INTRODUCTION	
  TO	
  CONSTRUCTION	
  INDUSTRY	
  	
  
[QSB30105]	
  
	
  
AMANDA	
  CHIONG	
  |	
  0320328	
  	
  
BRIDGET	
  HSU	
  |	
  0320218	
  	
  
FNBE	
  AUG	
  2014	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
Content	
  	
  
1. Project	
  Background	
  	
  
2. Introduction	
  To	
  Site	
  	
  
3. Location	
  &	
  Key	
  Plan	
  &	
  Site	
  Plan	
  	
  
4. Existing	
  Condition	
  
5. Site	
  context	
  	
  
6. Analysis	
  +	
  Inventory	
  +	
  Observation	
  	
  
-­‐ Circulation	
  	
  
-­‐ Microclimate	
  	
  
-­‐ Drainage	
  	
  
7. Individual	
  proposal	
  (Amanda	
  Chiong)	
  
8. Individual	
  proposal	
  (Bridget	
  Hsu)	
  
	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
PROJECT	
  INTRODUCTION	
  	
  
	
  
1.1 PROJECT	
  BACKGROUND	
  
	
  
	
   This	
  is	
  the	
  final	
  project	
  of	
  	
  Introduction	
  to	
  
Construction	
  Industry	
  	
  	
  .	
  This	
  project	
  consist	
  of	
  10%	
  Group	
  
and	
  30%	
  Individual	
  	
  The	
  objective	
  of	
  this	
  project	
  is	
  to	
  enable	
  
students	
  to	
  develop	
  an	
  understanding	
  of	
  the	
  building	
  team,	
  
its	
  organization,	
  duties	
  and	
  	
  inter-­‐relations	
  within	
  which	
  
they	
  will	
  seek	
  employment,	
  career	
  progression	
  or	
  further	
  
study	
  and	
  also	
  to	
  develop	
  an	
  awareness	
  of	
  their	
  professional	
  
responsibilities	
  and	
  to	
  appreciate	
  their	
  profession	
  in	
  	
  the	
  
construction	
  industry.	
  	
  	
  
	
   In	
  a	
  group	
  of	
  2	
  students	
  ,	
  student	
  need	
  to	
  find	
  a	
  specific	
  
empty	
  land	
  to	
  initiate	
  a	
  small	
  construction	
  project.	
  The	
  size	
  
of	
  the	
  land	
  shall	
  between	
  900m2	
  (30m	
  x	
  30m)	
  –	
  1200m2	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
(	
  30m	
  x	
  40m)	
  and	
  come	
  out	
  with	
  a	
  proposal	
  .	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
Introduction	
  to	
  the	
  Site	
  
	
  
	
  
	
  
After	
   surveying	
   and	
   consulting	
   with	
   our	
  
tutor,	
  we	
  choose	
  this	
  site	
  for	
  our	
  project	
  which	
  
is	
   located	
   at	
   Lorong	
   Kumpang	
   6,	
   Taman	
  
Ridgeway,	
   93200	
   Kuching,	
   Sarawak.	
   It	
   is	
   an	
  
empty	
  land	
  which	
  is	
  surrounded	
  by	
  residential	
  
area	
   as	
   shown	
   in	
   the	
   pictures	
   above.	
   We	
   find	
  
that	
   it	
   is	
   wasteful	
   to	
   let	
   it	
   remain	
   blank	
   and	
  
unused	
   as	
   it	
   is	
   located	
   in	
   the	
   center	
   of	
  
residential	
   area	
   which	
   have	
   development	
  
potential	
   on	
   various	
   purposes	
   to	
   benefit	
   the	
  
residents.	
   Thus,	
   we	
   decided	
   to	
   start	
   our	
  
development	
  project	
  on	
  it.	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
LOCATION	
  &	
  KEY	
  PLAN	
  	
  
	
  
PROJECT	
  SITE	
  
2.1	
  SITE	
  LOCATION	
  	
  
	
  
	
  
LOCATION	
  :	
  	
  
Lorong	
  Kumpang	
  6,	
  
Taman	
  Ridgeway,	
  
93200	
  Kuching,	
  
Sarawak.	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
SITE	
  PLAN	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
Existing	
  Condition	
  	
  
	
  
	
  
	
  
è	
  This	
  site	
  is	
  an	
  empty	
  
land	
  which	
  is	
  located	
  at	
  
Taman	
  Hwata.	
  
	
  
è	
  It	
  is	
  surrounded	
  by	
  
residential	
  area.	
  
	
  
	
  
è	
  There	
  is	
  no	
  any	
  
shoplots	
  around	
  it	
  
except	
  houses.	
  	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
è	
  There	
  is	
  a	
  few	
  types	
  of	
  
development	
  project	
  had	
  
been	
  carried	
  out	
  in	
  the	
  
same	
  area.	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
SITE	
  CONTEXT	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
SITE	
  
	
  ANALYSIS	
  	
  
INVENTORY	
  
OBSERVATION	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
CIRCULATION	
  	
  
	
  
-­‐ 	
  
-­‐ )	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  	
  	
  	
  
	
   	
   	
  	
  
Circulation	
  1	
  
	
  
Circulation	
  2	
  	
  	
  
	
  
	
  
The	
  site	
  can	
  be	
  easily	
  accessed	
  .	
  There	
  is	
  no	
  
specific	
  circulation	
  of	
  peoples	
  ,	
  because	
  there	
  is	
  
nothing’s	
  can	
  attract	
  people	
  to	
  go	
  to	
  the	
  site	
  .	
  People	
  
can	
  enter	
  to	
  the	
  site	
  through	
  circulation	
  1	
  or	
  
circulation	
  as	
  you	
  can	
  see	
  on	
  the	
  picture	
  .	
  	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
MICROCLIMATE	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
THE	
  SITE	
  IS	
  MODERATELY	
  HOT	
  
AND	
  EXTREMELY	
  SULTRY	
  ALL	
  
YEAR	
  ROUND	
  .	
  IT	
  IS	
  COOLER	
  IN	
  
THE	
  EARLY	
  MORNING	
  (6-­‐8AM)	
  
AND	
  LATE	
  EVENING	
  (6-­‐8PM),	
  
WITH	
  TEMPARATURE	
  ABOUT	
  
28	
  °C	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
-­‐WIND	
  FLOW	
  FROM	
  2	
  DIRECTION-­‐	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
DRAINAGE	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
There	
  is	
  only	
  one	
  
drainage	
  can	
  be	
  
seen	
  on	
  our	
  site	
  .	
  	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
SITE	
  ANALYSIS	
  	
  
	
  
SITE	
  CONTEXT	
  	
   Image Distance Time
Kuching	
  
International	
  	
  
Airport	
  
9.2 km 15 min
Kuching	
  City	
  Center	
   5.6 km 12 min
SHOPPING	
  MALL	
  	
  
City	
  ONE	
  Megamall	
   2.4 km 5 min
Boulevard	
  
Shopping	
  Mall	
  
	
  
3.6	
  km	
   6	
  min	
  
The	
  Spring	
  
Shopping	
  Mall	
  
	
  
3.6	
  km 6	
  min	
  
HEATH	
  CENTER	
  	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
Timberland	
  Medical	
  
Centre	
  
1.6 km 4	
  min
Borneo	
  Medical	
  
Centre	
  
2	
  km 3	
  min
EDUCATION	
  AREA	
  	
  
	
  
SMK	
  DPHA	
  Gapor	
   1.8 km 4	
  min
Inti	
  College	
  
Sarawak	
  
	
  
1.8 km 4	
  min
Swinburne	
  
University	
  of	
  
Technology	
  
	
  
2.5	
  km 5	
  min
Sunway	
  College	
  
Kuching	
  
	
  
1.5	
  km 4	
  min
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
	
  
SERVICE	
  CENTER	
  	
  
Maybank	
  Kuching	
  
Selantan	
  
1.9	
  km 4	
  min
Petronas	
  	
  station	
   1.4	
  km 3	
  min
SUPERMARKET	
  	
  
	
  
Morning	
  Market	
   2.3	
  km 5	
  min
RESTAURANT	
  	
  
	
  
KFC	
  
	
  
1.6	
  km 4	
  min
MacDonald	
  
	
  
2.0	
  km 5	
  min
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Pizza	
  Hut	
  
	
  
1.6	
  km 4	
  min
RELIGIOUS	
  AREA	
  	
  
	
  
Church	
  
	
  
1.3	
  km 4	
  min
Kuching	
  Buddhist	
  
Society	
  
	
  
0.9	
  km 2	
  min
Masjid	
  
	
  
1	
  km 2	
  min
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
	
  
AMANDA	
  CHIONG	
  
PROPOSAL	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
Final	
  Project	
  :	
  	
  
A	
  Sport	
  Recreational	
  Centre	
  
Development	
  Plan	
  Proposal	
  
	
   	
  
Name	
  :	
  Amanda	
  Chiong	
  Pei	
  Shan	
  
	
  
Student	
  ID	
  :	
  0320328	
  
	
  
Tutor	
  :	
  Pn.	
  Hasmanira	
  
	
  
Course	
  :	
  Foundation	
  in	
  Natural	
  and	
  Built	
  
Environment	
  (FNBE)	
  
	
  
Module	
  :	
  Introduction	
  to	
  the	
  Constructed	
  	
  
Industry	
  (QSB30105)	
  
	
  
Intake	
  :	
  August	
  2014	
  
	
   	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
Contents	
  
	
  
No.	
   Topic	
   Page	
  
1.	
   Introduction	
   3	
  
2.	
   Objective	
  of	
  the	
  Construction	
   4	
  
3.	
   Sketch	
  Plan	
  of	
  Proposal	
   5-­‐12	
  
4.	
   Concept	
   13-­‐14	
  
5.	
   Rationale	
  and	
  Benefits	
   15-­‐16	
  
6.	
   Costing	
   17	
  
7.	
   References	
  List	
   18	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
   	
  
Introduction	
  
	
  
	
  	
  	
  	
  	
  	
  In	
  this	
  final	
  project,	
  we	
  are	
  given	
  a	
  task	
  
to	
   find	
   a	
   specific	
   empty	
   land	
   with	
   a	
  
maximum	
  size	
  of	
  900m²	
  to	
  initiate	
  a	
  small	
  
construction	
  project	
  on	
  it	
  in	
  a	
  group	
  of	
  2	
  
people.	
  
	
  	
  	
  	
  	
  	
  For	
   this	
   project,	
   we	
   have	
   to	
   do	
  
research	
   on	
   the	
   types	
   of	
   building	
  
development,	
   for	
   instance,	
   recreation	
  
area,	
   commercial	
   area,	
   industrial	
   area,	
  
agricultural	
   area,	
   tourism	
   area	
   and	
  
residential	
  area.	
  In	
  this	
  plan	
  proposal,	
  we	
  
should	
   include	
   suggestion,	
   rationale,	
  
benefits,	
  site	
  analysis,	
  evaluation	
  and	
  the	
  
requirement	
  of	
  the	
  project.	
  
	
  	
  	
  	
  	
  	
  For	
   our	
   group,	
   we	
   come	
   out	
   with	
   an	
  
outcome	
  to	
  use	
  the	
  empty	
  land	
  located	
  in	
  
Kuching,	
   Sarawak.	
   Thus,	
   I	
   decided	
   to	
  
build	
   a	
   sport	
   recreation	
   centre	
   on	
   this	
  
empty	
  land	
  for	
  my	
  individual	
  report.	
  	
  
	
   	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
Objective	
  of	
  the	
  Construction	
  
è	
  To	
  serve	
  as	
  a	
  sport	
  recreation	
  centre	
  
for	
  the	
  residents	
  in	
  Taman	
  Hwata	
  	
  
è	
   To	
   provide	
   a	
   recreation	
   and	
   leisure	
  
venue	
  for	
  the	
  residents	
  
è	
  To	
  provide	
  a	
  standard	
  and	
  high	
  quality	
  
sports	
  environment	
  for	
  the	
  residents	
  
è	
  To	
  promote	
  good	
  relation	
  between	
  
neighborhood	
  	
  
è	
  To	
  raise	
  awareness	
  about	
  importance	
  
of	
  exercise	
  for	
  health	
  	
  
è	
  To	
  provide	
  an	
  area	
  for	
  the	
  teenagers	
  to	
  
relax	
  through	
  a	
  positive	
  and	
  healthy	
  way	
  
è	
  To	
  improve	
  public	
  interests	
  in	
  sports	
  
especially	
  among	
  the	
  teenagers	
  
è	
  To	
  provide	
  a	
  comfortable	
  and	
  
convenient	
  place	
  which	
  is	
  equipped	
  with	
  
complete	
  facilities	
  for	
  exercise	
  
	
   	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
Sketch	
  Plan	
  of	
  Proposal	
  
	
  
	
  	
  	
  	
  	
  	
  This	
  mini	
  sport	
  stadium	
  is	
  equipped	
  with	
  
complete	
  facilities	
  to	
  enable	
  the	
  residents	
  to	
  
enjoy	
  a	
  standard	
  quality	
  environment	
  of	
  
exercise.	
  The	
  stadium	
  consists	
  of	
  2	
  storeys,	
  
which	
  have	
  an	
  indoor	
  basketball	
  court	
  on	
  the	
  
ground	
  floor	
  whereas	
  two	
  volleyball	
  courts,	
  two	
  
badminton	
  courts,	
  and	
  a	
  yoga	
  studio	
  on	
  the	
  first	
  
floor	
  as	
  well.	
  Therefore,	
  different	
  types	
  of	
  games	
  
can	
  be	
  carried	
  out	
  at	
  the	
  same	
  time.	
  Other	
  than	
  
that,	
  it	
  also	
  solve	
  the	
  problem	
  of	
  space	
  
insufficiency	
  for	
  exercise	
  which	
  often	
  occur	
  in	
  
the	
  reality	
  life.	
  
	
  	
  	
  	
  	
  	
  In	
  the	
  mini	
  stadium,	
  there	
  are	
  two	
  glass	
  
sliding	
  door	
  as	
  the	
  main	
  entrance	
  located	
  on	
  
each	
  side	
  of	
  the	
  stadium	
  for	
  easy	
  access.	
  Beside	
  
that,	
  two	
  staircases	
  is	
  provided	
  too	
  near	
  the	
  
entrance	
  which	
  connected	
  the	
  ground	
  floor	
  to	
  
the	
  second	
  floor.	
  Since	
  the	
  entrance	
  is	
  faced	
  to	
  
the	
  parking	
  area,	
  thus	
  there	
  would	
  be	
  no	
  
problem	
  for	
  the	
  visitor	
  to	
  access	
  the	
  stadium	
  
and	
  explore	
  throughout	
  the	
  entire	
  building.	
  
	
  	
  	
  	
  	
  	
  For	
  the	
  interior	
  ground	
  floor	
  area,	
  the	
  
stadium	
  are	
  accommodated	
  with	
  two	
  sides	
  of	
  
audience	
  seats	
  that	
  are	
  distributed	
  scientifically	
  
to	
  avoid	
  any	
  visual	
  obstruction	
  provide	
  the	
  
audience	
  a	
  good	
  view	
  during	
  the	
  game	
  is	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
playing.	
  Other	
  than	
  that,	
  there	
  is	
  also	
  athletes’	
  
rest	
  room	
  provided	
  in	
  the	
  stadium	
  with	
  
different	
  gender	
  separated.	
  Each	
  of	
  the	
  rest	
  
room	
  supplied	
  with	
  shower	
  room,	
  stadium	
  
lockers,	
  benches,	
  toilets	
  and	
  sinks.	
  There	
  are	
  
also	
  public	
  toilets	
  provided	
  for	
  males	
  and	
  
females	
  beside	
  the	
  rest	
  room	
  for	
  public.	
  
	
  	
  	
  	
  	
  	
  On	
  the	
  first	
  floor,	
  there	
  are	
  two	
  benches	
  on	
  
the	
  side	
  of	
  each	
  court.	
  There	
  is	
  a	
  net	
  windscreen	
  
playing	
  the	
  role	
  as	
  a	
  barrier	
  between	
  volleyball	
  
courts	
  and	
  badminton	
  courts	
  for	
  safety	
  
purposes.	
  A	
  yoga	
  studio	
  is	
  located	
  near	
  to	
  the	
  
badminton	
  court	
  and	
  there	
  is	
  a	
  storeroom	
  
beside	
  it.	
  There	
  is	
  also	
  restroom	
  for	
  athletes	
  and	
  
public	
  toilets	
  provided	
  on	
  this	
  floor.	
  Other	
  than	
  
that,	
  there	
  is	
  also	
  a	
  coffeehouse	
  as	
  a	
  resting	
  area	
  
on	
  the	
  first	
  floor.	
  
	
   	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
Plan	
  of	
  the	
  
	
  building	
  	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
Plan	
  of	
  interior	
  structure	
  
	
  
	
   	
  
>	
 Volleyball	
  
court	
  
>	
 Basketball	
  court	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
   	
  
>	
 Coffeehouse	
  
>	
 Badminton	
  
court	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
   	
  
-­‐	
  locker	
  
-­‐	
  shower	
  room	
  
-­‐	
  benches	
  
	
  
Examples	
  of	
  the	
  facilities	
  
	
  
1.	
  Restrooms	
  
-­‐	
  toilets	
  	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
-­‐	
  pvc	
  flooring	
  
>	
 low	
  sound	
  
transmission
>	
 Longer	
  service	
  life
>	
 Robust	
  
>	
 Less	
  maintenance	
  
>	
 Easy	
  installation	
  
>	
 Sturdy	
  construction	
  
>	
 An	
  wireless	
  electrical	
  
scoreboard	
  is	
  hanging	
  
down	
  from	
  the	
  ceiling	
  
in	
  the	
  middle	
  of	
  the	
  
court	
  	
  	
  
>	
 Audience	
  seat	
  on	
  
the	
  both	
  side	
  of	
  the	
  
basketball	
  court	
  
-­‐	
  basketball	
  court	
  
>	
  width	
  =	
  15m	
  
>	
  length	
  =	
  28m	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
6.	
  Coffeehouse	
  
	
  
	
  
	
  
5.	
  Yoga	
  Studio	
  
	
  
	
  
	
  
4.	
  Volleyball	
  Court	
  
	
  
	
  
	
  
3.	
  Badminton	
  Court	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
Concept	
  
	
  
	
  	
  	
  	
  	
  	
  This	
  construction	
  plan	
  proposal	
  is	
  designed	
  
based	
  on	
  the	
  30m×30m	
  empty	
  land	
  located	
  at	
  
Kuching,	
  Sarawak.	
  The	
  aim	
  of	
  this	
  construction	
  
is	
  to	
  transform	
  the	
  unused	
  empty	
  land	
  into	
  a	
  
place	
  that	
  can	
  benefit	
  the	
  residents.	
  	
  
	
  	
  	
  	
  	
  After	
  surveying,	
  I	
  found	
  that	
  there	
  is	
  no	
  any	
  
place	
  provided	
  for	
  the	
  residents	
  to	
  exercise	
  in	
  
this	
  area.	
  Thus,	
  I	
  decided	
  to	
  start	
  a	
  construction	
  
of	
  a	
  mini	
  sport	
  stadium	
  on	
  this	
  empty	
  land,	
  
which	
  accommodate	
  with	
  3	
  kinds	
  of	
  courts,	
  a	
  
yoga	
  studio	
  and	
  a	
  coffeehouse	
  to	
  provide	
  a	
  
sufficient	
  space	
  for	
  the	
  residents	
  to	
  enjoy	
  
exercising	
  under	
  a	
  complete	
  equipped	
  
environment.	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  	
  	
  Residents	
  can	
  enjoy	
  some	
  popular	
  indoor	
  
sport	
  activities,	
  for	
  example,	
  basketball,	
  
badminton	
  and	
  volleyball.	
  Besides	
  that,	
  small	
  
games	
  competition	
  or	
  matches	
  can	
  be	
  held	
  at	
  
here	
  as	
  the	
  facilities	
  are	
  complete	
  equipped.	
  	
  
	
  	
  	
  	
  	
  	
  After	
  considered	
  every	
  single	
  problems,	
  I	
  
had	
  came	
  out	
  with	
  an	
  outcome	
  of	
  the	
  design	
  of	
  
my	
  site	
  which	
  makes	
  it	
  become	
  an	
  unique	
  place	
  
that	
  is	
  suitable	
  for	
  exercise	
  and	
  training.	
  The	
  
stadium	
  is	
  a	
  recreation	
  area,	
  which	
  is	
  designed	
  
to	
  be	
  constructed	
  using	
  sustainable	
  and	
  
environment-­‐friendly	
  construction	
  materials.	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  	
  	
  	
  	
  	
  This	
  building	
  is	
  generally	
  eco-­‐friendly	
  and	
  
the	
  concept	
  of	
  the	
  entire	
  building	
  is	
  basically	
  
based	
  on	
  the	
  green	
  building	
  concept.	
  The	
  outer	
  
part	
  of	
  the	
  building	
  is	
  a	
  combination	
  of	
  steel	
  and	
  
glass	
  that	
  is	
  counted	
  as	
  elements	
  of	
  recycled-­‐
content	
  building	
  materials.	
  	
  
	
   	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
Rationale	
  and	
  Benefits	
  
	
  
	
  	
  	
  	
  	
  	
  There	
  is	
  a	
  lot	
  of	
  reasons	
  and	
  benefits	
  to	
  built	
  
this	
  stadium.	
  First,	
  the	
  location	
  of	
  or	
  site	
  is	
  
strategic	
  in	
  the	
  city	
  with	
  a	
  big	
  empty	
  surface	
  
area.	
  The	
  surplus	
  empty	
  spaces	
  after	
  the	
  
complete	
  construction	
  of	
  the	
  stadium	
  can	
  be	
  
considered	
  to	
  build	
  as	
  a	
  car	
  park	
  to	
  make	
  the	
  
circulation	
  and	
  access	
  for	
  the	
  residents	
  and	
  
public	
  to	
  the	
  stadium	
  very	
  convenient	
  and	
  
comfortable.	
  	
  
	
  	
  	
  	
  	
  	
  This	
  construction	
  plan	
  is	
  targeting	
  majorly	
  
on	
  the	
  residents	
  in	
  Taman	
  Hwata	
  as	
  this	
  area	
  is	
  
lack	
  of	
  a	
  sport	
  recreation	
  area.	
  In	
  fact,	
  the	
  
stadium	
  serves	
  free	
  and	
  standard	
  sport	
  
equipment	
  and	
  facilities	
  for	
  public	
  to	
  encourage	
  
the	
  residents	
  to	
  be	
  more	
  active	
  in	
  sports	
  and	
  
also	
  encourage	
  the	
  teenagers	
  to	
  relax	
  through	
  a	
  
positive	
  ways.	
  Besides	
  that,	
  the	
  stadium	
  also	
  can	
  
promote	
  the	
  relation	
  between	
  neighborhoods.	
  	
  
	
  	
  	
  	
  	
  	
  Sports	
  bring	
  many	
  benefits	
  to	
  us,	
  it’s	
  not	
  only	
  
improves	
  our	
  health	
  physically	
  but	
  also	
  
empower	
  youth	
  and	
  promote	
  higher	
  self-­‐esteem	
  
among	
  the	
  teenagers.	
  Other	
  than	
  that,	
  it	
  also	
  
motivates	
  students	
  in	
  their	
  studies,	
  which	
  lead	
  
them	
  to	
  get	
  better	
  grades.	
  Playing	
  sports	
  also	
  
can	
  create	
  friendships	
  and	
  extend	
  social	
  
networks	
  because	
  sports	
  gather	
  peoples	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
together	
  from	
  different	
  places,	
  backgrounds,	
  
and	
  communities.	
  Many	
  times,	
  the	
  friendships	
  
that	
  create	
  on	
  the	
  field	
  remain	
  intact	
  even	
  when	
  
you	
  are	
  not	
  playing	
  sports.	
  	
  
	
  	
  	
  	
  	
  	
  Overall,	
  this	
  recreational	
  development	
  plan	
  
brings	
  a	
  lot	
  of	
  benefits	
  and	
  comfortable	
  for	
  the	
  
residents.	
  	
  
	
   	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  Costing	
  
	
  
No.	
   Item	
   Unit	
   Qty	
   Amount(RM)	
  
1.	
   Cement	
   m2	
   310	
   7,750.00	
  
2.	
   Brick	
   m2	
   335	
   8,375.00	
  
3.	
   Roof	
   m2	
   910	
   145,600.00	
  
4.	
   Lamp	
   no.	
   350	
   5,600.00	
  
5.	
   Bench	
   no.	
   26	
   7,800.00	
  
6.	
   Scoreboard	
   no.	
   1	
   2,000.00	
  
7.	
   Locker	
   no.	
   80	
   9,600.00	
  
8.	
   Dustbin	
   no.	
   20	
   1,300.00	
  
9.	
   Toilet	
  bowl	
   no.	
   24	
   2,400.00	
  
10.	
   Urinal	
   no.	
   8	
   40.00	
  
11.	
   Toilet	
  sink	
   no.	
   24	
   720.00	
  
12.	
   Shower	
   no.	
   24	
   1,920.00	
  
13.	
   Toilet	
  door	
   no.	
   28	
   4,480.00	
  
14.	
   Sliding	
  door	
   no.	
   2	
   225.00	
  
15.	
   Door	
   no.	
   3	
   720.00	
  
16.	
   Air	
  Conditioner	
   no.	
   42	
   126,000.00	
  
17.	
   Fan	
   no.	
   25	
   2,125.00	
  
Total	
   326,655.00	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
References	
  List	
  
	
  
What	
  are	
  the	
  benefits	
  of	
  Sport?	
  Advantages	
  of	
  sport.	
  
(n.d.).	
  Retrieved	
  November	
  10,	
  2014,	
  from	
  
http://www.onlinesportscommunity.com/The	
  benefi
ts	
  of	
  sport/	
  
	
  
Advantages	
  Of	
  Sports	
  And	
  Teens.	
  (n.d.).	
  Retrieved	
  
November	
  10,	
  2014,	
  from	
  
http://www.more4kids.info/359/advantages-­‐of-­‐
sports-­‐and-­‐teens/	
  
	
  
(n.d.).	
  Retrieved	
  November	
  10,	
  2014,	
  from	
  
http://www.polokwane.gov.za/index.php?view_page	
  
1782	
  
	
  
Construction	
  elements	
  for	
  Melbourne	
  sports	
  stadium.	
  
(n.d.).	
  Retrieved	
  November	
  10,	
  2014,	
  from	
  
https://www.thyssenkrupp.com/en/bildstrecke/41/	
  
	
  
Design	
  elements	
  -­‐	
  Basketball	
  courts.	
  (n.d.).	
  Retrieved	
  
November	
  10,	
  2014,	
  from	
  
https://conceptdraw.com/a2201c3/preview	
  
	
  
(n.d.).	
  Retrieved	
  November	
  10,	
  2014,	
  from	
  
http://www.uefa.org/MultimediaFiles/Download/Eu
roExperience/competitions/General/01/74/38/69/1
743869_DOWNLOAD.pdf	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
BRIDGET	
  HSU	
  	
  	
  
PROPOSAL	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
PROJECT	
  3	
  :	
  	
  
THE	
  PROJECT	
  PROPOSAL	
  	
  
	
  
INTRODUCTION	
  TO	
  CONSTRUCTION	
  INDUSTRY	
  	
  
[QSB30105]	
  
	
  
BRIDGET	
  HSU	
  |	
  0320218	
  	
  
FNBE	
  AUG	
  2014	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
CONTENT	
  	
  
	
  
1.PROJECT	
  INTRODUCTION	
  	
  
2.PROJECT	
  CONCEPT	
  	
  
3.PROJECT	
  PLAN	
  	
  
4.JUSTIFICATION	
  	
  
5.	
  COSTING	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  Page	
  
	
  
3	
  
4-­‐6	
  
7	
  
8	
  
9	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
PROJECT	
  INTRODUCTION	
  	
  
	
  
1.2 PROJECT	
  BACKGROUND	
  
	
  
	
   This	
  is	
  the	
  final	
  project	
  of	
  	
  Introduction	
  to	
  
Construction	
  Industry	
  .	
  In	
  this	
  project	
  I	
  was	
  given	
  a	
  
task	
  to	
  find	
  a	
  specific	
  empty	
  land	
  to	
  initiate	
  a	
  small	
  
construction	
  project.	
  The	
  size	
  of	
  the	
  land	
  shall	
  
between	
  900m2	
  (30m	
  x	
  30m)	
  –	
  1200m2	
  	
  (	
  30m	
  x	
  40m)	
  
and	
  come	
  out	
  with	
  a	
  proposal.	
  	
  
I	
  have	
  decided	
  to	
  develop	
  a	
  commercial	
  area	
  on	
  
the	
  land	
  that	
  we	
  found	
  .	
  I	
  plan	
  	
  to	
  build	
  a	
  drive	
  –	
  thru	
  
laundry	
  and	
  a	
  café	
  on	
  that	
  empty	
  land	
  because	
  the	
  
land	
  is	
  surround	
  with	
  residential	
  area	
  ,	
  education	
  
area	
  and	
  also	
  service	
  area	
  which	
  means	
  a	
  lot	
  of	
  
people	
  will	
  go	
  through	
  this	
  land	
  to	
  access	
  to	
  another	
  
land.	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
PROJECT	
  CONCEPT	
  	
  
	
  
3.1	
  PROJECT	
  CONCEPT	
  	
  
	
  
The	
  construction	
  plan	
  is	
  design	
  on	
  30	
  x	
  30	
  
in	
  Lorong	
  Kumpang	
  6,	
  Taman	
  Ridgeway,	
  93200	
  
Kuching,	
  Sarawak	
  .	
  It	
  conceive	
  two	
  kind	
  of	
  
commercial	
  area	
  .	
  It	
  is	
  a	
  sufficient	
  space	
  for	
  the	
  
resident	
  staying	
  around	
  to	
  enjoy	
  the	
  good	
  
facilities	
  provided	
  at	
  the	
  commercial	
  building	
  .	
  	
  
Furthermore	
  ,	
  the	
  part	
  which	
  I	
  really	
  
highlighted	
  in	
  my	
  commercial	
  building	
  is	
  the	
  
Drive-­‐	
  Thru	
  Laundry	
  ,	
  people	
  nowadays	
  have	
  a	
  
very	
  tight	
  schedule	
  of	
  life	
  ,	
  therefore	
  drive-­‐	
  thru	
  
laundry	
  will	
  bring	
  a	
  lot	
  of	
  benefit	
  to	
  everyone.	
  	
  
	
  There	
  is	
  also	
  a	
  lovely	
  café	
  inside	
  the	
  
building	
  .	
  The	
  café	
  is	
  where	
  people	
  have	
  a	
  little	
  
break	
  time	
  while	
  waiting	
  for	
  the	
  cloths	
  to	
  be	
  
collect	
  	
  .	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
OBJECTIVE	
  	
  
	
  
-­‐ Offer	
  clients	
  services	
  ranging	
  from	
  full-­‐service	
  
washing	
  and	
  drying	
  to	
  optional	
  folding,	
  and	
  
extended	
  business	
  hours.	
  
	
  
-­‐ To	
  provide	
  convenient,	
  clean,	
  and	
  friendly	
  
laundry	
  service.	
  
	
  
	
  
-­‐ Unite	
  the	
  neighborhood	
  relationship	
  
between	
  each	
  other	
  .	
  	
  
	
  
	
  
BENEFIT	
  	
  
	
  
-­‐ Busy	
  people	
  can	
  just	
  drop	
  their	
  dirty	
  clothes	
  and	
  
collect	
  it	
  when	
  the	
  cloth	
  are	
  ready	
  to	
  be	
  collect	
  
by	
  just	
  drive	
  thru	
  the	
  laundry	
  shop	
  .	
  	
  
-­‐ Citizen	
  staying	
  around	
  the	
  building	
  can	
  send	
  
their	
  clothes	
  by	
  walking	
  .	
  	
  
-­‐ Citizen	
  staying	
  in	
  that	
  area	
  will	
  know	
  more	
  about	
  
people	
  staying	
  around	
  them	
  by	
  seeing	
  them	
  at	
  
the	
  coffee	
  shop	
  inside	
  the	
  laundry	
  building	
  ,	
  this	
  
might	
  help	
  to	
  get	
  know	
  each	
  other	
  more	
  and	
  be	
  
friend	
  .	
  
-­‐ Business	
  man	
  /	
  women	
  can	
  save	
  their	
  money	
  by	
  
paying	
  so	
  much	
  to	
  maid	
  for	
  only	
  helping	
  washing	
  
cloths	
  and	
  folding	
  it	
  .	
  	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
3.2	
  PROJECT	
  IMAGES	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
PROJECT	
  PLAN	
  	
  
	
  
ELEVATION	
  	
  
FLOOR	
  PLAN	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
	
  
JUSTIFICATION	
  
	
  
	
  
Building	
  a	
  commercial	
  area	
  on	
  the	
  empty	
  land	
  
has	
  made	
  it	
  a	
  business	
  opportunity	
  with	
  great	
  
potential	
  .	
  Drive	
  –	
  Thru	
  Laundry	
  +	
  Coffee	
  shop	
  .	
  	
  
According	
  to	
  my	
  research	
  and	
  also	
  my	
  own	
  
experience	
  living	
  Malaysia	
  ,	
  Malaysia	
  has	
  a	
  very	
  
unpredictable	
  weather	
  country	
  .	
  Due	
  to	
  this	
  issue	
  
many	
  people	
  complain	
  especially	
  business	
  man	
  ,	
  
student	
  even	
  house	
  wife	
  complain	
  about	
  the	
  weather	
  
in	
  Malaysia	
  .	
  What	
  they	
  complain	
  ?	
  People	
  complaint	
  
on	
  a	
  sunny	
  day	
  out	
  of	
  sudden	
  it	
  will	
  rain	
  and	
  all	
  
clothes	
  are	
  wet	
  again	
  before	
  it	
  dry	
  completely	
  .	
  This	
  
make	
  people	
  very	
  angry	
  .	
  
People	
  are	
  rushing	
  with	
  time	
  nowadays	
  .	
  
Everyone	
  has	
  a	
  very	
  tight	
  life	
  schedule	
  .	
  A	
  drive	
  thru	
  
(Pick	
  &	
  Pay	
  &	
  Go)	
  will	
  be	
  more	
  convenient	
  for	
  
everyone	
  .	
  But	
  there	
  is	
  also	
  a	
  sitting	
  area	
  and	
  a	
  coffee	
  
shop	
  to	
  relax	
  inside	
  this	
  commercial	
  building	
  .	
  	
  	
  
Resident	
  staying	
  in	
  this	
  area	
  can	
  walk	
  to	
  this	
  
Drive-­‐	
  Thru	
  laundry	
  .	
  1	
  min	
  walking	
  distance	
  from	
  
housing	
  area	
  .	
  You	
  might	
  see	
  your	
  neighbor	
  which	
  
you	
  haven’t	
  seen	
  them	
  before	
  .	
  Higher	
  chance	
  of	
  
getting	
  know	
  more	
  people	
  staying	
  at	
  your	
  
neighborhood	
  .	
  	
  	
  
Therefore	
  ,	
  in	
  my	
  opinion	
  opening	
  a	
  drive	
  thru	
  -­‐	
  
laundry	
  shop	
  in	
  Kuching	
  ,Malaysia	
  has	
  a	
  very	
  high	
  
potential	
  .	
  	
  	
  
	
   	
  
	
  
	
  
	
  
 
	
  
	
  
	
  ICI	
  FINAL	
  PROJECT	
  |	
  THE	
  PROJECT	
  PROPOSAL	
  |	
  FNBE	
  AUG	
  2014	
  	
  
	
  
	
   	
  
	
  
AMANDA	
  CHIONG	
  -­‐	
  0320328	
  |	
  BRIDGET	
  HSU	
  -­‐	
  0320218	
  |	
  PN	
  HAS	
  	
  
	
  
	
   	
  
ESTIMATE	
  COSTING	
  	
  
	
  
	
  
	
  
Item	
  	
   Description	
  	
   Unit	
   Qty	
   Amount	
  (RM)	
  
	
   A	
  –	
  Concrete	
  	
   	
   	
   	
  
	
   Cement	
  	
   M³	
   300	
   7500.00	
  
	
   Brick	
  	
   M
2
	
   350	
   8750	
  .00	
  
	
   B	
  –	
  Roofing	
  	
   	
   	
   	
  
	
   Roof	
  	
   M
2
	
   1200	
   192000.00	
  
	
   C	
  –	
  Element	
  	
   	
   	
   	
  
	
   Washer	
  –	
  38Ib	
  capacity	
  	
   No.	
   5	
   15000.00	
  
	
   Tumbler	
  Dryer	
  40Ib	
  capacity	
  	
   No.	
   5	
   17500.00	
  
	
   Dry	
  Cleaning	
  machine	
  25Ib	
  	
   No.	
   5	
   17500.00	
  
	
   Roller	
  Iron	
  40	
  x	
  12	
  inch	
  	
   No.	
   3	
   6000.00	
  
	
   Ironing	
  table	
  	
   No.	
   3	
   6000.00	
  
	
   Steaming	
  vacuum	
  board	
   No.	
   3	
   5000.00	
  
	
   LED	
  lamp	
  	
   No.	
   250	
   4000.00	
  
	
   Tables	
  	
   No.	
   25	
   15000.00	
  
	
   Chair	
  	
   No.	
   100	
   15000.00	
  
	
   Dustbin	
  	
   No.	
   10	
   650.00	
  
	
   Toilet	
  bowl	
  	
   No.	
   5	
   1500.00	
  
	
   Toilet	
  sink	
  	
   No.	
   5	
   1000.00	
  
	
   Sliding	
  door	
  	
   No.	
   4	
   2000.00	
  
	
   Air	
  conditioner	
  	
   No.	
   10	
   30000.00	
  
	
   D	
  –	
  Others	
  	
   	
   	
   	
  
	
   Water	
  tap	
  	
   No.	
   4	
   100.00	
  
	
   Fire	
  extinguisher	
  	
   No.	
   8	
   150.00	
  
	
   Fire	
  alarm	
  	
   No.	
   5	
   500.00	
  
	
   Fire	
  sprinkler	
  	
   No.	
   15	
   100.00	
  
	
   Subtotal	
  :325250.00	
  
	
   Estimate	
  Cost	
  :	
  350000.00	
  	
  	
  

More Related Content

Similar to Proposal

Ici final project
Ici final projectIci final project
Ici final projectTrace96
 
Ici proposal final project
Ici proposal final projectIci proposal final project
Ici proposal final projectjlwc
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteRAVI KUMAR
 
Ici final project
Ici   final projectIci   final project
Ici final projectJoeylau97
 
Ici - final project
Ici - final projectIci - final project
Ici - final projectleejanett3
 
Dina J. architectural and interior work samples-2019
Dina J. architectural and interior work samples-2019Dina J. architectural and interior work samples-2019
Dina J. architectural and interior work samples-2019Dina j. soliman
 
Ici- final project
Ici- final projectIci- final project
Ici- final projectdinnahanny
 
Internship Report
Internship ReportInternship Report
Internship Reportprathagarg
 
ICI FINAL PROJECT ( GROUP )
ICI FINAL PROJECT ( GROUP )ICI FINAL PROJECT ( GROUP )
ICI FINAL PROJECT ( GROUP )kellyxc
 
Sansiri Business Direction 2014
Sansiri Business Direction 2014Sansiri Business Direction 2014
Sansiri Business Direction 2014SansiriPLC
 
Ici 3docx
Ici 3docxIci 3docx
Ici 3docxzerkai
 
Project on working capital
Project on working capitalProject on working capital
Project on working capitalSonu Pramanick
 

Similar to Proposal (20)

Ici final project
Ici final projectIci final project
Ici final project
 
Ici proposal final project
Ici proposal final projectIci proposal final project
Ici proposal final project
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction Site
 
Ici final project
Ici   final projectIci   final project
Ici final project
 
Ici - final project
Ici - final projectIci - final project
Ici - final project
 
Ici baba
Ici babaIci baba
Ici baba
 
Dina J. architectural and interior work samples-2019
Dina J. architectural and interior work samples-2019Dina J. architectural and interior work samples-2019
Dina J. architectural and interior work samples-2019
 
Ici- final project
Ici- final projectIci- final project
Ici- final project
 
chun's
chun'schun's
chun's
 
ARC 2615
ARC 2615ARC 2615
ARC 2615
 
Internship Report
Internship ReportInternship Report
Internship Report
 
ICI_FP
ICI_FPICI_FP
ICI_FP
 
Yihui's pm final
Yihui's pm finalYihui's pm final
Yihui's pm final
 
MGO - Portfolio 2017
MGO - Portfolio 2017MGO - Portfolio 2017
MGO - Portfolio 2017
 
ICI FINAL PROJECT ( GROUP )
ICI FINAL PROJECT ( GROUP )ICI FINAL PROJECT ( GROUP )
ICI FINAL PROJECT ( GROUP )
 
Ici final groupwork
Ici final groupworkIci final groupwork
Ici final groupwork
 
Sansiri Business Direction 2014
Sansiri Business Direction 2014Sansiri Business Direction 2014
Sansiri Business Direction 2014
 
ICI.docx
ICI.docxICI.docx
ICI.docx
 
Ici 3docx
Ici 3docxIci 3docx
Ici 3docx
 
Project on working capital
Project on working capitalProject on working capital
Project on working capital
 

More from Bridget Hsu

BUSINESS CHARITY DRIVE REPORT
BUSINESS CHARITY DRIVE REPORT BUSINESS CHARITY DRIVE REPORT
BUSINESS CHARITY DRIVE REPORT Bridget Hsu
 
BUSINESS PLAN SLIDE
BUSINESS PLAN SLIDE BUSINESS PLAN SLIDE
BUSINESS PLAN SLIDE Bridget Hsu
 
VIDEO PRESENTATION SLIDE
VIDEO PRESENTATION SLIDEVIDEO PRESENTATION SLIDE
VIDEO PRESENTATION SLIDEBridget Hsu
 
PSY Project 2 Slide
PSY Project 2 Slide PSY Project 2 Slide
PSY Project 2 Slide Bridget Hsu
 
PSY ASSIGNMENT 1 .pdf
PSY ASSIGNMENT 1 .pdfPSY ASSIGNMENT 1 .pdf
PSY ASSIGNMENT 1 .pdfBridget Hsu
 
COMPARE-OR-CONTRAST-TWO-MOVIE (1).docx
COMPARE-OR-CONTRAST-TWO-MOVIE (1).docxCOMPARE-OR-CONTRAST-TWO-MOVIE (1).docx
COMPARE-OR-CONTRAST-TWO-MOVIE (1).docxBridget Hsu
 
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdfproject2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdfBridget Hsu
 
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdfproject2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdfBridget Hsu
 
project1experientiallandscape-141209213936-conversion-gate01.pdf
project1experientiallandscape-141209213936-conversion-gate01.pdfproject1experientiallandscape-141209213936-conversion-gate01.pdf
project1experientiallandscape-141209213936-conversion-gate01.pdfBridget Hsu
 
1bici-updated-141129071811-conversion-gate01.pdf
1bici-updated-141129071811-conversion-gate01.pdf1bici-updated-141129071811-conversion-gate01.pdf
1bici-updated-141129071811-conversion-gate01.pdfBridget Hsu
 

More from Bridget Hsu (20)

ACC
ACC ACC
ACC
 
FZF
FZF FZF
FZF
 
BUSINESS CHARITY DRIVE REPORT
BUSINESS CHARITY DRIVE REPORT BUSINESS CHARITY DRIVE REPORT
BUSINESS CHARITY DRIVE REPORT
 
INVESTMENT SCAM
INVESTMENT SCAMINVESTMENT SCAM
INVESTMENT SCAM
 
BUSINESS PLAN SLIDE
BUSINESS PLAN SLIDE BUSINESS PLAN SLIDE
BUSINESS PLAN SLIDE
 
VIDEO PRESENTATION SLIDE
VIDEO PRESENTATION SLIDEVIDEO PRESENTATION SLIDE
VIDEO PRESENTATION SLIDE
 
PSY Project 2 Slide
PSY Project 2 Slide PSY Project 2 Slide
PSY Project 2 Slide
 
PSY ASSIGNMENT 1 .pdf
PSY ASSIGNMENT 1 .pdfPSY ASSIGNMENT 1 .pdf
PSY ASSIGNMENT 1 .pdf
 
PSY
PSY PSY
PSY
 
COMPARE-OR-CONTRAST-TWO-MOVIE (1).docx
COMPARE-OR-CONTRAST-TWO-MOVIE (1).docxCOMPARE-OR-CONTRAST-TWO-MOVIE (1).docx
COMPARE-OR-CONTRAST-TWO-MOVIE (1).docx
 
English2
English2 English2
English2
 
english2_.pdf
english2_.pdfenglish2_.pdf
english2_.pdf
 
english2_.pdf
english2_.pdfenglish2_.pdf
english2_.pdf
 
ICI
ICIICI
ICI
 
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdfproject2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
 
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdfproject2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
 
project1experientiallandscape-141209213936-conversion-gate01.pdf
project1experientiallandscape-141209213936-conversion-gate01.pdfproject1experientiallandscape-141209213936-conversion-gate01.pdf
project1experientiallandscape-141209213936-conversion-gate01.pdf
 
icip2.pdf
icip2.pdficip2.pdf
icip2.pdf
 
1bici-updated-141129071811-conversion-gate01.pdf
1bici-updated-141129071811-conversion-gate01.pdf1bici-updated-141129071811-conversion-gate01.pdf
1bici-updated-141129071811-conversion-gate01.pdf
 
Ici pj1
Ici pj1Ici pj1
Ici pj1
 

Recently uploaded

Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call GirlsJagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur DubaiBur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubaidajasot375
 
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call GirlsPragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Retail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College ParkRetail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College Parkjosebenzaquen
 
Akola Call Girls #9907093804 Contact Number Escorts Service Akola
Akola Call Girls #9907093804 Contact Number Escorts Service AkolaAkola Call Girls #9907093804 Contact Number Escorts Service Akola
Akola Call Girls #9907093804 Contact Number Escorts Service Akolasrsj9000
 
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl service
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl serviceDelhi Room Call Girls : ☎ 8527673949, Low rate Call girl service
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl serviceashishs7044
 
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in DowntownDowntown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtowndajasot375
 
9654467111 Call Girls In Noida Sector 62 Short 1500 Night 6000
9654467111 Call Girls In Noida Sector 62 Short 1500 Night 60009654467111 Call Girls In Noida Sector 62 Short 1500 Night 6000
9654467111 Call Girls In Noida Sector 62 Short 1500 Night 6000Sapana Sha
 
Bridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.comBridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.comthephillipta
 
Burari Call Girls : ☎ 8527673949, Low rate Call Girls
Burari Call Girls : ☎ 8527673949, Low rate Call GirlsBurari Call Girls : ☎ 8527673949, Low rate Call Girls
Burari Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
FULL ENJOY - 9953040155 Call Girls in Laxmi Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Laxmi Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Laxmi Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Laxmi Nagar | DelhiMalviyaNagarCallGirl
 
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...dajasot375
 
Mandi House Call Girls : ☎ 8527673949, Low rate Call Girls
Mandi House Call Girls : ☎ 8527673949, Low rate Call GirlsMandi House Call Girls : ☎ 8527673949, Low rate Call Girls
Mandi House Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Strip Zagor Extra 322 - Dva ortaka.pdf
Strip   Zagor Extra 322 - Dva ortaka.pdfStrip   Zagor Extra 322 - Dva ortaka.pdf
Strip Zagor Extra 322 - Dva ortaka.pdfStripovizijacom
 
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Moti Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | DelhiMalviyaNagarCallGirl
 
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi NcrSapana Sha
 
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...anilsa9823
 
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | DelhiMalviyaNagarCallGirl
 
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...akbard9823
 
FULL ENJOY - 9953040155 Call Girls in Shahdara | Delhi
FULL ENJOY - 9953040155 Call Girls in Shahdara | DelhiFULL ENJOY - 9953040155 Call Girls in Shahdara | Delhi
FULL ENJOY - 9953040155 Call Girls in Shahdara | DelhiMalviyaNagarCallGirl
 

Recently uploaded (20)

Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call GirlsJagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
 
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur DubaiBur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
 
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call GirlsPragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
 
Retail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College ParkRetail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College Park
 
Akola Call Girls #9907093804 Contact Number Escorts Service Akola
Akola Call Girls #9907093804 Contact Number Escorts Service AkolaAkola Call Girls #9907093804 Contact Number Escorts Service Akola
Akola Call Girls #9907093804 Contact Number Escorts Service Akola
 
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl service
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl serviceDelhi Room Call Girls : ☎ 8527673949, Low rate Call girl service
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl service
 
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in DowntownDowntown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
 
9654467111 Call Girls In Noida Sector 62 Short 1500 Night 6000
9654467111 Call Girls In Noida Sector 62 Short 1500 Night 60009654467111 Call Girls In Noida Sector 62 Short 1500 Night 6000
9654467111 Call Girls In Noida Sector 62 Short 1500 Night 6000
 
Bridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.comBridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.com
 
Burari Call Girls : ☎ 8527673949, Low rate Call Girls
Burari Call Girls : ☎ 8527673949, Low rate Call GirlsBurari Call Girls : ☎ 8527673949, Low rate Call Girls
Burari Call Girls : ☎ 8527673949, Low rate Call Girls
 
FULL ENJOY - 9953040155 Call Girls in Laxmi Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Laxmi Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Laxmi Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Laxmi Nagar | Delhi
 
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
 
Mandi House Call Girls : ☎ 8527673949, Low rate Call Girls
Mandi House Call Girls : ☎ 8527673949, Low rate Call GirlsMandi House Call Girls : ☎ 8527673949, Low rate Call Girls
Mandi House Call Girls : ☎ 8527673949, Low rate Call Girls
 
Strip Zagor Extra 322 - Dva ortaka.pdf
Strip   Zagor Extra 322 - Dva ortaka.pdfStrip   Zagor Extra 322 - Dva ortaka.pdf
Strip Zagor Extra 322 - Dva ortaka.pdf
 
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Moti Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | Delhi
 
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr
9654467111 Full Enjoy @24/7 Call Girls In Saket Delhi Ncr
 
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...
 
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
 
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
 
FULL ENJOY - 9953040155 Call Girls in Shahdara | Delhi
FULL ENJOY - 9953040155 Call Girls in Shahdara | DelhiFULL ENJOY - 9953040155 Call Girls in Shahdara | Delhi
FULL ENJOY - 9953040155 Call Girls in Shahdara | Delhi
 

Proposal

  • 1.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS             PROJECT  3  :     THE  PROJECT  PROPOSAL       INTRODUCTION  TO  CONSTRUCTION  INDUSTRY     [QSB30105]     AMANDA  CHIONG  |  0320328     BRIDGET  HSU  |  0320218     FNBE  AUG  2014                  
  • 2.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           Content     1. Project  Background     2. Introduction  To  Site     3. Location  &  Key  Plan  &  Site  Plan     4. Existing  Condition   5. Site  context     6. Analysis  +  Inventory  +  Observation     -­‐ Circulation     -­‐ Microclimate     -­‐ Drainage     7. Individual  proposal  (Amanda  Chiong)   8. Individual  proposal  (Bridget  Hsu)                                
  • 3.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           PROJECT  INTRODUCTION       1.1 PROJECT  BACKGROUND       This  is  the  final  project  of    Introduction  to   Construction  Industry      .  This  project  consist  of  10%  Group   and  30%  Individual    The  objective  of  this  project  is  to  enable   students  to  develop  an  understanding  of  the  building  team,   its  organization,  duties  and    inter-­‐relations  within  which   they  will  seek  employment,  career  progression  or  further   study  and  also  to  develop  an  awareness  of  their  professional   responsibilities  and  to  appreciate  their  profession  in    the   construction  industry.         In  a  group  of  2  students  ,  student  need  to  find  a  specific   empty  land  to  initiate  a  small  construction  project.  The  size   of  the  land  shall  between  900m2  (30m  x  30m)  –  1200m2                                       (  30m  x  40m)  and  come  out  with  a  proposal  .                              
  • 4.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           Introduction  to  the  Site         After   surveying   and   consulting   with   our   tutor,  we  choose  this  site  for  our  project  which   is   located   at   Lorong   Kumpang   6,   Taman   Ridgeway,   93200   Kuching,   Sarawak.   It   is   an   empty  land  which  is  surrounded  by  residential   area   as   shown   in   the   pictures   above.   We   find   that   it   is   wasteful   to   let   it   remain   blank   and   unused   as   it   is   located   in   the   center   of   residential   area   which   have   development   potential   on   various   purposes   to   benefit   the   residents.   Thus,   we   decided   to   start   our   development  project  on  it.  
  • 5.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           LOCATION  &  KEY  PLAN       PROJECT  SITE   2.1  SITE  LOCATION         LOCATION  :     Lorong  Kumpang  6,   Taman  Ridgeway,   93200  Kuching,   Sarawak.  
  • 6.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS             SITE  PLAN                                
  • 7.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           Existing  Condition           è  This  site  is  an  empty   land  which  is  located  at   Taman  Hwata.     è  It  is  surrounded  by   residential  area.       è  There  is  no  any   shoplots  around  it   except  houses.    
  • 8.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS                                                     è  There  is  a  few  types  of   development  project  had   been  carried  out  in  the   same  area.      
  • 9.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           SITE  CONTEXT                                    
  • 10.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS                         SITE    ANALYSIS     INVENTORY   OBSERVATION                  
  • 11.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           CIRCULATION       -­‐   -­‐ )                                               Circulation  1     Circulation  2           The  site  can  be  easily  accessed  .  There  is  no   specific  circulation  of  peoples  ,  because  there  is   nothing’s  can  attract  people  to  go  to  the  site  .  People   can  enter  to  the  site  through  circulation  1  or   circulation  as  you  can  see  on  the  picture  .      
  • 12.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           MICROCLIMATE                 THE  SITE  IS  MODERATELY  HOT   AND  EXTREMELY  SULTRY  ALL   YEAR  ROUND  .  IT  IS  COOLER  IN   THE  EARLY  MORNING  (6-­‐8AM)   AND  LATE  EVENING  (6-­‐8PM),   WITH  TEMPARATURE  ABOUT   28  °C                 -­‐WIND  FLOW  FROM  2  DIRECTION-­‐  
  • 13.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS             DRAINAGE                               There  is  only  one   drainage  can  be   seen  on  our  site  .              
  • 14.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS             SITE  ANALYSIS       SITE  CONTEXT     Image Distance Time Kuching   International     Airport   9.2 km 15 min Kuching  City  Center   5.6 km 12 min SHOPPING  MALL     City  ONE  Megamall   2.4 km 5 min Boulevard   Shopping  Mall     3.6  km   6  min   The  Spring   Shopping  Mall     3.6  km 6  min   HEATH  CENTER      
  • 15.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS                   Timberland  Medical   Centre   1.6 km 4  min Borneo  Medical   Centre   2  km 3  min EDUCATION  AREA       SMK  DPHA  Gapor   1.8 km 4  min Inti  College   Sarawak     1.8 km 4  min Swinburne   University  of   Technology     2.5  km 5  min Sunway  College   Kuching     1.5  km 4  min
  • 16.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS               SERVICE  CENTER     Maybank  Kuching   Selantan   1.9  km 4  min Petronas    station   1.4  km 3  min SUPERMARKET       Morning  Market   2.3  km 5  min RESTAURANT       KFC     1.6  km 4  min MacDonald     2.0  km 5  min
  • 17.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS                                                     Pizza  Hut     1.6  km 4  min RELIGIOUS  AREA       Church     1.3  km 4  min Kuching  Buddhist   Society     0.9  km 2  min Masjid     1  km 2  min
  • 18.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS                     AMANDA  CHIONG   PROPOSAL            
  • 19.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS                   Final  Project  :     A  Sport  Recreational  Centre   Development  Plan  Proposal       Name  :  Amanda  Chiong  Pei  Shan     Student  ID  :  0320328     Tutor  :  Pn.  Hasmanira     Course  :  Foundation  in  Natural  and  Built   Environment  (FNBE)     Module  :  Introduction  to  the  Constructed     Industry  (QSB30105)     Intake  :  August  2014      
  • 20.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           Contents     No.   Topic   Page   1.   Introduction   3   2.   Objective  of  the  Construction   4   3.   Sketch  Plan  of  Proposal   5-­‐12   4.   Concept   13-­‐14   5.   Rationale  and  Benefits   15-­‐16   6.   Costing   17   7.   References  List   18      
  • 21.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS               Introduction                In  this  final  project,  we  are  given  a  task   to   find   a   specific   empty   land   with   a   maximum  size  of  900m²  to  initiate  a  small   construction  project  on  it  in  a  group  of  2   people.              For   this   project,   we   have   to   do   research   on   the   types   of   building   development,   for   instance,   recreation   area,   commercial   area,   industrial   area,   agricultural   area,   tourism   area   and   residential  area.  In  this  plan  proposal,  we   should   include   suggestion,   rationale,   benefits,  site  analysis,  evaluation  and  the   requirement  of  the  project.              For   our   group,   we   come   out   with   an   outcome  to  use  the  empty  land  located  in   Kuching,   Sarawak.   Thus,   I   decided   to   build   a   sport   recreation   centre   on   this   empty  land  for  my  individual  report.        
  • 22.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS             Objective  of  the  Construction   è  To  serve  as  a  sport  recreation  centre   for  the  residents  in  Taman  Hwata     è   To   provide   a   recreation   and   leisure   venue  for  the  residents   è  To  provide  a  standard  and  high  quality   sports  environment  for  the  residents   è  To  promote  good  relation  between   neighborhood     è  To  raise  awareness  about  importance   of  exercise  for  health     è  To  provide  an  area  for  the  teenagers  to   relax  through  a  positive  and  healthy  way   è  To  improve  public  interests  in  sports   especially  among  the  teenagers   è  To  provide  a  comfortable  and   convenient  place  which  is  equipped  with   complete  facilities  for  exercise      
  • 23.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           Sketch  Plan  of  Proposal                This  mini  sport  stadium  is  equipped  with   complete  facilities  to  enable  the  residents  to   enjoy  a  standard  quality  environment  of   exercise.  The  stadium  consists  of  2  storeys,   which  have  an  indoor  basketball  court  on  the   ground  floor  whereas  two  volleyball  courts,  two   badminton  courts,  and  a  yoga  studio  on  the  first   floor  as  well.  Therefore,  different  types  of  games   can  be  carried  out  at  the  same  time.  Other  than   that,  it  also  solve  the  problem  of  space   insufficiency  for  exercise  which  often  occur  in   the  reality  life.              In  the  mini  stadium,  there  are  two  glass   sliding  door  as  the  main  entrance  located  on   each  side  of  the  stadium  for  easy  access.  Beside   that,  two  staircases  is  provided  too  near  the   entrance  which  connected  the  ground  floor  to   the  second  floor.  Since  the  entrance  is  faced  to   the  parking  area,  thus  there  would  be  no   problem  for  the  visitor  to  access  the  stadium   and  explore  throughout  the  entire  building.              For  the  interior  ground  floor  area,  the   stadium  are  accommodated  with  two  sides  of   audience  seats  that  are  distributed  scientifically   to  avoid  any  visual  obstruction  provide  the   audience  a  good  view  during  the  game  is  
  • 24.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           playing.  Other  than  that,  there  is  also  athletes’   rest  room  provided  in  the  stadium  with   different  gender  separated.  Each  of  the  rest   room  supplied  with  shower  room,  stadium   lockers,  benches,  toilets  and  sinks.  There  are   also  public  toilets  provided  for  males  and   females  beside  the  rest  room  for  public.              On  the  first  floor,  there  are  two  benches  on   the  side  of  each  court.  There  is  a  net  windscreen   playing  the  role  as  a  barrier  between  volleyball   courts  and  badminton  courts  for  safety   purposes.  A  yoga  studio  is  located  near  to  the   badminton  court  and  there  is  a  storeroom   beside  it.  There  is  also  restroom  for  athletes  and   public  toilets  provided  on  this  floor.  Other  than   that,  there  is  also  a  coffeehouse  as  a  resting  area   on  the  first  floor.      
  • 25.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           Plan  of  the    building      
  • 26.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           Plan  of  interior  structure         > Volleyball   court   > Basketball  court  
  • 27.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS               > Coffeehouse   > Badminton   court  
  • 28.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS               -­‐  locker   -­‐  shower  room   -­‐  benches     Examples  of  the  facilities     1.  Restrooms   -­‐  toilets      
  • 29.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS             -­‐  pvc  flooring   > low  sound   transmission > Longer  service  life > Robust   > Less  maintenance   > Easy  installation   > Sturdy  construction   > An  wireless  electrical   scoreboard  is  hanging   down  from  the  ceiling   in  the  middle  of  the   court       > Audience  seat  on   the  both  side  of  the   basketball  court   -­‐  basketball  court   >  width  =  15m   >  length  =  28m  
  • 30.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS             6.  Coffeehouse         5.  Yoga  Studio         4.  Volleyball  Court         3.  Badminton  Court      
  • 31.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           Concept                This  construction  plan  proposal  is  designed   based  on  the  30m×30m  empty  land  located  at   Kuching,  Sarawak.  The  aim  of  this  construction   is  to  transform  the  unused  empty  land  into  a   place  that  can  benefit  the  residents.              After  surveying,  I  found  that  there  is  no  any   place  provided  for  the  residents  to  exercise  in   this  area.  Thus,  I  decided  to  start  a  construction   of  a  mini  sport  stadium  on  this  empty  land,   which  accommodate  with  3  kinds  of  courts,  a   yoga  studio  and  a  coffeehouse  to  provide  a   sufficient  space  for  the  residents  to  enjoy   exercising  under  a  complete  equipped   environment.                        Residents  can  enjoy  some  popular  indoor   sport  activities,  for  example,  basketball,   badminton  and  volleyball.  Besides  that,  small   games  competition  or  matches  can  be  held  at   here  as  the  facilities  are  complete  equipped.                After  considered  every  single  problems,  I   had  came  out  with  an  outcome  of  the  design  of   my  site  which  makes  it  become  an  unique  place   that  is  suitable  for  exercise  and  training.  The   stadium  is  a  recreation  area,  which  is  designed   to  be  constructed  using  sustainable  and   environment-­‐friendly  construction  materials.  
  • 32.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS                      This  building  is  generally  eco-­‐friendly  and   the  concept  of  the  entire  building  is  basically   based  on  the  green  building  concept.  The  outer   part  of  the  building  is  a  combination  of  steel  and   glass  that  is  counted  as  elements  of  recycled-­‐ content  building  materials.        
  • 33.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           Rationale  and  Benefits                There  is  a  lot  of  reasons  and  benefits  to  built   this  stadium.  First,  the  location  of  or  site  is   strategic  in  the  city  with  a  big  empty  surface   area.  The  surplus  empty  spaces  after  the   complete  construction  of  the  stadium  can  be   considered  to  build  as  a  car  park  to  make  the   circulation  and  access  for  the  residents  and   public  to  the  stadium  very  convenient  and   comfortable.                This  construction  plan  is  targeting  majorly   on  the  residents  in  Taman  Hwata  as  this  area  is   lack  of  a  sport  recreation  area.  In  fact,  the   stadium  serves  free  and  standard  sport   equipment  and  facilities  for  public  to  encourage   the  residents  to  be  more  active  in  sports  and   also  encourage  the  teenagers  to  relax  through  a   positive  ways.  Besides  that,  the  stadium  also  can   promote  the  relation  between  neighborhoods.                Sports  bring  many  benefits  to  us,  it’s  not  only   improves  our  health  physically  but  also   empower  youth  and  promote  higher  self-­‐esteem   among  the  teenagers.  Other  than  that,  it  also   motivates  students  in  their  studies,  which  lead   them  to  get  better  grades.  Playing  sports  also   can  create  friendships  and  extend  social   networks  because  sports  gather  peoples  
  • 34.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           together  from  different  places,  backgrounds,   and  communities.  Many  times,  the  friendships   that  create  on  the  field  remain  intact  even  when   you  are  not  playing  sports.                Overall,  this  recreational  development  plan   brings  a  lot  of  benefits  and  comfortable  for  the   residents.        
  • 35.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS            Costing     No.   Item   Unit   Qty   Amount(RM)   1.   Cement   m2   310   7,750.00   2.   Brick   m2   335   8,375.00   3.   Roof   m2   910   145,600.00   4.   Lamp   no.   350   5,600.00   5.   Bench   no.   26   7,800.00   6.   Scoreboard   no.   1   2,000.00   7.   Locker   no.   80   9,600.00   8.   Dustbin   no.   20   1,300.00   9.   Toilet  bowl   no.   24   2,400.00   10.   Urinal   no.   8   40.00   11.   Toilet  sink   no.   24   720.00   12.   Shower   no.   24   1,920.00   13.   Toilet  door   no.   28   4,480.00   14.   Sliding  door   no.   2   225.00   15.   Door   no.   3   720.00   16.   Air  Conditioner   no.   42   126,000.00   17.   Fan   no.   25   2,125.00   Total   326,655.00  
  • 36.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           References  List     What  are  the  benefits  of  Sport?  Advantages  of  sport.   (n.d.).  Retrieved  November  10,  2014,  from   http://www.onlinesportscommunity.com/The  benefi ts  of  sport/     Advantages  Of  Sports  And  Teens.  (n.d.).  Retrieved   November  10,  2014,  from   http://www.more4kids.info/359/advantages-­‐of-­‐ sports-­‐and-­‐teens/     (n.d.).  Retrieved  November  10,  2014,  from   http://www.polokwane.gov.za/index.php?view_page   1782     Construction  elements  for  Melbourne  sports  stadium.   (n.d.).  Retrieved  November  10,  2014,  from   https://www.thyssenkrupp.com/en/bildstrecke/41/     Design  elements  -­‐  Basketball  courts.  (n.d.).  Retrieved   November  10,  2014,  from   https://conceptdraw.com/a2201c3/preview     (n.d.).  Retrieved  November  10,  2014,  from   http://www.uefa.org/MultimediaFiles/Download/Eu roExperience/competitions/General/01/74/38/69/1 743869_DOWNLOAD.pdf    
  • 37.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS                   BRIDGET  HSU       PROPOSAL              
  • 38.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           PROJECT  3  :     THE  PROJECT  PROPOSAL       INTRODUCTION  TO  CONSTRUCTION  INDUSTRY     [QSB30105]     BRIDGET  HSU  |  0320218     FNBE  AUG  2014                                            
  • 39.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS             CONTENT       1.PROJECT  INTRODUCTION     2.PROJECT  CONCEPT     3.PROJECT  PLAN     4.JUSTIFICATION     5.  COSTING                                                            Page     3   4-­‐6   7   8   9    
  • 40.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           PROJECT  INTRODUCTION       1.2 PROJECT  BACKGROUND       This  is  the  final  project  of    Introduction  to   Construction  Industry  .  In  this  project  I  was  given  a   task  to  find  a  specific  empty  land  to  initiate  a  small   construction  project.  The  size  of  the  land  shall   between  900m2  (30m  x  30m)  –  1200m2    (  30m  x  40m)   and  come  out  with  a  proposal.     I  have  decided  to  develop  a  commercial  area  on   the  land  that  we  found  .  I  plan    to  build  a  drive  –  thru   laundry  and  a  café  on  that  empty  land  because  the   land  is  surround  with  residential  area  ,  education   area  and  also  service  area  which  means  a  lot  of   people  will  go  through  this  land  to  access  to  another   land.                                  
  • 41.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS             PROJECT  CONCEPT       3.1  PROJECT  CONCEPT       The  construction  plan  is  design  on  30  x  30   in  Lorong  Kumpang  6,  Taman  Ridgeway,  93200   Kuching,  Sarawak  .  It  conceive  two  kind  of   commercial  area  .  It  is  a  sufficient  space  for  the   resident  staying  around  to  enjoy  the  good   facilities  provided  at  the  commercial  building  .     Furthermore  ,  the  part  which  I  really   highlighted  in  my  commercial  building  is  the   Drive-­‐  Thru  Laundry  ,  people  nowadays  have  a   very  tight  schedule  of  life  ,  therefore  drive-­‐  thru   laundry  will  bring  a  lot  of  benefit  to  everyone.      There  is  also  a  lovely  café  inside  the   building  .  The  café  is  where  people  have  a  little   break  time  while  waiting  for  the  cloths  to  be   collect    .                
  • 42.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           OBJECTIVE       -­‐ Offer  clients  services  ranging  from  full-­‐service   washing  and  drying  to  optional  folding,  and   extended  business  hours.     -­‐ To  provide  convenient,  clean,  and  friendly   laundry  service.       -­‐ Unite  the  neighborhood  relationship   between  each  other  .         BENEFIT       -­‐ Busy  people  can  just  drop  their  dirty  clothes  and   collect  it  when  the  cloth  are  ready  to  be  collect   by  just  drive  thru  the  laundry  shop  .     -­‐ Citizen  staying  around  the  building  can  send   their  clothes  by  walking  .     -­‐ Citizen  staying  in  that  area  will  know  more  about   people  staying  around  them  by  seeing  them  at   the  coffee  shop  inside  the  laundry  building  ,  this   might  help  to  get  know  each  other  more  and  be   friend  .   -­‐ Business  man  /  women  can  save  their  money  by   paying  so  much  to  maid  for  only  helping  washing   cloths  and  folding  it  .        
  • 43.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS             3.2  PROJECT  IMAGES                                                    
  • 44.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           PROJECT  PLAN       ELEVATION     FLOOR  PLAN    
  • 45.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS             JUSTIFICATION       Building  a  commercial  area  on  the  empty  land   has  made  it  a  business  opportunity  with  great   potential  .  Drive  –  Thru  Laundry  +  Coffee  shop  .     According  to  my  research  and  also  my  own   experience  living  Malaysia  ,  Malaysia  has  a  very   unpredictable  weather  country  .  Due  to  this  issue   many  people  complain  especially  business  man  ,   student  even  house  wife  complain  about  the  weather   in  Malaysia  .  What  they  complain  ?  People  complaint   on  a  sunny  day  out  of  sudden  it  will  rain  and  all   clothes  are  wet  again  before  it  dry  completely  .  This   make  people  very  angry  .   People  are  rushing  with  time  nowadays  .   Everyone  has  a  very  tight  life  schedule  .  A  drive  thru   (Pick  &  Pay  &  Go)  will  be  more  convenient  for   everyone  .  But  there  is  also  a  sitting  area  and  a  coffee   shop  to  relax  inside  this  commercial  building  .       Resident  staying  in  this  area  can  walk  to  this   Drive-­‐  Thru  laundry  .  1  min  walking  distance  from   housing  area  .  You  might  see  your  neighbor  which   you  haven’t  seen  them  before  .  Higher  chance  of   getting  know  more  people  staying  at  your   neighborhood  .       Therefore  ,  in  my  opinion  opening  a  drive  thru  -­‐   laundry  shop  in  Kuching  ,Malaysia  has  a  very  high   potential  .                
  • 46.        ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014             AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS           ESTIMATE  COSTING           Item     Description     Unit   Qty   Amount  (RM)     A  –  Concrete             Cement     M³   300   7500.00     Brick     M 2   350   8750  .00     B  –  Roofing             Roof     M 2   1200   192000.00     C  –  Element             Washer  –  38Ib  capacity     No.   5   15000.00     Tumbler  Dryer  40Ib  capacity     No.   5   17500.00     Dry  Cleaning  machine  25Ib     No.   5   17500.00     Roller  Iron  40  x  12  inch     No.   3   6000.00     Ironing  table     No.   3   6000.00     Steaming  vacuum  board   No.   3   5000.00     LED  lamp     No.   250   4000.00     Tables     No.   25   15000.00     Chair     No.   100   15000.00     Dustbin     No.   10   650.00     Toilet  bowl     No.   5   1500.00     Toilet  sink     No.   5   1000.00     Sliding  door     No.   4   2000.00     Air  conditioner     No.   10   30000.00     D  –  Others             Water  tap     No.   4   100.00     Fire  extinguisher     No.   8   150.00     Fire  alarm     No.   5   500.00     Fire  sprinkler     No.   15   100.00     Subtotal  :325250.00     Estimate  Cost  :  350000.00