Puffer’s is a man-made pond created by re-routing and damming the Mill River.
-(dam built 1740 by Nathanial Kellogg, to power a saw mill. Dam washed out in 1893;
current dam built in 1895; reinforced w/ concrete in 1976).
-The man-made dam impedes the river’s ability to transport sediment a) by artificially and
abruptly decreasing the natural channel slope, decreasing water velocity (and water’s
ability to transport sediment) and b) physically blocking all but a 6-inch column of water
that passes over the dam, so that only dissolved sediment can pass downstream.
All of this results in sedimentation rates that far surpass those of natural ponds
A Brief History
• -The Mill River is located between the highlands of Shutesbury and the Ct.
river in N. Hadley and flows over slanted bed rock
• The “20ft drop in elevation over 30 feet” made it the perfect candidate for
industrial applications during the industrial revolution
• Around 1725 to 1760 land prospectors began buying the upper most lots
along the Mill River
• 1760 to 1800 many dams were built
• 1763 the town commissioned the construction of a bridge (where Cushman
bridge is currently located)
• 1825 aprx. The New London Northern Railroad routed its’ tracks through
the area, due to its volume of production occurring in the region.
• “Factory Hollow” was the name for what we now call Puffers Pond. Paper
mills were located upstream, and the Amherst Cotton Factory
incorporators, (who’s dam can still be scene today) was located in “Factory
Hollow”. West, (further down stream) grist and saw mills could be found
along the Mill river, in North Amherst.
History Continued
• At each mill location a dam was built and a pond formed . As a result, the
river was turned into a series of ponds.
• It is believed that in 1800 the dam at Factory Hollow may have been raised
(no direct proof)
• Some factory material records in Factory Hollow include:
– soap, firewood, lamp oil, twine, dyes (indigo), fustic, logwood, madder. Potash
alum, copperas, woad, and vitrols
• Nov. 30th 1847 the Ingraham Factories at Factory Hollow burned down…it
had been a metropolis of industry with 100’s of buildings
• The Cushman family (located up stream) moved their “Red Mill” paper
plant to the abandoned Factory Hollow site, in 1891 “Red Mill burned
down”
• 1930’the dam at Cushman was removed, for “safety reasons”
• 1970’s Puffer’s pond was dredged
• Now a site for recreation
1985 feasibility study
The town of Amherst hired the engineering firm, Tighe & Bond, to conduct a feasibility study of
a dredging project in 1985, and the firm produced this contour map outlining (not extremely
precisely) the rough bathymetry of Puffer’s Pond
proposed
dredging
plan
In 1989 Tighe & Bond created this map outlining the dredging plan for the pond. The dredging
was to be completed in four “phases,” each phase covering a certain area of the pond, but only
3 phases were ultimately completed, during the winter of 1989-1990. The goal was to remove
roughly 10 feet vertical depth of sediment in each of these zones, and to create a “sediment
trap” that would block most incoming sediment from the Mill River and minimize the future
accumulation of sediment in the main body of the pond. (describe sediment trap – basically a
large hole in the ground)
the proposed dredging plan
This is a contour map of the proposed plan. Note the sediment trap at the Mill River channel.
the 1990
bathymetry
(interpolation of 1990
proposed dredging plan)
Based on our 2000 and 2009 data sets, we are inclined to think that the dredging wasn’t carried
out exactly as planned.
-they ended up dredging down to a described “layer of gravel,” which the firm claimed was (on
average) 10 feet below the existing top of the sediment
-less dredging in general (esp. in sediment trap, and near dam outlet
-additional dredging probably occurred in southern-central peninsula and northern-central edge
of pond;
-phase 4 wasn’t completed i.e. northeast portion is too deep
1985 vs. 1990
Statistics: 82,000 cubic meters of sediment
were removed; average of 10 vertical feet of
sediment removed in each zone.
1990 vs. 2000
These maps demonstrate the buildup of sediment around the mouth of mill river (expansion of
the delta), and most notably the accumulation of sediment in the sediment trap. Reiterate goal
of project: to update the bathymetry map so we can see how, where, and rate at which
sediment has built up since 1990 (and to create a more accurate AND precise contour map than
the 2000 one)
1990 vs. 2009
Note the accumulation of sediment in the channel, the westward expansion of the delta, the
red area in the northeast where the pond wasn’t actually dredged, the lower maximum depths
near the dam.
changes in pond volume over time
date volume of pond (m3)
2009 96,000
2000 89,000
1990 120,000
1985 66,000
1990-2009 23,000
1990-1985 53,000
* This corresponds to an annual sedimentation rate of 1,200 m3 per year.
Since the area of drainage basin is 40 km2, the erosion rate
in the drainage basin is probably about .03mm/year.
** The project report claimed that 63,000 m3 of sediment
were removed during 1990 dredging.
Our calculations indicate a greater amount of sediment dredged than was actually reported,
which indicates the inaccuracy of the 1990 dredging plan map – i.e. they probably dredged less
sediment than they had planned to when they drew up the map.
Three of the four cores contained a distinctive layer of mulch.
Mercury Concentrations
Depth
(m)
Hg
(nanogr
ams)
Hg
Concent
ration
(ppb)
.01 30.12 200.81
.40 15.20 100.3047
.90 39.30 280.6887
1.35 66.58 443.8958
1.55 675.60 4509.004
6
1.70 525.44 3502.947
9
1.90 0.56 3.7408
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
0 1000 2000 3000 4000 5000
Depth(m)
Concentration (ppb)
Concentration of Mercury
Sediment that was not removed
when the pond was dredged.
Remained from mills

More Related Content

Similar to Puffers Pond Figs

Matt Mundinger Portfolio
Matt Mundinger PortfolioMatt Mundinger Portfolio
Matt Mundinger Portfoliommundinger
 
Vertical ground: making geology graham icus 2016
Vertical ground: making geology graham icus 2016Vertical ground: making geology graham icus 2016
Vertical ground: making geology graham icus 2016Stephen Graham
 
Make Sure You Know....
Make Sure You Know....Make Sure You Know....
Make Sure You Know....tudorgeog
 
Sullivan County Meaningful Watershed Education Experience
Sullivan County Meaningful Watershed Education ExperienceSullivan County Meaningful Watershed Education Experience
Sullivan County Meaningful Watershed Education ExperienceMichael Hewitt, GISP
 
vdocument.in_submarine-canyons-and-fans-submarine-canyons-major-conduits.ppt
vdocument.in_submarine-canyons-and-fans-submarine-canyons-major-conduits.pptvdocument.in_submarine-canyons-and-fans-submarine-canyons-major-conduits.ppt
vdocument.in_submarine-canyons-and-fans-submarine-canyons-major-conduits.pptSaadTaman
 
finalprojectprotectignph
finalprojectprotectignphfinalprojectprotectignph
finalprojectprotectignphEliot Mancini
 
canutepresentation.ppt
canutepresentation.pptcanutepresentation.ppt
canutepresentation.pptMahadArif2
 
canutepresentation.ppt
canutepresentation.pptcanutepresentation.ppt
canutepresentation.pptMadavanR
 
S5c9 chapter 9-facts and figures related to surface and underground canals.
S5c9 chapter 9-facts and figures related to surface and underground canals.S5c9 chapter 9-facts and figures related to surface and underground canals.
S5c9 chapter 9-facts and figures related to surface and underground canals.Shivu P
 
Project report on water jet system
Project report on water jet systemProject report on water jet system
Project report on water jet systemAabid Khan
 
Restoring Westmeadows Meander
Restoring Westmeadows MeanderRestoring Westmeadows Meander
Restoring Westmeadows MeanderTony Smith
 
A History Tour: Upper Mississippi River
A History Tour: Upper Mississippi RiverA History Tour: Upper Mississippi River
A History Tour: Upper Mississippi RiverStefania Padalino
 
Chasnala mine inundation
Chasnala   mine inundationChasnala   mine inundation
Chasnala mine inundationkarankarthi
 
Dams by Luke Camilleri, 3.01
Dams by Luke Camilleri, 3.01Dams by Luke Camilleri, 3.01
Dams by Luke Camilleri, 3.01geographystudents
 
Flooding 4 Boscastle
Flooding 4   BoscastleFlooding 4   Boscastle
Flooding 4 Boscastletudorgeog
 
The great shale-gas rush new product developement
The great shale-gas rush new product developementThe great shale-gas rush new product developement
The great shale-gas rush new product developementGaurav Singh
 

Similar to Puffers Pond Figs (20)

Matt Mundinger Portfolio
Matt Mundinger PortfolioMatt Mundinger Portfolio
Matt Mundinger Portfolio
 
A chronology of development on the current river
A chronology of development on the current river A chronology of development on the current river
A chronology of development on the current river
 
Reservoir Dam Safety
Reservoir Dam SafetyReservoir Dam Safety
Reservoir Dam Safety
 
Vertical ground: making geology graham icus 2016
Vertical ground: making geology graham icus 2016Vertical ground: making geology graham icus 2016
Vertical ground: making geology graham icus 2016
 
Make Sure You Know....
Make Sure You Know....Make Sure You Know....
Make Sure You Know....
 
Sullivan County Meaningful Watershed Education Experience
Sullivan County Meaningful Watershed Education ExperienceSullivan County Meaningful Watershed Education Experience
Sullivan County Meaningful Watershed Education Experience
 
vdocument.in_submarine-canyons-and-fans-submarine-canyons-major-conduits.ppt
vdocument.in_submarine-canyons-and-fans-submarine-canyons-major-conduits.pptvdocument.in_submarine-canyons-and-fans-submarine-canyons-major-conduits.ppt
vdocument.in_submarine-canyons-and-fans-submarine-canyons-major-conduits.ppt
 
finalprojectprotectignph
finalprojectprotectignphfinalprojectprotectignph
finalprojectprotectignph
 
canutepresentation.ppt
canutepresentation.pptcanutepresentation.ppt
canutepresentation.ppt
 
canutepresentation.ppt
canutepresentation.pptcanutepresentation.ppt
canutepresentation.ppt
 
S5c9 chapter 9-facts and figures related to surface and underground canals.
S5c9 chapter 9-facts and figures related to surface and underground canals.S5c9 chapter 9-facts and figures related to surface and underground canals.
S5c9 chapter 9-facts and figures related to surface and underground canals.
 
Project report on water jet system
Project report on water jet systemProject report on water jet system
Project report on water jet system
 
Restoring Westmeadows Meander
Restoring Westmeadows MeanderRestoring Westmeadows Meander
Restoring Westmeadows Meander
 
coalpreppic
coalpreppiccoalpreppic
coalpreppic
 
A History Tour: Upper Mississippi River
A History Tour: Upper Mississippi RiverA History Tour: Upper Mississippi River
A History Tour: Upper Mississippi River
 
Presentation on high dam
Presentation on high damPresentation on high dam
Presentation on high dam
 
Chasnala mine inundation
Chasnala   mine inundationChasnala   mine inundation
Chasnala mine inundation
 
Dams by Luke Camilleri, 3.01
Dams by Luke Camilleri, 3.01Dams by Luke Camilleri, 3.01
Dams by Luke Camilleri, 3.01
 
Flooding 4 Boscastle
Flooding 4   BoscastleFlooding 4   Boscastle
Flooding 4 Boscastle
 
The great shale-gas rush new product developement
The great shale-gas rush new product developementThe great shale-gas rush new product developement
The great shale-gas rush new product developement
 

More from UmassGeo

Workshop Intro
Workshop IntroWorkshop Intro
Workshop IntroUmassGeo
 
Initial core descript teachers
Initial core descript teachersInitial core descript teachers
Initial core descript teachersUmassGeo
 
Lesson 4 el’gygytgyn smear slides 1
Lesson 4 el’gygytgyn smear slides 1Lesson 4 el’gygytgyn smear slides 1
Lesson 4 el’gygytgyn smear slides 1UmassGeo
 
Lesson 4 pollen 1
Lesson 4 pollen 1Lesson 4 pollen 1
Lesson 4 pollen 1UmassGeo
 
Polar Trec
Polar TrecPolar Trec
Polar TrecUmassGeo
 
Relative Dating
Relative DatingRelative Dating
Relative DatingUmassGeo
 
Js diatom amherst 2014
Js diatom amherst 2014Js diatom amherst 2014
Js diatom amherst 2014UmassGeo
 
Js Arctic Amplification and the Jet Stream
Js Arctic Amplification and the Jet StreamJs Arctic Amplification and the Jet Stream
Js Arctic Amplification and the Jet StreamUmassGeo
 

More from UmassGeo (8)

Workshop Intro
Workshop IntroWorkshop Intro
Workshop Intro
 
Initial core descript teachers
Initial core descript teachersInitial core descript teachers
Initial core descript teachers
 
Lesson 4 el’gygytgyn smear slides 1
Lesson 4 el’gygytgyn smear slides 1Lesson 4 el’gygytgyn smear slides 1
Lesson 4 el’gygytgyn smear slides 1
 
Lesson 4 pollen 1
Lesson 4 pollen 1Lesson 4 pollen 1
Lesson 4 pollen 1
 
Polar Trec
Polar TrecPolar Trec
Polar Trec
 
Relative Dating
Relative DatingRelative Dating
Relative Dating
 
Js diatom amherst 2014
Js diatom amherst 2014Js diatom amherst 2014
Js diatom amherst 2014
 
Js Arctic Amplification and the Jet Stream
Js Arctic Amplification and the Jet StreamJs Arctic Amplification and the Jet Stream
Js Arctic Amplification and the Jet Stream
 

Recently uploaded

Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSean M. Fox
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptNishitharanjan Rout
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismDabee Kamal
 
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes GuàrdiaPersonalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes GuàrdiaEADTU
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...Gary Wood
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfPondicherry University
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital ManagementMBA Assignment Experts
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽中 央社
 
UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024Borja Sotomayor
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code ExamplesPeter Brusilovsky
 
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUMDEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUMELOISARIVERA8
 
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...MysoreMuleSoftMeetup
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFVivekanand Anglo Vedic Academy
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnershipsexpandedwebsite
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...EADTU
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....Ritu480198
 
male presentation...pdf.................
male presentation...pdf.................male presentation...pdf.................
male presentation...pdf.................MirzaAbrarBaig5
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...Nguyen Thanh Tu Collection
 

Recently uploaded (20)

Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in Hinduism
 
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes GuàrdiaPersonalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
 
UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code Examples
 
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUMDEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
 
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDF
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
male presentation...pdf.................
male presentation...pdf.................male presentation...pdf.................
male presentation...pdf.................
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 

Puffers Pond Figs

  • 1.
  • 2.
  • 4.
  • 5.
  • 6.
  • 7. Intro Puffer’s is a man-made pond created by re-routing and damming the Mill River. -(dam built 1740 by Nathanial Kellogg, to power a saw mill. Dam washed out in 1893; current dam built in 1895; reinforced w/ concrete in 1976). -The man-made dam impedes the river’s ability to transport sediment a) by artificially and abruptly decreasing the natural channel slope, decreasing water velocity (and water’s ability to transport sediment) and b) physically blocking all but a 6-inch column of water that passes over the dam, so that only dissolved sediment can pass downstream. All of this results in sedimentation rates that far surpass those of natural ponds
  • 8. A Brief History • -The Mill River is located between the highlands of Shutesbury and the Ct. river in N. Hadley and flows over slanted bed rock • The “20ft drop in elevation over 30 feet” made it the perfect candidate for industrial applications during the industrial revolution • Around 1725 to 1760 land prospectors began buying the upper most lots along the Mill River • 1760 to 1800 many dams were built • 1763 the town commissioned the construction of a bridge (where Cushman bridge is currently located) • 1825 aprx. The New London Northern Railroad routed its’ tracks through the area, due to its volume of production occurring in the region. • “Factory Hollow” was the name for what we now call Puffers Pond. Paper mills were located upstream, and the Amherst Cotton Factory incorporators, (who’s dam can still be scene today) was located in “Factory Hollow”. West, (further down stream) grist and saw mills could be found along the Mill river, in North Amherst.
  • 9. History Continued • At each mill location a dam was built and a pond formed . As a result, the river was turned into a series of ponds. • It is believed that in 1800 the dam at Factory Hollow may have been raised (no direct proof) • Some factory material records in Factory Hollow include: – soap, firewood, lamp oil, twine, dyes (indigo), fustic, logwood, madder. Potash alum, copperas, woad, and vitrols • Nov. 30th 1847 the Ingraham Factories at Factory Hollow burned down…it had been a metropolis of industry with 100’s of buildings • The Cushman family (located up stream) moved their “Red Mill” paper plant to the abandoned Factory Hollow site, in 1891 “Red Mill burned down” • 1930’the dam at Cushman was removed, for “safety reasons” • 1970’s Puffer’s pond was dredged • Now a site for recreation
  • 10. 1985 feasibility study The town of Amherst hired the engineering firm, Tighe & Bond, to conduct a feasibility study of a dredging project in 1985, and the firm produced this contour map outlining (not extremely precisely) the rough bathymetry of Puffer’s Pond
  • 11. proposed dredging plan In 1989 Tighe & Bond created this map outlining the dredging plan for the pond. The dredging was to be completed in four “phases,” each phase covering a certain area of the pond, but only 3 phases were ultimately completed, during the winter of 1989-1990. The goal was to remove roughly 10 feet vertical depth of sediment in each of these zones, and to create a “sediment trap” that would block most incoming sediment from the Mill River and minimize the future accumulation of sediment in the main body of the pond. (describe sediment trap – basically a large hole in the ground)
  • 12. the proposed dredging plan This is a contour map of the proposed plan. Note the sediment trap at the Mill River channel.
  • 13. the 1990 bathymetry (interpolation of 1990 proposed dredging plan) Based on our 2000 and 2009 data sets, we are inclined to think that the dredging wasn’t carried out exactly as planned. -they ended up dredging down to a described “layer of gravel,” which the firm claimed was (on average) 10 feet below the existing top of the sediment -less dredging in general (esp. in sediment trap, and near dam outlet -additional dredging probably occurred in southern-central peninsula and northern-central edge of pond; -phase 4 wasn’t completed i.e. northeast portion is too deep
  • 14. 1985 vs. 1990 Statistics: 82,000 cubic meters of sediment were removed; average of 10 vertical feet of sediment removed in each zone.
  • 15. 1990 vs. 2000 These maps demonstrate the buildup of sediment around the mouth of mill river (expansion of the delta), and most notably the accumulation of sediment in the sediment trap. Reiterate goal of project: to update the bathymetry map so we can see how, where, and rate at which sediment has built up since 1990 (and to create a more accurate AND precise contour map than the 2000 one)
  • 16.
  • 17. 1990 vs. 2009 Note the accumulation of sediment in the channel, the westward expansion of the delta, the red area in the northeast where the pond wasn’t actually dredged, the lower maximum depths near the dam.
  • 18. changes in pond volume over time date volume of pond (m3) 2009 96,000 2000 89,000 1990 120,000 1985 66,000 1990-2009 23,000 1990-1985 53,000 * This corresponds to an annual sedimentation rate of 1,200 m3 per year. Since the area of drainage basin is 40 km2, the erosion rate in the drainage basin is probably about .03mm/year. ** The project report claimed that 63,000 m3 of sediment were removed during 1990 dredging. Our calculations indicate a greater amount of sediment dredged than was actually reported, which indicates the inaccuracy of the 1990 dredging plan map – i.e. they probably dredged less sediment than they had planned to when they drew up the map.
  • 19.
  • 20. Three of the four cores contained a distinctive layer of mulch.
  • 21.
  • 22. Mercury Concentrations Depth (m) Hg (nanogr ams) Hg Concent ration (ppb) .01 30.12 200.81 .40 15.20 100.3047 .90 39.30 280.6887 1.35 66.58 443.8958 1.55 675.60 4509.004 6 1.70 525.44 3502.947 9 1.90 0.56 3.7408 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 0 1000 2000 3000 4000 5000 Depth(m) Concentration (ppb) Concentration of Mercury Sediment that was not removed when the pond was dredged. Remained from mills