1. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
FINAL PROJECT
INTRODUCTION TO THE CONSTRUCTION INDUSTRY | QSB 30105 |
REPORT | PROPOSAL OF A POTENTIAL SITE
TAN CHIN YIN | 0320080
TRACE GEW YEE | 0320269
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
2. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
CONTENT
1. INTRODUCTION
2. BENEFITS & IMPACTS OF PROJECT TO THE CLIENT & THE SURROUNDING
COMMUNITY USER
3. INTRODUCTION OF SITE
4. MAP
5. SITE ANALYSIS & OBSERVATION
6. SKETCHES OF PROPOSAL
7. IMAGES OF EXAMPLE OF FOOD COURT
8. AUTHORITY PROCEDURE
9. APPROVAL FORM
10. CONCLUSION
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
3. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
1. INTRODUCTION
In this final project, we are required to be grouped with two members. We have to find
an empty space for a small construction, but the space is limited for 30m×30m or
30m×40m big.
For this project, we also have to do a report about the small construction. The report
have to require some important information which are the benefit and impact of the
project, introduction of site, site analysis and observation, costing, our plans of our
construction and some images of our ideas. So, for our site, we have decided to construct
a food court at our site. So, we have done some research about food court.
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
4. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
2. BENEFITS & IMPACTS OF PROJECT TO THE CLIENT
& THE SURROUNDING COMMUNITY USER
2.1 BENEFITS:
- many choices for foods
Food court is a place where shops are opened to sell different kinds of foods. So, there
would be many choices in choosing what to eat or drink
- convenient for nearby people
As there are nearby residential area, supermarket and sport’s center. Hence, it is very
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
5. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
convenient for them to stop and eat or drink at the food court.
- economical prices
Other food court sold their food in economical price. In our food court, we are also going
with economical prices which are affordable for everyone to buy the foods.
- save fuel from traveling
It can also help in saving fuels, as some of the people can walk or cycle to the food court
and they do not need to drive to the food court.
2.2 IMPACTS
- traffic jam
As the residential area, supermarket, sport’s center and there is even a bus stop near the
food court, so it would maybe cause a bit of traffic jam on the road.
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
6. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
- no enough parking place
If the food court becomes popular, it would cause no enough parking problems.
- worrying about
some accident might
happen
Some future accident
may also happen that
we should predict.
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
7. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
- Crime rates will also increase due to the crowds of people in food court.
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
8. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
3. INTRODUCTION TO THE SITE
It’s one of 30m x 40m empty land located at Puchong Utama , Puchong , Selangor .
SEMENANJUNG MALAYSIA SELANGOR, SEMENANJUNG MALAYSIA
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
MALAYSIA
9. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
PUCHONG UTAMA, PUCHONG, SELANGOR
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
OUR SITE
10. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
4. MAP
4.1 KEY PLAN
4.2 LOCATION PLAN
4.3 SITE PLAN ( MAP )
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
Our site
11. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
SITE PLAN ( SATELITE )
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
12. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
5. SITE ANALYSIS & OBSERVATION
5.1 SITE OBSERVATION
A) SURROUNDING ELEMENTS
A. AEON BIG
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
A
B
C
D D
E
13. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
B. KSL SPORTS CENTRE
- 38 badminton court ( largest badminton court in Malaysia )
-10 Futsal court (international tournament carried out at here before )
- Ping Pong service
- estimated crowds every night 250 people ( average )
B. PUCHONG UTAMA BUS STATION
- the only bus station in Puchong
- several bus stops around Puchong Utama
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
14. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
C. PUCHONG UTAMA RESIDENTIAL AREA
- population around 50,000
- Taman Mas
- Taman Maju Jaya
- Taman Meranti Jaya
- Bandar Bukit Puchong
- Kampung Seri Aman
-Taman Puchong Utama
(Most of the residents’ daily route are the main road which is entrance from LDP to food
court )
E. Commercial area
- 4 rows of commercial block
- Mix offices
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
Our Site
15. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
5.2 CIRCULATION
- 2 lane of 2 way main road to enter food court
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
16. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
Food
Court
Food Court
17. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
I. FROM SURROUNDING TO FOOD COURT
A) Local residents
Explanation of circulation :
Local residents normal comes from the south point of Puchong Utama, because the
residential areas in Puchong Utama are more further from the LDP( Lebuhraya
Damansara-Puchong ) to the food court.
Residents in Taman Maju Jaya normally come from the West road .
The main road for Puchong Utama residents is very important,because that is the only
way the can exit via main road to LDP.
Therefore , our food court located right next to the main road is easily been seen by the
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
Main road
High way
Main road
N
West Road
18. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
residents.
B) Non-local residents
Explanation of circulation :
Non-local residents normally enter from LDP(Lebuhraya Damansara-Puchong) to the
main road , after that turn left into Jalan Puchong Utama 3. The food court is located on
their right hand side.
C) Bus route
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
19. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
Explanation of circulation :
This is the only bus staion in Puchong.
This is also the end of the bus route, bus’s driver normally rest at here before starts their
new journey.
There are several bus route surround Puchong Utama, which is surround the food court as
well.
Although the bus does not stop right infront of food court , but the bus stop infront of
KSL sports center and on the left of the Aeon big.
People can just walk within 2 minutes from the Bus station.
The buses bring their passenger pass thru food court and stops at bus station, we think the
drivers and passengers from the buses will mostly visited food court , if they want to have
a meal.
II. EXIT FROM FOOD COURT
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
Bus
Station
20. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
Explanation of circulation :
The exit from food court is at the back. Visitors from food court exit via the main road to
their own destination.
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
Food Court
21. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
6. SKETCH PLAN OF PROPOSAL
6.1 FLOOR PLAN
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
22. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
6.2 FRONT ELEVATION
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
23. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
24. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
6.2 SIDE ELEVATION
7. IMAGES OF EXAMPLE OF FOOD COURT
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
25. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
8. AUTHORITY
PROCEDURE
PUSAT SETEMPAT (OSC)
MAJLIS PERBANDARAN SUBANG JAYA (MPSJ)
Persiaran Perpaduan USJ 5,
47610 Subang Jaya,
Selangor Darul Ehsan.
Tel : 03 – 8026 3131
Fax : 03 – 8026 3295
Web : www.mpsj.gov.my
No. Ruj. OSC : MPSJ /____ /_____
No. Ruj. OSC terdahulu (jika ada) :_____________________________
Tarikh Daftar : _____________________________
Masa : _____________________________
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
26. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
Jenis permohonan yang dikemukakan :-
1) Permohonan Kelulusan Pelan Bangunan bagi Skim Perumahan dan Bangunan Perusahaan/
Perniagaan / Kemudahan Awam / Bangunan Ibadat Bukan Islam / Rumah Sesebuah /
Rumah Berkembar.
Kategori Permohonan :
a) Permohonan secara Konvensional
b) Permohonan Serentak (KM, KT & INFRA, PB)
c) Permohonan Serentak (KT & INFRA , PB)
SENARAI SEMAK PENERIMAAN DOKUMEN BAGI PERMOHONAN PELAN
BANGUNAN
Tajuk Permohonan : .........................................................................................................................................................................
................................................................................................................................................................................
................................................................................................................................................................................
................................................................................................................................................................................
...............................................................................................................................................................................
................................................................................................................................................................................
..............................................................................................................................................................................
Pemilik /
Pemaju : ..........................................................................................................................................................................
Alamat
Pemilik/Pemaju : ..........................................................................................................................................................................
..........................................................................................................................................................................
................................................................................................................................................................................
Tel. & Fax : ..........................................................................................................................................................................
Perunding : ..........................................................................................................................................................................
Alamat
Perunding : ..........................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
Tel. & Fax : ..........................................................................................................................................................................
Nama : ..........................................................................................................................................................................
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
27. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
Perakuan Pemohon/Perunding:
Saya bagi pihak Pemohon/Perunding dengan ini membuat perakuan bahawa semua dokumen-dokumen yang disertakan adalah
benar serta
mematuhi keperluan permohonan pembangunan di Majlis Perbandaran Subang Jaya (MPSJ)
MAKLUMAN
Selaras dengan Pekeliling Ketua Setiusaha Kementerian Perumahan dan Kerajaan Tempatan bilangan 5 Tahun 2009 (rujukan
KPKT(02)799/6
Klt.8(24) – Template Seragam Senarai Semak Dokumen Dan Senarai Semak Semak Terperinci Agensi Teknikal Luaran Untuk
Proses Kelulusan
Pemajuan Melalui Pusat Setempat (OSC) bertarikh 6hb Mei 2009, pemakaian template ini dikuatkuasakan penggunaannya
mulai 1hb Mei 2011.
Sebarang pertanyaan dan penjelasan lanjut berhubung pekeliling ini boleh dikemukakan kepada:
KETUA PENGARAH
Jabatan Kerajaan Tempatan
Kementerian Perumahan & Kerajaan Tempatan
Aras 4, Blok K, Pusat Bandara Damansara,
50782 Kuala Lumpur
(u.p.: Bahagian Penyelidikan dan Perundangan Teknikal)
No. Telefon : 03-20947033 / 2087 4501
No. Fax : 03-2095 5180 / 2095 3717
Sebarang pertanyaan dan penjelasan lanjut berhubung Senarai Semak dan perinciannya, sila hubungi agensi / jabatan teknikal
yang berkaitan.
.......................…………………………….
Nama, Tandatangan & Cop Pemohon /
Perunding
.......................…………………………….
Nama, Tandatangan &
Cop Pegawai OSC 1
.......................…………………………….
Nama, Tandatangan &
Cop Pegawai OSC 2
Tarikh : …………………… Tarikh : ……………………… Tarikh : ……………………..
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
28. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
9. APPROVAL FORM
MPSJ.RK.KPT(OSC)-07
PINDAAN: 01
TARIKH KUATKUASA : 01 MEI 2014
KERAJAAN MALAYSIA
JABATAN KERAJAAN TEMPATAN
KEMENTERIAN PERUMAHAN DAN KERAJAAN TEMPATAN
PERSIARAN PERPADUAN USJ 5,
47610 SUBANG JAYA,
SELANGOR DARUL EHSAN.
TEL : 03 – 8026 3131
FAX : 03 – 8026 3295
WEB : www.mpsj.gov.my
FEBRUARI 2013
HAKCIPTA TERPELIHARA
SENARAI SEMAK DOKUMEN DAN SENARAI
SEMAK TERPERINCI AGENSI TEKNIKAL
DALAMAN DAN LUARAN
(PELAN BANGUNAN BARU/SERENTAK)
MAJLIS PERBANDARAN
SUBANG JAYA(MPSJ)
PERSIARAN PERPADUAN USJ 5,
47610 SUBANG JAYA,
SELANGOR DARUL EHSAN.
TEL : 03 – 8026 3131
FAX : 03 – 8026 3295
WEB : www.mpsj.gov.my
TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269
29. FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL
10. CONCLUSION
In this 40m x 30m proposal of a food court, with solemn consideration from many
aspects. We can say that pros of present of this building are much more than the cons. The
main reason we say so is because of the surrounding elements. With these helps from the
surrounding elements , our proposal of food court is about to say 99% success of
percentage out of 100% , therefore developer should accept this proposal without much
hesitation.
The reason why it is still empty now, in our opinion are the landowner want to keep it or
lent to others but not self develope as the landowner may have a thought of this very
potential land may bring him more benefits in the future.