Single Phase Liquid Vessel Sizing for HYSYS Dynamics
Process Facilities often have intermediate storage
facilities that store liquids prior to transporting to
downstream equipment. The period of storage is
short, i.e., of the order of minutes to hours & is
defined as Holdup time. The Holdup time can also
be explained as the reserve volume required to
ensure safe & controlled operation of
downstream equipment.
The intermediate vessel also acts as a buffer
vessel to accommodate any surge/spikes in flow
rates, and is termed as surge time.
Vessel Volume is an input data required in
Process Dynamic Simulation and the following
exercise covers estimation of volume required for
single phase liquid flow into an intermediate
vertical/horizontal/flat bottomed process vessel.
Problem Statement
Water at 1,341 m3
/h, flows into a vessel & held
for a holdup time of 1 min before discharging into
downstream equipment. The vessel’s liquid
percent level is desired to be held at 50% (half
full) for a certain drain rate. Estimate the size of
the vessel required for an L/D ratio of 1.
Design Methodology & Results
Based on the above data, the vessel volume [V]
for a flow rate of 1,341 m3
/h is,
𝑽 = 𝑸[𝒎 𝟑
𝒉⁄ ] ×
𝑻 𝒉𝒐𝒍𝒅𝒖𝒑[𝒎𝒊𝒏]
𝟔𝟎
×
𝟏𝟎𝟎
% 𝑳𝒊𝒒𝒖𝒊𝒅 𝑳𝒆𝒗𝒆𝒍
(1)
Based on the vessel volume estimated for the
holdup time, the dimensions of the vessel are,
𝑫 = √
𝟒𝑽
𝝅𝑳
; 𝑾𝒉𝒆𝒓𝒆 𝑳 = 𝒏 × 𝑫 (2)
Substituting the values for vessel dimensions,
𝑽 = 𝟏𝟑𝟒𝟏 ×
𝟏
𝟔𝟎
×
𝟏𝟎𝟎
𝟓𝟎
= 𝟒𝟒. 𝟕𝒎 𝟑
(3)
Taking L = D, i.e., L/D ratio of 1.0
𝑫 = √
𝟒×𝟒𝟒.𝟕
𝝅
𝟑
≈ 𝟑. 𝟗 𝒎 (4)
Since L = D; Therefore L = 3.9 m.
Surge Study
From the estimates, the vessel chosen is flat
bottomed on concrete foundation & is subjected
to a peak flowrate rise of 1,474 m3
/h in a 2 min
interval. The liquid level rises to ~57% from 50%.
Figure 1. Surge Flow rate increase on % Liquid Level
Thumb Rules
The different arrangement types are as follows,
Figure 2. Intermediate Storage Vessel Types & L/D Ratio
1. Holding time for most intermediate tanks is 10
min (half full tanks)
2. Holding time for feed tanks to furnace is 30
min (half full).
3. The optimum ratio is 3 for commonly used L/D
ratios of 2 to 5.
4. Vessels < 4 m3
, are vertically mounted with L/D
ratio of 2 to 5 on leg supports/ brackets.
5. Vessels 4 m3
< V < 40 m3
is horizontal & saddle
supported with L/D ratio of 2 to 5.
6. Vessels V > 40 m3
is flat bottom tank on
concrete foundation with L/D ratio of 0.5 - 1.5.
References
Perry’s Chemical Engineers Handbook, 7th
Edition

More Related Content

What's hot

What's hot (19)

Stream flow measurement
Stream flow  measurementStream flow  measurement
Stream flow measurement
 
Stream flow measurement technique
Stream flow measurement techniqueStream flow measurement technique
Stream flow measurement technique
 
اسئله واجوبه قنوات مفتوحه 267 ص 4 (2)
اسئله واجوبه قنوات مفتوحه 267 ص 4 (2)اسئله واجوبه قنوات مفتوحه 267 ص 4 (2)
اسئله واجوبه قنوات مفتوحه 267 ص 4 (2)
 
Fluid Mechanics Unit-1 (vk-ssm)
Fluid Mechanics Unit-1 (vk-ssm)Fluid Mechanics Unit-1 (vk-ssm)
Fluid Mechanics Unit-1 (vk-ssm)
 
Water hammer in pipe_AMIT
Water hammer in pipe_AMITWater hammer in pipe_AMIT
Water hammer in pipe_AMIT
 
Unit 1 CE8394 FMM
Unit 1 CE8394 FMMUnit 1 CE8394 FMM
Unit 1 CE8394 FMM
 
Darcy´s law
Darcy´s lawDarcy´s law
Darcy´s law
 
Fluid mechanics Lab Report
Fluid mechanics Lab ReportFluid mechanics Lab Report
Fluid mechanics Lab Report
 
Week 1 3_pascal_bernoulli
Week 1 3_pascal_bernoulliWeek 1 3_pascal_bernoulli
Week 1 3_pascal_bernoulli
 
PREDICTING SHIP SQUAT IN NIGERIAN WATERWAYS (CASE STUDY: NIGER DELTA)
PREDICTING SHIP SQUAT IN NIGERIAN WATERWAYS (CASE STUDY: NIGER DELTA)PREDICTING SHIP SQUAT IN NIGERIAN WATERWAYS (CASE STUDY: NIGER DELTA)
PREDICTING SHIP SQUAT IN NIGERIAN WATERWAYS (CASE STUDY: NIGER DELTA)
 
Application on bernoulli equation
Application on bernoulli equationApplication on bernoulli equation
Application on bernoulli equation
 
Raynolds number
Raynolds numberRaynolds number
Raynolds number
 
Reynold's number
Reynold's numberReynold's number
Reynold's number
 
L2 darcys law
L2 darcys lawL2 darcys law
L2 darcys law
 
fluid mechanics
fluid mechanicsfluid mechanics
fluid mechanics
 
Fluid Mechanics - Fluid Dynamics
Fluid Mechanics - Fluid DynamicsFluid Mechanics - Fluid Dynamics
Fluid Mechanics - Fluid Dynamics
 
Pumping test
Pumping testPumping test
Pumping test
 
00 multiphase flows - intorduction
00 multiphase flows - intorduction00 multiphase flows - intorduction
00 multiphase flows - intorduction
 
Gw03 other applications of dwlr data
Gw03 other applications of dwlr dataGw03 other applications of dwlr data
Gw03 other applications of dwlr data
 

Similar to Single Phase Liquid Vessel Sizing for HYSYS Dynamics

Hydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankHydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankC. P. Kumar
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineeringchala hailu
 
ReverseOsmosisLabReport
ReverseOsmosisLabReportReverseOsmosisLabReport
ReverseOsmosisLabReportJanet Mok
 
Dam Engineering.pptx
Dam Engineering.pptxDam Engineering.pptx
Dam Engineering.pptxssuser3f22f9
 
Gw02 role of dwlr data in groundwater resource estimation
Gw02 role of dwlr data in groundwater resource estimationGw02 role of dwlr data in groundwater resource estimation
Gw02 role of dwlr data in groundwater resource estimationhydrologyproject0
 
Estimate the evaporation rate of water (water loss) for the cooling tower
Estimate the evaporation rate of water (water loss) for the cooling towerEstimate the evaporation rate of water (water loss) for the cooling tower
Estimate the evaporation rate of water (water loss) for the cooling towerBarhm Mohamad
 
2 c 9detentionstoragedesign
2 c 9detentionstoragedesign2 c 9detentionstoragedesign
2 c 9detentionstoragedesignSiam Kak
 
WATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptxWATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptxSsgTiger
 
Waterdistributionsystem 120411061916-phpapp01
Waterdistributionsystem 120411061916-phpapp01Waterdistributionsystem 120411061916-phpapp01
Waterdistributionsystem 120411061916-phpapp01Mallika Vyshnavi
 
Experimental Analysis on Sinking Time of Littoral Submarine .docx
Experimental Analysis on Sinking Time of Littoral Submarine  .docxExperimental Analysis on Sinking Time of Littoral Submarine  .docx
Experimental Analysis on Sinking Time of Littoral Submarine .docxnealwaters20034
 
Experimental Analysis on Sinking Time of Littoral Submarine .docx
Experimental Analysis on Sinking Time of Littoral Submarine  .docxExperimental Analysis on Sinking Time of Littoral Submarine  .docx
Experimental Analysis on Sinking Time of Littoral Submarine .docxrhetttrevannion
 
Internal Forced Convection
Internal Forced ConvectionInternal Forced Convection
Internal Forced ConvectionKumarMurari5
 
Lec7. Design Of Forebay-1.pdf
Lec7. Design Of Forebay-1.pdfLec7. Design Of Forebay-1.pdf
Lec7. Design Of Forebay-1.pdfHadiqa Qadir
 
Lab cstr in series
Lab cstr in seriesLab cstr in series
Lab cstr in seriesAzlan Skool
 
NAVAL ARCHITECTURE- GEOMETRY OF SHIP
NAVAL ARCHITECTURE- GEOMETRY OF SHIPNAVAL ARCHITECTURE- GEOMETRY OF SHIP
NAVAL ARCHITECTURE- GEOMETRY OF SHIPSomasundaramRenganat
 
Rule Level & Gate Operation in a Dam.pptx
Rule Level & Gate Operation in a Dam.pptxRule Level & Gate Operation in a Dam.pptx
Rule Level & Gate Operation in a Dam.pptxManish Khandelwal
 

Similar to Single Phase Liquid Vessel Sizing for HYSYS Dynamics (20)

Hydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankHydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation Tank
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineering
 
ReverseOsmosisLabReport
ReverseOsmosisLabReportReverseOsmosisLabReport
ReverseOsmosisLabReport
 
Dam Engineering.pptx
Dam Engineering.pptxDam Engineering.pptx
Dam Engineering.pptx
 
Chapter Nine.ppt
Chapter Nine.pptChapter Nine.ppt
Chapter Nine.ppt
 
Gw02 role of dwlr data in groundwater resource estimation
Gw02 role of dwlr data in groundwater resource estimationGw02 role of dwlr data in groundwater resource estimation
Gw02 role of dwlr data in groundwater resource estimation
 
Reservoir
ReservoirReservoir
Reservoir
 
Estimate the evaporation rate of water (water loss) for the cooling tower
Estimate the evaporation rate of water (water loss) for the cooling towerEstimate the evaporation rate of water (water loss) for the cooling tower
Estimate the evaporation rate of water (water loss) for the cooling tower
 
2012 pe review__hyd_
2012 pe review__hyd_2012 pe review__hyd_
2012 pe review__hyd_
 
2 c 9detentionstoragedesign
2 c 9detentionstoragedesign2 c 9detentionstoragedesign
2 c 9detentionstoragedesign
 
WATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptxWATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptx
 
Draining a tank Case Study
Draining a tank Case StudyDraining a tank Case Study
Draining a tank Case Study
 
Waterdistributionsystem 120411061916-phpapp01
Waterdistributionsystem 120411061916-phpapp01Waterdistributionsystem 120411061916-phpapp01
Waterdistributionsystem 120411061916-phpapp01
 
Experimental Analysis on Sinking Time of Littoral Submarine .docx
Experimental Analysis on Sinking Time of Littoral Submarine  .docxExperimental Analysis on Sinking Time of Littoral Submarine  .docx
Experimental Analysis on Sinking Time of Littoral Submarine .docx
 
Experimental Analysis on Sinking Time of Littoral Submarine .docx
Experimental Analysis on Sinking Time of Littoral Submarine  .docxExperimental Analysis on Sinking Time of Littoral Submarine  .docx
Experimental Analysis on Sinking Time of Littoral Submarine .docx
 
Internal Forced Convection
Internal Forced ConvectionInternal Forced Convection
Internal Forced Convection
 
Lec7. Design Of Forebay-1.pdf
Lec7. Design Of Forebay-1.pdfLec7. Design Of Forebay-1.pdf
Lec7. Design Of Forebay-1.pdf
 
Lab cstr in series
Lab cstr in seriesLab cstr in series
Lab cstr in series
 
NAVAL ARCHITECTURE- GEOMETRY OF SHIP
NAVAL ARCHITECTURE- GEOMETRY OF SHIPNAVAL ARCHITECTURE- GEOMETRY OF SHIP
NAVAL ARCHITECTURE- GEOMETRY OF SHIP
 
Rule Level & Gate Operation in a Dam.pptx
Rule Level & Gate Operation in a Dam.pptxRule Level & Gate Operation in a Dam.pptx
Rule Level & Gate Operation in a Dam.pptx
 

More from Vijay Sarathy

Exploring LPG Cylinders for Medical Oxygen - A Preliminary Study
Exploring LPG Cylinders for Medical Oxygen - A Preliminary StudyExploring LPG Cylinders for Medical Oxygen - A Preliminary Study
Exploring LPG Cylinders for Medical Oxygen - A Preliminary StudyVijay Sarathy
 
Heating Value Estimation for Natural Gas Applications
Heating Value Estimation for Natural Gas ApplicationsHeating Value Estimation for Natural Gas Applications
Heating Value Estimation for Natural Gas ApplicationsVijay Sarathy
 
Empirical Approach to Hydrate Formation in Natural Gas Pipelines
Empirical Approach to Hydrate Formation in Natural Gas PipelinesEmpirical Approach to Hydrate Formation in Natural Gas Pipelines
Empirical Approach to Hydrate Formation in Natural Gas PipelinesVijay Sarathy
 
Evaporation Pond Process Design in Oil & Gas Industry
Evaporation Pond Process Design in Oil & Gas IndustryEvaporation Pond Process Design in Oil & Gas Industry
Evaporation Pond Process Design in Oil & Gas IndustryVijay Sarathy
 
Key Thermo-Physical Properties of Light Crude Oils
Key Thermo-Physical Properties of Light Crude OilsKey Thermo-Physical Properties of Light Crude Oils
Key Thermo-Physical Properties of Light Crude OilsVijay Sarathy
 
Cooling Tower Makeup Water Estimation
Cooling Tower Makeup Water EstimationCooling Tower Makeup Water Estimation
Cooling Tower Makeup Water EstimationVijay Sarathy
 
Design Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingDesign Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingVijay Sarathy
 
Gas Compression Stages – Process Design & Optimization
Gas Compression Stages – Process Design & OptimizationGas Compression Stages – Process Design & Optimization
Gas Compression Stages – Process Design & OptimizationVijay Sarathy
 
Gas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & OptimizationGas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & OptimizationVijay Sarathy
 
ECONOMIC INSULATION FOR INDUSTRIAL PIPING
ECONOMIC INSULATION FOR INDUSTRIAL PIPINGECONOMIC INSULATION FOR INDUSTRIAL PIPING
ECONOMIC INSULATION FOR INDUSTRIAL PIPINGVijay Sarathy
 
Flash Steam and Steam Condensates in Return Lines
Flash Steam and Steam Condensates in Return LinesFlash Steam and Steam Condensates in Return Lines
Flash Steam and Steam Condensates in Return LinesVijay Sarathy
 
Evaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand ProductionEvaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand ProductionVijay Sarathy
 
Natural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & EconomicsNatural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & EconomicsVijay Sarathy
 
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM DataPredicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM DataVijay Sarathy
 
Load Sharing for Parallel Operation of Gas Compressors
Load Sharing for Parallel Operation of Gas CompressorsLoad Sharing for Parallel Operation of Gas Compressors
Load Sharing for Parallel Operation of Gas CompressorsVijay Sarathy
 
Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations Vijay Sarathy
 
Key Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design BasisKey Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design BasisVijay Sarathy
 
Chemical Process Calculations – Short Tutorial
Chemical Process Calculations – Short TutorialChemical Process Calculations – Short Tutorial
Chemical Process Calculations – Short TutorialVijay Sarathy
 
Process Design for Natural Gas Transmission
Process Design for Natural Gas TransmissionProcess Design for Natural Gas Transmission
Process Design for Natural Gas TransmissionVijay Sarathy
 
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPSOPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPSVijay Sarathy
 

More from Vijay Sarathy (20)

Exploring LPG Cylinders for Medical Oxygen - A Preliminary Study
Exploring LPG Cylinders for Medical Oxygen - A Preliminary StudyExploring LPG Cylinders for Medical Oxygen - A Preliminary Study
Exploring LPG Cylinders for Medical Oxygen - A Preliminary Study
 
Heating Value Estimation for Natural Gas Applications
Heating Value Estimation for Natural Gas ApplicationsHeating Value Estimation for Natural Gas Applications
Heating Value Estimation for Natural Gas Applications
 
Empirical Approach to Hydrate Formation in Natural Gas Pipelines
Empirical Approach to Hydrate Formation in Natural Gas PipelinesEmpirical Approach to Hydrate Formation in Natural Gas Pipelines
Empirical Approach to Hydrate Formation in Natural Gas Pipelines
 
Evaporation Pond Process Design in Oil & Gas Industry
Evaporation Pond Process Design in Oil & Gas IndustryEvaporation Pond Process Design in Oil & Gas Industry
Evaporation Pond Process Design in Oil & Gas Industry
 
Key Thermo-Physical Properties of Light Crude Oils
Key Thermo-Physical Properties of Light Crude OilsKey Thermo-Physical Properties of Light Crude Oils
Key Thermo-Physical Properties of Light Crude Oils
 
Cooling Tower Makeup Water Estimation
Cooling Tower Makeup Water EstimationCooling Tower Makeup Water Estimation
Cooling Tower Makeup Water Estimation
 
Design Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingDesign Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve Sizing
 
Gas Compression Stages – Process Design & Optimization
Gas Compression Stages – Process Design & OptimizationGas Compression Stages – Process Design & Optimization
Gas Compression Stages – Process Design & Optimization
 
Gas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & OptimizationGas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & Optimization
 
ECONOMIC INSULATION FOR INDUSTRIAL PIPING
ECONOMIC INSULATION FOR INDUSTRIAL PIPINGECONOMIC INSULATION FOR INDUSTRIAL PIPING
ECONOMIC INSULATION FOR INDUSTRIAL PIPING
 
Flash Steam and Steam Condensates in Return Lines
Flash Steam and Steam Condensates in Return LinesFlash Steam and Steam Condensates in Return Lines
Flash Steam and Steam Condensates in Return Lines
 
Evaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand ProductionEvaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand Production
 
Natural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & EconomicsNatural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & Economics
 
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM DataPredicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
 
Load Sharing for Parallel Operation of Gas Compressors
Load Sharing for Parallel Operation of Gas CompressorsLoad Sharing for Parallel Operation of Gas Compressors
Load Sharing for Parallel Operation of Gas Compressors
 
Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations
 
Key Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design BasisKey Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design Basis
 
Chemical Process Calculations – Short Tutorial
Chemical Process Calculations – Short TutorialChemical Process Calculations – Short Tutorial
Chemical Process Calculations – Short Tutorial
 
Process Design for Natural Gas Transmission
Process Design for Natural Gas TransmissionProcess Design for Natural Gas Transmission
Process Design for Natural Gas Transmission
 
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPSOPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
 

Recently uploaded

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Recently uploaded (20)

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Single Phase Liquid Vessel Sizing for HYSYS Dynamics

  • 1. Page 1 of 1 Single Phase Liquid Vessel Sizing for HYSYS Dynamics Process Facilities often have intermediate storage facilities that store liquids prior to transporting to downstream equipment. The period of storage is short, i.e., of the order of minutes to hours & is defined as Holdup time. The Holdup time can also be explained as the reserve volume required to ensure safe & controlled operation of downstream equipment. The intermediate vessel also acts as a buffer vessel to accommodate any surge/spikes in flow rates, and is termed as surge time. Vessel Volume is an input data required in Process Dynamic Simulation and the following exercise covers estimation of volume required for single phase liquid flow into an intermediate vertical/horizontal/flat bottomed process vessel. Problem Statement Water at 1,341 m3 /h, flows into a vessel & held for a holdup time of 1 min before discharging into downstream equipment. The vessel’s liquid percent level is desired to be held at 50% (half full) for a certain drain rate. Estimate the size of the vessel required for an L/D ratio of 1. Design Methodology & Results Based on the above data, the vessel volume [V] for a flow rate of 1,341 m3 /h is, 𝑽 = 𝑸[𝒎 𝟑 𝒉⁄ ] × 𝑻 𝒉𝒐𝒍𝒅𝒖𝒑[𝒎𝒊𝒏] 𝟔𝟎 × 𝟏𝟎𝟎 % 𝑳𝒊𝒒𝒖𝒊𝒅 𝑳𝒆𝒗𝒆𝒍 (1) Based on the vessel volume estimated for the holdup time, the dimensions of the vessel are, 𝑫 = √ 𝟒𝑽 𝝅𝑳 ; 𝑾𝒉𝒆𝒓𝒆 𝑳 = 𝒏 × 𝑫 (2) Substituting the values for vessel dimensions, 𝑽 = 𝟏𝟑𝟒𝟏 × 𝟏 𝟔𝟎 × 𝟏𝟎𝟎 𝟓𝟎 = 𝟒𝟒. 𝟕𝒎 𝟑 (3) Taking L = D, i.e., L/D ratio of 1.0 𝑫 = √ 𝟒×𝟒𝟒.𝟕 𝝅 𝟑 ≈ 𝟑. 𝟗 𝒎 (4) Since L = D; Therefore L = 3.9 m. Surge Study From the estimates, the vessel chosen is flat bottomed on concrete foundation & is subjected to a peak flowrate rise of 1,474 m3 /h in a 2 min interval. The liquid level rises to ~57% from 50%. Figure 1. Surge Flow rate increase on % Liquid Level Thumb Rules The different arrangement types are as follows, Figure 2. Intermediate Storage Vessel Types & L/D Ratio 1. Holding time for most intermediate tanks is 10 min (half full tanks) 2. Holding time for feed tanks to furnace is 30 min (half full). 3. The optimum ratio is 3 for commonly used L/D ratios of 2 to 5. 4. Vessels < 4 m3 , are vertically mounted with L/D ratio of 2 to 5 on leg supports/ brackets. 5. Vessels 4 m3 < V < 40 m3 is horizontal & saddle supported with L/D ratio of 2 to 5. 6. Vessels V > 40 m3 is flat bottom tank on concrete foundation with L/D ratio of 0.5 - 1.5. References Perry’s Chemical Engineers Handbook, 7th Edition