
2. Majorly these defects are on soft skills parts only
3. No major process knowledge gap identified
Non-Parametric Testing
0.980.840.700.560.420.280.140.00
Median
Mean
0.8900.8850.8800.8750.870
1st Q uartile 0.85420
Median 0.88540
3rd Q uartile 0.91670
Maximum 1.00000
0.86917 0.87706
0.88540 0.89000
0.10866 0.11424
A -Squared 352.84
P-V alue < 0.005
Mean 0.87311
StDev 0.11138
V ariance 0.01241
Skewness -6.2990
Kurtosis 46.5711
N 3064
Minimum 0.00000
A nderson-Darling Normality Test
95% C onfidence Interv al for Mean
95% C onfidence Interv al for Median
95% C onfidence Interv al for StDev
95% Confidence Intervals
Summary for AQS
1.41.21.00.80.60.40.20.0
99.99
99
95
80
50
20
5
1
0.01
AQS
Percent
Mean 0.8731
StDev 0.1114
N 3064
AD 352.844
P-Value <0.005
Probability Plot of AQS
Normal - 95% CI
Null Hypothesis: The agent wise quality score follows a normal distribution
Alternate Hypothesis: The agent wise quality score does not follow a normal distribution
Result: As the p-value in both the test (Shapiro-Wilk normality test & Anderson-Darling
normality test) is negligible & less than 0.05, we reject the null hypothesis of data
follows a normal distribution and conclude with 95% confidence level the we have
enough evidence of assuming non normality of the data.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Kruskal-Wallis rank sum test – Team Leader wise QTY scores
Pairwise comparisons using Wilcoxon rank sum test
Null hypothesis: There is no difference in team leader wise quality
scores’ distributions
Alternate hypothesis: At least one team leader wise quality scores’
distribution is different
Result: reject the null hypothesis
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Wilcoxon rank sum test – PT/FT
Null hypothesis: Median of quality scores for part timers and full timers
are equal
Alternate hypothesis: Median of quality score of part timers is lesser
than that of full timers
Result: As the p-value is less than 0.05, we reject the null hypothesis
that median of quality scores for part timers and full timers are equal
and conclude with 95% confidence level that we have enough evidence
of assuming median of quality score of part timers is lesser than that of
full timers.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Kruskal-Wallis rank sum test – PT/FT
Null hypothesis: There is no difference in quality scores’ distributions of
different categories of calls
Alternate hypothesis: At least one category of calls has different quality
scores’ distribution
Result: As the p-value is negligible & less than 0.05, we reject the null
hypothesis of different categories call quality scores’ distributions are
indifferent and conclude with 95% confidence level that we have
enough evidence of assuming at least one call category quality scores’
distribution is different. As shown in box plot the QTY scores for
complaint category of calls are pretty poor
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Kruskal-Wallis rank sum test – Different Shifts
Null hypothesis: There is no difference in quality scores’
distributions of different shifts
Alternate hypothesis: At least one calls audited for one shift
has different quality scores’ distribution
Result: As the p-value for Kruskal-Wallis test is negligible & less
than 0.05, we reject the null hypothesis of call quality scores’
distributions in all shifts are indifferent and conclude with 95%
confidence level that we have enough evidence of assuming at
least one shifts’ quality score distribution is different. Distribution
of 19:30-23:30 shift quality scores is different than others.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Wilcoxon rank sum test – Peak vs Non-Peak
Null Hypothesis: Median of quality scores are equal in peak and non
peak hours
Alternate Hypothesis: Median of quality score in peak hours is lesser
than in non peak hours
Result: As the p-value is negligible & less than 0.05, we reject the null
hypothesis that median of quality scores are equal in peak and non
peak hours and conclude with 95% confidence level that we have
enough evidence of assuming peak hours quality scores are less than
non peak hours quality scores.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Wilcoxon rank sum test – Call Length
Null hypothesis: Median of quality score for long calls is less than or
equal of median of short calls
Alternate hypothesis: Median of quality score for short calls is greater
than of long calls
Result: As the p-value is 1, we fail to reject the null hypothesis that
Median of quality score for long calls is less than or equal of median of
short calls and conclude with 95% confidence level that we have
enough evidence of assuming that long calls quality scores are less than
short calls.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
Wilcoxon rank sum test – Overtime
Null Hypothesis: Median of quality scores in overtime hours is less than
or equal to non-overtime hours
Alternate Hypothesis: Median of quality scores in overtime hours is
greater than to non-overtime hours
Result: As the p-value is 1, we fail to reject the null hypothesis that
Median of quality score for overtime hours is less than or equal of
median of non-overtime hours and conclude with 95% confidence level
that we have enough evidence of assuming that overtime hours quality
scores are less than non-overtime hours quality scores.
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
1. Quality scores of part timers are lesser than that of full timers and they are contributing more on lower side of quality
scores
2. Complaint category quality scores are extremely poor and demands immediate attention
3. As mentioned in point no 2 part timer who majorly come in 19:30-23:30 shift are impacting the quality scores severely
4. Quality scores improves for next call if feedback is given for previous call within 24 hours of call audit
5. Peak hours which are generally observed between 06:00 PM to 10:30 PM are having greater impact on lesser side of
quality scores
6. During the peak hours 08-09 PM & 09-10 PM are the major hit area and an strategy must be formulated for these hours
7. Wednesday quality scores distribution is different than others.
8. Associates are unable to score good on long calls and these calls are accounting for lower quality scores
9. Associate are not active, energetic or serious during their overtime hours and scoring poor in quality scores during
overtime hours
10. FCR calls quality score are higher than non FCR, which clearly shares a message that if the query of a customer is not
resolved in first go it becomes an unpleasant experience for guest and tough for agents to handle such calls
11. TL Sidhartha Kapoor’s team has been scoring poor in quality scores
12. Quality scores of female employees are higher than the male employees
13. Quality scores of experienced employees are higher than the fresher employees
14. 80% of the call defects are due to lack of the soft skills of associates
15. Quality scores of graduate employees are greater than under graduate employees
16. Associate tenurity can be modeled to predict the quality scores, higher the tenurity, higher the quality scores
CONCLUSIONS
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
1. Employees who are having experience from same
industry are scoring good in terms of quality
1. Refresher training for fresher employees every week
2. Fresher Employees are scoring poor quality scores 2. Stretching training days for fresher employees
3. Fresher Employees are adding more fatals to the
calls
3. Conducting briefings on top call drivers
4. Sharing feedback on aily basis so that the employees can work
on defaulting areas
1.Female employees are scoring good quality scores 1. Conducting refresher training for male associates
2. Male employees are scoring poor quality scores
2. One-o-one session with the employess so that they can be
motivated toward their work
3. Call listening sessions on floor so that best practice can be
followed across.
1. Quality Scores vary team leader wise
2. Atleast one team leader has low quality scores
CallType
1. Poor quality scores in complaint calls
1. Team Leaders will share feedback on real time basis
2. Daily pre/post briefings will be conducted by Team leaders
2. Hiring less number of part timers
1.Agents would be coming to office 15 mins prior to their shifts starts time so that they can be given briefing on the basis of Day-1's
observations
2. Refreshers and complaint handling session to be conducted for defaulter
1. Part timers are having low quality scores in
comparison to full timers
PT/FT
1. It is observed that part timers attend less number of refresher and other sessions so the number of sessions to be increased
Gender
ExperiencedEmployeesvs
FresherEmployees
1.More no. of female employees to be employed
1. Hiring Experienced candidates so that the good quality can
be ensured
Defaulting Areas Factors Corrective Preventive
TeamLeaders
RECOMMENDATION
D
Define
M
Measure
A
Analyse
I
Improve
C
Control
1. Short calls are having good quality scores
2. Long calls are having poor quality scores
Overtime
1. Employees who are doing overtime are having poor
quality scores
HiringSource
1. Associate hired from campus drive are scoring poor
in quality
1. Associates who are scoring poor consistently are to be
indentified and must be issued a perforance improvement plan
1. More number of employees are to be hired from Job portal
and employee referral.
Tenurity
1. As the agent is tenured in he system his QTY scores
improves
1. Management to work on 0-90 days tenurity bucket in term of attrition
WeekDay
1. Wednesday having special offers which increases
the demand and stores lack on scalability which turns
customers unhappy and contribute in lower quality
scores
1. To push client to align more resources to store
2. To align 100% manpower at call centre
Call
Length
1. Team of knowledge holders will be prepared for handling calls efficiently
2. Arranging call back for the customers
1. Effcetive manpower/batch palnning to be done
DifferentShifts
1. Associates in shift 19:30-22:30 are scoring poor
quality score
1. Refresher training for employees
2. Conducting call play sessions for the associates
3. Conducting pre shift briefings to motivate the employees
Defaulting Areas Factors Corrective Preventive
RECOMMENDATION
Six sigma project_-_Call Centre Quality improvement

More Related Content

What's hot

Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project CaponeraAnnalisa Caponera
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with examplebhanutomar
 
RMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 FinalRMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 FinalMichael Camp
 
Six Sigma and Its Implementation
Six Sigma and Its ImplementationSix Sigma and Its Implementation
Six Sigma and Its ImplementationAnsar Lawi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt ProjectAndrey Lygin
 
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...GoLeanSixSigma.com
 
Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Simon Misiewicz
 
Six Sigma Green Belt
Six Sigma Green BeltSix Sigma Green Belt
Six Sigma Green BeltRaju N
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awarenesssawate
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingAnkit Sharma
 
Lean Six Sigma Yellow Belt.pptx
Lean Six Sigma Yellow Belt.pptxLean Six Sigma Yellow Belt.pptx
Lean Six Sigma Yellow Belt.pptxMohammad Amr
 
Goal Examples for Support Teams
Goal Examples for Support TeamsGoal Examples for Support Teams
Goal Examples for Support TeamsBetterWorks
 

What's hot (20)

Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project Caponera
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
RMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 FinalRMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 Final
 
Six Sigma and Its Implementation
Six Sigma and Its ImplementationSix Sigma and Its Implementation
Six Sigma and Its Implementation
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt Project
 
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Training for quality
Training for qualityTraining for quality
Training for quality
 
for quality month 2014
for quality month 2014for quality month 2014
for quality month 2014
 
Six sigma-black-belt-project-sample
Six sigma-black-belt-project-sampleSix sigma-black-belt-project-sample
Six sigma-black-belt-project-sample
 
Layered process audit
Layered process audit Layered process audit
Layered process audit
 
Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase
 
Six Sigma Green Belt
Six Sigma Green BeltSix Sigma Green Belt
Six Sigma Green Belt
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awareness
 
Yellow Belt Training
Yellow Belt TrainingYellow Belt Training
Yellow Belt Training
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete training
 
Lean Six Sigma Yellow Belt.pptx
Lean Six Sigma Yellow Belt.pptxLean Six Sigma Yellow Belt.pptx
Lean Six Sigma Yellow Belt.pptx
 
Goal Examples for Support Teams
Goal Examples for Support TeamsGoal Examples for Support Teams
Goal Examples for Support Teams
 
Dmaic
DmaicDmaic
Dmaic
 

Similar to Six sigma project_-_Call Centre Quality improvement

Project attrition
Project attritionProject attrition
Project attritiondigvijayra
 
Resume_pawan kanyu
Resume_pawan kanyuResume_pawan kanyu
Resume_pawan kanyuPawan Kanyu
 
Overview Six sigma by D&H Engineers
Overview Six sigma by D&H EngineersOverview Six sigma by D&H Engineers
Overview Six sigma by D&H EngineersD&H Engineers
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentationvivekissar
 
Quality management and quality planning
Quality management and quality planningQuality management and quality planning
Quality management and quality planningAmartya Talukdar
 
Importan refrence of quality
Importan refrence of qualityImportan refrence of quality
Importan refrence of qualityali8055
 
Lean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptxLean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptxDebashishDolon
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleDheerendra S Negi
 
Santosh Updated
Santosh UpdatedSantosh Updated
Santosh UpdatedSantosh R
 
Six Sigma Quality and IT Governance
Six Sigma Quality and IT GovernanceSix Sigma Quality and IT Governance
Six Sigma Quality and IT Governancelmgangi
 
Surjit's Resume - Manager Customer Experience & Process Excellence
Surjit's Resume - Manager Customer Experience & Process ExcellenceSurjit's Resume - Manager Customer Experience & Process Excellence
Surjit's Resume - Manager Customer Experience & Process ExcellenceSurjit Saggu
 
Failure Modes FMEA-&-Measurement_Systems_Analysis.ppt
Failure Modes FMEA-&-Measurement_Systems_Analysis.pptFailure Modes FMEA-&-Measurement_Systems_Analysis.ppt
Failure Modes FMEA-&-Measurement_Systems_Analysis.pptMadan Karki
 

Similar to Six sigma project_-_Call Centre Quality improvement (20)

Project attrition
Project attritionProject attrition
Project attrition
 
Resume_pawan kanyu
Resume_pawan kanyuResume_pawan kanyu
Resume_pawan kanyu
 
Prabhat Chauhan -CV
Prabhat Chauhan -CVPrabhat Chauhan -CV
Prabhat Chauhan -CV
 
CV_BIJU.A
CV_BIJU.ACV_BIJU.A
CV_BIJU.A
 
Overview Six sigma by D&H Engineers
Overview Six sigma by D&H EngineersOverview Six sigma by D&H Engineers
Overview Six sigma by D&H Engineers
 
Six sigma define - v1.0
Six sigma   define - v1.0Six sigma   define - v1.0
Six sigma define - v1.0
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
Quality management and quality planning
Quality management and quality planningQuality management and quality planning
Quality management and quality planning
 
Importan refrence of quality
Importan refrence of qualityImportan refrence of quality
Importan refrence of quality
 
Lean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptxLean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptx
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sample
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
Six sigma
Six sigma Six sigma
Six sigma
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Santosh Updated
Santosh UpdatedSantosh Updated
Santosh Updated
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six Sigma Quality and IT Governance
Six Sigma Quality and IT GovernanceSix Sigma Quality and IT Governance
Six Sigma Quality and IT Governance
 
Surjit's Resume - Manager Customer Experience & Process Excellence
Surjit's Resume - Manager Customer Experience & Process ExcellenceSurjit's Resume - Manager Customer Experience & Process Excellence
Surjit's Resume - Manager Customer Experience & Process Excellence
 
Djana Kazic
Djana KazicDjana Kazic
Djana Kazic
 
Failure Modes FMEA-&-Measurement_Systems_Analysis.ppt
Failure Modes FMEA-&-Measurement_Systems_Analysis.pptFailure Modes FMEA-&-Measurement_Systems_Analysis.ppt
Failure Modes FMEA-&-Measurement_Systems_Analysis.ppt
 

Recently uploaded

Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptx
Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptxAmazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptx
Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptxAbdelrhman abooda
 
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Book
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Bookvip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Book
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Bookmanojkuma9823
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxStephen266013
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfgstagge
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...dajasot375
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改yuu sss
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptSonatrach
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdfHuman37
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts ServiceSapana Sha
 
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样vhwb25kk
 
ASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel CanterASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel Cantervoginip
 
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝DelhiRS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhijennyeacort
 
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理e4aez8ss
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Jack DiGiovanna
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfSocial Samosa
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort servicejennyeacort
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceSapana Sha
 
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls DubaiDubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls Dubaihf8803863
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998YohFuh
 

Recently uploaded (20)

Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptx
Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptxAmazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptx
Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptx
 
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Book
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Bookvip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Book
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Book
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docx
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdf
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts Service
 
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
 
ASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel CanterASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel Canter
 
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝DelhiRS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
 
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
 
Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts Service
 
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls DubaiDubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998
 

Six sigma project_-_Call Centre Quality improvement

  • 1. Submitted by Name: Vijay Kumar Roll No. 150401047
  • 2. DEFINE DELIVERABLES D Define M Measure A Analyse I Improve C Control Pre DMAIC Analysis Project Charter Terms & Acronyms Used ARMI/RASIC Process Map (Flow Chart) SIPOC/COPIS
  • 3. PROJECT MAPPING D Define M Measure A Analyse I Improve C Control Customer Sample Comments Key Output Characteristics Important to Business VP Operations & Quality Assurance Need to initiate the project on service quality as from last 6 months i.e. Aug-17 to Jan’18 we are unable to meet the desired target of 90%. The objective is to increase the internal quality score without compromise on the process productivity. Service Quality Client Satisfaction R&P Customer Relationship Manager From last 3 months the average quality scores are stagnant at 87%, Need to work with all the team members and understand where is the gap so that the new target 90%(monthly) can be achieved and sustained. Quality Target Customer Service Customer Experience Management Manager (OPS) Urgent attention required on quality as we have not been able to achieve the target 90% from last 6 months despite the incentive program rolled out for quality. Weekly Quality Scores Monthly incentives on quality Number of agents meeting the target Productivity
  • 4. Dec-17toFeb-18QualitySummary 0.980.840.700.560.420.280.140.00 Median Mean 0.8900.8850.8800.8750.870 1st Q uartile 0.85420 Median 0.88540 3rd Q uartile 0.91670 Maximum 1.00000 0.86917 0.87706 0.88540 0.89000 0.10866 0.11424 A -Squared 352.84 P-V alue < 0.005 Mean 0.87311 StDev 0.11138 V ariance 0.01241 Skewness -6.2990 Kurtosis 46.5711 N 3064 Minimum 0.00000 A nderson-Darling Normality Test 95% C onfidence Interv al for Mean 95% C onfidence Interv al for Median 95% C onfidence Interv al for StDev 95% Confidence Intervals Summary for AQS 3 MONTHS DATA GRAPHICAL SUMMARY 1.41.21.00.80.60.40.20.0 99.99 99 95 80 50 20 5 1 0.01 AQS Percent Mean 0.8731 StDev 0.1114 N 3064 AD 352.844 P-Value <0.005 Probability Plot of AQS Normal - 95% CI • Since, P-Value is less than 0.05, hence data distribution is Non - Normal • Since data is Normal so, central tendency should be taken as Median
  • 5. PROJECT CHARTER D Define M Measure A Analyse I Improve C Control Six Sigma Project Charter Belt Name: Vijay Kumar Project Name: Quality improvement in PHD process Division: PHD Process Champion (PO): Nitin Sachdeva Start Date: 1-Feb Master Black Belt: Nitin Sachdeva End Date: Team Members: Syed Ali Gaurav Kumar Vinay Sharma Shivangi Tripathi Kannu Bhardwaj Problem Statement: Objective & Scope Internal call quality, an important performance metric at Pizza Hut contact centre operations in inTarvo Technologies Pvt. Ltd, was dipping from 87.9% to 86.7% during Dec-17 to Feb-18. Analyzing the data from last three months the average quality was observed to be 86% which is 4% less than the desired target of 90%. The objective of the project is to improve the quality stats through the identification of the variables that influence the quality. The goal of the project is to sustain an incremental improvement in quality so as to reach to desired target of 90%, gain reward on its billing and enable maximum of its operational employees to achieve incentives. The scope of the project is centralized order taking centre at inTarvo Technologies Pvt Ltd connected by a call centre number 011-39883988. Primary Metric: Internal Quality Secondary Metrics: Average Call Handling Time Consequences Metrics:
  • 6. PROJECT CHARTER: Primary & Secondary Metric D Define M Measure A Analyse I Improve C Control 90% 90% 90% 88% 87% 87% 85% 86% 87% 88% 89% 90% 91% Dec-17 Jan-18 Feb-18 AvgQTYscores Primary Metric Target Actual 165 165 165 179 178 179 150 155 160 165 170 175 180 185 190 195 Dec-17 Jan-18 Feb-18 AverageCallHandlingTime Secondary Metric Target Actual
  • 7. TERMS & ACRONYMS USED D Define M Measure A Analyse I Improve C Control Indicators Definition AQS Average Quality Score QA Quality Analyst IVR Interactive Voice Response FCR First Call Resolution SL Service Level AHT Average Handling Time QTY Quality
  • 8. STAKEHOLDER ANALYSIS: ARMI When Populating the Stakeholder, consider the ARMI: • A= Approver of team decisions • R= Resource or subject matter expert (ad hoc) • M= Member of team • I= Interested parties who are to be informed Key Stakeholders Define Measure Analyze Improve Control VP Operations & Quality Assurance - Intarvo CRM Head – DIL GM - Ops & Quality Project Mentor - IMT Customer Relationship Manager – DIL Operations Manager Quality Manager I/R I/R I/R I/R I/R Team Members M M M M M I/A I/A I/A I/A I/A I/A I/A I/A I/A I/A I/A I/A I/A I/A I/A I I I I I I/A I/A I/A I/A I/A I I I I I
  • 9. RASIC D Define M Measure A Analyse I Improve C Control • Responsible (R) : Solely and directly responsible for the activity (Owner) - Includes approving authority (A) • Approve (A) : Reviews and assures that the activity is being done as per expectations • Support (S) : Provides the necessary help and support in the project • Inform (I) : Is to be kept informed of the status/progress being made • Consult (C) : Is to be consulted for this activity for inputs RASIC Chart for Define & Measure Activities VP Opera tions & Qualit y Assur ance- Intarv oCRM Head- DIL Projec t Ment or- IMTCusto mer Relati onshi p Mana ger- DIL Opera tions Mana ger Qualit y Mana ger Team Memb ers Memb ers (Assoc iates) Pre- DMAIC Collection of VOB from all stakeholders I I I I/A S/C/R R - - Data Collection for last 3 months I I I I/C R/S R S - Analysis of data I I I C I R S - Report out on the Pre DMAIC Analysis I I I I/C I/C R - - DEFINE Project Charter Creation I I A I/S/C I R - - Charter Approval from Executives/Project Guide A I A S/R - - - - Build SIPOC I I I I I R S - Build Process Map - - - S/C S/C R - - MEASURE Build the data collection plan I I I S/C S R - - Get the DCP Approval - - C A - R - - Approve DCP I I A - - R - - Collect Data - - I/C I S R - - Validate data - - C S/C S R - - Publish next steps to stakeholder I I I I I R - -
  • 12. THE SIPOC PROCESS MAP D Define M Measure A Analyse I Improve C Control Suppliers Inputs Process Output Customer Requirements • Phones • Office depot • System • CRM • Customer • Store • Accounting team • Complete call < 3mins • Correct address • Correct price • Accuracy of punching • Customer’s query • Customer details • Address • Name • Time, date • Volume • CRM navigation • Training, Coaching & feedback • Shifts • Hold Call received by CC Associate Customer’s concern identified Customer details verified in CRM Information provided to customer Call is documented in CRM Call closed by cc Associate Quality Audit done next day/same day • Call completion • Case tagged • Data on cycle time • Process metrics data saved
  • 14. DATA COLLECTION PLAN D Define M Measure A Analyse I Improve C Control Y Operational Definition Defect Definition Required Performance Standard Specification Limit Opportunity Improvement in internal Call Quality Points Achieved/Points Available <85% 90% USL- NA LSL- 85% Weekly Y Data Type Unit of Measurement Decimal Places Database Container Existing/New Database If new, when would the database be ready Planned Start date for Data Collection Improvement in internal Call Quality Discrete % Yes Excel Existing NA 15h Apr Data Items Needed Formula to be Used Equipment Used for Measurement Equipment Calibration Info Responsibility Training Need Operator Information Quality data for last 3 months Points Achieved/Points Available Audit Legend Quality Lead NA Quality Team MODE OF COLLECTING DATA
  • 15. MSA: MEASUREMENT SYSTEM ANALYSIS VinaySyedShivangi 95 90 85 80 75 70 Appraiser Percent 95.0% C I Percent VinaySyedShivangi 95 90 85 80 75 70 Appraiser Percent 95.0% C I Percent Date of study: 20-March-2018 Reported by: Vijay Kumar Name of product: Misc: Assessment Agreement Within Appraisers Appraiser vs Standard ATTRIBUTE AGREEMENT ANALYSIS • The sample of 60 units has been evaluated by 3 different evaluators and the audit variance of 3 appraisers is ranging between 85% to 87% • The appraiser vs standard agreement has also been observed between 80% to 81% • Above results are enough to conclude that the evaluation scores are accurate and precise, however appraisers need some calibration with master calibrator
  • 16. MSA: MEASUREMENT SYSTEM ANALYSIS D Define M Measure A Analyse I Improve C Control Process Sigma Level Calculator - Discrete Data Sample Data (user inputs): Number of units n 3,064 Total number of defects observed d 1,889 Number of defect opportunities per unit o 1 Sigma Shift (typically +1.5 for long term data) 1.5 Results: Defects per Unit dpu 0.61651436 Defects per Million Opportunities dpmo 616,514.4 Defects per Opportunity dpo% 61.65% Yield yield% 38.35% Process Sigma Level sigma 1.204
  • 18. D Define M Measure A Analyse I Improve C Control Hypothesis Testing – Overall Summary Key Input Variables Input Type Data Collection possible Data Type - X Data Type - Y Data Normality (Y) Test Used Outcome Call Type N Yes Discrete Continuous No Kruskal-Wallis test Reject Null Hypothesis Duration P Yes Continuous Continuous No Spearman Correlation Reject Null Hypothesis Trainers C Yes Discrete Continuous Yes ANOVA Fail to reject the null hypothesis Feedback Delivery C Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis Team leader wise QTY scores C Yes Discrete Continuous No Kruskal-Wallis test Reject Null Hypothesis Shift Stretch/Overtime P Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis FCR C Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis Gender C Yes Discrete Continuous Yes Two Sample t-test Reject Null Hypothesis Peak non peak N Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis Age C Yes Continuous Continuous Yes Pearson Correlation Reject Null Hypothesis Different Shift C Yes Discrete Continuous No Kruskal-Wallis test Reject Null Hypothesis Part time/full time C Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis Associate's Tenurity P Yes Continuous Continuous Yes Pearson Correlation Reject Null Hypothesis Experienced vs Fresher Associate C Yes Discrete Continuous Yes Two Sample t-test Reject Null Hypothesis High hold usage/avg hold C Yes Continuous Continuous Yes Pearson Correlation Fail to reject the null hypothesis Day Hours N Yes Discrete Continuous No Kruskal-Wallis test Reject Null Hypothesis Week Day N Yes Discrete Continuous No Kruskal-Wallis test Reject Null Hypothesis Education background C Yes Discrete Continuous Yes Two Sample t-test Reject Null Hypothesis Hiring Source C Yes Discrete Continuous Yes ANOVA Reject Null Hypothesis Rushing on call C Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis Training, feedback & coaching C Yes Continuous Continuous Yes Pearson Correlation Fail to reject the null hypothesis Call Length C Yes Discrete Continuous No Wilcoxon rank sum test Reject Null Hypothesis Attrition C Yes Discrete Continuous Yes Two Sample t-test Fail to reject the null hypothesis Pressure of Other Metrics N Yes Continuous Continuous No Pearson Correlation Fail to reject the null hypothesis Top Call Drivers C Yes Discrete Discrete No Pareto Analysis NA Tagging % N No Discrete Discrete NA NA NA Technical issues N No Discrete Continuous NA NA NA Process Complexity N No Discrete Continuous NA NA NA Floor Environment C No Discrete Continuous NA NA NA Training Material N No Discrete Continuous NA NA NA
  • 19. D Define M Measure A Analyse I Improve C Control Paramatric Testing – Data Normality Shapiro-Wilk normality test data: Agentwise_data_Monthly$QTY_Score W = 0.98135, p-value = 0.07097 Anderson-Darling normality test data: Agentwise_data_Monthly$QTY_Score A = 0.48113, p-value = 0.2284 Null Hypothesis: The agent wise quality score follows a normal distribution Alternate Hypothesis: The agent wise quality score does not follow a normal distribution Result: As the p-value in both the test (Shapiro-Wilk normality test & Anderson-Darling normality test) is greater than 0.05, we fail to reject the null hypothesis of data follows a normal distribution.
  • 20. D Define M Measure A Analyse I Improve C Control 2 Sample T-Test – Gender wise QTY scores Null Hypothesis: Average quality score are equal in male & female both categories Alternate Hypothesis: Average quality score for females is higher than that of males Result: As the p-value for t-test is less than 0.05, we reject the null hypothesis of mean quality scores are equal and conclude at 95% confidence level that we have enough evidence of assuming that mean quality scores of female employees are higher than the male employees.
  • 21. D Define M Measure A Analyse I Improve C Control 2 Sample T-Test – Experience wise QTY scores Null Hypothesis: Average quality score for fresher & experienced employees are equal Alternate Hypothesis: Average quality score of experienced employees is higher than that of fresher employees Test result: As the p-value for t-test is less than 0.05, we reject the null hypothesis of mean quality scores are equal and conclude at 95% confidence level that we have enough evidence of assuming that mean quality scores of experienced employees are higher than the fresher employees.
  • 22. D Define M Measure A Analyse I Improve C Control 2 Sample T-Test – Attrition Null Hypothesis: Average quality scores are equal for attired and non attired employees Alternate Hypothesis: Average quality scores are not equal for attired and non attired employees Test result: As the p-value for t-test is greater than 0.05, we fail to reject the null hypothesis of mean quality scores are equal and conclude at 95% confidence level that we have enough evidence of assuming that mean quality scores of both category of employees are same.
  • 23. D Define M Measure A Analyse I Improve C Control 2 Sample T-Test – Educational Background Null Hypothesis: Average quality scores are equal for graduate and under graduate employees Alternate Hypothesis: Average quality scores of graduate employees are greater than of under graduate employee Test result: As the p-value for t-test above is less than 0.05, we reject the null hypothesis of mean quality scores are equal for both level of education background and conclude at 95% confidence level that we have enough evidence of assuming that mean quality scores of graduate employees are greater than under graduate employees.
  • 24. D Define M Measure A Analyse I Improve C Control ANOVA - Trainers Null Hypothesis: There is no significant difference in trainer wise (3 trainers) average quality scores Alternate Hypothesis: At least one trainer trained trainees’ quality scores are different Test result: As the p-value for t-test above is greater than 0.05, we fail to reject the null hypothesis of trainer wise mean quality scores are equal and conclude at 95% confidence level that we have enough evidence of assuming that mean quality scores are same irrespective of the batch trained by any trainer.
  • 26. D Define M Measure A Analyse I Improve C Control ANOVA - Hiring Source Null Hypothesis: There is no significant difference in average quality scores of employees hired from different sources Alternate Hypothesis: At least one group of employees’ quality scores are different Test result: As the p-value for t-test above is less than 0.05, we reject the null hypothesis of mean quality scores are equal for associates hired from different hiring sources and conclude at 95% confidence level that we have enough evidence of assuming that mean quality scores of at least one hiring source employees is different.
  • 27. D Define M Measure A Analyse I Improve C Control Hiring Source Pairwise Probabilities Matrix Pairwise Probabilities Campus Drive Job Portal Referral Walk in Campus Drive 0.0000 0.0002 0.0058 Job Portal 0.1605 0.0039 Referral 0.2086 Walk in As the P-Values in pairwise probabilities matrix for campus drive are less than 0.05 against the other sources of hirings, we concluded that scores are poor for employees those who have been hired from campus drive. Similarly walk in.
  • 28. D Define M Measure A Analyse I Improve C Control Correlation Test – Hold and Feedback Null Hypothesis: There is no correlation between average quality scores and average hold time Alternate Hypothesis: There is a correlation between average quality scores and average hold time data: Avg_Feedback_Break and QTY_Score t = 1.0884, df = 128, p-value = 0.2785 alternative hypothesis: true correlation is not equal to 0 95 percent confidence interval: -0.07770563 0.26360135 sample estimates: cor 0.09576174 data: Avg_Hold_Time and QTY_Score t = -1.3789, df = 128, p-value = 0.1703 alternative hypothesis: true correlation is not equal to 0 95 percent confidence interval: -0.28718967 0.05228902 sample estimates: cor -0.1209864 Test result: As the p-value for t-test above is greater than 0.05, we fail to reject the null hypothesis and conclude at 95% confidence level that we have enough evidence of assuming that there is no correlation between average quality scores and average hold time. Test result: As the p-value for t-test above is greater than 0.05, we fail to reject the null hypothesis and conclude at 95% confidence level that we have enough evidence of assuming that There is no correlation between average quality scores and average feedback breaks. Null Hypothesis: There is no correlation between average quality scores and average feedback breaks Alternate Hypothesis: There is a correlation between average quality scores and average feedback breaks
  • 29. D Define M Measure A Analyse I Improve C Control Correlation Test – Age and Tenurity Null Hypothesis: There is no correlation between average quality scores and age of the associates Alternate Hypothesis: There is a correlation between average quality scores and age of the associates Null Hypothesis: There is no correlation between average quality scores and tenurity of the associates Alternate Hypothesis: There is a correlation between average quality scores and tenurity of the associates Test result: As the p-value for t-test above is less than 0.05, we reject the null hypothesis that there is correlation between quality scores and age of the associates and conclude at 95% confidence level that we have evidence of assuming that there is a moderate correlation between average quality scores and age of the associates. Test result: As the p-value for t-test above is less than 0.05, we reject the null hypothesis that there is correlation between quality scores and tenurity of the associates and conclude at 95% confidence level that we have enough evidence of assuming that there is a correlation between average quality scores and tenurity of the associates.
  • 30. D Define M Measure A Analyse I Improve C Control Linear Regression - Age Null Hypothesis: There is no significant prediction of quality scores through age of the associates Alternate Hypothesis: There is a significant prediction of quality scores through age of the associates Result: Since the R sq value is 13%, associates age predict only 13% variation in quality scores. We can not consider the model as R sq value is below 50% and conclude at 95% confidence interval that there can not be a significant prediction of quality scores through age of the associates. RegressionModel:QTY_Score = (0.739839) + (0.005364)*Age
  • 31. D Define M Measure A Analyse I Improve C Control Regression Null Hypothesis: There is no significant prediction of quality scores through tenurity of the associates Alternate Hypothesis: There is a significant prediction of quality scores through tenurity of the associates Regression Model: QTY_Score = (0.822761) + (0.000262) * AssociatesTenurity Result: Since the R sq value is 51%, associates tenurity predict 51% variation in quality scores. We can consider the model as R sq value is above 50% and conclude at 95% confidence interval that there can be a significant prediction of quality scores through tenurity of the associates.
  • 33. D Define M Measure A Analyse I Improve C Control Pareto Analysis – Top Call Drivers 1. As shown in above Pareto graph 80% of the defects on the calls are due to 20% of the parameters available in quality sheet. 2. Majorly these defects are on soft skills parts only 3. No major process knowledge gap identified
  • 34. Non-Parametric Testing 0.980.840.700.560.420.280.140.00 Median Mean 0.8900.8850.8800.8750.870 1st Q uartile 0.85420 Median 0.88540 3rd Q uartile 0.91670 Maximum 1.00000 0.86917 0.87706 0.88540 0.89000 0.10866 0.11424 A -Squared 352.84 P-V alue < 0.005 Mean 0.87311 StDev 0.11138 V ariance 0.01241 Skewness -6.2990 Kurtosis 46.5711 N 3064 Minimum 0.00000 A nderson-Darling Normality Test 95% C onfidence Interv al for Mean 95% C onfidence Interv al for Median 95% C onfidence Interv al for StDev 95% Confidence Intervals Summary for AQS 1.41.21.00.80.60.40.20.0 99.99 99 95 80 50 20 5 1 0.01 AQS Percent Mean 0.8731 StDev 0.1114 N 3064 AD 352.844 P-Value <0.005 Probability Plot of AQS Normal - 95% CI Null Hypothesis: The agent wise quality score follows a normal distribution Alternate Hypothesis: The agent wise quality score does not follow a normal distribution Result: As the p-value in both the test (Shapiro-Wilk normality test & Anderson-Darling normality test) is negligible & less than 0.05, we reject the null hypothesis of data follows a normal distribution and conclude with 95% confidence level the we have enough evidence of assuming non normality of the data.
  • 35. D Define M Measure A Analyse I Improve C Control Kruskal-Wallis rank sum test – Team Leader wise QTY scores Pairwise comparisons using Wilcoxon rank sum test Null hypothesis: There is no difference in team leader wise quality scores’ distributions Alternate hypothesis: At least one team leader wise quality scores’ distribution is different Result: reject the null hypothesis
  • 36. D Define M Measure A Analyse I Improve C Control Wilcoxon rank sum test – PT/FT Null hypothesis: Median of quality scores for part timers and full timers are equal Alternate hypothesis: Median of quality score of part timers is lesser than that of full timers Result: As the p-value is less than 0.05, we reject the null hypothesis that median of quality scores for part timers and full timers are equal and conclude with 95% confidence level that we have enough evidence of assuming median of quality score of part timers is lesser than that of full timers.
  • 37. D Define M Measure A Analyse I Improve C Control Kruskal-Wallis rank sum test – PT/FT Null hypothesis: There is no difference in quality scores’ distributions of different categories of calls Alternate hypothesis: At least one category of calls has different quality scores’ distribution Result: As the p-value is negligible & less than 0.05, we reject the null hypothesis of different categories call quality scores’ distributions are indifferent and conclude with 95% confidence level that we have enough evidence of assuming at least one call category quality scores’ distribution is different. As shown in box plot the QTY scores for complaint category of calls are pretty poor
  • 38. D Define M Measure A Analyse I Improve C Control Kruskal-Wallis rank sum test – Different Shifts Null hypothesis: There is no difference in quality scores’ distributions of different shifts Alternate hypothesis: At least one calls audited for one shift has different quality scores’ distribution Result: As the p-value for Kruskal-Wallis test is negligible & less than 0.05, we reject the null hypothesis of call quality scores’ distributions in all shifts are indifferent and conclude with 95% confidence level that we have enough evidence of assuming at least one shifts’ quality score distribution is different. Distribution of 19:30-23:30 shift quality scores is different than others.
  • 39. D Define M Measure A Analyse I Improve C Control Wilcoxon rank sum test – Peak vs Non-Peak Null Hypothesis: Median of quality scores are equal in peak and non peak hours Alternate Hypothesis: Median of quality score in peak hours is lesser than in non peak hours Result: As the p-value is negligible & less than 0.05, we reject the null hypothesis that median of quality scores are equal in peak and non peak hours and conclude with 95% confidence level that we have enough evidence of assuming peak hours quality scores are less than non peak hours quality scores.
  • 40. D Define M Measure A Analyse I Improve C Control Wilcoxon rank sum test – Call Length Null hypothesis: Median of quality score for long calls is less than or equal of median of short calls Alternate hypothesis: Median of quality score for short calls is greater than of long calls Result: As the p-value is 1, we fail to reject the null hypothesis that Median of quality score for long calls is less than or equal of median of short calls and conclude with 95% confidence level that we have enough evidence of assuming that long calls quality scores are less than short calls.
  • 41. D Define M Measure A Analyse I Improve C Control Wilcoxon rank sum test – Overtime Null Hypothesis: Median of quality scores in overtime hours is less than or equal to non-overtime hours Alternate Hypothesis: Median of quality scores in overtime hours is greater than to non-overtime hours Result: As the p-value is 1, we fail to reject the null hypothesis that Median of quality score for overtime hours is less than or equal of median of non-overtime hours and conclude with 95% confidence level that we have enough evidence of assuming that overtime hours quality scores are less than non-overtime hours quality scores.
  • 42. D Define M Measure A Analyse I Improve C Control 1. Quality scores of part timers are lesser than that of full timers and they are contributing more on lower side of quality scores 2. Complaint category quality scores are extremely poor and demands immediate attention 3. As mentioned in point no 2 part timer who majorly come in 19:30-23:30 shift are impacting the quality scores severely 4. Quality scores improves for next call if feedback is given for previous call within 24 hours of call audit 5. Peak hours which are generally observed between 06:00 PM to 10:30 PM are having greater impact on lesser side of quality scores 6. During the peak hours 08-09 PM & 09-10 PM are the major hit area and an strategy must be formulated for these hours 7. Wednesday quality scores distribution is different than others. 8. Associates are unable to score good on long calls and these calls are accounting for lower quality scores 9. Associate are not active, energetic or serious during their overtime hours and scoring poor in quality scores during overtime hours 10. FCR calls quality score are higher than non FCR, which clearly shares a message that if the query of a customer is not resolved in first go it becomes an unpleasant experience for guest and tough for agents to handle such calls 11. TL Sidhartha Kapoor’s team has been scoring poor in quality scores 12. Quality scores of female employees are higher than the male employees 13. Quality scores of experienced employees are higher than the fresher employees 14. 80% of the call defects are due to lack of the soft skills of associates 15. Quality scores of graduate employees are greater than under graduate employees 16. Associate tenurity can be modeled to predict the quality scores, higher the tenurity, higher the quality scores CONCLUSIONS
  • 43. D Define M Measure A Analyse I Improve C Control 1. Employees who are having experience from same industry are scoring good in terms of quality 1. Refresher training for fresher employees every week 2. Fresher Employees are scoring poor quality scores 2. Stretching training days for fresher employees 3. Fresher Employees are adding more fatals to the calls 3. Conducting briefings on top call drivers 4. Sharing feedback on aily basis so that the employees can work on defaulting areas 1.Female employees are scoring good quality scores 1. Conducting refresher training for male associates 2. Male employees are scoring poor quality scores 2. One-o-one session with the employess so that they can be motivated toward their work 3. Call listening sessions on floor so that best practice can be followed across. 1. Quality Scores vary team leader wise 2. Atleast one team leader has low quality scores CallType 1. Poor quality scores in complaint calls 1. Team Leaders will share feedback on real time basis 2. Daily pre/post briefings will be conducted by Team leaders 2. Hiring less number of part timers 1.Agents would be coming to office 15 mins prior to their shifts starts time so that they can be given briefing on the basis of Day-1's observations 2. Refreshers and complaint handling session to be conducted for defaulter 1. Part timers are having low quality scores in comparison to full timers PT/FT 1. It is observed that part timers attend less number of refresher and other sessions so the number of sessions to be increased Gender ExperiencedEmployeesvs FresherEmployees 1.More no. of female employees to be employed 1. Hiring Experienced candidates so that the good quality can be ensured Defaulting Areas Factors Corrective Preventive TeamLeaders RECOMMENDATION
  • 44. D Define M Measure A Analyse I Improve C Control 1. Short calls are having good quality scores 2. Long calls are having poor quality scores Overtime 1. Employees who are doing overtime are having poor quality scores HiringSource 1. Associate hired from campus drive are scoring poor in quality 1. Associates who are scoring poor consistently are to be indentified and must be issued a perforance improvement plan 1. More number of employees are to be hired from Job portal and employee referral. Tenurity 1. As the agent is tenured in he system his QTY scores improves 1. Management to work on 0-90 days tenurity bucket in term of attrition WeekDay 1. Wednesday having special offers which increases the demand and stores lack on scalability which turns customers unhappy and contribute in lower quality scores 1. To push client to align more resources to store 2. To align 100% manpower at call centre Call Length 1. Team of knowledge holders will be prepared for handling calls efficiently 2. Arranging call back for the customers 1. Effcetive manpower/batch palnning to be done DifferentShifts 1. Associates in shift 19:30-22:30 are scoring poor quality score 1. Refresher training for employees 2. Conducting call play sessions for the associates 3. Conducting pre shift briefings to motivate the employees Defaulting Areas Factors Corrective Preventive RECOMMENDATION

Editor's Notes

  1. This data includes the critical errors/defects which are rated 0%
  2. This data does not include the critical errors/defects which are rated 0%